Environmental Impact
Assessment (EIA)
Abdiwali Abdullahi
BSc in Public Health,
MSc in Public Health(HM)
06 March, 2021
Benefits of EIA:
• The benefits of EIA can be direct, such as the
improved design or location of a project, or indirect,
such as better quality EIA work or raised
environmental awareness of the personnel involved
in the project. In these cases, there will be with
flow-on effects in their future work. As mentioned
above, these potential gains from EIA increase the
earlier the process is applied in the design process.
In general, the benefits of EIA include:
1. Better environmental planning and design of a
proposal: Carrying out an EIA entails an analysis of
alternatives in the design and location of projects. This
can result in the selection of an improved technology,
which lowers waste outputs or an environmentally
optimum location for a project. A well-designed project
can minimize risks and impacts on the environment
and people, and thereby avoid associated costs of
remedial treatment or compensation for damage.
2. Ensuring compliance with environmental
standards.
• Compliance with environmental standards
reduces damage to the environment and
disruption to communities. It also avoids
the likelihood of penalties, fines and loss of
trust and credibility.
3. Savings in capital and operating costs
• EIA can avoid the undue costs of unanticipated
impacts. These can worsen if environmental
problems have not been considered from the start
of proposal design and require modification later.
An ‘anticipate & avoid’ approach is much cheaper
than ‘react & cure’. Generally, changes which
must be made late in the project cycle are the
most expensive
4. Reduced time and costs of approvals of
development applications.
• If all environmental concerns have been
taken into account properly before
submission for project approval, then it is
unlikely that delays will occur as a result
of decision-makers asking for additional
information or alterations to mitigation
measures.
5. Increased project acceptance by the public.
• This is achieved by an open and
transparent EIA process, with
provision of opportunities for public
involvement that are appropriate to
the people who are most directly
affected by and interested in the
proposal.
KEY PRINCIPLES OF EIA
• To date, EIA has been applied primarily at the
project-level. This 'first generation' process is now
complemented by SEA of policies, plans and
programmes, and both EIA and SEA are being
adapted to bring a greater measure of 'sustainability
assurance' to development decision making. These
trends have brought new perspectives on what
constitutes EIA good practice and effective
performance.
• Recently, a number of reviews of these issues have
been undertaken, including the International
Study of the Effectiveness of Environmental
Assessment. It described basic and operational
principles for the main steps and activities
undertaken in the EIA process. The International
Association for Impact Assessment (IAIA) and the
Institute of Environmental Management and
Assessment (IEMA) have drawn on these to
prepare a statement of EIA 'best practice' for
reference and use by their members.
The Effectiveness Study identified three core
values on which the EIA process is based:
• Integrity- the ElA process should meet internationally
accepted requirements and standards of practice;
• Utility- the ElA process should provide the information
which is sufficient and relevant for decision-making; and
• Sustainability- the EIA process should result in the
implementation of environmental safeguards which are
sufficient to mitigate serious adverse effects and avoid
irreversible loss of resource and ecosystem functions.
Principles of EIA
• There are basics or guiding principles of EIA
good practice, these are applicable to all types
of proposals and by all EIA systems. When
applying or referring to them, it is important
to consider the principles as a single package,
recognizing their varying interrelationships.
some principles overlap, The principles should be
applied as part of a systematic and balanced
approach, having regard to the context and
circumstances.
Guiding principles of EIA good practice
• Purposive– EIA should meet its aims of informing
decision making and ensuring an appropriate level of
environmental protection and human health.
• Focused– EIA should concentrate on significant
environmental effects, taking into account the issues
that matter.
• Adaptive– EIA should be adjusted to the realities,
issues and circumstances of the proposals under
review.
• Participative– EIA should provide appropriate
opportunities to inform and involve the interested
and allected publics, and their inputs and concerns
should be addressed openly.
• Transparent– EIA should be a clear, easily
understood and open process, with early notification
procedure, access to documentation, and a public
record of decisions taken and reasons lor them.
• Pigorous– EIA should apply the ‘best practicable’
methodologies to address the impacts and issues
being investigated.
• Practical– EIA should identify measures lor
impact mitigation that work and can be
implemented.
• Credible– EIA should be carried out with
professionalism, rigor, fairness, objectivity,
impartiality and balance.
• Efficient– EIA should impose the minimum cost
burden on proponents consistent with meeting
process requirements and objectives.
Law, Policy and
Institutional Arrangements
• EIA is an evolving process.
• When establishing or strengthening an EIA system,
there is an opportunity to build upon the experience of
others and to move towards legal and policy
frameworks that support environmental sustainability.
• EIA systems have become progressively more broadly
based, encompassing a wider range of impacts, higher
levels of decision-making and new areas of emphasis.
About EIA Systems
Stakeholders Involved …
• Proponents:
• Understandably, proponents will wish to shape the
proposal to give it the best chance of success.
• Often, this involves trying to create public understanding
and acceptance of the proposal through the provision of
basic information.
• More creatively, project design can be improved through
using public inputs on alternatives and mitigation and
understanding local knowledge and values.
Stakeholders Involved …
• Government agencies:
• The government agencies involved in the EIA process
will want to have their policy and regulatory
responsibilities addressed in impact analysis and
mitigation consideration.
• For the competent authority, an effective public
involvement programme can mean the proposal may be
less likely to become controversial in the later stages of
the process.
Stakeholders Involved …
• Government agencies:
• For the responsible EIA agency, the concern will be
whether or not the public involvement process conforms
to requirements and procedures.
Stakeholders Involved …
• NGOs/Interest groups:
• Comments from NGOs can provide a useful policy
perspective on a proposal; for example, the relationship
of the proposal to sustainability objectives and strategy.
• Their views may also be helpful when there are
difficulties with involving local people.
• However, this surrogate approach should be considered
as exceptional; it cannot substitute for or replace views
which should be solicited directly.
Stakeholders Involved …
• Other interested groups:
• Other interested groups include those who are experts
in particular fields and can make a significant
contribution to the EIA study.
• The advice and knowledge of government agencies and
the industry sector most directly concerned with the
proposal should always be sought.
• However, in many cases, substantive information about
the environmental setting and effects will come from
outside sources.
Stakeholders Involved …
• The different benefits provided for key groups by
effective public participation are described in the
table below.
• However, these benefits may not be always
realised or acknowledged by participants.
• Each of the above groups may perceive the
benefits gained from public involvement in the
EIA process through the lens of their own
experience and interests.
The benefits of effective participation for different groups
The proponent The decision-maker Affected communities
Raises the proponent’s awareness of the
potential impacts of a proposal on the
environment and the affected community
Achieves more informed and accountable
decision making
Provides an opportunity to raise concerns
and influence the decision-making process
Legitimises proposals and ensures greater
acceptance and support
Provides increased assurance that all issues
of legitimate concern have been addressed
Provides an opportunity to gain a better
understanding and knowledge about the
environmental impacts and risks that may
arise
Improves public trust and confidence
Demonstrates fairness and transparency,
avoiding accusations of decisions being made
‘behind closed doors’
Increases awareness of how decision-
making processes work, who makes
decisions and on what basis
Assists by obtaining local information/data
Promotes good relations with the proponent
and third parties
Empowers people, providing the
knowledge that they can influence decision
making and creating a greater sense of
social responsibility
Avoids potentially costly delays later in the
process by resolving conflict early
Avoids potentially costly delays later in the
process by resolving conflict early
Ensures all relevant issues and concerns
are dealt with prior to the decision
3rd EIA Law, Policy and Institutional Arrangements.pptx

More Related Content

Similar to 3rd EIA Law, Policy and Institutional Arrangements.pptx

SENN 2013 Participatory Monitoring and Evaluation-130918.ppt
SENN 2013 Participatory Monitoring and Evaluation-130918.pptSENN 2013 Participatory Monitoring and Evaluation-130918.ppt
SENN 2013 Participatory Monitoring and Evaluation-130918.ppt
ZiaUlhaq765467
 

Similar to 3rd EIA Law, Policy and Institutional Arrangements.pptx (20)

SEA.pptx
SEA.pptxSEA.pptx
SEA.pptx
 
Environmental Management_LEC04.pptx
Environmental Management_LEC04.pptxEnvironmental Management_LEC04.pptx
Environmental Management_LEC04.pptx
 
Introduction to Strategic Environmental Assessment
Introduction to Strategic Environmental Assessment Introduction to Strategic Environmental Assessment
Introduction to Strategic Environmental Assessment
 
Principles of environmental impact assessment
Principles of environmental impact assessmentPrinciples of environmental impact assessment
Principles of environmental impact assessment
 
Contemporary issues in environmental impact assessment
Contemporary issues in environmental impact assessmentContemporary issues in environmental impact assessment
Contemporary issues in environmental impact assessment
 
Unit 3 point 1 Environmental Sustainability
Unit 3  point 1 Environmental  SustainabilityUnit 3  point 1 Environmental  Sustainability
Unit 3 point 1 Environmental Sustainability
 
Environmental Impact Assessment and Environmental Audit- Unit III
Environmental Impact Assessment and Environmental Audit- Unit IIIEnvironmental Impact Assessment and Environmental Audit- Unit III
Environmental Impact Assessment and Environmental Audit- Unit III
 
Environmentally Sound Technologies for the Future for the future
Environmentally Sound Technologies for the Future for the futureEnvironmentally Sound Technologies for the Future for the future
Environmentally Sound Technologies for the Future for the future
 
FUNCTIONS OF EPA
FUNCTIONS OF EPAFUNCTIONS OF EPA
FUNCTIONS OF EPA
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessment
 
Auditing the extractive industry-the case of Ghana
Auditing the extractive industry-the case of GhanaAuditing the extractive industry-the case of Ghana
Auditing the extractive industry-the case of Ghana
 
Environment impact Assessment (EIA) in Uganda
Environment impact Assessment (EIA) in UgandaEnvironment impact Assessment (EIA) in Uganda
Environment impact Assessment (EIA) in Uganda
 
Environment impact assessment
Environment impact assessmentEnvironment impact assessment
Environment impact assessment
 
Concept of Environmental impact assessment - Stages, Parameters, and Benefits...
Concept of Environmental impact assessment - Stages, Parameters, and Benefits...Concept of Environmental impact assessment - Stages, Parameters, and Benefits...
Concept of Environmental impact assessment - Stages, Parameters, and Benefits...
 
Approach of Environmental Management (Projects require EIA or IEE)
Approach of Environmental Management (Projects require EIA or IEE)Approach of Environmental Management (Projects require EIA or IEE)
Approach of Environmental Management (Projects require EIA or IEE)
 
Policy perspectives on rural practice change
Policy perspectives on rural practice changePolicy perspectives on rural practice change
Policy perspectives on rural practice change
 
Environmental Impact Assessment (EIA).pdf
Environmental Impact Assessment (EIA).pdfEnvironmental Impact Assessment (EIA).pdf
Environmental Impact Assessment (EIA).pdf
 
BasConcept of Eic nvironmental Impact Assessment-pages-2-13,18-65.pdf
BasConcept of  Eic nvironmental Impact Assessment-pages-2-13,18-65.pdfBasConcept of  Eic nvironmental Impact Assessment-pages-2-13,18-65.pdf
BasConcept of Eic nvironmental Impact Assessment-pages-2-13,18-65.pdf
 
SENN 2013 Participatory Monitoring and Evaluation-130918.ppt
SENN 2013 Participatory Monitoring and Evaluation-130918.pptSENN 2013 Participatory Monitoring and Evaluation-130918.ppt
SENN 2013 Participatory Monitoring and Evaluation-130918.ppt
 
Public participation in eia
Public participation in eiaPublic participation in eia
Public participation in eia
 

Recently uploaded

Russian Call Girls Lucknow Just Call 👉👉7877925207 Top Class Call Girl Service...
Russian Call Girls Lucknow Just Call 👉👉7877925207 Top Class Call Girl Service...Russian Call Girls Lucknow Just Call 👉👉7877925207 Top Class Call Girl Service...
Russian Call Girls Lucknow Just Call 👉👉7877925207 Top Class Call Girl Service...
adilkhan87451
 

Recently uploaded (20)

Call Girls Gwalior Just Call 8617370543 Top Class Call Girl Service Available
Call Girls Gwalior Just Call 8617370543 Top Class Call Girl Service AvailableCall Girls Gwalior Just Call 8617370543 Top Class Call Girl Service Available
Call Girls Gwalior Just Call 8617370543 Top Class Call Girl Service Available
 
Call Girls Shimla Just Call 8617370543 Top Class Call Girl Service Available
Call Girls Shimla Just Call 8617370543 Top Class Call Girl Service AvailableCall Girls Shimla Just Call 8617370543 Top Class Call Girl Service Available
Call Girls Shimla Just Call 8617370543 Top Class Call Girl Service Available
 
(Low Rate RASHMI ) Rate Of Call Girls Jaipur ❣ 8445551418 ❣ Elite Models & Ce...
(Low Rate RASHMI ) Rate Of Call Girls Jaipur ❣ 8445551418 ❣ Elite Models & Ce...(Low Rate RASHMI ) Rate Of Call Girls Jaipur ❣ 8445551418 ❣ Elite Models & Ce...
(Low Rate RASHMI ) Rate Of Call Girls Jaipur ❣ 8445551418 ❣ Elite Models & Ce...
 
💕SONAM KUMAR💕Premium Call Girls Jaipur ↘️9257276172 ↙️One Night Stand With Lo...
💕SONAM KUMAR💕Premium Call Girls Jaipur ↘️9257276172 ↙️One Night Stand With Lo...💕SONAM KUMAR💕Premium Call Girls Jaipur ↘️9257276172 ↙️One Night Stand With Lo...
💕SONAM KUMAR💕Premium Call Girls Jaipur ↘️9257276172 ↙️One Night Stand With Lo...
 
Night 7k to 12k Chennai City Center Call Girls 👉👉 7427069034⭐⭐ 100% Genuine E...
Night 7k to 12k Chennai City Center Call Girls 👉👉 7427069034⭐⭐ 100% Genuine E...Night 7k to 12k Chennai City Center Call Girls 👉👉 7427069034⭐⭐ 100% Genuine E...
Night 7k to 12k Chennai City Center Call Girls 👉👉 7427069034⭐⭐ 100% Genuine E...
 
Russian Call Girls Lucknow Just Call 👉👉7877925207 Top Class Call Girl Service...
Russian Call Girls Lucknow Just Call 👉👉7877925207 Top Class Call Girl Service...Russian Call Girls Lucknow Just Call 👉👉7877925207 Top Class Call Girl Service...
Russian Call Girls Lucknow Just Call 👉👉7877925207 Top Class Call Girl Service...
 
Call Girls Ahmedabad Just Call 9630942363 Top Class Call Girl Service Available
Call Girls Ahmedabad Just Call 9630942363 Top Class Call Girl Service AvailableCall Girls Ahmedabad Just Call 9630942363 Top Class Call Girl Service Available
Call Girls Ahmedabad Just Call 9630942363 Top Class Call Girl Service Available
 
Night 7k to 12k Navi Mumbai Call Girl Photo 👉 BOOK NOW 9833363713 👈 ♀️ night ...
Night 7k to 12k Navi Mumbai Call Girl Photo 👉 BOOK NOW 9833363713 👈 ♀️ night ...Night 7k to 12k Navi Mumbai Call Girl Photo 👉 BOOK NOW 9833363713 👈 ♀️ night ...
Night 7k to 12k Navi Mumbai Call Girl Photo 👉 BOOK NOW 9833363713 👈 ♀️ night ...
 
Russian Call Girls Service Jaipur {8445551418} ❤️PALLAVI VIP Jaipur Call Gir...
Russian Call Girls Service  Jaipur {8445551418} ❤️PALLAVI VIP Jaipur Call Gir...Russian Call Girls Service  Jaipur {8445551418} ❤️PALLAVI VIP Jaipur Call Gir...
Russian Call Girls Service Jaipur {8445551418} ❤️PALLAVI VIP Jaipur Call Gir...
 
Call Girls Visakhapatnam Just Call 8250077686 Top Class Call Girl Service Ava...
Call Girls Visakhapatnam Just Call 8250077686 Top Class Call Girl Service Ava...Call Girls Visakhapatnam Just Call 8250077686 Top Class Call Girl Service Ava...
Call Girls Visakhapatnam Just Call 8250077686 Top Class Call Girl Service Ava...
 
Top Rated Bangalore Call Girls Majestic ⟟ 9332606886 ⟟ Call Me For Genuine S...
Top Rated Bangalore Call Girls Majestic ⟟  9332606886 ⟟ Call Me For Genuine S...Top Rated Bangalore Call Girls Majestic ⟟  9332606886 ⟟ Call Me For Genuine S...
Top Rated Bangalore Call Girls Majestic ⟟ 9332606886 ⟟ Call Me For Genuine S...
 
Best Rate (Patna ) Call Girls Patna ⟟ 8617370543 ⟟ High Class Call Girl In 5 ...
Best Rate (Patna ) Call Girls Patna ⟟ 8617370543 ⟟ High Class Call Girl In 5 ...Best Rate (Patna ) Call Girls Patna ⟟ 8617370543 ⟟ High Class Call Girl In 5 ...
Best Rate (Patna ) Call Girls Patna ⟟ 8617370543 ⟟ High Class Call Girl In 5 ...
 
Call Girls Rishikesh Just Call 8250077686 Top Class Call Girl Service Available
Call Girls Rishikesh Just Call 8250077686 Top Class Call Girl Service AvailableCall Girls Rishikesh Just Call 8250077686 Top Class Call Girl Service Available
Call Girls Rishikesh Just Call 8250077686 Top Class Call Girl Service Available
 
The Most Attractive Hyderabad Call Girls Kothapet 𖠋 9332606886 𖠋 Will You Mis...
The Most Attractive Hyderabad Call Girls Kothapet 𖠋 9332606886 𖠋 Will You Mis...The Most Attractive Hyderabad Call Girls Kothapet 𖠋 9332606886 𖠋 Will You Mis...
The Most Attractive Hyderabad Call Girls Kothapet 𖠋 9332606886 𖠋 Will You Mis...
 
Premium Bangalore Call Girls Jigani Dail 6378878445 Escort Service For Hot Ma...
Premium Bangalore Call Girls Jigani Dail 6378878445 Escort Service For Hot Ma...Premium Bangalore Call Girls Jigani Dail 6378878445 Escort Service For Hot Ma...
Premium Bangalore Call Girls Jigani Dail 6378878445 Escort Service For Hot Ma...
 
Call Girls Vadodara Just Call 8617370543 Top Class Call Girl Service Available
Call Girls Vadodara Just Call 8617370543 Top Class Call Girl Service AvailableCall Girls Vadodara Just Call 8617370543 Top Class Call Girl Service Available
Call Girls Vadodara Just Call 8617370543 Top Class Call Girl Service Available
 
Manyata Tech Park ( Call Girls ) Bangalore ✔ 6297143586 ✔ Hot Model With Sexy...
Manyata Tech Park ( Call Girls ) Bangalore ✔ 6297143586 ✔ Hot Model With Sexy...Manyata Tech Park ( Call Girls ) Bangalore ✔ 6297143586 ✔ Hot Model With Sexy...
Manyata Tech Park ( Call Girls ) Bangalore ✔ 6297143586 ✔ Hot Model With Sexy...
 
Independent Call Girls In Jaipur { 8445551418 } ✔ ANIKA MEHTA ✔ Get High Prof...
Independent Call Girls In Jaipur { 8445551418 } ✔ ANIKA MEHTA ✔ Get High Prof...Independent Call Girls In Jaipur { 8445551418 } ✔ ANIKA MEHTA ✔ Get High Prof...
Independent Call Girls In Jaipur { 8445551418 } ✔ ANIKA MEHTA ✔ Get High Prof...
 
Pondicherry Call Girls Book Now 9630942363 Top Class Pondicherry Escort Servi...
Pondicherry Call Girls Book Now 9630942363 Top Class Pondicherry Escort Servi...Pondicherry Call Girls Book Now 9630942363 Top Class Pondicherry Escort Servi...
Pondicherry Call Girls Book Now 9630942363 Top Class Pondicherry Escort Servi...
 
Top Rated Hyderabad Call Girls Erragadda ⟟ 9332606886 ⟟ Call Me For Genuine ...
Top Rated  Hyderabad Call Girls Erragadda ⟟ 9332606886 ⟟ Call Me For Genuine ...Top Rated  Hyderabad Call Girls Erragadda ⟟ 9332606886 ⟟ Call Me For Genuine ...
Top Rated Hyderabad Call Girls Erragadda ⟟ 9332606886 ⟟ Call Me For Genuine ...
 

3rd EIA Law, Policy and Institutional Arrangements.pptx

  • 1. Environmental Impact Assessment (EIA) Abdiwali Abdullahi BSc in Public Health, MSc in Public Health(HM) 06 March, 2021
  • 2. Benefits of EIA: • The benefits of EIA can be direct, such as the improved design or location of a project, or indirect, such as better quality EIA work or raised environmental awareness of the personnel involved in the project. In these cases, there will be with flow-on effects in their future work. As mentioned above, these potential gains from EIA increase the earlier the process is applied in the design process.
  • 3. In general, the benefits of EIA include: 1. Better environmental planning and design of a proposal: Carrying out an EIA entails an analysis of alternatives in the design and location of projects. This can result in the selection of an improved technology, which lowers waste outputs or an environmentally optimum location for a project. A well-designed project can minimize risks and impacts on the environment and people, and thereby avoid associated costs of remedial treatment or compensation for damage.
  • 4. 2. Ensuring compliance with environmental standards. • Compliance with environmental standards reduces damage to the environment and disruption to communities. It also avoids the likelihood of penalties, fines and loss of trust and credibility.
  • 5. 3. Savings in capital and operating costs • EIA can avoid the undue costs of unanticipated impacts. These can worsen if environmental problems have not been considered from the start of proposal design and require modification later. An ‘anticipate & avoid’ approach is much cheaper than ‘react & cure’. Generally, changes which must be made late in the project cycle are the most expensive
  • 6. 4. Reduced time and costs of approvals of development applications. • If all environmental concerns have been taken into account properly before submission for project approval, then it is unlikely that delays will occur as a result of decision-makers asking for additional information or alterations to mitigation measures.
  • 7. 5. Increased project acceptance by the public. • This is achieved by an open and transparent EIA process, with provision of opportunities for public involvement that are appropriate to the people who are most directly affected by and interested in the proposal.
  • 8. KEY PRINCIPLES OF EIA • To date, EIA has been applied primarily at the project-level. This 'first generation' process is now complemented by SEA of policies, plans and programmes, and both EIA and SEA are being adapted to bring a greater measure of 'sustainability assurance' to development decision making. These trends have brought new perspectives on what constitutes EIA good practice and effective performance.
  • 9. • Recently, a number of reviews of these issues have been undertaken, including the International Study of the Effectiveness of Environmental Assessment. It described basic and operational principles for the main steps and activities undertaken in the EIA process. The International Association for Impact Assessment (IAIA) and the Institute of Environmental Management and Assessment (IEMA) have drawn on these to prepare a statement of EIA 'best practice' for reference and use by their members.
  • 10. The Effectiveness Study identified three core values on which the EIA process is based: • Integrity- the ElA process should meet internationally accepted requirements and standards of practice; • Utility- the ElA process should provide the information which is sufficient and relevant for decision-making; and • Sustainability- the EIA process should result in the implementation of environmental safeguards which are sufficient to mitigate serious adverse effects and avoid irreversible loss of resource and ecosystem functions.
  • 11. Principles of EIA • There are basics or guiding principles of EIA good practice, these are applicable to all types of proposals and by all EIA systems. When applying or referring to them, it is important to consider the principles as a single package, recognizing their varying interrelationships. some principles overlap, The principles should be applied as part of a systematic and balanced approach, having regard to the context and circumstances.
  • 12. Guiding principles of EIA good practice • Purposive– EIA should meet its aims of informing decision making and ensuring an appropriate level of environmental protection and human health. • Focused– EIA should concentrate on significant environmental effects, taking into account the issues that matter. • Adaptive– EIA should be adjusted to the realities, issues and circumstances of the proposals under review.
  • 13. • Participative– EIA should provide appropriate opportunities to inform and involve the interested and allected publics, and their inputs and concerns should be addressed openly. • Transparent– EIA should be a clear, easily understood and open process, with early notification procedure, access to documentation, and a public record of decisions taken and reasons lor them. • Pigorous– EIA should apply the ‘best practicable’ methodologies to address the impacts and issues being investigated.
  • 14. • Practical– EIA should identify measures lor impact mitigation that work and can be implemented. • Credible– EIA should be carried out with professionalism, rigor, fairness, objectivity, impartiality and balance. • Efficient– EIA should impose the minimum cost burden on proponents consistent with meeting process requirements and objectives.
  • 16. • EIA is an evolving process. • When establishing or strengthening an EIA system, there is an opportunity to build upon the experience of others and to move towards legal and policy frameworks that support environmental sustainability. • EIA systems have become progressively more broadly based, encompassing a wider range of impacts, higher levels of decision-making and new areas of emphasis. About EIA Systems
  • 17. Stakeholders Involved … • Proponents: • Understandably, proponents will wish to shape the proposal to give it the best chance of success. • Often, this involves trying to create public understanding and acceptance of the proposal through the provision of basic information. • More creatively, project design can be improved through using public inputs on alternatives and mitigation and understanding local knowledge and values.
  • 18. Stakeholders Involved … • Government agencies: • The government agencies involved in the EIA process will want to have their policy and regulatory responsibilities addressed in impact analysis and mitigation consideration. • For the competent authority, an effective public involvement programme can mean the proposal may be less likely to become controversial in the later stages of the process.
  • 19. Stakeholders Involved … • Government agencies: • For the responsible EIA agency, the concern will be whether or not the public involvement process conforms to requirements and procedures.
  • 20. Stakeholders Involved … • NGOs/Interest groups: • Comments from NGOs can provide a useful policy perspective on a proposal; for example, the relationship of the proposal to sustainability objectives and strategy. • Their views may also be helpful when there are difficulties with involving local people. • However, this surrogate approach should be considered as exceptional; it cannot substitute for or replace views which should be solicited directly.
  • 21. Stakeholders Involved … • Other interested groups: • Other interested groups include those who are experts in particular fields and can make a significant contribution to the EIA study. • The advice and knowledge of government agencies and the industry sector most directly concerned with the proposal should always be sought. • However, in many cases, substantive information about the environmental setting and effects will come from outside sources.
  • 22. Stakeholders Involved … • The different benefits provided for key groups by effective public participation are described in the table below. • However, these benefits may not be always realised or acknowledged by participants. • Each of the above groups may perceive the benefits gained from public involvement in the EIA process through the lens of their own experience and interests.
  • 23. The benefits of effective participation for different groups The proponent The decision-maker Affected communities Raises the proponent’s awareness of the potential impacts of a proposal on the environment and the affected community Achieves more informed and accountable decision making Provides an opportunity to raise concerns and influence the decision-making process Legitimises proposals and ensures greater acceptance and support Provides increased assurance that all issues of legitimate concern have been addressed Provides an opportunity to gain a better understanding and knowledge about the environmental impacts and risks that may arise Improves public trust and confidence Demonstrates fairness and transparency, avoiding accusations of decisions being made ‘behind closed doors’ Increases awareness of how decision- making processes work, who makes decisions and on what basis Assists by obtaining local information/data Promotes good relations with the proponent and third parties Empowers people, providing the knowledge that they can influence decision making and creating a greater sense of social responsibility Avoids potentially costly delays later in the process by resolving conflict early Avoids potentially costly delays later in the process by resolving conflict early Ensures all relevant issues and concerns are dealt with prior to the decision