SlideShare a Scribd company logo
1 of 7
Download to read offline
© 2016-2017 All Rights Reserved, No part of this document should be modified/used without prior consent
Tutors India™ - Your trusted mentor since 2001
www.tutorindia.com I UK # +44-1143520021, Info@tutorsindia.com
Page 1 of 7
IMPLEMENATATION OF PROJECT MANAGEMENT- ROLE
OF CRITICAL SUCCESS FACTORS
This Sample Work has been completed by ‘Tutors India’
Copyright © Tutors India. All rights reserved.
www.tutorsindia.com
© 2016-2017 All Rights Reserved, No part of this document should be modified/used without prior consent
Tutors India™ - Your trusted mentor since 2001
www.tutorindia.com I UK # +44-1143520021, Info@tutorsindia.com
Page 2 of 7
Table of Contents
Introduction................................................................................................................................3
Project management in the construction industry......................................................................3
Critical success factors in construction industry........................................................................4
Research objectives:...................................................................................................................5
Research design .........................................................................................................................5
Literature review........................................................................................................................5
Scope and Limitations of the study............................................................................................5
References:.................................................................................................................................7
© 2016-2017 All Rights Reserved, No part of this document should be modified/used without prior consent
Tutors India™ - Your trusted mentor since 2001
www.tutorindia.com I UK # +44-1143520021, Info@tutorsindia.com
Page 3 of 7
Introduction
A project is nothing but a temporary task or endeavor that is carried out for the creation of a
specific service or product (PMBOK, 2000). Even if the projects are temporary, the process
of project management occurs in repetition through the entire cycle of life of every project.
A process could be defined a sequence of changes or the functions that are aimed for the
achievement of results. The crucial factor that leads to the successful implementation of a
project is the efficient management of the lot of processes that are entwined throughout the
life cycles of the project, there should be a proper conception of the project by the
stakeholders and this should be enforced in a consistent manner by the management in
parallel.
There are a lot of organization that are involved in the establishment of competency in the
process of project management and such organizations face a lot of dilemmas at the outset
regarding where to begin and the decisions taken for such crucial questions are important in
deciding the success or failure of any project. The ultimate goal of the implementation of the
project is to ensure that there is consistent and sequential establishment of the practices like
commencement, planning, implementation, quality control and the closure of the project.
There could be no spontaneous occurrence of these practices naturally and a skillful and
cautious crafting of these processes along with effective communication and delicate
enforcement is very critical in the successful completion of the project. Also other negative
factors like the resistances exerted by the organization for change should be handled. The
processes of project management provide the building blocks for the establishment of training
as well as procedures. There are also tools and techniques that would help to improve the
efficiency of the implementation of project management and lead ultimately to the
maintenance of these processes
Project management in the construction industry
In the construction industry, the process of project management comprises a set of aims that
could be achieved by the implementation of a series of procedures that facet the constraint of
resources. Also there exist conflicts among the objectives that are stated initially with
reference to the cost, time, scope, quality and constraints that take a toll on the human
resources as well as the finances. There should be proper resolving of such conflicts when the
project initiates and there should also be tradeoffs or a set of substitutes created. There are a
lot of functions of project management that includes the following
 The objectives of a project should be specified and the plans that include the
description of the scope of the project, the budgeting plans, schedules, setting the
requirements for performance and the selection of the participants for the project
 Optimizing the efficient usage of the resources by procuring the labor, equipment and
materials as per the plan in the schedule.
 Implementing the associated operations by the efficient coordination as well as
control in the planning , designing, contracts and construction throughout the process
 Effective communications development and the apparatus for the resolving of the
conflicts among the participants
There are also some areas that should be handled with efficiency by the project manager and
they are as follows:
© 2016-2017 All Rights Reserved, No part of this document should be modified/used without prior consent
Tutors India™ - Your trusted mentor since 2001
www.tutorindia.com I UK # +44-1143520021, Info@tutorsindia.com
Page 4 of 7
 A proper integration of the process of project management so that it can be ensured
that the elements in the project are co-ordinated in an effective manner.
 There should be efficient project scope management so that all the required work is
included in the project
 Time management in the project so that there could be an effective schedule for the
project
 Cost management in the project so that the resources needed could be identified and
the control of budget could be maintained
 Management of quality in the project so that all the functional requirements are met
 Human resource management in the project should be met and the proper
employment of the personnel in the project should be ensured
 Management of proper communication in the project so that there could be
communication internally and externally
 Analysis of risk management in the project so that there could be mitigation of the
risk that are potential risks
 Procurement management in the project so that there could be obtaining of the
resources from that of the external sources (PMBOK, 2000).
Critical success factors in construction industry
Success in the task at hand is the aim of every business activity and therefore it is essential
that the organizations should be successful in their business at hand so that they could survive
in businesses like construction industry which is very competitive. The construction industry
is being revolutionized with continuous developments of new methods in business as well as
technologies. Hence the companies involved in the construction should take in the
applications of new business and also develop approaches so that they can retain their
positions in the industry and succeed in business.
Kivrak (2008) summarizes the definitions of success as follows: “There are many definitions
of success. Traditionally, it is defined as the degree to which goals and expectations are met.
On the other hand, one of the definitions of failure is the inability of a firm to pay its
obligations when they are due (Frederikslust, 1978). In recent years, there has been an
increase in the studies of critical success/failure factors especially in project management
subject (Hyvari, 2006) The traditional approach to success in the construction industry is to
focus on the ability to plan and execute projects (Abraham, 2003) Traditionally, the success
parameters for projects in this industry are cost, time and quality (Hughes, 2004)”.
The completion of a project occurs because of the convergence of a lot of events as well as
interactions that are planned beforehand or that are unplanned throughout the facility’s life
with the participants changing and a parallel change in an environment that is changing.
There are certain factors that very critical than that of the others for the success of a project
than that of the others and these are called as the critical success factors (CSFs). This term
was first used by Rockart (1982) in the context of the projects and (Sanvido et al. 1992) used
this term in the context of the management of the projects. This topic has been the subject of
intense research since then and also the trend existing in the present scenario is that
excellence in the systems of delivery is pursued and it is said that “because the pursuit of
excellence in project delivery systems is not new, this new research direction could thrive
upon a rich legacy of many previous investigators. However the concept of project success
has remained ambiguously defined in the mind of the construction professionals”.
© 2016-2017 All Rights Reserved, No part of this document should be modified/used without prior consent
Tutors India™ - Your trusted mentor since 2001
www.tutorindia.com I UK # +44-1143520021, Info@tutorsindia.com
Page 5 of 7
Research objectives:
With the above mentioned background, the study is designed to facilitate the identification of
the variables or success factors that impact a successful implementation of a project. The
research focus is the construction industry and on the basis of the study, new patterns are
expected to emerge that would indicate the major indicators of performance for the
measurement of success of projects in the construction industry. Therefore the results of the
study could be utilized for the effective implementation of projects in the construction
industry.
The objectives of the project are as follows:
 To make an assessment of the construction industry with special focus on the
management of construction and research
 To make an attempt in the development of a strategic model involving the critical
success factors so that there could be improvements and strengthening of the
construction management
 To provide recommendations for the standardization of the practices so that there
could be improvements in time, productivity, cost safety and quality.
Research design
The methodology of the study consists of the development of a questionnaire so that
information on the critical success factors could be elicited for the construction projects in
organizations that contract constructions and the survey of the questionnaire could be
conducted by means of personal interviews and in case of inaccessibility to personal
interviews, the questionnaire would be completed by means of filling through postal mail.
The feedback from the questionnaire could be used for the identification of the major success
factors in the construction projects.
Literature review
The primary sources would be the academic journals associated with the construction
industry. Also various reports as well as documents related to the construction industry
released by the government and other official websites would be used. There would also be
use of secondary sources like the write-ups in the newspapers and other scholarly magazines
and journals. The books available on the construction industry by different authors would
also be studied.
The help of various libraries available would also be sought so that notes could be collected
from that of the primary as well as the secondary sources. Many useful websites found on the
internet would also be utilized for the collection of references.
Scope and Limitations of the study
The scope of the study is that in the dynamic construction industry which is replete with
uncertainties in terms of technology, developmental processes and budgets, the identification
© 2016-2017 All Rights Reserved, No part of this document should be modified/used without prior consent
Tutors India™ - Your trusted mentor since 2001
www.tutorindia.com I UK # +44-1143520021, Info@tutorsindia.com
Page 6 of 7
of the critical success factors would serve as great means for improving the effectiveness of
the project. This is particularly important in the context of the complicated and difficult
building projects where the team involved faces changes that are unprecedented.
One of the limitations of the study is that only a small number of firms would be used fo the
study and hence the findings of the study should be interpreted with care and caution. Also
another limitation of the study is that the interrelationships existing among the various critical
success factors could not be established with this method of study.
Tentative scheme of chapterization
Chapter 1: introduction
Introduction
Background of the study
Research statement
Significance of the research
Research Aim
Research objectives
Chapter 2: Review of literature
Chapter 3: Research methodology
Research approach
Research method
Research tools
Sampling procedure
Data collection procedures
Primary data
Interviewing
Secondary data
Questions used for the interview in research
Data analysis
Limitations of research
Chapter 4: Results and analysis
Chapter 5: Summary and conclusions
Chapter 6: Bibliography
© 2016-2017 All Rights Reserved, No part of this document should be modified/used without prior consent
Tutors India™ - Your trusted mentor since 2001
www.tutorindia.com I UK # +44-1143520021, Info@tutorsindia.com
Page 7 of 7
References
Abraham G. L. (2003) ‘‘Critical success factors for the construction industry’’, In: Moleenar,
K R and Chinowsky, P S (Ed.), Proceedings of Construction Research Congress, March 19-
21, Honolulu, Hawaii.
A guide to the Project Management Body of Knowledge (PMBOK® Guide) 2000 Edition,
pp. 4
Frederikslust, R. A. I. (1978) ‘‘'Predictability of Corporate Failure’’, Martinus Nijhoff Social
Sciences Division, Leiden, The Netherlands.
Hughes, S. W. Tippett, D. D and. Thomas, W. K (2004) ‘‘Measuring project success in the
construction industry’’, Engineering Management Journal, 16(3), 31-37.
Hyvari, I. (2006) ‘‘Success of projects in different organizational conditions’’, Project
Management Journal, 37(4), 31-41.
Rockart, J. F. (1982). "The changing role of the information systems executive: A critical
success factors perspective." Sloan Mgmt. Review, 24(1), 3-13.
Sanvido, V., Grobler, F., Pariff, K., Guvents, M., and Coyle, M. (1992). ‘‘Critical success
factors for construction projects.’’ J. Constr. Eng. Manage., 118(1), 94 –111.

More Related Content

What's hot

PROJECT REPORT ON ROAD CONSTRUCTION
PROJECT REPORT ON ROAD CONSTRUCTIONPROJECT REPORT ON ROAD CONSTRUCTION
PROJECT REPORT ON ROAD CONSTRUCTIONGLA University
 
Lecture 3. project management – description (2)
Lecture 3. project management – description (2)Lecture 3. project management – description (2)
Lecture 3. project management – description (2)Dania Abdel-aziz
 
Role of Project Management Consultancy in Construction Project
Role of Project Management Consultancy in Construction ProjectRole of Project Management Consultancy in Construction Project
Role of Project Management Consultancy in Construction ProjectIOSR Journals
 
Lecture 3.2. project management – description (3)
Lecture 3.2. project management – description (3) Lecture 3.2. project management – description (3)
Lecture 3.2. project management – description (3) Dania Abdel-aziz
 
road construction project
road construction projectroad construction project
road construction projectnishant singh
 
Public Transport: Who should own it? Who should plan it? Who should pay for it?
Public Transport: Who should own it? Who should plan it? Who should pay for it?Public Transport: Who should own it? Who should plan it? Who should pay for it?
Public Transport: Who should own it? Who should plan it? Who should pay for it?Paul Barter
 
Value engineering Short Over view ppt
Value engineering Short Over view pptValue engineering Short Over view ppt
Value engineering Short Over view pptMashfiq Albartross
 
training report
training reporttraining report
training reportLilonheart
 
Project Selection Methods
Project Selection MethodsProject Selection Methods
Project Selection MethodsManikandan M
 
Ebcs 1 basis of design actions on structures
Ebcs 1 basis of design   actions on structuresEbcs 1 basis of design   actions on structures
Ebcs 1 basis of design actions on structuresAlemu Osore
 
Batcoda technical specification
Batcoda technical specificationBatcoda technical specification
Batcoda technical specificationDejene Tsegaye
 
Value_Analysis_and_Value_Engineering, A_seminar_by_Mohan_Kumar_G
Value_Analysis_and_Value_Engineering, A_seminar_by_Mohan_Kumar_GValue_Analysis_and_Value_Engineering, A_seminar_by_Mohan_Kumar_G
Value_Analysis_and_Value_Engineering, A_seminar_by_Mohan_Kumar_GMohan Kumar G
 
Lecture 2. project management – Description (1)
Lecture 2. project management – Description (1)Lecture 2. project management – Description (1)
Lecture 2. project management – Description (1)Dania Abdel-aziz
 
1.TRAFFIC CHARACTERISTICS (TE) 2170613 GTU
1.TRAFFIC CHARACTERISTICS (TE) 2170613 GTU1.TRAFFIC CHARACTERISTICS (TE) 2170613 GTU
1.TRAFFIC CHARACTERISTICS (TE) 2170613 GTUVATSAL PATEL
 
Construction Management in Developing Countries, Lecture 7
Construction Management in Developing Countries, Lecture 7Construction Management in Developing Countries, Lecture 7
Construction Management in Developing Countries, Lecture 7Hari Krishna Shrestha
 

What's hot (20)

PROJECT REPORT ON ROAD CONSTRUCTION
PROJECT REPORT ON ROAD CONSTRUCTIONPROJECT REPORT ON ROAD CONSTRUCTION
PROJECT REPORT ON ROAD CONSTRUCTION
 
Lecture 3. project management – description (2)
Lecture 3. project management – description (2)Lecture 3. project management – description (2)
Lecture 3. project management – description (2)
 
Role of Project Management Consultancy in Construction Project
Role of Project Management Consultancy in Construction ProjectRole of Project Management Consultancy in Construction Project
Role of Project Management Consultancy in Construction Project
 
Lecture 3.2. project management – description (3)
Lecture 3.2. project management – description (3) Lecture 3.2. project management – description (3)
Lecture 3.2. project management – description (3)
 
CONSTRUCTION MANAGEMENT
CONSTRUCTION MANAGEMENTCONSTRUCTION MANAGEMENT
CONSTRUCTION MANAGEMENT
 
road construction project
road construction projectroad construction project
road construction project
 
Public Transport: Who should own it? Who should plan it? Who should pay for it?
Public Transport: Who should own it? Who should plan it? Who should pay for it?Public Transport: Who should own it? Who should plan it? Who should pay for it?
Public Transport: Who should own it? Who should plan it? Who should pay for it?
 
Value engineering Short Over view ppt
Value engineering Short Over view pptValue engineering Short Over view ppt
Value engineering Short Over view ppt
 
training report
training reporttraining report
training report
 
Project Selection Methods
Project Selection MethodsProject Selection Methods
Project Selection Methods
 
DE GTU Floating bridge
DE GTU Floating bridge DE GTU Floating bridge
DE GTU Floating bridge
 
Ebcs 1 basis of design actions on structures
Ebcs 1 basis of design   actions on structuresEbcs 1 basis of design   actions on structures
Ebcs 1 basis of design actions on structures
 
Batcoda technical specification
Batcoda technical specificationBatcoda technical specification
Batcoda technical specification
 
Value_Analysis_and_Value_Engineering, A_seminar_by_Mohan_Kumar_G
Value_Analysis_and_Value_Engineering, A_seminar_by_Mohan_Kumar_GValue_Analysis_and_Value_Engineering, A_seminar_by_Mohan_Kumar_G
Value_Analysis_and_Value_Engineering, A_seminar_by_Mohan_Kumar_G
 
Lecture 2. project management – Description (1)
Lecture 2. project management – Description (1)Lecture 2. project management – Description (1)
Lecture 2. project management – Description (1)
 
Project management structures
Project management structuresProject management structures
Project management structures
 
1.TRAFFIC CHARACTERISTICS (TE) 2170613 GTU
1.TRAFFIC CHARACTERISTICS (TE) 2170613 GTU1.TRAFFIC CHARACTERISTICS (TE) 2170613 GTU
1.TRAFFIC CHARACTERISTICS (TE) 2170613 GTU
 
Construction Management in Developing Countries, Lecture 7
Construction Management in Developing Countries, Lecture 7Construction Management in Developing Countries, Lecture 7
Construction Management in Developing Countries, Lecture 7
 
PMP_Project Stakeholder Management
PMP_Project Stakeholder ManagementPMP_Project Stakeholder Management
PMP_Project Stakeholder Management
 
Grant making and management
Grant making and managementGrant making and management
Grant making and management
 

Similar to Research proposal implementation of project management

Fundamentals of Project Management
Fundamentals of Project ManagementFundamentals of Project Management
Fundamentals of Project ManagementRodolfo Siles
 
Scheduling and Cost ControlChristopher MihunPM620-1801B-01.docx
Scheduling and Cost ControlChristopher MihunPM620-1801B-01.docxScheduling and Cost ControlChristopher MihunPM620-1801B-01.docx
Scheduling and Cost ControlChristopher MihunPM620-1801B-01.docxanhlodge
 
Project Management Course & Tutorial by eAcademy.lk
Project Management Course & Tutorial by eAcademy.lkProject Management Course & Tutorial by eAcademy.lk
Project Management Course & Tutorial by eAcademy.lkUdara Sandaruwan
 
Project report submitted in IIM Calcutta
Project report submitted in IIM CalcuttaProject report submitted in IIM Calcutta
Project report submitted in IIM CalcuttaRAJESH KUMAR SHARMA
 
The role of time, cost and quality in project management
The role of time, cost and quality in project managementThe role of time, cost and quality in project management
The role of time, cost and quality in project managementIRJET Journal
 
Running Head PROJECT MANAGEMENT METHODOLOGIES & TOOLS1PROJE.docx
Running Head PROJECT MANAGEMENT METHODOLOGIES & TOOLS1PROJE.docxRunning Head PROJECT MANAGEMENT METHODOLOGIES & TOOLS1PROJE.docx
Running Head PROJECT MANAGEMENT METHODOLOGIES & TOOLS1PROJE.docxtodd581
 
Project management [module 1]
Project management [module 1]Project management [module 1]
Project management [module 1]OyetadeTobi
 
Answer sheet project management
Answer sheet project managementAnswer sheet project management
Answer sheet project managementPMlynda17
 
Running head IMPLEMENTATION STRATEGIESIMPLEMENTATION STRATEGIES.docx
Running head IMPLEMENTATION STRATEGIESIMPLEMENTATION STRATEGIES.docxRunning head IMPLEMENTATION STRATEGIESIMPLEMENTATION STRATEGIES.docx
Running head IMPLEMENTATION STRATEGIESIMPLEMENTATION STRATEGIES.docxcowinhelen
 
Project management tools and techniques- tutorsindia.com
Project management tools and techniques- tutorsindia.comProject management tools and techniques- tutorsindia.com
Project management tools and techniques- tutorsindia.comTutors India
 
Top Project Management Best Practices.pdf
Top Project Management Best Practices.pdfTop Project Management Best Practices.pdf
Top Project Management Best Practices.pdfOrangescrum
 
PPT1-PROJECT-_-Project-Management.pptx
PPT1-PROJECT-_-Project-Management.pptxPPT1-PROJECT-_-Project-Management.pptx
PPT1-PROJECT-_-Project-Management.pptxSabrinaScott22
 
Project management
Project managementProject management
Project managementArnab Ghosh
 
Pearson HND BTEC Level 5 HNDManaging a Successful Business Pr.docx
Pearson HND BTEC Level 5 HNDManaging a Successful Business Pr.docxPearson HND BTEC Level 5 HNDManaging a Successful Business Pr.docx
Pearson HND BTEC Level 5 HNDManaging a Successful Business Pr.docxAASTHA76
 
Project Planning, Scheduling and Preparation of Quality Assurance Control Doc...
Project Planning, Scheduling and Preparation of Quality Assurance Control Doc...Project Planning, Scheduling and Preparation of Quality Assurance Control Doc...
Project Planning, Scheduling and Preparation of Quality Assurance Control Doc...IRJET Journal
 

Similar to Research proposal implementation of project management (20)

Fundamentals of Project Management
Fundamentals of Project ManagementFundamentals of Project Management
Fundamentals of Project Management
 
Scheduling and Cost ControlChristopher MihunPM620-1801B-01.docx
Scheduling and Cost ControlChristopher MihunPM620-1801B-01.docxScheduling and Cost ControlChristopher MihunPM620-1801B-01.docx
Scheduling and Cost ControlChristopher MihunPM620-1801B-01.docx
 
Project Management Course & Tutorial by eAcademy.lk
Project Management Course & Tutorial by eAcademy.lkProject Management Course & Tutorial by eAcademy.lk
Project Management Course & Tutorial by eAcademy.lk
 
Project report submitted in IIM Calcutta
Project report submitted in IIM CalcuttaProject report submitted in IIM Calcutta
Project report submitted in IIM Calcutta
 
The role of time, cost and quality in project management
The role of time, cost and quality in project managementThe role of time, cost and quality in project management
The role of time, cost and quality in project management
 
Running Head PROJECT MANAGEMENT METHODOLOGIES & TOOLS1PROJE.docx
Running Head PROJECT MANAGEMENT METHODOLOGIES & TOOLS1PROJE.docxRunning Head PROJECT MANAGEMENT METHODOLOGIES & TOOLS1PROJE.docx
Running Head PROJECT MANAGEMENT METHODOLOGIES & TOOLS1PROJE.docx
 
Project management fundamentals
Project management fundamentalsProject management fundamentals
Project management fundamentals
 
Project management [module 1]
Project management [module 1]Project management [module 1]
Project management [module 1]
 
Answer sheet project management
Answer sheet project managementAnswer sheet project management
Answer sheet project management
 
Project Management U 1.pptx
Project Management U 1.pptxProject Management U 1.pptx
Project Management U 1.pptx
 
Running head IMPLEMENTATION STRATEGIESIMPLEMENTATION STRATEGIES.docx
Running head IMPLEMENTATION STRATEGIESIMPLEMENTATION STRATEGIES.docxRunning head IMPLEMENTATION STRATEGIESIMPLEMENTATION STRATEGIES.docx
Running head IMPLEMENTATION STRATEGIESIMPLEMENTATION STRATEGIES.docx
 
Construction Supervising Site Engineer - Duties & Responsibilities
Construction Supervising Site Engineer - Duties & ResponsibilitiesConstruction Supervising Site Engineer - Duties & Responsibilities
Construction Supervising Site Engineer - Duties & Responsibilities
 
Project management tools and techniques- tutorsindia.com
Project management tools and techniques- tutorsindia.comProject management tools and techniques- tutorsindia.com
Project management tools and techniques- tutorsindia.com
 
Top Project Management Best Practices.pdf
Top Project Management Best Practices.pdfTop Project Management Best Practices.pdf
Top Project Management Best Practices.pdf
 
PPT1-PROJECT-_-Project-Management.pptx
PPT1-PROJECT-_-Project-Management.pptxPPT1-PROJECT-_-Project-Management.pptx
PPT1-PROJECT-_-Project-Management.pptx
 
Project management
Project managementProject management
Project management
 
Pearson HND BTEC Level 5 HNDManaging a Successful Business Pr.docx
Pearson HND BTEC Level 5 HNDManaging a Successful Business Pr.docxPearson HND BTEC Level 5 HNDManaging a Successful Business Pr.docx
Pearson HND BTEC Level 5 HNDManaging a Successful Business Pr.docx
 
Project management – standard for today´s modern company
Project management – standard for today´s modern companyProject management – standard for today´s modern company
Project management – standard for today´s modern company
 
Publishable article
Publishable articlePublishable article
Publishable article
 
Project Planning, Scheduling and Preparation of Quality Assurance Control Doc...
Project Planning, Scheduling and Preparation of Quality Assurance Control Doc...Project Planning, Scheduling and Preparation of Quality Assurance Control Doc...
Project Planning, Scheduling and Preparation of Quality Assurance Control Doc...
 

More from Tutors India

Is Market Driven Educational Model (Encouraging Privatisation in Higher Educa...
Is Market Driven Educational Model (Encouraging Privatisation in Higher Educa...Is Market Driven Educational Model (Encouraging Privatisation in Higher Educa...
Is Market Driven Educational Model (Encouraging Privatisation in Higher Educa...Tutors India
 
How Tutors India is deft of making Synopsis for all kind of Marketing Researc...
How Tutors India is deft of making Synopsis for all kind of Marketing Researc...How Tutors India is deft of making Synopsis for all kind of Marketing Researc...
How Tutors India is deft of making Synopsis for all kind of Marketing Researc...Tutors India
 
Reference collection apa style- sample
Reference collection apa style- sampleReference collection apa style- sample
Reference collection apa style- sampleTutors India
 
Dissertation fdi-foreign-direct-investment
Dissertation fdi-foreign-direct-investmentDissertation fdi-foreign-direct-investment
Dissertation fdi-foreign-direct-investmentTutors India
 
Comprehensive dissertation writing for finance management expectation from u...
Comprehensive dissertation writing for finance management  expectation from u...Comprehensive dissertation writing for finance management  expectation from u...
Comprehensive dissertation writing for finance management expectation from u...Tutors India
 
Business plan-to-start-a-coffee-shop-Dissertation-Sample
Business plan-to-start-a-coffee-shop-Dissertation-Sample Business plan-to-start-a-coffee-shop-Dissertation-Sample
Business plan-to-start-a-coffee-shop-Dissertation-Sample Tutors India
 
Privatisation of higher education dissertation proposal-sample
Privatisation of higher education dissertation proposal-samplePrivatisation of higher education dissertation proposal-sample
Privatisation of higher education dissertation proposal-sampleTutors India
 
Enforcement mechanism research proposal-Sample Work
Enforcement mechanism research proposal-Sample WorkEnforcement mechanism research proposal-Sample Work
Enforcement mechanism research proposal-Sample WorkTutors India
 
Joyful research proposal with tutorsindia
Joyful research proposal with tutorsindiaJoyful research proposal with tutorsindia
Joyful research proposal with tutorsindiaTutors India
 
Contract labour law research proposal sample work
Contract labour law research proposal sample workContract labour law research proposal sample work
Contract labour law research proposal sample workTutors India
 
Vehicle Scheduling Problem Research Proposal-Tutorsindia
Vehicle Scheduling Problem Research Proposal-TutorsindiaVehicle Scheduling Problem Research Proposal-Tutorsindia
Vehicle Scheduling Problem Research Proposal-TutorsindiaTutors India
 
Research proposal contract_labour_law_sample_work
Research proposal contract_labour_law_sample_workResearch proposal contract_labour_law_sample_work
Research proposal contract_labour_law_sample_workTutors India
 
Essay writing survival kit_ a must-have university guide for students
Essay  writing survival kit_ a must-have university guide for studentsEssay  writing survival kit_ a must-have university guide for students
Essay writing survival kit_ a must-have university guide for studentsTutors India
 
Master dissertation topics sample
Master dissertation topics sample Master dissertation topics sample
Master dissertation topics sample Tutors India
 
Make a smart move with tutorsindia
Make a smart move with tutorsindia Make a smart move with tutorsindia
Make a smart move with tutorsindia Tutors India
 

More from Tutors India (15)

Is Market Driven Educational Model (Encouraging Privatisation in Higher Educa...
Is Market Driven Educational Model (Encouraging Privatisation in Higher Educa...Is Market Driven Educational Model (Encouraging Privatisation in Higher Educa...
Is Market Driven Educational Model (Encouraging Privatisation in Higher Educa...
 
How Tutors India is deft of making Synopsis for all kind of Marketing Researc...
How Tutors India is deft of making Synopsis for all kind of Marketing Researc...How Tutors India is deft of making Synopsis for all kind of Marketing Researc...
How Tutors India is deft of making Synopsis for all kind of Marketing Researc...
 
Reference collection apa style- sample
Reference collection apa style- sampleReference collection apa style- sample
Reference collection apa style- sample
 
Dissertation fdi-foreign-direct-investment
Dissertation fdi-foreign-direct-investmentDissertation fdi-foreign-direct-investment
Dissertation fdi-foreign-direct-investment
 
Comprehensive dissertation writing for finance management expectation from u...
Comprehensive dissertation writing for finance management  expectation from u...Comprehensive dissertation writing for finance management  expectation from u...
Comprehensive dissertation writing for finance management expectation from u...
 
Business plan-to-start-a-coffee-shop-Dissertation-Sample
Business plan-to-start-a-coffee-shop-Dissertation-Sample Business plan-to-start-a-coffee-shop-Dissertation-Sample
Business plan-to-start-a-coffee-shop-Dissertation-Sample
 
Privatisation of higher education dissertation proposal-sample
Privatisation of higher education dissertation proposal-samplePrivatisation of higher education dissertation proposal-sample
Privatisation of higher education dissertation proposal-sample
 
Enforcement mechanism research proposal-Sample Work
Enforcement mechanism research proposal-Sample WorkEnforcement mechanism research proposal-Sample Work
Enforcement mechanism research proposal-Sample Work
 
Joyful research proposal with tutorsindia
Joyful research proposal with tutorsindiaJoyful research proposal with tutorsindia
Joyful research proposal with tutorsindia
 
Contract labour law research proposal sample work
Contract labour law research proposal sample workContract labour law research proposal sample work
Contract labour law research proposal sample work
 
Vehicle Scheduling Problem Research Proposal-Tutorsindia
Vehicle Scheduling Problem Research Proposal-TutorsindiaVehicle Scheduling Problem Research Proposal-Tutorsindia
Vehicle Scheduling Problem Research Proposal-Tutorsindia
 
Research proposal contract_labour_law_sample_work
Research proposal contract_labour_law_sample_workResearch proposal contract_labour_law_sample_work
Research proposal contract_labour_law_sample_work
 
Essay writing survival kit_ a must-have university guide for students
Essay  writing survival kit_ a must-have university guide for studentsEssay  writing survival kit_ a must-have university guide for students
Essay writing survival kit_ a must-have university guide for students
 
Master dissertation topics sample
Master dissertation topics sample Master dissertation topics sample
Master dissertation topics sample
 
Make a smart move with tutorsindia
Make a smart move with tutorsindia Make a smart move with tutorsindia
Make a smart move with tutorsindia
 

Recently uploaded

How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17Celine George
 
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptxOn_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptxPooja Bhuva
 
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxExploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxPooja Bhuva
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfagholdier
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxCeline George
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfPoh-Sun Goh
 
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxCOMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxannathomasp01
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and ModificationsMJDuyan
 
Plant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptxPlant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptxUmeshTimilsina1
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...Poonam Aher Patil
 
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfDr Vijay Vishwakarma
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024Elizabeth Walsh
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.MaryamAhmad92
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...Nguyen Thanh Tu Collection
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxJisc
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Jisc
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxDr. Sarita Anand
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxmarlenawright1
 
Wellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxWellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxJisc
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - Englishneillewis46
 

Recently uploaded (20)

How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17
 
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptxOn_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
 
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxExploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptx
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxCOMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
Plant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptxPlant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptx
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptx
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
 
Wellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxWellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptx
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 

Research proposal implementation of project management

  • 1. © 2016-2017 All Rights Reserved, No part of this document should be modified/used without prior consent Tutors India™ - Your trusted mentor since 2001 www.tutorindia.com I UK # +44-1143520021, Info@tutorsindia.com Page 1 of 7 IMPLEMENATATION OF PROJECT MANAGEMENT- ROLE OF CRITICAL SUCCESS FACTORS This Sample Work has been completed by ‘Tutors India’ Copyright © Tutors India. All rights reserved. www.tutorsindia.com
  • 2. © 2016-2017 All Rights Reserved, No part of this document should be modified/used without prior consent Tutors India™ - Your trusted mentor since 2001 www.tutorindia.com I UK # +44-1143520021, Info@tutorsindia.com Page 2 of 7 Table of Contents Introduction................................................................................................................................3 Project management in the construction industry......................................................................3 Critical success factors in construction industry........................................................................4 Research objectives:...................................................................................................................5 Research design .........................................................................................................................5 Literature review........................................................................................................................5 Scope and Limitations of the study............................................................................................5 References:.................................................................................................................................7
  • 3. © 2016-2017 All Rights Reserved, No part of this document should be modified/used without prior consent Tutors India™ - Your trusted mentor since 2001 www.tutorindia.com I UK # +44-1143520021, Info@tutorsindia.com Page 3 of 7 Introduction A project is nothing but a temporary task or endeavor that is carried out for the creation of a specific service or product (PMBOK, 2000). Even if the projects are temporary, the process of project management occurs in repetition through the entire cycle of life of every project. A process could be defined a sequence of changes or the functions that are aimed for the achievement of results. The crucial factor that leads to the successful implementation of a project is the efficient management of the lot of processes that are entwined throughout the life cycles of the project, there should be a proper conception of the project by the stakeholders and this should be enforced in a consistent manner by the management in parallel. There are a lot of organization that are involved in the establishment of competency in the process of project management and such organizations face a lot of dilemmas at the outset regarding where to begin and the decisions taken for such crucial questions are important in deciding the success or failure of any project. The ultimate goal of the implementation of the project is to ensure that there is consistent and sequential establishment of the practices like commencement, planning, implementation, quality control and the closure of the project. There could be no spontaneous occurrence of these practices naturally and a skillful and cautious crafting of these processes along with effective communication and delicate enforcement is very critical in the successful completion of the project. Also other negative factors like the resistances exerted by the organization for change should be handled. The processes of project management provide the building blocks for the establishment of training as well as procedures. There are also tools and techniques that would help to improve the efficiency of the implementation of project management and lead ultimately to the maintenance of these processes Project management in the construction industry In the construction industry, the process of project management comprises a set of aims that could be achieved by the implementation of a series of procedures that facet the constraint of resources. Also there exist conflicts among the objectives that are stated initially with reference to the cost, time, scope, quality and constraints that take a toll on the human resources as well as the finances. There should be proper resolving of such conflicts when the project initiates and there should also be tradeoffs or a set of substitutes created. There are a lot of functions of project management that includes the following  The objectives of a project should be specified and the plans that include the description of the scope of the project, the budgeting plans, schedules, setting the requirements for performance and the selection of the participants for the project  Optimizing the efficient usage of the resources by procuring the labor, equipment and materials as per the plan in the schedule.  Implementing the associated operations by the efficient coordination as well as control in the planning , designing, contracts and construction throughout the process  Effective communications development and the apparatus for the resolving of the conflicts among the participants There are also some areas that should be handled with efficiency by the project manager and they are as follows:
  • 4. © 2016-2017 All Rights Reserved, No part of this document should be modified/used without prior consent Tutors India™ - Your trusted mentor since 2001 www.tutorindia.com I UK # +44-1143520021, Info@tutorsindia.com Page 4 of 7  A proper integration of the process of project management so that it can be ensured that the elements in the project are co-ordinated in an effective manner.  There should be efficient project scope management so that all the required work is included in the project  Time management in the project so that there could be an effective schedule for the project  Cost management in the project so that the resources needed could be identified and the control of budget could be maintained  Management of quality in the project so that all the functional requirements are met  Human resource management in the project should be met and the proper employment of the personnel in the project should be ensured  Management of proper communication in the project so that there could be communication internally and externally  Analysis of risk management in the project so that there could be mitigation of the risk that are potential risks  Procurement management in the project so that there could be obtaining of the resources from that of the external sources (PMBOK, 2000). Critical success factors in construction industry Success in the task at hand is the aim of every business activity and therefore it is essential that the organizations should be successful in their business at hand so that they could survive in businesses like construction industry which is very competitive. The construction industry is being revolutionized with continuous developments of new methods in business as well as technologies. Hence the companies involved in the construction should take in the applications of new business and also develop approaches so that they can retain their positions in the industry and succeed in business. Kivrak (2008) summarizes the definitions of success as follows: “There are many definitions of success. Traditionally, it is defined as the degree to which goals and expectations are met. On the other hand, one of the definitions of failure is the inability of a firm to pay its obligations when they are due (Frederikslust, 1978). In recent years, there has been an increase in the studies of critical success/failure factors especially in project management subject (Hyvari, 2006) The traditional approach to success in the construction industry is to focus on the ability to plan and execute projects (Abraham, 2003) Traditionally, the success parameters for projects in this industry are cost, time and quality (Hughes, 2004)”. The completion of a project occurs because of the convergence of a lot of events as well as interactions that are planned beforehand or that are unplanned throughout the facility’s life with the participants changing and a parallel change in an environment that is changing. There are certain factors that very critical than that of the others for the success of a project than that of the others and these are called as the critical success factors (CSFs). This term was first used by Rockart (1982) in the context of the projects and (Sanvido et al. 1992) used this term in the context of the management of the projects. This topic has been the subject of intense research since then and also the trend existing in the present scenario is that excellence in the systems of delivery is pursued and it is said that “because the pursuit of excellence in project delivery systems is not new, this new research direction could thrive upon a rich legacy of many previous investigators. However the concept of project success has remained ambiguously defined in the mind of the construction professionals”.
  • 5. © 2016-2017 All Rights Reserved, No part of this document should be modified/used without prior consent Tutors India™ - Your trusted mentor since 2001 www.tutorindia.com I UK # +44-1143520021, Info@tutorsindia.com Page 5 of 7 Research objectives: With the above mentioned background, the study is designed to facilitate the identification of the variables or success factors that impact a successful implementation of a project. The research focus is the construction industry and on the basis of the study, new patterns are expected to emerge that would indicate the major indicators of performance for the measurement of success of projects in the construction industry. Therefore the results of the study could be utilized for the effective implementation of projects in the construction industry. The objectives of the project are as follows:  To make an assessment of the construction industry with special focus on the management of construction and research  To make an attempt in the development of a strategic model involving the critical success factors so that there could be improvements and strengthening of the construction management  To provide recommendations for the standardization of the practices so that there could be improvements in time, productivity, cost safety and quality. Research design The methodology of the study consists of the development of a questionnaire so that information on the critical success factors could be elicited for the construction projects in organizations that contract constructions and the survey of the questionnaire could be conducted by means of personal interviews and in case of inaccessibility to personal interviews, the questionnaire would be completed by means of filling through postal mail. The feedback from the questionnaire could be used for the identification of the major success factors in the construction projects. Literature review The primary sources would be the academic journals associated with the construction industry. Also various reports as well as documents related to the construction industry released by the government and other official websites would be used. There would also be use of secondary sources like the write-ups in the newspapers and other scholarly magazines and journals. The books available on the construction industry by different authors would also be studied. The help of various libraries available would also be sought so that notes could be collected from that of the primary as well as the secondary sources. Many useful websites found on the internet would also be utilized for the collection of references. Scope and Limitations of the study The scope of the study is that in the dynamic construction industry which is replete with uncertainties in terms of technology, developmental processes and budgets, the identification
  • 6. © 2016-2017 All Rights Reserved, No part of this document should be modified/used without prior consent Tutors India™ - Your trusted mentor since 2001 www.tutorindia.com I UK # +44-1143520021, Info@tutorsindia.com Page 6 of 7 of the critical success factors would serve as great means for improving the effectiveness of the project. This is particularly important in the context of the complicated and difficult building projects where the team involved faces changes that are unprecedented. One of the limitations of the study is that only a small number of firms would be used fo the study and hence the findings of the study should be interpreted with care and caution. Also another limitation of the study is that the interrelationships existing among the various critical success factors could not be established with this method of study. Tentative scheme of chapterization Chapter 1: introduction Introduction Background of the study Research statement Significance of the research Research Aim Research objectives Chapter 2: Review of literature Chapter 3: Research methodology Research approach Research method Research tools Sampling procedure Data collection procedures Primary data Interviewing Secondary data Questions used for the interview in research Data analysis Limitations of research Chapter 4: Results and analysis Chapter 5: Summary and conclusions Chapter 6: Bibliography
  • 7. © 2016-2017 All Rights Reserved, No part of this document should be modified/used without prior consent Tutors India™ - Your trusted mentor since 2001 www.tutorindia.com I UK # +44-1143520021, Info@tutorsindia.com Page 7 of 7 References Abraham G. L. (2003) ‘‘Critical success factors for the construction industry’’, In: Moleenar, K R and Chinowsky, P S (Ed.), Proceedings of Construction Research Congress, March 19- 21, Honolulu, Hawaii. A guide to the Project Management Body of Knowledge (PMBOK® Guide) 2000 Edition, pp. 4 Frederikslust, R. A. I. (1978) ‘‘'Predictability of Corporate Failure’’, Martinus Nijhoff Social Sciences Division, Leiden, The Netherlands. Hughes, S. W. Tippett, D. D and. Thomas, W. K (2004) ‘‘Measuring project success in the construction industry’’, Engineering Management Journal, 16(3), 31-37. Hyvari, I. (2006) ‘‘Success of projects in different organizational conditions’’, Project Management Journal, 37(4), 31-41. Rockart, J. F. (1982). "The changing role of the information systems executive: A critical success factors perspective." Sloan Mgmt. Review, 24(1), 3-13. Sanvido, V., Grobler, F., Pariff, K., Guvents, M., and Coyle, M. (1992). ‘‘Critical success factors for construction projects.’’ J. Constr. Eng. Manage., 118(1), 94 –111.