   A Guide to the Project Management Body of
      Knowledge (PMBOK®), 4th edition
          A WHITE PAPER PREPARED FOR ASPE BY DAVID CACCAMO, PMP




www.ASPE-SDLC.com                                    toll-free: 877-800-5221
A Guide to the Project Management Body of

                               Knowledge (PMBOK®), 4th edition
The 4th edition of A Guide to the Project Management Body of Knowledge (popularly
known as the PMBOK) was issued in 2008 and PMP examinations based upon this
edition will begin on July 1, 2009. As the source for the overwhelming majority of the
material covered on the test, it is imperative for prospective PMPs who have some
familiarity with the older 3rd edition to retool their thinking to bring it in line with the
changed text. Likewise, current PMPs who tested on the 3rd edition should make
themselves aware of the changes in order to stay current with the process
terminology that will soon follow in organizations that wish to be fully PMBOK
compliant.

The major changes to the PMBOK are:

    1) The adoption of the verb-noun format for process names

    2) Amplification as to Enterprise Environmental Factors and Organizational
       Process Assets

    3) Clarifications as to the relationships between Corrective Actions, Preventative
       Actions, Defect Repairs, and Requested changes

    4) The elimination, addition, and consolidation of processes to tighten the logic of
       the process groups

    5) A division of the Project Management Plan documents from Project Documents
       that was unclear in the 3rd edition of the PMBOK

    6) The establishment of a distinction between the elements of a Project Charter
       from the Project Scope Statement

    7) The elimination of process flow diagrams that were often interpreted as
       activity diagrams rather than logical flows

    8) More emphasis on the logical connections between the processes (where
       outputs become inputs to follow-on processes)

    9) An appendix that is intended to emphasize the need for soft (interpersonal)
       skills




© 2009 ASPE – all rights reserved                                                                                Page 1
                                       th
                 A Guide to the PMBOK, 4    Edition – A White Paper prepared for ASPE’s SDLC Training Division
Verb-Noun Format

The standardization of the name format for the processes, while not a major change,
was indicative of a general move to force consistency between the nine knowledge
areas. The Project Management Institute is, in many ways, an academic-like
organization. That means that decisions are reached by consensus, and it is at least
arguable that there was too much consensus and too little direction by the editors
when it come to things such as the standardization of tools, the naming of processes,
and the use of inputs. For example, most processes in a knowledge area use the
subsidiary management plan for that area as an input. But sometimes, for no
apparent reason, there were unexplained exceptions. The across-the-board
standardization of the 4th edition is very welcome improvement and serves to make
the PMBOK more logically consistent.

Enterprise Environmental Factors/Organizational Process Assets

The 3rd edition PMBOK freely used Enterprise Environmental Factors and
Organizational Process Assets as inputs for many of the processes. Obviously the vast
range of processes implied a great deal of depth in these two inputs, but the
explanations given in the early chapters were not sufficient to support all of these
uses. The expansion of these two inputs respective definitions gives more academic
rigor to the terms, but probably will not be considered of great importance to most
project managers.

Corrective Actions / Preventive Actions / Defect Repairs / Change Requests

One way of looking at how these four outputs (and subsequent inputs) differed was to
think about the difference between short-term and long-term management actions.
In this scheme, Corrective Actions, Preventive Actions, and Defect Repairs can be
thought of as those actions necessary to keep a project on track (i.e., short-term,
day-to-day management actions), while Change Requests are actions necessary to
change the direction of the project (i.e., long-term, strategic action).

Under the new PMI scheme, Corrective Actions, Preventive Actions, and Defect
Repairs have become variations of Change Requests. In other words, a Change
Request may still be used to increase or decrease the scope of a project (long-term,
strategic action), but it can also mean the mundane day-to-day actions of running a
project (Corrective Actions, Preventive Actions, and Defect Repairs). In addition,
“Updates” has been added as another category. These represent just that, updates
to the content of documents, plans, etc.




© 2009 ASPE – all rights reserved                                                                                Page 2
                                       th
                 A Guide to the PMBOK, 4    Edition – A White Paper prepared for ASPE’s SDLC Training Division
Whether this change helps practitioners may be open to question, but it is certainly
reduces the number of inputs and outputs that a would-be PMP must memorize for
the examination.

Processes

The major changes in the processes themselves were as follows:

         -   The elimination of the “Develop Preliminary Project Scope Statement”
             process

         -   The addition of the “Identify Stakeholders” process

         -   The substitution of the “Collect Requirements” process for the “Scope
             Planning” process

         -   The consolidation of the “Plan Purchases and Acquisitions” and the “Plan
             Contracting” processes into the “Plan Procurements” process

         -   The consolidation of the “Request Seller Responses” and “Select Sellers”
             processes into the “Conduct Procurements” process

         -   The move of the Manage the Project Team from the Monitoring and
             Controlling Process Group to the Executing Process Group

         -   The move of the Manage Stakeholder Expectations from the Monitoring and
             Controlling Process Group to the Executing Process Group

The elimination of the Preliminary Project Scope Statement has so far elicited the
most comment from project managers. Comments have ranged from “I’ll do it
anyway” to “I’ll include it in the Charter” to “I never did it anyway.” The best way of
thinking about this change may be that it reflects a concerted effort to start
distinguishing between Business Analysis processes (during Initiation) and project
scope planning (during planning). Regardless, it seems clear that future editions of
the PMBOK are going to have to confront more directly the growing standardization of
Business Analysis tools and processes being developed under that profession’s own BA
Body of Knowledge.

Most project management professors and instructors have long taught that
stakeholder analysis is the first step in communications planning. Thus the “Identify
Stakeholders” process added under Communications Management in the Initiating
Process Group is a needed change to better illustrate the connection between
stakeholders and project communications management.


© 2009 ASPE – all rights reserved                                                                                Page 3
                                       th
                 A Guide to the PMBOK, 4    Edition – A White Paper prepared for ASPE’s SDLC Training Division
The “Collect Requirements” process helps to present a more detailed understanding
of requirements gathering in developing the project’s scope. And again, the ultimate
reconciliation of the BABOK with the PMBOK would seem to be a logical necessity.

The least consistent knowledge area, at least in terms of process naming, was
Procurement Management. Anyone who has ever sat for the PMP exam probably
remembers this area’s inconsistent and confusing nomenclature. This was an over-
due change.

Finally, the “Manage Stakeholders” process is becoming the “Manage Stakeholder
Expectations” and seems to be a more proactive approach to stakeholder management
than was evidenced by the 3rd edition. In this respect, it is also more in keeping with
how project management is normally taught to new practitioners and serves to make
the PMBOK more relevant to real world management.

Project Management Plan / Project Documents

One difficult to understand feature of the PMBOK third edition was its explanation of
the documents that should or could be included in a Project Management Plan. On
cursory inspection, it appeared that just about any document was fair game to being
included.

The division of the Project Management Plan from all these other working documents
(now referred to as Project Documents) and the subsequent clarification of the
Project Management Plan’s content (baselines and subsidiary management plans)
clears up this confusing situation, much to the PMBOKs improvement.

Incidentally, the PMBOK now refers to the three baselines as the Scope Baseline (still
made up of the Project Scope Statement, the WBS, and the WBS Dictionary), the
Schedule Baseline, and the Cost Performance Baseline.

Project Charter / Project Scope Statement

The emphasis change in the Charter becomes apparent upon reviewing the bullet
items presented in the PMBOK as to what a charter includes. The term “High Level”
is used in three of the bullets and “Summary” in two. The remaining five bullets
describe administrative items (approvals, authority) or background.

Process Flow Diagrams

The Process Flow Diagrams in the third edition were not helpful in understanding just
what was happening in the respective process groups. For example, the Planning flow
diagram was at odds with the stated process inputs of that process group, while the


© 2009 ASPE – all rights reserved                                                                                Page 4
                                       th
                 A Guide to the PMBOK, 4    Edition – A White Paper prepared for ASPE’s SDLC Training Division
Executing diagram was just confusing. Most prospective PMPs thought that what they
were looking at was an activity flow diagram, and they therefore thought they could
transfer these diagrams into a PERT/CPM network for accomplishing their project.
More than a few instructors gave their students corrected diagrams, or even told their
students to ignore the diagrams altogether. Their removal should be welcome news
to anyone trying to understand the PMI methodology.

Logical Connections between Processes

Each of the processes (as presented in their respective knowledge area chapters) now
includes a diagram showing the data flow (inputs) to the process, specifically
identifying the source of that input. In some cases, this diagram comes perilously
close to information overload (as in the “Develop Project Management Plan” process),
but on the whole these diagrams serve the very useful function of illustrating the
connections and feedback loops that connect the various processes.

Interpersonal Skills

The Interpersonal Skills appendix (Appendix G) is a start at recognizing the
importance of these skills in project success, but at present the appendix seems too
general and lacking in specifics to be of any real value. If PMI stays with the appendix
in its next (fifth) edition, look for a considerable “beefing up” of this material.

Conclusion

As with most edition changes, the authors tweaked definitions here and there,
sometimes resulting in clarification, many times making changes that appear simply
cosmetic. But on the whole, the 4th edition was a definite improvement on the 3rd.
The update went a long way towards tightening up the logic of the work as well as
supplying some much needed consistency to everything from simple wording to inputs,
tools and techniques, and outputs. The substantive changes to the processes
themselves were in keeping with the way the profession is actually taught and
practiced, and this alone makes the 4th edition a much better document.




© 2009 ASPE – all rights reserved                                                                                Page 5
                                       th
                 A Guide to the PMBOK, 4    Edition – A White Paper prepared for ASPE’s SDLC Training Division

Contenu connexe

Plus de ASPE, Inc.

Sp2010 Office 2010 Web Seminar
Sp2010 Office 2010 Web SeminarSp2010 Office 2010 Web Seminar
Sp2010 Office 2010 Web SeminarASPE, Inc.
 
SharePoint Office 2010 Web Seminar
SharePoint  Office 2010  Web  SeminarSharePoint  Office 2010  Web  Seminar
SharePoint Office 2010 Web SeminarASPE, Inc.
 
Measuring Business Analyst Impact
Measuring Business Analyst ImpactMeasuring Business Analyst Impact
Measuring Business Analyst ImpactASPE, Inc.
 
BA/PM Interaction: Real world Perspective Based on Feedback and Interaction f...
BA/PM Interaction: Real world Perspective Based on Feedback and Interaction f...BA/PM Interaction: Real world Perspective Based on Feedback and Interaction f...
BA/PM Interaction: Real world Perspective Based on Feedback and Interaction f...ASPE, Inc.
 
Building a Project Management Information System with SharePoint
Building a Project Management Information System with SharePointBuilding a Project Management Information System with SharePoint
Building a Project Management Information System with SharePointASPE, Inc.
 
Implementing a Hyper-V Virtualization Infrastructure
Implementing a Hyper-V Virtualization InfrastructureImplementing a Hyper-V Virtualization Infrastructure
Implementing a Hyper-V Virtualization InfrastructureASPE, Inc.
 

Plus de ASPE, Inc. (6)

Sp2010 Office 2010 Web Seminar
Sp2010 Office 2010 Web SeminarSp2010 Office 2010 Web Seminar
Sp2010 Office 2010 Web Seminar
 
SharePoint Office 2010 Web Seminar
SharePoint  Office 2010  Web  SeminarSharePoint  Office 2010  Web  Seminar
SharePoint Office 2010 Web Seminar
 
Measuring Business Analyst Impact
Measuring Business Analyst ImpactMeasuring Business Analyst Impact
Measuring Business Analyst Impact
 
BA/PM Interaction: Real world Perspective Based on Feedback and Interaction f...
BA/PM Interaction: Real world Perspective Based on Feedback and Interaction f...BA/PM Interaction: Real world Perspective Based on Feedback and Interaction f...
BA/PM Interaction: Real world Perspective Based on Feedback and Interaction f...
 
Building a Project Management Information System with SharePoint
Building a Project Management Information System with SharePointBuilding a Project Management Information System with SharePoint
Building a Project Management Information System with SharePoint
 
Implementing a Hyper-V Virtualization Infrastructure
Implementing a Hyper-V Virtualization InfrastructureImplementing a Hyper-V Virtualization Infrastructure
Implementing a Hyper-V Virtualization Infrastructure
 

Dernier

Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfShashank Mehta
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfrichard876048
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Doge Mining Website
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?Olivia Kresic
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 

Dernier (20)

Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdf
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdf
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
 
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCREnjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 

A Guide to the Project Management Body of Knowledge (PMBOK), 4th edition

  • 1. ASPE SDLC Training A Guide to the Project Management Body of Knowledge (PMBOK®), 4th edition A WHITE PAPER PREPARED FOR ASPE BY DAVID CACCAMO, PMP www.ASPE-SDLC.com toll-free: 877-800-5221
  • 2. A Guide to the Project Management Body of Knowledge (PMBOK®), 4th edition The 4th edition of A Guide to the Project Management Body of Knowledge (popularly known as the PMBOK) was issued in 2008 and PMP examinations based upon this edition will begin on July 1, 2009. As the source for the overwhelming majority of the material covered on the test, it is imperative for prospective PMPs who have some familiarity with the older 3rd edition to retool their thinking to bring it in line with the changed text. Likewise, current PMPs who tested on the 3rd edition should make themselves aware of the changes in order to stay current with the process terminology that will soon follow in organizations that wish to be fully PMBOK compliant. The major changes to the PMBOK are: 1) The adoption of the verb-noun format for process names 2) Amplification as to Enterprise Environmental Factors and Organizational Process Assets 3) Clarifications as to the relationships between Corrective Actions, Preventative Actions, Defect Repairs, and Requested changes 4) The elimination, addition, and consolidation of processes to tighten the logic of the process groups 5) A division of the Project Management Plan documents from Project Documents that was unclear in the 3rd edition of the PMBOK 6) The establishment of a distinction between the elements of a Project Charter from the Project Scope Statement 7) The elimination of process flow diagrams that were often interpreted as activity diagrams rather than logical flows 8) More emphasis on the logical connections between the processes (where outputs become inputs to follow-on processes) 9) An appendix that is intended to emphasize the need for soft (interpersonal) skills © 2009 ASPE – all rights reserved Page 1 th A Guide to the PMBOK, 4 Edition – A White Paper prepared for ASPE’s SDLC Training Division
  • 3. Verb-Noun Format The standardization of the name format for the processes, while not a major change, was indicative of a general move to force consistency between the nine knowledge areas. The Project Management Institute is, in many ways, an academic-like organization. That means that decisions are reached by consensus, and it is at least arguable that there was too much consensus and too little direction by the editors when it come to things such as the standardization of tools, the naming of processes, and the use of inputs. For example, most processes in a knowledge area use the subsidiary management plan for that area as an input. But sometimes, for no apparent reason, there were unexplained exceptions. The across-the-board standardization of the 4th edition is very welcome improvement and serves to make the PMBOK more logically consistent. Enterprise Environmental Factors/Organizational Process Assets The 3rd edition PMBOK freely used Enterprise Environmental Factors and Organizational Process Assets as inputs for many of the processes. Obviously the vast range of processes implied a great deal of depth in these two inputs, but the explanations given in the early chapters were not sufficient to support all of these uses. The expansion of these two inputs respective definitions gives more academic rigor to the terms, but probably will not be considered of great importance to most project managers. Corrective Actions / Preventive Actions / Defect Repairs / Change Requests One way of looking at how these four outputs (and subsequent inputs) differed was to think about the difference between short-term and long-term management actions. In this scheme, Corrective Actions, Preventive Actions, and Defect Repairs can be thought of as those actions necessary to keep a project on track (i.e., short-term, day-to-day management actions), while Change Requests are actions necessary to change the direction of the project (i.e., long-term, strategic action). Under the new PMI scheme, Corrective Actions, Preventive Actions, and Defect Repairs have become variations of Change Requests. In other words, a Change Request may still be used to increase or decrease the scope of a project (long-term, strategic action), but it can also mean the mundane day-to-day actions of running a project (Corrective Actions, Preventive Actions, and Defect Repairs). In addition, “Updates” has been added as another category. These represent just that, updates to the content of documents, plans, etc. © 2009 ASPE – all rights reserved Page 2 th A Guide to the PMBOK, 4 Edition – A White Paper prepared for ASPE’s SDLC Training Division
  • 4. Whether this change helps practitioners may be open to question, but it is certainly reduces the number of inputs and outputs that a would-be PMP must memorize for the examination. Processes The major changes in the processes themselves were as follows: - The elimination of the “Develop Preliminary Project Scope Statement” process - The addition of the “Identify Stakeholders” process - The substitution of the “Collect Requirements” process for the “Scope Planning” process - The consolidation of the “Plan Purchases and Acquisitions” and the “Plan Contracting” processes into the “Plan Procurements” process - The consolidation of the “Request Seller Responses” and “Select Sellers” processes into the “Conduct Procurements” process - The move of the Manage the Project Team from the Monitoring and Controlling Process Group to the Executing Process Group - The move of the Manage Stakeholder Expectations from the Monitoring and Controlling Process Group to the Executing Process Group The elimination of the Preliminary Project Scope Statement has so far elicited the most comment from project managers. Comments have ranged from “I’ll do it anyway” to “I’ll include it in the Charter” to “I never did it anyway.” The best way of thinking about this change may be that it reflects a concerted effort to start distinguishing between Business Analysis processes (during Initiation) and project scope planning (during planning). Regardless, it seems clear that future editions of the PMBOK are going to have to confront more directly the growing standardization of Business Analysis tools and processes being developed under that profession’s own BA Body of Knowledge. Most project management professors and instructors have long taught that stakeholder analysis is the first step in communications planning. Thus the “Identify Stakeholders” process added under Communications Management in the Initiating Process Group is a needed change to better illustrate the connection between stakeholders and project communications management. © 2009 ASPE – all rights reserved Page 3 th A Guide to the PMBOK, 4 Edition – A White Paper prepared for ASPE’s SDLC Training Division
  • 5. The “Collect Requirements” process helps to present a more detailed understanding of requirements gathering in developing the project’s scope. And again, the ultimate reconciliation of the BABOK with the PMBOK would seem to be a logical necessity. The least consistent knowledge area, at least in terms of process naming, was Procurement Management. Anyone who has ever sat for the PMP exam probably remembers this area’s inconsistent and confusing nomenclature. This was an over- due change. Finally, the “Manage Stakeholders” process is becoming the “Manage Stakeholder Expectations” and seems to be a more proactive approach to stakeholder management than was evidenced by the 3rd edition. In this respect, it is also more in keeping with how project management is normally taught to new practitioners and serves to make the PMBOK more relevant to real world management. Project Management Plan / Project Documents One difficult to understand feature of the PMBOK third edition was its explanation of the documents that should or could be included in a Project Management Plan. On cursory inspection, it appeared that just about any document was fair game to being included. The division of the Project Management Plan from all these other working documents (now referred to as Project Documents) and the subsequent clarification of the Project Management Plan’s content (baselines and subsidiary management plans) clears up this confusing situation, much to the PMBOKs improvement. Incidentally, the PMBOK now refers to the three baselines as the Scope Baseline (still made up of the Project Scope Statement, the WBS, and the WBS Dictionary), the Schedule Baseline, and the Cost Performance Baseline. Project Charter / Project Scope Statement The emphasis change in the Charter becomes apparent upon reviewing the bullet items presented in the PMBOK as to what a charter includes. The term “High Level” is used in three of the bullets and “Summary” in two. The remaining five bullets describe administrative items (approvals, authority) or background. Process Flow Diagrams The Process Flow Diagrams in the third edition were not helpful in understanding just what was happening in the respective process groups. For example, the Planning flow diagram was at odds with the stated process inputs of that process group, while the © 2009 ASPE – all rights reserved Page 4 th A Guide to the PMBOK, 4 Edition – A White Paper prepared for ASPE’s SDLC Training Division
  • 6. Executing diagram was just confusing. Most prospective PMPs thought that what they were looking at was an activity flow diagram, and they therefore thought they could transfer these diagrams into a PERT/CPM network for accomplishing their project. More than a few instructors gave their students corrected diagrams, or even told their students to ignore the diagrams altogether. Their removal should be welcome news to anyone trying to understand the PMI methodology. Logical Connections between Processes Each of the processes (as presented in their respective knowledge area chapters) now includes a diagram showing the data flow (inputs) to the process, specifically identifying the source of that input. In some cases, this diagram comes perilously close to information overload (as in the “Develop Project Management Plan” process), but on the whole these diagrams serve the very useful function of illustrating the connections and feedback loops that connect the various processes. Interpersonal Skills The Interpersonal Skills appendix (Appendix G) is a start at recognizing the importance of these skills in project success, but at present the appendix seems too general and lacking in specifics to be of any real value. If PMI stays with the appendix in its next (fifth) edition, look for a considerable “beefing up” of this material. Conclusion As with most edition changes, the authors tweaked definitions here and there, sometimes resulting in clarification, many times making changes that appear simply cosmetic. But on the whole, the 4th edition was a definite improvement on the 3rd. The update went a long way towards tightening up the logic of the work as well as supplying some much needed consistency to everything from simple wording to inputs, tools and techniques, and outputs. The substantive changes to the processes themselves were in keeping with the way the profession is actually taught and practiced, and this alone makes the 4th edition a much better document. © 2009 ASPE – all rights reserved Page 5 th A Guide to the PMBOK, 4 Edition – A White Paper prepared for ASPE’s SDLC Training Division