Managing Structured aircraft Modification ProjectS
Program overview
Typically we focus on hands-on Engineering and installation challenges rather than taking a top-down view of an
entire installation and planning accordingly. As a result, we are often unable to keep to the scheduled timeline
causing expensive delays in returning our airplanes to service and cost over-runs. The bulk of the cost of a
modification lies in the time the aircraft is out of service, not in the money spent on parts and labor. We have
a valuable asset depreciating while at the same time it is not generating revenue.

Schedule:

This course includes workshops on pre-prototype and installation planning from project inception to “airplane
in the hangar” for both these new products:

● Garden Hotel,
Kuala Lumpur , Malaysia

• Nitrogen Generating System (NGS), Fuel Tank Inerting System (FTIS), and
• Onboard Wifi (in-flight wireless internet for customers).
Installation and components of the above products are discussed in detail but not at part number level, nor are
detailed engineering issues addressed during this course..
The US FAA mandated NGS several years ago and the first deadline will come 12/26/14, so all US carriers are
working with urgency. In Europe, airlines are not yet retrofitting airplanes with NGS and FTIS but all new aircraft
are being delivered with the products installed. Asian airlines in Singapore, Japan, and China have already
begun retrofitting NGS and FTIS on their fleets in anticipation of the awaited update from local government
Aviation organizations.
The curriculum includes scheduling, dependencies, resource planning, risk management, progress tracking,
vendor/MRO management and other critical path topics. Typically, aviation projects are large and crossfunctional including MROs and other vendors. The Project Manager usually does not have direct reports
and must therefore influence people and use leadership to gain stakeholder trust and commitment. Several
techniques are taught for building teamwork and sustained momentum with cross-functional and third party
stakeholders, all of whom have competing priorities.
At the conclusion of this course participants will have added project planning, tracking, team-building, and
leaderships to their skills as well as detailed installation planning knowledge on NGS and onboard Wifi.

Benefits

● 22 & 23 January 2014
Venue:

target audience
A must attend MasterClass for:
•Airline and MRO Maintenance
Managers
•Aviation Engineers
•Airline and MRO Maintenance
Planners
•Airline and MRO Project
Managers
From the following industries:
• Airlines
• Defense Directorates
• MROs, Repair Stations
• Universities

●
●
●
●

Project Management principles and techniques and how to apply them to your aircraft modification projects.
Anticipate and mitigate risks to timelines that can cause delays.
Advance tasks from the prototype installation phase so that they are completed prior to aircraft induction.
Leadership and teamwork techniques that maximize stakeholder commitment and energy in cross-functional
environments.
● How to plan the installation of the following products from project inception until starting the modifications:
• Nitrogen Generating System (NGS) and Fuel Tank Inerting System (FTIS)
• Onboard wifi applications
● Gain cutting-edge insight on how to plan your prototype and install the above products using the shortest amount
of ground time in the most efficient manner.
www.eccinternational.com

• Aircraft and Component
• Manufacturers
• Air Forces
• Technical Colleges
• Civil Aviation Authorities
• Aircraft Wiring / Avionics
Suppliers

More Related Content

Viewers also liked

Nasogastric intubation
Nasogastric intubationNasogastric intubation
Nasogastric intubation
Larina Martin
 
2007 Annexe à la circulaire couleur des bouteilles de gaz
2007 Annexe à la circulaire couleur des bouteilles de gaz2007 Annexe à la circulaire couleur des bouteilles de gaz
2007 Annexe à la circulaire couleur des bouteilles de gaz
APRHOC
 

Viewers also liked (20)

Sas Xr200
Sas Xr200Sas Xr200
Sas Xr200
 
Electronics & Avionics project
Electronics & Avionics projectElectronics & Avionics project
Electronics & Avionics project
 
Energy efficient aviation infrastructure
Energy efficient aviation infrastructureEnergy efficient aviation infrastructure
Energy efficient aviation infrastructure
 
Topic 7 Digital Technique Fiber optics
Topic 7 Digital Technique Fiber opticsTopic 7 Digital Technique Fiber optics
Topic 7 Digital Technique Fiber optics
 
Aircraft fuel system
Aircraft fuel systemAircraft fuel system
Aircraft fuel system
 
Nasogastric Tube (NGT) insertion and removal
Nasogastric Tube (NGT) insertion and removalNasogastric Tube (NGT) insertion and removal
Nasogastric Tube (NGT) insertion and removal
 
NLMB: Slides 67 to 73
NLMB: Slides 67 to 73NLMB: Slides 67 to 73
NLMB: Slides 67 to 73
 
Safety Management Systems (SMS) Fundamentals: Basics
Safety Management Systems (SMS) Fundamentals: BasicsSafety Management Systems (SMS) Fundamentals: Basics
Safety Management Systems (SMS) Fundamentals: Basics
 
Nasogastric intubation
Nasogastric intubationNasogastric intubation
Nasogastric intubation
 
La place du power-to-gas dans le système énergétique futur
La place du power-to-gas dans le système énergétique futurLa place du power-to-gas dans le système énergétique futur
La place du power-to-gas dans le système énergétique futur
 
40 cfr 261.4(b)(6) The RCRA Exclusion From Hazardous Waste for Trivalent Chro...
40 cfr 261.4(b)(6) The RCRA Exclusion From Hazardous Waste for Trivalent Chro...40 cfr 261.4(b)(6) The RCRA Exclusion From Hazardous Waste for Trivalent Chro...
40 cfr 261.4(b)(6) The RCRA Exclusion From Hazardous Waste for Trivalent Chro...
 
A SHORT REVIEW ON ALUMINIUM ANODIZING: AN ECO-FRIENDLY METAL FINISHING PROCESS
A SHORT REVIEW ON ALUMINIUM ANODIZING: AN ECO-FRIENDLY METAL FINISHING PROCESSA SHORT REVIEW ON ALUMINIUM ANODIZING: AN ECO-FRIENDLY METAL FINISHING PROCESS
A SHORT REVIEW ON ALUMINIUM ANODIZING: AN ECO-FRIENDLY METAL FINISHING PROCESS
 
Principles of corrosion
Principles of corrosionPrinciples of corrosion
Principles of corrosion
 
Chromium problems
Chromium problemsChromium problems
Chromium problems
 
Aluminum Anodizing
Aluminum AnodizingAluminum Anodizing
Aluminum Anodizing
 
TALAT Lecture 5203: Anodizing of Aluminium
TALAT Lecture 5203: Anodizing of AluminiumTALAT Lecture 5203: Anodizing of Aluminium
TALAT Lecture 5203: Anodizing of Aluminium
 
Methods for removal of chromium
Methods for removal of chromiumMethods for removal of chromium
Methods for removal of chromium
 
2007 Annexe à la circulaire couleur des bouteilles de gaz
2007 Annexe à la circulaire couleur des bouteilles de gaz2007 Annexe à la circulaire couleur des bouteilles de gaz
2007 Annexe à la circulaire couleur des bouteilles de gaz
 
Effect of Nanoporous Anodic Aluminum Oxide (AAO) Characteristics On Solar Abs...
Effect of Nanoporous Anodic Aluminum Oxide (AAO) Characteristics On Solar Abs...Effect of Nanoporous Anodic Aluminum Oxide (AAO) Characteristics On Solar Abs...
Effect of Nanoporous Anodic Aluminum Oxide (AAO) Characteristics On Solar Abs...
 
Removal of chromium
Removal of chromiumRemoval of chromium
Removal of chromium
 

Similar to Managing Structured Aircraft Modification Projects

Manuel Neto- Resume 2016
Manuel Neto-  Resume 2016Manuel Neto-  Resume 2016
Manuel Neto- Resume 2016
Neto Manuel
 
R.Rodriguez_CurrentCoverLetter_Resume
R.Rodriguez_CurrentCoverLetter_ResumeR.Rodriguez_CurrentCoverLetter_Resume
R.Rodriguez_CurrentCoverLetter_Resume
René Rodríguez, Jr.
 
Jerry Beste Resume_04.2015
Jerry Beste Resume_04.2015Jerry Beste Resume_04.2015
Jerry Beste Resume_04.2015
Jerry Beste
 
All Interior Customer - Boeing - Manufacturer - Support
All Interior Customer - Boeing - Manufacturer - SupportAll Interior Customer - Boeing - Manufacturer - Support
All Interior Customer - Boeing - Manufacturer - Support
Derek Gresler
 
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015
ramiz reyad
 

Similar to Managing Structured Aircraft Modification Projects (20)

Manuel Neto- Resume 2016
Manuel Neto-  Resume 2016Manuel Neto-  Resume 2016
Manuel Neto- Resume 2016
 
CV
CVCV
CV
 
Offshore & Marine Projects and Risk Management with Contractual Perspectives
Offshore & Marine Projects and Risk Management with Contractual PerspectivesOffshore & Marine Projects and Risk Management with Contractual Perspectives
Offshore & Marine Projects and Risk Management with Contractual Perspectives
 
PD219 Offshore & Marine Projects and Risk Management with Contractual Perspec...
PD219 Offshore & Marine Projects and Risk Management with Contractual Perspec...PD219 Offshore & Marine Projects and Risk Management with Contractual Perspec...
PD219 Offshore & Marine Projects and Risk Management with Contractual Perspec...
 
Certified Planning Engineer CPE
Certified Planning Engineer CPE Certified Planning Engineer CPE
Certified Planning Engineer CPE
 
Jc resume1
Jc resume1Jc resume1
Jc resume1
 
R.Rodriguez_CurrentCoverLetter_Resume
R.Rodriguez_CurrentCoverLetter_ResumeR.Rodriguez_CurrentCoverLetter_Resume
R.Rodriguez_CurrentCoverLetter_Resume
 
Jerry Beste Resume_04.2015
Jerry Beste Resume_04.2015Jerry Beste Resume_04.2015
Jerry Beste Resume_04.2015
 
CV-Baghzouz Nour New
CV-Baghzouz Nour NewCV-Baghzouz Nour New
CV-Baghzouz Nour New
 
SURESH MANICKAM
SURESH MANICKAMSURESH MANICKAM
SURESH MANICKAM
 
CV-Mohamed Mabrouk-Technical Trainer
CV-Mohamed Mabrouk-Technical TrainerCV-Mohamed Mabrouk-Technical Trainer
CV-Mohamed Mabrouk-Technical Trainer
 
All Interior Customer - Boeing - Manufacturer - Support
All Interior Customer - Boeing - Manufacturer - SupportAll Interior Customer - Boeing - Manufacturer - Support
All Interior Customer - Boeing - Manufacturer - Support
 
Civili Engr Aldophus Bethune CV
Civili Engr Aldophus Bethune CVCivili Engr Aldophus Bethune CV
Civili Engr Aldophus Bethune CV
 
The Completions Group Overview
The Completions Group OverviewThe Completions Group Overview
The Completions Group Overview
 
The Completions Group Overview
The Completions Group OverviewThe Completions Group Overview
The Completions Group Overview
 
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015
 
IRJET- Schedule Delay Analysis in Construction Management using Primavera P6
IRJET- Schedule Delay Analysis in Construction Management using Primavera P6IRJET- Schedule Delay Analysis in Construction Management using Primavera P6
IRJET- Schedule Delay Analysis in Construction Management using Primavera P6
 
Oman EPC 2015 summary and recommendations
Oman EPC 2015 summary and recommendationsOman EPC 2015 summary and recommendations
Oman EPC 2015 summary and recommendations
 
CV
CVCV
CV
 
Mohamed Fazil CV
Mohamed Fazil CVMohamed Fazil CV
Mohamed Fazil CV
 

More from APEXMarCom

More from APEXMarCom (6)

Training ROI - Return of Investment
Training ROI - Return of InvestmentTraining ROI - Return of Investment
Training ROI - Return of Investment
 
An IMPERATIVE for EVERY ORGANIZATION: Crisis Communication Planner
An IMPERATIVE for EVERY ORGANIZATION: Crisis Communication PlannerAn IMPERATIVE for EVERY ORGANIZATION: Crisis Communication Planner
An IMPERATIVE for EVERY ORGANIZATION: Crisis Communication Planner
 
CERTIFIED Data Center Professional - CDCP
CERTIFIED Data Center Professional - CDCPCERTIFIED Data Center Professional - CDCP
CERTIFIED Data Center Professional - CDCP
 
Blended ITIL® Foundation
Blended ITIL® FoundationBlended ITIL® Foundation
Blended ITIL® Foundation
 
Cloud Essentials Course
Cloud Essentials CourseCloud Essentials Course
Cloud Essentials Course
 
Friday Forum ISO 27001: 2013
Friday Forum ISO 27001: 2013Friday Forum ISO 27001: 2013
Friday Forum ISO 27001: 2013
 

Recently uploaded

Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
WSO2
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
?#DUbAI#??##{{(☎️+971_581248768%)**%*]'#abortion pills for sale in dubai@
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
panagenda
 

Recently uploaded (20)

AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
 
Manulife - Insurer Transformation Award 2024
Manulife - Insurer Transformation Award 2024Manulife - Insurer Transformation Award 2024
Manulife - Insurer Transformation Award 2024
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
A Beginners Guide to Building a RAG App Using Open Source Milvus
A Beginners Guide to Building a RAG App Using Open Source MilvusA Beginners Guide to Building a RAG App Using Open Source Milvus
A Beginners Guide to Building a RAG App Using Open Source Milvus
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectors
 

Managing Structured Aircraft Modification Projects

  • 1. LiMited SLotS onLY! Managing Structured aircraft Modification ProjectS Program overview Typically we focus on hands-on Engineering and installation challenges rather than taking a top-down view of an entire installation and planning accordingly. As a result, we are often unable to keep to the scheduled timeline causing expensive delays in returning our airplanes to service and cost over-runs. The bulk of the cost of a modification lies in the time the aircraft is out of service, not in the money spent on parts and labor. We have a valuable asset depreciating while at the same time it is not generating revenue. Schedule: This course includes workshops on pre-prototype and installation planning from project inception to “airplane in the hangar” for both these new products: ● Garden Hotel, Kuala Lumpur , Malaysia • Nitrogen Generating System (NGS), Fuel Tank Inerting System (FTIS), and • Onboard Wifi (in-flight wireless internet for customers). Installation and components of the above products are discussed in detail but not at part number level, nor are detailed engineering issues addressed during this course.. The US FAA mandated NGS several years ago and the first deadline will come 12/26/14, so all US carriers are working with urgency. In Europe, airlines are not yet retrofitting airplanes with NGS and FTIS but all new aircraft are being delivered with the products installed. Asian airlines in Singapore, Japan, and China have already begun retrofitting NGS and FTIS on their fleets in anticipation of the awaited update from local government Aviation organizations. The curriculum includes scheduling, dependencies, resource planning, risk management, progress tracking, vendor/MRO management and other critical path topics. Typically, aviation projects are large and crossfunctional including MROs and other vendors. The Project Manager usually does not have direct reports and must therefore influence people and use leadership to gain stakeholder trust and commitment. Several techniques are taught for building teamwork and sustained momentum with cross-functional and third party stakeholders, all of whom have competing priorities. At the conclusion of this course participants will have added project planning, tracking, team-building, and leaderships to their skills as well as detailed installation planning knowledge on NGS and onboard Wifi. Benefits ● 22 & 23 January 2014 Venue: target audience A must attend MasterClass for: •Airline and MRO Maintenance Managers •Aviation Engineers •Airline and MRO Maintenance Planners •Airline and MRO Project Managers From the following industries: • Airlines • Defense Directorates • MROs, Repair Stations • Universities ● ● ● ● Project Management principles and techniques and how to apply them to your aircraft modification projects. Anticipate and mitigate risks to timelines that can cause delays. Advance tasks from the prototype installation phase so that they are completed prior to aircraft induction. Leadership and teamwork techniques that maximize stakeholder commitment and energy in cross-functional environments. ● How to plan the installation of the following products from project inception until starting the modifications: • Nitrogen Generating System (NGS) and Fuel Tank Inerting System (FTIS) • Onboard wifi applications ● Gain cutting-edge insight on how to plan your prototype and install the above products using the shortest amount of ground time in the most efficient manner. www.eccinternational.com • Aircraft and Component • Manufacturers • Air Forces • Technical Colleges • Civil Aviation Authorities • Aircraft Wiring / Avionics Suppliers