- Présentations
- Documents
- Infographies
A Study in Construction Delays of Residential Structures
IRJESJOURNAL
•
il y a 6 ans
Pearson Correlation, Spearman Correlation &Linear Regression
Azmi Mohd Tamil
•
il y a 11 ans
The spearman rank order correlation coefficient
Regent University
•
il y a 6 ans
RESEARCH METHOD - SAMPLING
Hafizah Hajimia
•
il y a 10 ans
Effect of construction delays on project time overrun
eSAT Journals
•
il y a 7 ans
A BIM-integrated framework to predict schedule delays in Construction
Sahil Navlani
•
il y a 6 ans
causes and implication of delay in construction
sudinak
•
il y a 8 ans
Dissertation_Capital Structure final
Jasmin Taylor
•
il y a 8 ans
Sample size calculation
Pandurangi Raghavendra
•
il y a 11 ans
PDU 202 Qualitative Research Method: Data Collection
Agatha N. Ardhiati
•
il y a 11 ans
Qualitative
CresenthiaBiswasMegh
•
il y a 4 ans
Improvement of the model of minimization of the costs in a time overrun context case of construction projects
IAEME Publication
•
il y a 9 ans
Cost Overrun Causes Related to the Design Phase in the Egyptian Construction Industry
World-Academic Journal
•
il y a 10 ans
FACTORS AFFECTING DELAYS ON PRIVATE CONSTRUCTION PROJECTS
IAEME Publication
•
il y a 8 ans
Factor Affecting Construction Cost and Time in road project
IRJET Journal
•
il y a 6 ans
Project delay and_cost_overrun-libre
UTHM
•
il y a 9 ans
Reasons for the Delay and Cost Overrun in Residential Projects - 2017
Sankalp Swarnkar
•
il y a 6 ans
IRJET- Analysis of Cost Overrun in Construction Projects
IRJET Journal
•
il y a 4 ans
Personality type as predictor of team roles
Malcolm Gabriel
•
il y a 11 ans