Ce diaporama a bien été signalé.
Le téléchargement de votre SlideShare est en cours. ×

Sustainable Architecture: Design Green with the Client in Mind.pdf

Publicité
Publicité
Publicité
Publicité
Publicité
Publicité
Publicité
Publicité
Publicité
Publicité
Chargement dans…3
×

Consultez-les par la suite

1 sur 46 Publicité

Sustainable Architecture: Design Green with the Client in Mind.pdf

Télécharger pour lire hors ligne

In this webinar, we will hear from Pedro Clarke, a principal architect and thought leader in sustainable architecture, about designing and building more sustainable buildings and how to engage clients in learning sustainable processes.

In this webinar, we will hear from Pedro Clarke, a principal architect and thought leader in sustainable architecture, about designing and building more sustainable buildings and how to engage clients in learning sustainable processes.

Publicité
Publicité

Plus De Contenu Connexe

Plus par Aggregage (20)

Plus récents (20)

Publicité

Sustainable Architecture: Design Green with the Client in Mind.pdf

  1. 1. with Pedro Clarke – Principal Architect at A+ Architecture, In Loco Program Director Sustainable Architecture: Stephanie Braswell Webinar Coordinator, Architecture Focus WEDNESDAY OCTOBER 19TH 9:30 AM PDT | 2:30 PM EDT | 5:30 PM BST Architecture Focus Expert Insights. Personalized for you. Pedro Clarke, Director, Principal Architect Design Green with the Client in Mind
  2. 2. 03 Started and run by an experienced and successful group of digital media entrepreneurs, Aggregage is re-imagining and building out the next generation of business media in a way that meets the needs and expectations of today’s business professionals and B2B marketers. Using social media, machine intelligence/smart algorithms and big data, Aggregage’s ever-growing portfolio of industry-sector focused verticals delivers the most engaging and relevant content to each industry’s professionals. This content comes from an average of 100 or more industry thought leaders in each vertical. These acclaimed industry leaders offer their insights, analyses and opinions on the important issues and trends in their industry. This breadth of content sources generates hundreds of fresh pieces of content each week. Using our proprietary intelligence platform, Aggregage uses the social media activity of everyone reading this content in order to rank and curate the posts so that readers can make excellent use of the limited amount of time that they have available to stay up to date on their industry’s developments. These same machine intelligence algorithms can use each reader’s social signals to personalize the content, thereby delivering relevance for each and every one of our readers. https://www.aggregage.com/
  3. 3. Click on the Questions panel to interact with the presenters TO USE YOUR TELEPHONE: You must select "Use Telephone" after joining and call in using the numbers below. United States: +1 (562) 247-8422 Access Code: 507-457-596 Audio PIN: Shown after joining the webinar TO USE YOUR COMPUTER'S AUDIO: When the webinar begins, you will be connected to audio using your computer's microphone and speakers (VoIP). A headset is recommended.
  4. 4. PEDRO CLARKE Director, Principal Architect
  5. 5. A E
  6. 6. A E
  7. 7. A E What do you mean by sustainability Leaving things better than we found them...
  8. 8. A E
  9. 9. A E U-Value Thermal transmittance is the rate of transfer of heat through matter.
  10. 10. A E
  11. 11. A E More than Certification Buildings should be well designed...
  12. 12. A E
  13. 13. A E Portugal... more than just a sunny country contextualism is key to a good sustainable design...
  14. 14. A E Avg. 56 days of rain (3012hrs of Sun) https://www.climatedata.eu/ Faro, Algarve
  15. 15. A E Avg. 82 days of rain (2781hrs of Sun) https://www.climatedata.eu/ Lisbon, Estremadura
  16. 16. A E Avg.109 days of rain (2463hrs of Sun) https://www.climatedata.eu/ Porto, Douro Litoral
  17. 17. A E Monte da Caliça a o t e ficient
  18. 18. A E
  19. 19. A E Passive Design Approach Learning from vernacular...
  20. 20. A E
  21. 21. A E Passive Design Approach Controling Solar Gain
  22. 22. A E
  23. 23. A E
  24. 24. A E
  25. 25. A E
  26. 26. A E
  27. 27. A E Passive Design Approach Materials, Daylight, Embeded Carbon, etc...
  28. 28. A E
  29. 29. A E
  30. 30. A E
  31. 31. A E
  32. 32. A E
  33. 33. A E Integrating Active Technology how to make the most of new tech...
  34. 34. A E
  35. 35. A E
  36. 36. A E
  37. 37. A E
  38. 38. A E
  39. 39. A E Our Approach moving forwards
  40. 40. A E The RIBA Plan of Work organises the process of briefing,designing,delivering, maintaining,operating and using a building into eight stages. It is a framework for all disciplines on construction projects and should be used solely as guidance for the preparation of detailed professional services and building contracts. 0 Strategic Definition 1 Preparation and Briefing 2 Concept Design 3 Spatial Coordination 4 Technical Design 5 Manufacturing and Construction 6 Handover 7 Use Projects span from Stage 1 to Stage 6; the outcome of Stage 0 may be the decision to initiate a project and Stage 7covers the ongoing use of the building. Stage Outcome at the end of the stage The best means of achieving the Client Requirements confirmed If the outcome determines that a building is the best means of achieving the Client Requirements, the client proceeds to Stage 1 Project Brief approved by the client and confirmed that it can be accommodated on the site Architectural Concept approved by the client and aligned to the Project Brief The brief remains “live” during Stage 2 and is derogated in response to the Architectural Concept Architectural and engineering information Spatially Coordinated All design information required to manufacture and construct the project completed Stage 4 will overlap with Stage 5 on most projects Manufacturing,construction and Commissioning completed There is no design work in Stage 5 other than responding to Site Queries Building handed over, Aftercare initiated and Building Contract concluded Building used,operated and maintained efficiently Stage 7starts concurrently with Stage 6 and lasts for the life of the building Core Tasks during the stage Project Strategies might include: – Conservation (if applicable) – Cost – Fire Safety – Health and Safety – Inclusive Design – Planning – Plan for Use – Procurement – Sustainability See RIBA Plan of Work 2020 Overview for detailed guidance on Project Strategies Prepare Client Requirements Develop Business Case for feasible options including review of Project Risks and Project Budget Ratify option that best delivers Client Requirements Review Feedback from previous projects Undertake Site Appraisals No design team required for Stages 0 and 1. Client advisers may be appointed to the client team to provide strategic advice and design thinking before Stage 2 commences. Prepare Project Brief including Project Outcomes and Sustainability Outcomes, Quality Aspirations and Spatial Requirements Undertake Feasibility Studies Agree Project Budget Source Site Information including Site Surveys Prepare Project Programme Prepare Project Execution Plan Prepare Architectural Concept incorporating Strategic Engineering requirements and aligned to Cost Plan, Project Strategies and Outline Specification Agree Project Brief Derogations Undertake Design Reviews with client and Project Stakeholders Prepare stage Design Programme Undertake Design Studies, Engineering Analysis and Cost Exercises to test Architectural Concept resulting in Spatially Coordinated design aligned to updated Cost Plan, Project Strategies and Outline Specification Initiate Change Control Procedures Prepare stage Design Programme Develop architectural and engineering technical design Prepare and coordinate design team Building Systems information Prepare and integrate specialist subcontractor Building Systems information Prepare stage Design Programme Specialist subcontractor designs are prepared and reviewed during Stage 4 Finalise Site Logistics Manufacture Building Systems and construct building Monitor progress against Construction Programme Inspect Construction Quality Resolve Site Queries as required Undertake Commissioning of building Prepare Building Manual Building handover tasks bridge Stages 5 and 6 as set out in the Plan for Use Strategy Hand over building in line with Plan for Use Strategy Undertake review of Project Performance Undertake seasonal Commissioning Rectify defects Complete initial Aftercare tasks including light touch Post Occupancy Evaluation Implement Facilities Management and Asset Management Undertake Post Occupancy Evaluation of building performance in use Verify Project Outcomes including Sustainability Outcomes Adaptation of a building (at the end of its useful life) triggers a new Stage 0 Core Statutory Processes during the stage: Planning Building Regulations Health and Safety (CDM) Strategic appraisal of Planning considerations Source pre-application Planning Advice Initiate collation of health and safety Pre-construction Information Obtain pre-application Planning Advice Agree route to Building Regulations compliance Option: submit outline Planning Application Review design against Building Regulations Prepare and submit Planning Application See Planning Note for guidance on submitting a Planning Application earlier than at end of Stage 3 Submit Building Regulations Application Discharge pre- commencement Planning Conditions Prepare Construction Phase Plan Submit form F10 to HSE if applicable Carry out Construction Phase Plan Comply with Planning Conditions related to construction Comply with Planning Conditions as required Comply with Planning Conditions as required Procurement Route Traditional Tender Appoint contractor Design & Build 1 Stage ER CP Appoint contractor Design & Build 2 Stage ER Pre-contract services agreement CP Appoint contractor Management Contract Construction Management Appoint contractor Contractor-led ER Preferred bidder CP Appoint contractor Information Exchanges at the end of the stage Client Requirements Business Case Project Brief Feasibility Studies Site Information Project Budget Project Programme Procurement Strategy Responsibility Matrix Information Requirements Project Brief Derogations Signed off Stage Report Project Strategies Outline Specification Cost Plan Signed off Stage Report Project Strategies Updated Outline Specification Updated Cost Plan Planning Application Manufacturing Information Construction Information Final Specifications Residual Project Strategies Building Regulations Application Building Manual including Health and Safety File and Fire Safety Information Practical Completion certificate including Defects List Asset Information If Verified Construction Information is required,verification tasks must be defined Feedback on Project Performance Final Certificate Feedback from light touch Post Occupancy Evaluation Feedback from Post Occupancy Evaluation Updated Building Manual including Health and Safety File and Fire Safety Information as necessary Core RIBA Plan of Work terms are defined in the RIBA Plan of Work 2020 Overview glossary and set in Bold Type. Further guidance and detailed stage descriptions are included in the RIBA Plan of Work 2020 Overview. © RIBA 2020 Stage Boundaries: Stages 0-4 will generally be undertaken one after the other. Stages 4 and 5 will overlap in the Project Programme for most projects. Stage 5 commences when the contractor takes possession of the site and finishes at Practical Completion. Stage 6 starts with the handover of the building to the client immediately after Practical Completion and finishes at the end of the Defects Liability Period. Stage 7starts concurrently with Stage 6 and lasts for the life of the building. Planning Note: Planning Applications are generally submitted at the end of Stage 3 and should only be submitted earlier when the threshold of information required has been met. If a Planning Application is made during Stage 3,a mid- stage gateway should be determined and it should be clear to the project team which tasks and deliverables will be required. See Overview guidance. Procurement: The RIBA Plan of Work is procurement neutral – See Overview guidance for a detailed description of how each stage might be adjusted to accommodate the requirements of the Procurement Strategy. ER Employer’s Requirements CP Contractor’s Proposals RIBA Plan of Work 2020 Appoint client team Appoint design team Appoint Facilities Management and Asset Management teams,and strategic advisers as needed
  41. 41. A E
  42. 42. A E credit: UKGBC
  43. 43. A E
  44. 44. A E Notes Sustainability criteria Minimum standard Best practice Innovative Pioneering a b c d e f g h 1. Embodied carbon in fabric 2. Building and materials re-use 3. Recycled and reclaimed content 4. Material toxicity 5. Climate change adaptation 6. Landscape and biodiversity Embodied carbon not assessed. Preference stated for locally sourced materials Preference for standard sizes of elements such as steel beams/columns or precast units 15% recycled content likely as standard Avoid high VOC content paints, sealants etc and all ozone-depleting materials, including insulation Local planning requirements met. Mitigate against negative biodiversity impacts where feasible No considerations beyond those embodied in regulatory compliance Commercial – >5.5m3 /person/yr Schools – 4.4m3 /pupil/yr Carry out Flood Risk Assessment. No increase in run off Contractor to produce Site Waste Management Plan (SWMP) to identify waste streams and areas for segregation on-site or post collection Adequate space for storing recyclable waste Some covered cycle storage Use of industry standards. Standard client briefing Sourcing of office supplies and cleaning products considered Building has no or only a slight negative impact on productivity. Meet regulation for internal comfort, including air quality Structure engineered to minimise material mass. Cement replacements, eg GGBFS. Materials specified to be from local sources High-grade elements designed for recyclability. Future flexibility of building considered 30% recycled content PVC cabling exchanged for LSF. No petro-chemical based insulation materials. All ‘C’ rated materials avoided Detailed life cycle analysis for material selection. Low carbon materials where possible. Structure engineered to work at 90% capacity [Wise] Building flexibility document produced. Most materials and structure designed for dismantling 45% recycled content ‘B’ and ‘C’ rated materials avoided. VOC-free paints and timber. PVC-free building. Natural materials where possible Structure made from entirely low embodied carbon materials, with known provenance. Building serviceability regulations challenged [Wise]. Building carbon-profiled [Sturgis] Flexibility or dismantling drives design. Label and log or e-tag main elements 60% recycled content Use only natural materials where products exist. 80% of materials ‘A’ or ‘A+’ rated Highly building specific. Wise, Chris, ‘What If Everything We Did Was Wrong?’, www.building.co.uk. Sturgis Associates, ‘Redefining Zero’, www.rics.org Only applies to relevant materials Ratings refer to BRE Green Guide See TSB report ‘Design For Future Climate’, 2010, and Summer Targets in Energy sheet Biodiversity is the variety of species within an ecosystem, used as a measure of the health of biological systems For more guidance see WRAP Adequate cycling provisions can require significant internal space Consider space for food growth Productivity highly subjective. For more see www.cibse.org/ pdfs/8aratcliffe.pdf Potential impacts reviewed with client, strategic principles discussed and reported concerning key risks Measures included in upgrade strategies to address projected risks as appropriate for life expectancy of building components Consult an ecologist on biodiversity enhancement, giving preference to local species. Integrated landscape and water strategy. Landscape management plan Commercial – 4.5m3 /person/yr Schools – 3m3 /pupil/yr Thorough site hydrological characterisation, design responds to environment, including SUDs where appropriate. Rainwater harvesting for WCs and irrigation Establish waste streams during design, set key KPIs early on. Waste reviews on design team meeting agendas. Divert 75% by weight of non hazardous project waste from landfill Managed recycling processes involving space for separating and collecting recyclables. Encourage occupants to recycle Full cycling support provisions as part of travel plan. Utilise video conferencing. Access considered in site selection Stakeholder consultation. Stakeholders understand standards and design Sustainable procurement of office supplies, cleaning products and food and monitoring of consumption No impact on productivity. Connection to outside. Air quality monitored Develop Green Infrastructure Strategy. Landscape works in harmony with building design and climate. Extensive planting to reduce summer urban heat island. Deciduous planting for shading windows Biodiversity enhancement key driver in Green Infrastructure Strategy. Landscape significantly influences building design Design approach driven by climate change adaptation implications with agreed emissions scenario and probabilistic range appropriate to each key risk 7. Mains water consumption 8. Drainage systems 9. Construction waste minimisation 10. Operational waste recycling 11. Transport 12. Stakeholder involvement and design process 13. Sustainable procurement of consumables 14. Healthy environments Commercial – 1.5m3 /person/yr Schools – 1.5m3 /pupil/yr Flood risk defines site selection. Drainage sytem fully integrated into environment. Consider reedbed treatment for irrigation Implement Modern Methods of Construction throughout design. Account for site conditions impacting waste. Materials logistics plan Provide incentives for recycling. On-site composting for biodegradable waste Fully site-specific travel plan covering site infrastructure and awareness raising. Electric vehicle charging points. Utilise virtual video conferencing Design strategy tested with stakeholders. New boundaries set All consumables sustainably procured. Mostly paperless organisation. Some food grown on site Slightly positive impact on productivity. Psychological and social impacts assessed during design Commercial – <1.5m3 /person/yr Schools – 0.5m3 /pupil/yr Closed loop water system. Waste-to-Energy plant or alterna- tives to water based foul drainage Achieve zero net waste for project Waste stream feeds on or off-site anaerobic digestion for biogas production Feed transport into personal carbon trading scheme. Accessibility drives site selection Feed back the results of briefing and design process into industry standards Some organic food grown on site, with the rest seasonal, local Building has noticeable positive impact on productivity. Strive to create a ‘sense of place’ a: Construction materials b: Climate change adaptation c: Landscape and biodiversity d: Water e: Waste f: Transport issues g: Management h: Productivity and health WIDER SUSTAINABILITY PARAMETERS TO BE USED IN CONJUNCTION WITH ENERGY CRITERIA
  45. 45. A E A+Sustainability Matrix: Universal decoding sustainability beyond energy and balancing green ambitions with the budgetary realities of clients based on Max Fordham Sustainability Matrix V_00.01 - DRAFT: work in progress - 22/07/11 Minimum standard Best Practice Innovative Pioneering Notes + Other Commitments materials NB! In case of not reaching the minimum standard goals, following mitigation strategy applies: The cost of embodied carbon will be offsetted through a respective organisation. a. Embodied carbon materials preference for locally/regionally sourced (400km) low carbon where possible cement replacement known origin life cycle materials and solutions that can be recycled. life cycle analysis building carbon-profiled /Sturgis/ structure Minimized mass Work with structural engineer on reducing overdimensioning factor Waste management prevention preference for standard sizes high grade elements Mostly designed for dismantling labelled and loged or e-tagged elements reuse Future reuse taken into consideration Reuse strategy documented designed to dismantle recycle preference for recycled content commitment for recycled content always recycle when available Min. 50% documented Toxicity natural materials where possible where product exists VOC content avoid VOC-free paints and timber ODP / petrochmicals avoid none in insulation; LSF cabling PVC-free building Material rating C avoided B avoided 80% A or A+ energy NB! In case of not reaching the minimum standard goals, following mitigation strategy applies: The client will commit to sign up to green energy supplier. b. Building fabric U-values (wall/window/roof) 0,35/1,8/0,25 (wall/window/roof): 0,2/1,4/0,15 (wall/window/roof): 0,15/1,1/0,12 (wall/window/roof): 0,1/0,8/0,1 Airtightness at 50MPa 10 m3/hm2 5 m3/hm2 2 m3/hm2 1 m3/hm2 Thermal mass Assesment Design Generation electrical aim for 20% 30,00% 50-100% Min. 100% Consumption Heating + Cooling 25 kWh/m2/yr 18 kWh/m2/yr 15 kWh/m2/yr 11 kWh/m2/yr Ventilation natural where possible night cooling, heat recovery assisted natural for summer peak pre-cooled air for summer peak lighting Low energy fittings daylight compensating dimming New technologies (LEDs,...) Climate crisis adaptation general regulatory compliance strategic principles discussed with client strategy report concerning key risks appropriate measures for life expectancy of building components agreed emissions scenario set range appropriate to each key risk EPC rating B+ A A+ A+ and energy generation operational emmissions 20 kgCO2/m2/yr 15 kgCO2/m2/yr 10 kgCO2/m2/yr 0 kgCO2/m2/yr landscape NB! In case of not reaching the minimum standard goals, following mitigation strategy applies: The client will commit to invest in biodiversity projects. c. Preservation regulatory compliance Integrated landscape and water strategy Green Infrastructure Strategy extensive + deciduous planting Influences building design Biodiversity regulatory compliance Preference to local species Consult an ecologist resources NB! In case of not reaching the minimum standard goals, following mitigation strategy applies: The client will commit to invest in water-treating projects. d. Water consumption water saving fixtures consumption assesment consumption monitoring Drainage systems Rainwater SuDS where appropriate for WCs and irrigation integrated with environment closed loop water system Reuse Reedbed treatment for irrigation Alternative to water based foul drainage Waste management construction waste regulatory compliance set KPIs + waste reviews on site agenda modern methods of construction account for site conditions impacting waste Materials logistics plan achieve zero net waste for project operational waste designed storage for recyclables and compost processes managed, encouraged on-site composting compost supplies biogas production building in use NB! In case of not reaching the minimum standard goals, following mitigation strategy applies: User involvement Guide standard log book with O&M manual non-technical user guide New boundaries set Briefing hand-over meeting explaining standards and design to users Soft landings framework results fed back into industry energy Users involved in commissioning guided, interactive and online design strategy tested with clients e. Monitoring general 1st year monitoring & smart metres responsibility to respond on reports full post occupancy evaluation Anonymized external reporting Continual monitoring and fine-tuning Formal external review Results published to industry
  46. 46. Webinar Coordinator, Architecture Focus Pedro Clarke Director, Principal Architec t Stephanie Braswell /in/pedro-clarke /in/stephanie-braswell architecturefocus.com Q&A a-architecture.org

×