SlideShare une entreprise Scribd logo
1  sur  15
LINKE HOFMANN BUSCH COACHES
(LHB)
ADARSH (14113004)
AJAY SINGHAL (14113007)
LHB COACHES
• Developed by Linke-Hofmann-Busch of Germany.
• Manufactured in Kapurthala, India.
• Design speed – 160 kmph, can go up to 200 kmph.
• Introduced in India in 2001.
• Firstly used in New Delhi-Lucknow Shatabdi Express – imported from Germany.
• Technology Transfer agreement.
2October 15, 2016
Why LHB ???
Limitations of ICF coaches :-
• Speed potential
• Heavy corrosion
• Poor riding comfort
Made of stainless steel – less corrosion.
Higher capacity, low maintenance, better aesthetics.
Modular lighting, Anti-telescopic.
3October 15, 2016
USAGE & PRODUCTION
• Presently used in Rajdhani, Shatabdi, Duronto and Gatimaan Express.
• Slow upgradation of non-AC ICF coaches with non-AC LHB coaches in trains like
Purushottam Express, Sampoorn Kranti Express, etc.
• Major production at Kapurthala, Punjab.
• Also produced by Integral Coach Factory.
• Upcoming factories at Raebareli, Pallakad and Kolar.
4October 15, 2016
Different Types Of LHB Coaches
Class Coach Type Description Sleeping Capacity Sitting Capacity
1A LWFAC
Air-conditioned first class
sleeping-car
24 24
2A LWACCW
Air-conditioned 2-tier
sleeping-car
54 54
3A LWACCN
Air-conditioned 3-tier
sleeping-car
72 72
SL LSCN
Second class 3-tier
sleeper
78 78
EC LWFCZAC
Air-conditioned executive
chair car
56
CC LWSCZAC Air-conditioned chair car 78
2S LWSCZ Chair car 78
II LGS/LS Second class 99
PC LWCBAC
Air-conditioned
pantry/kitchen/buffet car
EOG LWLRRM
Luggage/generator/brake
van
5October 15, 2016
TECHNICAL DETAILS
• Bogies
- Eurofima standards : Axle distance-2560 mm, Dia of
wheels-915 mm.
- Primary and secondary suspension, vertical and
transverse shock absorbers, brake cylinders, etc.
• Couplers
- connection between two adjacent coaches-Coupler
System.
6October 15, 2016
• Air-conditioning system
- Roof mounted AC package unit.
- Good humidity control.
- Temperature sensors.
• Doors and interiors
• Water supply system and Toilets
- Two freshwater tanks-capacity 1370 litres.
- Control Discharge Toilet System (CDTS).
- 40 litre waste water tank for the toilet system.
7October 15, 2016
• Pantry
- Store cold and hot meals.
- Components : bottle cooler, hot case, water
boiler, deep freezer, etc.
• Other equipments
- Waste bins.
- Fire extinguisher.
- 415 V supply located outside the compartment
doors.
8October 15, 2016
MAINTENANCE
• Schedule D1 : Trip / Weekly
• Schedule D2 : Three monthly ± 3days
• Schedule D3 : Half Yearly ± 15 days
• Shop Schedule (SS-1), IOH : 18 Months / 6 Lakh kms whichever is earlier
• Shop Schedule (SS-2), POH : 36 Months / 12 Lakh kms whichever is earlier
9October 15, 2016
COMPARISON BETWEEN ICF & LHB COACHES
S.no. Attributes ICF LHB
1. Average speed Less More than ICF
2. Safety Safe More safe
3. Brake System Thread break system Disk brakes
4. Relative motion More Less
5. Seating Capacity Less (3rd AC-64) More (3rd AC-72)
6. Sound level More (100 Db) Less (60 Db)
7. Maintenance More Less
10October 15, 2016
October 15, 2016 11
TALGO COACHES
• Manufactured in Spain
• First trial in India between Bareilly and Moradabad.
• 9-coach Talgo train has :
• 2 executive class cars
• 4 chair cars
• 1 cafeteria
• 1 power car and tail end coach.
• Can run upto a speed of 180 kmph in India.
12October 15, 2016
BENEFITS OF TALGO COACHES
• Light Weight Construction, High Speed
• Can reduce Railways’ energy bills by 30% .
• Saves about Rs. 1 crore compared to LHB Rajdhani and Shatabdi coaches.
• Less swaying while taking turns.
• Coaches have reading lights, tables, audio & video entertainment.
13October 15, 2016
October 15, 2016 14
October 15, 2016 15

Contenu connexe

Tendances

Carriage and wagon
Carriage and wagonCarriage and wagon
Carriage and wagonAjeet Kumar
 
Lhb coach documentation
Lhb coach  documentationLhb coach  documentation
Lhb coach documentationTURENDARSAHU
 
Industrial training report
Industrial training reportIndustrial training report
Industrial training reportALOK RAJ
 
A project on buffer
A project on bufferA project on buffer
A project on bufferRitesh Rohan
 
Pamphlet on rake testing procedure for freight stock
Pamphlet on rake testing procedure for freight stockPamphlet on rake testing procedure for freight stock
Pamphlet on rake testing procedure for freight stockSrinivasaRao Guduru
 
Indian Railways Training on Coach Care Centre
Indian Railways Training on Coach Care CentreIndian Railways Training on Coach Care Centre
Indian Railways Training on Coach Care CentreRao Khola
 
Coach care centre new delhi
Coach care centre new delhiCoach care centre new delhi
Coach care centre new delhiHome
 
INTRODUCTION OF CARRIAGE & WAGON, VARIOUS TYPES OF WAGON
INTRODUCTION OF CARRIAGE  & WAGON, VARIOUS  TYPES OF WAGON INTRODUCTION OF CARRIAGE  & WAGON, VARIOUS  TYPES OF WAGON
INTRODUCTION OF CARRIAGE & WAGON, VARIOUS TYPES OF WAGON TCCW1
 
Presentation on Coach Care Complex
Presentation on Coach Care ComplexPresentation on Coach Care Complex
Presentation on Coach Care ComplexRitikBaghmar
 
Summer training report coach care new Delhi rkgit
Summer training report coach care new Delhi rkgitSummer training report coach care new Delhi rkgit
Summer training report coach care new Delhi rkgitItnesh Kumar
 
STUDY OF ICF BOGIE
STUDY OF ICF BOGIESTUDY OF ICF BOGIE
STUDY OF ICF BOGIEpavan kotra
 
Air brake system in boxnhl wagon ,indian railways
Air brake system in boxnhl wagon ,indian railwaysAir brake system in boxnhl wagon ,indian railways
Air brake system in boxnhl wagon ,indian railwaysApeksha Shrivastav
 
central railway internship report
central railway internship reportcentral railway internship report
central railway internship reportrahul waghmare
 
Jagadhri workshop ppt
Jagadhri workshop pptJagadhri workshop ppt
Jagadhri workshop pptJasdeep Singh
 
Indian railway ajmer
Indian railway ajmerIndian railway ajmer
Indian railway ajmerANKIT SHARMA
 

Tendances (20)

railway_plant_layout
railway_plant_layoutrailway_plant_layout
railway_plant_layout
 
Carriage and wagon
Carriage and wagonCarriage and wagon
Carriage and wagon
 
Lhb coach documentation
Lhb coach  documentationLhb coach  documentation
Lhb coach documentation
 
Industrial training report
Industrial training reportIndustrial training report
Industrial training report
 
A project on buffer
A project on bufferA project on buffer
A project on buffer
 
Pamphlet on rake testing procedure for freight stock
Pamphlet on rake testing procedure for freight stockPamphlet on rake testing procedure for freight stock
Pamphlet on rake testing procedure for freight stock
 
Indian Railways Training on Coach Care Centre
Indian Railways Training on Coach Care CentreIndian Railways Training on Coach Care Centre
Indian Railways Training on Coach Care Centre
 
Coach care centre new delhi
Coach care centre new delhiCoach care centre new delhi
Coach care centre new delhi
 
INTRODUCTION OF CARRIAGE & WAGON, VARIOUS TYPES OF WAGON
INTRODUCTION OF CARRIAGE  & WAGON, VARIOUS  TYPES OF WAGON INTRODUCTION OF CARRIAGE  & WAGON, VARIOUS  TYPES OF WAGON
INTRODUCTION OF CARRIAGE & WAGON, VARIOUS TYPES OF WAGON
 
Presentation on Coach Care Complex
Presentation on Coach Care ComplexPresentation on Coach Care Complex
Presentation on Coach Care Complex
 
Summer training report coach care new Delhi rkgit
Summer training report coach care new Delhi rkgitSummer training report coach care new Delhi rkgit
Summer training report coach care new Delhi rkgit
 
STUDY OF ICF BOGIE
STUDY OF ICF BOGIESTUDY OF ICF BOGIE
STUDY OF ICF BOGIE
 
Training report
Training reportTraining report
Training report
 
Air brake system in boxnhl wagon ,indian railways
Air brake system in boxnhl wagon ,indian railwaysAir brake system in boxnhl wagon ,indian railways
Air brake system in boxnhl wagon ,indian railways
 
central railway internship report
central railway internship reportcentral railway internship report
central railway internship report
 
Jagadhri workshop ppt
Jagadhri workshop pptJagadhri workshop ppt
Jagadhri workshop ppt
 
Lhb ac buffet car
Lhb ac buffet carLhb ac buffet car
Lhb ac buffet car
 
Indian railway ajmer
Indian railway ajmerIndian railway ajmer
Indian railway ajmer
 
Casnub Bogies
Casnub BogiesCasnub Bogies
Casnub Bogies
 
liluahworkshop
liluahworkshopliluahworkshop
liluahworkshop
 

En vedette

Local material for civil infrastructure projects
Local material for civil infrastructure projectsLocal material for civil infrastructure projects
Local material for civil infrastructure projectsADARSH _
 
Economic planning - India
Economic planning - IndiaEconomic planning - India
Economic planning - IndiaADARSH _
 
The Akashi Kaikyo bridge - longest suspension bridge in the world
The Akashi Kaikyo bridge - longest suspension bridge in the worldThe Akashi Kaikyo bridge - longest suspension bridge in the world
The Akashi Kaikyo bridge - longest suspension bridge in the worldADARSH _
 
Introduction handbook on LHB coaches
Introduction handbook on LHB coachesIntroduction handbook on LHB coaches
Introduction handbook on LHB coachesSrinivasaRao Guduru
 
Train Branding - Advertising with Indian Railways
Train Branding - Advertising with Indian Railways Train Branding - Advertising with Indian Railways
Train Branding - Advertising with Indian Railways Organized Outdoor
 
Inplant Training - Integral Coach Factory
Inplant Training - Integral Coach FactoryInplant Training - Integral Coach Factory
Inplant Training - Integral Coach FactorySudarshan Mohan
 
Rail rapid transit system (india)
Rail rapid transit system (india)Rail rapid transit system (india)
Rail rapid transit system (india)Sourabh Jain
 
ICF Bogie Details by Yadvendu
ICF Bogie Details by YadvenduICF Bogie Details by Yadvendu
ICF Bogie Details by YadvenduJogendra Yadvendu
 
Augmented Reality (AR) - The Future of Mobile Applications?
Augmented Reality (AR) - The Future of Mobile Applications? Augmented Reality (AR) - The Future of Mobile Applications?
Augmented Reality (AR) - The Future of Mobile Applications? Carin Campanario
 
Indian Railway locomotive ppt
Indian Railway locomotive pptIndian Railway locomotive ppt
Indian Railway locomotive pptShrey Sandiman
 
AR - Augmented Reality
AR - Augmented RealityAR - Augmented Reality
AR - Augmented Realitydrstupid
 
Unit 1. introduction to Railway Engineering
Unit 1. introduction to Railway EngineeringUnit 1. introduction to Railway Engineering
Unit 1. introduction to Railway Engineeringnkocet
 
railway presentation Ppt
railway presentation Pptrailway presentation Ppt
railway presentation PptSachin Singh
 

En vedette (20)

ICF Bogie
ICF BogieICF Bogie
ICF Bogie
 
Indian Railways ppt.
Indian Railways ppt.Indian Railways ppt.
Indian Railways ppt.
 
Local material for civil infrastructure projects
Local material for civil infrastructure projectsLocal material for civil infrastructure projects
Local material for civil infrastructure projects
 
Economic planning - India
Economic planning - IndiaEconomic planning - India
Economic planning - India
 
The Akashi Kaikyo bridge - longest suspension bridge in the world
The Akashi Kaikyo bridge - longest suspension bridge in the worldThe Akashi Kaikyo bridge - longest suspension bridge in the world
The Akashi Kaikyo bridge - longest suspension bridge in the world
 
Introduction handbook on LHB coaches
Introduction handbook on LHB coachesIntroduction handbook on LHB coaches
Introduction handbook on LHB coaches
 
Train Branding - Advertising with Indian Railways
Train Branding - Advertising with Indian Railways Train Branding - Advertising with Indian Railways
Train Branding - Advertising with Indian Railways
 
Bogie assembly alco
Bogie assembly alcoBogie assembly alco
Bogie assembly alco
 
Inplant Training - Integral Coach Factory
Inplant Training - Integral Coach FactoryInplant Training - Integral Coach Factory
Inplant Training - Integral Coach Factory
 
Rail rapid transit system (india)
Rail rapid transit system (india)Rail rapid transit system (india)
Rail rapid transit system (india)
 
ICF Bogie Details by Yadvendu
ICF Bogie Details by YadvenduICF Bogie Details by Yadvendu
ICF Bogie Details by Yadvendu
 
Augmented Reality (AR) - The Future of Mobile Applications?
Augmented Reality (AR) - The Future of Mobile Applications? Augmented Reality (AR) - The Future of Mobile Applications?
Augmented Reality (AR) - The Future of Mobile Applications?
 
integral coach factory report
integral coach factory report integral coach factory report
integral coach factory report
 
Maintenace manual for wagons
Maintenace manual for wagonsMaintenace manual for wagons
Maintenace manual for wagons
 
Indian Railway locomotive ppt
Indian Railway locomotive pptIndian Railway locomotive ppt
Indian Railway locomotive ppt
 
Railway training
Railway trainingRailway training
Railway training
 
Railway loco ppt
Railway loco ppt Railway loco ppt
Railway loco ppt
 
AR - Augmented Reality
AR - Augmented RealityAR - Augmented Reality
AR - Augmented Reality
 
Unit 1. introduction to Railway Engineering
Unit 1. introduction to Railway EngineeringUnit 1. introduction to Railway Engineering
Unit 1. introduction to Railway Engineering
 
railway presentation Ppt
railway presentation Pptrailway presentation Ppt
railway presentation Ppt
 

Similaire à LHB Coaches Technical Details

Linke hofman busch coaches
Linke hofman busch coachesLinke hofman busch coaches
Linke hofman busch coachesRaviVerma414
 
railway workshop Training
railway workshop Trainingrailway workshop Training
railway workshop TrainingAman Singhal
 
Continuous Delivery using AWS CodePipeline, AWS Lambda & AWS ElasticBeanstalk
Continuous Delivery using AWS CodePipeline, AWS Lambda & AWS ElasticBeanstalkContinuous Delivery using AWS CodePipeline, AWS Lambda & AWS ElasticBeanstalk
Continuous Delivery using AWS CodePipeline, AWS Lambda & AWS ElasticBeanstalkThomas Shaw
 
[20160314][CUHK][CSCI4140]Life of an Agile Team]
[20160314][CUHK][CSCI4140]Life of an Agile Team][20160314][CUHK][CSCI4140]Life of an Agile Team]
[20160314][CUHK][CSCI4140]Life of an Agile Team]Wong Hoi Sing Edison
 
Best Practices For A Successful SOLIDWORKS 2016 Upgrade
Best Practices For A Successful SOLIDWORKS 2016 UpgradeBest Practices For A Successful SOLIDWORKS 2016 Upgrade
Best Practices For A Successful SOLIDWORKS 2016 UpgradeCAPINC
 
Project Report (Modern Coach Factory, Raebareli)
Project Report (Modern Coach Factory, Raebareli)Project Report (Modern Coach Factory, Raebareli)
Project Report (Modern Coach Factory, Raebareli)Shikhar Gupta
 

Similaire à LHB Coaches Technical Details (6)

Linke hofman busch coaches
Linke hofman busch coachesLinke hofman busch coaches
Linke hofman busch coaches
 
railway workshop Training
railway workshop Trainingrailway workshop Training
railway workshop Training
 
Continuous Delivery using AWS CodePipeline, AWS Lambda & AWS ElasticBeanstalk
Continuous Delivery using AWS CodePipeline, AWS Lambda & AWS ElasticBeanstalkContinuous Delivery using AWS CodePipeline, AWS Lambda & AWS ElasticBeanstalk
Continuous Delivery using AWS CodePipeline, AWS Lambda & AWS ElasticBeanstalk
 
[20160314][CUHK][CSCI4140]Life of an Agile Team]
[20160314][CUHK][CSCI4140]Life of an Agile Team][20160314][CUHK][CSCI4140]Life of an Agile Team]
[20160314][CUHK][CSCI4140]Life of an Agile Team]
 
Best Practices For A Successful SOLIDWORKS 2016 Upgrade
Best Practices For A Successful SOLIDWORKS 2016 UpgradeBest Practices For A Successful SOLIDWORKS 2016 Upgrade
Best Practices For A Successful SOLIDWORKS 2016 Upgrade
 
Project Report (Modern Coach Factory, Raebareli)
Project Report (Modern Coach Factory, Raebareli)Project Report (Modern Coach Factory, Raebareli)
Project Report (Modern Coach Factory, Raebareli)
 

Dernier

Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncssuser2ae721
 
National Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfNational Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfRajuKanojiya4
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm Systemirfanmechengr
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating SystemRashmi Bhat
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionMebane Rash
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating SystemRashmi Bhat
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfROCENODodongVILLACER
 
Industrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptIndustrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptNarmatha D
 
Vishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsVishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsSachinPawar510423
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - GuideGOPINATHS437943
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgsaravananr517913
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating SystemRashmi Bhat
 

Dernier (20)

Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
 
National Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfNational Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdf
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm System
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating System
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of Action
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating System
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdf
 
Industrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptIndustrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.ppt
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
Vishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsVishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documents
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - Guide
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating System
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 

LHB Coaches Technical Details

  • 1. LINKE HOFMANN BUSCH COACHES (LHB) ADARSH (14113004) AJAY SINGHAL (14113007)
  • 2. LHB COACHES • Developed by Linke-Hofmann-Busch of Germany. • Manufactured in Kapurthala, India. • Design speed – 160 kmph, can go up to 200 kmph. • Introduced in India in 2001. • Firstly used in New Delhi-Lucknow Shatabdi Express – imported from Germany. • Technology Transfer agreement. 2October 15, 2016
  • 3. Why LHB ??? Limitations of ICF coaches :- • Speed potential • Heavy corrosion • Poor riding comfort Made of stainless steel – less corrosion. Higher capacity, low maintenance, better aesthetics. Modular lighting, Anti-telescopic. 3October 15, 2016
  • 4. USAGE & PRODUCTION • Presently used in Rajdhani, Shatabdi, Duronto and Gatimaan Express. • Slow upgradation of non-AC ICF coaches with non-AC LHB coaches in trains like Purushottam Express, Sampoorn Kranti Express, etc. • Major production at Kapurthala, Punjab. • Also produced by Integral Coach Factory. • Upcoming factories at Raebareli, Pallakad and Kolar. 4October 15, 2016
  • 5. Different Types Of LHB Coaches Class Coach Type Description Sleeping Capacity Sitting Capacity 1A LWFAC Air-conditioned first class sleeping-car 24 24 2A LWACCW Air-conditioned 2-tier sleeping-car 54 54 3A LWACCN Air-conditioned 3-tier sleeping-car 72 72 SL LSCN Second class 3-tier sleeper 78 78 EC LWFCZAC Air-conditioned executive chair car 56 CC LWSCZAC Air-conditioned chair car 78 2S LWSCZ Chair car 78 II LGS/LS Second class 99 PC LWCBAC Air-conditioned pantry/kitchen/buffet car EOG LWLRRM Luggage/generator/brake van 5October 15, 2016
  • 6. TECHNICAL DETAILS • Bogies - Eurofima standards : Axle distance-2560 mm, Dia of wheels-915 mm. - Primary and secondary suspension, vertical and transverse shock absorbers, brake cylinders, etc. • Couplers - connection between two adjacent coaches-Coupler System. 6October 15, 2016
  • 7. • Air-conditioning system - Roof mounted AC package unit. - Good humidity control. - Temperature sensors. • Doors and interiors • Water supply system and Toilets - Two freshwater tanks-capacity 1370 litres. - Control Discharge Toilet System (CDTS). - 40 litre waste water tank for the toilet system. 7October 15, 2016
  • 8. • Pantry - Store cold and hot meals. - Components : bottle cooler, hot case, water boiler, deep freezer, etc. • Other equipments - Waste bins. - Fire extinguisher. - 415 V supply located outside the compartment doors. 8October 15, 2016
  • 9. MAINTENANCE • Schedule D1 : Trip / Weekly • Schedule D2 : Three monthly ± 3days • Schedule D3 : Half Yearly ± 15 days • Shop Schedule (SS-1), IOH : 18 Months / 6 Lakh kms whichever is earlier • Shop Schedule (SS-2), POH : 36 Months / 12 Lakh kms whichever is earlier 9October 15, 2016
  • 10. COMPARISON BETWEEN ICF & LHB COACHES S.no. Attributes ICF LHB 1. Average speed Less More than ICF 2. Safety Safe More safe 3. Brake System Thread break system Disk brakes 4. Relative motion More Less 5. Seating Capacity Less (3rd AC-64) More (3rd AC-72) 6. Sound level More (100 Db) Less (60 Db) 7. Maintenance More Less 10October 15, 2016
  • 12. TALGO COACHES • Manufactured in Spain • First trial in India between Bareilly and Moradabad. • 9-coach Talgo train has : • 2 executive class cars • 4 chair cars • 1 cafeteria • 1 power car and tail end coach. • Can run upto a speed of 180 kmph in India. 12October 15, 2016
  • 13. BENEFITS OF TALGO COACHES • Light Weight Construction, High Speed • Can reduce Railways’ energy bills by 30% . • Saves about Rs. 1 crore compared to LHB Rajdhani and Shatabdi coaches. • Less swaying while taking turns. • Coaches have reading lights, tables, audio & video entertainment. 13October 15, 2016