A very basic PPT for our Final Year project showcase. This is very bland; we did our best in the next final and ultimate PPT we could make. Check it out here: https://www.slideshare.net/AftabMirza5/project-management-system-ultimate-ppt
2. ABSTRACT
In present scenario Engineering Institutes
works on multiple student projects manually so
there is need to manage all these projects
efficiently in term of student management, topic
allocation and project design. Project
Management system from the first of
announcement to the last submission, are
managed through this web-based application.
3. Project Definition
โข This project is made to suit student projects management
system, that includes various projects assigned to students
and the students working on each project.
โข This software system allows for easy project management
and tracking activities in those projects.
โข It is an effective software system to help manage these
activities in a college environment.
4. FUNCTIONAL REQUIREMENTS
Software Requirements
โข Operating System: Windows 7 or later
โข Server Client: Mozilla Firefox or Google
Chrome
โข IDE: ATOM IDE
โข Frontend: CSS with HTML
โข Backend: PHP
Hardware Requirements
โข Processor: AMD A9 or Intel i3 and better
โข RAM: 2GB
โข HDD: 30 GB
6. MODULES
1. H.O.D. Login: The system has an H.O.D. (admin) who has the
highest authority of system. They can view and also hold the
position to modify data into the system Guide details and
respective projects assigned to them, resources available and
so on.
2. Group Leader Login: Every Leader can login into the system
and look out for schedule, resources allocated and status of the
project.
3. Project Co-Ordinator Login: They can modify required input
into the system like projects undertaken, Leader & member
details and assign respective projects to them.
4. Guide Login: They have exclusive rights to view their complete
project status and also modify it. Each guide can view complete
details of their respective allotted group.
7. BENEFITS
1. It excludes the manual work of tracking projects.
2. It maintains schedule of the projects that is the start
and end date of project accomplishment and
reminds prior to the end date.
3. The system saves time, efforts and cost of
organization.
4. It is easy and flexible to use.
5. Probability of upgrading backend to qualify as a
corporate product.