4. Referent
Adrian Pflieger
CEO BPA GmbH / Germany
Date of Birth: June 1970
Place of Birth: Stuttgart / Germany
Higher Education
Karlsruhe: Dipl.‐Ing.
Biberach: Dipl.‐Wirtsch.‐Ing.
1997: Züblin AG – Site Engineer
1998: Founding BPA GmbH in Germany
1998: Founding CEMproof AG in Switzerland
2004 – 2012 Lecturer at the University of Applied Science in
Karlsruhe / Germany
Expert in Design for Protection and Rehabilitation of
Concrete Structures WTA / TAE
Collaboration in several Committees (national/international)
Author of several technical Statements
Speaker of several technical Seminars
„If you think about the cost too late, you
ruin your company,
If you think about the cost too early, you
kill creativity!“
a.pflieger@bpa‐waterproofing.com
5. a.pflieger@bpa‐waterproofing.com
BPA-GmbH
Manufacturer of high-quality sealing systems
• Founded: 1998
• Location: Herrenberg / Germany
• DIN EN ISO 9001:2015
• Manufacturing Locations in Germany and
Switzerland
• All products are certified and approved
(abP Public Test Approval / CE‐Marks / Ü‐Marks)
•Member:
37. Self‐healing technology DualProof S, SilverSeal, EasySeal
EasySeal is a
PP-fleece / PP-non-woven,
treated with SAP / LDP polymer with
unique self healing properties. The
polymer with SAP / LDP mixture with
swelling, hydrophilic polyacrylates
secure the integrity of the system in
the case that the regular membrane is
damaged during installation.
Penetrating water causes the
polyacrylates to swell and makes the
whole system impermeable. The
building structure is permanently
protected against penetrating water,
even small cracks and voids in the
concrete are sealed.
45. Recap
BS 8102:2009 / EN 13967 / DIN SPEC 20000 - 202
• Client’s Requirements
• Desk Studies
• Design Team
On-Site Considerations
• Applicators of waterproofing materials should be suitably trained. -Certification
• Products should conform to relevant standards. -Membrane Thickness, Concrete …
• Manufacturer’s installation instructions should be followed at all times.
• A suitable water management system should installed to provided a dry site until all
detailing is completed, all membranes are placed and all concrete is placed and cured.