SAP ECC to S/4HANA Move
Options, Transition scenarios, Preparation, Tools
Abhishek Goel
S/4HANA Movement Specialist
April, 2019
V20190407
2CUSTOMER© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
Agenda
 S/4HANA (OP / Cloud) Options, Positioning & Deployment options
 S/4HANA Transition Scenarios
 Green Field or conversion ?
 Introduction to NZDT for S/4HANA conversion
 High level planning & preparation steps for S/HANA conversion
 S/4HANA Migration Impact to other systems
 S/4HANA Sizing
 S/4HANA Conversion - Custom Coding Impact
 Side by side S/4HANA Custom Code Extension using SCP
 Migration Approach / Sequence
 Optional consumption of Innovation during S/4HANA conversion
 S/4HANA conversion (pre, conversion & post) steps
 Questions ?
3CUSTOMER© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
SAP S/4HANA is SAP’s next generation Digital Core
 Optimized for SAP HANA
 New architecture and data models
 “Principle of One”
 Renewed applications
 Fiori based User Experience
 Cloud & on-premise deployment models
SAP S/4HANA – Digital Core
SAP S/4HANA is a new product line.
The classical SAP Business Suite & SAP ERP is a separate product line and
will still be available.
System conversion including custom code from existing
SAP Business Suite or SAP ERP is possible.
4CUSTOMER© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
SAP S/4HANA
Release strategy for 2018 / 2019 and definition of deliveries
FPS01*
Feature Package Stack
(technically SPS 01)
RTC planned for
Jan 30, 2019
FPS02*
Feature Package Stack
(technically SPS 02)
SPS03*
Support Package Stack
(technically SPS 03)
SAP S/4HANA 1809 SPS00
New release incl. new
technology stack
(NetWeaver AS ABAP 7.53 SP00
including UI1.56
SAP HANA 2.0 SP03 as minimal Version)
2018 2019
Q4 Q1 Q2 Q4Q3
SAP S/4HANA 19xx
SPS00*
New release incl. new
Technology Stack
Maintenance Line
2020
Q3 Q1 Q2 Q3 Q4
Important Links
2655761 - Restrictions and
recommendations regarding specific
revisions of the SAP HANA database for
use in SAP S/4HANA
2659710 - SAP S/4HANA 1809:
Restriction Notes
* This is the current state of planning and may be changed by SAP at any time without notice.
Support Package Stack for SAP S/4HANA 1809*
After general availability of SAP S/4HANA 1809, Feature Package Stacks (FPS) and Support Package Stacks (SPS) contains
stabilizations bundled with corrections and legal changes. Customers benefit from this functionality as part of their maintenance
fee. First SPS of a new release can contain selected features and are labelled Feature Package Stack (FPS) accordingly.
Support Package Stacks are compiled periodically and made available on the SAP Software Download Center
Product information will be available on the User Assistance Content Platform
S/4HANA (OP / Cloud) Options &
Positioning
6CUSTOMER© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
SAP S/4HANA Cloud,
single tenant edition
SAP S/4HANA
(On-premise managed by cloud
providers or customers)
SAP S/4HANA
(Private cloud managed by SAP)
Cloud ERP* ERP in the Cloud ERP OP
SAP S/4HANA Cloud
One SAP S/4HANA: the right solution for each customer cloud journey
Implementation Greenfield with data migration
Greenfield with data and
configuration migration
Greenfield or conversion of existing
implementations
Greenfield or conversion of existing
implementations
Functional Scope
Business configuration of standardized core ERP
and select LOB processes
Full functional S/4HANA scope of core ERP
and extended LOB and industry processes
Full functional S/4HANA scope of core ERP
and extended LOB and industry processes
Full functional S/4HANA scope of core ERP
and extended LOB and industry processes
Industries
Supported
In-depth support for professional services and
component manufacturing;
more industries on road map
All industries supported All industries supported All industries supported
Extensibility
S/4HANA Extensibility Framework and
extensions via SCP, using whitelisted APIs
S/4HANA Extensibility Framework and
extensions via SCP, with full extensibility
option
Customization, modification, and
extensibility possible
Customization, modification, and
extensibility possible
Innovation Cycle Quarterly
2 upgrades a year, one mandatory within 12
month window of release
Annual;
speed of adoption on customers’ schedule
Annual;
speed of adoption on customers’ schedule
Deployment
Benefits
Multi-tenant environment,
Lowest TCO and fastest time to value
Single-tenant environment
Low TCO and fast time to value
Customer controlled deployment and
implementation efforts
Customer controlled deployment and
implementation efforts
Licensing Subscription licensing Subscription licensing BYOL + infrastructure subscription Perpetual licensing
Infrastructure Shared public cloud
Dedicated system landscape on cloud
infrastructure
Customer specific system landscape
Runs on SAP HANA Enterprise Cloud
Runs on customer preferred infrastructure
*according to Gartner Cloud (SaaS) Definition
7CUSTOMER© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
Finding the Right Fit for Your Customer or Prospect (Internal)
Begin with public cloud (SaaS) as the best option for a
digital future
 LowestTCO
 Fastest time-to-value
 Shortest innovation cycle
Continue with private edition as a full cloud offering
with more flexibility
 LowTCO
 More flexibility
 Customer-influenced innovation cycle
Progress to next option in order to meet customer needs
(consider capability and policy requirements)
Starting point
CloudERP
SAP S/4HANA Cloud
SAP S/4HANA Cloud,
private edition
SAP S/4HANA
(Private cloud managed by SAP)
SAP S/4HANA
(On-premise managed by cloud providers
or customers)
TODAY
Highly Customized
FUTURE
Cloud ERP
Private Managed Cloud
SaaS
Completely SAP Managed Transformation with SAP’s Private Managed Cloud
On Premise
SAP Data Center
Lift & Shift
Bring your SAP solutions on
SAP HANA platform in HANA
Enterprise Cloud
S/4 HANA Migration
Migrate your individual ERP-
solution to newest
S/4 HANA release
Innovation Extension
Extend the latest innovations
of S/4 HANA and extend with
SCP
Values
 Private & Secure
 Adaptive & Scalable
 Best-Practice Services
 Reference Architecture
 License Subscription
Facts
 840+ DCC Customers
 3500+ SAP HANA Databases
 66TB+ Largest Instance
 99.99% Average Availability
 1100+ S/4HANA Systems on DCC
A customer path to S/4HANA Cloud
INTERNAL© 2019 SAP SE or an SAP affiliate company. All rights reserved. ǀ
Overview Transition Scenarios
10CUSTOMER© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
Transition to SAP S/4HANA
Different approaches to move to SAP S/4HANA
Type Approach Available for Purpose
System
Conversion
(Tool: Software Update Manager)
New
Implementation
(Tool: SAP S/4HANA migration
cockpit)
Hybrid Data
Transition
(Customer-tailored
service/consulting offering)
Reusing
byin-place
conversion
Bringing your business processes to the new
platform
 A complete technical in-place conversion of an existing ERP
software system in SAP Business Suite to SAP S/4HANA
 Adoption of new innovations at your speed
New implementation/reimplementation
 Reengineering and process simplification based on latest innovations
 Implementing innovative business processes with preconfigured
content on a new platform
 Performing initial data load
 Retiring old landscape
Value-driven data migration to the new platform
 You need more than master data and open items, such as
transactional data, complete or selected by a time slice
 Migrate a selection of data (such as by organizational units), or
migrate data from more than one system, or migrate application-
related data into an SAP S/4HANA–based solution landscape
Standardized
Customer
tailored
Reengineering
withdatamigration
SAP S/4HANASAP ERP
system
SAP S/4HANASAP ERP or
third-party
system(s)
SAP S/4HANA
SAP S/4HANA
Cloud
SAP ERP or
third-party
system(s)
SAP Community blog: How to find my path to SAP S/4HANA
11CUSTOMER© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
SAP S/4HANA
New Implementation
Scenario description
New implementation of SAP S/4HANA e.g. for
customers migrating a legacy system.
Legacy
Any customers
legacy system
Initial data load from
Legacy or SAP System
with SAP S/4HANA
Migration Cockpit
What How
Install SAP S/4HANA
SWPM (Software
Provisioning Manager)
Initial data load from
source system
• SAP S/4HANA Migration
Cockpit (Legacy system
via file upload)
• Optional: SAP Data
Services with SAP Best
Practice Migration content
1
2
(SAP GUI) / SAP Fiori
SAP HANA
SAP S/4HANA Core
12CUSTOMER© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
SAP S/4HANA
System Conversion – Transition Paths Overview
Prerequisites on source system
• Unicode is required
• ABAP single stack required
• SAP HANA database not required
• SAP Suite on HANA customers who are planning a system
conversion to SAP S/4HANA 1709 or 1809 must first update
the database from SAP HANA 1.0 to SAP HANA 2.0 and
then do the system conversion
SAP HANA
SAP S/4HANA 1809
SAP S/4HANA System Conversion – At a glance
Conversion requirements incl. min./max. SP-level on source system:
2625407 - SAPS/4HANA 1809: Release Information Note
2482453 - SAP S/4HANA 1709: Release Information Note
AnyDB or SAP HANA
SAP ERP 6.0, EHP xx
Prerequisites on target system
• SAP S/4HANA 1809 is based on SAP ABAP Platform 1809​
• SAP ABAP Platform 1809 has different OS coverage
13CUSTOMER© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
Comparing the Paths to SAP S/4HANA
Questions influencing the choice of the transition scenario
System Requirements
New
Implementation System Conversion
A company has restrictions that do
not allow to move to SAP
S/4HANA on-premise in a one-
step procedure.
New
Implementation System Conversion
New
Implementation System Conversion
A company has business processes
that already fit to the current
requirements.
New
Implementation System Conversion
New
Implementation System Conversion
Custom Code
Time to Value
A company has checked and is
able to take over existing custom
code.
A company wants to go live rather fast.
Business Processes
A company seeks to fundamentally
redesign its business processes.
System Conversion Path
15CUSTOMER© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
Near Zero Downtime Overview (only Available via involving SAPC via DBS)
SAP S/4HANA Conversion as sample
ERP
6.0x
via DMO of SUM
Data model
conversion
S/4
HANA
ERP
6.0x
ERP
6.0x
S/4
HANA
Create clone
Software update, database
migration, …
Repeated replay and
data conversion of delta
Final delta replay
S/4
HANA
Production
operation
Uptime UptimeDowntime
1. Start recording on PRD
2. Create the NZDT clone
3. Start converting the clone to S/4HANA – SUM/DMO
4. Convert the original data to SAP S/4HANA data model
5. Start on-line replay and conversion of the recorded data
(repeated replay and conversion to S/4 data model possible)
6. Begin downtime and finalize replay of the recorded data
7. Convert the remaining data to SAP S/4HANA data model
8. Validate the system and go live with SAP S/4HANA
1
2
3 4 5 6 7 8
Recording
Final data
conversion
16CUSTOMER© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
High Level Planning & preparation Steps for S4HANA conversion
 Project Planning, resources, existing ECC UAT scripts
 Any Data Archiving, Housekeeping etc to reduce database size
 Check for and remove obsolete custom code (i.e CCLM), unnecessary modifications and clones of SAP standard
objects, in order to keep your code base clean.
 Check your custom code and start HANA database related adjustments as part of preparation for S/4HANA
 Execute S/HANA Sizing, HANA Hardware and infrastructure provisioning by customer, Split any dual stack systems
 Execute the S/4HANA Readiness check using the Maintenance planner, pre-transition checks etc to check
 your SAP ERP system (including SAP and partner add-ons) can technically be converted to S/4HANA.
 Check Technical scope and restrictions, Check the pre-requisite SAP Notes
 Check Installed ERP & partner add-ons, Industry solutions are compatible with HANA or S/4HANA
 Check custom code for needed adaptations to the new SAP data model etc.
 Explore the simplification items - the functionalities relevant for you that have changed
 Review the S/4HANA simplification List, cook Book, conversion guides etc
 Any OS /DB scripts which needs to be adjusted in the target OS / DB systems.
 In S/4HANA Business Partner replaces the ERP Customer/supplier concept. Get accustomed to Business Partner
Know-How
 Check for consistent customer/supplier data and valid and consistent customer/supplier and Business Partner
customizing entries in ERP system
 Clean up your customer and vendor data in preparation for the Business Partner and Customer/Vendor Integration
(CVI) (SAP Notes: 2211312, 2210486, 2216176)
 Execute Pre-conversion check to ensure that all the necessary CVI mappings are done for both customer and vendor.
 Note 2216176 delivers the pre-conversion checks for Business Partner which have to be executed before the conversion
to S/4
17CUSTOMER© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
SAP S/4HANA conversion impact to other NW systems
 SAP Note 1388258 – Central Hub systems like Portal, PI & BW need to be upgraded mandatorily to
Netweaver 7.31 (min)
 Either a new Fiori setup would need to be Greenfield implemented or existing Fiori will need to be upgraded in
synch with the Target S/4HANA version
 Solution Manager must be minimum version 7.01 SPS 23 or 7.1 SPS 10
 If the source ECC system is on HANA 1.0, an upgrade to HANA 2.0 will be needed as a pre-requisite
 If applicable, upgrade of other NW systems can be done as pre-requisite steps or within the same S/4HANA
conversion project.
SAP PI, BW,
Portal
AS ABAP < 7.31
AnyDB
SAP PI, BW,
Portal
AS ABAP >=7.31
AnyDB
SAP PI, BW or Portal systems lower
than Netweaver 7.31
SAP PI, BW or Portal systems
would need to be upgraded to
minimum Netweaver 7.31
18CUSTOMER© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
S/4HANA Sizing
 Apply the necessary SAP Notes on the ERP system on AnyDB
 Refresh Database statistics
 Execute the Sizing Report
 Analyze the output for the HANA Appliance Memory output
 Work with the preferred Hardware vendor to order the HANA appliance
 Only the database server needs to be changed, the application server can be reutilized
19CUSTOMER© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
Why do we need Custom Code Analysis?
Drivers of Change within a S/4HANA Migration Project
Possible Sources of Impact to Custom Code
– Software Changes
The change of software levels (e.g. SPS, EHP, and/or version) has the potential of impacting custom
code, especially when custom code makes references to the standard objects that were
enhanced/modified as part of the software update.
– Platform Changes
As there may be platform specific performance hints implemented within custom code, the change of
the underlying platform (i.e. to SAP HANA) could impact the performance of that code. Additionally,
implications like sort order also have to be accounted for when changing platforms.
– Unicode Conversion
The migration to SAP HANA requires that the database is Unicode. If the source system has yet to
converted, the conversion can be included in the scope of the migration project. As a requirement
for the conversion, all custom code must be Unicode enabled.
– Business Requirements
Evolution in the business and adoption of innovations can both be drivers for change to custom
code. With the migration to SAP HANA, the business may decide to include some of these
enhancements within the scope of the project.
– Data Model Simplification
The simplification of the data model with S/4HANA can have a potential impact on custom code. For
instance, custom code that directly writes to the total tables will need to be adjusted.
20CUSTOMER© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
Custom Code Management
Approach for Remediating Custom Code
Get transparency
on Custom Code
Go back to SAP Standard**
Remove waste
 Readiness
Check
 Logging
 Usage &
Procedure
Logging
 Innovation Control Center
Adjust HANA specifics
 Sort order, DB hints,
EXEC SQL…
**) Not covered in this deck
1 2
Refactoring
BP Re-Design
Analyze Impact &
Create a plan
 Code Inspector /
ATC
3
 Technical replacement
of custom by SAP code
 Re-Engineer & improve BP
Adjust Upgrade / EHP specifics
 Changed / removed SAP
code
Adjust S/4HANA specifics
 Write access on totals
 Views on totals, appends
 Incompatible SAP
software changes
Can happen upfront of a migration project
4
Identify Analyze Improve
We are
Here !!
Next
Step
Custom Code Extensibility using SCP –
side by side Extensions
22CUSTOMER© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
Custom Code Extension using SCP - enables Extension, Integration, development
Extend cloud solutions
running in the cloud with
custom extensions also running
in the cloud
Build new custom solutions
running in the cloud
Extend on-premises
solutions running in your data
center with custom extensions
running in the cloud
On-Demand Extensions Hybrid Solutions New Cloud Solutions
On-Premise
Services DataServices Data
On-Premise
Extension
Data
SAP Business
Suites …
Services Data
Cloud Extension
Data
Cloud
Solutions
Cloud Application
Extend
Cloud & On-Prem Apps
Integrate
Your Apps and Data
Build
New Cloud Apps
23CUSTOMER© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
Side-by-side Extensibility for SAP S/4HANA using SAP Cloud Platform ABAP
Environment
KEY CAPABILITIES
Develop and deploy side-by-side extensions on
a separate PaaS
Integrate with SAP S/4HANA
Consume SAP S/4HANA data via
whitelisted APIs
BENEFITS
Leverage your ABAP know how in the cloud
Transform your ABAP custom code to the cloud
Benefit from SAP Cloud Platform environment
Application
Clients
Corporate Identity Provider
Backend system, i.e
SAP S/4HANA Cloud,
SAP S/4HANA,
SAP ERP, SAP
NetWeaver AS ABAP
SAP CLOUD PLATFORM
Custom Data
SAP HANA tenant
Your ABAP
extension
Connectivity
Please note: first version supports S/4HANA Cloud extensions only, on-prem support will be released in Q4 2018
24CUSTOMER© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
Custom Code - When to decouple and to use side-by-side extensions by use
case examples
In-App Side by side
Modification to SAP Standard Code
-Modifying SAP S/4HANA software (SAP Standard programs) with full access to ABAP Workbench (SE80) X
Developing custom code enhancements in SAP Standard applications
-using Customer exits, Z-Programs on customer name spaces, BAdIs, APIs X X
-adding functionality, Fields, Tables to standard SAP software without actually the original standard delivered objects X X
Developing (incl. ABAP) custom applications integrated to and decoupled from SAP Standard application
-Custom Apps combining SAP and/or non-SAP data – write back to ERP X X
-Custom Apps combining SAP and/or non-SAP data – no write back to ERP X
-ERP Z-ABAP code still required and reasonable/feasible to be decoupled from core ERP X
Connecting to IoT sensors, streaming and (incl. instantaneous) analyzing of IoT data X
Exploring and Running AI, Predictive, Machine Learning, IoT services on ERP data and non-ERP data X
Integration of AI, Predictive, Machine Learning, IoT “results” (back) into standard core ERP processes, S4, ECC… X
Consumer-grade UX
-UX - User Interface - Design Time cloud, Run Time on premise, Portal on premise X
-UX - User Interface - Design Time cloud, Run Time cloud, incl. single Fiori Launchpad for cloud and on-premise Fiori X
-UX - Mobile Apps deployed in Cloud Portal, and/or corporate AppStore incl. Apple SDK X
-ERP Z-transaction to be replaced with mobile Apps or custom UX for example prior to conversion to S/4HANA X
Flexible Process Integration based on API’s with on-premise and cloud applications, SAP and 3rd-party X
BI Self Service and Data Integration, which deviate from standard corporate (stable core) BI, KPI’s etc.
-Data Transformation X
-Combining SAP data with non-SAP data X
-Creating ad-hoc queries and KPI’s against live production data without transports X
Big Data Storage and Exploration X
25CUSTOMER© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
Conversion
 Prepare the digital core to be stable, clean
and lean for S/4HANA conversion
 Decouple modifications from S/4HANA to
SAP Cloud Platform wherever possible
Greenfield
 Keep the new stable core clean and lean
from the start
 Stay close to Standard as much as possible
 Minimize Modifications in stable core
Accelerate your Journey to S/4HANA
26CUSTOMER© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
ECC to S/4HANA conversion steps
ERP DEV /
AnyDB
 New S/4HANA production support systems to replace the current ERP systems
ERP QAS /
AnyDB
ERP PRD /
AnyDB
SAP S/4HANA
DEV
SAP S/4HANA
QAS
SAP S/4HANA
PRD
New Hardware
Existing Instances
S/4HANA Conversion steps
1. Build a Sandbox (SBX) system on AnyDB via system
copy from Production
2. Migrate Sandbox (SBX) system on AnyDB to SAP
S/4HANA. Fix all issues, custom coding here.
3. Migrate Development system to S/4HANA. Use the
DEV S/4HANA system as Development system for the
conversion project
4. Migrate Quality system. This will be used as S/4HANA
Quality system for the conversion project.
5. Mock Cutover and Dress-Rehearsal (Migration to
S/4HANA) based on a fresh system copy of PRD
6. Go-live. Conversion of the S/4HANA Production
system
7. Decommission ERP systems running on AnyDB
database, decommission S/4HANA SBX system.
SAP ERP SBX /
AnyDBS/4HANA SBX
1
2
3 4 6
5
7
27CUSTOMER© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
Transition to SAP S/4HANA
Optional – Include Additional Innovations or solution to existing pain points
Technical Migration Business Process Transformation
New Implementation (‚Greenfield‘)
System Conversion (technical project)
Landscape Transfomation w/ individual Scope
System Conversion with additional/full scope of BP Transformation (aka‘Big Bang‘)
seperate, single implementation projects
(i.e. BP re-design, new Applications, Fiori UX, etc.)
i.e. mandatory Simplifications
and FI Migration
28CUSTOMER© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
3 Elements of S/4HANA Conversion
Database
Migration
Functional
Impact
Custom Code
Impact
S/4HANA conversion consists of 3 mandatory logically distinct efforts
• Effort is similar to other DB migrations a customer may have already done
• No longer required for SoH customers
• Functional impact of application simplification and following the principle of one
• Many simplification list items can be done on start release as preparation for S/4HANA conversion
• Upgrade-like tasks with SPAU, SPDD and S/4 specific custom code efforts
• Experience shows that SPAU and SPDD efforts often exceed S/4 specific custom code efforts
• S/4 specific custom code efforts are mainly resulting from data model changes
• Recommendation: perform housekeeping (get rid of unused code, delete unused data, …)
Optional
consumption of
innovation
• Traditional capabilities are generally available thus it is possible to convert to S/4HANA rather
technically
• The degree of process change is largely a business decision when planning the conversion project
Mandatory
Optional
29CUSTOMER© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
S/4HANA System Conversion – Best Practices
Conversion Tasks
Preparation Activities Pre - Conversion Activities Conversion to S/4HANA Post-Conversion Activities
1 2 3 4
 S/4HANA Conversion
preparation activities
 Maintenance Planner Checks
 Functional Pre-Checks
 Custom Code Migration
Worklist
 Check on the Add-Ons (SAP
INVOICE MGMT BY OT 6.0-
VIM 0600_600)
 System Conversion Pre-
Checks Activities
 Check Currency Settings and
CO Configuration
 Create Production Versions for
all BOM & Routing
combinations
 Convert Storage Locations
to MRP Areas
 Customer Vendor Integration
 Perform month end closing
for all previous periods –
including periodic asset
postings
 Perform consistency checks
(total of open items to GL
balance)
 Perform reconciliation across
various Functional applications
• SUM-DMO to migrate
ERP system to S/4HANA
1809 system
• Gateway Server
installation and
configuration
• Fiori Add-on Installation
and Configuration for S/4
HANA
• Track the issues faced
during the conversion
• SPDD Activities
• Activation of new Asset
Accounting and SAP
Credit management
• Material Ledger activation
at Valuation Area level
• System Conversion Post
Check Activities
• Reconcile balances of
Universal journal with the
pre-conversion balances
• Replacement of MBxx and
Sales master data
transactions
• Fiori Activation
30CUSTOMER© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
Transition to SAP S/4HANA
High Level Conversion Timeline – no two customers are same
Activate Phases - > Prep
Project Week Responsibility 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Project Preparation Partner / Customer
Cycle 1: SBX (copy of PRD)
Prepare ECC to 1809 conversion (CVI, custom code analysis, application checks, SAP Notes) Partner
SBX Fiori upgrade or new Installation Partner
SAP ECC to 1809 Conversion using SUM w DMO option Partner
Post Activities to Complete SAP S/4HANA Conversion Partner
Custom Code Fixes Partner
Functional verification by users Customer
Cycle 2: DEV
DEV Pre - conversion S/4HANA tasks (CVI, Application checks, SAP Notes) Partner
SBX Fiori upgrade or new Installation Partner
SAP ECC to 1809 Conversion using SUM w DMO option Partner
Post Activities to Complete SAP S/4HANA Conversion Partner
Quick Functional verification by users Customer
Cycle 3: QAS
DEV Pre - conversion S/4HANA tasks (CVI, Application checks, SAP Notes) Partner
SBX Fiori upgrade or new Installation Partner
SAP ECC to 1809 Conversion using SUM w DMO option Partner
Post Activities to Complete SAP S/4HANA Conversion Partner
Integration Test / UAT Customer
Any extra Testing, GO/No-Go decision in view of testing results status Customer
Cycle 5: CutOver Rehearsal
Refresh ECC sandbox from ECC Production Customer
Cutover Rehearsal simulating actual go-live Partner / Customer
Cycle 4: PRD
cut over planning & preparation Partner / Customer
Go-live (S4, Fiori) Partner / Customer
Go-live Support Partner
Deploy RunExplore Realize
This is a draft timeline only. Every customer is different. Actual timeline will depend on customer setup
like Business functionality, custom code impacted, number of cycles needed, UAT issues, duration etc
31CUSTOMER© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
SAP S/4HANA
Important tools supporting your transition to SAP S/4HANA
Application
specific follow-
up activities
Application
specific follow-
up activities
Custom code
preparation
Realization phase
System
requirements
Software Update
Manager (SUM)
Cross-application & application specific preparation
activities
Maintenance
planner
Pre
checks
Custom code
preparation
Preparation phase
Simplification List
Planning phase
Transformation
Navigator
Roadmap
Viewer
SAP S/4HANA
Readiness Check
Uninstall ABAP Add-ons
During System Update
Database migration
Software update
Data conversion
Remote Scans with ABAP Test Cockpit
Simplification
Item Catalog
Unicode conversion
See also the Custom Code Migration Guide
New Framework via
Simplification Item Catalog
New SUM 2.0 incl.
Prerequisite Check
SAP S/4HANA
Readiness Check Remote Scans with
ABAP Test Cockpit
Additional Information
33CUSTOMER© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
Discover Determine Prepare Adapt Migrate
Discover Your Destination Execute Your MoveBuild Your Business Case
 SAP Fiori apps reference library
 Business Scenario
Recommendations (BSR)
 Solution Explorer
 Value Lifecycle Manager (VLM)
 Pathfinder
 Innovation Discovery Tool
 SAP Roadmap
 SAP Best Practice Explorer
 SAP S/4HANA Trial
 Feature Scope description
 SAP Roadmap Viewer
 SAP Transformation Navigator
 SAP Readiness Check for SAP S/4HANA
 Simplification Item Catalog
 Simplification Item Check
 Code Inspector / Custom Code Migration Worklist
 Pre-Checks
 SAP Activate
 Maintenance Planner
 Migration Cockpit
 SAP Data Services with Rapid Data
Migration content
SAP S/4HANA Deployment Strategy
Tool List
34CUSTOMER© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
OpenSAP Course: OpenSAP course “Your Path to SAP S/4HANA”
SAP S/4HANA product related Training: SAP S/4HANA Overview and
Business Processes
Discover SAP S/4HANA
Gives an introduction to the next-generation business suite SAP S/4HANA
SAP S/4HANA Trials
Experience SAP S/4HANA with trials for the cloud and on-premise
editions
Detailed SAP S/4HANA Roadmaps: SAP product & solution roadmaps
Feature Scope Description (PDF)
Provides an overview on the available features
SAP Help Portal: http://help.sap.com/s4hana:
Tipps & Tricks:
CVI cookbook
BI Extractors: SAP note 2500202 now provides full transparency for
customers on availability of BI extractors in SAP S/4HANA.
SD Foreign Trade:Most of the former SD Foreign Trade scope is
meanwhile available directly in SAP S/4HANA. Therefore customers
currently using SD Foreign Trade can in most cases avoid the effort of
migrating to SAP GTS.
SAP Community Blog: the top simplificationlist items
Useful links: application specific preparation
SAP Readiness Check for SAP S/4HANA
SAP S/4HANA System Conversion – At a glance
Maintenance Planner (SAP Help Portal) oder http://help.sap.com/maintenanceplanner
 SCN BLOG: Maintenance Planner
 SCN BLOG: Maintenance Planner – Release Highlights
Simplification Item Catalog
Pre-checks in System Conversion
SAP S/4HANA Simplification Item Check – How to do it right‘
ABAP Test Cockpit – an Introduction to SAP’s new ABAP Quality Assurance Tool ,
 Remote Code Analysis in ATC – One central check system for multiple systems on various releases
 Remote Code Analysis in ATC – Technical Setup step by step
 Remote Code Analysis in ATC – Working with Baseline to suppress findings in old legacy code
 Remote Code Analysis in ATC for Developers
 Remote Code Analysis in ATC – Working with Exemptions
 Remote Code Analysis in ATC – Scanning customer extensions
 Remote Code Analysis in ATC – Working efficiently with ATC Result List
 Remote Code Analysis in ATC – FAQ
ABAP Testing and Analysis Community: Link
ABAP Call Monitor (SCMON): Link
Usage Procedure Logging (UPL): Link
Best Practices Custom Code Lifecycle Management (CCLM): Link
ABAP custom code migration and recommendations for SAP HANA:
• SAP Note: 1912445
• SAP Community: Link
Further information see
• SAP Community Blog on Custom Code Adaptation process
• SAP Note: 2241080
• SAP Note: 2190420
Questions ?
Thank you !
Abhishek Goel
S/4HANA Movement Specialist
abhi.goel@sap.com

Contenu connexe

Tendances

SAP HANA Migration Deck.pptx
SAP HANA Migration Deck.pptxSAP HANA Migration Deck.pptx
SAP HANA Migration Deck.pptxSingbBablu
 
Building the Business Case for SAP S/4HANA
Building the Business Case for SAP S/4HANABuilding the Business Case for SAP S/4HANA
Building the Business Case for SAP S/4HANABluefin Solutions
 
S4 HANA presentation.pptx
S4 HANA presentation.pptxS4 HANA presentation.pptx
S4 HANA presentation.pptxNiranjanPatro2
 
SAP S/4HANA Migration Cockpit
SAP S/4HANA Migration CockpitSAP S/4HANA Migration Cockpit
SAP S/4HANA Migration CockpitEdwin Weijers
 
SAP S4HANA Migration Cockpit.pdf
SAP S4HANA Migration Cockpit.pdfSAP S4HANA Migration Cockpit.pdf
SAP S4HANA Migration Cockpit.pdfKrishnaAkula4
 
SAP Activate Methodology for S/4HANA Implementation
SAP Activate Methodology for S/4HANA ImplementationSAP Activate Methodology for S/4HANA Implementation
SAP Activate Methodology for S/4HANA ImplementationKellton Tech Solutions Ltd
 
SAP S4HANA : Learn From Our Implementation Journey
SAP S4HANA : Learn From Our Implementation JourneySAP S4HANA : Learn From Our Implementation Journey
SAP S4HANA : Learn From Our Implementation JourneyAnup Lakra
 
Selecting SAP S/4 HANA- Digital Core migration strategy - Greenfield vs Brow...
Selecting SAP S/4 HANA- Digital Core migration strategy -  Greenfield vs Brow...Selecting SAP S/4 HANA- Digital Core migration strategy -  Greenfield vs Brow...
Selecting SAP S/4 HANA- Digital Core migration strategy - Greenfield vs Brow...Akash Agrawal
 
Technical Walkthrough of SAP S/4HANA System Conversion
Technical Walkthrough of SAP S/4HANA System ConversionTechnical Walkthrough of SAP S/4HANA System Conversion
Technical Walkthrough of SAP S/4HANA System ConversionAkilesh Kumaran
 
S/4 HANA conversion functional value proposition
S/4 HANA conversion functional value propositionS/4 HANA conversion functional value proposition
S/4 HANA conversion functional value propositionVignesh Bhatt
 
SAP Roll Out - An Introduction and Advantages
SAP Roll Out - An Introduction and AdvantagesSAP Roll Out - An Introduction and Advantages
SAP Roll Out - An Introduction and Advantagesanjalirao366
 
Overview of SAP HANA Cloud Platform
Overview of SAP HANA Cloud PlatformOverview of SAP HANA Cloud Platform
Overview of SAP HANA Cloud PlatformVitaliy Rudnytskiy
 
SAP S/4HANA: Finance Capability and Frequently Asked Questions
SAP S/4HANA: Finance Capability and Frequently Asked QuestionsSAP S/4HANA: Finance Capability and Frequently Asked Questions
SAP S/4HANA: Finance Capability and Frequently Asked QuestionsCapgemini
 

Tendances (20)

SAP HANA Migration Deck.pptx
SAP HANA Migration Deck.pptxSAP HANA Migration Deck.pptx
SAP HANA Migration Deck.pptx
 
Building the Business Case for SAP S/4HANA
Building the Business Case for SAP S/4HANABuilding the Business Case for SAP S/4HANA
Building the Business Case for SAP S/4HANA
 
S4 HANA presentation.pptx
S4 HANA presentation.pptxS4 HANA presentation.pptx
S4 HANA presentation.pptx
 
SAP S/4 HANA Technical assessment before migration
SAP S/4 HANA Technical assessment before migrationSAP S/4 HANA Technical assessment before migration
SAP S/4 HANA Technical assessment before migration
 
SAP S/4HANA Migration Cockpit
SAP S/4HANA Migration CockpitSAP S/4HANA Migration Cockpit
SAP S/4HANA Migration Cockpit
 
SAP Fiori ppt
SAP Fiori pptSAP Fiori ppt
SAP Fiori ppt
 
Moving to SAP S/4HANA
Moving to SAP S/4HANAMoving to SAP S/4HANA
Moving to SAP S/4HANA
 
SAP S4HANA Migration Cockpit.pdf
SAP S4HANA Migration Cockpit.pdfSAP S4HANA Migration Cockpit.pdf
SAP S4HANA Migration Cockpit.pdf
 
SAP Activate Methodology for S/4HANA Implementation
SAP Activate Methodology for S/4HANA ImplementationSAP Activate Methodology for S/4HANA Implementation
SAP Activate Methodology for S/4HANA Implementation
 
SAP S4HANA : Learn From Our Implementation Journey
SAP S4HANA : Learn From Our Implementation JourneySAP S4HANA : Learn From Our Implementation Journey
SAP S4HANA : Learn From Our Implementation Journey
 
Migrating to SAP S/4HANA
Migrating to SAP S/4HANAMigrating to SAP S/4HANA
Migrating to SAP S/4HANA
 
SAP S/4HANA Cloud
SAP S/4HANA CloudSAP S/4HANA Cloud
SAP S/4HANA Cloud
 
Selecting SAP S/4 HANA- Digital Core migration strategy - Greenfield vs Brow...
Selecting SAP S/4 HANA- Digital Core migration strategy -  Greenfield vs Brow...Selecting SAP S/4 HANA- Digital Core migration strategy -  Greenfield vs Brow...
Selecting SAP S/4 HANA- Digital Core migration strategy - Greenfield vs Brow...
 
Technical Walkthrough of SAP S/4HANA System Conversion
Technical Walkthrough of SAP S/4HANA System ConversionTechnical Walkthrough of SAP S/4HANA System Conversion
Technical Walkthrough of SAP S/4HANA System Conversion
 
SAP HANA Overview
SAP HANA OverviewSAP HANA Overview
SAP HANA Overview
 
Migration to sap s4 hana
Migration to sap s4 hanaMigration to sap s4 hana
Migration to sap s4 hana
 
S/4 HANA conversion functional value proposition
S/4 HANA conversion functional value propositionS/4 HANA conversion functional value proposition
S/4 HANA conversion functional value proposition
 
SAP Roll Out - An Introduction and Advantages
SAP Roll Out - An Introduction and AdvantagesSAP Roll Out - An Introduction and Advantages
SAP Roll Out - An Introduction and Advantages
 
Overview of SAP HANA Cloud Platform
Overview of SAP HANA Cloud PlatformOverview of SAP HANA Cloud Platform
Overview of SAP HANA Cloud Platform
 
SAP S/4HANA: Finance Capability and Frequently Asked Questions
SAP S/4HANA: Finance Capability and Frequently Asked QuestionsSAP S/4HANA: Finance Capability and Frequently Asked Questions
SAP S/4HANA: Finance Capability and Frequently Asked Questions
 

Similaire à SAP ECC to S/4HANA Move

170627_s4hana_key_adoption_scenarios.pptx
170627_s4hana_key_adoption_scenarios.pptx170627_s4hana_key_adoption_scenarios.pptx
170627_s4hana_key_adoption_scenarios.pptxPavanSharma686420
 
170627_s4hana_key_adoption_scenarios (1).pdf
170627_s4hana_key_adoption_scenarios (1).pdf170627_s4hana_key_adoption_scenarios (1).pdf
170627_s4hana_key_adoption_scenarios (1).pdffarzanaperween83
 
170627_s4hana_key_adoption_scenarios (1) (1) (1).pdf
170627_s4hana_key_adoption_scenarios (1) (1) (1).pdf170627_s4hana_key_adoption_scenarios (1) (1) (1).pdf
170627_s4hana_key_adoption_scenarios (1) (1) (1).pdffarzanaperween83
 
Finance Illustration.pptx
Finance Illustration.pptxFinance Illustration.pptx
Finance Illustration.pptxRajK191012
 
RISE PCE CAA Migration Options_wave4.pdf
RISE PCE CAA Migration Options_wave4.pdfRISE PCE CAA Migration Options_wave4.pdf
RISE PCE CAA Migration Options_wave4.pdfken761ken1
 
210316_rise_with_sap_s4hana_cloud_license_overview.pdf
210316_rise_with_sap_s4hana_cloud_license_overview.pdf210316_rise_with_sap_s4hana_cloud_license_overview.pdf
210316_rise_with_sap_s4hana_cloud_license_overview.pdfssuser1808ab1
 
SAP S/4HANA cloud editions or On Prem? Demystifying the options and cost bene...
SAP S/4HANA cloud editions or On Prem? Demystifying the options and cost bene...SAP S/4HANA cloud editions or On Prem? Demystifying the options and cost bene...
SAP S/4HANA cloud editions or On Prem? Demystifying the options and cost bene...IBM
 
YASH Technologies at ASUG Minnesota chapter meeting
YASH Technologies at ASUG Minnesota chapter meetingYASH Technologies at ASUG Minnesota chapter meeting
YASH Technologies at ASUG Minnesota chapter meetingYASH Technologies
 
Migration scenarios RISE with SAP S4HANA Cloud, Private Edition - Version #1....
Migration scenarios RISE with SAP S4HANA Cloud, Private Edition - Version #1....Migration scenarios RISE with SAP S4HANA Cloud, Private Edition - Version #1....
Migration scenarios RISE with SAP S4HANA Cloud, Private Edition - Version #1....Yevilina Rizka
 
SAP S_4HANA Migration Cockpit - Migrate your Data to SAP S_4HANA.pdf
SAP S_4HANA Migration Cockpit - Migrate your Data to SAP S_4HANA.pdfSAP S_4HANA Migration Cockpit - Migrate your Data to SAP S_4HANA.pdf
SAP S_4HANA Migration Cockpit - Migrate your Data to SAP S_4HANA.pdfsubbulokam
 
Александр Чужиков - Сценарии внедрения SAP S/4HANA
Александр Чужиков - Сценарии внедрения SAP S/4HANAАлександр Чужиков - Сценарии внедрения SAP S/4HANA
Александр Чужиков - Сценарии внедрения SAP S/4HANAIlya Kaznacheev
 
SAP ERP IMPLEMENTATION AND Sap migration
SAP ERP IMPLEMENTATION AND Sap migrationSAP ERP IMPLEMENTATION AND Sap migration
SAP ERP IMPLEMENTATION AND Sap migrationArig
 
04. sap business_suite_4_hana
04. sap business_suite_4_hana04. sap business_suite_4_hana
04. sap business_suite_4_hanaRoberto Ortiz
 
SAP on Linux the way to S/4HANA
SAP on Linux the way to S/4HANASAP on Linux the way to S/4HANA
SAP on Linux the way to S/4HANAFinceptum Oy
 
Sap s4 hana (2)
Sap s4 hana (2)Sap s4 hana (2)
Sap s4 hana (2)babloo6
 
SAP Financial Closing cockpit in SAP S/4HANA; status and Roadmap
SAP Financial Closing cockpit in SAP S/4HANA; status and RoadmapSAP Financial Closing cockpit in SAP S/4HANA; status and Roadmap
SAP Financial Closing cockpit in SAP S/4HANA; status and RoadmapEdwin Weijers
 
SAP Financial Closing cockpit in SAP S/4HANA; status and Roadmap
SAP Financial Closing cockpit in SAP S/4HANA; status and RoadmapSAP Financial Closing cockpit in SAP S/4HANA; status and Roadmap
SAP Financial Closing cockpit in SAP S/4HANA; status and RoadmapEdwin Weijers
 
SAP HANA SPS10- Multitenant Database Containers
SAP HANA SPS10- Multitenant Database ContainersSAP HANA SPS10- Multitenant Database Containers
SAP HANA SPS10- Multitenant Database ContainersSAP Technology
 
Case study : New SAP S/4HANA on SUSE Implementation Business Benefits Achieved
Case study : New SAP S/4HANA on SUSE Implementation Business Benefits AchievedCase study : New SAP S/4HANA on SUSE Implementation Business Benefits Achieved
Case study : New SAP S/4HANA on SUSE Implementation Business Benefits AchievedSUSE
 

Similaire à SAP ECC to S/4HANA Move (20)

170627_s4hana_key_adoption_scenarios.pptx
170627_s4hana_key_adoption_scenarios.pptx170627_s4hana_key_adoption_scenarios.pptx
170627_s4hana_key_adoption_scenarios.pptx
 
170627_s4hana_key_adoption_scenarios (1).pdf
170627_s4hana_key_adoption_scenarios (1).pdf170627_s4hana_key_adoption_scenarios (1).pdf
170627_s4hana_key_adoption_scenarios (1).pdf
 
170627_s4hana_key_adoption_scenarios (1) (1) (1).pdf
170627_s4hana_key_adoption_scenarios (1) (1) (1).pdf170627_s4hana_key_adoption_scenarios (1) (1) (1).pdf
170627_s4hana_key_adoption_scenarios (1) (1) (1).pdf
 
Finance Illustration.pptx
Finance Illustration.pptxFinance Illustration.pptx
Finance Illustration.pptx
 
Chill S4HANA Sales Training.ppt
Chill S4HANA Sales Training.pptChill S4HANA Sales Training.ppt
Chill S4HANA Sales Training.ppt
 
RISE PCE CAA Migration Options_wave4.pdf
RISE PCE CAA Migration Options_wave4.pdfRISE PCE CAA Migration Options_wave4.pdf
RISE PCE CAA Migration Options_wave4.pdf
 
210316_rise_with_sap_s4hana_cloud_license_overview.pdf
210316_rise_with_sap_s4hana_cloud_license_overview.pdf210316_rise_with_sap_s4hana_cloud_license_overview.pdf
210316_rise_with_sap_s4hana_cloud_license_overview.pdf
 
SAP S/4HANA cloud editions or On Prem? Demystifying the options and cost bene...
SAP S/4HANA cloud editions or On Prem? Demystifying the options and cost bene...SAP S/4HANA cloud editions or On Prem? Demystifying the options and cost bene...
SAP S/4HANA cloud editions or On Prem? Demystifying the options and cost bene...
 
YASH Technologies at ASUG Minnesota chapter meeting
YASH Technologies at ASUG Minnesota chapter meetingYASH Technologies at ASUG Minnesota chapter meeting
YASH Technologies at ASUG Minnesota chapter meeting
 
Migration scenarios RISE with SAP S4HANA Cloud, Private Edition - Version #1....
Migration scenarios RISE with SAP S4HANA Cloud, Private Edition - Version #1....Migration scenarios RISE with SAP S4HANA Cloud, Private Edition - Version #1....
Migration scenarios RISE with SAP S4HANA Cloud, Private Edition - Version #1....
 
SAP S_4HANA Migration Cockpit - Migrate your Data to SAP S_4HANA.pdf
SAP S_4HANA Migration Cockpit - Migrate your Data to SAP S_4HANA.pdfSAP S_4HANA Migration Cockpit - Migrate your Data to SAP S_4HANA.pdf
SAP S_4HANA Migration Cockpit - Migrate your Data to SAP S_4HANA.pdf
 
Александр Чужиков - Сценарии внедрения SAP S/4HANA
Александр Чужиков - Сценарии внедрения SAP S/4HANAАлександр Чужиков - Сценарии внедрения SAP S/4HANA
Александр Чужиков - Сценарии внедрения SAP S/4HANA
 
SAP ERP IMPLEMENTATION AND Sap migration
SAP ERP IMPLEMENTATION AND Sap migrationSAP ERP IMPLEMENTATION AND Sap migration
SAP ERP IMPLEMENTATION AND Sap migration
 
04. sap business_suite_4_hana
04. sap business_suite_4_hana04. sap business_suite_4_hana
04. sap business_suite_4_hana
 
SAP on Linux the way to S/4HANA
SAP on Linux the way to S/4HANASAP on Linux the way to S/4HANA
SAP on Linux the way to S/4HANA
 
Sap s4 hana (2)
Sap s4 hana (2)Sap s4 hana (2)
Sap s4 hana (2)
 
SAP Financial Closing cockpit in SAP S/4HANA; status and Roadmap
SAP Financial Closing cockpit in SAP S/4HANA; status and RoadmapSAP Financial Closing cockpit in SAP S/4HANA; status and Roadmap
SAP Financial Closing cockpit in SAP S/4HANA; status and Roadmap
 
SAP Financial Closing cockpit in SAP S/4HANA; status and Roadmap
SAP Financial Closing cockpit in SAP S/4HANA; status and RoadmapSAP Financial Closing cockpit in SAP S/4HANA; status and Roadmap
SAP Financial Closing cockpit in SAP S/4HANA; status and Roadmap
 
SAP HANA SPS10- Multitenant Database Containers
SAP HANA SPS10- Multitenant Database ContainersSAP HANA SPS10- Multitenant Database Containers
SAP HANA SPS10- Multitenant Database Containers
 
Case study : New SAP S/4HANA on SUSE Implementation Business Benefits Achieved
Case study : New SAP S/4HANA on SUSE Implementation Business Benefits AchievedCase study : New SAP S/4HANA on SUSE Implementation Business Benefits Achieved
Case study : New SAP S/4HANA on SUSE Implementation Business Benefits Achieved
 

Plus de AGSanePLDTCompany

SAP Business One - CRM and Sales/AR Module
SAP Business One - CRM and Sales/AR ModuleSAP Business One - CRM and Sales/AR Module
SAP Business One - CRM and Sales/AR ModuleAGSanePLDTCompany
 
2022 AGS CLIENT APPRECIATON DAY SAP BUSINESS ONE UPDATES
2022 AGS CLIENT APPRECIATON DAY SAP BUSINESS ONE UPDATES 2022 AGS CLIENT APPRECIATON DAY SAP BUSINESS ONE UPDATES
2022 AGS CLIENT APPRECIATON DAY SAP BUSINESS ONE UPDATES AGSanePLDTCompany
 
2022 CLIENT APPRECIATION DAY SAP S/4HANA UPDATES TO CUSTOMERS
2022 CLIENT APPRECIATION DAY SAP S/4HANA UPDATES TO CUSTOMERS2022 CLIENT APPRECIATION DAY SAP S/4HANA UPDATES TO CUSTOMERS
2022 CLIENT APPRECIATION DAY SAP S/4HANA UPDATES TO CUSTOMERSAGSanePLDTCompany
 
2022 AGS MANILA CLIENT APPRECIATION DAY FOR AUGUST 25.pptx
2022 AGS MANILA CLIENT APPRECIATION DAY FOR AUGUST 25.pptx2022 AGS MANILA CLIENT APPRECIATION DAY FOR AUGUST 25.pptx
2022 AGS MANILA CLIENT APPRECIATION DAY FOR AUGUST 25.pptxAGSanePLDTCompany
 
2022 AGS MANILA CLIENT APPRECIATION DAY FOR AUGUST 24.pptx
2022 AGS MANILA CLIENT APPRECIATION DAY FOR AUGUST 24.pptx2022 AGS MANILA CLIENT APPRECIATION DAY FOR AUGUST 24.pptx
2022 AGS MANILA CLIENT APPRECIATION DAY FOR AUGUST 24.pptxAGSanePLDTCompany
 
2022 AGS Cebu Client Appreciation Day
2022 AGS Cebu Client Appreciation Day 2022 AGS Cebu Client Appreciation Day
2022 AGS Cebu Client Appreciation Day AGSanePLDTCompany
 
The New Business Essentials: Analytics that Matters with BIR E-Invoicing Session
The New Business Essentials: Analytics that Matters with BIR E-Invoicing SessionThe New Business Essentials: Analytics that Matters with BIR E-Invoicing Session
The New Business Essentials: Analytics that Matters with BIR E-Invoicing SessionAGSanePLDTCompany
 
Refresher Training_Inventory Management.pdf
Refresher Training_Inventory Management.pdfRefresher Training_Inventory Management.pdf
Refresher Training_Inventory Management.pdfAGSanePLDTCompany
 
SAP SME - The Agility Engine think piece - partner - July 10.pdf
SAP SME - The Agility Engine think piece - partner - July 10.pdfSAP SME - The Agility Engine think piece - partner - July 10.pdf
SAP SME - The Agility Engine think piece - partner - July 10.pdfAGSanePLDTCompany
 
SAP Business One Financial Module
SAP Business One Financial ModuleSAP Business One Financial Module
SAP Business One Financial ModuleAGSanePLDTCompany
 
SAP Business One Basics and Procure to Pay
SAP Business One Basics and Procure to PaySAP Business One Basics and Procure to Pay
SAP Business One Basics and Procure to PayAGSanePLDTCompany
 
Quickhits 2022 Add Button Extended In Marketing Documents
Quickhits 2022  Add Button Extended In Marketing DocumentsQuickhits 2022  Add Button Extended In Marketing Documents
Quickhits 2022 Add Button Extended In Marketing DocumentsAGSanePLDTCompany
 
Webinar February 23 AGS Mobile Technologies
Webinar February 23 AGS Mobile TechnologiesWebinar February 23 AGS Mobile Technologies
Webinar February 23 AGS Mobile TechnologiesAGSanePLDTCompany
 
SAP B1 Intelligent Enterprise AGS
SAP B1 Intelligent Enterprise AGSSAP B1 Intelligent Enterprise AGS
SAP B1 Intelligent Enterprise AGSAGSanePLDTCompany
 
LOG4J VULNERABILITY SAP BUSINESS ONE IMPACT AND WORK AROUNDS
LOG4J VULNERABILITY SAP BUSINESS ONE IMPACT AND WORK AROUNDSLOG4J VULNERABILITY SAP BUSINESS ONE IMPACT AND WORK AROUNDS
LOG4J VULNERABILITY SAP BUSINESS ONE IMPACT AND WORK AROUNDSAGSanePLDTCompany
 
AGS Support Live SAP Business One Order to Cash
AGS Support Live SAP Business One Order to Cash AGS Support Live SAP Business One Order to Cash
AGS Support Live SAP Business One Order to Cash AGSanePLDTCompany
 
AGS x COUPA's Lunch + Learn Series: Optimizing Spend and Cash
AGS x COUPA's Lunch + Learn Series: Optimizing Spend and Cash AGS x COUPA's Lunch + Learn Series: Optimizing Spend and Cash
AGS x COUPA's Lunch + Learn Series: Optimizing Spend and Cash AGSanePLDTCompany
 
AGS x COUPA's Lunch + Learn Series: Improving Operational Performance
AGS x COUPA's Lunch + Learn Series: Improving Operational Performance AGS x COUPA's Lunch + Learn Series: Improving Operational Performance
AGS x COUPA's Lunch + Learn Series: Improving Operational Performance AGSanePLDTCompany
 

Plus de AGSanePLDTCompany (20)

SAP Business One - CRM and Sales/AR Module
SAP Business One - CRM and Sales/AR ModuleSAP Business One - CRM and Sales/AR Module
SAP Business One - CRM and Sales/AR Module
 
2022 AGS CLIENT APPRECIATON DAY SAP BUSINESS ONE UPDATES
2022 AGS CLIENT APPRECIATON DAY SAP BUSINESS ONE UPDATES 2022 AGS CLIENT APPRECIATON DAY SAP BUSINESS ONE UPDATES
2022 AGS CLIENT APPRECIATON DAY SAP BUSINESS ONE UPDATES
 
2022 CLIENT APPRECIATION DAY SAP S/4HANA UPDATES TO CUSTOMERS
2022 CLIENT APPRECIATION DAY SAP S/4HANA UPDATES TO CUSTOMERS2022 CLIENT APPRECIATION DAY SAP S/4HANA UPDATES TO CUSTOMERS
2022 CLIENT APPRECIATION DAY SAP S/4HANA UPDATES TO CUSTOMERS
 
2022 AGS MANILA CLIENT APPRECIATION DAY FOR AUGUST 25.pptx
2022 AGS MANILA CLIENT APPRECIATION DAY FOR AUGUST 25.pptx2022 AGS MANILA CLIENT APPRECIATION DAY FOR AUGUST 25.pptx
2022 AGS MANILA CLIENT APPRECIATION DAY FOR AUGUST 25.pptx
 
2022 AGS MANILA CLIENT APPRECIATION DAY FOR AUGUST 24.pptx
2022 AGS MANILA CLIENT APPRECIATION DAY FOR AUGUST 24.pptx2022 AGS MANILA CLIENT APPRECIATION DAY FOR AUGUST 24.pptx
2022 AGS MANILA CLIENT APPRECIATION DAY FOR AUGUST 24.pptx
 
2022 AGS Cebu Client Appreciation Day
2022 AGS Cebu Client Appreciation Day 2022 AGS Cebu Client Appreciation Day
2022 AGS Cebu Client Appreciation Day
 
The New Business Essentials: Analytics that Matters with BIR E-Invoicing Session
The New Business Essentials: Analytics that Matters with BIR E-Invoicing SessionThe New Business Essentials: Analytics that Matters with BIR E-Invoicing Session
The New Business Essentials: Analytics that Matters with BIR E-Invoicing Session
 
Refresher Training_Inventory Management.pdf
Refresher Training_Inventory Management.pdfRefresher Training_Inventory Management.pdf
Refresher Training_Inventory Management.pdf
 
SAP SME - The Agility Engine think piece - partner - July 10.pdf
SAP SME - The Agility Engine think piece - partner - July 10.pdfSAP SME - The Agility Engine think piece - partner - July 10.pdf
SAP SME - The Agility Engine think piece - partner - July 10.pdf
 
SAP Business One Financial Module
SAP Business One Financial ModuleSAP Business One Financial Module
SAP Business One Financial Module
 
SAP Business One Basics and Procure to Pay
SAP Business One Basics and Procure to PaySAP Business One Basics and Procure to Pay
SAP Business One Basics and Procure to Pay
 
Rise with SAP
Rise with SAPRise with SAP
Rise with SAP
 
Quickhits 2022 Add Button Extended In Marketing Documents
Quickhits 2022  Add Button Extended In Marketing DocumentsQuickhits 2022  Add Button Extended In Marketing Documents
Quickhits 2022 Add Button Extended In Marketing Documents
 
Webinar February 23 AGS Mobile Technologies
Webinar February 23 AGS Mobile TechnologiesWebinar February 23 AGS Mobile Technologies
Webinar February 23 AGS Mobile Technologies
 
SAP B1 Intelligent Enterprise AGS
SAP B1 Intelligent Enterprise AGSSAP B1 Intelligent Enterprise AGS
SAP B1 Intelligent Enterprise AGS
 
Data Ownership
Data OwnershipData Ownership
Data Ownership
 
LOG4J VULNERABILITY SAP BUSINESS ONE IMPACT AND WORK AROUNDS
LOG4J VULNERABILITY SAP BUSINESS ONE IMPACT AND WORK AROUNDSLOG4J VULNERABILITY SAP BUSINESS ONE IMPACT AND WORK AROUNDS
LOG4J VULNERABILITY SAP BUSINESS ONE IMPACT AND WORK AROUNDS
 
AGS Support Live SAP Business One Order to Cash
AGS Support Live SAP Business One Order to Cash AGS Support Live SAP Business One Order to Cash
AGS Support Live SAP Business One Order to Cash
 
AGS x COUPA's Lunch + Learn Series: Optimizing Spend and Cash
AGS x COUPA's Lunch + Learn Series: Optimizing Spend and Cash AGS x COUPA's Lunch + Learn Series: Optimizing Spend and Cash
AGS x COUPA's Lunch + Learn Series: Optimizing Spend and Cash
 
AGS x COUPA's Lunch + Learn Series: Improving Operational Performance
AGS x COUPA's Lunch + Learn Series: Improving Operational Performance AGS x COUPA's Lunch + Learn Series: Improving Operational Performance
AGS x COUPA's Lunch + Learn Series: Improving Operational Performance
 

Dernier

办理(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一
办理(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一办理(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一
办理(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一F La
 
Multiple time frame trading analysis -brianshannon.pdf
Multiple time frame trading analysis -brianshannon.pdfMultiple time frame trading analysis -brianshannon.pdf
Multiple time frame trading analysis -brianshannon.pdfchwongval
 
Top 5 Best Data Analytics Courses In Queens
Top 5 Best Data Analytics Courses In QueensTop 5 Best Data Analytics Courses In Queens
Top 5 Best Data Analytics Courses In Queensdataanalyticsqueen03
 
Real-Time AI Streaming - AI Max Princeton
Real-Time AI  Streaming - AI Max PrincetonReal-Time AI  Streaming - AI Max Princeton
Real-Time AI Streaming - AI Max PrincetonTimothy Spann
 
modul pembelajaran robotic Workshop _ by Slidesgo.pptx
modul pembelajaran robotic Workshop _ by Slidesgo.pptxmodul pembelajaran robotic Workshop _ by Slidesgo.pptx
modul pembelajaran robotic Workshop _ by Slidesgo.pptxaleedritatuxx
 
How we prevented account sharing with MFA
How we prevented account sharing with MFAHow we prevented account sharing with MFA
How we prevented account sharing with MFAAndrei Kaleshka
 
IMA MSN - Medical Students Network (2).pptx
IMA MSN - Medical Students Network (2).pptxIMA MSN - Medical Students Network (2).pptx
IMA MSN - Medical Students Network (2).pptxdolaknnilon
 
办理学位证加利福尼亚大学洛杉矶分校毕业证,UCLA成绩单原版一比一
办理学位证加利福尼亚大学洛杉矶分校毕业证,UCLA成绩单原版一比一办理学位证加利福尼亚大学洛杉矶分校毕业证,UCLA成绩单原版一比一
办理学位证加利福尼亚大学洛杉矶分校毕业证,UCLA成绩单原版一比一F sss
 
Predictive Analysis for Loan Default Presentation : Data Analysis Project PPT
Predictive Analysis for Loan Default  Presentation : Data Analysis Project PPTPredictive Analysis for Loan Default  Presentation : Data Analysis Project PPT
Predictive Analysis for Loan Default Presentation : Data Analysis Project PPTBoston Institute of Analytics
 
Statistics, Data Analysis, and Decision Modeling, 5th edition by James R. Eva...
Statistics, Data Analysis, and Decision Modeling, 5th edition by James R. Eva...Statistics, Data Analysis, and Decision Modeling, 5th edition by James R. Eva...
Statistics, Data Analysis, and Decision Modeling, 5th edition by James R. Eva...ssuserf63bd7
 
Heart Disease Classification Report: A Data Analysis Project
Heart Disease Classification Report: A Data Analysis ProjectHeart Disease Classification Report: A Data Analysis Project
Heart Disease Classification Report: A Data Analysis ProjectBoston Institute of Analytics
 
NLP Data Science Project Presentation:Predicting Heart Disease with NLP Data ...
NLP Data Science Project Presentation:Predicting Heart Disease with NLP Data ...NLP Data Science Project Presentation:Predicting Heart Disease with NLP Data ...
NLP Data Science Project Presentation:Predicting Heart Disease with NLP Data ...Boston Institute of Analytics
 
Defining Constituents, Data Vizzes and Telling a Data Story
Defining Constituents, Data Vizzes and Telling a Data StoryDefining Constituents, Data Vizzes and Telling a Data Story
Defining Constituents, Data Vizzes and Telling a Data StoryJeremy Anderson
 
DBA Basics: Getting Started with Performance Tuning.pdf
DBA Basics: Getting Started with Performance Tuning.pdfDBA Basics: Getting Started with Performance Tuning.pdf
DBA Basics: Getting Started with Performance Tuning.pdfJohn Sterrett
 
Predicting Salary Using Data Science: A Comprehensive Analysis.pdf
Predicting Salary Using Data Science: A Comprehensive Analysis.pdfPredicting Salary Using Data Science: A Comprehensive Analysis.pdf
Predicting Salary Using Data Science: A Comprehensive Analysis.pdfBoston Institute of Analytics
 
Business Analytics using Microsoft Excel
Business Analytics using Microsoft ExcelBusiness Analytics using Microsoft Excel
Business Analytics using Microsoft Excelysmaelreyes
 
MK KOMUNIKASI DATA (TI)komdat komdat.docx
MK KOMUNIKASI DATA (TI)komdat komdat.docxMK KOMUNIKASI DATA (TI)komdat komdat.docx
MK KOMUNIKASI DATA (TI)komdat komdat.docxUnduhUnggah1
 
Generative AI for Social Good at Open Data Science East 2024
Generative AI for Social Good at Open Data Science East 2024Generative AI for Social Good at Open Data Science East 2024
Generative AI for Social Good at Open Data Science East 2024Colleen Farrelly
 
1:1定制(UQ毕业证)昆士兰大学毕业证成绩单修改留信学历认证原版一模一样
1:1定制(UQ毕业证)昆士兰大学毕业证成绩单修改留信学历认证原版一模一样1:1定制(UQ毕业证)昆士兰大学毕业证成绩单修改留信学历认证原版一模一样
1:1定制(UQ毕业证)昆士兰大学毕业证成绩单修改留信学历认证原版一模一样vhwb25kk
 
LLMs, LMMs, their Improvement Suggestions and the Path towards AGI
LLMs, LMMs, their Improvement Suggestions and the Path towards AGILLMs, LMMs, their Improvement Suggestions and the Path towards AGI
LLMs, LMMs, their Improvement Suggestions and the Path towards AGIThomas Poetter
 

Dernier (20)

办理(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一
办理(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一办理(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一
办理(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一
 
Multiple time frame trading analysis -brianshannon.pdf
Multiple time frame trading analysis -brianshannon.pdfMultiple time frame trading analysis -brianshannon.pdf
Multiple time frame trading analysis -brianshannon.pdf
 
Top 5 Best Data Analytics Courses In Queens
Top 5 Best Data Analytics Courses In QueensTop 5 Best Data Analytics Courses In Queens
Top 5 Best Data Analytics Courses In Queens
 
Real-Time AI Streaming - AI Max Princeton
Real-Time AI  Streaming - AI Max PrincetonReal-Time AI  Streaming - AI Max Princeton
Real-Time AI Streaming - AI Max Princeton
 
modul pembelajaran robotic Workshop _ by Slidesgo.pptx
modul pembelajaran robotic Workshop _ by Slidesgo.pptxmodul pembelajaran robotic Workshop _ by Slidesgo.pptx
modul pembelajaran robotic Workshop _ by Slidesgo.pptx
 
How we prevented account sharing with MFA
How we prevented account sharing with MFAHow we prevented account sharing with MFA
How we prevented account sharing with MFA
 
IMA MSN - Medical Students Network (2).pptx
IMA MSN - Medical Students Network (2).pptxIMA MSN - Medical Students Network (2).pptx
IMA MSN - Medical Students Network (2).pptx
 
办理学位证加利福尼亚大学洛杉矶分校毕业证,UCLA成绩单原版一比一
办理学位证加利福尼亚大学洛杉矶分校毕业证,UCLA成绩单原版一比一办理学位证加利福尼亚大学洛杉矶分校毕业证,UCLA成绩单原版一比一
办理学位证加利福尼亚大学洛杉矶分校毕业证,UCLA成绩单原版一比一
 
Predictive Analysis for Loan Default Presentation : Data Analysis Project PPT
Predictive Analysis for Loan Default  Presentation : Data Analysis Project PPTPredictive Analysis for Loan Default  Presentation : Data Analysis Project PPT
Predictive Analysis for Loan Default Presentation : Data Analysis Project PPT
 
Statistics, Data Analysis, and Decision Modeling, 5th edition by James R. Eva...
Statistics, Data Analysis, and Decision Modeling, 5th edition by James R. Eva...Statistics, Data Analysis, and Decision Modeling, 5th edition by James R. Eva...
Statistics, Data Analysis, and Decision Modeling, 5th edition by James R. Eva...
 
Heart Disease Classification Report: A Data Analysis Project
Heart Disease Classification Report: A Data Analysis ProjectHeart Disease Classification Report: A Data Analysis Project
Heart Disease Classification Report: A Data Analysis Project
 
NLP Data Science Project Presentation:Predicting Heart Disease with NLP Data ...
NLP Data Science Project Presentation:Predicting Heart Disease with NLP Data ...NLP Data Science Project Presentation:Predicting Heart Disease with NLP Data ...
NLP Data Science Project Presentation:Predicting Heart Disease with NLP Data ...
 
Defining Constituents, Data Vizzes and Telling a Data Story
Defining Constituents, Data Vizzes and Telling a Data StoryDefining Constituents, Data Vizzes and Telling a Data Story
Defining Constituents, Data Vizzes and Telling a Data Story
 
DBA Basics: Getting Started with Performance Tuning.pdf
DBA Basics: Getting Started with Performance Tuning.pdfDBA Basics: Getting Started with Performance Tuning.pdf
DBA Basics: Getting Started with Performance Tuning.pdf
 
Predicting Salary Using Data Science: A Comprehensive Analysis.pdf
Predicting Salary Using Data Science: A Comprehensive Analysis.pdfPredicting Salary Using Data Science: A Comprehensive Analysis.pdf
Predicting Salary Using Data Science: A Comprehensive Analysis.pdf
 
Business Analytics using Microsoft Excel
Business Analytics using Microsoft ExcelBusiness Analytics using Microsoft Excel
Business Analytics using Microsoft Excel
 
MK KOMUNIKASI DATA (TI)komdat komdat.docx
MK KOMUNIKASI DATA (TI)komdat komdat.docxMK KOMUNIKASI DATA (TI)komdat komdat.docx
MK KOMUNIKASI DATA (TI)komdat komdat.docx
 
Generative AI for Social Good at Open Data Science East 2024
Generative AI for Social Good at Open Data Science East 2024Generative AI for Social Good at Open Data Science East 2024
Generative AI for Social Good at Open Data Science East 2024
 
1:1定制(UQ毕业证)昆士兰大学毕业证成绩单修改留信学历认证原版一模一样
1:1定制(UQ毕业证)昆士兰大学毕业证成绩单修改留信学历认证原版一模一样1:1定制(UQ毕业证)昆士兰大学毕业证成绩单修改留信学历认证原版一模一样
1:1定制(UQ毕业证)昆士兰大学毕业证成绩单修改留信学历认证原版一模一样
 
LLMs, LMMs, their Improvement Suggestions and the Path towards AGI
LLMs, LMMs, their Improvement Suggestions and the Path towards AGILLMs, LMMs, their Improvement Suggestions and the Path towards AGI
LLMs, LMMs, their Improvement Suggestions and the Path towards AGI
 

SAP ECC to S/4HANA Move

  • 1. SAP ECC to S/4HANA Move Options, Transition scenarios, Preparation, Tools Abhishek Goel S/4HANA Movement Specialist April, 2019 V20190407
  • 2. 2CUSTOMER© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ Agenda  S/4HANA (OP / Cloud) Options, Positioning & Deployment options  S/4HANA Transition Scenarios  Green Field or conversion ?  Introduction to NZDT for S/4HANA conversion  High level planning & preparation steps for S/HANA conversion  S/4HANA Migration Impact to other systems  S/4HANA Sizing  S/4HANA Conversion - Custom Coding Impact  Side by side S/4HANA Custom Code Extension using SCP  Migration Approach / Sequence  Optional consumption of Innovation during S/4HANA conversion  S/4HANA conversion (pre, conversion & post) steps  Questions ?
  • 3. 3CUSTOMER© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ SAP S/4HANA is SAP’s next generation Digital Core  Optimized for SAP HANA  New architecture and data models  “Principle of One”  Renewed applications  Fiori based User Experience  Cloud & on-premise deployment models SAP S/4HANA – Digital Core SAP S/4HANA is a new product line. The classical SAP Business Suite & SAP ERP is a separate product line and will still be available. System conversion including custom code from existing SAP Business Suite or SAP ERP is possible.
  • 4. 4CUSTOMER© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ SAP S/4HANA Release strategy for 2018 / 2019 and definition of deliveries FPS01* Feature Package Stack (technically SPS 01) RTC planned for Jan 30, 2019 FPS02* Feature Package Stack (technically SPS 02) SPS03* Support Package Stack (technically SPS 03) SAP S/4HANA 1809 SPS00 New release incl. new technology stack (NetWeaver AS ABAP 7.53 SP00 including UI1.56 SAP HANA 2.0 SP03 as minimal Version) 2018 2019 Q4 Q1 Q2 Q4Q3 SAP S/4HANA 19xx SPS00* New release incl. new Technology Stack Maintenance Line 2020 Q3 Q1 Q2 Q3 Q4 Important Links 2655761 - Restrictions and recommendations regarding specific revisions of the SAP HANA database for use in SAP S/4HANA 2659710 - SAP S/4HANA 1809: Restriction Notes * This is the current state of planning and may be changed by SAP at any time without notice. Support Package Stack for SAP S/4HANA 1809* After general availability of SAP S/4HANA 1809, Feature Package Stacks (FPS) and Support Package Stacks (SPS) contains stabilizations bundled with corrections and legal changes. Customers benefit from this functionality as part of their maintenance fee. First SPS of a new release can contain selected features and are labelled Feature Package Stack (FPS) accordingly. Support Package Stacks are compiled periodically and made available on the SAP Software Download Center Product information will be available on the User Assistance Content Platform
  • 5. S/4HANA (OP / Cloud) Options & Positioning
  • 6. 6CUSTOMER© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ SAP S/4HANA Cloud, single tenant edition SAP S/4HANA (On-premise managed by cloud providers or customers) SAP S/4HANA (Private cloud managed by SAP) Cloud ERP* ERP in the Cloud ERP OP SAP S/4HANA Cloud One SAP S/4HANA: the right solution for each customer cloud journey Implementation Greenfield with data migration Greenfield with data and configuration migration Greenfield or conversion of existing implementations Greenfield or conversion of existing implementations Functional Scope Business configuration of standardized core ERP and select LOB processes Full functional S/4HANA scope of core ERP and extended LOB and industry processes Full functional S/4HANA scope of core ERP and extended LOB and industry processes Full functional S/4HANA scope of core ERP and extended LOB and industry processes Industries Supported In-depth support for professional services and component manufacturing; more industries on road map All industries supported All industries supported All industries supported Extensibility S/4HANA Extensibility Framework and extensions via SCP, using whitelisted APIs S/4HANA Extensibility Framework and extensions via SCP, with full extensibility option Customization, modification, and extensibility possible Customization, modification, and extensibility possible Innovation Cycle Quarterly 2 upgrades a year, one mandatory within 12 month window of release Annual; speed of adoption on customers’ schedule Annual; speed of adoption on customers’ schedule Deployment Benefits Multi-tenant environment, Lowest TCO and fastest time to value Single-tenant environment Low TCO and fast time to value Customer controlled deployment and implementation efforts Customer controlled deployment and implementation efforts Licensing Subscription licensing Subscription licensing BYOL + infrastructure subscription Perpetual licensing Infrastructure Shared public cloud Dedicated system landscape on cloud infrastructure Customer specific system landscape Runs on SAP HANA Enterprise Cloud Runs on customer preferred infrastructure *according to Gartner Cloud (SaaS) Definition
  • 7. 7CUSTOMER© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ Finding the Right Fit for Your Customer or Prospect (Internal) Begin with public cloud (SaaS) as the best option for a digital future  LowestTCO  Fastest time-to-value  Shortest innovation cycle Continue with private edition as a full cloud offering with more flexibility  LowTCO  More flexibility  Customer-influenced innovation cycle Progress to next option in order to meet customer needs (consider capability and policy requirements) Starting point CloudERP SAP S/4HANA Cloud SAP S/4HANA Cloud, private edition SAP S/4HANA (Private cloud managed by SAP) SAP S/4HANA (On-premise managed by cloud providers or customers)
  • 8. TODAY Highly Customized FUTURE Cloud ERP Private Managed Cloud SaaS Completely SAP Managed Transformation with SAP’s Private Managed Cloud On Premise SAP Data Center Lift & Shift Bring your SAP solutions on SAP HANA platform in HANA Enterprise Cloud S/4 HANA Migration Migrate your individual ERP- solution to newest S/4 HANA release Innovation Extension Extend the latest innovations of S/4 HANA and extend with SCP Values  Private & Secure  Adaptive & Scalable  Best-Practice Services  Reference Architecture  License Subscription Facts  840+ DCC Customers  3500+ SAP HANA Databases  66TB+ Largest Instance  99.99% Average Availability  1100+ S/4HANA Systems on DCC A customer path to S/4HANA Cloud INTERNAL© 2019 SAP SE or an SAP affiliate company. All rights reserved. ǀ
  • 10. 10CUSTOMER© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ Transition to SAP S/4HANA Different approaches to move to SAP S/4HANA Type Approach Available for Purpose System Conversion (Tool: Software Update Manager) New Implementation (Tool: SAP S/4HANA migration cockpit) Hybrid Data Transition (Customer-tailored service/consulting offering) Reusing byin-place conversion Bringing your business processes to the new platform  A complete technical in-place conversion of an existing ERP software system in SAP Business Suite to SAP S/4HANA  Adoption of new innovations at your speed New implementation/reimplementation  Reengineering and process simplification based on latest innovations  Implementing innovative business processes with preconfigured content on a new platform  Performing initial data load  Retiring old landscape Value-driven data migration to the new platform  You need more than master data and open items, such as transactional data, complete or selected by a time slice  Migrate a selection of data (such as by organizational units), or migrate data from more than one system, or migrate application- related data into an SAP S/4HANA–based solution landscape Standardized Customer tailored Reengineering withdatamigration SAP S/4HANASAP ERP system SAP S/4HANASAP ERP or third-party system(s) SAP S/4HANA SAP S/4HANA Cloud SAP ERP or third-party system(s) SAP Community blog: How to find my path to SAP S/4HANA
  • 11. 11CUSTOMER© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ SAP S/4HANA New Implementation Scenario description New implementation of SAP S/4HANA e.g. for customers migrating a legacy system. Legacy Any customers legacy system Initial data load from Legacy or SAP System with SAP S/4HANA Migration Cockpit What How Install SAP S/4HANA SWPM (Software Provisioning Manager) Initial data load from source system • SAP S/4HANA Migration Cockpit (Legacy system via file upload) • Optional: SAP Data Services with SAP Best Practice Migration content 1 2 (SAP GUI) / SAP Fiori SAP HANA SAP S/4HANA Core
  • 12. 12CUSTOMER© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ SAP S/4HANA System Conversion – Transition Paths Overview Prerequisites on source system • Unicode is required • ABAP single stack required • SAP HANA database not required • SAP Suite on HANA customers who are planning a system conversion to SAP S/4HANA 1709 or 1809 must first update the database from SAP HANA 1.0 to SAP HANA 2.0 and then do the system conversion SAP HANA SAP S/4HANA 1809 SAP S/4HANA System Conversion – At a glance Conversion requirements incl. min./max. SP-level on source system: 2625407 - SAPS/4HANA 1809: Release Information Note 2482453 - SAP S/4HANA 1709: Release Information Note AnyDB or SAP HANA SAP ERP 6.0, EHP xx Prerequisites on target system • SAP S/4HANA 1809 is based on SAP ABAP Platform 1809​ • SAP ABAP Platform 1809 has different OS coverage
  • 13. 13CUSTOMER© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ Comparing the Paths to SAP S/4HANA Questions influencing the choice of the transition scenario System Requirements New Implementation System Conversion A company has restrictions that do not allow to move to SAP S/4HANA on-premise in a one- step procedure. New Implementation System Conversion New Implementation System Conversion A company has business processes that already fit to the current requirements. New Implementation System Conversion New Implementation System Conversion Custom Code Time to Value A company has checked and is able to take over existing custom code. A company wants to go live rather fast. Business Processes A company seeks to fundamentally redesign its business processes.
  • 15. 15CUSTOMER© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ Near Zero Downtime Overview (only Available via involving SAPC via DBS) SAP S/4HANA Conversion as sample ERP 6.0x via DMO of SUM Data model conversion S/4 HANA ERP 6.0x ERP 6.0x S/4 HANA Create clone Software update, database migration, … Repeated replay and data conversion of delta Final delta replay S/4 HANA Production operation Uptime UptimeDowntime 1. Start recording on PRD 2. Create the NZDT clone 3. Start converting the clone to S/4HANA – SUM/DMO 4. Convert the original data to SAP S/4HANA data model 5. Start on-line replay and conversion of the recorded data (repeated replay and conversion to S/4 data model possible) 6. Begin downtime and finalize replay of the recorded data 7. Convert the remaining data to SAP S/4HANA data model 8. Validate the system and go live with SAP S/4HANA 1 2 3 4 5 6 7 8 Recording Final data conversion
  • 16. 16CUSTOMER© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ High Level Planning & preparation Steps for S4HANA conversion  Project Planning, resources, existing ECC UAT scripts  Any Data Archiving, Housekeeping etc to reduce database size  Check for and remove obsolete custom code (i.e CCLM), unnecessary modifications and clones of SAP standard objects, in order to keep your code base clean.  Check your custom code and start HANA database related adjustments as part of preparation for S/4HANA  Execute S/HANA Sizing, HANA Hardware and infrastructure provisioning by customer, Split any dual stack systems  Execute the S/4HANA Readiness check using the Maintenance planner, pre-transition checks etc to check  your SAP ERP system (including SAP and partner add-ons) can technically be converted to S/4HANA.  Check Technical scope and restrictions, Check the pre-requisite SAP Notes  Check Installed ERP & partner add-ons, Industry solutions are compatible with HANA or S/4HANA  Check custom code for needed adaptations to the new SAP data model etc.  Explore the simplification items - the functionalities relevant for you that have changed  Review the S/4HANA simplification List, cook Book, conversion guides etc  Any OS /DB scripts which needs to be adjusted in the target OS / DB systems.  In S/4HANA Business Partner replaces the ERP Customer/supplier concept. Get accustomed to Business Partner Know-How  Check for consistent customer/supplier data and valid and consistent customer/supplier and Business Partner customizing entries in ERP system  Clean up your customer and vendor data in preparation for the Business Partner and Customer/Vendor Integration (CVI) (SAP Notes: 2211312, 2210486, 2216176)  Execute Pre-conversion check to ensure that all the necessary CVI mappings are done for both customer and vendor.  Note 2216176 delivers the pre-conversion checks for Business Partner which have to be executed before the conversion to S/4
  • 17. 17CUSTOMER© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ SAP S/4HANA conversion impact to other NW systems  SAP Note 1388258 – Central Hub systems like Portal, PI & BW need to be upgraded mandatorily to Netweaver 7.31 (min)  Either a new Fiori setup would need to be Greenfield implemented or existing Fiori will need to be upgraded in synch with the Target S/4HANA version  Solution Manager must be minimum version 7.01 SPS 23 or 7.1 SPS 10  If the source ECC system is on HANA 1.0, an upgrade to HANA 2.0 will be needed as a pre-requisite  If applicable, upgrade of other NW systems can be done as pre-requisite steps or within the same S/4HANA conversion project. SAP PI, BW, Portal AS ABAP < 7.31 AnyDB SAP PI, BW, Portal AS ABAP >=7.31 AnyDB SAP PI, BW or Portal systems lower than Netweaver 7.31 SAP PI, BW or Portal systems would need to be upgraded to minimum Netweaver 7.31
  • 18. 18CUSTOMER© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ S/4HANA Sizing  Apply the necessary SAP Notes on the ERP system on AnyDB  Refresh Database statistics  Execute the Sizing Report  Analyze the output for the HANA Appliance Memory output  Work with the preferred Hardware vendor to order the HANA appliance  Only the database server needs to be changed, the application server can be reutilized
  • 19. 19CUSTOMER© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ Why do we need Custom Code Analysis? Drivers of Change within a S/4HANA Migration Project Possible Sources of Impact to Custom Code – Software Changes The change of software levels (e.g. SPS, EHP, and/or version) has the potential of impacting custom code, especially when custom code makes references to the standard objects that were enhanced/modified as part of the software update. – Platform Changes As there may be platform specific performance hints implemented within custom code, the change of the underlying platform (i.e. to SAP HANA) could impact the performance of that code. Additionally, implications like sort order also have to be accounted for when changing platforms. – Unicode Conversion The migration to SAP HANA requires that the database is Unicode. If the source system has yet to converted, the conversion can be included in the scope of the migration project. As a requirement for the conversion, all custom code must be Unicode enabled. – Business Requirements Evolution in the business and adoption of innovations can both be drivers for change to custom code. With the migration to SAP HANA, the business may decide to include some of these enhancements within the scope of the project. – Data Model Simplification The simplification of the data model with S/4HANA can have a potential impact on custom code. For instance, custom code that directly writes to the total tables will need to be adjusted.
  • 20. 20CUSTOMER© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ Custom Code Management Approach for Remediating Custom Code Get transparency on Custom Code Go back to SAP Standard** Remove waste  Readiness Check  Logging  Usage & Procedure Logging  Innovation Control Center Adjust HANA specifics  Sort order, DB hints, EXEC SQL… **) Not covered in this deck 1 2 Refactoring BP Re-Design Analyze Impact & Create a plan  Code Inspector / ATC 3  Technical replacement of custom by SAP code  Re-Engineer & improve BP Adjust Upgrade / EHP specifics  Changed / removed SAP code Adjust S/4HANA specifics  Write access on totals  Views on totals, appends  Incompatible SAP software changes Can happen upfront of a migration project 4 Identify Analyze Improve We are Here !! Next Step
  • 21. Custom Code Extensibility using SCP – side by side Extensions
  • 22. 22CUSTOMER© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ Custom Code Extension using SCP - enables Extension, Integration, development Extend cloud solutions running in the cloud with custom extensions also running in the cloud Build new custom solutions running in the cloud Extend on-premises solutions running in your data center with custom extensions running in the cloud On-Demand Extensions Hybrid Solutions New Cloud Solutions On-Premise Services DataServices Data On-Premise Extension Data SAP Business Suites … Services Data Cloud Extension Data Cloud Solutions Cloud Application Extend Cloud & On-Prem Apps Integrate Your Apps and Data Build New Cloud Apps
  • 23. 23CUSTOMER© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ Side-by-side Extensibility for SAP S/4HANA using SAP Cloud Platform ABAP Environment KEY CAPABILITIES Develop and deploy side-by-side extensions on a separate PaaS Integrate with SAP S/4HANA Consume SAP S/4HANA data via whitelisted APIs BENEFITS Leverage your ABAP know how in the cloud Transform your ABAP custom code to the cloud Benefit from SAP Cloud Platform environment Application Clients Corporate Identity Provider Backend system, i.e SAP S/4HANA Cloud, SAP S/4HANA, SAP ERP, SAP NetWeaver AS ABAP SAP CLOUD PLATFORM Custom Data SAP HANA tenant Your ABAP extension Connectivity Please note: first version supports S/4HANA Cloud extensions only, on-prem support will be released in Q4 2018
  • 24. 24CUSTOMER© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ Custom Code - When to decouple and to use side-by-side extensions by use case examples In-App Side by side Modification to SAP Standard Code -Modifying SAP S/4HANA software (SAP Standard programs) with full access to ABAP Workbench (SE80) X Developing custom code enhancements in SAP Standard applications -using Customer exits, Z-Programs on customer name spaces, BAdIs, APIs X X -adding functionality, Fields, Tables to standard SAP software without actually the original standard delivered objects X X Developing (incl. ABAP) custom applications integrated to and decoupled from SAP Standard application -Custom Apps combining SAP and/or non-SAP data – write back to ERP X X -Custom Apps combining SAP and/or non-SAP data – no write back to ERP X -ERP Z-ABAP code still required and reasonable/feasible to be decoupled from core ERP X Connecting to IoT sensors, streaming and (incl. instantaneous) analyzing of IoT data X Exploring and Running AI, Predictive, Machine Learning, IoT services on ERP data and non-ERP data X Integration of AI, Predictive, Machine Learning, IoT “results” (back) into standard core ERP processes, S4, ECC… X Consumer-grade UX -UX - User Interface - Design Time cloud, Run Time on premise, Portal on premise X -UX - User Interface - Design Time cloud, Run Time cloud, incl. single Fiori Launchpad for cloud and on-premise Fiori X -UX - Mobile Apps deployed in Cloud Portal, and/or corporate AppStore incl. Apple SDK X -ERP Z-transaction to be replaced with mobile Apps or custom UX for example prior to conversion to S/4HANA X Flexible Process Integration based on API’s with on-premise and cloud applications, SAP and 3rd-party X BI Self Service and Data Integration, which deviate from standard corporate (stable core) BI, KPI’s etc. -Data Transformation X -Combining SAP data with non-SAP data X -Creating ad-hoc queries and KPI’s against live production data without transports X Big Data Storage and Exploration X
  • 25. 25CUSTOMER© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ Conversion  Prepare the digital core to be stable, clean and lean for S/4HANA conversion  Decouple modifications from S/4HANA to SAP Cloud Platform wherever possible Greenfield  Keep the new stable core clean and lean from the start  Stay close to Standard as much as possible  Minimize Modifications in stable core Accelerate your Journey to S/4HANA
  • 26. 26CUSTOMER© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ ECC to S/4HANA conversion steps ERP DEV / AnyDB  New S/4HANA production support systems to replace the current ERP systems ERP QAS / AnyDB ERP PRD / AnyDB SAP S/4HANA DEV SAP S/4HANA QAS SAP S/4HANA PRD New Hardware Existing Instances S/4HANA Conversion steps 1. Build a Sandbox (SBX) system on AnyDB via system copy from Production 2. Migrate Sandbox (SBX) system on AnyDB to SAP S/4HANA. Fix all issues, custom coding here. 3. Migrate Development system to S/4HANA. Use the DEV S/4HANA system as Development system for the conversion project 4. Migrate Quality system. This will be used as S/4HANA Quality system for the conversion project. 5. Mock Cutover and Dress-Rehearsal (Migration to S/4HANA) based on a fresh system copy of PRD 6. Go-live. Conversion of the S/4HANA Production system 7. Decommission ERP systems running on AnyDB database, decommission S/4HANA SBX system. SAP ERP SBX / AnyDBS/4HANA SBX 1 2 3 4 6 5 7
  • 27. 27CUSTOMER© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ Transition to SAP S/4HANA Optional – Include Additional Innovations or solution to existing pain points Technical Migration Business Process Transformation New Implementation (‚Greenfield‘) System Conversion (technical project) Landscape Transfomation w/ individual Scope System Conversion with additional/full scope of BP Transformation (aka‘Big Bang‘) seperate, single implementation projects (i.e. BP re-design, new Applications, Fiori UX, etc.) i.e. mandatory Simplifications and FI Migration
  • 28. 28CUSTOMER© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ 3 Elements of S/4HANA Conversion Database Migration Functional Impact Custom Code Impact S/4HANA conversion consists of 3 mandatory logically distinct efforts • Effort is similar to other DB migrations a customer may have already done • No longer required for SoH customers • Functional impact of application simplification and following the principle of one • Many simplification list items can be done on start release as preparation for S/4HANA conversion • Upgrade-like tasks with SPAU, SPDD and S/4 specific custom code efforts • Experience shows that SPAU and SPDD efforts often exceed S/4 specific custom code efforts • S/4 specific custom code efforts are mainly resulting from data model changes • Recommendation: perform housekeeping (get rid of unused code, delete unused data, …) Optional consumption of innovation • Traditional capabilities are generally available thus it is possible to convert to S/4HANA rather technically • The degree of process change is largely a business decision when planning the conversion project Mandatory Optional
  • 29. 29CUSTOMER© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ S/4HANA System Conversion – Best Practices Conversion Tasks Preparation Activities Pre - Conversion Activities Conversion to S/4HANA Post-Conversion Activities 1 2 3 4  S/4HANA Conversion preparation activities  Maintenance Planner Checks  Functional Pre-Checks  Custom Code Migration Worklist  Check on the Add-Ons (SAP INVOICE MGMT BY OT 6.0- VIM 0600_600)  System Conversion Pre- Checks Activities  Check Currency Settings and CO Configuration  Create Production Versions for all BOM & Routing combinations  Convert Storage Locations to MRP Areas  Customer Vendor Integration  Perform month end closing for all previous periods – including periodic asset postings  Perform consistency checks (total of open items to GL balance)  Perform reconciliation across various Functional applications • SUM-DMO to migrate ERP system to S/4HANA 1809 system • Gateway Server installation and configuration • Fiori Add-on Installation and Configuration for S/4 HANA • Track the issues faced during the conversion • SPDD Activities • Activation of new Asset Accounting and SAP Credit management • Material Ledger activation at Valuation Area level • System Conversion Post Check Activities • Reconcile balances of Universal journal with the pre-conversion balances • Replacement of MBxx and Sales master data transactions • Fiori Activation
  • 30. 30CUSTOMER© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ Transition to SAP S/4HANA High Level Conversion Timeline – no two customers are same Activate Phases - > Prep Project Week Responsibility 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Project Preparation Partner / Customer Cycle 1: SBX (copy of PRD) Prepare ECC to 1809 conversion (CVI, custom code analysis, application checks, SAP Notes) Partner SBX Fiori upgrade or new Installation Partner SAP ECC to 1809 Conversion using SUM w DMO option Partner Post Activities to Complete SAP S/4HANA Conversion Partner Custom Code Fixes Partner Functional verification by users Customer Cycle 2: DEV DEV Pre - conversion S/4HANA tasks (CVI, Application checks, SAP Notes) Partner SBX Fiori upgrade or new Installation Partner SAP ECC to 1809 Conversion using SUM w DMO option Partner Post Activities to Complete SAP S/4HANA Conversion Partner Quick Functional verification by users Customer Cycle 3: QAS DEV Pre - conversion S/4HANA tasks (CVI, Application checks, SAP Notes) Partner SBX Fiori upgrade or new Installation Partner SAP ECC to 1809 Conversion using SUM w DMO option Partner Post Activities to Complete SAP S/4HANA Conversion Partner Integration Test / UAT Customer Any extra Testing, GO/No-Go decision in view of testing results status Customer Cycle 5: CutOver Rehearsal Refresh ECC sandbox from ECC Production Customer Cutover Rehearsal simulating actual go-live Partner / Customer Cycle 4: PRD cut over planning & preparation Partner / Customer Go-live (S4, Fiori) Partner / Customer Go-live Support Partner Deploy RunExplore Realize This is a draft timeline only. Every customer is different. Actual timeline will depend on customer setup like Business functionality, custom code impacted, number of cycles needed, UAT issues, duration etc
  • 31. 31CUSTOMER© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ SAP S/4HANA Important tools supporting your transition to SAP S/4HANA Application specific follow- up activities Application specific follow- up activities Custom code preparation Realization phase System requirements Software Update Manager (SUM) Cross-application & application specific preparation activities Maintenance planner Pre checks Custom code preparation Preparation phase Simplification List Planning phase Transformation Navigator Roadmap Viewer SAP S/4HANA Readiness Check Uninstall ABAP Add-ons During System Update Database migration Software update Data conversion Remote Scans with ABAP Test Cockpit Simplification Item Catalog Unicode conversion See also the Custom Code Migration Guide New Framework via Simplification Item Catalog New SUM 2.0 incl. Prerequisite Check SAP S/4HANA Readiness Check Remote Scans with ABAP Test Cockpit
  • 33. 33CUSTOMER© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ Discover Determine Prepare Adapt Migrate Discover Your Destination Execute Your MoveBuild Your Business Case  SAP Fiori apps reference library  Business Scenario Recommendations (BSR)  Solution Explorer  Value Lifecycle Manager (VLM)  Pathfinder  Innovation Discovery Tool  SAP Roadmap  SAP Best Practice Explorer  SAP S/4HANA Trial  Feature Scope description  SAP Roadmap Viewer  SAP Transformation Navigator  SAP Readiness Check for SAP S/4HANA  Simplification Item Catalog  Simplification Item Check  Code Inspector / Custom Code Migration Worklist  Pre-Checks  SAP Activate  Maintenance Planner  Migration Cockpit  SAP Data Services with Rapid Data Migration content SAP S/4HANA Deployment Strategy Tool List
  • 34. 34CUSTOMER© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ OpenSAP Course: OpenSAP course “Your Path to SAP S/4HANA” SAP S/4HANA product related Training: SAP S/4HANA Overview and Business Processes Discover SAP S/4HANA Gives an introduction to the next-generation business suite SAP S/4HANA SAP S/4HANA Trials Experience SAP S/4HANA with trials for the cloud and on-premise editions Detailed SAP S/4HANA Roadmaps: SAP product & solution roadmaps Feature Scope Description (PDF) Provides an overview on the available features SAP Help Portal: http://help.sap.com/s4hana: Tipps & Tricks: CVI cookbook BI Extractors: SAP note 2500202 now provides full transparency for customers on availability of BI extractors in SAP S/4HANA. SD Foreign Trade:Most of the former SD Foreign Trade scope is meanwhile available directly in SAP S/4HANA. Therefore customers currently using SD Foreign Trade can in most cases avoid the effort of migrating to SAP GTS. SAP Community Blog: the top simplificationlist items Useful links: application specific preparation SAP Readiness Check for SAP S/4HANA SAP S/4HANA System Conversion – At a glance Maintenance Planner (SAP Help Portal) oder http://help.sap.com/maintenanceplanner  SCN BLOG: Maintenance Planner  SCN BLOG: Maintenance Planner – Release Highlights Simplification Item Catalog Pre-checks in System Conversion SAP S/4HANA Simplification Item Check – How to do it right‘ ABAP Test Cockpit – an Introduction to SAP’s new ABAP Quality Assurance Tool ,  Remote Code Analysis in ATC – One central check system for multiple systems on various releases  Remote Code Analysis in ATC – Technical Setup step by step  Remote Code Analysis in ATC – Working with Baseline to suppress findings in old legacy code  Remote Code Analysis in ATC for Developers  Remote Code Analysis in ATC – Working with Exemptions  Remote Code Analysis in ATC – Scanning customer extensions  Remote Code Analysis in ATC – Working efficiently with ATC Result List  Remote Code Analysis in ATC – FAQ ABAP Testing and Analysis Community: Link ABAP Call Monitor (SCMON): Link Usage Procedure Logging (UPL): Link Best Practices Custom Code Lifecycle Management (CCLM): Link ABAP custom code migration and recommendations for SAP HANA: • SAP Note: 1912445 • SAP Community: Link Further information see • SAP Community Blog on Custom Code Adaptation process • SAP Note: 2241080 • SAP Note: 2190420
  • 35. Questions ? Thank you ! Abhishek Goel S/4HANA Movement Specialist abhi.goel@sap.com