SlideShare une entreprise Scribd logo
1  sur  68
Télécharger pour lire hors ligne
Exploration Technical Session
March 10th, 2022 | TSX:ERO | NYSE:ERO
ERO COPPER | 1
Cautionary Statements
Caution Regarding Forward Looking Information and Statements
This presentation contains “forward-looking statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995 and “forward-looking information” within the meaning of applicable Canadian securities legislation (collectively, “forward-looking
statements”). Forward-looking statements include statements that use forward-looking terminology such as “may”, “could”, “would”, “will”, “should”, “intend”, “target”, “plan”, “expect”, “budget”, “estimate”, “forecast”, “schedule”, “anticipate”, “believe”, “continue”, “potential”,
“view” or the negative or grammatical variation thereof or other variations thereof or comparable terminology. Forward-looking statements include, but are not limited to, statements with respect to the Company's guidance and/or outlook on future production, costs and capital
expenditures; development plans, costs, timelines and/or approvals for, as well as benefits, production and/or performance expected by, growth projects including development of the Deepening Extension Zone, construction of the new external shaft, and creation of a two-mine system
at the Pilar Mine, construction of the Boa Esperança mine, development of the Matinha Vein at the NX Gold Mine, expansion of the Caraíba Mill, and other infrastructure projects at the MCSA Complex; the Company’s expectations, strategies, objectives and plans for the MCSA Mining
Complex, the NX Gold Property and the Boa Esperança Property, including, but not limited to, the Company’s planned exploration, development and production activities; and the significance and timing of any particular exploration program or result and the Company’s expectations
and objectives for current and future exploration plans including, but not limited to, planned areas of additional exploration, further extensions and expansion of mineralization at the MCSA Mining Complex, the NX Gold Mine and the Boa Esperança Project.
Forward-looking statements are not a guarantee of future performance and are based upon a number of estimates and assumptions of management in light of management's experience and perception of trends, current conditions and expected developments, as well as other factors
that management believes to be relevant and reasonable in the circumstances, as of the date of this presentation including, without limitation, assumptions about: continued effectiveness of the measures taken by the Company to mitigate the possible impact of COVID-19 on its
workforce and operations; favourable equity and debt capital markets; the ability to raise any necessary additional capital on reasonable terms to advance the production, development and exploration of the Company's properties and assets; future prices of copper and other metal
prices; the timing and results of exploration and drilling programs; the accuracy of any mineral reserve and mineral resource estimates; the geology of the MCSA Mining Complex, NX Gold Property and the Boa Esperança Property being as described in the technical reports for these
properties; production costs; the accuracy of budgeted exploration and development costs and expenditures; the price of other commodities such as fuel; future currency exchange rates and interest rates; operating conditions being favourable such that the Company is able to
operate in a safe, efficient and effective manner; work force conditions to remain healthy in the face of prevailing epidemics, pandemics or other health risks (including COVID-19), political and regulatory stability; the receipt of governmental, regulatory and third party approvals,
licenses and permits on favourable terms; obtaining required renewals for existing approvals, licenses and permits on favourable terms; requirements under applicable laws; sustained labour stability; stability in financial and capital goods markets; availability of equipment and critical
supplies, spare parts and consumables; positive relations with local groups and the Company's ability to meet its obligations under its agreements with such groups; and satisfying the terms and conditions of the Company's current loan arrangements. While the Company considers
these assumptions to be reasonable, the assumptions are inherently subject to significant business, social, economic, political, regulatory, competitive, global health, and other risks and uncertainties, contingencies and other factors that could cause actual actions, events, conditions,
results, performance or achievements to be materially different from those projected in the forward-looking statements. Many assumptions are based on factors and events that are not within the control of the Company and there is no assurance they will prove to be correct.
Furthermore, such forward-looking statements involve a variety of known and unknown risks, uncertainties and other factors which may cause the actual plans, intentions, activities, results, performance or achievements of the Company to be materially different from any future plans,
intentions, activities, results, performance or achievements expressed or implied by such forward-looking statements. Such risks include, without limitation, the risk factors listed under the heading “Risk Factors” in the Company’s latest Annual Information Form (the “AIF”).
Although the Company has attempted to identify important factors that could cause actual actions, events, conditions, results, performance or achievements to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events,
conditions, results, performance or achievements to differ from those anticipated, estimated or intended.
The Company cautions that the foregoing lists of important assumptions and factors are not exhaustive. Other events or circumstances could cause actual results to differ materially from those estimated or projected and expressed in, or implied by, the forward-looking statement
contained herein. There can be no assurance that forward-looking statement will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statement. Accordingly, readers should not place undue reliance on forward-looking
statement.
Forward-looking statements contained herein are made as of the date of this presentation and the Company disclaims any obligation to update or revise any forward-looking statement, whether as a result of new information, future events or results or otherwise, except as and to the
extent required by applicable securities laws.
This presentation may also contain future-oriented financial information (“FOFI”) and information which could be considered to be in the nature of a “financial outlook”. Such FOFI or financial outlook was approved by management of the Company as of the date of presentation for the
purpose of providing management’s reasonable estimate of what return investors might expect to earn based on the assumptions set forth in such estimates and the information may not be appropriate for other purposes. Management cautions that such FOFI or financial outlook
reflects the Company’s current beliefs and are based on information currently available to the Company and on assumptions the Company believes are reasonable. Actual results and developments may differ materially from results and developments discussed in the FOFI or financial
outlook as they are subject to a number of significant risks and uncertainties. Certain of these risks and uncertainties are beyond the Company’s control. Consequently, all of the FOFI or financial outlook are qualified by these cautionary statements, and there can be no assurances.
Cautionary Notes Regarding Mineral Resource and Mineral Reserve Estimates
In accordance with applicable Canadian securities regulatory requirements, all mineral reserve and mineral resource estimates of the Company disclosed in this presentation have been prepared in accordance with National Instrument 43-101 - Standards of Disclosure for Mineral
Projects (“NI 43-101”) and are classified in accordance with the Canadian Institute of Mining, Metallurgy and Petroleum ("CIM") Definition Standards for Mineral Resources and Mineral Reserves, adopted by the CIM Council on May 10, 2014 (the "CIM Standards"). NI 43-101 is a rule
developed by the Canadian Securities Administrators that establishes standards for all public disclosure an issuer makes of scientific and technical information concerning mineral projects. NI 43-101 differs significantly from the disclosure requirements of the Securities and Exchange
Commission (the "SEC") generally applicable to U.S. companies. For example, the terms "mineral reserve", "proven mineral reserve", "probable mineral reserve", "mineral resource", "measured mineral resource", "indicated mineral resource" and "inferred mineral resource" are
defined in NI 43-101. These definitions differ from the definitions in the disclosure requirements promulgated by the SEC. Accordingly, information contained in this presentation may not be comparable to similar information made public by U.S. companies reporting pursuant to SEC
disclosure requirements.
Mineral resources which are not mineral reserves do not have demonstrated economic viability. Pursuant to the CIM Standards, mineral resources have a higher degree of uncertainty than mineral reserves as to their existence as well as their economic and legal feasibility. Inferred
mineral resources, when compared with measured or indicated mineral resources, have the least certainty as to their existence, and it cannot be assumed that all or any part of an inferred mineral resource will be upgraded to an indicated or measured mineral resource as a result of
continued exploration. Pursuant to NI 43-101, inferred mineral resources may not form the basis of any economic analysis. Accordingly, readers are cautioned not to assume that all or any part of a mineral resource exists, will ever be converted into a mineral reserve, or is or will ever
be economically or legally mineable or recovered.
ERO COPPER | 2
Disclaimer
General
Scientific and technical information contained in this presentation has been reviewed, verified and approved by Emerson Ricardo Re, MSc, MBA, MAusIMM (CP) (No. 305892), Registered Member (No. 0138) (Chilean Mining Commission) and Resource Manager of
the Company. Mr. Re is an employee of Ero and Qualified Person as defined by NI 43-101.
Information of a scientific or technical nature in respect of the MCSA Mining Complex included in this presentation is based on the press release dated January 6, 2022, and where applicable, the technical report dated January 14, 2021 with an effective date of
October 1, 2020 entitled “2020 Updated Mineral Resources and Mineral Reserves Statements of Mineração Caraíba's Vale do Curaçá Mineral Assets, Curaçá Valley”, prepared by Porfirio Cabaleiro Rodrigues, MAIG, Bernardo Horta de Cerqueira Viana, MAIG,
Paulo Roberto Bergmann, FAusIMM, Fábio Valério Câmara Xavier, MAIG and Dr. Augusto Ferreira Mendonça, RM SME all of GE21 Consultoria Mineral Ltda. (“GE21”) and Dr. Beck (Alizeibek) Nader, FAIG of BNA Mining Solutions (“BNA”), who are independent
qualified persons under NI 43-101 (the “2020 MCSA Technical Report”), and where applicable, the technical report dated October 17, 2018 with an effective date of August 1, 2018 entitled “2018 Updated Mineral Resources and Mineral Reserves Statements of
Mineração Caraíba's Vale do Curaçá Mineral Assets, Curaçá Valley”, prepared by Rubens Jose De Mendonça, MAusIMM, of Planminas – Projectos e Consultoria em Mineração Ltd. and Porfirio Cabaleiro Rodrigues, MAIG, Fábio Valério Cãmara Xavier, MAIG, and
Bernardo Horta de Cerqueira Viana, MAIG, all of GE21, who are independent qualified persons under NI 43-101 (the “2018 MCSA Technical Report”).
Information of a scientific or technical nature in respect of the NX Gold Mine included in this presentation is based on the press release dated January 6, 2022, and where applicable, the technical report, dated January 8, 2021 with an effective date of September
30, 2020, entitled “Mineral Resource and Reserve Estimate of the NX Gold Mine, Nova Xavantina”, prepared by Porfírio Cabaleiro Rodriguez, MAIG, Bernardo Horta Cerqueira Viana, MAIG, Paulo Roberto Begmann, FAusIMM and Leonardo de Moraes Soares,
MAIG, all of GE21, who are independent qualified persons under NI 43-101 (the “2020 NX Gold Mine Technical Report”).
Information of a scientific or technical nature in respect of the Boa Esperança Property included in this presentation is based on the technical report dated November 12, 2021 with an effective date of August 31, 2021, entitled “Boa Esperança Project NI 43-101
Technical Report on Feasibility Study Update”, prepared by Kevin Murray, P. Eng., Erin L. Patterson, P. Eng., and Scott C. Elfen, P.E., all of Ausenco Engineering Canada Inc., Carlos Guzmán, FAusIMM RM CMC of NCL Ingeniería y Construcción SpA, who are
independent qualified persons under NI 43-101, and Emerson Ricardo Re, MSc, MBA, MAusIMM (CP) (No. 305892), Registered Member (No. 0138) (Chilean Mining Commission) and Resource Manager of the Company (the “Boa Esperança Technical Report”).
Please see the AIF, 2020 MCSA Technical Report, 2018 MCSA Technical Report (on SEDAR only), the 2020 NX Gold Mine Technical Report, and the Boa Esperança Technical Report, each filed on the Company’s profile at www.sedar.com and www.sec.gov, for
details regarding the data verification undertaken with respect to the scientific and technical information included in this presentation regarding the MCSA Mining Complex, the NX Gold Mine and the Boa Esperança Property, for additional details regarding the
related exploration information, including interpretations, the QA/QC employed, sample, analytical and testing results and for additional details regarding the mineral resource and mineral reserve estimates disclosed herein.
Where applicable, exploration target projection(s) are shown to demonstrate future area of exploration focus within the Company’s operations. These projections are based on data compilation work which includes review of geological controls, structural
analysis and copper mineralization identified during the Company’s technical programs. The interpretation and boundary limits do not imply continuity of mineralization, or actual thickness of mineralization which has yet to be defined.
Third Party Information
This presentation includes market, industry and economic data which was obtained from various publicly available sources and other sources believed by the Company to be true. Although the Company believes it to be reliable, the Company has not
independently verified any of the data from third party sources referred to in this presentation, or analyzed or verified the underlying reports relied upon or referred to by such sources, or ascertained the underlying economic and other assumptions relied upon
by such sources. The Company believes that its market, industry and economic data is accurate and that its estimates and assumptions are reasonable, but there can be no assurance as to the accuracy or completeness thereof. The accuracy and completeness
of the market, industry and economic data used throughout this presentation are not guaranteed and the Company does not make any representation as to the accuracy or completeness of such information.
Non-IFRS Measures
Financial results of the Company are prepared in accordance with IFRS. The Company and MCSA utilize certain non-IFRS measures, including C1 cash cost of copper produced per pound, C1 cash costs of gold produced per ounce, EBITDA and working capital
as more particularly described in the Company's MD&A for the three and twelve months ended December 31, 2021, a copy of which can be found on the Company's website, on SEDAR and on EDGAR. The Company believes that these measures, together with
measures determined in accordance with IFRS, provide investors with an improved ability to evaluate the underlying performance of the Company, the MCSA Mining Complex and the NX Gold Mine. Non-IFRS measures do not have any standardized meaning
prescribed under IFRS, and therefore they may not be comparable to similar measures employed by other companies. The data is intended to provide additional information and should not be considered in isolation or as a substitute for measures of
performance prepared in accordance with IFRS. C1 cash cost of copper produced (per lb) is the sum of production costs, net of capital expenditure development costs and by-product credits, divided by the copper pounds produced. C1 cash cost reported by the
Company include treatment, refining charges, offsite costs, and certain tax credits relating to sales invoiced to the Company's Brazilian customer on sales. C1 cash cost of copper produced per pound is a non-IFRS measure used by the Company to manage and
evaluate operating performance of the Company’s operating mining unit and is widely reported in the mining industry as benchmarks for performance but does not have a standardized meaning and is disclosed in addition to IFRS measures. C1 cash cost of gold
produced (per ounce) is the sum of production costs, net of capital expenditure development costs and silver by-product credits, divided by the gold ounces produced. C1 cash cost of gold produced per ounce is a non-IFRS measure used by the Company to
manage and evaluate operating performance of the Company's operating mining unit and is widely reported in the mining industry as benchmarks for performance but does not have a standardized meaning and is disclosed in addition to IFRS measures.
ERO COPPER | 3
Introduction | Agenda & Objectives
Ero’s
Strategic
Position
 Fully funded organic growth strategy
 A peer leader in low carbon-intensive
copper production
Exploration
Strategy
 Exploration integral to Company
 High-margin growth focused
 Generating low-capital intensity projects
delivering high ROIC
Exploration
& Growth
 Unlocking value across all time-scales in
ongoing life-of-mine planning
Objectives
Delivery of asset potential across portfolio
Agenda
New format: semi-annual exploration webinars
2 Introduction & Company Overview
1
2
2022 Exploration Program Overview &
Recent Results
2
 MCSA Mining Complex
 Near-mine exploration
 Regional program & new areas of interest
 Nickel exploration program
 Boa Esperança
 NX Gold
2 Q&A
3
ERO COPPER | 4
Introduction | Today’s Speakers
Makko DeFilippo
President
Mike Richard
Chief Geological Officer
Pablo Mejia
VP Exploration
Filipe Porto
Director, Exploration Brazil
Eduardo Oliveira
Geology Manager, Brazil
Francisco Tomazoni
Senior Geologist, Brazil
ERO COPPER | 5
Ero Copper | High-Growth Clean Copper Producer
NX Gold Mine
Production
MCSA Mining
Complex
Production
Boa Esperanҫa
Development Project
(expected construction
start in Q2 2022)
20 kt
46 kt
97 kt
2017A 2021A 2025E
MCSA Boa
Brazil-Focused Clean Copper Producer
With Meaningful Gold Production
Strong Exploration Focus
Driving Organic Growth
Peer-Leading Returns
62% LTM Return on Invested Capital (“ROIC”)(1)
Doubling Copper Production Every 4 Years(2)
1. Source: FactSet Research Systems as of November 29, 2021. Based on last twelve months as of September 30, 2021.
2. Estimated production based on midpoint of production guidance ranges.
ERO COPPER | 6
NX Gold Mine
Production
MCSA Mining Complex
Production
Boa Esperanҫa
Mine in Development (expected construction start in Q2 2022)
1
2
3
2
1
3
45-50kt Cu
5-Year Forecasted
Annual Production(1)
$1.12/lb
Wtd. Avg. 5-Year Forecasted
C1 Cash Cost(1)
Bahia
Mato
Grosso
Pará
~35kt Cu
Avg. Annual Production
in First 5 Years(2)
$1.12/lb
Avg. C1 Cash Cost
in First 5 Years(2)
50-60koz Au
5-Year Forecasted
Annual Production(1)
$513/oz
Wtd. Avg. 5-Year Forecasted
C1 Cash Cost(1)
Ero Copper | Asset Portfolio
Note: C1 Cash Cost of Copper Produced, C1 Cash Cost of Gold Produced, and AISC of Gold Produced are non-IFRS measures.
2. Estimated production and unit costs based on
Please refer to the appendix for a discussion and reconciliation on non-IFRS performance measures.
1. Estimated production and unit costs based on 5-year guidance ranges as published on January 11, 2022.
the Boa Esperança Technical Report. Economics use a copper price forecast of $3.80/lb in 2024, $3.95/lb in 2025 and $3.40/lb in 2026 and thereafter, and a BRL:USD exchange rate of 5.00.
ERO COPPER | 7
 Management focused on creation of shareholder value through
exploration
 Globally, over 70 geologists across the Company’s exploration team
 Currently 34 drill rigs active across the portfolio
2022 Exploration Objectives:
 MCSA
 Addition of high-grade tonnes in the upper part of the Pilar Mine
 Increase mine life at Vermelhos to 10+ years, improve grade profile
 Continue systematic testing of high-priority regional targets focusing on
high-grade zones
 NX Gold
 Increase reserve life to 10+ years at NX Gold
 Aggressive regional exploration program in partnership with Royal Gold
(17,500m planned for 2022)
 Boa Esperança
 Incorporate results of ‘Gap Zone’ drill program into mine planning
 Test extensions of mineralization beyond pit limits
$28
$10
$6
2022 Exploration Budget
($ million)(1)
MCSA NX Gold Boa Esperanca
Ero Copper | Exploration at a Glance
1. 2022 exploration budget based on midpoint of guidance ranges.
MCSA Mining
Complex
Boa
Esperanҫa
NX Gold
Mine
Broader Brazil
ERO COPPER | 8
Near-Term Medium-Term & Long-Term
Gap Zone Exploration Boa Extensions (incl. Underground)
Carajás District Strategic Opportunities
New Regional Systems (i.e. Arapuá)
In-Mine Exploration Near-Mine Exploration Regional Exploration
Nickel, PGM Focused Exploration Program
Pilar Upper Levels
(Exploration & Engineering)
Past Producing Mines
(Lagoa da Mina & Surubim District)
Vermelhos Mine High-Grade Extensions
Pilar Mine Deepening Extension Growth
Vermelhos District Expansion Strategy
Matinha Vein Extensions
Santo Antonio Vein Extensions
New Regional Discoveries
New Strategic Opportunities
Ero Copper | Exploration Portfolio & Potential Life-of-Mine Impact
Placeholder | Placeholder
ERO COPPER | 9
M C S A M I N I N G C O M P L E X
ERO COPPER | 10
 Ero controls ~170,000 hectares along
a 100 km (62 mi) long belt with
favorable geology and excellent
infrastructure
 Previous owners invested little
capital into the assets; significantly
underexplored
 Multiple discoveries under Ero’s
ownership with 102 targets defined to
date
 36 high priority targets
 13 tested
 4 discoveries (previously announced)
 2 new mineralized systems currently
being tested
 Potential to add value through grade
improvement and utilization of
excess mill capacity (~1.3 million
tonnes per annum available)
MCSA Mining Complex | District-Scale Opportunity
ERO COPPER | 11
MCSA Mining Complex | Mineralization Characteristics
Mafic-ultramafic bodies
shown in green
 Copper deposits and occurrences broadly associated with mafic-ultramafic
intrusives
 Mafic-ultramafic intrusions postdate deformation of granulite facies gneissic
host rocks – emplaced in deep structures and utilize gneissic fabrics
 Mafic-ultramafic intrusive suite includes peridotite, orthopyroxenite, websterite,
norite, gabbro, anorthosite
 Associated with hornblende, phlogopite and altered to actinolite, talc, serpentine, carbonate
 Cu-dominant mineralization locally contains concentrations of Ni, Co, Pt, Pd, Au
 Disseminated to massive chalcopyrite +/- bornite, local pyrrhotite-pentlandite,
tellurides, PGE minerals + abundant chromite, magnetite and other
oxides/spinels
 Deposits commonly zoned: chalcopyrite / bornite in the center and pyrrhotite /
pyrite towards the edges
MCSA Mining Complex | Major Ore Types and Signatures
Type Sulphide breccias Sulphide veins and stringers
Disseminated and blebby
sulphides
Key Minerals
Chalcopyrite, bornite-rich,
+/- pentlandite
Chalcopyrite, bornite, pyrrhotite,
pentlandite
Chalcopyrite, bornite-rich,
pentlandite
Geometry
Irregular, flat to vertical, in
mafic-ultramafic bodies and
gneiss
Irregular/planar, various
orientations, in mafic-ultramafic
and gneiss
Irregular zones in mafic-
ultramafic bodies and gneiss
Geochemistry Strong Cu +/- Te +/- Ni, Pt, Pd Strong Cu, Ni, Te, Pt, Pd Strong Cu +/- Te +/- Ni, Pt, Pd
Geophysics
Moderate-high EM conductors;
locally magnetic
Weak EM conductors; IP
response; locally magnetic
Low to high IP response
High grade Low grade
ERO COPPER | 12
ERO COPPER | 13
 Pilar Mine commenced open pit
operations in 1979
 Underground operations
commenced in 1986
 “Pilar 3.0” initiative commenced
2022
 Creation of two mines within a
mine, allowing sustained
production volumes of ~3.0 million
tonnes per annum from Pilar
 Supported by significant
investments in cooling, paste fill
plant and new larger diameter
external shaft
 Shaft construction commenced
construction Q3 2021
MCSA Mining Complex | The New Pilar Mine “3.0”
Phase I & II Cooling Plant
(construction photo December 2021)
N
+100 m
-300 m
-700 m
-1100 m
-1500 m
Plan View
300 Meters
150
MSBS
Deepening
Extension
P1P2
400 Meters
200
ERO COPPER | 14
Total Mineralized Envelope (2021)
Existing Infrastructure
Total Mineralized Envelope (2018)
New External Shaft
 Aggressive exploration within the
Pilar Mine has resulted in significant
extensions to the known extent of
mineralization since 2018
 Extended ~800m to depth
 Meaningful additions in upper levels of
Pilar Mine (MSBS and P1P2) and
Deepening Extension
MCSA Mining Complex | Exploration Success at Pilar (2018-2021)
472
729
36
225
2018 2021
Measured & Indicated Resource Inferred Resource
24.8 Mt @
1.90% Cu
1.8 Mt @
2.07% Cu
45.1 Mt @
1.62% Cu
15.2 Mt @
1.48% Cu
Pilar Mine Resource Growth(1,2)
(Underground Mine Contained Cu, kt)
2. 2018 Measured Resource comprised of 15.6 Mt @ 1.92% Cu and 2018 Indicated Resources comprised of 9.3 Mt @ 1.85% Cu. 2021 Measured Resource comprised of 22.8 Mt @ 1.63% Cu and 2021
Indicated Resources comprised of 22.3 Mt @ 1.60% Cu.
1. 2018 Measured & Indicated Resources and 2018 Inferred Resources based on the 2018 MCSA Technical Report. 2021 Measured & Indicated Resources and 2021 Inferred
Resources based on the Company’s press release dated January 6, 2022. Please refer to the Appendix for additional information of a scientific or technical nature in respect of the
2021 Mineral Resources for MCSA Mining Complex.
ERO COPPER | 15
MCSA Mining Complex | Deepening Extension Overview
N
Deepening Extension
 Large focus since 2018 on growing
resources and reserves in the “Deepening
Extension”
 Zone currently measures ~500m x 500m x 20m
 Remains open with intercepts prior to year-
end including some of the best copper
intercepts published globally
8
217
9
130
2018 2021
Indicated Resource Inferred Resource
1.2 Mt @
0.62% Cu
0.3 Mt @
2.60% Cu
10.4 Mt @
2.08% Cu
6.1 Mt @
2.14% Cu
Level -965
Deepening Extension Resource Growth(1)
(Underground Mine Contained Cu, kt)
2. Previous Highlight Cu Intercepts released are from press releases dated July 7, 2021 and October 14, 2021. Please refer to these press releases for additional information.
1. 2018 Measured & Indicated Resources and 2018 Inferred Resources based on the 2018 MCSA Technical Report. 2021 Measured & Indicated Resources and 2021 Inferred
Resources based on the Company’s press release dated January 6, 2022. Please refer to the Appendix for additional information of a scientific or technical nature in respect of
the 2021 Mineral Resources for MCSA Mining Complex.
(2)
N
FC5196
FC47183
FC47187
FC48193
FC48195
3.0m at 1.78% Cu
12.7m at 1.06% Cu
15.0m at 1.40% Cu
32.0m at 1.51% Cu
42.8m at 1.82% Cu
FC5195
38.2m at 2.48% Cu
E
FC5195
FC5196
FC47183
FC47187
FC48193
FC48195
Level Mine -90
 At P1P2, Pilar Mine,
interpretation of drill
core in 2021 suggests a
fold hinge is a ‘trap’ for
high-grade copper
mineralization
 Fold hinges are repeated
at depth in the Pilar Mine
 The recurrence of these
traps suggests a
potentially important
structural control on
high-grade
mineralization
throughout the Curaçá
Valley
ERO COPPER | 16
+460 m
Level Mine -90
+460 m
Inferred Resource 2021
Existing Infrastructure
Measured/Indicated Resource 2021
New Cu Intercepts
200 Meters
100
Structural trap
being targeted in 2022
MCSA Mining Complex | P1P2 – Geological Controls and Implications
1. 2021 Measured & Indicated Resources and 2021 Inferred Resources based on the Company’s press release dated January 6, 2022. Please refer to the Appendix for additional
information of a scientific or technical nature in respect of the 2021 Mineral Resources for MCSA Mining Complex.
2. Please refer to the Appendix of this presentation for complete assay results.
Long Section (Looking East)
Cross Section (Looking North)
 Photo of Pilar or Vermelhos interpreted fold and
HG. Pablo screen capture
ERO COPPER | 17
• Put slide between pilar and
vermelhos showing what we’ve
learned from Pilar and suggesting
that it applies to Vermelhos
Existing Infrastructure
Total Mineralized Envelope (2021)(1)
All Copper Assays >6% Cu
Interpreted Structures
MCSA Mining Complex | The Importance of Structural Traps
N
 Geometries of both Pilar and
Vermelhos indicate a steeply-plunging
long axis of the deposits
 Mafic/ultramafic Intrusions are
generally in the form of lenses and
occur along structures, fold limbs and
within fold hinges
 Thick high-grade deposits commonly
located within fold hinges / structural
traps
 Understanding structural controls
opens window for discovery of
additional mineralization within and
adjacent to existing mine infrastructure
1. 2021 Mineralized Envelope based on the Company’s press release dated January 6, 2022. Please refer to the Appendix for additional information of a scientific or technical nature in respect of the 2021 Mineral Resources for MCSA Mining Complex.
Long Section (Looking East)
?
?
Placeholder | Placeholder
ERO COPPER | 18
• Add image
3 - D O V E R V I E W : P I L A R M I N E
ERO COPPER | 19
 Located ~60km north of Pilar
Mine & processing facilities
 Construction commenced in
2017, underground operations
commenced Q4 2018
 Discoveries of Siriema,
Vermelhos North and East
Zone Conduit have grown
mineral inventory at
Vermelhos
 First documented occurrences
of concentrated nickel
MCSA Mining Complex | Vermelhos Mine Overview
2. 2018 Measured Resource comprised of 3.0 Mt @ 4.12% Cu and 2018 Indicated Resources comprised of 1.5 Mt @ 1.97% Cu. 2021 Measured Resource comprised of 4.4 Mt @ 2.14% Cu and 2021 Indicated
Resources comprised of 11.6 Mt @ 1.01% Cu. ERO COPPER | 20
MCSA Mining Complex | Exploration Success at Vermelhos Mine (2018-2021)
Total Mineralized Envelope (2021)
Existing Infrastructure
Total Mineralized Envelope (2018)
+300 m
000 m
-300 m
N
500 Meters
250
N7-N8
Sombrero & Toboggan
East Zone
Siriema
500 Meters
250
Plan View
500 Meters
250
 Drill programs within the
Vermelhos Mine targeting
 High-grade extensions at depth
 East Zone Conduit
 N7-N8 Connection
 Improved understanding of control
on high-grade mineralization
through underground mapping
Interpreted Structures
155
212
24
151
2018 2021
Measured & Indicated Resource Inferred Resource
4.6 Mt @
3.40% Cu
2.0 Mt @
1.19% Cu
16.0 Mt @
1.32% Cu
17.1 Mt @
0.88% Cu
Vermelhos Mine Resource Growth(1,2)
(Underground Mine Contained Cu, kt)
Long Section (Looking East)
1. 2018 Measured & Indicated Resources and 2018 Inferred Resources based on the 2018 MCSA Technical Report. 2021 Measured & Indicated Resources and 2021 Inferred Resources
based on the Company’s press release dated January 6, 2022. Please refer to the Appendix for additional information of a scientific or technical nature in respect of the 2021 Mineral
Resources for MCSA Mining Complex.
ERO COPPER | 21
MCSA Mining Complex | New Results Beneath Toboggan and Sombrero
Inferred Resource 2021
Existing Infrastructure
Measured/Indicated Resource 2021
Previously Announced Cu Intercept(2)
 Drilling beneath Toboggan and
Sombrero continues to intercept high-
grade zones following enhanced
structural understanding
 Drilling ongoing to further test extent
of identified structural traps
 Using Pilar Mine as analogue to define
and identify controlling features
New Cu Intercept
W
Interpreted Structural Trap
2. Previously announced Cu intercept from the Company’s press release dated June 20, 2019.
1. 2021 Measured & Indicated Resources and 2021 Inferred Resources based on the Company’s press release dated January 6, 2022. Please refer to the Appendix for
additional information of a scientific or technical nature in respect of the 2021 Mineral Resources for MCSA Mining Complex.
Cross-Section (Looking North)
Fold axis
Foliation
FVS-1152 mineralized interval from 71.4m down hole – drilled from Level +120 of the Vermelhos
Mine. Northing: 8970842m, Easting: 396514m
Placeholder | Placeholder
ERO COPPER | 22
3 - D O V E R V I E W : V E R M E L H O S M I N E
ERO COPPER | 23
Drilling Program Targets Drilling (m)
Shallow (Above -965L) Resource Conversion & Upgrade 9,000
Shallow (Above -965L) Additions 4,600
Total Shallow (Inferred & Indicated) 13,600
Deepening (Below -965L) Resource Conversion & Upgrade 4,000
Total Shallow & Deepening 17,600
2023-2024 Production Plan Definition Drilling 34,000
Total 51,600
Follow-Up on Previously Mined Areas
within Upper Reaches of Pilar Mine (Above
-965L)
Additions TBD
Baraúna North (Crown Pillar) Resource Conversion & Upgrade 2,000
Baraúna South Resource Conversion & Upgrade 6,600
Baraúna South Additions 5,400
Total Baraúna 14,000
Drilling Program Targets Drilling (m)
Highest Value Inferred Resources Resource Conversion & Upgrade 18,500
High-Grade Resources Beneath Toboggan Additions 9,000
Follow-Up on Positive Results and
Understanding of Ore Controls
Additions & Exploration 7,000
Total Shallow & Deepening 34,500
2023-2024 Production Plan Definition Drilling 18,900
Total 53,400
Pilar
Vermelhos
2022
Budget
Opportunities
2022
Budget
Note: Summed totals may not add due to rounding.
 Approximately 100,000
meters of in-mine drilling
is budgeted at the MCSA
Mining Complex in 2022
MCSA Mining Complex | Pilar & Vermelhos: 2022 Drill Program
Placeholder | Placeholder
ERO COPPER | 24
M C S A R E G I O N A L E X P L O R A T I O N
ERO COPPER | 25
Exploration Sector
Size
(km x km)
Individual
Targets
Paraíso 14 x 5 3
Vermelhos 20 x 8 20
Cacimba da Torre 13 x 10 4
Barro Vermelho 20 x 10 8
Angicos 33 x 3 12
Surubim 15 x 8 17
Pirulito 33 x 2 3
Sertãozinho 17 x 3 7
Arapuá 38 x 4 18
Gêmeos 19 x 5 5
Bela Vista 10 x 6 1
Santa Fé 42 x 4 2
Caraíba 8 x 10 2
Total 102
 2018:
 56 original target areas
based on geophysics and
geochemistry
 2022:
 102 total individual
targets
 36 top priority targets
 13 tested
 23 remain to be
tested
 6 regional targets have
returned promising results
 4 previously
announced
discoveries
 2 new mineralized
systems of interest
MCSA Mining Complex | Regional Exploration: Work Completed To Date
Induced Polarization
785 km survey
2,031 km Survey
Gravity
21,000 km survey
Airborne TMI
High Res. Geology
1,300 km field mapping
Soil Geochemistry
61,500 soil samples
 Data Layers and
Methodology
 Copper showings
 Soil Geochemistry
 Mapping – trenching
 Ground Geophysics IP,
Gravity
 Airborne EM
 Exploration Criteria
 Copper showings
 Positive Cu / Ni Anomaly
 Presence of mafic-
ultramafic rocks
 Detailed structural
mapping
 IP anomaly – presence of
sulphide
 EM anomaly – massive
sulphide
MCSA Mining Complex | Our Approach to Regional Exploration
ERO COPPER | 27
Legend
Lineaments W Corridor
Geology Blocks
Cu ppm
82.8 – 108.6 (X + 2s- 2nd Order Anomaly)
108.6 – 2,630.1 (X + 3s - 1st Order Anomaly)
 Pilar and Vermelhos Mines located within
large sulphide systems (2+ km long
footprint)
 Geometries indicate steeply-plunging deposits
with relatively small near-surface footprints
 Mineralization associated with mafic-
ultramafic intrusions located within the
fold limbs and hinges, or at structural
intersections, are key structural traps
 Key is to identify traps within larger systems
with detailed mapping and trenching
 Mineralization occurs as disseminated to
massive sulphide breccia
MCSA Mining Complex | Regional Exploration: What We Have Learned
Lithology
Silcrete
Quartz Vein
Diabase Dyke
Granite
Mafic
Ultramafic
ERO COPPER | 28
FS17-01:
39.38m @ 0.59% Cu
from 38.4m to 77.7m
down hole
Northing: 8921097m
Easting: 394718m
Azimuth: 270°
Dip: -48°
Cu Anomalies (ppm)
S8
S7
FS17-01
FS10-04:
35.00m @ 0.56% Cu
from 88.0m to 123.0m
down hole
Northing: 8908254m
Easting: 402599m
Azimuth: 90°
Dip: -56°
FS10-04
Arapuá
(total strike
length of ~55km)
MCSA Mining Complex | Regional Exploration: Advancing New Mineralized Systems
1. Drill holes were drilled from surface. The length of intercept may not represent the true width of mineralization. From, To and Length are rounded to the nearest tenth of a meter.
S17 System
S10 System
Pilar Mine
82.8 – 108.6 (X + 2s- 2nd Order Anomaly)
108.6 – 2,630.1 (X + 3s - 1st Order Anomaly)
ERO COPPER | 29
S10
West
Hole ID From (m) To (m) Length (m) Cu (%)
S10 West
CRS10-13 13.0 28.0 15.0 0.25
and 33.0 43.0 10.0 0.30
CRS10-14 8.0 36.0 28.0 0.42
CRS10-15 1.0 35.0 34.0 0.45
CRS10-16 77.0 131.0 54.0 0.50
including 96.0 100.0 4.0 0.97
and 189.0 199.0 10.0 0.23
FS10-04 87.7 133.5 45.8 0.47
including 100.7 113.7 13.0 0.70
and 148.9 152.9 4.0 0.32
and 181.9 200.4 18.5 0.32
FS10-05 84.7 100.6 15.9 0.34
FS10-06 205.8 240.5 34.7 0.35
and 273.2 277.2 4.0 0.70
FS10-07 148.0 156.3 8.3 0.72
including 153.0 156.3 3.3 1.11
FS10-08 178.9 189.5 10.7 0.50
and 203.8 208.1 4.3 0.53
and 212.8 221.0 8.1 0.70
FS10-09 174.3 199.7 25.3 0.41
FS10-10 NSI NSI NSI NSI
FS10-11 77.7 82.1 4.4 0.54
FS10-12 23.1 34.9 11.8 0.48
FS10-13 110.3 158.1 47.8 0.39
FS10-14 10.4 37.0 26.6 0.50
including 23.6 32.2 8.6 0.70
FS10-15 268.7 298.1 29.4 0.46
and 316.6 336.9 20.3 0.40
FS10-18 NSI NSI NSI NSI
FS10-21 NSI NSI NSI NSI
 Example of regional exploration result at S10 West target, adjacent to Pilar Mine (part of S10 System)
MCSA Mining Complex | Regional Exploration: S10 System
1. NSI indicates no significant intercept, based on a three-meter mining width and a cut-off grade of 0.18% copper for regional exploration programs to demonstrate geological controls, irrespective of depth. Drill holes were drilled from surface.
The length of intercept may not represent the true width of mineralization. Values may not add up due to rounding. From, To and Length are rounded to the nearest tenth of a meter.
Plan View
S10
South*
S10
East*
*Refer to appendix for S10 East and S10 South drill results
S10 System
Pilar
Mine
ERO COPPER | 30
 Core objective for 2022: Delineate new
high margin discovery
 Continue testing known mineralized
systems and test at least 5 high-priority
anomalies
 Arapuá Sector (13km to be tested of ~55km
strike length)
 Surubim Sector (6km to be tested of ~15km
strike length)
 Vermelhos Sector (2.5km to be tested of
~20km strike length)
MCSA Mining Complex | 2022 Regional Objectives
Placeholder | Placeholder
ERO COPPER | 31
• Add photo?
M C S A : T H E N I C K E L O P P O R T U N I T Y
ERO COPPER | 32
Dunite
Harzb.
Opxt
Norite
Hzb/Opxt
Dunite
Hzb
Opxt
Norite
Base
Top
Classic Fractionation
Traditional Nickel-Sulphide Deposit
Classic Fractionation
MCSA Mining Complex
Dunite
Hzb
Ol Opxt
Opxt
Websterite
Gabbronorite
Hzb/Opxt
Dunite
Hzb
Opxt
Norite
MCSA Mining Complex | Regional Nickel and PGE Potential
 Traditional Nickel-
bearing rocks identified
in the Curaçá Valley
 Multiple mafic-
ultramafic rock types
suggest classic
fractionation
ERO COPPER | 33
22.9m @ 6.30% Cu + 0.44%Ni
FVS-171 (Vermelhos Mine): 158.4 – 181.3m; Opx+Flog+Chr (Ultramafic)-
Cpy+Pn+Po
OPXT-1 OPXT-2 OPXT-3 Qz+plag-4
Pn
Pn
Cpy
Chalcopyrite
Bornite
Toboggan – Level 208
Pentlandite
(Ni rich
Sulphide)
MCSA Mining Complex | Regional Nickel and PGE Potential (cont’d)
*Nickel mineralization model interpreted based on structural
controls and nickel assay values and does not imply continuity
of grade
*
*
FVS-171
Modeled extent of nickel
mineralization within
Vermelhos Mine
Northing: 8970819m
Easting: 396596m
Azimuth: 90°
Dip: -77°
ERO COPPER | 34
FCV-79
11.2m @ 0.24% Cu, 0.49% Ni,
0.57 gpt PGE+Au
FCV 79
Ni Targets
 Delineation of Ni-(PGE)
targets based on:
 Geochemical ratios and factor
analysis
 Airborne Electromagnetic
Survey
 Field mapping and trenching
 Initial drilling of 2 targets to
date (Espírito Santo and C25)
 Identified Pyrrhotite-
Pentlandite with anomalous
nickel
 Evaluation ongoing
 Several additional targets
identified
Hole Northing Easting Dip (°) From (m) To (m) Int (m) Cu (%) Ni (%) Pd (g/t) Pt (g/t) Au (g/t) PGE+Au (g/t)
FCV-79 8948430 413350 -64 86.3 97.5 11.2 0.24 0.49 0.25 0.21 0.06 0.57
MCSA Mining Complex | Regional Nickel and PGE Potential (cont’d)
ERO COPPER | 35
100 Meters
50
PGE+Au intercepts beneath Surubim Open Pit
NW
 Analysis of select samples through the Curaçá Valley
have highly anomalous levels of nickel, Platinum
Group Elements (PGEs) and gold
 Three main styles of PGE mineralization observed at
MCSA:
 High-grade copper-nickel-PGEs (this style of mineralization
shows similarities to footwall zones described within the
Sudbury District)
 High-grade PGE low-sulphide content, reef-style
mineralization (this style of mineralization shows similarities
described in PGE deposits, such as the Bushveld Complex,
South Africa and some zones within the Marathon Intrusion,
Canada)
 Copper-palladium rich (this style of mineralization shows
similarities to zones described within the Sudbury District and
Marathon Intrusion)
 In-house PGE analysis
capabilities are now fully operational
 Recently established a
dedicated team focused on
nickel/PGE
MCSA Mining Complex | Regional Nickel and PGE Potential (cont’d)
Surubim Measured & Indicated Mineral
Resource, Projected Section
Previously Announced PGE
Intercept(1)
1. Previously announced PGE intercept from the Company’s press release dated December 15, 2020.
Cross Section (Looking Northeast)
Placeholder | Placeholder
ERO COPPER | 36
• Add image
3 - D O V E R V I E W : M C S A R E G I O N A L P O T E N T I A L
Placeholder | Placeholder
B O A E S P E R A N Ç A
ERO COPPER | 38
 Iron Oxide Copper Gold (“IOCG”) Deposit
in world-class Carajás Mineral District
 Low capital-intensity, high-return,
construction-permitted copper project
located in Para State, Brazil
 Initial 12-year mine life with average annual
production of 35 kt copper over the first five
years of mine life
 Projected IRR of 41.8% and an after-tax NPV
of $380mm(1)
 Fast payback period of 1.4 years(1)
 Significant exploration potential within
existing open pit
 Currently 5 drill rigs on site
 Positive results from Gap Zone exploration
program highlight opportunities to further
improve project
 Construction to commence in Q2 2022
Boa Esperança | Overview of Carajás Copper District
1. Based on consensus copper prices price forecast used in the Boa Esperança Technical Report. Copper prices of $3.80/lb in 2024, $3.95/lb in 2025 and $3.40/lb in 2026 and thereafter, and a BRL:USD exchange rate of
5.00.
ERO COPPER | 39
 Drilling efforts to date focused on
improving quality of data for engineering
purposes and testing of the Gap Zone
 2022 Exploration Objectives:
 Support engineering team with geotechnical,
geometallurgical and condemnation drilling
 Further drill testing of the “Gap Zone”
 First pass wide-spaced drill testing for near-
surface targets and high-grade “underground”
extensions of Boa
 Initiate Regional Exploration program
$4.8
$1.2
2022 Exploration Budget
($ million)
Exploration Condemnation
Boa Esperança | Exploration Objectives for 2022
ERO COPPER | 40
BSPD-169*
9241175m N
450159m
E
9242243m N
451223m
E
BSPD-170*
200 Meters
100
BSPD-171
BSPD-172*
BSPD-173*
BSPD-174*
BSPD-182*
BSPD-183*
BSPD-192
BSPD-176*
BSPD-177
BSPD-179*
BSPD-185*
BSPD-186
BSPD-190* BSPD-208
BSPD-175*
BSPD-169
BSPD-190
BSPD-175
BSPD-176
BSPD-192
BSPD-171
BSPD-208
BSPD-186
BSPD-170
BSPD-185
BSPD-174
BSPD-182
+300 m
000 m
100 Meters
50
NW
BSPD-172
BSPD-173
BSPD-177
BSPD-179
BSPD-183
Measured and Indicated Resource 2021
New Cu Intercepts
Inferred Resource 2021
17.2m at 1.87% Cu
12.6m at 1.30% Cu
37.3m at 1.22% Cu
49.6m at 1.15% Cu
155.7m at 1.09% Cu
Underground Potential
(Open to Depth)
Boa Esperança | New Drill Results
1. 2021 Measured & Indicated Resources and 2021 Inferred Resources based on the 2021 Boa
Esperança Technical Report. Please refer to the Appendix for additional information of a scientific or
technical nature in respect of the 2021 Mineral Resources for the Boa Esperança Project.
2. Please refer to the Appendix of this presentation for complete assay results.
Cross Section (Looking Northeast) Plan View
*Refer to appendix for full drill results
Placeholder | Placeholder
ERO COPPER | 41
• Add image
3 - D O V E R V I E W : B O A E S P E R A N Ç A
Placeholder | Placeholder
N X G O L D M I N E
ERO COPPER | 43
 Shear-hosted quartz vein gold deposit
 Large land position (~117,000ha)
 The NX Gold Mine is a high-grade, low-cost gold
mine and processing facility located in Mato Grosso
State, Brazil
 Ore is processed at the adjacent Nova Xavantina Mill using
a conventional, three-stage crush, flotation and CIL circuit
 Current mine life to 2026 with significant growth opportunity
driven by a highly prospective land package and
underutilized mill
 Recent discoveries of Santo Antonio Vein (2018) and
new Matinha Vein (2021) suggest high potential for
additional discoveries
 Approximately 25% excess mill capacity
NX Gold Mine | Overview
400 Meters
250
8382950m N
340292m
E
8381322m N
338371m
E
MAT43
MAT37
MAT34
MAT33
MAT30
MAT31
SA104A
SA104B
SA108
Mine Level -215
ERO COPPER | 44
Plan View Cross Section (Looking South)
E
400 Meters
250
SA108
SA104A
SA104B
MAT33
MAT43
MAT34
MAT31
MAT30
MAT37
+200 m
-200 m
2.8m at 6.97gpt
3.8m at 19.27gpt
6.5m at 19.74gpt
0.9m at 2.58gpt
6.8m at 2.43gpt
2.5m at 5.66gpt
4.8m at 5.91gpt
3.5m at 7.06gpt
2.9m at 59.06gpt
Inferred Resource 2021
Existing Infrastructure
Indicated Resource 2021
Previously Mined
New Gold Intercepts
NX Gold Mine | New Drill Results
1. 2021 Measured & Indicated Resources and 2021 Inferred Resources based on the 2021 NX Gold Mine Technical Report. Please refer to the Appendix for additional
information of a scientific or technical nature in respect of the 2021 Mineral Resources for the NX Gold Mine.
2. Please refer to the Appendix of this presentation for complete assay results.
Placeholder | Placeholder
ERO COPPER | 45
3 - D O V E R V I E W : N X G O L D M I N E
Placeholder | Placeholder
ERO COPPER | 46
S u m m a r y
MCSA Mining
Complex
Boa
Esperanҫa
NX Gold
Mine
Broader Brazil
ERO COPPER | 47
Near-Term Medium-Term & Long-Term
Gap Zone Exploration Boa Extensions (incl. Underground)
Carajás District Strategic Opportunities
New Regional Systems (i.e. Arapuá)
In-Mine Exploration Near-Mine Exploration Regional Exploration
Nickel, PGM Focused Exploration Program
Pilar Upper Levels
(Exploration & Engineering)
Past Producing Mines
(Lagoa da Mina & Surubim District)
Vermelhos Mine High-Grade Extensions
Pilar Mine Deepening Extension Growth
Vermelhos District Expansion Strategy
Matinha Vein Extensions
Santo Antonio Vein Extensions
New Regional Discoveries
New Strategic Opportunities
Ero Copper | Exploration Portfolio & Potential Life-of-Mine Impact
Placeholder | Placeholder
ERO COPPER | 48
A P P E N D I X
Placeholder | Placeholder
ERO COPPER | 49
A P P E N D I X A : M C S A M I N I N G C O M P L E X
1. NSI indicates no significant intercept based on a three meter mining width and cut-off grade of 0.51% copper. Drill holes were drilled from level -30 and level +130 in the Pilar Mine. The length of intercept may not represent the true width of mineralization.
Values may not add up due to rounding. From, to and mineralized intercepts are rounded to the nearest tenth of a meter.
ERO COPPER | 50
MCSA Mining Complex | New Exploration Results – P1P2 (cont’d)
Hole ID From (m) To (m) Length (m) Cu (%)
FC47183 4.2 7.2 3.0 1.78
and 36.9 46.3 9.3 1.28
and 50.5 92.4 41.9 1.54
including 67.0 80.0 13.0 3.96
FC47187 4.0 9.3 5.3 1.91
and 41.3 54.0 12.7 1.06
and 133.5 137.5 4.0 0.86
FC48193 15.5 18.7 3.1 0.94
and 25.2 31.3 6.1 1.93
and 35.9 67.9 32.0 1.51
including 54.9 57.9 3.0 3.54
and 74.9 77.9 3.0 0.91
FC48195 6.0 9.0 3.0 1.52
and 14.0 17.0 3.0 0.98
and 24.6 39.6 15.0 1.40
including 30.6 33.6 3.0 2.09
and 47.6 53.6 6.0 1.16
and 95.2 100.9 5.7 1.28
Hole ID From (m) To (m) Length (m) Cu (%)
FC5195 93.0 131.2 38.2 2.48
including 99.0 111.2 12.2 3.60
and 185.5 198.7 13.2 1.61
including 194.7 199.5 4.9 2.12
and 220.2 227.2 6.9 1.38
and 236.2 244.6 8.4 1.16
FC5196 53.7 59.2 5.5 1.67
and 70.0 112.8 42.8 1.82
including 98.8 103.8 5.0 3.30
and 183.2 220.2 36.9 1.35
including 200.2 206.2 6.0 2.41
and 228.6 243.9 15.3 1.04
including 240.6 243.9 3.3 2.03
As detailed on slide 16. Please refer to slide 51 for collar locations
ERO COPPER | 51
MCSA Mining Complex | New Exploration Results – P1P2 (plan view)
100 Meters
50
FC5195
FC5196
FC47183
FC47187
FC48193
FC48195
Level Mine -90
Plan View
As further detailed on slide 16. Please refer to slide 50 for assay results
ERO COPPER | 52
MCSA Mining Complex | New Exploration Results – S10
Hole ID From (m) To (m) Length (m) Cu (%)
S10 West
CRS10-13 13.0 28.0 15.0 0.25
and 33.0 43.0 10.0 0.30
CRS10-14 8.0 36.0 28.0 0.42
CRS10-15 1.0 35.0 34.0 0.45
CRS10-16 77.0 131.0 54.0 0.50
including 96.0 100.0 4.0 0.97
and 189.0 199.0 10.0 0.23
FS10-04 87.7 133.5 45.8 0.47
including 100.7 113.7 13.0 0.70
and 148.9 152.9 4.0 0.32
and 181.9 200.4 18.5 0.32
FS10-05 84.7 100.6 15.9 0.34
FS10-06 205.8 240.5 34.7 0.35
and 273.2 277.2 4.0 0.70
Hole ID From (m) To (m) Length (m) Cu (%)
S10 West (cont’d)
FS10-07 148.0 156.3 8.3 0.72
including 153.0 156.3 3.3 1.11
FS10-08 178.9 189.5 10.7 0.50
and 203.8 208.1 4.3 0.53
and 212.8 221.0 8.1 0.70
FS10-09 174.3 199.7 25.3 0.41
FS10-10 NSI NSI NSI NSI
FS10-11 77.7 82.1 4.4 0.54
FS10-12 23.1 34.9 11.8 0.48
FS10-13 110.3 158.1 47.8 0.39
FS10-14 10.4 37.0 26.6 0.50
including 23.6 32.2 8.6 0.70
FS10-15 268.7 298.1 29.4 0.46
including 316.6 336.9 20.3 0.4
FS10-18 NSI NSI NSI NSI
FS10-21 NSI NSI NSI NSI
1. NSI indicates no significant intercept, based on a three meter mining width and a cut-off grade of 0.18% copper for regional exploration programs to demonstrate geological controls, irrespective of depth. Drill holes were drilled from surface. Holes not
included are either pending assay results or have been included in a different section of this presentation. The length of intercept may not represent the true width of mineralization. Values may not add up due to rounding. From, To and Length are rounded
to the nearest tenth of a meter.
Please refer to slide 28 and 29 for collar locations
ERO COPPER | 53
MCSA Mining Complex | New Exploration Results – S10 (cont’d)
Hole ID From (m) To (m) Length (m) Cu (%)
S10 East
CRS10-04 0.0 7.0 7.0 0.21
CRS10-06 73.0 78.0 5.0 0.44
and 134.0 137.0 3.0 0.58
CRS10-07 146.0 156.0 10.0 0.40
CRS10-08 53.0 60.0 7.0 0.29
and 65.0 80.0 15.0 0.26
CRS10-10 NSI NSI NSI NSI
CRS10-11 55.0 77.0 22.0 0.33
including 69.0 74.0 5.0 0.66
and 123.0 138.0 15.0 0.21
CRS10-12 137.0 142.0 5.0 0.30
CRS10-17 67.0 87.0 20.0 0.27
including 81.0 86.0 5.0 0.50
CRS10-18 98.0 102.0 4.0 0.31
CRS10-19 48.0 66.0 18.0 0.20
and 83.0 87.0 4.0 0.25
CRS10-20 NSI NSI NSI NSI
FS10-16 NSI NSI NSI NSI
FS10-17 NSI NSI NSI NSI
Hole ID From (m) To (m) Length (m) Cu (%)
S10 East (cont’d)
FS10-19 163.8 172.8 9.0 0.27
and 187.7 190.9 3.2 0.27
S10 South
CRS10-37 102.0 109.0 7.0 0.35
CRS10-38 81.0 85.0 4.0 0.27
CRS10-39 92.0 102.0 10.0 0.33
CRS10-40 NSI NSI NSI NSI
CRS10-41 NSI NSI NSI NSI
CRS10-42 NSI NSI NSI NSI
CRS10-43 50.0 73.0 23.0 0.42
FS10-20 57.6 96.6 39.0 0.37
FS10-22 59.5 84.5 25.0 0.47
FS10-23 NSI NSI NSI NSI
FS10-24 211.4 216.1 4.7 0.30
FS10-25 64.1 75.1 11.0 0.43
FS10-26 56.7 85.6 28.8 0.35
FS10-27 59.4 62.6 3.2 0.25
and 187.8 199.8 12.0 0.31
FS10-28 NSI NSI NSI NSI
FS10-29 NSI NSI NSI NSI
1. NSI indicates no significant intercept, based on a three meter mining width and a cut-off grade of 0.18% copper for regional exploration programs to demonstrate geological controls, irrespective of depth. Drill holes were
drilled from surface. Holes not included are either pending assay results or have been included in a different section of this presentation. The length of intercept may not represent the true width of mineralization. Values
may not add up due to rounding. From, To and Length are rounded to the nearest tenth of a meter.
Please refer to slide 28 and 29 for collar locations
ERO COPPER | 54
Curaçá Valley
Regional Setting | São Francisco Craton
 Archean to Paleoproterozoic blocks
 Paleo- to Meso-Archean (3.5-2.7 Ga) blocks: Gavião, Jequié and
Serrinha
 Neoarchean (2.7-2.6 Ga) arc: Itabuna-Salvador-Curaçá belt
 Metamorphosed/deformed ~2.35-2.09 Ga
 Peak metamorphism (D3) ~2.1 Ga: 850-900oC & >7 kbar (>30
km)
 ~2.09 Ga: Mafic Jacurici complex and Itiuba syenite
 ~2.05 Ga: G3 granites, pegmatites and mafic-ultramafic
intrusions (orthopyroxenites)
1. Source: Teixeira et al., 2010.
ERO COPPER | 55
MCSA Mining Complex | Reserves & Resources
Category
Tonnage
(kt)
Grade
(% Cu)
Contained
Cu (kt)
Underground
Proven 9,177 1.49% 137
Probable 20,797 1.42% 296
Proven & Probable Reserves 29,974 1.44% 432
Measured 30,355 1.63% 494
Indicated 39,005 1.33% 520
Measured & Indicated Resources 69,360 1.46% 1,014
Inferred Resources 40,331 1.14% 458
Open Pit
Proven 15,680 0.59% 92
Probable 13,627 0.61% 83
Proven & Probable Reserves 29,306 0.60% 175
Measured 16,777 0.61% 103
Indicated 18,563 0.56% 105
Measured & Indicated Resources 35,340 0.59% 208
Inferred Resources 3,000 0.50% 15
Total
Proven 24,857 0.92% 229
Probable 34,423 1.10% 378
Proven & Probable Reserves 59,280 1.02% 607
Measured 47,132 1.27% 597
Indicated 57,568 1.08% 624
Measured & Indicated Resources 104,700 1.17% 1,221
Inferred Resources 43,331 1.09% 473
Note: Mineral resources shown inclusive of mineral reserves. Mineral resources that are not mineral reserves do not have demonstrated economic viability. Please refer to Additional Information section of this
presentation for relevant technical and scientific information.
Placeholder | Placeholder
ERO COPPER | 56
A P P E N D I X B : B O A E S P E R A N Ç A
1. Mineralized intercepts below cut-off grade of 0.20% copper not reported. Drill holes were drilled from surface using diamond core drill rigs. The length of the intercept may not represent the true width of mineralization. Values may not add up due to rounding.
From, to and mineralized intercepts are rounded to the nearest tenth of a meter.
ERO COPPER | 57
Boa Esperança | New Exploration Results
Hole ID From (m) To (m) Length (m) Cu (%)
BSPD-170 42.7 54.7 12.0 0.22
and 68.5 76.0 7.5 0.26
and 85.0 89.5 4.5 0.33
and 107.5 116.5 9.0 0.24
and 260.6 265.1 4.5 0.39
and 324.1 350.4 26.3 0.53
including 342.2 346.8 4.6 1.34
BSPD-171 59.3 215.0 155.7 1.09
including 118.4 130.7 12.3 2.06
also
including 204.1 207.8 3.7 3.63
BSPD-172 31.0 43.0 12.0 0.29
and 48.7 79.9 31.2 1.01
including 59.8 62.9 3.1 3.79
and 118.5 120.3 1.8 1.13
BSPD-173 16.5 20.2 3.7 0.21
and 28.5 38.0 9.5 0.23
and 44.5 50.3 5.8 2.27
including 47.4 49.6 2.2 5.18
and 60.0 67.0 7.0 0.23
and 79.9 121.0 41.1 0.58
including 109.0 118.5 9.5 0.88
and 307.5 318.1 10.6 0.48
and 345.8 349.5 3.7 0.67
Hole ID From (m) To (m) Length (m) Cu (%)
BSPD-174 57.0 79.0 22.0 0.60
including 65.4 67.4 2.1 1.87
BSPD-176 35.5 78.3 42.8 0.31
and 119.2 132.7 13.5 0.35
and 137.9 144.1 6.2 0.43
and 201.1 204.4 3.3 0.43
and 394.5 398.0 3.5 0.96
and 403.5 410.5 7.0 0.83
and 419.0 426.5 7.5 0.73
BSPD-177 45.0 48.0 3.0 0.25
and 65.0 77.0 12.0 0.50
and 84.9 88.8 3.9 0.40
including 100.3 103.6 3.3 2.76
and 112.7 162.0 49.3 1.06
including 125.0 130.9 5.9 2.12
and 171.5 221.1 49.6 1.15
including 195.9 206.6 10.7 2.13
and 227.4 231.5 4.2 1.10
and 256.0 259.0 3.0 0.75
and 264.0 267.0 3.0 0.65
and 270.0 278.5 8.5 0.89
and 314.7 318.3 3.6 0.84
Please refer to slide 40 for collar locations
ERO COPPER | 58
Boa Esperança | New Exploration Results (cont’d)
Hole ID From (m) To (m) Length (m) Cu (%)
BSPD-179 49.3 85.0 35.7 0.45
including 51.8 55.6 3.8 1.28
and 89.5 94.7 5.2 0.24
and 137.6 140.5 2.9 0.75
and 155.8 158.5 2.6 1.74
and 215.7 238.8 23.1 0.51
including 230.2 237.8 7.7 0.83
and 258.1 262.1 4.0 0.84
and 318.0 342.6 24.6 0.80
including 318.0 323.0 5.0 2.37
BSPD-182 14.0 20.0 6.0 1.18
and 31.0 34.5 3.5 0.46
and 39.5 47.0 7.5 0.36
and 59.5 77.0 17.5 0.25
and 90.7 146.0 55.4 0.55
including 110.7 125.0 14.3 1.17
also
including 110.7 114.1 3.4 3.42
and 161.4 180.3 18.9 0.43
and 188.0 210.5 22.5 0.35
and 256.0 259.1 3.1 1.09
Hole ID From (m) To (m) Length (m) Cu (%)
BSPD-183 9.5 18.5 9.0 0.92
and 22.5 26.6 4.1 0.53
and 46.5 52.8 6.3 0.31
and 58.5 70.5 12.0 0.66
and 96.5 112.8 16.3 0.61
including 97.8 101.0 3.3 1.66
and 119.6 128.6 9.0 0.23
and 162.0 168.0 6.0 0.29
and 172.5 179.0 6.5 0.23
and 204.3 207.5 3.2 0.54
BSPD-185 15.0 43.5 28.5 0.56
including 28.5 38.0 9.5 1.11
and 81.2 85.0 3.8 0.29
and 105.5 119.0 13.6 0.53
and 136.7 186.5 49.9 0.39
and 190.0 193.5 3.4 0.38
and 196.1 202.0 5.9 0.85
and 213.2 236.4 23.2 0.55
including 230.4 235.0 4.6 1.25
and 243.0 253.0 10.0 0.41
1. Mineralized intercepts below cut-off grade of 0.20% copper not reported. Drill holes were drilled from surface using diamond core drill rigs. The length of the intercept may not represent the true width of mineralization. Values may not add up due to rounding.
From, to and mineralized intercepts are rounded to the nearest tenth of a meter.
Please refer to slide 40 for collar locations
ERO COPPER | 59
Boa Esperança | New Exploration Results (cont’d)
Hole ID From (m) To (m) Length (m) Cu (%)
BSPD-186 118.6 123.8 5.3 1.10
and 173.9 177.0 3.1 0.37
and 248.0 252.0 4.0 1.60
and 270.6 273.2 2.6 2.53
and 312.0 349.3 37.3 1.22
including 313.5 319.2 5.6 2.80
BSPD-190 151.0 154.2 3.2 0.47
and 223.3 227.0 3.8 0.83
and 249.9 256.1 6.3 0.60
BSPD-192 84.2 98.9 14.7 0.37
and 153.9 159.4 5.6 0.53
and 244.5 261.7 17.2 1.87
including 254.9 259.0 4.2 2.60
and 266.9 272.7 5.8 0.83
BSPD-208 96.2 101.0 4.8 0.77
and 108.9 112.0 3.1 0.88
and 212.4 224.9 12.6 1.30
and 328.9 339.6 10.7 1.32
1. Holes BSPD-169 and BSPD-175 were partially released in the press release dated September 28, 2021. Intercepts shown on this slide represent new intercepts that we previously pending results.
2. Mineralized intercepts below cut-off grade of 0.20% copper not reported. Drill holes were drilled from surface using diamond core drill rigs. The length of the intercept may not represent the true width of mineralization. Values may not add up due to rounding.
From, to and mineralized intercepts are rounded to the nearest tenth of a meter.
Hole ID From (m) To (m) Length (m) Cu (%)
Previously Released Holes (new assay results that were previously pending)(1)
BSPD-169 117.9 120.7 2.8 0.8
and 167.0 176.0 9.0 0.5
and 213.5 224.8 11.3 0.8
BSPD-175 105.6 115.3 9.7 0.4
and 211.6 217.1 5.5 0.4
Please refer to slide 40 for collar locations
ERO COPPER | 60
Boa Esperanҫa | Reserves & Resources
Category
Tonnage
(kt)
Grade
(% Cu)
Contained Cu
(kt)
Reserves
Boa Esperanҫa Proven 30,674 0.89% 273
Probable 12,378 0.67% 83
Total Proven & Probable 43,052 0.83% 357
Resources (Inclusive of Reserves)
Open Pit - High Grade Measured 7,117 2.16% 154
Indicated 1,661 2.27% 38
Measured & Indicated 8,778 2.18% 191
Inferred 40 2.69% 1
Open Pit - Low Grade Measured 25,476 0.60% 152
Indicated 13,433 0.51% 68
Measured & Indicated 38,909 0.57% 220
Inferred 514 0.49% 3
Underground - High Grade Measured 0 0.00% 0
Indicated 0 0.00% 0
Measured & Indicated 0 0.00% 0
Inferred 1,354 2.24% 30
Underground - Low Grade Measured 0 0.00% 0
Indicated 0 0.00% 0
Measured & Indicated 0 0.00% 0
Inferred 9,681 0.60% 58
Total
Measured 32,593 0.94% 306
Indicated 15,095 0.70% 106
Measured & Indicated 47,687 0.86% 412
Inferred 11,590 0.80% 92
Note: Mineral reserves and resources as outlined in the Boa Esperança Technical Report. Mineral resources shown inclusive of mineral reserves. Mineral resources that are not mineral reserves do not have demonstrated
economic viability. Please refer to Additional Information section of this presentation for relevant technical and scientific information.
Placeholder | Placeholder
ERO COPPER | 61
A P P E N D I X C : N X G O L D M I N E
1. Drill holes were drilled from surface. The length of intercept may not represent the true width of mineralization and reported intercepts reflect the entire thickness of the vein. Values may not add up due to rounding. From, to and mineralized intercepts are
rounded to the nearest tenth of a meter.
ERO COPPER | 62
NX Gold | New Exploration Results
Hole ID From (m) To (m) Length (m) Au (gpt)
San Antonio Extension to Depth
SA104A 926.6 933.1 6.5 19.74
SA104B 943.0 946.8 3.8 19.27
SA108 655.1 656.0 0.9 2.58
Matinha Upper Vein
MAT30 576.3 581.1 4.8 5.91
MAT31 630.0 633.5 3.5 7.06
MAT33 711.5 718.3 6.8 2.43
including 711.5 712.5 1.0 11.03
MAT34 499.7 502.5 2.8 6.97
MAT37 523.8 526.3 2.5 5.66
MAT43 490.1 493.0 2.9 59.06
Please refer to slide 44 for collar locations
ERO COPPER | 63
NX Gold | Reserves & Resources
Tonnage Grade Contained Au
(kt) (gpt Au) (koz)
Reserves
Santo Antonio Vein Probable 958 9.01 277
Matinha Vein Probable 146 6.26 29
Total Probable 1,104 8.64 307
Resources (Inclusive of Reserves)
Santo Antonio Vein Indicated 950 10.56 322
Inferred 248 2.99 24
Matinha Vein Indicated 124 8.55 34
Inferred 310 10.47 104
Other Indicated 7 3.36 1
Inferred 157 4.71 24
Indicated 1,081 10.28 357
Inferred 714 6.61 152
Category
Total
Note: Mineral resources shown inclusive of mineral reserves. Mineral resources that are not mineral reserves do not have demonstrated economic viability. Please refer to Additional Information section of this presentation for relevant technical and scientific
information.
Placeholder | Placeholder
ERO COPPER | 64
A P P E N D I X D : A D D I T I O N A L I N F O R M A T I O N
ERO COPPER | 65
Additional Information
Curaça Valley Mineral Reserves Notes:
1. Effective Date of September 30, 2021.
2. Mineral reserves included within stated mineral resources. All figures have been rounded to reflect the relative accuracy of the estimates. Summed amounts may not add due to rounding.
3. The mineral reserve estimates are prepared in accordance with the CIM Definition Standards for mineral resources and mineral reserves, adopted by the CIM Council on May 10, 2014 (the “CIM Standards”), and the CIM Estimation of
mineral resources and mineral reserves Best Practice Guidelines, using geostatistical and/or classical methods, plus economic and mining parameters appropriate for the deposit. Mineral reserves are based on a long-term copper price
of US$2.75 per pound (“lb”), and a USD:BRL foreign exchange rate of 5.23. Mineral reserves are the economic portion of the measured and indicated mineral resources. Mining dilution and recovery factors vary for specific reserve
sources and are influenced by factors such as deposit type, deposit shape, stope orientation and selected mining method.
4. A low-grade envelope using a cut-off grade of 0.20% copper for underground deposits was used to develop a dilution envelope and development block model that was included to define the grade of blocks within the dilution envelope in
the planning and design of stopes within the mineral resources and mineral reserve estimate.
Curaça Valley Mineral Resources Notes:
1. Effective Date of September 30, 2021.
2. Mineral resources have been constrained within newly developed 3D lithology models applying a 0.45% and 0.20% copper grade envelope for high and marginal grade, respectively. Within these envelopes, mineral resources for
underground deposits are constrained using varying stope dimensions of up to 20m by 10m by 35m applying a 0.51% copper cut-off grade, as well as a 0.32% copper marginal cut-off grade for underground deposits.
3. A low-grade envelope using a cut-off grade of 0.20% copper for underground deposits was used to develop a dilution envelope and development block model that was included to define the grade of blocks within the dilution envelope
in the planning and design of stopes within the mineral resources and mineral reserve estimate.
4. Mineral resources have been constrained within newly developed 3D lithology models using a 0.21% copper cut-off grade for open pit deposits.
5. Mineral resources estimated by ordinary kriging inside 5m by 5m by 5m blocks.
NX Gold Mineral Reserves Notes:
1. Effective Date of September 30, 2021.
2. Mineral reserves included within stated mineral resources. All figures have been rounded to the relative accuracy of the estimates. Summed amounts may not add due to rounding.
3. The mineral reserve estimates are prepared in accordance with the CIM Standards and the CIM Guidelines, using geostatistical and/or classical methods, plus economic and mining parameters appropriate for the deposit. Mineral
reserves are based on a long-term gold price of US$1,650 per ounce (“oz”), and a USD:BRL foreign exchange rate of 5.00. Mineral reserves are the economic portion of the Indicated mineral resources. Mineral reserve estimates
include operational dilution of 17.4% plus planned dilution of approximately 8.5% within each stope for room-and-pillar mining areas and operational dilution of 3.2% plus planned dilution of 21.2% for cut-and-fill mining areas. Assumes
mining recovery of 92.5% and 94.7% for room-and-pillar and cut-and-fill areas, respectively. Practical mining shapes (wireframes) are designed using geological wireframes / mineral resource block models as a guide.
NX Gold Mineral Resources Notes:
1. Effective Date of September 30, 2021.
2. Presented mineral resources inclusive of mineral reserves. Indicated mineral resource totals are undiluted. All figures have been rounded to the relative accuracy of the estimates. Summed amounts may not add due to rounding.
3. Mineral resources are estimated using ordinary kriging within 2.5 meter by 2.5 meter by 0.5 meter block size.
4. Mineral resource are constrained using a minimum stope dimension of 2.0 meters by 2.0 meters by 1.5 meters and a cut-off of 1.90 gpt based on gold price of US$1,900 per ounce of gold.
5. The mineral resource estimates are prepared in accordance with the CIM Standards and the CIM Guidelines, using geostatistical and/or classical methods, plus economic and mining parameters appropriate for the deposit.
ERO COPPER | 66
Additional Information (cont’d)
Boa Esperança Mineral Reserves Notes:
1. Effective Date of August 31, 2021.
2. Stated mineral resources are inclusive of mineral reserves. All figures have been rounded to the relative accuracy of the estimates. Summed amounts may not add due to rounding. High-grade and low-grade mineral resources defined
as greater than or equal to 1.00% copper and less than 1.00% copper, respectively.
3. A 3D geologic model was developed for the Boa Esperança Project. Geologically constrained copper grade shells are developed using a copper cut-off grade of 0.20% and 0.51% for pit constrained and unconstrained mineral
resources, respectively, to generate a 3D mineralization model of the Boa Esperança Project. Within grade shells, mineral resources are estimated using ordinary kriging within a 2.0 meter by 2.0 meter by 4.0 meter block size. Open
pit constrained, unconstrained and marginal cut-off grades are based upon a copper price of US$6,400 per tonne with cost parameters appropriate to the deposit. The mineral resource estimates are prepared in accordance with the
Canadian Institute of Mining, Metallurgy and Petroleum (“CIM”) Definition Standards for Mineral Resources and Mineral Reserves, adopted by the CIM Council on May 10, 2014 (the “CIM Standards”), and the CIM Estimation of Mineral
Resources and Mineral Reserves Best Practice Guidelines, adopted by CIM Council on November 29, 2019 (the ‘CIM Guidelines”), using geostatistical and/or classical methods, plus economic and mining parameters appropriate to
the deposit.
4. Mineral reserve estimates are prepared in accordance with the CIM Standards and the CIM Guidelines, using geostatistical and/or classical methods, plus economic and mining parameters appropriate for the deposit. Mineral reserves
are based on a long-term copper price of US$6,613 per tonne; concentrate grade of 27% copper; average metallurgical recoveries of 91.3%; copper concentrate logistics costs of US$108.20 per wet metric tonne ("wmt"); transport
losses of 0.2%; copper concentrate treatment charges of US$59.50 per dry metric tonne ("dmt"), refining charges of U$0.0595 per pound of copper; copper payability of 96.3%; average mining cost of US$2.47 per tonne mined;
processing cost of US$7.74 per tonne processed and G&A costs of US$3.83 per tonne processed; average pit slope angles that range from 30º for saprolite to 50º for fresh rock and a 2% CFEM government royalty.
5. Mineral reserves are classified according to the CIM Standards and the CIM Guidelines by Mr. Carlos Guzman, RM CMC (0119) and FAusIMM (229036), an employee of NCL Ingenieria y Construcion SpA ("NCL") and an independent
qualified person as such term is defined under NI 43-101. NCL is independent of the Company. Please refer to the Boa Esperança Technical Report for additional technical information.
Boa Esperança Mineral Resources Notes:
1. Effective Date of August 31, 2021.
2. Presented Mineral Resources inclusive of Mineral Reserves. Summed amounts may not add due to rounding. High-grade and low-grade mineral resources defined as greater than or equal to 1.00% copper and less than 1.00% copper,
respectively.
3. A 3D geologic model was developed for the Project. Geologically constrained grade shells were developed using various copper cut-off grades to generate a 3D mineralization model of the Project. Within the grade shells, mineral
resources were estimated using ordinary kriging within a 2.0 meter by 2.0 meter by 4.0 meter block size. Within the optimized resource open pit limits, a cut-off grade of 0.20% copper was applied based upon a copper price of
US$6,400 per tonne, net smelter return ("NSR") of 94.53%, average metallurgical recoveries of 90.7%, mining recovery of 95.0%, dilution of 5.0%, mining costs of US$3.10 per tonne mined run of mine ("ROM"), processing and
transportation costs of US$5.65 per tonne ROM, and G&A costs of US$2.66 per tonne ROM. Unconstrained inferred mineral resources have been stated at a cut-off grade of 0.51% copper with a marginal cut-off grade of 0.32% copper
based upon a copper price of US$6,400 per tonne, NSR of 94.53%, mining recovery of 100%, average metallurgical recoveries of 90.7%, mining costs of US$14.71 per tonne ROM, processing and transportation costs of US$5.70 per
tonne ROM, and G&A costs of US$2.60 per tonne ROM.
4. Block model tonnage and grade estimates for the Project were classified according to the CIM Standards and the CIM Guidelines by Mr. Emerson Ricardo Re, RM CMC (0138) and MAusIMM (CP) (305892), an employee of Ero
Copper Corp. and a qualified person as such term is defined under NI 43-101. Please refer to the Boa Esperança Technical Report for additional technical information.
Suite 1050, 625 Howe Street, Vancouver, BC, V6C 2T6
www.erocopper.com
Investor Inquiries:
Courtney Lynn, VP Corporate Development & Investor Relations
+1.604.335.7504
info@erocopper.com
ERO COPPER | 67

Contenu connexe

Tendances

Osisko Gold Royalties - 2020 Annual Meeting of Shareholders
Osisko Gold Royalties - 2020 Annual Meeting of ShareholdersOsisko Gold Royalties - 2020 Annual Meeting of Shareholders
Osisko Gold Royalties - 2020 Annual Meeting of ShareholdersOsisko Gold Royalties Ltd
 
Waterberg pea presentation
Waterberg pea presentationWaterberg pea presentation
Waterberg pea presentationpgroupm
 
Rubicon Minerals February 2018 Corporate Presentation
Rubicon Minerals February 2018 Corporate PresentationRubicon Minerals February 2018 Corporate Presentation
Rubicon Minerals February 2018 Corporate PresentationRubicon Minerals Corporation
 
2021 06 02_-_ero_-_corporate_presentation_vf
2021 06 02_-_ero_-_corporate_presentation_vf2021 06 02_-_ero_-_corporate_presentation_vf
2021 06 02_-_ero_-_corporate_presentation_vfAdnet Communications
 
Osisko Gold Royalties - Corporate Presentation, January 13, 2022
Osisko Gold Royalties - Corporate Presentation, January 13, 2022Osisko Gold Royalties - Corporate Presentation, January 13, 2022
Osisko Gold Royalties - Corporate Presentation, January 13, 2022Osisko Gold Royalties Ltd
 
American lithium investor presentation
American lithium   investor presentation American lithium   investor presentation
American lithium investor presentation RonWidjaja
 
June2021 paas investor presentation
June2021 paas investor presentationJune2021 paas investor presentation
June2021 paas investor presentationcsandovalduran
 
Osisko Gold Royalties - Q4 and Year 2018 Results
Osisko Gold Royalties - Q4 and Year 2018 ResultsOsisko Gold Royalties - Q4 and Year 2018 Results
Osisko Gold Royalties - Q4 and Year 2018 ResultsOsisko Gold Royalties Ltd
 
American Lithium - Investor Presentation
American Lithium - Investor PresentationAmerican Lithium - Investor Presentation
American Lithium - Investor PresentationBianca Pisciola
 
Otso Gold Corporate Presentation
Otso Gold Corporate PresentationOtso Gold Corporate Presentation
Otso Gold Corporate PresentationBianca Pisciola
 
Rubicon Minerals February 2018 Corporate Presentation (BMO)
Rubicon Minerals February 2018 Corporate Presentation (BMO)Rubicon Minerals February 2018 Corporate Presentation (BMO)
Rubicon Minerals February 2018 Corporate Presentation (BMO)Rubicon Minerals Corporation
 
Rubicon Minerals April 2018 Corporate Presentation
Rubicon Minerals April 2018 Corporate PresentationRubicon Minerals April 2018 Corporate Presentation
Rubicon Minerals April 2018 Corporate PresentationRubicon Minerals Corporation
 
Denver Gold Forum Presentation
Denver Gold Forum PresentationDenver Gold Forum Presentation
Denver Gold Forum Presentationyamanagold2016
 
Rubicon Minerals Updated March 2018 Corporate Presentation
Rubicon Minerals Updated March 2018 Corporate PresentationRubicon Minerals Updated March 2018 Corporate Presentation
Rubicon Minerals Updated March 2018 Corporate PresentationRubicon Minerals Corporation
 
Rubicon Minerals March 2018 Corporate Presentation
Rubicon Minerals March 2018 Corporate PresentationRubicon Minerals March 2018 Corporate Presentation
Rubicon Minerals March 2018 Corporate PresentationRubicon Minerals Corporation
 
Canadian Malartic Investor and Analyst Tour - General Presentation
Canadian Malartic Investor and Analyst Tour - General PresentationCanadian Malartic Investor and Analyst Tour - General Presentation
Canadian Malartic Investor and Analyst Tour - General PresentationAgnico Eagle Mines
 
Paas investor presentation sept 2019
Paas investor presentation sept 2019Paas investor presentation sept 2019
Paas investor presentation sept 2019csandovalduran
 

Tendances (20)

2019 AGM Presentation
2019 AGM Presentation2019 AGM Presentation
2019 AGM Presentation
 
Osisko Gold Royalties - 2020 Annual Meeting of Shareholders
Osisko Gold Royalties - 2020 Annual Meeting of ShareholdersOsisko Gold Royalties - 2020 Annual Meeting of Shareholders
Osisko Gold Royalties - 2020 Annual Meeting of Shareholders
 
Waterberg pea presentation
Waterberg pea presentationWaterberg pea presentation
Waterberg pea presentation
 
Rubicon Minerals February 2018 Corporate Presentation
Rubicon Minerals February 2018 Corporate PresentationRubicon Minerals February 2018 Corporate Presentation
Rubicon Minerals February 2018 Corporate Presentation
 
2021 06 02_-_ero_-_corporate_presentation_vf
2021 06 02_-_ero_-_corporate_presentation_vf2021 06 02_-_ero_-_corporate_presentation_vf
2021 06 02_-_ero_-_corporate_presentation_vf
 
Osisko Gold Royalties - Corporate Presentation, January 13, 2022
Osisko Gold Royalties - Corporate Presentation, January 13, 2022Osisko Gold Royalties - Corporate Presentation, January 13, 2022
Osisko Gold Royalties - Corporate Presentation, January 13, 2022
 
American lithium investor presentation
American lithium   investor presentation American lithium   investor presentation
American lithium investor presentation
 
June2021 paas investor presentation
June2021 paas investor presentationJune2021 paas investor presentation
June2021 paas investor presentation
 
Osisko Gold Royalties - Q4 and Year 2018 Results
Osisko Gold Royalties - Q4 and Year 2018 ResultsOsisko Gold Royalties - Q4 and Year 2018 Results
Osisko Gold Royalties - Q4 and Year 2018 Results
 
American Lithium - Investor Presentation
American Lithium - Investor PresentationAmerican Lithium - Investor Presentation
American Lithium - Investor Presentation
 
Plateau Energy Metals June 2020 Presentation
Plateau Energy Metals June 2020 PresentationPlateau Energy Metals June 2020 Presentation
Plateau Energy Metals June 2020 Presentation
 
Otso Gold Corporate Presentation
Otso Gold Corporate PresentationOtso Gold Corporate Presentation
Otso Gold Corporate Presentation
 
Silvercorp Corporate Presentation
Silvercorp Corporate PresentationSilvercorp Corporate Presentation
Silvercorp Corporate Presentation
 
Rubicon Minerals February 2018 Corporate Presentation (BMO)
Rubicon Minerals February 2018 Corporate Presentation (BMO)Rubicon Minerals February 2018 Corporate Presentation (BMO)
Rubicon Minerals February 2018 Corporate Presentation (BMO)
 
Rubicon Minerals April 2018 Corporate Presentation
Rubicon Minerals April 2018 Corporate PresentationRubicon Minerals April 2018 Corporate Presentation
Rubicon Minerals April 2018 Corporate Presentation
 
Denver Gold Forum Presentation
Denver Gold Forum PresentationDenver Gold Forum Presentation
Denver Gold Forum Presentation
 
Rubicon Minerals Updated March 2018 Corporate Presentation
Rubicon Minerals Updated March 2018 Corporate PresentationRubicon Minerals Updated March 2018 Corporate Presentation
Rubicon Minerals Updated March 2018 Corporate Presentation
 
Rubicon Minerals March 2018 Corporate Presentation
Rubicon Minerals March 2018 Corporate PresentationRubicon Minerals March 2018 Corporate Presentation
Rubicon Minerals March 2018 Corporate Presentation
 
Canadian Malartic Investor and Analyst Tour - General Presentation
Canadian Malartic Investor and Analyst Tour - General PresentationCanadian Malartic Investor and Analyst Tour - General Presentation
Canadian Malartic Investor and Analyst Tour - General Presentation
 
Paas investor presentation sept 2019
Paas investor presentation sept 2019Paas investor presentation sept 2019
Paas investor presentation sept 2019
 

Similaire à ERO Copper technical session explores exploration

Ero Copper - GS HY Conference vF2.pdf
Ero Copper - GS HY Conference vF2.pdfEro Copper - GS HY Conference vF2.pdf
Ero Copper - GS HY Conference vF2.pdfAdnetNew
 
Goldman Sachs Leveraged Finance and Credit Conference
Goldman Sachs Leveraged Finance and Credit ConferenceGoldman Sachs Leveraged Finance and Credit Conference
Goldman Sachs Leveraged Finance and Credit ConferenceAdnet Communications
 
Ero Copper June 2022 Corporate Presentation
Ero Copper June 2022 Corporate PresentationEro Copper June 2022 Corporate Presentation
Ero Copper June 2022 Corporate PresentationAdnet Communications
 
Equinox Gold Corporate Presentation
Equinox Gold Corporate PresentationEquinox Gold Corporate Presentation
Equinox Gold Corporate PresentationEquinox Gold Corp.
 
Equinox Gold Corporate Presentation
Equinox Gold Corporate PresentationEquinox Gold Corporate Presentation
Equinox Gold Corporate PresentationEquinox Gold Corp.
 
Osisko Gold Royalties - 2018 AGM Presentation
Osisko Gold Royalties - 2018 AGM PresentationOsisko Gold Royalties - 2018 AGM Presentation
Osisko Gold Royalties - 2018 AGM PresentationOsisko Gold Royalties Ltd
 
Equinox Gold March Corporate Presentation Deck
Equinox Gold March Corporate Presentation DeckEquinox Gold March Corporate Presentation Deck
Equinox Gold March Corporate Presentation DeckEquinox Gold Corp.
 
Equinox Gold's Corporate Presentation March 2024
Equinox Gold's Corporate Presentation March 2024Equinox Gold's Corporate Presentation March 2024
Equinox Gold's Corporate Presentation March 2024Equinox Gold Corp.
 
Equinox Gold March Corporate Presentation
Equinox Gold March Corporate PresentationEquinox Gold March Corporate Presentation
Equinox Gold March Corporate PresentationEquinox Gold Corp.
 
Equinox Gold Corporate Presentation
Equinox Gold Corporate PresentationEquinox Gold Corporate Presentation
Equinox Gold Corporate PresentationEquinox Gold Corp.
 
Equinox Gold Corporate Presentation
Equinox Gold Corporate PresentationEquinox Gold Corporate Presentation
Equinox Gold Corporate PresentationEquinox Gold Corp.
 
BMO Capital Markets Global Metals & Mining Conference
BMO Capital Markets Global Metals & Mining Conference BMO Capital Markets Global Metals & Mining Conference
BMO Capital Markets Global Metals & Mining Conference yamanagold2016
 
Equinox Gold Corporate Presentation
Equinox Gold Corporate PresentationEquinox Gold Corporate Presentation
Equinox Gold Corporate PresentationEquinox Gold Corp.
 
Equinox Gold Corporate Presentation
Equinox Gold Corporate PresentationEquinox Gold Corporate Presentation
Equinox Gold Corporate PresentationEquinox Gold Corp.
 
Osisko Gold Royalties - Corporate Presentation - January 2017
Osisko Gold Royalties - Corporate Presentation - January 2017Osisko Gold Royalties - Corporate Presentation - January 2017
Osisko Gold Royalties - Corporate Presentation - January 2017Osisko Gold Royalties Ltd
 
Equinox Gold Corporate Presentation
Equinox Gold Corporate PresentationEquinox Gold Corporate Presentation
Equinox Gold Corporate PresentationEquinox Gold Corp.
 
Equinox Gold Corporate Presentation
Equinox Gold Corporate PresentationEquinox Gold Corporate Presentation
Equinox Gold Corporate PresentationEquinox Gold Corp.
 
Osisko Gold Royalties Corporate Presentation
Osisko Gold Royalties Corporate PresentationOsisko Gold Royalties Corporate Presentation
Osisko Gold Royalties Corporate PresentationOsisko Gold Royalties Ltd
 
BMO Capital Markets 28th Global Metals & Mining Conference
BMO Capital Markets 28th Global Metals & Mining ConferenceBMO Capital Markets 28th Global Metals & Mining Conference
BMO Capital Markets 28th Global Metals & Mining ConferencePretiumR
 
European Gold Forum 2017
European Gold Forum 2017European Gold Forum 2017
European Gold Forum 2017yamanagold2016
 

Similaire à ERO Copper technical session explores exploration (20)

Ero Copper - GS HY Conference vF2.pdf
Ero Copper - GS HY Conference vF2.pdfEro Copper - GS HY Conference vF2.pdf
Ero Copper - GS HY Conference vF2.pdf
 
Goldman Sachs Leveraged Finance and Credit Conference
Goldman Sachs Leveraged Finance and Credit ConferenceGoldman Sachs Leveraged Finance and Credit Conference
Goldman Sachs Leveraged Finance and Credit Conference
 
Ero Copper June 2022 Corporate Presentation
Ero Copper June 2022 Corporate PresentationEro Copper June 2022 Corporate Presentation
Ero Copper June 2022 Corporate Presentation
 
Equinox Gold Corporate Presentation
Equinox Gold Corporate PresentationEquinox Gold Corporate Presentation
Equinox Gold Corporate Presentation
 
Equinox Gold Corporate Presentation
Equinox Gold Corporate PresentationEquinox Gold Corporate Presentation
Equinox Gold Corporate Presentation
 
Osisko Gold Royalties - 2018 AGM Presentation
Osisko Gold Royalties - 2018 AGM PresentationOsisko Gold Royalties - 2018 AGM Presentation
Osisko Gold Royalties - 2018 AGM Presentation
 
Equinox Gold March Corporate Presentation Deck
Equinox Gold March Corporate Presentation DeckEquinox Gold March Corporate Presentation Deck
Equinox Gold March Corporate Presentation Deck
 
Equinox Gold's Corporate Presentation March 2024
Equinox Gold's Corporate Presentation March 2024Equinox Gold's Corporate Presentation March 2024
Equinox Gold's Corporate Presentation March 2024
 
Equinox Gold March Corporate Presentation
Equinox Gold March Corporate PresentationEquinox Gold March Corporate Presentation
Equinox Gold March Corporate Presentation
 
Equinox Gold Corporate Presentation
Equinox Gold Corporate PresentationEquinox Gold Corporate Presentation
Equinox Gold Corporate Presentation
 
Equinox Gold Corporate Presentation
Equinox Gold Corporate PresentationEquinox Gold Corporate Presentation
Equinox Gold Corporate Presentation
 
BMO Capital Markets Global Metals & Mining Conference
BMO Capital Markets Global Metals & Mining Conference BMO Capital Markets Global Metals & Mining Conference
BMO Capital Markets Global Metals & Mining Conference
 
Equinox Gold Corporate Presentation
Equinox Gold Corporate PresentationEquinox Gold Corporate Presentation
Equinox Gold Corporate Presentation
 
Equinox Gold Corporate Presentation
Equinox Gold Corporate PresentationEquinox Gold Corporate Presentation
Equinox Gold Corporate Presentation
 
Osisko Gold Royalties - Corporate Presentation - January 2017
Osisko Gold Royalties - Corporate Presentation - January 2017Osisko Gold Royalties - Corporate Presentation - January 2017
Osisko Gold Royalties - Corporate Presentation - January 2017
 
Equinox Gold Corporate Presentation
Equinox Gold Corporate PresentationEquinox Gold Corporate Presentation
Equinox Gold Corporate Presentation
 
Equinox Gold Corporate Presentation
Equinox Gold Corporate PresentationEquinox Gold Corporate Presentation
Equinox Gold Corporate Presentation
 
Osisko Gold Royalties Corporate Presentation
Osisko Gold Royalties Corporate PresentationOsisko Gold Royalties Corporate Presentation
Osisko Gold Royalties Corporate Presentation
 
BMO Capital Markets 28th Global Metals & Mining Conference
BMO Capital Markets 28th Global Metals & Mining ConferenceBMO Capital Markets 28th Global Metals & Mining Conference
BMO Capital Markets 28th Global Metals & Mining Conference
 
European Gold Forum 2017
European Gold Forum 2017European Gold Forum 2017
European Gold Forum 2017
 

Plus de Adnet Communications

Lundin Gold April 2024 Corporate Presentation v4.pdf
Lundin Gold April 2024 Corporate Presentation v4.pdfLundin Gold April 2024 Corporate Presentation v4.pdf
Lundin Gold April 2024 Corporate Presentation v4.pdfAdnet Communications
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024Adnet Communications
 
20240314 Calibre March 2024 Investor Presentation (FINAL).pdf
20240314 Calibre March 2024 Investor Presentation (FINAL).pdf20240314 Calibre March 2024 Investor Presentation (FINAL).pdf
20240314 Calibre March 2024 Investor Presentation (FINAL).pdfAdnet Communications
 
Lundin Gold March 2024 Corporate Presentation - PDAC v1.pdf
Lundin Gold March 2024 Corporate Presentation - PDAC v1.pdfLundin Gold March 2024 Corporate Presentation - PDAC v1.pdf
Lundin Gold March 2024 Corporate Presentation - PDAC v1.pdfAdnet Communications
 
2024.03 Strategic Resources Presentation
2024.03 Strategic Resources Presentation2024.03 Strategic Resources Presentation
2024.03 Strategic Resources PresentationAdnet Communications
 
TriStar Gold- 03-13-2024 presentation pdf
TriStar Gold- 03-13-2024 presentation pdfTriStar Gold- 03-13-2024 presentation pdf
TriStar Gold- 03-13-2024 presentation pdfAdnet Communications
 
Strategic Resources Corporate Presentation - March 2024 Update
Strategic Resources Corporate Presentation - March 2024 UpdateStrategic Resources Corporate Presentation - March 2024 Update
Strategic Resources Corporate Presentation - March 2024 UpdateAdnet Communications
 
2024.03 Strategic Resources_Pub (1). pdf
2024.03 Strategic Resources_Pub (1). pdf2024.03 Strategic Resources_Pub (1). pdf
2024.03 Strategic Resources_Pub (1). pdfAdnet Communications
 
2024.03 Strategic Resources_Pub presentation
2024.03 Strategic Resources_Pub presentation2024.03 Strategic Resources_Pub presentation
2024.03 Strategic Resources_Pub presentationAdnet Communications
 
https://bitterrootresources.com/investors/presentations/
https://bitterrootresources.com/investors/presentations/https://bitterrootresources.com/investors/presentations/
https://bitterrootresources.com/investors/presentations/Adnet Communications
 
Silver One Corporate Presentation March 2024
Silver One Corporate Presentation March 2024Silver One Corporate Presentation March 2024
Silver One Corporate Presentation March 2024Adnet Communications
 
TriStar Gold Corporate Presentation Updated February 2024
TriStar Gold Corporate Presentation Updated February 2024TriStar Gold Corporate Presentation Updated February 2024
TriStar Gold Corporate Presentation Updated February 2024Adnet Communications
 
20240222 Calibre February 2024 Investor Presentation
20240222 Calibre February 2024 Investor Presentation20240222 Calibre February 2024 Investor Presentation
20240222 Calibre February 2024 Investor PresentationAdnet Communications
 
TriStar Gold Corporate Presentation February 2024
TriStar Gold Corporate Presentation February 2024TriStar Gold Corporate Presentation February 2024
TriStar Gold Corporate Presentation February 2024Adnet Communications
 
Q4 2023 Conference Call Presentation FINAL-v4.pdf
Q4 2023 Conference Call Presentation FINAL-v4.pdfQ4 2023 Conference Call Presentation FINAL-v4.pdf
Q4 2023 Conference Call Presentation FINAL-v4.pdfAdnet Communications
 
20240220 Calibre Q4 and FY 2023 Conference Call Present.pdf
20240220 Calibre Q4 and FY 2023 Conference Call Present.pdf20240220 Calibre Q4 and FY 2023 Conference Call Present.pdf
20240220 Calibre Q4 and FY 2023 Conference Call Present.pdfAdnet Communications
 
Strategic Resources corporate presentation
Strategic Resources corporate presentationStrategic Resources corporate presentation
Strategic Resources corporate presentationAdnet Communications
 
Lundin Gold Corproate Presentation February 2024
Lundin Gold Corproate Presentation February 2024Lundin Gold Corproate Presentation February 2024
Lundin Gold Corproate Presentation February 2024Adnet Communications
 
20240123 Calibre January 2024 Investor Presentation FIN.pdf
20240123 Calibre January 2024 Investor Presentation FIN.pdf20240123 Calibre January 2024 Investor Presentation FIN.pdf
20240123 Calibre January 2024 Investor Presentation FIN.pdfAdnet Communications
 
20240110 January 2024 Investor Presentation.pdf
20240110 January 2024 Investor Presentation.pdf20240110 January 2024 Investor Presentation.pdf
20240110 January 2024 Investor Presentation.pdfAdnet Communications
 

Plus de Adnet Communications (20)

Lundin Gold April 2024 Corporate Presentation v4.pdf
Lundin Gold April 2024 Corporate Presentation v4.pdfLundin Gold April 2024 Corporate Presentation v4.pdf
Lundin Gold April 2024 Corporate Presentation v4.pdf
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024
 
20240314 Calibre March 2024 Investor Presentation (FINAL).pdf
20240314 Calibre March 2024 Investor Presentation (FINAL).pdf20240314 Calibre March 2024 Investor Presentation (FINAL).pdf
20240314 Calibre March 2024 Investor Presentation (FINAL).pdf
 
Lundin Gold March 2024 Corporate Presentation - PDAC v1.pdf
Lundin Gold March 2024 Corporate Presentation - PDAC v1.pdfLundin Gold March 2024 Corporate Presentation - PDAC v1.pdf
Lundin Gold March 2024 Corporate Presentation - PDAC v1.pdf
 
2024.03 Strategic Resources Presentation
2024.03 Strategic Resources Presentation2024.03 Strategic Resources Presentation
2024.03 Strategic Resources Presentation
 
TriStar Gold- 03-13-2024 presentation pdf
TriStar Gold- 03-13-2024 presentation pdfTriStar Gold- 03-13-2024 presentation pdf
TriStar Gold- 03-13-2024 presentation pdf
 
Strategic Resources Corporate Presentation - March 2024 Update
Strategic Resources Corporate Presentation - March 2024 UpdateStrategic Resources Corporate Presentation - March 2024 Update
Strategic Resources Corporate Presentation - March 2024 Update
 
2024.03 Strategic Resources_Pub (1). pdf
2024.03 Strategic Resources_Pub (1). pdf2024.03 Strategic Resources_Pub (1). pdf
2024.03 Strategic Resources_Pub (1). pdf
 
2024.03 Strategic Resources_Pub presentation
2024.03 Strategic Resources_Pub presentation2024.03 Strategic Resources_Pub presentation
2024.03 Strategic Resources_Pub presentation
 
https://bitterrootresources.com/investors/presentations/
https://bitterrootresources.com/investors/presentations/https://bitterrootresources.com/investors/presentations/
https://bitterrootresources.com/investors/presentations/
 
Silver One Corporate Presentation March 2024
Silver One Corporate Presentation March 2024Silver One Corporate Presentation March 2024
Silver One Corporate Presentation March 2024
 
TriStar Gold Corporate Presentation Updated February 2024
TriStar Gold Corporate Presentation Updated February 2024TriStar Gold Corporate Presentation Updated February 2024
TriStar Gold Corporate Presentation Updated February 2024
 
20240222 Calibre February 2024 Investor Presentation
20240222 Calibre February 2024 Investor Presentation20240222 Calibre February 2024 Investor Presentation
20240222 Calibre February 2024 Investor Presentation
 
TriStar Gold Corporate Presentation February 2024
TriStar Gold Corporate Presentation February 2024TriStar Gold Corporate Presentation February 2024
TriStar Gold Corporate Presentation February 2024
 
Q4 2023 Conference Call Presentation FINAL-v4.pdf
Q4 2023 Conference Call Presentation FINAL-v4.pdfQ4 2023 Conference Call Presentation FINAL-v4.pdf
Q4 2023 Conference Call Presentation FINAL-v4.pdf
 
20240220 Calibre Q4 and FY 2023 Conference Call Present.pdf
20240220 Calibre Q4 and FY 2023 Conference Call Present.pdf20240220 Calibre Q4 and FY 2023 Conference Call Present.pdf
20240220 Calibre Q4 and FY 2023 Conference Call Present.pdf
 
Strategic Resources corporate presentation
Strategic Resources corporate presentationStrategic Resources corporate presentation
Strategic Resources corporate presentation
 
Lundin Gold Corproate Presentation February 2024
Lundin Gold Corproate Presentation February 2024Lundin Gold Corproate Presentation February 2024
Lundin Gold Corproate Presentation February 2024
 
20240123 Calibre January 2024 Investor Presentation FIN.pdf
20240123 Calibre January 2024 Investor Presentation FIN.pdf20240123 Calibre January 2024 Investor Presentation FIN.pdf
20240123 Calibre January 2024 Investor Presentation FIN.pdf
 
20240110 January 2024 Investor Presentation.pdf
20240110 January 2024 Investor Presentation.pdf20240110 January 2024 Investor Presentation.pdf
20240110 January 2024 Investor Presentation.pdf
 

Dernier

Classical Theory of Macroeconomics by Adam Smith
Classical Theory of Macroeconomics by Adam SmithClassical Theory of Macroeconomics by Adam Smith
Classical Theory of Macroeconomics by Adam SmithAdamYassin2
 
NO1 WorldWide online istikhara for love marriage vashikaran specialist love p...
NO1 WorldWide online istikhara for love marriage vashikaran specialist love p...NO1 WorldWide online istikhara for love marriage vashikaran specialist love p...
NO1 WorldWide online istikhara for love marriage vashikaran specialist love p...Amil Baba Dawood bangali
 
2024 Q1 Crypto Industry Report | CoinGecko
2024 Q1 Crypto Industry Report | CoinGecko2024 Q1 Crypto Industry Report | CoinGecko
2024 Q1 Crypto Industry Report | CoinGeckoCoinGecko
 
Stock Market Brief Deck for 4/24/24 .pdf
Stock Market Brief Deck for 4/24/24 .pdfStock Market Brief Deck for 4/24/24 .pdf
Stock Market Brief Deck for 4/24/24 .pdfMichael Silva
 
Current Economic situation of Pakistan .pptx
Current Economic situation of Pakistan .pptxCurrent Economic situation of Pakistan .pptx
Current Economic situation of Pakistan .pptxuzma244191
 
House of Commons ; CDC schemes overview document
House of Commons ; CDC schemes overview documentHouse of Commons ; CDC schemes overview document
House of Commons ; CDC schemes overview documentHenry Tapper
 
Economic Risk Factor Update: April 2024 [SlideShare]
Economic Risk Factor Update: April 2024 [SlideShare]Economic Risk Factor Update: April 2024 [SlideShare]
Economic Risk Factor Update: April 2024 [SlideShare]Commonwealth
 
magnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdf
magnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdfmagnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdf
magnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdfHenry Tapper
 
fca-bsps-decision-letter-redacted (1).pdf
fca-bsps-decision-letter-redacted (1).pdffca-bsps-decision-letter-redacted (1).pdf
fca-bsps-decision-letter-redacted (1).pdfHenry Tapper
 
Stock Market Brief Deck FOR 4/17 video.pdf
Stock Market Brief Deck FOR 4/17 video.pdfStock Market Brief Deck FOR 4/17 video.pdf
Stock Market Brief Deck FOR 4/17 video.pdfMichael Silva
 
PMFBY , Pradhan Mantri Fasal bima yojna
PMFBY , Pradhan Mantri  Fasal bima yojnaPMFBY , Pradhan Mantri  Fasal bima yojna
PMFBY , Pradhan Mantri Fasal bima yojnaDharmendra Kumar
 
(办理学位证)加拿大萨省大学毕业证成绩单原版一比一
(办理学位证)加拿大萨省大学毕业证成绩单原版一比一(办理学位证)加拿大萨省大学毕业证成绩单原版一比一
(办理学位证)加拿大萨省大学毕业证成绩单原版一比一S SDS
 
原版1:1复刻温哥华岛大学毕业证Vancouver毕业证留信学历认证
原版1:1复刻温哥华岛大学毕业证Vancouver毕业证留信学历认证原版1:1复刻温哥华岛大学毕业证Vancouver毕业证留信学历认证
原版1:1复刻温哥华岛大学毕业证Vancouver毕业证留信学历认证rjrjkk
 
212MTAMount Durham University Bachelor's Diploma in Technology
212MTAMount Durham University Bachelor's Diploma in Technology212MTAMount Durham University Bachelor's Diploma in Technology
212MTAMount Durham University Bachelor's Diploma in Technologyz xss
 
BPPG response - Options for Defined Benefit schemes - 19Apr24.pdf
BPPG response - Options for Defined Benefit schemes - 19Apr24.pdfBPPG response - Options for Defined Benefit schemes - 19Apr24.pdf
BPPG response - Options for Defined Benefit schemes - 19Apr24.pdfHenry Tapper
 
Managing Finances in a Small Business (yes).pdf
Managing Finances  in a Small Business (yes).pdfManaging Finances  in a Small Business (yes).pdf
Managing Finances in a Small Business (yes).pdfmar yame
 
原版1:1复刻堪萨斯大学毕业证KU毕业证留信学历认证
原版1:1复刻堪萨斯大学毕业证KU毕业证留信学历认证原版1:1复刻堪萨斯大学毕业证KU毕业证留信学历认证
原版1:1复刻堪萨斯大学毕业证KU毕业证留信学历认证jdkhjh
 
(办理原版一样)QUT毕业证昆士兰科技大学毕业证学位证留信学历认证成绩单补办
(办理原版一样)QUT毕业证昆士兰科技大学毕业证学位证留信学历认证成绩单补办(办理原版一样)QUT毕业证昆士兰科技大学毕业证学位证留信学历认证成绩单补办
(办理原版一样)QUT毕业证昆士兰科技大学毕业证学位证留信学历认证成绩单补办fqiuho152
 
letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...
letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...
letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...Henry Tapper
 

Dernier (20)

Classical Theory of Macroeconomics by Adam Smith
Classical Theory of Macroeconomics by Adam SmithClassical Theory of Macroeconomics by Adam Smith
Classical Theory of Macroeconomics by Adam Smith
 
NO1 WorldWide online istikhara for love marriage vashikaran specialist love p...
NO1 WorldWide online istikhara for love marriage vashikaran specialist love p...NO1 WorldWide online istikhara for love marriage vashikaran specialist love p...
NO1 WorldWide online istikhara for love marriage vashikaran specialist love p...
 
2024 Q1 Crypto Industry Report | CoinGecko
2024 Q1 Crypto Industry Report | CoinGecko2024 Q1 Crypto Industry Report | CoinGecko
2024 Q1 Crypto Industry Report | CoinGecko
 
Stock Market Brief Deck for 4/24/24 .pdf
Stock Market Brief Deck for 4/24/24 .pdfStock Market Brief Deck for 4/24/24 .pdf
Stock Market Brief Deck for 4/24/24 .pdf
 
Current Economic situation of Pakistan .pptx
Current Economic situation of Pakistan .pptxCurrent Economic situation of Pakistan .pptx
Current Economic situation of Pakistan .pptx
 
House of Commons ; CDC schemes overview document
House of Commons ; CDC schemes overview documentHouse of Commons ; CDC schemes overview document
House of Commons ; CDC schemes overview document
 
Economic Risk Factor Update: April 2024 [SlideShare]
Economic Risk Factor Update: April 2024 [SlideShare]Economic Risk Factor Update: April 2024 [SlideShare]
Economic Risk Factor Update: April 2024 [SlideShare]
 
magnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdf
magnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdfmagnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdf
magnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdf
 
fca-bsps-decision-letter-redacted (1).pdf
fca-bsps-decision-letter-redacted (1).pdffca-bsps-decision-letter-redacted (1).pdf
fca-bsps-decision-letter-redacted (1).pdf
 
Stock Market Brief Deck FOR 4/17 video.pdf
Stock Market Brief Deck FOR 4/17 video.pdfStock Market Brief Deck FOR 4/17 video.pdf
Stock Market Brief Deck FOR 4/17 video.pdf
 
PMFBY , Pradhan Mantri Fasal bima yojna
PMFBY , Pradhan Mantri  Fasal bima yojnaPMFBY , Pradhan Mantri  Fasal bima yojna
PMFBY , Pradhan Mantri Fasal bima yojna
 
(办理学位证)加拿大萨省大学毕业证成绩单原版一比一
(办理学位证)加拿大萨省大学毕业证成绩单原版一比一(办理学位证)加拿大萨省大学毕业证成绩单原版一比一
(办理学位证)加拿大萨省大学毕业证成绩单原版一比一
 
原版1:1复刻温哥华岛大学毕业证Vancouver毕业证留信学历认证
原版1:1复刻温哥华岛大学毕业证Vancouver毕业证留信学历认证原版1:1复刻温哥华岛大学毕业证Vancouver毕业证留信学历认证
原版1:1复刻温哥华岛大学毕业证Vancouver毕业证留信学历认证
 
212MTAMount Durham University Bachelor's Diploma in Technology
212MTAMount Durham University Bachelor's Diploma in Technology212MTAMount Durham University Bachelor's Diploma in Technology
212MTAMount Durham University Bachelor's Diploma in Technology
 
BPPG response - Options for Defined Benefit schemes - 19Apr24.pdf
BPPG response - Options for Defined Benefit schemes - 19Apr24.pdfBPPG response - Options for Defined Benefit schemes - 19Apr24.pdf
BPPG response - Options for Defined Benefit schemes - 19Apr24.pdf
 
Managing Finances in a Small Business (yes).pdf
Managing Finances  in a Small Business (yes).pdfManaging Finances  in a Small Business (yes).pdf
Managing Finances in a Small Business (yes).pdf
 
🔝+919953056974 🔝young Delhi Escort service Pusa Road
🔝+919953056974 🔝young Delhi Escort service Pusa Road🔝+919953056974 🔝young Delhi Escort service Pusa Road
🔝+919953056974 🔝young Delhi Escort service Pusa Road
 
原版1:1复刻堪萨斯大学毕业证KU毕业证留信学历认证
原版1:1复刻堪萨斯大学毕业证KU毕业证留信学历认证原版1:1复刻堪萨斯大学毕业证KU毕业证留信学历认证
原版1:1复刻堪萨斯大学毕业证KU毕业证留信学历认证
 
(办理原版一样)QUT毕业证昆士兰科技大学毕业证学位证留信学历认证成绩单补办
(办理原版一样)QUT毕业证昆士兰科技大学毕业证学位证留信学历认证成绩单补办(办理原版一样)QUT毕业证昆士兰科技大学毕业证学位证留信学历认证成绩单补办
(办理原版一样)QUT毕业证昆士兰科技大学毕业证学位证留信学历认证成绩单补办
 
letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...
letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...
letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...
 

ERO Copper technical session explores exploration

  • 1. Exploration Technical Session March 10th, 2022 | TSX:ERO | NYSE:ERO
  • 2. ERO COPPER | 1 Cautionary Statements Caution Regarding Forward Looking Information and Statements This presentation contains “forward-looking statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995 and “forward-looking information” within the meaning of applicable Canadian securities legislation (collectively, “forward-looking statements”). Forward-looking statements include statements that use forward-looking terminology such as “may”, “could”, “would”, “will”, “should”, “intend”, “target”, “plan”, “expect”, “budget”, “estimate”, “forecast”, “schedule”, “anticipate”, “believe”, “continue”, “potential”, “view” or the negative or grammatical variation thereof or other variations thereof or comparable terminology. Forward-looking statements include, but are not limited to, statements with respect to the Company's guidance and/or outlook on future production, costs and capital expenditures; development plans, costs, timelines and/or approvals for, as well as benefits, production and/or performance expected by, growth projects including development of the Deepening Extension Zone, construction of the new external shaft, and creation of a two-mine system at the Pilar Mine, construction of the Boa Esperança mine, development of the Matinha Vein at the NX Gold Mine, expansion of the Caraíba Mill, and other infrastructure projects at the MCSA Complex; the Company’s expectations, strategies, objectives and plans for the MCSA Mining Complex, the NX Gold Property and the Boa Esperança Property, including, but not limited to, the Company’s planned exploration, development and production activities; and the significance and timing of any particular exploration program or result and the Company’s expectations and objectives for current and future exploration plans including, but not limited to, planned areas of additional exploration, further extensions and expansion of mineralization at the MCSA Mining Complex, the NX Gold Mine and the Boa Esperança Project. Forward-looking statements are not a guarantee of future performance and are based upon a number of estimates and assumptions of management in light of management's experience and perception of trends, current conditions and expected developments, as well as other factors that management believes to be relevant and reasonable in the circumstances, as of the date of this presentation including, without limitation, assumptions about: continued effectiveness of the measures taken by the Company to mitigate the possible impact of COVID-19 on its workforce and operations; favourable equity and debt capital markets; the ability to raise any necessary additional capital on reasonable terms to advance the production, development and exploration of the Company's properties and assets; future prices of copper and other metal prices; the timing and results of exploration and drilling programs; the accuracy of any mineral reserve and mineral resource estimates; the geology of the MCSA Mining Complex, NX Gold Property and the Boa Esperança Property being as described in the technical reports for these properties; production costs; the accuracy of budgeted exploration and development costs and expenditures; the price of other commodities such as fuel; future currency exchange rates and interest rates; operating conditions being favourable such that the Company is able to operate in a safe, efficient and effective manner; work force conditions to remain healthy in the face of prevailing epidemics, pandemics or other health risks (including COVID-19), political and regulatory stability; the receipt of governmental, regulatory and third party approvals, licenses and permits on favourable terms; obtaining required renewals for existing approvals, licenses and permits on favourable terms; requirements under applicable laws; sustained labour stability; stability in financial and capital goods markets; availability of equipment and critical supplies, spare parts and consumables; positive relations with local groups and the Company's ability to meet its obligations under its agreements with such groups; and satisfying the terms and conditions of the Company's current loan arrangements. While the Company considers these assumptions to be reasonable, the assumptions are inherently subject to significant business, social, economic, political, regulatory, competitive, global health, and other risks and uncertainties, contingencies and other factors that could cause actual actions, events, conditions, results, performance or achievements to be materially different from those projected in the forward-looking statements. Many assumptions are based on factors and events that are not within the control of the Company and there is no assurance they will prove to be correct. Furthermore, such forward-looking statements involve a variety of known and unknown risks, uncertainties and other factors which may cause the actual plans, intentions, activities, results, performance or achievements of the Company to be materially different from any future plans, intentions, activities, results, performance or achievements expressed or implied by such forward-looking statements. Such risks include, without limitation, the risk factors listed under the heading “Risk Factors” in the Company’s latest Annual Information Form (the “AIF”). Although the Company has attempted to identify important factors that could cause actual actions, events, conditions, results, performance or achievements to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events, conditions, results, performance or achievements to differ from those anticipated, estimated or intended. The Company cautions that the foregoing lists of important assumptions and factors are not exhaustive. Other events or circumstances could cause actual results to differ materially from those estimated or projected and expressed in, or implied by, the forward-looking statement contained herein. There can be no assurance that forward-looking statement will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statement. Accordingly, readers should not place undue reliance on forward-looking statement. Forward-looking statements contained herein are made as of the date of this presentation and the Company disclaims any obligation to update or revise any forward-looking statement, whether as a result of new information, future events or results or otherwise, except as and to the extent required by applicable securities laws. This presentation may also contain future-oriented financial information (“FOFI”) and information which could be considered to be in the nature of a “financial outlook”. Such FOFI or financial outlook was approved by management of the Company as of the date of presentation for the purpose of providing management’s reasonable estimate of what return investors might expect to earn based on the assumptions set forth in such estimates and the information may not be appropriate for other purposes. Management cautions that such FOFI or financial outlook reflects the Company’s current beliefs and are based on information currently available to the Company and on assumptions the Company believes are reasonable. Actual results and developments may differ materially from results and developments discussed in the FOFI or financial outlook as they are subject to a number of significant risks and uncertainties. Certain of these risks and uncertainties are beyond the Company’s control. Consequently, all of the FOFI or financial outlook are qualified by these cautionary statements, and there can be no assurances. Cautionary Notes Regarding Mineral Resource and Mineral Reserve Estimates In accordance with applicable Canadian securities regulatory requirements, all mineral reserve and mineral resource estimates of the Company disclosed in this presentation have been prepared in accordance with National Instrument 43-101 - Standards of Disclosure for Mineral Projects (“NI 43-101”) and are classified in accordance with the Canadian Institute of Mining, Metallurgy and Petroleum ("CIM") Definition Standards for Mineral Resources and Mineral Reserves, adopted by the CIM Council on May 10, 2014 (the "CIM Standards"). NI 43-101 is a rule developed by the Canadian Securities Administrators that establishes standards for all public disclosure an issuer makes of scientific and technical information concerning mineral projects. NI 43-101 differs significantly from the disclosure requirements of the Securities and Exchange Commission (the "SEC") generally applicable to U.S. companies. For example, the terms "mineral reserve", "proven mineral reserve", "probable mineral reserve", "mineral resource", "measured mineral resource", "indicated mineral resource" and "inferred mineral resource" are defined in NI 43-101. These definitions differ from the definitions in the disclosure requirements promulgated by the SEC. Accordingly, information contained in this presentation may not be comparable to similar information made public by U.S. companies reporting pursuant to SEC disclosure requirements. Mineral resources which are not mineral reserves do not have demonstrated economic viability. Pursuant to the CIM Standards, mineral resources have a higher degree of uncertainty than mineral reserves as to their existence as well as their economic and legal feasibility. Inferred mineral resources, when compared with measured or indicated mineral resources, have the least certainty as to their existence, and it cannot be assumed that all or any part of an inferred mineral resource will be upgraded to an indicated or measured mineral resource as a result of continued exploration. Pursuant to NI 43-101, inferred mineral resources may not form the basis of any economic analysis. Accordingly, readers are cautioned not to assume that all or any part of a mineral resource exists, will ever be converted into a mineral reserve, or is or will ever be economically or legally mineable or recovered.
  • 3. ERO COPPER | 2 Disclaimer General Scientific and technical information contained in this presentation has been reviewed, verified and approved by Emerson Ricardo Re, MSc, MBA, MAusIMM (CP) (No. 305892), Registered Member (No. 0138) (Chilean Mining Commission) and Resource Manager of the Company. Mr. Re is an employee of Ero and Qualified Person as defined by NI 43-101. Information of a scientific or technical nature in respect of the MCSA Mining Complex included in this presentation is based on the press release dated January 6, 2022, and where applicable, the technical report dated January 14, 2021 with an effective date of October 1, 2020 entitled “2020 Updated Mineral Resources and Mineral Reserves Statements of Mineração Caraíba's Vale do Curaçá Mineral Assets, Curaçá Valley”, prepared by Porfirio Cabaleiro Rodrigues, MAIG, Bernardo Horta de Cerqueira Viana, MAIG, Paulo Roberto Bergmann, FAusIMM, Fábio Valério Câmara Xavier, MAIG and Dr. Augusto Ferreira Mendonça, RM SME all of GE21 Consultoria Mineral Ltda. (“GE21”) and Dr. Beck (Alizeibek) Nader, FAIG of BNA Mining Solutions (“BNA”), who are independent qualified persons under NI 43-101 (the “2020 MCSA Technical Report”), and where applicable, the technical report dated October 17, 2018 with an effective date of August 1, 2018 entitled “2018 Updated Mineral Resources and Mineral Reserves Statements of Mineração Caraíba's Vale do Curaçá Mineral Assets, Curaçá Valley”, prepared by Rubens Jose De Mendonça, MAusIMM, of Planminas – Projectos e Consultoria em Mineração Ltd. and Porfirio Cabaleiro Rodrigues, MAIG, Fábio Valério Cãmara Xavier, MAIG, and Bernardo Horta de Cerqueira Viana, MAIG, all of GE21, who are independent qualified persons under NI 43-101 (the “2018 MCSA Technical Report”). Information of a scientific or technical nature in respect of the NX Gold Mine included in this presentation is based on the press release dated January 6, 2022, and where applicable, the technical report, dated January 8, 2021 with an effective date of September 30, 2020, entitled “Mineral Resource and Reserve Estimate of the NX Gold Mine, Nova Xavantina”, prepared by Porfírio Cabaleiro Rodriguez, MAIG, Bernardo Horta Cerqueira Viana, MAIG, Paulo Roberto Begmann, FAusIMM and Leonardo de Moraes Soares, MAIG, all of GE21, who are independent qualified persons under NI 43-101 (the “2020 NX Gold Mine Technical Report”). Information of a scientific or technical nature in respect of the Boa Esperança Property included in this presentation is based on the technical report dated November 12, 2021 with an effective date of August 31, 2021, entitled “Boa Esperança Project NI 43-101 Technical Report on Feasibility Study Update”, prepared by Kevin Murray, P. Eng., Erin L. Patterson, P. Eng., and Scott C. Elfen, P.E., all of Ausenco Engineering Canada Inc., Carlos Guzmán, FAusIMM RM CMC of NCL Ingeniería y Construcción SpA, who are independent qualified persons under NI 43-101, and Emerson Ricardo Re, MSc, MBA, MAusIMM (CP) (No. 305892), Registered Member (No. 0138) (Chilean Mining Commission) and Resource Manager of the Company (the “Boa Esperança Technical Report”). Please see the AIF, 2020 MCSA Technical Report, 2018 MCSA Technical Report (on SEDAR only), the 2020 NX Gold Mine Technical Report, and the Boa Esperança Technical Report, each filed on the Company’s profile at www.sedar.com and www.sec.gov, for details regarding the data verification undertaken with respect to the scientific and technical information included in this presentation regarding the MCSA Mining Complex, the NX Gold Mine and the Boa Esperança Property, for additional details regarding the related exploration information, including interpretations, the QA/QC employed, sample, analytical and testing results and for additional details regarding the mineral resource and mineral reserve estimates disclosed herein. Where applicable, exploration target projection(s) are shown to demonstrate future area of exploration focus within the Company’s operations. These projections are based on data compilation work which includes review of geological controls, structural analysis and copper mineralization identified during the Company’s technical programs. The interpretation and boundary limits do not imply continuity of mineralization, or actual thickness of mineralization which has yet to be defined. Third Party Information This presentation includes market, industry and economic data which was obtained from various publicly available sources and other sources believed by the Company to be true. Although the Company believes it to be reliable, the Company has not independently verified any of the data from third party sources referred to in this presentation, or analyzed or verified the underlying reports relied upon or referred to by such sources, or ascertained the underlying economic and other assumptions relied upon by such sources. The Company believes that its market, industry and economic data is accurate and that its estimates and assumptions are reasonable, but there can be no assurance as to the accuracy or completeness thereof. The accuracy and completeness of the market, industry and economic data used throughout this presentation are not guaranteed and the Company does not make any representation as to the accuracy or completeness of such information. Non-IFRS Measures Financial results of the Company are prepared in accordance with IFRS. The Company and MCSA utilize certain non-IFRS measures, including C1 cash cost of copper produced per pound, C1 cash costs of gold produced per ounce, EBITDA and working capital as more particularly described in the Company's MD&A for the three and twelve months ended December 31, 2021, a copy of which can be found on the Company's website, on SEDAR and on EDGAR. The Company believes that these measures, together with measures determined in accordance with IFRS, provide investors with an improved ability to evaluate the underlying performance of the Company, the MCSA Mining Complex and the NX Gold Mine. Non-IFRS measures do not have any standardized meaning prescribed under IFRS, and therefore they may not be comparable to similar measures employed by other companies. The data is intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. C1 cash cost of copper produced (per lb) is the sum of production costs, net of capital expenditure development costs and by-product credits, divided by the copper pounds produced. C1 cash cost reported by the Company include treatment, refining charges, offsite costs, and certain tax credits relating to sales invoiced to the Company's Brazilian customer on sales. C1 cash cost of copper produced per pound is a non-IFRS measure used by the Company to manage and evaluate operating performance of the Company’s operating mining unit and is widely reported in the mining industry as benchmarks for performance but does not have a standardized meaning and is disclosed in addition to IFRS measures. C1 cash cost of gold produced (per ounce) is the sum of production costs, net of capital expenditure development costs and silver by-product credits, divided by the gold ounces produced. C1 cash cost of gold produced per ounce is a non-IFRS measure used by the Company to manage and evaluate operating performance of the Company's operating mining unit and is widely reported in the mining industry as benchmarks for performance but does not have a standardized meaning and is disclosed in addition to IFRS measures.
  • 4. ERO COPPER | 3 Introduction | Agenda & Objectives Ero’s Strategic Position  Fully funded organic growth strategy  A peer leader in low carbon-intensive copper production Exploration Strategy  Exploration integral to Company  High-margin growth focused  Generating low-capital intensity projects delivering high ROIC Exploration & Growth  Unlocking value across all time-scales in ongoing life-of-mine planning Objectives Delivery of asset potential across portfolio Agenda New format: semi-annual exploration webinars 2 Introduction & Company Overview 1 2 2022 Exploration Program Overview & Recent Results 2  MCSA Mining Complex  Near-mine exploration  Regional program & new areas of interest  Nickel exploration program  Boa Esperança  NX Gold 2 Q&A 3
  • 5. ERO COPPER | 4 Introduction | Today’s Speakers Makko DeFilippo President Mike Richard Chief Geological Officer Pablo Mejia VP Exploration Filipe Porto Director, Exploration Brazil Eduardo Oliveira Geology Manager, Brazil Francisco Tomazoni Senior Geologist, Brazil
  • 6. ERO COPPER | 5 Ero Copper | High-Growth Clean Copper Producer NX Gold Mine Production MCSA Mining Complex Production Boa Esperanҫa Development Project (expected construction start in Q2 2022) 20 kt 46 kt 97 kt 2017A 2021A 2025E MCSA Boa Brazil-Focused Clean Copper Producer With Meaningful Gold Production Strong Exploration Focus Driving Organic Growth Peer-Leading Returns 62% LTM Return on Invested Capital (“ROIC”)(1) Doubling Copper Production Every 4 Years(2) 1. Source: FactSet Research Systems as of November 29, 2021. Based on last twelve months as of September 30, 2021. 2. Estimated production based on midpoint of production guidance ranges.
  • 7. ERO COPPER | 6 NX Gold Mine Production MCSA Mining Complex Production Boa Esperanҫa Mine in Development (expected construction start in Q2 2022) 1 2 3 2 1 3 45-50kt Cu 5-Year Forecasted Annual Production(1) $1.12/lb Wtd. Avg. 5-Year Forecasted C1 Cash Cost(1) Bahia Mato Grosso Pará ~35kt Cu Avg. Annual Production in First 5 Years(2) $1.12/lb Avg. C1 Cash Cost in First 5 Years(2) 50-60koz Au 5-Year Forecasted Annual Production(1) $513/oz Wtd. Avg. 5-Year Forecasted C1 Cash Cost(1) Ero Copper | Asset Portfolio Note: C1 Cash Cost of Copper Produced, C1 Cash Cost of Gold Produced, and AISC of Gold Produced are non-IFRS measures. 2. Estimated production and unit costs based on Please refer to the appendix for a discussion and reconciliation on non-IFRS performance measures. 1. Estimated production and unit costs based on 5-year guidance ranges as published on January 11, 2022. the Boa Esperança Technical Report. Economics use a copper price forecast of $3.80/lb in 2024, $3.95/lb in 2025 and $3.40/lb in 2026 and thereafter, and a BRL:USD exchange rate of 5.00.
  • 8. ERO COPPER | 7  Management focused on creation of shareholder value through exploration  Globally, over 70 geologists across the Company’s exploration team  Currently 34 drill rigs active across the portfolio 2022 Exploration Objectives:  MCSA  Addition of high-grade tonnes in the upper part of the Pilar Mine  Increase mine life at Vermelhos to 10+ years, improve grade profile  Continue systematic testing of high-priority regional targets focusing on high-grade zones  NX Gold  Increase reserve life to 10+ years at NX Gold  Aggressive regional exploration program in partnership with Royal Gold (17,500m planned for 2022)  Boa Esperança  Incorporate results of ‘Gap Zone’ drill program into mine planning  Test extensions of mineralization beyond pit limits $28 $10 $6 2022 Exploration Budget ($ million)(1) MCSA NX Gold Boa Esperanca Ero Copper | Exploration at a Glance 1. 2022 exploration budget based on midpoint of guidance ranges.
  • 9. MCSA Mining Complex Boa Esperanҫa NX Gold Mine Broader Brazil ERO COPPER | 8 Near-Term Medium-Term & Long-Term Gap Zone Exploration Boa Extensions (incl. Underground) Carajás District Strategic Opportunities New Regional Systems (i.e. Arapuá) In-Mine Exploration Near-Mine Exploration Regional Exploration Nickel, PGM Focused Exploration Program Pilar Upper Levels (Exploration & Engineering) Past Producing Mines (Lagoa da Mina & Surubim District) Vermelhos Mine High-Grade Extensions Pilar Mine Deepening Extension Growth Vermelhos District Expansion Strategy Matinha Vein Extensions Santo Antonio Vein Extensions New Regional Discoveries New Strategic Opportunities Ero Copper | Exploration Portfolio & Potential Life-of-Mine Impact
  • 10. Placeholder | Placeholder ERO COPPER | 9 M C S A M I N I N G C O M P L E X
  • 11. ERO COPPER | 10  Ero controls ~170,000 hectares along a 100 km (62 mi) long belt with favorable geology and excellent infrastructure  Previous owners invested little capital into the assets; significantly underexplored  Multiple discoveries under Ero’s ownership with 102 targets defined to date  36 high priority targets  13 tested  4 discoveries (previously announced)  2 new mineralized systems currently being tested  Potential to add value through grade improvement and utilization of excess mill capacity (~1.3 million tonnes per annum available) MCSA Mining Complex | District-Scale Opportunity
  • 12. ERO COPPER | 11 MCSA Mining Complex | Mineralization Characteristics Mafic-ultramafic bodies shown in green  Copper deposits and occurrences broadly associated with mafic-ultramafic intrusives  Mafic-ultramafic intrusions postdate deformation of granulite facies gneissic host rocks – emplaced in deep structures and utilize gneissic fabrics  Mafic-ultramafic intrusive suite includes peridotite, orthopyroxenite, websterite, norite, gabbro, anorthosite  Associated with hornblende, phlogopite and altered to actinolite, talc, serpentine, carbonate  Cu-dominant mineralization locally contains concentrations of Ni, Co, Pt, Pd, Au  Disseminated to massive chalcopyrite +/- bornite, local pyrrhotite-pentlandite, tellurides, PGE minerals + abundant chromite, magnetite and other oxides/spinels  Deposits commonly zoned: chalcopyrite / bornite in the center and pyrrhotite / pyrite towards the edges
  • 13. MCSA Mining Complex | Major Ore Types and Signatures Type Sulphide breccias Sulphide veins and stringers Disseminated and blebby sulphides Key Minerals Chalcopyrite, bornite-rich, +/- pentlandite Chalcopyrite, bornite, pyrrhotite, pentlandite Chalcopyrite, bornite-rich, pentlandite Geometry Irregular, flat to vertical, in mafic-ultramafic bodies and gneiss Irregular/planar, various orientations, in mafic-ultramafic and gneiss Irregular zones in mafic- ultramafic bodies and gneiss Geochemistry Strong Cu +/- Te +/- Ni, Pt, Pd Strong Cu, Ni, Te, Pt, Pd Strong Cu +/- Te +/- Ni, Pt, Pd Geophysics Moderate-high EM conductors; locally magnetic Weak EM conductors; IP response; locally magnetic Low to high IP response High grade Low grade ERO COPPER | 12
  • 14. ERO COPPER | 13  Pilar Mine commenced open pit operations in 1979  Underground operations commenced in 1986  “Pilar 3.0” initiative commenced 2022  Creation of two mines within a mine, allowing sustained production volumes of ~3.0 million tonnes per annum from Pilar  Supported by significant investments in cooling, paste fill plant and new larger diameter external shaft  Shaft construction commenced construction Q3 2021 MCSA Mining Complex | The New Pilar Mine “3.0” Phase I & II Cooling Plant (construction photo December 2021)
  • 15. N +100 m -300 m -700 m -1100 m -1500 m Plan View 300 Meters 150 MSBS Deepening Extension P1P2 400 Meters 200 ERO COPPER | 14 Total Mineralized Envelope (2021) Existing Infrastructure Total Mineralized Envelope (2018) New External Shaft  Aggressive exploration within the Pilar Mine has resulted in significant extensions to the known extent of mineralization since 2018  Extended ~800m to depth  Meaningful additions in upper levels of Pilar Mine (MSBS and P1P2) and Deepening Extension MCSA Mining Complex | Exploration Success at Pilar (2018-2021) 472 729 36 225 2018 2021 Measured & Indicated Resource Inferred Resource 24.8 Mt @ 1.90% Cu 1.8 Mt @ 2.07% Cu 45.1 Mt @ 1.62% Cu 15.2 Mt @ 1.48% Cu Pilar Mine Resource Growth(1,2) (Underground Mine Contained Cu, kt) 2. 2018 Measured Resource comprised of 15.6 Mt @ 1.92% Cu and 2018 Indicated Resources comprised of 9.3 Mt @ 1.85% Cu. 2021 Measured Resource comprised of 22.8 Mt @ 1.63% Cu and 2021 Indicated Resources comprised of 22.3 Mt @ 1.60% Cu. 1. 2018 Measured & Indicated Resources and 2018 Inferred Resources based on the 2018 MCSA Technical Report. 2021 Measured & Indicated Resources and 2021 Inferred Resources based on the Company’s press release dated January 6, 2022. Please refer to the Appendix for additional information of a scientific or technical nature in respect of the 2021 Mineral Resources for MCSA Mining Complex.
  • 16. ERO COPPER | 15 MCSA Mining Complex | Deepening Extension Overview N Deepening Extension  Large focus since 2018 on growing resources and reserves in the “Deepening Extension”  Zone currently measures ~500m x 500m x 20m  Remains open with intercepts prior to year- end including some of the best copper intercepts published globally 8 217 9 130 2018 2021 Indicated Resource Inferred Resource 1.2 Mt @ 0.62% Cu 0.3 Mt @ 2.60% Cu 10.4 Mt @ 2.08% Cu 6.1 Mt @ 2.14% Cu Level -965 Deepening Extension Resource Growth(1) (Underground Mine Contained Cu, kt) 2. Previous Highlight Cu Intercepts released are from press releases dated July 7, 2021 and October 14, 2021. Please refer to these press releases for additional information. 1. 2018 Measured & Indicated Resources and 2018 Inferred Resources based on the 2018 MCSA Technical Report. 2021 Measured & Indicated Resources and 2021 Inferred Resources based on the Company’s press release dated January 6, 2022. Please refer to the Appendix for additional information of a scientific or technical nature in respect of the 2021 Mineral Resources for MCSA Mining Complex. (2)
  • 17. N FC5196 FC47183 FC47187 FC48193 FC48195 3.0m at 1.78% Cu 12.7m at 1.06% Cu 15.0m at 1.40% Cu 32.0m at 1.51% Cu 42.8m at 1.82% Cu FC5195 38.2m at 2.48% Cu E FC5195 FC5196 FC47183 FC47187 FC48193 FC48195 Level Mine -90  At P1P2, Pilar Mine, interpretation of drill core in 2021 suggests a fold hinge is a ‘trap’ for high-grade copper mineralization  Fold hinges are repeated at depth in the Pilar Mine  The recurrence of these traps suggests a potentially important structural control on high-grade mineralization throughout the Curaçá Valley ERO COPPER | 16 +460 m Level Mine -90 +460 m Inferred Resource 2021 Existing Infrastructure Measured/Indicated Resource 2021 New Cu Intercepts 200 Meters 100 Structural trap being targeted in 2022 MCSA Mining Complex | P1P2 – Geological Controls and Implications 1. 2021 Measured & Indicated Resources and 2021 Inferred Resources based on the Company’s press release dated January 6, 2022. Please refer to the Appendix for additional information of a scientific or technical nature in respect of the 2021 Mineral Resources for MCSA Mining Complex. 2. Please refer to the Appendix of this presentation for complete assay results. Long Section (Looking East) Cross Section (Looking North)
  • 18.  Photo of Pilar or Vermelhos interpreted fold and HG. Pablo screen capture ERO COPPER | 17 • Put slide between pilar and vermelhos showing what we’ve learned from Pilar and suggesting that it applies to Vermelhos Existing Infrastructure Total Mineralized Envelope (2021)(1) All Copper Assays >6% Cu Interpreted Structures MCSA Mining Complex | The Importance of Structural Traps N  Geometries of both Pilar and Vermelhos indicate a steeply-plunging long axis of the deposits  Mafic/ultramafic Intrusions are generally in the form of lenses and occur along structures, fold limbs and within fold hinges  Thick high-grade deposits commonly located within fold hinges / structural traps  Understanding structural controls opens window for discovery of additional mineralization within and adjacent to existing mine infrastructure 1. 2021 Mineralized Envelope based on the Company’s press release dated January 6, 2022. Please refer to the Appendix for additional information of a scientific or technical nature in respect of the 2021 Mineral Resources for MCSA Mining Complex. Long Section (Looking East) ? ?
  • 19. Placeholder | Placeholder ERO COPPER | 18 • Add image 3 - D O V E R V I E W : P I L A R M I N E
  • 20. ERO COPPER | 19  Located ~60km north of Pilar Mine & processing facilities  Construction commenced in 2017, underground operations commenced Q4 2018  Discoveries of Siriema, Vermelhos North and East Zone Conduit have grown mineral inventory at Vermelhos  First documented occurrences of concentrated nickel MCSA Mining Complex | Vermelhos Mine Overview
  • 21. 2. 2018 Measured Resource comprised of 3.0 Mt @ 4.12% Cu and 2018 Indicated Resources comprised of 1.5 Mt @ 1.97% Cu. 2021 Measured Resource comprised of 4.4 Mt @ 2.14% Cu and 2021 Indicated Resources comprised of 11.6 Mt @ 1.01% Cu. ERO COPPER | 20 MCSA Mining Complex | Exploration Success at Vermelhos Mine (2018-2021) Total Mineralized Envelope (2021) Existing Infrastructure Total Mineralized Envelope (2018) +300 m 000 m -300 m N 500 Meters 250 N7-N8 Sombrero & Toboggan East Zone Siriema 500 Meters 250 Plan View 500 Meters 250  Drill programs within the Vermelhos Mine targeting  High-grade extensions at depth  East Zone Conduit  N7-N8 Connection  Improved understanding of control on high-grade mineralization through underground mapping Interpreted Structures 155 212 24 151 2018 2021 Measured & Indicated Resource Inferred Resource 4.6 Mt @ 3.40% Cu 2.0 Mt @ 1.19% Cu 16.0 Mt @ 1.32% Cu 17.1 Mt @ 0.88% Cu Vermelhos Mine Resource Growth(1,2) (Underground Mine Contained Cu, kt) Long Section (Looking East) 1. 2018 Measured & Indicated Resources and 2018 Inferred Resources based on the 2018 MCSA Technical Report. 2021 Measured & Indicated Resources and 2021 Inferred Resources based on the Company’s press release dated January 6, 2022. Please refer to the Appendix for additional information of a scientific or technical nature in respect of the 2021 Mineral Resources for MCSA Mining Complex.
  • 22. ERO COPPER | 21 MCSA Mining Complex | New Results Beneath Toboggan and Sombrero Inferred Resource 2021 Existing Infrastructure Measured/Indicated Resource 2021 Previously Announced Cu Intercept(2)  Drilling beneath Toboggan and Sombrero continues to intercept high- grade zones following enhanced structural understanding  Drilling ongoing to further test extent of identified structural traps  Using Pilar Mine as analogue to define and identify controlling features New Cu Intercept W Interpreted Structural Trap 2. Previously announced Cu intercept from the Company’s press release dated June 20, 2019. 1. 2021 Measured & Indicated Resources and 2021 Inferred Resources based on the Company’s press release dated January 6, 2022. Please refer to the Appendix for additional information of a scientific or technical nature in respect of the 2021 Mineral Resources for MCSA Mining Complex. Cross-Section (Looking North) Fold axis Foliation FVS-1152 mineralized interval from 71.4m down hole – drilled from Level +120 of the Vermelhos Mine. Northing: 8970842m, Easting: 396514m
  • 23. Placeholder | Placeholder ERO COPPER | 22 3 - D O V E R V I E W : V E R M E L H O S M I N E
  • 24. ERO COPPER | 23 Drilling Program Targets Drilling (m) Shallow (Above -965L) Resource Conversion & Upgrade 9,000 Shallow (Above -965L) Additions 4,600 Total Shallow (Inferred & Indicated) 13,600 Deepening (Below -965L) Resource Conversion & Upgrade 4,000 Total Shallow & Deepening 17,600 2023-2024 Production Plan Definition Drilling 34,000 Total 51,600 Follow-Up on Previously Mined Areas within Upper Reaches of Pilar Mine (Above -965L) Additions TBD Baraúna North (Crown Pillar) Resource Conversion & Upgrade 2,000 Baraúna South Resource Conversion & Upgrade 6,600 Baraúna South Additions 5,400 Total Baraúna 14,000 Drilling Program Targets Drilling (m) Highest Value Inferred Resources Resource Conversion & Upgrade 18,500 High-Grade Resources Beneath Toboggan Additions 9,000 Follow-Up on Positive Results and Understanding of Ore Controls Additions & Exploration 7,000 Total Shallow & Deepening 34,500 2023-2024 Production Plan Definition Drilling 18,900 Total 53,400 Pilar Vermelhos 2022 Budget Opportunities 2022 Budget Note: Summed totals may not add due to rounding.  Approximately 100,000 meters of in-mine drilling is budgeted at the MCSA Mining Complex in 2022 MCSA Mining Complex | Pilar & Vermelhos: 2022 Drill Program
  • 25. Placeholder | Placeholder ERO COPPER | 24 M C S A R E G I O N A L E X P L O R A T I O N
  • 26. ERO COPPER | 25 Exploration Sector Size (km x km) Individual Targets Paraíso 14 x 5 3 Vermelhos 20 x 8 20 Cacimba da Torre 13 x 10 4 Barro Vermelho 20 x 10 8 Angicos 33 x 3 12 Surubim 15 x 8 17 Pirulito 33 x 2 3 Sertãozinho 17 x 3 7 Arapuá 38 x 4 18 Gêmeos 19 x 5 5 Bela Vista 10 x 6 1 Santa Fé 42 x 4 2 Caraíba 8 x 10 2 Total 102  2018:  56 original target areas based on geophysics and geochemistry  2022:  102 total individual targets  36 top priority targets  13 tested  23 remain to be tested  6 regional targets have returned promising results  4 previously announced discoveries  2 new mineralized systems of interest MCSA Mining Complex | Regional Exploration: Work Completed To Date
  • 27. Induced Polarization 785 km survey 2,031 km Survey Gravity 21,000 km survey Airborne TMI High Res. Geology 1,300 km field mapping Soil Geochemistry 61,500 soil samples  Data Layers and Methodology  Copper showings  Soil Geochemistry  Mapping – trenching  Ground Geophysics IP, Gravity  Airborne EM  Exploration Criteria  Copper showings  Positive Cu / Ni Anomaly  Presence of mafic- ultramafic rocks  Detailed structural mapping  IP anomaly – presence of sulphide  EM anomaly – massive sulphide MCSA Mining Complex | Our Approach to Regional Exploration
  • 28. ERO COPPER | 27 Legend Lineaments W Corridor Geology Blocks Cu ppm 82.8 – 108.6 (X + 2s- 2nd Order Anomaly) 108.6 – 2,630.1 (X + 3s - 1st Order Anomaly)  Pilar and Vermelhos Mines located within large sulphide systems (2+ km long footprint)  Geometries indicate steeply-plunging deposits with relatively small near-surface footprints  Mineralization associated with mafic- ultramafic intrusions located within the fold limbs and hinges, or at structural intersections, are key structural traps  Key is to identify traps within larger systems with detailed mapping and trenching  Mineralization occurs as disseminated to massive sulphide breccia MCSA Mining Complex | Regional Exploration: What We Have Learned Lithology Silcrete Quartz Vein Diabase Dyke Granite Mafic Ultramafic
  • 29. ERO COPPER | 28 FS17-01: 39.38m @ 0.59% Cu from 38.4m to 77.7m down hole Northing: 8921097m Easting: 394718m Azimuth: 270° Dip: -48° Cu Anomalies (ppm) S8 S7 FS17-01 FS10-04: 35.00m @ 0.56% Cu from 88.0m to 123.0m down hole Northing: 8908254m Easting: 402599m Azimuth: 90° Dip: -56° FS10-04 Arapuá (total strike length of ~55km) MCSA Mining Complex | Regional Exploration: Advancing New Mineralized Systems 1. Drill holes were drilled from surface. The length of intercept may not represent the true width of mineralization. From, To and Length are rounded to the nearest tenth of a meter. S17 System S10 System Pilar Mine 82.8 – 108.6 (X + 2s- 2nd Order Anomaly) 108.6 – 2,630.1 (X + 3s - 1st Order Anomaly)
  • 30. ERO COPPER | 29 S10 West Hole ID From (m) To (m) Length (m) Cu (%) S10 West CRS10-13 13.0 28.0 15.0 0.25 and 33.0 43.0 10.0 0.30 CRS10-14 8.0 36.0 28.0 0.42 CRS10-15 1.0 35.0 34.0 0.45 CRS10-16 77.0 131.0 54.0 0.50 including 96.0 100.0 4.0 0.97 and 189.0 199.0 10.0 0.23 FS10-04 87.7 133.5 45.8 0.47 including 100.7 113.7 13.0 0.70 and 148.9 152.9 4.0 0.32 and 181.9 200.4 18.5 0.32 FS10-05 84.7 100.6 15.9 0.34 FS10-06 205.8 240.5 34.7 0.35 and 273.2 277.2 4.0 0.70 FS10-07 148.0 156.3 8.3 0.72 including 153.0 156.3 3.3 1.11 FS10-08 178.9 189.5 10.7 0.50 and 203.8 208.1 4.3 0.53 and 212.8 221.0 8.1 0.70 FS10-09 174.3 199.7 25.3 0.41 FS10-10 NSI NSI NSI NSI FS10-11 77.7 82.1 4.4 0.54 FS10-12 23.1 34.9 11.8 0.48 FS10-13 110.3 158.1 47.8 0.39 FS10-14 10.4 37.0 26.6 0.50 including 23.6 32.2 8.6 0.70 FS10-15 268.7 298.1 29.4 0.46 and 316.6 336.9 20.3 0.40 FS10-18 NSI NSI NSI NSI FS10-21 NSI NSI NSI NSI  Example of regional exploration result at S10 West target, adjacent to Pilar Mine (part of S10 System) MCSA Mining Complex | Regional Exploration: S10 System 1. NSI indicates no significant intercept, based on a three-meter mining width and a cut-off grade of 0.18% copper for regional exploration programs to demonstrate geological controls, irrespective of depth. Drill holes were drilled from surface. The length of intercept may not represent the true width of mineralization. Values may not add up due to rounding. From, To and Length are rounded to the nearest tenth of a meter. Plan View S10 South* S10 East* *Refer to appendix for S10 East and S10 South drill results S10 System Pilar Mine
  • 31. ERO COPPER | 30  Core objective for 2022: Delineate new high margin discovery  Continue testing known mineralized systems and test at least 5 high-priority anomalies  Arapuá Sector (13km to be tested of ~55km strike length)  Surubim Sector (6km to be tested of ~15km strike length)  Vermelhos Sector (2.5km to be tested of ~20km strike length) MCSA Mining Complex | 2022 Regional Objectives
  • 32. Placeholder | Placeholder ERO COPPER | 31 • Add photo? M C S A : T H E N I C K E L O P P O R T U N I T Y
  • 33. ERO COPPER | 32 Dunite Harzb. Opxt Norite Hzb/Opxt Dunite Hzb Opxt Norite Base Top Classic Fractionation Traditional Nickel-Sulphide Deposit Classic Fractionation MCSA Mining Complex Dunite Hzb Ol Opxt Opxt Websterite Gabbronorite Hzb/Opxt Dunite Hzb Opxt Norite MCSA Mining Complex | Regional Nickel and PGE Potential  Traditional Nickel- bearing rocks identified in the Curaçá Valley  Multiple mafic- ultramafic rock types suggest classic fractionation
  • 34. ERO COPPER | 33 22.9m @ 6.30% Cu + 0.44%Ni FVS-171 (Vermelhos Mine): 158.4 – 181.3m; Opx+Flog+Chr (Ultramafic)- Cpy+Pn+Po OPXT-1 OPXT-2 OPXT-3 Qz+plag-4 Pn Pn Cpy Chalcopyrite Bornite Toboggan – Level 208 Pentlandite (Ni rich Sulphide) MCSA Mining Complex | Regional Nickel and PGE Potential (cont’d) *Nickel mineralization model interpreted based on structural controls and nickel assay values and does not imply continuity of grade * * FVS-171 Modeled extent of nickel mineralization within Vermelhos Mine Northing: 8970819m Easting: 396596m Azimuth: 90° Dip: -77°
  • 35. ERO COPPER | 34 FCV-79 11.2m @ 0.24% Cu, 0.49% Ni, 0.57 gpt PGE+Au FCV 79 Ni Targets  Delineation of Ni-(PGE) targets based on:  Geochemical ratios and factor analysis  Airborne Electromagnetic Survey  Field mapping and trenching  Initial drilling of 2 targets to date (Espírito Santo and C25)  Identified Pyrrhotite- Pentlandite with anomalous nickel  Evaluation ongoing  Several additional targets identified Hole Northing Easting Dip (°) From (m) To (m) Int (m) Cu (%) Ni (%) Pd (g/t) Pt (g/t) Au (g/t) PGE+Au (g/t) FCV-79 8948430 413350 -64 86.3 97.5 11.2 0.24 0.49 0.25 0.21 0.06 0.57 MCSA Mining Complex | Regional Nickel and PGE Potential (cont’d)
  • 36. ERO COPPER | 35 100 Meters 50 PGE+Au intercepts beneath Surubim Open Pit NW  Analysis of select samples through the Curaçá Valley have highly anomalous levels of nickel, Platinum Group Elements (PGEs) and gold  Three main styles of PGE mineralization observed at MCSA:  High-grade copper-nickel-PGEs (this style of mineralization shows similarities to footwall zones described within the Sudbury District)  High-grade PGE low-sulphide content, reef-style mineralization (this style of mineralization shows similarities described in PGE deposits, such as the Bushveld Complex, South Africa and some zones within the Marathon Intrusion, Canada)  Copper-palladium rich (this style of mineralization shows similarities to zones described within the Sudbury District and Marathon Intrusion)  In-house PGE analysis capabilities are now fully operational  Recently established a dedicated team focused on nickel/PGE MCSA Mining Complex | Regional Nickel and PGE Potential (cont’d) Surubim Measured & Indicated Mineral Resource, Projected Section Previously Announced PGE Intercept(1) 1. Previously announced PGE intercept from the Company’s press release dated December 15, 2020. Cross Section (Looking Northeast)
  • 37. Placeholder | Placeholder ERO COPPER | 36 • Add image 3 - D O V E R V I E W : M C S A R E G I O N A L P O T E N T I A L
  • 38. Placeholder | Placeholder B O A E S P E R A N Ç A
  • 39. ERO COPPER | 38  Iron Oxide Copper Gold (“IOCG”) Deposit in world-class Carajás Mineral District  Low capital-intensity, high-return, construction-permitted copper project located in Para State, Brazil  Initial 12-year mine life with average annual production of 35 kt copper over the first five years of mine life  Projected IRR of 41.8% and an after-tax NPV of $380mm(1)  Fast payback period of 1.4 years(1)  Significant exploration potential within existing open pit  Currently 5 drill rigs on site  Positive results from Gap Zone exploration program highlight opportunities to further improve project  Construction to commence in Q2 2022 Boa Esperança | Overview of Carajás Copper District 1. Based on consensus copper prices price forecast used in the Boa Esperança Technical Report. Copper prices of $3.80/lb in 2024, $3.95/lb in 2025 and $3.40/lb in 2026 and thereafter, and a BRL:USD exchange rate of 5.00.
  • 40. ERO COPPER | 39  Drilling efforts to date focused on improving quality of data for engineering purposes and testing of the Gap Zone  2022 Exploration Objectives:  Support engineering team with geotechnical, geometallurgical and condemnation drilling  Further drill testing of the “Gap Zone”  First pass wide-spaced drill testing for near- surface targets and high-grade “underground” extensions of Boa  Initiate Regional Exploration program $4.8 $1.2 2022 Exploration Budget ($ million) Exploration Condemnation Boa Esperança | Exploration Objectives for 2022
  • 41. ERO COPPER | 40 BSPD-169* 9241175m N 450159m E 9242243m N 451223m E BSPD-170* 200 Meters 100 BSPD-171 BSPD-172* BSPD-173* BSPD-174* BSPD-182* BSPD-183* BSPD-192 BSPD-176* BSPD-177 BSPD-179* BSPD-185* BSPD-186 BSPD-190* BSPD-208 BSPD-175* BSPD-169 BSPD-190 BSPD-175 BSPD-176 BSPD-192 BSPD-171 BSPD-208 BSPD-186 BSPD-170 BSPD-185 BSPD-174 BSPD-182 +300 m 000 m 100 Meters 50 NW BSPD-172 BSPD-173 BSPD-177 BSPD-179 BSPD-183 Measured and Indicated Resource 2021 New Cu Intercepts Inferred Resource 2021 17.2m at 1.87% Cu 12.6m at 1.30% Cu 37.3m at 1.22% Cu 49.6m at 1.15% Cu 155.7m at 1.09% Cu Underground Potential (Open to Depth) Boa Esperança | New Drill Results 1. 2021 Measured & Indicated Resources and 2021 Inferred Resources based on the 2021 Boa Esperança Technical Report. Please refer to the Appendix for additional information of a scientific or technical nature in respect of the 2021 Mineral Resources for the Boa Esperança Project. 2. Please refer to the Appendix of this presentation for complete assay results. Cross Section (Looking Northeast) Plan View *Refer to appendix for full drill results
  • 42. Placeholder | Placeholder ERO COPPER | 41 • Add image 3 - D O V E R V I E W : B O A E S P E R A N Ç A
  • 43. Placeholder | Placeholder N X G O L D M I N E
  • 44. ERO COPPER | 43  Shear-hosted quartz vein gold deposit  Large land position (~117,000ha)  The NX Gold Mine is a high-grade, low-cost gold mine and processing facility located in Mato Grosso State, Brazil  Ore is processed at the adjacent Nova Xavantina Mill using a conventional, three-stage crush, flotation and CIL circuit  Current mine life to 2026 with significant growth opportunity driven by a highly prospective land package and underutilized mill  Recent discoveries of Santo Antonio Vein (2018) and new Matinha Vein (2021) suggest high potential for additional discoveries  Approximately 25% excess mill capacity NX Gold Mine | Overview
  • 45. 400 Meters 250 8382950m N 340292m E 8381322m N 338371m E MAT43 MAT37 MAT34 MAT33 MAT30 MAT31 SA104A SA104B SA108 Mine Level -215 ERO COPPER | 44 Plan View Cross Section (Looking South) E 400 Meters 250 SA108 SA104A SA104B MAT33 MAT43 MAT34 MAT31 MAT30 MAT37 +200 m -200 m 2.8m at 6.97gpt 3.8m at 19.27gpt 6.5m at 19.74gpt 0.9m at 2.58gpt 6.8m at 2.43gpt 2.5m at 5.66gpt 4.8m at 5.91gpt 3.5m at 7.06gpt 2.9m at 59.06gpt Inferred Resource 2021 Existing Infrastructure Indicated Resource 2021 Previously Mined New Gold Intercepts NX Gold Mine | New Drill Results 1. 2021 Measured & Indicated Resources and 2021 Inferred Resources based on the 2021 NX Gold Mine Technical Report. Please refer to the Appendix for additional information of a scientific or technical nature in respect of the 2021 Mineral Resources for the NX Gold Mine. 2. Please refer to the Appendix of this presentation for complete assay results.
  • 46. Placeholder | Placeholder ERO COPPER | 45 3 - D O V E R V I E W : N X G O L D M I N E
  • 47. Placeholder | Placeholder ERO COPPER | 46 S u m m a r y
  • 48. MCSA Mining Complex Boa Esperanҫa NX Gold Mine Broader Brazil ERO COPPER | 47 Near-Term Medium-Term & Long-Term Gap Zone Exploration Boa Extensions (incl. Underground) Carajás District Strategic Opportunities New Regional Systems (i.e. Arapuá) In-Mine Exploration Near-Mine Exploration Regional Exploration Nickel, PGM Focused Exploration Program Pilar Upper Levels (Exploration & Engineering) Past Producing Mines (Lagoa da Mina & Surubim District) Vermelhos Mine High-Grade Extensions Pilar Mine Deepening Extension Growth Vermelhos District Expansion Strategy Matinha Vein Extensions Santo Antonio Vein Extensions New Regional Discoveries New Strategic Opportunities Ero Copper | Exploration Portfolio & Potential Life-of-Mine Impact
  • 49. Placeholder | Placeholder ERO COPPER | 48 A P P E N D I X
  • 50. Placeholder | Placeholder ERO COPPER | 49 A P P E N D I X A : M C S A M I N I N G C O M P L E X
  • 51. 1. NSI indicates no significant intercept based on a three meter mining width and cut-off grade of 0.51% copper. Drill holes were drilled from level -30 and level +130 in the Pilar Mine. The length of intercept may not represent the true width of mineralization. Values may not add up due to rounding. From, to and mineralized intercepts are rounded to the nearest tenth of a meter. ERO COPPER | 50 MCSA Mining Complex | New Exploration Results – P1P2 (cont’d) Hole ID From (m) To (m) Length (m) Cu (%) FC47183 4.2 7.2 3.0 1.78 and 36.9 46.3 9.3 1.28 and 50.5 92.4 41.9 1.54 including 67.0 80.0 13.0 3.96 FC47187 4.0 9.3 5.3 1.91 and 41.3 54.0 12.7 1.06 and 133.5 137.5 4.0 0.86 FC48193 15.5 18.7 3.1 0.94 and 25.2 31.3 6.1 1.93 and 35.9 67.9 32.0 1.51 including 54.9 57.9 3.0 3.54 and 74.9 77.9 3.0 0.91 FC48195 6.0 9.0 3.0 1.52 and 14.0 17.0 3.0 0.98 and 24.6 39.6 15.0 1.40 including 30.6 33.6 3.0 2.09 and 47.6 53.6 6.0 1.16 and 95.2 100.9 5.7 1.28 Hole ID From (m) To (m) Length (m) Cu (%) FC5195 93.0 131.2 38.2 2.48 including 99.0 111.2 12.2 3.60 and 185.5 198.7 13.2 1.61 including 194.7 199.5 4.9 2.12 and 220.2 227.2 6.9 1.38 and 236.2 244.6 8.4 1.16 FC5196 53.7 59.2 5.5 1.67 and 70.0 112.8 42.8 1.82 including 98.8 103.8 5.0 3.30 and 183.2 220.2 36.9 1.35 including 200.2 206.2 6.0 2.41 and 228.6 243.9 15.3 1.04 including 240.6 243.9 3.3 2.03 As detailed on slide 16. Please refer to slide 51 for collar locations
  • 52. ERO COPPER | 51 MCSA Mining Complex | New Exploration Results – P1P2 (plan view) 100 Meters 50 FC5195 FC5196 FC47183 FC47187 FC48193 FC48195 Level Mine -90 Plan View As further detailed on slide 16. Please refer to slide 50 for assay results
  • 53. ERO COPPER | 52 MCSA Mining Complex | New Exploration Results – S10 Hole ID From (m) To (m) Length (m) Cu (%) S10 West CRS10-13 13.0 28.0 15.0 0.25 and 33.0 43.0 10.0 0.30 CRS10-14 8.0 36.0 28.0 0.42 CRS10-15 1.0 35.0 34.0 0.45 CRS10-16 77.0 131.0 54.0 0.50 including 96.0 100.0 4.0 0.97 and 189.0 199.0 10.0 0.23 FS10-04 87.7 133.5 45.8 0.47 including 100.7 113.7 13.0 0.70 and 148.9 152.9 4.0 0.32 and 181.9 200.4 18.5 0.32 FS10-05 84.7 100.6 15.9 0.34 FS10-06 205.8 240.5 34.7 0.35 and 273.2 277.2 4.0 0.70 Hole ID From (m) To (m) Length (m) Cu (%) S10 West (cont’d) FS10-07 148.0 156.3 8.3 0.72 including 153.0 156.3 3.3 1.11 FS10-08 178.9 189.5 10.7 0.50 and 203.8 208.1 4.3 0.53 and 212.8 221.0 8.1 0.70 FS10-09 174.3 199.7 25.3 0.41 FS10-10 NSI NSI NSI NSI FS10-11 77.7 82.1 4.4 0.54 FS10-12 23.1 34.9 11.8 0.48 FS10-13 110.3 158.1 47.8 0.39 FS10-14 10.4 37.0 26.6 0.50 including 23.6 32.2 8.6 0.70 FS10-15 268.7 298.1 29.4 0.46 including 316.6 336.9 20.3 0.4 FS10-18 NSI NSI NSI NSI FS10-21 NSI NSI NSI NSI 1. NSI indicates no significant intercept, based on a three meter mining width and a cut-off grade of 0.18% copper for regional exploration programs to demonstrate geological controls, irrespective of depth. Drill holes were drilled from surface. Holes not included are either pending assay results or have been included in a different section of this presentation. The length of intercept may not represent the true width of mineralization. Values may not add up due to rounding. From, To and Length are rounded to the nearest tenth of a meter. Please refer to slide 28 and 29 for collar locations
  • 54. ERO COPPER | 53 MCSA Mining Complex | New Exploration Results – S10 (cont’d) Hole ID From (m) To (m) Length (m) Cu (%) S10 East CRS10-04 0.0 7.0 7.0 0.21 CRS10-06 73.0 78.0 5.0 0.44 and 134.0 137.0 3.0 0.58 CRS10-07 146.0 156.0 10.0 0.40 CRS10-08 53.0 60.0 7.0 0.29 and 65.0 80.0 15.0 0.26 CRS10-10 NSI NSI NSI NSI CRS10-11 55.0 77.0 22.0 0.33 including 69.0 74.0 5.0 0.66 and 123.0 138.0 15.0 0.21 CRS10-12 137.0 142.0 5.0 0.30 CRS10-17 67.0 87.0 20.0 0.27 including 81.0 86.0 5.0 0.50 CRS10-18 98.0 102.0 4.0 0.31 CRS10-19 48.0 66.0 18.0 0.20 and 83.0 87.0 4.0 0.25 CRS10-20 NSI NSI NSI NSI FS10-16 NSI NSI NSI NSI FS10-17 NSI NSI NSI NSI Hole ID From (m) To (m) Length (m) Cu (%) S10 East (cont’d) FS10-19 163.8 172.8 9.0 0.27 and 187.7 190.9 3.2 0.27 S10 South CRS10-37 102.0 109.0 7.0 0.35 CRS10-38 81.0 85.0 4.0 0.27 CRS10-39 92.0 102.0 10.0 0.33 CRS10-40 NSI NSI NSI NSI CRS10-41 NSI NSI NSI NSI CRS10-42 NSI NSI NSI NSI CRS10-43 50.0 73.0 23.0 0.42 FS10-20 57.6 96.6 39.0 0.37 FS10-22 59.5 84.5 25.0 0.47 FS10-23 NSI NSI NSI NSI FS10-24 211.4 216.1 4.7 0.30 FS10-25 64.1 75.1 11.0 0.43 FS10-26 56.7 85.6 28.8 0.35 FS10-27 59.4 62.6 3.2 0.25 and 187.8 199.8 12.0 0.31 FS10-28 NSI NSI NSI NSI FS10-29 NSI NSI NSI NSI 1. NSI indicates no significant intercept, based on a three meter mining width and a cut-off grade of 0.18% copper for regional exploration programs to demonstrate geological controls, irrespective of depth. Drill holes were drilled from surface. Holes not included are either pending assay results or have been included in a different section of this presentation. The length of intercept may not represent the true width of mineralization. Values may not add up due to rounding. From, To and Length are rounded to the nearest tenth of a meter. Please refer to slide 28 and 29 for collar locations
  • 55. ERO COPPER | 54 Curaçá Valley Regional Setting | São Francisco Craton  Archean to Paleoproterozoic blocks  Paleo- to Meso-Archean (3.5-2.7 Ga) blocks: Gavião, Jequié and Serrinha  Neoarchean (2.7-2.6 Ga) arc: Itabuna-Salvador-Curaçá belt  Metamorphosed/deformed ~2.35-2.09 Ga  Peak metamorphism (D3) ~2.1 Ga: 850-900oC & >7 kbar (>30 km)  ~2.09 Ga: Mafic Jacurici complex and Itiuba syenite  ~2.05 Ga: G3 granites, pegmatites and mafic-ultramafic intrusions (orthopyroxenites) 1. Source: Teixeira et al., 2010.
  • 56. ERO COPPER | 55 MCSA Mining Complex | Reserves & Resources Category Tonnage (kt) Grade (% Cu) Contained Cu (kt) Underground Proven 9,177 1.49% 137 Probable 20,797 1.42% 296 Proven & Probable Reserves 29,974 1.44% 432 Measured 30,355 1.63% 494 Indicated 39,005 1.33% 520 Measured & Indicated Resources 69,360 1.46% 1,014 Inferred Resources 40,331 1.14% 458 Open Pit Proven 15,680 0.59% 92 Probable 13,627 0.61% 83 Proven & Probable Reserves 29,306 0.60% 175 Measured 16,777 0.61% 103 Indicated 18,563 0.56% 105 Measured & Indicated Resources 35,340 0.59% 208 Inferred Resources 3,000 0.50% 15 Total Proven 24,857 0.92% 229 Probable 34,423 1.10% 378 Proven & Probable Reserves 59,280 1.02% 607 Measured 47,132 1.27% 597 Indicated 57,568 1.08% 624 Measured & Indicated Resources 104,700 1.17% 1,221 Inferred Resources 43,331 1.09% 473 Note: Mineral resources shown inclusive of mineral reserves. Mineral resources that are not mineral reserves do not have demonstrated economic viability. Please refer to Additional Information section of this presentation for relevant technical and scientific information.
  • 57. Placeholder | Placeholder ERO COPPER | 56 A P P E N D I X B : B O A E S P E R A N Ç A
  • 58. 1. Mineralized intercepts below cut-off grade of 0.20% copper not reported. Drill holes were drilled from surface using diamond core drill rigs. The length of the intercept may not represent the true width of mineralization. Values may not add up due to rounding. From, to and mineralized intercepts are rounded to the nearest tenth of a meter. ERO COPPER | 57 Boa Esperança | New Exploration Results Hole ID From (m) To (m) Length (m) Cu (%) BSPD-170 42.7 54.7 12.0 0.22 and 68.5 76.0 7.5 0.26 and 85.0 89.5 4.5 0.33 and 107.5 116.5 9.0 0.24 and 260.6 265.1 4.5 0.39 and 324.1 350.4 26.3 0.53 including 342.2 346.8 4.6 1.34 BSPD-171 59.3 215.0 155.7 1.09 including 118.4 130.7 12.3 2.06 also including 204.1 207.8 3.7 3.63 BSPD-172 31.0 43.0 12.0 0.29 and 48.7 79.9 31.2 1.01 including 59.8 62.9 3.1 3.79 and 118.5 120.3 1.8 1.13 BSPD-173 16.5 20.2 3.7 0.21 and 28.5 38.0 9.5 0.23 and 44.5 50.3 5.8 2.27 including 47.4 49.6 2.2 5.18 and 60.0 67.0 7.0 0.23 and 79.9 121.0 41.1 0.58 including 109.0 118.5 9.5 0.88 and 307.5 318.1 10.6 0.48 and 345.8 349.5 3.7 0.67 Hole ID From (m) To (m) Length (m) Cu (%) BSPD-174 57.0 79.0 22.0 0.60 including 65.4 67.4 2.1 1.87 BSPD-176 35.5 78.3 42.8 0.31 and 119.2 132.7 13.5 0.35 and 137.9 144.1 6.2 0.43 and 201.1 204.4 3.3 0.43 and 394.5 398.0 3.5 0.96 and 403.5 410.5 7.0 0.83 and 419.0 426.5 7.5 0.73 BSPD-177 45.0 48.0 3.0 0.25 and 65.0 77.0 12.0 0.50 and 84.9 88.8 3.9 0.40 including 100.3 103.6 3.3 2.76 and 112.7 162.0 49.3 1.06 including 125.0 130.9 5.9 2.12 and 171.5 221.1 49.6 1.15 including 195.9 206.6 10.7 2.13 and 227.4 231.5 4.2 1.10 and 256.0 259.0 3.0 0.75 and 264.0 267.0 3.0 0.65 and 270.0 278.5 8.5 0.89 and 314.7 318.3 3.6 0.84 Please refer to slide 40 for collar locations
  • 59. ERO COPPER | 58 Boa Esperança | New Exploration Results (cont’d) Hole ID From (m) To (m) Length (m) Cu (%) BSPD-179 49.3 85.0 35.7 0.45 including 51.8 55.6 3.8 1.28 and 89.5 94.7 5.2 0.24 and 137.6 140.5 2.9 0.75 and 155.8 158.5 2.6 1.74 and 215.7 238.8 23.1 0.51 including 230.2 237.8 7.7 0.83 and 258.1 262.1 4.0 0.84 and 318.0 342.6 24.6 0.80 including 318.0 323.0 5.0 2.37 BSPD-182 14.0 20.0 6.0 1.18 and 31.0 34.5 3.5 0.46 and 39.5 47.0 7.5 0.36 and 59.5 77.0 17.5 0.25 and 90.7 146.0 55.4 0.55 including 110.7 125.0 14.3 1.17 also including 110.7 114.1 3.4 3.42 and 161.4 180.3 18.9 0.43 and 188.0 210.5 22.5 0.35 and 256.0 259.1 3.1 1.09 Hole ID From (m) To (m) Length (m) Cu (%) BSPD-183 9.5 18.5 9.0 0.92 and 22.5 26.6 4.1 0.53 and 46.5 52.8 6.3 0.31 and 58.5 70.5 12.0 0.66 and 96.5 112.8 16.3 0.61 including 97.8 101.0 3.3 1.66 and 119.6 128.6 9.0 0.23 and 162.0 168.0 6.0 0.29 and 172.5 179.0 6.5 0.23 and 204.3 207.5 3.2 0.54 BSPD-185 15.0 43.5 28.5 0.56 including 28.5 38.0 9.5 1.11 and 81.2 85.0 3.8 0.29 and 105.5 119.0 13.6 0.53 and 136.7 186.5 49.9 0.39 and 190.0 193.5 3.4 0.38 and 196.1 202.0 5.9 0.85 and 213.2 236.4 23.2 0.55 including 230.4 235.0 4.6 1.25 and 243.0 253.0 10.0 0.41 1. Mineralized intercepts below cut-off grade of 0.20% copper not reported. Drill holes were drilled from surface using diamond core drill rigs. The length of the intercept may not represent the true width of mineralization. Values may not add up due to rounding. From, to and mineralized intercepts are rounded to the nearest tenth of a meter. Please refer to slide 40 for collar locations
  • 60. ERO COPPER | 59 Boa Esperança | New Exploration Results (cont’d) Hole ID From (m) To (m) Length (m) Cu (%) BSPD-186 118.6 123.8 5.3 1.10 and 173.9 177.0 3.1 0.37 and 248.0 252.0 4.0 1.60 and 270.6 273.2 2.6 2.53 and 312.0 349.3 37.3 1.22 including 313.5 319.2 5.6 2.80 BSPD-190 151.0 154.2 3.2 0.47 and 223.3 227.0 3.8 0.83 and 249.9 256.1 6.3 0.60 BSPD-192 84.2 98.9 14.7 0.37 and 153.9 159.4 5.6 0.53 and 244.5 261.7 17.2 1.87 including 254.9 259.0 4.2 2.60 and 266.9 272.7 5.8 0.83 BSPD-208 96.2 101.0 4.8 0.77 and 108.9 112.0 3.1 0.88 and 212.4 224.9 12.6 1.30 and 328.9 339.6 10.7 1.32 1. Holes BSPD-169 and BSPD-175 were partially released in the press release dated September 28, 2021. Intercepts shown on this slide represent new intercepts that we previously pending results. 2. Mineralized intercepts below cut-off grade of 0.20% copper not reported. Drill holes were drilled from surface using diamond core drill rigs. The length of the intercept may not represent the true width of mineralization. Values may not add up due to rounding. From, to and mineralized intercepts are rounded to the nearest tenth of a meter. Hole ID From (m) To (m) Length (m) Cu (%) Previously Released Holes (new assay results that were previously pending)(1) BSPD-169 117.9 120.7 2.8 0.8 and 167.0 176.0 9.0 0.5 and 213.5 224.8 11.3 0.8 BSPD-175 105.6 115.3 9.7 0.4 and 211.6 217.1 5.5 0.4 Please refer to slide 40 for collar locations
  • 61. ERO COPPER | 60 Boa Esperanҫa | Reserves & Resources Category Tonnage (kt) Grade (% Cu) Contained Cu (kt) Reserves Boa Esperanҫa Proven 30,674 0.89% 273 Probable 12,378 0.67% 83 Total Proven & Probable 43,052 0.83% 357 Resources (Inclusive of Reserves) Open Pit - High Grade Measured 7,117 2.16% 154 Indicated 1,661 2.27% 38 Measured & Indicated 8,778 2.18% 191 Inferred 40 2.69% 1 Open Pit - Low Grade Measured 25,476 0.60% 152 Indicated 13,433 0.51% 68 Measured & Indicated 38,909 0.57% 220 Inferred 514 0.49% 3 Underground - High Grade Measured 0 0.00% 0 Indicated 0 0.00% 0 Measured & Indicated 0 0.00% 0 Inferred 1,354 2.24% 30 Underground - Low Grade Measured 0 0.00% 0 Indicated 0 0.00% 0 Measured & Indicated 0 0.00% 0 Inferred 9,681 0.60% 58 Total Measured 32,593 0.94% 306 Indicated 15,095 0.70% 106 Measured & Indicated 47,687 0.86% 412 Inferred 11,590 0.80% 92 Note: Mineral reserves and resources as outlined in the Boa Esperança Technical Report. Mineral resources shown inclusive of mineral reserves. Mineral resources that are not mineral reserves do not have demonstrated economic viability. Please refer to Additional Information section of this presentation for relevant technical and scientific information.
  • 62. Placeholder | Placeholder ERO COPPER | 61 A P P E N D I X C : N X G O L D M I N E
  • 63. 1. Drill holes were drilled from surface. The length of intercept may not represent the true width of mineralization and reported intercepts reflect the entire thickness of the vein. Values may not add up due to rounding. From, to and mineralized intercepts are rounded to the nearest tenth of a meter. ERO COPPER | 62 NX Gold | New Exploration Results Hole ID From (m) To (m) Length (m) Au (gpt) San Antonio Extension to Depth SA104A 926.6 933.1 6.5 19.74 SA104B 943.0 946.8 3.8 19.27 SA108 655.1 656.0 0.9 2.58 Matinha Upper Vein MAT30 576.3 581.1 4.8 5.91 MAT31 630.0 633.5 3.5 7.06 MAT33 711.5 718.3 6.8 2.43 including 711.5 712.5 1.0 11.03 MAT34 499.7 502.5 2.8 6.97 MAT37 523.8 526.3 2.5 5.66 MAT43 490.1 493.0 2.9 59.06 Please refer to slide 44 for collar locations
  • 64. ERO COPPER | 63 NX Gold | Reserves & Resources Tonnage Grade Contained Au (kt) (gpt Au) (koz) Reserves Santo Antonio Vein Probable 958 9.01 277 Matinha Vein Probable 146 6.26 29 Total Probable 1,104 8.64 307 Resources (Inclusive of Reserves) Santo Antonio Vein Indicated 950 10.56 322 Inferred 248 2.99 24 Matinha Vein Indicated 124 8.55 34 Inferred 310 10.47 104 Other Indicated 7 3.36 1 Inferred 157 4.71 24 Indicated 1,081 10.28 357 Inferred 714 6.61 152 Category Total Note: Mineral resources shown inclusive of mineral reserves. Mineral resources that are not mineral reserves do not have demonstrated economic viability. Please refer to Additional Information section of this presentation for relevant technical and scientific information.
  • 65. Placeholder | Placeholder ERO COPPER | 64 A P P E N D I X D : A D D I T I O N A L I N F O R M A T I O N
  • 66. ERO COPPER | 65 Additional Information Curaça Valley Mineral Reserves Notes: 1. Effective Date of September 30, 2021. 2. Mineral reserves included within stated mineral resources. All figures have been rounded to reflect the relative accuracy of the estimates. Summed amounts may not add due to rounding. 3. The mineral reserve estimates are prepared in accordance with the CIM Definition Standards for mineral resources and mineral reserves, adopted by the CIM Council on May 10, 2014 (the “CIM Standards”), and the CIM Estimation of mineral resources and mineral reserves Best Practice Guidelines, using geostatistical and/or classical methods, plus economic and mining parameters appropriate for the deposit. Mineral reserves are based on a long-term copper price of US$2.75 per pound (“lb”), and a USD:BRL foreign exchange rate of 5.23. Mineral reserves are the economic portion of the measured and indicated mineral resources. Mining dilution and recovery factors vary for specific reserve sources and are influenced by factors such as deposit type, deposit shape, stope orientation and selected mining method. 4. A low-grade envelope using a cut-off grade of 0.20% copper for underground deposits was used to develop a dilution envelope and development block model that was included to define the grade of blocks within the dilution envelope in the planning and design of stopes within the mineral resources and mineral reserve estimate. Curaça Valley Mineral Resources Notes: 1. Effective Date of September 30, 2021. 2. Mineral resources have been constrained within newly developed 3D lithology models applying a 0.45% and 0.20% copper grade envelope for high and marginal grade, respectively. Within these envelopes, mineral resources for underground deposits are constrained using varying stope dimensions of up to 20m by 10m by 35m applying a 0.51% copper cut-off grade, as well as a 0.32% copper marginal cut-off grade for underground deposits. 3. A low-grade envelope using a cut-off grade of 0.20% copper for underground deposits was used to develop a dilution envelope and development block model that was included to define the grade of blocks within the dilution envelope in the planning and design of stopes within the mineral resources and mineral reserve estimate. 4. Mineral resources have been constrained within newly developed 3D lithology models using a 0.21% copper cut-off grade for open pit deposits. 5. Mineral resources estimated by ordinary kriging inside 5m by 5m by 5m blocks. NX Gold Mineral Reserves Notes: 1. Effective Date of September 30, 2021. 2. Mineral reserves included within stated mineral resources. All figures have been rounded to the relative accuracy of the estimates. Summed amounts may not add due to rounding. 3. The mineral reserve estimates are prepared in accordance with the CIM Standards and the CIM Guidelines, using geostatistical and/or classical methods, plus economic and mining parameters appropriate for the deposit. Mineral reserves are based on a long-term gold price of US$1,650 per ounce (“oz”), and a USD:BRL foreign exchange rate of 5.00. Mineral reserves are the economic portion of the Indicated mineral resources. Mineral reserve estimates include operational dilution of 17.4% plus planned dilution of approximately 8.5% within each stope for room-and-pillar mining areas and operational dilution of 3.2% plus planned dilution of 21.2% for cut-and-fill mining areas. Assumes mining recovery of 92.5% and 94.7% for room-and-pillar and cut-and-fill areas, respectively. Practical mining shapes (wireframes) are designed using geological wireframes / mineral resource block models as a guide. NX Gold Mineral Resources Notes: 1. Effective Date of September 30, 2021. 2. Presented mineral resources inclusive of mineral reserves. Indicated mineral resource totals are undiluted. All figures have been rounded to the relative accuracy of the estimates. Summed amounts may not add due to rounding. 3. Mineral resources are estimated using ordinary kriging within 2.5 meter by 2.5 meter by 0.5 meter block size. 4. Mineral resource are constrained using a minimum stope dimension of 2.0 meters by 2.0 meters by 1.5 meters and a cut-off of 1.90 gpt based on gold price of US$1,900 per ounce of gold. 5. The mineral resource estimates are prepared in accordance with the CIM Standards and the CIM Guidelines, using geostatistical and/or classical methods, plus economic and mining parameters appropriate for the deposit.
  • 67. ERO COPPER | 66 Additional Information (cont’d) Boa Esperança Mineral Reserves Notes: 1. Effective Date of August 31, 2021. 2. Stated mineral resources are inclusive of mineral reserves. All figures have been rounded to the relative accuracy of the estimates. Summed amounts may not add due to rounding. High-grade and low-grade mineral resources defined as greater than or equal to 1.00% copper and less than 1.00% copper, respectively. 3. A 3D geologic model was developed for the Boa Esperança Project. Geologically constrained copper grade shells are developed using a copper cut-off grade of 0.20% and 0.51% for pit constrained and unconstrained mineral resources, respectively, to generate a 3D mineralization model of the Boa Esperança Project. Within grade shells, mineral resources are estimated using ordinary kriging within a 2.0 meter by 2.0 meter by 4.0 meter block size. Open pit constrained, unconstrained and marginal cut-off grades are based upon a copper price of US$6,400 per tonne with cost parameters appropriate to the deposit. The mineral resource estimates are prepared in accordance with the Canadian Institute of Mining, Metallurgy and Petroleum (“CIM”) Definition Standards for Mineral Resources and Mineral Reserves, adopted by the CIM Council on May 10, 2014 (the “CIM Standards”), and the CIM Estimation of Mineral Resources and Mineral Reserves Best Practice Guidelines, adopted by CIM Council on November 29, 2019 (the ‘CIM Guidelines”), using geostatistical and/or classical methods, plus economic and mining parameters appropriate to the deposit. 4. Mineral reserve estimates are prepared in accordance with the CIM Standards and the CIM Guidelines, using geostatistical and/or classical methods, plus economic and mining parameters appropriate for the deposit. Mineral reserves are based on a long-term copper price of US$6,613 per tonne; concentrate grade of 27% copper; average metallurgical recoveries of 91.3%; copper concentrate logistics costs of US$108.20 per wet metric tonne ("wmt"); transport losses of 0.2%; copper concentrate treatment charges of US$59.50 per dry metric tonne ("dmt"), refining charges of U$0.0595 per pound of copper; copper payability of 96.3%; average mining cost of US$2.47 per tonne mined; processing cost of US$7.74 per tonne processed and G&A costs of US$3.83 per tonne processed; average pit slope angles that range from 30º for saprolite to 50º for fresh rock and a 2% CFEM government royalty. 5. Mineral reserves are classified according to the CIM Standards and the CIM Guidelines by Mr. Carlos Guzman, RM CMC (0119) and FAusIMM (229036), an employee of NCL Ingenieria y Construcion SpA ("NCL") and an independent qualified person as such term is defined under NI 43-101. NCL is independent of the Company. Please refer to the Boa Esperança Technical Report for additional technical information. Boa Esperança Mineral Resources Notes: 1. Effective Date of August 31, 2021. 2. Presented Mineral Resources inclusive of Mineral Reserves. Summed amounts may not add due to rounding. High-grade and low-grade mineral resources defined as greater than or equal to 1.00% copper and less than 1.00% copper, respectively. 3. A 3D geologic model was developed for the Project. Geologically constrained grade shells were developed using various copper cut-off grades to generate a 3D mineralization model of the Project. Within the grade shells, mineral resources were estimated using ordinary kriging within a 2.0 meter by 2.0 meter by 4.0 meter block size. Within the optimized resource open pit limits, a cut-off grade of 0.20% copper was applied based upon a copper price of US$6,400 per tonne, net smelter return ("NSR") of 94.53%, average metallurgical recoveries of 90.7%, mining recovery of 95.0%, dilution of 5.0%, mining costs of US$3.10 per tonne mined run of mine ("ROM"), processing and transportation costs of US$5.65 per tonne ROM, and G&A costs of US$2.66 per tonne ROM. Unconstrained inferred mineral resources have been stated at a cut-off grade of 0.51% copper with a marginal cut-off grade of 0.32% copper based upon a copper price of US$6,400 per tonne, NSR of 94.53%, mining recovery of 100%, average metallurgical recoveries of 90.7%, mining costs of US$14.71 per tonne ROM, processing and transportation costs of US$5.70 per tonne ROM, and G&A costs of US$2.60 per tonne ROM. 4. Block model tonnage and grade estimates for the Project were classified according to the CIM Standards and the CIM Guidelines by Mr. Emerson Ricardo Re, RM CMC (0138) and MAusIMM (CP) (305892), an employee of Ero Copper Corp. and a qualified person as such term is defined under NI 43-101. Please refer to the Boa Esperança Technical Report for additional technical information.