© 2013 Cairn India Limited
RJ-ON-90/1
Bhagyam Operations Overview
© 2013 Cairn India Limited 2
Aishwariya
Bhagyam Well Pads
Export Oil Pipeline
Rajasthan Integrated Development Overview
Raageshwari Gas Terminal (RGT) &
Well Pads
Thumbli Water Field
Mangala Process Terminal (MPT) & Well pads
Barmer .
Guda Malani .
© 2013 Cairn India Limited 3
 Cumulative oil Production : 20.1 Million BBLs.
 Water Injection cumulative has crossed: 32 M BBls
 Crossed 3.1 million LTI free Man-hours of operation
 870 days LTI free operation since commissioning
 Green belt development- 8000 saplings planted this year
Production and HSE highlights.
© 2013 Cairn India Limited 4
Well Pad Clusters
BWP-04 BWP-05 BWP-06 BWP-07 BWP-10 BWP-03 BWP-13 BWP-02 BWP-14 BWP-08 BWP-11
PW-09 PW-02 PW-13 PW-02 PW-03 PW-16 PW-12 PW-05 PW-07 PW-01 PW-01
IW-01 IW-02 IW-01 IW-02 IW-03 IW-01 IW-00 IW-03 IW-00 IW-02 IW-02
IW-06
Cluster-A Cluster-B Cluster-C
BWP-15
PW-03
BWP-01
PW-08
IW-01
BWP-09
PW-08
IW-00
BWP-12
PW-06
IW-02
© 2013 Cairn India Limited 5
MPP Pumps
CAPACITY ( Liquid/Gas) : 55000 BPD/ 1.466 Mmscfd
SUCTION PRESSURE : 5.5 Bar
DISCHARGE PRESSURE : 16.8 Bar
© 2013 Cairn India Limited 6
Water Injection Flowlines
BWP04 BWP06
PW-09 PW-13
IW-02 IW-01
BWP13 BWP03 BWP10 BWP12 8" BWP07 BWP05
PW-16 PW-09 PW-03 PW-06 10" PW-02 PW-02
IW-00 IW-01 IW-00 IW-02 IW-02 IW-02
6" 6" 10" 6" 8"
CORRIDOR-A (18")
24"
CORRIDOR-B(18")
10" 10" 6" 6" 10"
BWP01 BWP02 BWP14 BWP09 BWP11 BWP8N
PW-08 PW-05 PW-02 PW-03 PW-01 PW-01
IW-01 IW-03 IW-00 IW-00 IW-02 IW-02
WATER INJECTION LINES SCHEMATIC
MPT
GATHERING PAD
BWP-15
PW-03
IW-03
© 2013 Cairn India Limited 7
Wells Status
Producers:
 Total Wells : 94
 PCP Wells : 84
 Jet Pumps : 10
Injectors:
 Total Wells: 28
© 2013 Cairn India Limited 8
BHAGYAM WELL COMPLETION
Wellhead
 Suspension of Casing & Tubing
 Flanging of Fluid Flow device/ X-mas Tree
 Hydraulic communication with annulus
X-Mas Tree
 A system of valves that control physical or
hydraulic access into the tubing string or
annulus “A”
© 2013 Cairn India Limited 9
Christmas Tree
 The PCP Christmas tree assembly
comprises of Master valve, BOP, kill
wing valve and Drive head on top.
 At the bottom we have tubing hanger
which has got chemical injection
connection and down hole gauge cable
running up to the downhole.
 The wing XSV is installed for the slam
shut of the flow arm in case of trip
scenario.
© 2013 Cairn India Limited 10
Key Consideration for Safety
 Fire & Gas detection Facilities at Field
 Building Fire & Gas detection & suppression system
 Manual Call Points
 PAGA System
 Access Control
 CCTV Coverage
 Dedicated Fire Tender with Crew
 First Aid centre with dedicated Ambulance
 PTW System in Place
 Oil Spill response Facilities
 IRC & ERT for Emergency Management
© 2013 Cairn India Limited 11
BHAGYAM WELL COMPLETION
Casing
 Hole stabilization
 Protection of fresh water
 Zonal Isolation
 Prevent water migration to producing zones
 Confine production to the wellbore
 Isolate over-pressured and under-pressured formation
Casing Types:
Casing Type Oil Well Injection Well
Conductor Casing
13 3/8" 9 5/8"
Surface Casing 9 5/8" 7"
Production Casing
7" 4 1/2"
© 2013 Cairn India Limited 12
© 2013 Cairn India Limited 13
© 2013 Cairn India Limited 14
PCP (Progressive Cavity Pump)
PCP: A Progressive cavity pump is a type of positive displacement pump
and is also known as a progressing cavity pump, eccentric screw
pump or cavity pump.
PC Pumping Systems typically consist of the following components:
 Surface Equipment
Drive head assembly
VFD (Variable Frequency Drive)
Down hole gauge Panel (Geophysical Research Company)
BOP (Blow Out Preventer), Flow Tee – Kombi Tree
 Down hole equipment
Stator (Stationary with tubing)
Rotor (Internal & Rotary with drive rods)
© 2013 Cairn India Limited 15
15
PCP System Configuration
Standard Components
Downhole Equipment
Belts & Sheaves
Surface Drive
Stuffing Box
Pumping Tee
Electric Motor
Polished Rod
Sucker Rods
w/ Couplings
Surface Equipment
PC Pump Stator
PC Pump Rotor
No-Turn Tool
Tubing String
Tagbar
Sucker Rods
w/ Couplings
© 2013 Cairn India Limited 16
Polish Rod and Clamp arrangement
 The entire series of Polish rod,
Sucker rod and Rotor is
suspended in the downhole
through the Polish rod clamp.
 Sucker rods transfers the power
from the prime mover ( Motor )
to Rotor.
© 2013 Cairn India Limited 17
17
PC Pumping System
PCP Systems typically consist of a surface drive, a sucker
rod string, a production tubing string and, of course, the
downhole Progressing Cavity Pump.
The pump comprises two key elements:
A single helical-shaped ROTOR that turns inside a double
helical elastomer-lined STATOR
In most cases, the stator is attached to the bottom of a
production tubing string and the rotor is attached to a
drive string that is suspended and rotated by the surface
drive.
© 2013 Cairn India Limited 18
18
Progressing Cavity Pump
General Features
 Classified as a single rotor, internal helical gear,
positive displacement pump
 Consists in two key components:
 Rotor:
 Is a high strength steel component externally
machined as a helix of “n” lobes and coated with
chrome or an alternative hard material.
 Only moving part.
 Stator:
 Generally made with elastomer (or rubber) with
and internal shape as an helix of “n+1” lobes.
This rubber body is bonded to the interior of a
steel tube.
 Stationary piece.
© 2013 Cairn India Limited 19
VFD & GRC Panel
 VFD , variable frequency drive is a
device which is used to control the
speed by adjusting frequency of the
motor input power supply.
 The LCD screen display’s the
parameters related to Motor i.e.
frequency, current, avg voltage etc.
 The Down hole gauge (GRC) panel is
installed to monitor the well downhole
parameters like Pump intake/discharge
temperature & Pressure locally.
Supplied by Unico
© 2013 Cairn India Limited 20
Kombi-Tee Functions
 Provides a solid platform to mount
the PCP Drivehead
 Side ports direct the well
production down the flow line
 BOP seals off wellbore to allow
servicing of the surface equipment
 Polish Rod Clamp suspends the rod
string and resists torque, allowing
for safe maintenance and easier
removal and installation of the
Drivehead
 By applying 500 ft-lbs of torque to
the lock out rams, they will
suspend ≥39000 lbs of axial load and
resist ≥1000 ft-lbs of torque
© 2013 Cairn India Limited 21
Jet Pumps
• The actual working components of the jet pump are the nozzle,
throat and diffuser.
• These components are assembled in a variety of configurations
and materials to suit the production requirements and downhole
environment.
How the Jet Pump Works
• Power fluid at high pressure (low velocity) is converted to a low-
pressure (high velocity) jet by the nozzle.
• The pressure at the entrance of the throat becomes lower as
the power fluid rate is increased. Due to this lower pressure,
fluid is drawn in from the wellbore.
• The suction fluid becomes entrained with the high velocity jet
and the pumping action then begins.
• After mixing in the throat, the combined power fluid and suction
fluid is slowed down by the diffuser. Because the velocity is
reduced, the pressure increases – rising to a value sufficient to
pump the fluid to the surface.
A full range of nozzle and throat sizes are available to allow power
fluid rate and pressure to be varied to meet various requirements.
© 2013 Cairn India Limited 22
Thank You

More Related Content

What's hot

Well completion equipment 2. landing nipples
Well completion equipment  2. landing nipplesWell completion equipment  2. landing nipples
Well completion equipment 2. landing nipplesElsayed Amer
 
Scsssv surface control subsurface safety valve
Scsssv surface control subsurface safety valveScsssv surface control subsurface safety valve
Scsssv surface control subsurface safety valveElsayed Amer
 
Completion equipment packer part #1
Completion equipment packer part #1Completion equipment packer part #1
Completion equipment packer part #1Elsayed Amer
 
02 wireline
02 wireline02 wireline
02 wirelineJohan RC
 
Artificial lift methods in production
Artificial lift methods in productionArtificial lift methods in production
Artificial lift methods in productionFarida Ismayilova
 
Operation of Centrifugal Pumps
Operation of Centrifugal PumpsOperation of Centrifugal Pumps
Operation of Centrifugal PumpsSahyog Shishodia
 
Valves operation and functions complete guide
Valves operation and functions complete guideValves operation and functions complete guide
Valves operation and functions complete guideElsayed Amer
 
Completion equipment part 1
Completion equipment part 1Completion equipment part 1
Completion equipment part 1Elsayed Amer
 
Well Completion Design.pdf
Well Completion Design.pdfWell Completion Design.pdf
Well Completion Design.pdfmmody4
 
Life Cycle of Oil & Gas Wells
Life Cycle of Oil & Gas WellsLife Cycle of Oil & Gas Wells
Life Cycle of Oil & Gas WellsMohamed Elnagar
 
Mechanical Valve
Mechanical ValveMechanical Valve
Mechanical ValveNathan
 
psv and pvrvdesign calculation.ppt
psv and pvrvdesign calculation.pptpsv and pvrvdesign calculation.ppt
psv and pvrvdesign calculation.pptssuser73bb74
 
introduction to completions and workovers (2)
introduction to completions and workovers (2)introduction to completions and workovers (2)
introduction to completions and workovers (2)Dr. Arzu Javadova
 

What's hot (20)

Well completion equipment 2. landing nipples
Well completion equipment  2. landing nipplesWell completion equipment  2. landing nipples
Well completion equipment 2. landing nipples
 
Scsssv surface control subsurface safety valve
Scsssv surface control subsurface safety valveScsssv surface control subsurface safety valve
Scsssv surface control subsurface safety valve
 
Completion equipment packer part #1
Completion equipment packer part #1Completion equipment packer part #1
Completion equipment packer part #1
 
02 wireline
02 wireline02 wireline
02 wireline
 
Artificial lift methods in production
Artificial lift methods in productionArtificial lift methods in production
Artificial lift methods in production
 
Wellhead
WellheadWellhead
Wellhead
 
Coiled tubing Equipments .pdf
Coiled tubing Equipments .pdfCoiled tubing Equipments .pdf
Coiled tubing Equipments .pdf
 
04 gas lift_equipment
04 gas lift_equipment04 gas lift_equipment
04 gas lift_equipment
 
Operation of Centrifugal Pumps
Operation of Centrifugal PumpsOperation of Centrifugal Pumps
Operation of Centrifugal Pumps
 
Well Control
Well ControlWell Control
Well Control
 
Valves operation and functions complete guide
Valves operation and functions complete guideValves operation and functions complete guide
Valves operation and functions complete guide
 
Bfwp
BfwpBfwp
Bfwp
 
2.1 rig types
2.1 rig types2.1 rig types
2.1 rig types
 
Completion equipment part 1
Completion equipment part 1Completion equipment part 1
Completion equipment part 1
 
Well Completion Design.pdf
Well Completion Design.pdfWell Completion Design.pdf
Well Completion Design.pdf
 
Life Cycle of Oil & Gas Wells
Life Cycle of Oil & Gas WellsLife Cycle of Oil & Gas Wells
Life Cycle of Oil & Gas Wells
 
Mechanical Valve
Mechanical ValveMechanical Valve
Mechanical Valve
 
psv and pvrvdesign calculation.ppt
psv and pvrvdesign calculation.pptpsv and pvrvdesign calculation.ppt
psv and pvrvdesign calculation.ppt
 
Well Workover
Well Workover Well Workover
Well Workover
 
introduction to completions and workovers (2)
introduction to completions and workovers (2)introduction to completions and workovers (2)
introduction to completions and workovers (2)
 

Viewers also liked

safety engineering in process plants module 2
 safety engineering in process plants module 2 safety engineering in process plants module 2
safety engineering in process plants module 2Afsal Ameen c
 
Loss Prevention Best Practices
Loss Prevention Best PracticesLoss Prevention Best Practices
Loss Prevention Best PracticesPayton Burger
 
Road Safety Data Integration using FME
Road Safety Data Integration using FMERoad Safety Data Integration using FME
Road Safety Data Integration using FMESafe Software
 
Masters in Industrial Safety Engineering (Tamilnadu Colleges)
Masters in Industrial Safety Engineering (Tamilnadu Colleges)Masters in Industrial Safety Engineering (Tamilnadu Colleges)
Masters in Industrial Safety Engineering (Tamilnadu Colleges)Sheik Alavudeen
 
D11 2 safety_data_sheets-final-web
D11 2 safety_data_sheets-final-webD11 2 safety_data_sheets-final-web
D11 2 safety_data_sheets-final-webDir Jan
 
Complying with New Functional Safety Standards
Complying with New Functional Safety StandardsComplying with New Functional Safety Standards
Complying with New Functional Safety StandardsDesign World
 
Safety Engineering - Compilation of Reports
Safety Engineering - Compilation of ReportsSafety Engineering - Compilation of Reports
Safety Engineering - Compilation of ReportsJahh Lavz
 
History of Process Safety in AIChE
History of Process Safety in AIChEHistory of Process Safety in AIChE
History of Process Safety in AIChEDIv CHAS
 
Fault tree and event tree in risk analysis
Fault tree and event tree in risk analysisFault tree and event tree in risk analysis
Fault tree and event tree in risk analysisJennifer Gutierrez
 
Road Safety Engineering
Road Safety EngineeringRoad Safety Engineering
Road Safety EngineeringAshish Parihar
 
Fault tree analysis
Fault tree analysisFault tree analysis
Fault tree analysiselsonpaul11
 
FAULT & EVENT TREE ANALYSIS
FAULT & EVENT TREE ANALYSISFAULT & EVENT TREE ANALYSIS
FAULT & EVENT TREE ANALYSISNitesh Dongare
 
FAULT TREE ANALYSIS (FTA) SEMINAR PRESENTATION
FAULT TREE ANALYSIS (FTA) SEMINAR PRESENTATIONFAULT TREE ANALYSIS (FTA) SEMINAR PRESENTATION
FAULT TREE ANALYSIS (FTA) SEMINAR PRESENTATIONOrange Slides
 
Realize Accelerated Savings Through Effective Category Management + Supplier ...
Realize Accelerated Savings Through Effective Category Management + Supplier ...Realize Accelerated Savings Through Effective Category Management + Supplier ...
Realize Accelerated Savings Through Effective Category Management + Supplier ...SAP Ariba
 

Viewers also liked (17)

safety engineering in process plants module 2
 safety engineering in process plants module 2 safety engineering in process plants module 2
safety engineering in process plants module 2
 
SAFETY ENGINEERING AND ECONOMICS
SAFETY ENGINEERING AND ECONOMICSSAFETY ENGINEERING AND ECONOMICS
SAFETY ENGINEERING AND ECONOMICS
 
Loss Prevention Best Practices
Loss Prevention Best PracticesLoss Prevention Best Practices
Loss Prevention Best Practices
 
Road Safety Data Integration using FME
Road Safety Data Integration using FMERoad Safety Data Integration using FME
Road Safety Data Integration using FME
 
Masters in Industrial Safety Engineering (Tamilnadu Colleges)
Masters in Industrial Safety Engineering (Tamilnadu Colleges)Masters in Industrial Safety Engineering (Tamilnadu Colleges)
Masters in Industrial Safety Engineering (Tamilnadu Colleges)
 
Milk Powder Combustible Dust Hazards
Milk Powder Combustible Dust HazardsMilk Powder Combustible Dust Hazards
Milk Powder Combustible Dust Hazards
 
D11 2 safety_data_sheets-final-web
D11 2 safety_data_sheets-final-webD11 2 safety_data_sheets-final-web
D11 2 safety_data_sheets-final-web
 
Complying with New Functional Safety Standards
Complying with New Functional Safety StandardsComplying with New Functional Safety Standards
Complying with New Functional Safety Standards
 
Safety Engineering - Compilation of Reports
Safety Engineering - Compilation of ReportsSafety Engineering - Compilation of Reports
Safety Engineering - Compilation of Reports
 
History of Process Safety in AIChE
History of Process Safety in AIChEHistory of Process Safety in AIChE
History of Process Safety in AIChE
 
Fault tree and event tree in risk analysis
Fault tree and event tree in risk analysisFault tree and event tree in risk analysis
Fault tree and event tree in risk analysis
 
Road Safety Engineering
Road Safety EngineeringRoad Safety Engineering
Road Safety Engineering
 
Fault tree analysis
Fault tree analysisFault tree analysis
Fault tree analysis
 
FAULT & EVENT TREE ANALYSIS
FAULT & EVENT TREE ANALYSISFAULT & EVENT TREE ANALYSIS
FAULT & EVENT TREE ANALYSIS
 
FAULT TREE ANALYSIS (FTA) SEMINAR PRESENTATION
FAULT TREE ANALYSIS (FTA) SEMINAR PRESENTATIONFAULT TREE ANALYSIS (FTA) SEMINAR PRESENTATION
FAULT TREE ANALYSIS (FTA) SEMINAR PRESENTATION
 
GHS presentation
GHS presentationGHS presentation
GHS presentation
 
Realize Accelerated Savings Through Effective Category Management + Supplier ...
Realize Accelerated Savings Through Effective Category Management + Supplier ...Realize Accelerated Savings Through Effective Category Management + Supplier ...
Realize Accelerated Savings Through Effective Category Management + Supplier ...
 

Similar to well pad operations - PCP

Leveraging Technology For Maintenance Excellence
Leveraging Technology For Maintenance ExcellenceLeveraging Technology For Maintenance Excellence
Leveraging Technology For Maintenance ExcellenceSwapnil Sharma
 
Don-Nan Rod Lift Brochure
Don-Nan Rod Lift BrochureDon-Nan Rod Lift Brochure
Don-Nan Rod Lift BrochureTyler Fowler
 
2006 pontiac gto service repair manual
2006 pontiac gto service repair manual2006 pontiac gto service repair manual
2006 pontiac gto service repair manualfjseedcxkmdmme
 
2004 Pontiac GTO Service Repair Manual
2004 Pontiac GTO Service Repair Manual2004 Pontiac GTO Service Repair Manual
2004 Pontiac GTO Service Repair Manualhjsnekmde
 
2005 pontiac gto service repair manual
2005 pontiac gto service repair manual2005 pontiac gto service repair manual
2005 pontiac gto service repair manualfsjekdmemmd
 
2006 pontiac gto service repair manual
2006 pontiac gto service repair manual2006 pontiac gto service repair manual
2006 pontiac gto service repair manualfjskedmmem
 
2004 pontiac gto service repair manual
2004 pontiac gto service repair manual2004 pontiac gto service repair manual
2004 pontiac gto service repair manualfjkskemmdmm
 
Escavadeira hidraulica cat 390 dl
Escavadeira hidraulica cat 390 dlEscavadeira hidraulica cat 390 dl
Escavadeira hidraulica cat 390 dl85283081
 
2005 Pontiac GTO Service Repair Manual.pdf
2005 Pontiac GTO Service Repair Manual.pdf2005 Pontiac GTO Service Repair Manual.pdf
2005 Pontiac GTO Service Repair Manual.pdfrte638359
 
2005 Pontiac GTO Service Repair Manual.pdf
2005 Pontiac GTO Service Repair Manual.pdf2005 Pontiac GTO Service Repair Manual.pdf
2005 Pontiac GTO Service Repair Manual.pdfkm7seyduh7dw
 
2006 Pontiac GTO Service Repair Manual.pdf
2006 Pontiac GTO Service Repair Manual.pdf2006 Pontiac GTO Service Repair Manual.pdf
2006 Pontiac GTO Service Repair Manual.pdfkm7seyduh7dw
 
2004 Pontiac GTO Service Repair Manual.pdf
2004 Pontiac GTO Service Repair Manual.pdf2004 Pontiac GTO Service Repair Manual.pdf
2004 Pontiac GTO Service Repair Manual.pdfkm7seyduh7dw
 
2005 Pontiac GTO Service Repair Manual.pdf
2005 Pontiac GTO Service Repair Manual.pdf2005 Pontiac GTO Service Repair Manual.pdf
2005 Pontiac GTO Service Repair Manual.pdfjdkdksmdmd
 
2006 Pontiac GTO Service Repair Manual.pdf
2006 Pontiac GTO Service Repair Manual.pdf2006 Pontiac GTO Service Repair Manual.pdf
2006 Pontiac GTO Service Repair Manual.pdfjdkdksmdmd
 
2004 Pontiac GTO Service Repair Manual.pdf
2004 Pontiac GTO Service Repair Manual.pdf2004 Pontiac GTO Service Repair Manual.pdf
2004 Pontiac GTO Service Repair Manual.pdfjdkdksmdmd
 
2004 Pontiac GTO Service Repair Manual.pdf
2004 Pontiac GTO Service Repair Manual.pdf2004 Pontiac GTO Service Repair Manual.pdf
2004 Pontiac GTO Service Repair Manual.pdffujsekm8didd
 
2005 Pontiac GTO Service Repair Manual.pdf
2005 Pontiac GTO Service Repair Manual.pdf2005 Pontiac GTO Service Repair Manual.pdf
2005 Pontiac GTO Service Repair Manual.pdffujsekm8didd
 
2006 Pontiac GTO Service Repair Manual.pdf
2006 Pontiac GTO Service Repair Manual.pdf2006 Pontiac GTO Service Repair Manual.pdf
2006 Pontiac GTO Service Repair Manual.pdffujsekm8didd
 

Similar to well pad operations - PCP (20)

Leveraging Technology For Maintenance Excellence
Leveraging Technology For Maintenance ExcellenceLeveraging Technology For Maintenance Excellence
Leveraging Technology For Maintenance Excellence
 
powerbrochure
powerbrochurepowerbrochure
powerbrochure
 
Don-Nan Rod Lift Brochure
Don-Nan Rod Lift BrochureDon-Nan Rod Lift Brochure
Don-Nan Rod Lift Brochure
 
390 d
390 d390 d
390 d
 
2006 pontiac gto service repair manual
2006 pontiac gto service repair manual2006 pontiac gto service repair manual
2006 pontiac gto service repair manual
 
2004 Pontiac GTO Service Repair Manual
2004 Pontiac GTO Service Repair Manual2004 Pontiac GTO Service Repair Manual
2004 Pontiac GTO Service Repair Manual
 
2005 pontiac gto service repair manual
2005 pontiac gto service repair manual2005 pontiac gto service repair manual
2005 pontiac gto service repair manual
 
2006 pontiac gto service repair manual
2006 pontiac gto service repair manual2006 pontiac gto service repair manual
2006 pontiac gto service repair manual
 
2004 pontiac gto service repair manual
2004 pontiac gto service repair manual2004 pontiac gto service repair manual
2004 pontiac gto service repair manual
 
Escavadeira hidraulica cat 390 dl
Escavadeira hidraulica cat 390 dlEscavadeira hidraulica cat 390 dl
Escavadeira hidraulica cat 390 dl
 
2005 Pontiac GTO Service Repair Manual.pdf
2005 Pontiac GTO Service Repair Manual.pdf2005 Pontiac GTO Service Repair Manual.pdf
2005 Pontiac GTO Service Repair Manual.pdf
 
2005 Pontiac GTO Service Repair Manual.pdf
2005 Pontiac GTO Service Repair Manual.pdf2005 Pontiac GTO Service Repair Manual.pdf
2005 Pontiac GTO Service Repair Manual.pdf
 
2006 Pontiac GTO Service Repair Manual.pdf
2006 Pontiac GTO Service Repair Manual.pdf2006 Pontiac GTO Service Repair Manual.pdf
2006 Pontiac GTO Service Repair Manual.pdf
 
2004 Pontiac GTO Service Repair Manual.pdf
2004 Pontiac GTO Service Repair Manual.pdf2004 Pontiac GTO Service Repair Manual.pdf
2004 Pontiac GTO Service Repair Manual.pdf
 
2005 Pontiac GTO Service Repair Manual.pdf
2005 Pontiac GTO Service Repair Manual.pdf2005 Pontiac GTO Service Repair Manual.pdf
2005 Pontiac GTO Service Repair Manual.pdf
 
2006 Pontiac GTO Service Repair Manual.pdf
2006 Pontiac GTO Service Repair Manual.pdf2006 Pontiac GTO Service Repair Manual.pdf
2006 Pontiac GTO Service Repair Manual.pdf
 
2004 Pontiac GTO Service Repair Manual.pdf
2004 Pontiac GTO Service Repair Manual.pdf2004 Pontiac GTO Service Repair Manual.pdf
2004 Pontiac GTO Service Repair Manual.pdf
 
2004 Pontiac GTO Service Repair Manual.pdf
2004 Pontiac GTO Service Repair Manual.pdf2004 Pontiac GTO Service Repair Manual.pdf
2004 Pontiac GTO Service Repair Manual.pdf
 
2005 Pontiac GTO Service Repair Manual.pdf
2005 Pontiac GTO Service Repair Manual.pdf2005 Pontiac GTO Service Repair Manual.pdf
2005 Pontiac GTO Service Repair Manual.pdf
 
2006 Pontiac GTO Service Repair Manual.pdf
2006 Pontiac GTO Service Repair Manual.pdf2006 Pontiac GTO Service Repair Manual.pdf
2006 Pontiac GTO Service Repair Manual.pdf
 

Recently uploaded

Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Standamitlee9823
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...tanu pandey
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01KreezheaRecto
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfRagavanV2
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptMsecMca
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfRagavanV2
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 

Recently uploaded (20)

Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 

well pad operations - PCP

  • 1. © 2013 Cairn India Limited RJ-ON-90/1 Bhagyam Operations Overview
  • 2. © 2013 Cairn India Limited 2 Aishwariya Bhagyam Well Pads Export Oil Pipeline Rajasthan Integrated Development Overview Raageshwari Gas Terminal (RGT) & Well Pads Thumbli Water Field Mangala Process Terminal (MPT) & Well pads Barmer . Guda Malani .
  • 3. © 2013 Cairn India Limited 3  Cumulative oil Production : 20.1 Million BBLs.  Water Injection cumulative has crossed: 32 M BBls  Crossed 3.1 million LTI free Man-hours of operation  870 days LTI free operation since commissioning  Green belt development- 8000 saplings planted this year Production and HSE highlights.
  • 4. © 2013 Cairn India Limited 4 Well Pad Clusters BWP-04 BWP-05 BWP-06 BWP-07 BWP-10 BWP-03 BWP-13 BWP-02 BWP-14 BWP-08 BWP-11 PW-09 PW-02 PW-13 PW-02 PW-03 PW-16 PW-12 PW-05 PW-07 PW-01 PW-01 IW-01 IW-02 IW-01 IW-02 IW-03 IW-01 IW-00 IW-03 IW-00 IW-02 IW-02 IW-06 Cluster-A Cluster-B Cluster-C BWP-15 PW-03 BWP-01 PW-08 IW-01 BWP-09 PW-08 IW-00 BWP-12 PW-06 IW-02
  • 5. © 2013 Cairn India Limited 5 MPP Pumps CAPACITY ( Liquid/Gas) : 55000 BPD/ 1.466 Mmscfd SUCTION PRESSURE : 5.5 Bar DISCHARGE PRESSURE : 16.8 Bar
  • 6. © 2013 Cairn India Limited 6 Water Injection Flowlines BWP04 BWP06 PW-09 PW-13 IW-02 IW-01 BWP13 BWP03 BWP10 BWP12 8" BWP07 BWP05 PW-16 PW-09 PW-03 PW-06 10" PW-02 PW-02 IW-00 IW-01 IW-00 IW-02 IW-02 IW-02 6" 6" 10" 6" 8" CORRIDOR-A (18") 24" CORRIDOR-B(18") 10" 10" 6" 6" 10" BWP01 BWP02 BWP14 BWP09 BWP11 BWP8N PW-08 PW-05 PW-02 PW-03 PW-01 PW-01 IW-01 IW-03 IW-00 IW-00 IW-02 IW-02 WATER INJECTION LINES SCHEMATIC MPT GATHERING PAD BWP-15 PW-03 IW-03
  • 7. © 2013 Cairn India Limited 7 Wells Status Producers:  Total Wells : 94  PCP Wells : 84  Jet Pumps : 10 Injectors:  Total Wells: 28
  • 8. © 2013 Cairn India Limited 8 BHAGYAM WELL COMPLETION Wellhead  Suspension of Casing & Tubing  Flanging of Fluid Flow device/ X-mas Tree  Hydraulic communication with annulus X-Mas Tree  A system of valves that control physical or hydraulic access into the tubing string or annulus “A”
  • 9. © 2013 Cairn India Limited 9 Christmas Tree  The PCP Christmas tree assembly comprises of Master valve, BOP, kill wing valve and Drive head on top.  At the bottom we have tubing hanger which has got chemical injection connection and down hole gauge cable running up to the downhole.  The wing XSV is installed for the slam shut of the flow arm in case of trip scenario.
  • 10. © 2013 Cairn India Limited 10 Key Consideration for Safety  Fire & Gas detection Facilities at Field  Building Fire & Gas detection & suppression system  Manual Call Points  PAGA System  Access Control  CCTV Coverage  Dedicated Fire Tender with Crew  First Aid centre with dedicated Ambulance  PTW System in Place  Oil Spill response Facilities  IRC & ERT for Emergency Management
  • 11. © 2013 Cairn India Limited 11 BHAGYAM WELL COMPLETION Casing  Hole stabilization  Protection of fresh water  Zonal Isolation  Prevent water migration to producing zones  Confine production to the wellbore  Isolate over-pressured and under-pressured formation Casing Types: Casing Type Oil Well Injection Well Conductor Casing 13 3/8" 9 5/8" Surface Casing 9 5/8" 7" Production Casing 7" 4 1/2"
  • 12. © 2013 Cairn India Limited 12
  • 13. © 2013 Cairn India Limited 13
  • 14. © 2013 Cairn India Limited 14 PCP (Progressive Cavity Pump) PCP: A Progressive cavity pump is a type of positive displacement pump and is also known as a progressing cavity pump, eccentric screw pump or cavity pump. PC Pumping Systems typically consist of the following components:  Surface Equipment Drive head assembly VFD (Variable Frequency Drive) Down hole gauge Panel (Geophysical Research Company) BOP (Blow Out Preventer), Flow Tee – Kombi Tree  Down hole equipment Stator (Stationary with tubing) Rotor (Internal & Rotary with drive rods)
  • 15. © 2013 Cairn India Limited 15 15 PCP System Configuration Standard Components Downhole Equipment Belts & Sheaves Surface Drive Stuffing Box Pumping Tee Electric Motor Polished Rod Sucker Rods w/ Couplings Surface Equipment PC Pump Stator PC Pump Rotor No-Turn Tool Tubing String Tagbar Sucker Rods w/ Couplings
  • 16. © 2013 Cairn India Limited 16 Polish Rod and Clamp arrangement  The entire series of Polish rod, Sucker rod and Rotor is suspended in the downhole through the Polish rod clamp.  Sucker rods transfers the power from the prime mover ( Motor ) to Rotor.
  • 17. © 2013 Cairn India Limited 17 17 PC Pumping System PCP Systems typically consist of a surface drive, a sucker rod string, a production tubing string and, of course, the downhole Progressing Cavity Pump. The pump comprises two key elements: A single helical-shaped ROTOR that turns inside a double helical elastomer-lined STATOR In most cases, the stator is attached to the bottom of a production tubing string and the rotor is attached to a drive string that is suspended and rotated by the surface drive.
  • 18. © 2013 Cairn India Limited 18 18 Progressing Cavity Pump General Features  Classified as a single rotor, internal helical gear, positive displacement pump  Consists in two key components:  Rotor:  Is a high strength steel component externally machined as a helix of “n” lobes and coated with chrome or an alternative hard material.  Only moving part.  Stator:  Generally made with elastomer (or rubber) with and internal shape as an helix of “n+1” lobes. This rubber body is bonded to the interior of a steel tube.  Stationary piece.
  • 19. © 2013 Cairn India Limited 19 VFD & GRC Panel  VFD , variable frequency drive is a device which is used to control the speed by adjusting frequency of the motor input power supply.  The LCD screen display’s the parameters related to Motor i.e. frequency, current, avg voltage etc.  The Down hole gauge (GRC) panel is installed to monitor the well downhole parameters like Pump intake/discharge temperature & Pressure locally. Supplied by Unico
  • 20. © 2013 Cairn India Limited 20 Kombi-Tee Functions  Provides a solid platform to mount the PCP Drivehead  Side ports direct the well production down the flow line  BOP seals off wellbore to allow servicing of the surface equipment  Polish Rod Clamp suspends the rod string and resists torque, allowing for safe maintenance and easier removal and installation of the Drivehead  By applying 500 ft-lbs of torque to the lock out rams, they will suspend ≥39000 lbs of axial load and resist ≥1000 ft-lbs of torque
  • 21. © 2013 Cairn India Limited 21 Jet Pumps • The actual working components of the jet pump are the nozzle, throat and diffuser. • These components are assembled in a variety of configurations and materials to suit the production requirements and downhole environment. How the Jet Pump Works • Power fluid at high pressure (low velocity) is converted to a low- pressure (high velocity) jet by the nozzle. • The pressure at the entrance of the throat becomes lower as the power fluid rate is increased. Due to this lower pressure, fluid is drawn in from the wellbore. • The suction fluid becomes entrained with the high velocity jet and the pumping action then begins. • After mixing in the throat, the combined power fluid and suction fluid is slowed down by the diffuser. Because the velocity is reduced, the pressure increases – rising to a value sufficient to pump the fluid to the surface. A full range of nozzle and throat sizes are available to allow power fluid rate and pressure to be varied to meet various requirements.
  • 22. © 2013 Cairn India Limited 22 Thank You