2. TSX-V:ATC
Forward-Looking Statements
2
FORWARD-LOOKING STATEMENTS
This presentation contains forward-looking information. Forward looking information contained in this presentation includes, but is not limited to, statements with respect to: (i) the
estimation of inferred and indicated mineral resources; (ii) the success of exploration activities; (iii) the results of the PEA including statements about future production, future
operating and capital costs, the projected IRR, NPV, payback period, and production timelines for the Tiger Deposit.
These statements are based on information currently available to ATAC Resources Ltd. (“ATAC”) and ATAC provides no assurance that actual results will meet management’s
expectations. In certain cases, forward-looking information may be identified by such terms as "anticipates", "believes", "could", "estimates", "expects", "may", "shall", "will", or
"would". Forward-looking information contained in this presentation is based on certain factors and assumptions regarding, among other things, the estimation of mineral
resources, the realization of resource estimate, gold metal prices, the timing and amount of future exploration and development expenditures, the estimation of initial and
sustaining capital requirements, the estimation of labour and operating costs, the availability of necessary financing and materials to continue to explore and develop the Tiger
Deposit in the short and long-term, the progress of exploration and development activities, the receipt of necessary regulatory approvals, the completion of the environmental
assessment process, and assumptions with respect to currency fluctuations, environmental risks, title disputes or claims, and other similar matters. While ATAC considers these
assumptions to be reasonable based on information currently available to it, they may prove to be incorrect.
Forward-looking information involves known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of ATAC to be
materially different from any future results, performance or achievements expressed or implied by the forward-looking information. Such factors include risks inherent in the
exploration and development of mineral deposits, including risks relating to changes in project parameters as plans continue to be redefined including the possibility that mining
operations may not commence at the Tiger Deposit, risks relating to variations in mineral resources, grade or recovery rates resulting from current exploration and development
activities, risks relating to changes in gold prices and the worldwide demand for and supply of gold, risks related to increased competition in the mining industry generally, risks
related to current global financial conditions, uncertainties inherent in the estimation of mineral resources, access and supply risks, reliance on key personnel, operational risks
inherent in the conduct of mining activities, including the risk of accidents, labour disputes, increases in capital and operating costs and the risk of delays or increased costs that
might be encountered during the development process, regulatory risks, including risks relating to the acquisition of the necessary licenses and permits, financing, capitalization
and liquidity risks, including the risk that the financing necessary to fund the exploration and development activities at the Tiger Deposit may not be available on satisfactory terms,
or at all, risks related to disputes concerning property titles and interest, and environmental risks. This list is not exhaustive of the factors that may affect any of ATAC's forward-
looking information. These and other factors should be considered carefully and readers should not place undue reliance on ATAC's forward-looking information. ATAC does not
undertake to update any forward-looking information that may be made from time to time by ATAC or on its behalf, except in accordance with applicable securities laws.
TECHNICAL DISCLOSURE
It should be noted that the Tiger Deposit PEA is preliminary in nature and includes inferred mineral resources that are considered too speculative geologically to have the
economic considerations applied to them that would enable them to be categorized as mineral reserves. There is no certainty that the PEA forecast will be realized or that any of
the resources will ever be upgraded to reserves. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. Additional information about the
Tiger Deposit PEA is summarized in ATAC’s February 27, 2020 technical report titled “Technical Report and Preliminary Economic Assessment for the Tiger Deposit, Rackla Gold
Project, Yukon, Canada”, which can be viewed at www.sedar.com under the ATAC profile or on the ATAC website at www.atacresources.com. Additional information about the
Osiris Resource Estimate is summarized in ATAC’s July 2, 2018 technical report titled “Technical Report and Estimate of Mineral Resources for the Osiris Project, Yukon,
Canada,” which can be viewed at www.sedar.com under the ATAC profile or on the ATAC website at www.atacresources.com. Historical information for East Goldfield and the Val
Target rely on disclosure from previous operators and have not been independently verified.
QUALIFIED PERSON
Adam Coulter, M.Sc., P.Geo., ATAC’s Vice President of Exploration, is a qualified person for the purposes of National Instrument 43-101. All technical information contained in this
presentation has been approved by Adam Coulter.
TRUE WIDTHS
True widths for diamond drill holes are estimated to be 30% - 100% of intersected widths. RAB drill hole intersections are drilled thicknesses and true widths are unknown.
Advancing Yukon’s Premier Precious and Base Metal District
3. TSX-V:ATC
CREATIV
E
DIVISION
Osiris Deposit: 1,685,000 oz. Au at 4.23 g/t (Inferred)*
Tiger Deposit: 464,000 oz. Au at 3.19 g/t (M&I)*
East Goldfield property in Nevada allows for year-
round exploration
Rackla Gold Project has district-scale, high-grade
discovery potential
100%-owned, 185-km long polymetallic belt in Yukon
4Advancing Yukon’s Premier Precious and Base Metal District
Strong cash position with ~C$8M, no debt
Strategic Assets in Top Tier Jurisdictions
*Please see appendix for 43-101 compliant mineral resources.
4. TSX-V:ATC
Capital Structure
4Advancing Yukon’s Premier Precious and Base Metal District
Share Structure
Shares Outstanding 162,383,547
Fully Diluted 183,421,903
Options ($0.20 - $0.76) 12,967,500
Warrants ($0.23 - $0.425) 8,070,856
Working Capital ~C$10M
52-Week Range 0.11 – 0.315
200-Day Moving Average 0.20
Share Structure as at July 9, 2020
Recent Financings
Flow-through Shares Common Shares Proceeds
June 2020 4,347,827 @ $0.23/share - ~$1.0 M
March 2019 10,507,143 @ $0.35/share - ~$3.6 M
May 2018 7,556,700 @ $0.60/share - ~$4.5 M
May 2017 (Barrick) 16,684,800 @ $0.50/share - ~$8.3 M
Apr. 2016 5,000,000 @ $0.65/share - ~$3.3 M
Significant Holders
Barrick 17.6% *
Strategic Metals Ltd. 6.0% **
Sprott Gold Equity Fund 4.2% ***
* As at February 1, 2020
** As at June 4, 2020
*** As at March 31, 2020
5. TSX-V:ATC
Yukon – A Top Tier Jurisdiction
5Advancing Yukon’s Premier Precious and Base Metal District
5 of the world’s top gold producers have
invested in Yukon projects since 2016
ATAC received positive joint decision for
a 65 km tote road in March 2018
Stable tax/royalty regime
Yukon general corporate tax rate cut from
15% to 12% in 2017
Yukon Resource Gateway Project: Over
$360 million in combined federal/territorial
funding to improve road access
Mining accounts for 20% of Yukon GDP
6. TSX-V:ATC
The Rau Project hosts the advanced-stage Tiger
Gold Deposit and is situated in a polymetallic
district with over 20 other underexplored targets
The Rackla Gold Property
6Advancing Yukon’s Premier Precious and Base Metal District
The Osiris Project hosts Canada’s first Carlin-type
gold discoveries with an inferred resource of
1,685,000 ounces at 4.23 g/t Au at the Osiris Deposit
The Orion Project hosts Carlin-type gold
mineralization over a 2.5 km strike length, along
the regional-scale Anubis Fault
The Rackla Gold Property is ~1,700 km² and is
comprised of three separate projects: Osiris, Orion
and Rau.
8. TSX-V:ATC
Airstrip Target
8Advancing Yukon’s Premier Precious and Base Metal District
• Largest gold-in-soil anomaly on the Rackla Gold
Property (>11.5 km2)
• Gold mineralization occurs in oxidized pyrite- and
arsenopyrite-bearing quartz veins
• Appears to be the first orogenic gold system
identified in this area
• Rock sampling up to 6.39 g/t gold demonstrates
high-grade potential
• RAB and Diamond Drilling underway
Rau Project
11. TSX-V:ATC
2020 Updated Tiger Resource & PEA
11
Parameter Value
Gold Price (US$/oz) $1400
Exchange Rate (US$:CA$) 0.77
Pre-tax NPV(5%) (millions) $118.2
Pre-tax IRR 54.5%
Post-tax NPV(5%) (millions) $85.4
Post-tax IRR 42.6%
Recovered Gold 267,090 oz
Average Gold Grade 3.82 g/t
Average Oxide Recovery 90.5%
Average Sulphide Recovery 61.1%
Pre-production Capital (millions) $110.1
Sustaining Capital (millions) $9.3
Payback (pre-tax) 1.24 years
Payback (post-tax) 1.40 years
Pre-production Period 1 year
Mine life 6 years
Process Carbon-in-Pulp Leach
Production Rate 1,500 tpd
Operational Period Year-round (365 days)
Strip Ratio 5.3:1
Access Method Tote Road: ~$11 million
*See page 2 for 43-101 Technical Report disclosure
Advancing Yukon’s Premier Precious and Base Metal District
• Measured and Indicated Resources of
464,000 ounces of gold at 3.19 g/t
• Pre-Tax NPV of $118.2 M with an IRR of
54.5% and a 1.24 year payback period
• PEA envisions a small, high-grade,
conventional open pit operation
• At US$1,550/oz gold price the NPV
increases to $161.4 M with an IRR of
69.2%
• The deposit remains open for expansion
along strike and at depth
Rau Project
13. TSX-V:ATC
Val Target
13
• Historic silver-lead-zinc±copper±gold target,
re-interpreted in 2019 with potential for
significant bulk-tonnage grade silver-lead-
zinc mineralization
• 1.5 km x 1.5 km geochemical anomaly which
remains open to the south and east
• Drilled and trenched by several companies
from 1978 to 1988 with a focus on high-grade
galena veins
• Historic work neglected gold and copper
potential
Advancing Yukon’s Premier Precious and Base Metal District
Zone Ag (g/t) Pb
(%)
Zn
(%)
Cu
(%)
Au
(g/t)
Big Red 4,010 73.3% 3.4% 0.8% -
Big Red 613 5.9% 8.3% - 0.66
Tetrahedrite 11,663 76.4% 0.9% 2.6% -
South Hill 3,470 68.1% 7.5% 1.2% -
South Hill 321 6.0% 7.3% - 0.53
Highlight Rock Samples
Rau Project
14. TSX-V:ATC
Osiris & Orion – Carlin-type Gold in Yukon
14Advancing Yukon’s Premier Precious and Base Metal District
15. TSX-V:ATC
Osiris Project – High Grade Gold Resources
15
Inferred Mineral Resource: 1,685,000 ounces gold at an average grade of 4.23 g/t (12.4Mt)
Includes the Conrad, Sunrise, Osiris, and Ibis Zones
Based on ~79,000m drilling
238 holes at an average depth of 330m
Pit-Constrained Resource: 1,055,000 ounces gold at an average grade of 4.08 g/t (8.0Mt)
Source: http://www.visualcapitalist.com/company-spotlight/atac-resources/
Advancing Yukon’s Premier Precious and Base Metal District
Osiris Project
16. TSX-V:ATC
Orion Project – Early Stage Carlin-Style Targets
16Advancing Yukon’s Premier Precious and Base Metal District
Orion Project
18. TSX-V:ATC
East Goldfield Project
18Advancing Yukon’s Premier Precious and Base Metal District
600 ha road-accessible property, located
within the Goldfield Mining District in Nevada.
8 km east of the past producing Goldfield
Main Deposit (historic production of 4.2
million ounces at 18.55 g/t gold*)
Extensive west-northwest trending high-
sulphidation epithermal alteration in
favourable volcanic stratigraphy
Adjacent to Waterton’s development-stage
Gemfield project (47.3 million tonnes of
Measured and Indicated at 1.03 g/t gold,
totaling 1,574,000 ounces of gold).
Hosts the past-producing Tom Keane mine,
where historic 2003 RC drilling by Metallic
Gold Ventures Inc. returned 22.86 m of 2.88
g/t gold.
Silicic ledges along existing road Historic Tom Keane Mine
Nevada
22. TSX-V:ATC
Strong Upside Potential – Undervalued relative to peer group (EV/Au Eq. Ounce)
22Advancing Yukon’s Premier Precious and Base Metal District
Peer Average: $49 per ounce
$150
Source: Company reports and 43-101 resource and reserve statements. Resources are inclusive
of reserves. Au Eq. calculations based on long-run analyst consensus for Au and Ag. All values
in CAD as at May 20, 2020.
~$8
~$11
23. TSX-V:ATC
Why Invest in ATAC?
23Advancing Yukon’s Premier Precious and Base Metal District
Nevada grassroots exploration at the East Goldfield project
provides opportunities for year-round results and news flow
Economic Tiger Deposit
Updated Tiger Deposit PEA demonstrates a pre-tax NPV(5%) of
$118.2M with an IRR of 54.5% at US$1,400/oz gold
Gold mineralization along 2.5 km strike at the Orion Project,
including: 19.85 g/t gold over 8.51 m (AN-12-001),
and 2.75 g/t gold over 61.29 m (AN-16-010)
100% ownership of two high-grade open-pit gold deposits in
Yukon, both open for expansion
District-scale discovery potential across ~1,700-km² Rackla
Gold Project, located in a top-tier Canadian mining jurisdiction
25. TSX-V:ATC
APPENDIX
25Advancing Yukon’s Premier Precious and Base Metal District
ATAC Mineral Inventory
26
27
28
29
30
31
32
33
34
Osiris Resource Sensitivity
Osiris and Sunrise Drilling & Geology
Orion Targets and As in Soil
Management & Directors
Conrad Drilling & Geology
Tiger Resources and PEA Gold Price Sensitivity
Tiger Capital and Operating Costs
Tiger Gold Deposit & PEA Pit Shell
26. TSX-V:ATC
Management & Directors
26Advancing Yukon’s Premier Precious and Base Metal District
Graham Downs, President & CEO
23 years of Yukon mineral exploration experience
Director of Trifecta Gold
Adam Coulter, VP Exploration
Professional Geologist, working in mineral exploration and
development since 2012
Andrew Carne, VP Corporate & Project Development
Professional Engineer, working in mineral exploration and
development since 2012
Vice President of the Yukon Chamber of Mines
Ian Talbot, Chief Operating Officer
Formerly internal counsel with BHP Billiton World
Exploration
Larry Donaldson, Chief Financial Officer
Chartered Accountant with over 30 years accounting, audit,
and tax experience
Ed Cope, Technical Advisor
21 years with Barrick Gold Corporation; retired
as VP Exploration for North America in 2016
Bill Wengzynowski, Geological Consultant
30+ years of Yukon-focused exploration experience
Two-time recipient of Yukon Prospector of the Year award
Douglas Goss, Chairman & Director
Queen Elizabeth II Golden and Diamond Jubilee Medals
Alberta Order of Excellence
General Counsel & Corporate Secretary to Premium Brands since
1999
Rob Carne, Executive Chairman, Technical Committee & Director
Former President of ATAC and part of the Rackla Gold Project
discovery team
Bruce Youngman, Director
President and COO of Canplats Resources; acquired by Goldcorp
Former VP and director of Northern Dynasty Minerals
Don Poirier, Director
Former VP Corporate Development for Hecla Mining
Glenn Yeadon, Secretary & Director
34 years as a partner or associate of Tupper, Jonsson & Yeadon
Bruce Kenway, Director
Founding member of chartered accounting firm Kenway Mack
Slusarchuk Stewart LLP
27. TSX-V:ATC
Total ATAC Mineral Inventory
27Advancing Yukon’s Premier Precious and Base Metal District
Zone Tonnes Grade (Au g/t) Gold (oz)
Conrad 6,487,000 4.00 835,000
Osiris 474,000 4.61 70,000
Sunrise 309,000 4.23 42,000
Ibis 775,000 4.35 108,000
Total 8,045,000 4.08 1,055,000
Zone Tonnes Grade (Au g/t) Gold (oz)
Conrad 3,174,000 4.46 455,000
Osiris 427,000 3.79 52,000
Sunrise 531,000 5.53 95,000
Ibis 203,000 4.27 28,000
Total 4,335,000 4.52 630,000
Osiris Inferred Pit-Constrained Resources (1.30 g/t gold cut-off)*
Osiris Inferred Underground Resources (2.60 g/t gold cut-off)*
Tiger Measured and Indicated Resources (0.75 g/t gold open pit cut-off | 1.50 g/t gold underground cut-off)*
Zone Constraint Classification Tonnes Grade (Au g/t) Gold (oz)
Oxides Open Pit Indicated 1,980,000 3.74 238,000
Underground Indicated 165,000 3.09 16,000
Sulphides Open Pit Measured 799,000 2.92 75,000
Open Pit Indicated 847,000 2.68 73,000
Underground Measured 29,000 2.06 2,000
Underground Indicated 706,000 2.64 60,000
Total M+I 4,526,000 3.19 464,000
*See page 2 for 43-101 Technical Report disclosure
30. TSX-V:ATC
OS-17-273 - 35.90 g/t Au
26.70 m of 12.95 g/t gold in OS-18-273
29Advancing Yukon’s Premier Precious and Base Metal District
Osiris and Sunrise Drilling & Geology Osiris Project
31. TSX-V:ATC 31Advancing Yukon’s Premier Precious and Base Metal District
Orion Targets and Arsenic-in-Soil Orion Project
32. TSX-V:ATC
Tiger Resources and PEA Gold Price Sensitivity
32
Type Constraint Classification
Au Cut-off
(g/t)
Tonnes
> Cut-off
Grade
> Cut-off
Contained
Metal
Au (g/t) Au (oz)
Oxide Open Pit Indicated 0.75 1,980,000 3.74 238,000
Underground Indicated 1.5 165,000 3.09 16,000
Sulphide Open Pit Measured 0.75 799,000 2.92 75,000
Open Pit Indicated 0.75 847,000 2.68 73,000
Underground Measured 1.5 29,000 2.06 2,000
Underground Indicated 1.5 706,000 2.64 60,000
Total M+I Variable 4,526,000 3.19 464,000
Oxide Open Pit Inferred 0.75 20,000 1.54 1,000
Underground Inferred 1.5 41,000 2.62 3,000
Sulphide Open Pit Inferred 0.75 7,000 2.41 500
Underground Inferred 1.5 97,000 2.26 7,000
Total Inferred Variable 165,000 2.17 11,500
Gold Price $US/oz (0.77 $US/CA$) $1,250 $1,300 $1,350 $1,400 $1,450 $1,500 $1,550
Pre-Tax NPV (5% discount rate) $M $74.9 $89.4 $103.8 $118.2 $132.6 $147.0 $161.4
Pre-Tax IRR 38.7% 44.1% 49.4% 54.5% 59.4% 64.3% 69.2%
The Mineral Resource estimate used in the updated PEA was completed by Steven Ristorcelli, C.P.G. (Mine Development Associates). The
effective date of this Mineral Resource estimate is January 3, 2020. Three dimensional polygonal models were constructed to constrain oxide and
sulphide mineralization, as well as model rock types and grade corridors. See page 2 for Technical Report disclosure.
Advancing Yukon’s Premier Precious and Base Metal District
Rau Project
33. TSX-V:ATC
Tiger Capital and Operating Costs
33
* Totals may not add exactly due to rounding
** Includes capitalized pre-production mining costs.
Major mining equipment is leased
*** Contingencies were factored on an area-by-area basic depending on
the detail level of each estimate
Capital Costs
Pre Production
(Millions)*
Sustaining
Capital
LOM
Site Infrastructure $8.4 - $8.4
Tote Road $11.6 - $11.6
Open Pit Mining** $10.4 - $10.4
Materials Crushing
and Handling
$2.0 - $2.0
Process Plant $30.4 - $30.4
Tailings and Water
Management
$8.0 $9.3 $17.3
Project Indirects $20.8 - $20.8
Owner’s Cost $1.3 - $1.3
Contingencies*** $17.2 - $17.2
TOTAL $110.1 $9.3 $119.4
Operating Costs
LOM
Avg.
Mining Costs
($/t mined)*
$4.28
Processing
($/t processed)
$29.88
G & A
($/t processed)
$15.33
Surface Services
($/t processed)
$4.68
Camp & Genset Leasing
($/t processed)
$0.64
Equipment Leasing
($/t processed)
$1.68
* Not including capitalized pre-production mining
costs
*See page 2 for 43-101 Technical Report disclosure
Advancing Yukon’s Premier Precious and Base Metal District
Rau Project