Profile: Construction Manager at GVS Group.
Period: June 2012 to Feb 2015. Duration: 3.5 years
• Commissioned and handover 4 warehousing projects
• Developed strategies to optimize cost and quality for the projects
• Set up sourcing network for materials and services
Professional Responsibilities:
1. Schedule:
• Detailed Schedule planning for the project as per scope.
• Aligning schedule with Contractor & Client.
• Making daily/weekly plan as per schedule and deploying to contractor.
• Schedule tracking and sending DPRs.
• Ensuring material & contractor manpower availability as per schedule and
planning in advance.
2. Cost:
• Preparing basic project estimate as per BOQ.
• Preparing cash flow projection as per schedule.
• Fortnightly cost tracking reports to client.
• Monthly cash flow requirement for next month to client as per schedule.
• Controlling site budget and implementing cost saving ideas.
3. Design & Execution:
• Follow up with client/designer for design drawing availability on time.
• Understanding all drawings in detail.
• Deployment of drawings to contractor engineer/supervisor.
• Ensuring execution as per design through right system checks on site.
• Interacting with client/designer in case of implementation related issues due to
design.
4. Quality:
• Preparing quality protocol on site & aligning the client & contractor.
• Preparation & Implementation of QAP, SOP & ITP at various site for delivering
quality product to customer.
5. Safety:
• Ensuring PPEs and safety systems are followed on site.
• Periodic audits and feedbacks - positive/negative to be given to contractors on
safety.
6. Vendor Management:
• Listing contractors/suppliers locally for the scope of work.
• Gathering quotation from contractors/suppliers.
• Technical capability evaluation & recommendation.
• Planning with vendors & pushing them for work to protect schedule.
• Doing material planning in client scope as per the schedule by vendors.
• Discussing & implementing cost & schedule saving ideas with vendors.
Previous Position:
• Assistant Manager at HDIL (Housing Development and Infrastructures Limited)
Previous Profile: July 2010 to Nov 2012 Period: 2 years
1. Quality Assurance & Control:
• Preparing methods for inspection, testing and evaluation.
• Checking of the quality of material received at the sites as per the required
specifications & quality norms.
• Administering the implementation of a testing and inspection schedule and ensuring
the compliance.
• Coordinating the quality auditing efforts to ensure compliance with adopted
standards.
• Random Inspecting and checking the executed works to ensure the quality.
• Conducting Quarterly Quality rating of the projects to create awareness in employee.
• Preparation of Standard Operating Procedures (SOP), Laboratory Quality Manual,
Quality Plan for Projects, Technical specification for projects, acceptance criteria,
Inspection and Test plan & Construction methodology etc.
2. Analysis:
• Unit quantity of steel, concrete and shuttering work.
• Cement and sand required for block masonry, internal plaster, external plaster and
water proofing.
3. Billing:
• RA (running account) bills for civil work using AutoCAD drawing (structural).
• RA bills for finishing work using AutoCAD drawing (Architectural).
• Escalation by verifying purchase order, tax invoice and delivery challan and weighing
sheet.
4. Contracts:
• Liaison with other departments.
• Preparation of BOQ (bill of quantity).
• Estimating quantities from Drawings.
5. Execution:
• Project: MMRDA SRA, Kurla
Type: Residential building, No. of flats: 17508, Structure: 30 Bldgs each, Ground
floor + 13 floors, Built-up area up to 398.75 Million square feet.
• Quality assurance of materials at site. i.e. verifying strength of brick, concrete and
steel as per IS (Indian standards), measuring silt content in sand, slump test of
concrete for measuring workability, cement consistency test, alignment of shuttering,
scaffolding and plaster.
6. Planning:
• Embarking new project: project information, start and finish date, schedule of project
from either start or finish date.
• Adding task and milestone to a project: task name and amount of time each task will
take in months, days, and hours. Milestone where duration is zero.
• Showing critical path: using Gantt chart, network diagram, and critical task.
EDUCATION:
EDUCATION INSTITUTION CGPA/ Percentage
B.Tech (Honors)-
Civil Engineering
NIT – JAMSHEPUR
2010 7.31
XII
Board of intermediate education Don Bosco High School - Vadodara,
GUJARAT
72
X
Board of Secondary Education Don Bosco High School – Vadodara,
GUJARAT
77.14
INTERNSHIPS AND KEY ACADEMIC PROJECTS:
• Organization: JUSCO, Tatanagar Period: May 2009– July 2009
Successfully completed a project on “Cracks in Concrete in one storied buildings”
at ICS department Kadma, JUSCO, Tatanagar (Jharkhand)
• B.Tech project- 1 Period: July 2009– Nov 2010
Project on Trenchless technology in building underground tunnels for
multipurpose infrastructural use like pipeline for petroleum or water.
• B.Tech project-2: Period: Jan 2010– April 2010
Experiment on Composite plates under stress and development of graphs
based on Matlab programming.
SCHOLASTIC ACHIEVEMENTS:
• Received ONGC scholarship for the last 3 academic years, the scholarship is
awarded for the meritorious performance at graduation level studies and covers
the tuition fees of the institute
SOFTWARE SKILLS:
• Engineering Software : AutoCAD and Google Sketch up.
• Languages known : English, Hindi and Gujarati
• Operating Systems : Microsoft Windows, Linux.
EXTRACURRICULAR ACTIVITIES:
• A highly appreciated project named “AURA-Advanced Utility Robotic
Arm” which is prosthetic arm developed in 2009.
• Received Awards in hardware making (robots and machines)
competitions in the following events for “AURA”:
a. Won 1st prize for “Genesis” at IIT-ROORKEE tech fest
COGNIZANCE-2K9.
b. Won 2nd prize in open hardware at IIT-KHARAGPUR tech fest
KSHITIJ-2K9
c. Won Most Innovative Project prize in “Endeavour” at IIT-KANPUR
tech fest TECHKRIT-2K9
d. Won 2nd prize in open hardware at NIT-JAMSHEDPUR tech fest
PRAVAH-2K9
• Won 3rd prize for AUTOCAD design at NIT-JAMSHEDPUR tech fest
PRAVAH-2K9

Contenu connexe

Tendances (20)

CV
CVCV
CV
 
Umar
UmarUmar
Umar
 
riyasdeen - qs
riyasdeen - qsriyasdeen - qs
riyasdeen - qs
 
Ravi resume
Ravi resumeRavi resume
Ravi resume
 
QA-QC MANAGER , CONSTRUCTION MANAGER .2016
QA-QC MANAGER , CONSTRUCTION MANAGER .2016QA-QC MANAGER , CONSTRUCTION MANAGER .2016
QA-QC MANAGER , CONSTRUCTION MANAGER .2016
 
B_Naik-CV1
B_Naik-CV1B_Naik-CV1
B_Naik-CV1
 
Project Engineer Cv
Project Engineer CvProject Engineer Cv
Project Engineer Cv
 
AKBAR CV
AKBAR CVAKBAR CV
AKBAR CV
 
C.V of Project Manager Haider Ahmed Al Dure.PDF
C.V of Project Manager Haider Ahmed Al Dure.PDFC.V of Project Manager Haider Ahmed Al Dure.PDF
C.V of Project Manager Haider Ahmed Al Dure.PDF
 
RESUME Khaled 2017
RESUME Khaled  2017RESUME Khaled  2017
RESUME Khaled 2017
 
hdebelenjr-latest-CV
hdebelenjr-latest-CVhdebelenjr-latest-CV
hdebelenjr-latest-CV
 
Pradeep-CV
Pradeep-CVPradeep-CV
Pradeep-CV
 
Ashoka-CV
Ashoka-CVAshoka-CV
Ashoka-CV
 
Resume of Ghulam Muhammad
Resume of Ghulam MuhammadResume of Ghulam Muhammad
Resume of Ghulam Muhammad
 
RICKY - CV- 01-Apr-2015
RICKY - CV- 01-Apr-2015RICKY - CV- 01-Apr-2015
RICKY - CV- 01-Apr-2015
 
CV OF MVV
CV OF MVVCV OF MVV
CV OF MVV
 
Fady samir cv
Fady samir cvFady samir cv
Fady samir cv
 
Resume
ResumeResume
Resume
 
R K MISHRA CV
R K MISHRA CVR K MISHRA CV
R K MISHRA CV
 
Curriculum Vitae Of Khalid
Curriculum Vitae Of KhalidCurriculum Vitae Of Khalid
Curriculum Vitae Of Khalid
 

En vedette

Vé máy bay vietnam airlines hà nội đi san francisco giá rẻ
Vé máy bay vietnam airlines hà nội đi san francisco giá rẻVé máy bay vietnam airlines hà nội đi san francisco giá rẻ
Vé máy bay vietnam airlines hà nội đi san francisco giá rẻthuy01baydep
 
Cuidados del agua
Cuidados del aguaCuidados del agua
Cuidados del aguaNell NH
 
Trabajo de salud publica 3
Trabajo de salud publica 3Trabajo de salud publica 3
Trabajo de salud publica 3ciag07
 
Significado de "literal" y "álgebra".
Significado de "literal" y "álgebra".Significado de "literal" y "álgebra".
Significado de "literal" y "álgebra".LauraiGome2
 
CV CITRA RACHMILLIA, S.Psi
CV CITRA RACHMILLIA, S.PsiCV CITRA RACHMILLIA, S.Psi
CV CITRA RACHMILLIA, S.Psicitra rachmillia
 
Apuntes primera unidad
Apuntes primera unidad Apuntes primera unidad
Apuntes primera unidad Laura Rosado
 
Rehabilitación y restauración ecológica
Rehabilitación y restauración ecológicaRehabilitación y restauración ecológica
Rehabilitación y restauración ecológicaLuis Martinez
 
ARMY TRAINING TRANSCRIPT
ARMY TRAINING TRANSCRIPTARMY TRAINING TRANSCRIPT
ARMY TRAINING TRANSCRIPTBrian Watral
 

En vedette (13)

Multicultural App
Multicultural AppMulticultural App
Multicultural App
 
Vé máy bay vietnam airlines hà nội đi san francisco giá rẻ
Vé máy bay vietnam airlines hà nội đi san francisco giá rẻVé máy bay vietnam airlines hà nội đi san francisco giá rẻ
Vé máy bay vietnam airlines hà nội đi san francisco giá rẻ
 
Cuidados del agua
Cuidados del aguaCuidados del agua
Cuidados del agua
 
Resume_JagdishMathikumar
Resume_JagdishMathikumarResume_JagdishMathikumar
Resume_JagdishMathikumar
 
Trabajo de salud publica 3
Trabajo de salud publica 3Trabajo de salud publica 3
Trabajo de salud publica 3
 
Significado de "literal" y "álgebra".
Significado de "literal" y "álgebra".Significado de "literal" y "álgebra".
Significado de "literal" y "álgebra".
 
Cuidadosdelagua
Cuidadosdelagua Cuidadosdelagua
Cuidadosdelagua
 
CV CITRA RACHMILLIA, S.Psi
CV CITRA RACHMILLIA, S.PsiCV CITRA RACHMILLIA, S.Psi
CV CITRA RACHMILLIA, S.Psi
 
Complemento online
Complemento onlineComplemento online
Complemento online
 
Apuntes primera unidad
Apuntes primera unidad Apuntes primera unidad
Apuntes primera unidad
 
Rehabilitación y restauración ecológica
Rehabilitación y restauración ecológicaRehabilitación y restauración ecológica
Rehabilitación y restauración ecológica
 
Sigma Xi 2016
Sigma Xi 2016Sigma Xi 2016
Sigma Xi 2016
 
ARMY TRAINING TRANSCRIPT
ARMY TRAINING TRANSCRIPTARMY TRAINING TRANSCRIPT
ARMY TRAINING TRANSCRIPT
 

Similaire à Jha Ajachi_NIT Jamshedpur_CV (20)

CV-Sounder
CV-SounderCV-Sounder
CV-Sounder
 
CV Project Manager
CV Project ManagerCV Project Manager
CV Project Manager
 
Resume of Hariom
Resume of HariomResume of Hariom
Resume of Hariom
 
Velpandi CV
Velpandi CV Velpandi CV
Velpandi CV
 
GMR
GMRGMR
GMR
 
Amjad CV Updated
Amjad CV UpdatedAmjad CV Updated
Amjad CV Updated
 
resume-.PDF (2)
resume-.PDF (2)resume-.PDF (2)
resume-.PDF (2)
 
sounder
soundersounder
sounder
 
Naresh Resume
Naresh Resume Naresh Resume
Naresh Resume
 
Samsul Alam Resume
Samsul Alam ResumeSamsul Alam Resume
Samsul Alam Resume
 
wilson cv
wilson cvwilson cv
wilson cv
 
Quantity Surveyor 5+ Yrs Exp
Quantity Surveyor 5+ Yrs ExpQuantity Surveyor 5+ Yrs Exp
Quantity Surveyor 5+ Yrs Exp
 
Mirasol Resume 10-14-14
Mirasol Resume 10-14-14Mirasol Resume 10-14-14
Mirasol Resume 10-14-14
 
PIPING SUPERVISOR RESUME
PIPING SUPERVISOR RESUME  PIPING SUPERVISOR RESUME
PIPING SUPERVISOR RESUME
 
madhu updated cv
madhu updated cvmadhu updated cv
madhu updated cv
 
Sunil Final Resume
Sunil Final ResumeSunil Final Resume
Sunil Final Resume
 
Project Engineer
Project EngineerProject Engineer
Project Engineer
 
Turnover Engineer
Turnover EngineerTurnover Engineer
Turnover Engineer
 
UCM-CV
UCM-CVUCM-CV
UCM-CV
 
Curriculum_Vitate 20.09.15
Curriculum_Vitate 20.09.15Curriculum_Vitate 20.09.15
Curriculum_Vitate 20.09.15
 

Jha Ajachi_NIT Jamshedpur_CV

  • 1. JHA AJACHI RADHAKRISHNA BINOD PERSONAL PROFILE: Name: JHA AJACHI RADHAKRISHNA BINOD Date of Birth: JANUARY 7, 1989 Sex: Male E-Mail: ajachi.1989@gmail.com Ph no: +91 9873464177 PROFESSIONAL WORK EXPERIENCE: Previous Position: Profile: Construction Manager at GVS Group. Period: June 2012 to Feb 2015. Duration: 3.5 years • Commissioned and handover 4 warehousing projects • Developed strategies to optimize cost and quality for the projects • Set up sourcing network for materials and services Professional Responsibilities: 1. Schedule: • Detailed Schedule planning for the project as per scope. • Aligning schedule with Contractor & Client. • Making daily/weekly plan as per schedule and deploying to contractor. • Schedule tracking and sending DPRs. • Ensuring material & contractor manpower availability as per schedule and planning in advance. 2. Cost: • Preparing basic project estimate as per BOQ. • Preparing cash flow projection as per schedule. • Fortnightly cost tracking reports to client. • Monthly cash flow requirement for next month to client as per schedule. • Controlling site budget and implementing cost saving ideas. 3. Design & Execution: • Follow up with client/designer for design drawing availability on time. • Understanding all drawings in detail. • Deployment of drawings to contractor engineer/supervisor. • Ensuring execution as per design through right system checks on site. • Interacting with client/designer in case of implementation related issues due to
  • 2. design. 4. Quality: • Preparing quality protocol on site & aligning the client & contractor. • Preparation & Implementation of QAP, SOP & ITP at various site for delivering quality product to customer. 5. Safety: • Ensuring PPEs and safety systems are followed on site. • Periodic audits and feedbacks - positive/negative to be given to contractors on safety. 6. Vendor Management: • Listing contractors/suppliers locally for the scope of work. • Gathering quotation from contractors/suppliers. • Technical capability evaluation & recommendation. • Planning with vendors & pushing them for work to protect schedule. • Doing material planning in client scope as per the schedule by vendors. • Discussing & implementing cost & schedule saving ideas with vendors. Previous Position: • Assistant Manager at HDIL (Housing Development and Infrastructures Limited) Previous Profile: July 2010 to Nov 2012 Period: 2 years 1. Quality Assurance & Control: • Preparing methods for inspection, testing and evaluation. • Checking of the quality of material received at the sites as per the required specifications & quality norms. • Administering the implementation of a testing and inspection schedule and ensuring the compliance. • Coordinating the quality auditing efforts to ensure compliance with adopted standards. • Random Inspecting and checking the executed works to ensure the quality. • Conducting Quarterly Quality rating of the projects to create awareness in employee. • Preparation of Standard Operating Procedures (SOP), Laboratory Quality Manual, Quality Plan for Projects, Technical specification for projects, acceptance criteria, Inspection and Test plan & Construction methodology etc.
  • 3. 2. Analysis: • Unit quantity of steel, concrete and shuttering work. • Cement and sand required for block masonry, internal plaster, external plaster and water proofing. 3. Billing: • RA (running account) bills for civil work using AutoCAD drawing (structural). • RA bills for finishing work using AutoCAD drawing (Architectural). • Escalation by verifying purchase order, tax invoice and delivery challan and weighing sheet. 4. Contracts: • Liaison with other departments. • Preparation of BOQ (bill of quantity). • Estimating quantities from Drawings. 5. Execution: • Project: MMRDA SRA, Kurla Type: Residential building, No. of flats: 17508, Structure: 30 Bldgs each, Ground floor + 13 floors, Built-up area up to 398.75 Million square feet. • Quality assurance of materials at site. i.e. verifying strength of brick, concrete and steel as per IS (Indian standards), measuring silt content in sand, slump test of concrete for measuring workability, cement consistency test, alignment of shuttering, scaffolding and plaster. 6. Planning: • Embarking new project: project information, start and finish date, schedule of project from either start or finish date. • Adding task and milestone to a project: task name and amount of time each task will take in months, days, and hours. Milestone where duration is zero. • Showing critical path: using Gantt chart, network diagram, and critical task. EDUCATION: EDUCATION INSTITUTION CGPA/ Percentage B.Tech (Honors)- Civil Engineering NIT – JAMSHEPUR 2010 7.31 XII Board of intermediate education Don Bosco High School - Vadodara, GUJARAT 72 X Board of Secondary Education Don Bosco High School – Vadodara, GUJARAT 77.14 INTERNSHIPS AND KEY ACADEMIC PROJECTS:
  • 4. • Organization: JUSCO, Tatanagar Period: May 2009– July 2009 Successfully completed a project on “Cracks in Concrete in one storied buildings” at ICS department Kadma, JUSCO, Tatanagar (Jharkhand) • B.Tech project- 1 Period: July 2009– Nov 2010 Project on Trenchless technology in building underground tunnels for multipurpose infrastructural use like pipeline for petroleum or water. • B.Tech project-2: Period: Jan 2010– April 2010 Experiment on Composite plates under stress and development of graphs based on Matlab programming. SCHOLASTIC ACHIEVEMENTS: • Received ONGC scholarship for the last 3 academic years, the scholarship is awarded for the meritorious performance at graduation level studies and covers the tuition fees of the institute SOFTWARE SKILLS: • Engineering Software : AutoCAD and Google Sketch up. • Languages known : English, Hindi and Gujarati • Operating Systems : Microsoft Windows, Linux. EXTRACURRICULAR ACTIVITIES: • A highly appreciated project named “AURA-Advanced Utility Robotic Arm” which is prosthetic arm developed in 2009. • Received Awards in hardware making (robots and machines) competitions in the following events for “AURA”: a. Won 1st prize for “Genesis” at IIT-ROORKEE tech fest COGNIZANCE-2K9. b. Won 2nd prize in open hardware at IIT-KHARAGPUR tech fest KSHITIJ-2K9 c. Won Most Innovative Project prize in “Endeavour” at IIT-KANPUR tech fest TECHKRIT-2K9 d. Won 2nd prize in open hardware at NIT-JAMSHEDPUR tech fest PRAVAH-2K9 • Won 3rd prize for AUTOCAD design at NIT-JAMSHEDPUR tech fest PRAVAH-2K9