DMAIC
Understand the Process of DMAIC .
The Articles defined for help and to educate our
Six Sigma Certified Associates to run business and
process in dynamic way.
Ajit Kumar
6/28/2012
In every interview , the interviewer basically ask about six
sigma and importance of it, You can search Google and
understand the purpose of six sigma , definition of six sigma
but you stuck while talking about DMAIC, primarily when
interviewer ask in which phase what tool to be used. Here
We go to simplify your all questions.
6∂
*
8 – Discipline Methodology
(by ford)
DMAIC Methodology DFSS (DMADV)
 Used for –
 Problem solving
 RCA
 Permanent Corrective
Action
 Systemic Action
Used For
 Problem Solving
&
 Process Improvement
Used For
 Design new product or
process
 Re-design existing
product or process
Leads to
 Continual Improvement
Leads to
 Continual Improvement
 Breakthrough
Improvement
Leads to
 Design / Redesign or P n
P with fewer defects
means 4.5 sigma at
least.
Before Creating any project you must know what Method can fit for
your project, Basically there are 3 tool which we used while designing
any project.
1. TQM – Total quality management – 8D Method
2. DMAIC – Define Measure Analyze Improve & Control Method
3. DMADV – Define Measure Analyze Design & Verify Method
*
Define: - Based on your CTQ /CTP
Define Phase Steps / Tools
 Define customer and their requirements
(CTQs)
 Develop Project Charter
 Develop High Level Process Map
 Action plan for process standardization
 V.O.C Gathering and CTQ definitions
 Problem Statement
- Goal Statement
- Business Need Addressed
- Scope / Boundaries of the project
- Constraints
- Resources Needed
- Assumption
- Team Guidelines
- Team Composition
- Preliminary Project Milestones
 SIRPOC (SIPOC)
 Interim Containment Action
Define Tollgate Review ( Check List )
In Define Phase we Define Project Charter which includes Business Goal ,
Problem Statement , High Level Process Map , what Action we are going
to place and who all would be team member during this project
execution.
Measure: - Gather data to establish the current / baseline status, what is the
actually going on at the work place with the process as it works today quantify
the problem.
Measure Phase Steps / Tools
 Define Defect, Opportunity , Unit &
Metrics
 Identify the CTPs
 Develop the data collection plan &
format
 Validate the Measurement system.
 Collect the data
 Begin Developing Y = f(x) Relationship
 Calculate process capability and sigma
baseline
 Based on CTQs and process knowledge ,
Benchmarking
 Using Pareto , Correlation analysis, CT
matrix
 Questionnaires, Sampling plans
 Measurement System Analysis / Gage R &
R
 Check Sheet , Data Sets
 Correlation Analysis , Regression analysis ,
Design of Experiments
 CP , CPK , DPMO , / Sigma Level
Calculation
Measure : - Measure your Problematic Area
Analyze and determine the root cause of the defects. Interpret the data to
establish cause effect relationship.
Analyze Phase Steps / Tools
 Identify Value / Non-value added
process steps.
 Identify source of variation.
 Determine Root cause
 Determine vital few X’s , Y = f(X)
 Prepare Action plan to explore various
solution for the causes.
 Process Map Review and vale Analysis.
 Histogram, Control Chart Box, Whisker
Plot.
 Cause and effect fishbone diagram , Ask
Why 5 Times , Pareto
 Correlation Analysis, Regression Analysis,
Hypothesis, Testing, Design of
experiments.
 Brainstorming, SWOT analysis.
Analyze : What went wrong and how it will correct.
Improve : - Develop solution targeted at the confirmed causes. Design work Flow
Improve Phase Steps / Tools
 Develop Potential ideas & Solutions
 Assess failure modes of potential
solution
 Reduce risks associated with potential
solution.
 Plan & Execute Solution on pilot basis.
 Fine tune the Potential Solutions.
 Check performance levels after
improvement.
 Brainstorming, DOE.
 FMEA
 Mistake proofing
 Verification
 Validation
 CP, CPK, DPMO , Sigma Level
Improve : - during this phase FMEA, Brainstorming play vital role to get the
work flow designed , What & How to perform action.
Control : - Develop consequence management to control , Conduct FMEA
Control Phase Steps / Tools
 Authenticated calculation of saving
achieved.
 Develop & Implement the document
plan.
 Develop & Implement the training Plan.
 Develop & Implement the Control Plan
 Plan the Audit schedules & audit
requirements
 Transfer of project to process owner.
 Determining improvement in process
capability & Process sigma.
 Standardized work (SOPs, WIS , etc)
 Competency Matrix
 Control charts.
 PDCACP , CPK, DPMO , Sigma Level
Control : - Applying consequence management to control the improvement ,
Design SOPs to sustain the achievements, develop & Implement training plan to
improve more.
Thank you
Reader
Like | Subscribe & Share with your friends and colleagues…………………………………
Write me for your query – mailonajit@gmail.com

More Related Content

What's hot

Measure Phase
Measure PhaseMeasure Phase
Measure Phase
jay68
 
PMP Training - 08 project quality management
PMP Training - 08 project quality managementPMP Training - 08 project quality management
PMP Training - 08 project quality management
ejlp12
 
Six sigma green belt project template
Six sigma green belt project templateSix sigma green belt project template
Six sigma green belt project template
Shankaran Rd
 

What's hot (20)

Dmaic overview for slideshare
Dmaic overview for slideshareDmaic overview for slideshare
Dmaic overview for slideshare
 
Lean 6sigma and DMAIC
Lean 6sigma and DMAICLean 6sigma and DMAIC
Lean 6sigma and DMAIC
 
Project Management In The Automotive Industry
Project Management In The Automotive IndustryProject Management In The Automotive Industry
Project Management In The Automotive Industry
 
Dmadv overview 1
Dmadv overview 1Dmadv overview 1
Dmadv overview 1
 
Speed And Quality Of Development
Speed And Quality Of DevelopmentSpeed And Quality Of Development
Speed And Quality Of Development
 
Dmaic
DmaicDmaic
Dmaic
 
Six Sigma Green Belt Training Part 4
Six Sigma Green Belt Training Part 4Six Sigma Green Belt Training Part 4
Six Sigma Green Belt Training Part 4
 
8D analysis presentation
8D analysis presentation8D analysis presentation
8D analysis presentation
 
Define Phase
Define PhaseDefine Phase
Define Phase
 
Poka Yoka Techniques
Poka Yoka TechniquesPoka Yoka Techniques
Poka Yoka Techniques
 
Six Sigma Tools Project Templates
Six Sigma Tools Project TemplatesSix Sigma Tools Project Templates
Six Sigma Tools Project Templates
 
Measure Phase
Measure PhaseMeasure Phase
Measure Phase
 
Six Sigma Green Belt for Beginners in a Nutshell
Six Sigma Green Belt for Beginners in a NutshellSix Sigma Green Belt for Beginners in a Nutshell
Six Sigma Green Belt for Beginners in a Nutshell
 
DMAIC, DMADV & AGILE
DMAIC, DMADV & AGILEDMAIC, DMADV & AGILE
DMAIC, DMADV & AGILE
 
PMP Training - 08 project quality management
PMP Training - 08 project quality managementPMP Training - 08 project quality management
PMP Training - 08 project quality management
 
PDCA quality improvement
PDCA quality improvementPDCA quality improvement
PDCA quality improvement
 
DMAIC Model
DMAIC ModelDMAIC Model
DMAIC Model
 
Design for Six Sigma Primer
Design for Six Sigma PrimerDesign for Six Sigma Primer
Design for Six Sigma Primer
 
Six sigma green belt project template
Six sigma green belt project templateSix sigma green belt project template
Six sigma green belt project template
 
PDCA & Tools
PDCA & ToolsPDCA & Tools
PDCA & Tools
 

Similar to Understand dmaic

Basic Six Sigma Presentation
Basic Six Sigma PresentationBasic Six Sigma Presentation
Basic Six Sigma Presentation
vivekissar
 
QM-029-Six Sigma Overview
QM-029-Six Sigma OverviewQM-029-Six Sigma Overview
QM-029-Six Sigma Overview
handbook
 
Six Sigma For Managers 185
Six Sigma For Managers 185Six Sigma For Managers 185
Six Sigma For Managers 185
Anjoum .
 
QM-021-PDCA
QM-021-PDCAQM-021-PDCA
QM-021-PDCA
handbook
 
Six Sigma Process Improvement
Six Sigma Process ImprovementSix Sigma Process Improvement
Six Sigma Process Improvement
mrt77
 

Similar to Understand dmaic (20)

DMAIC Components
DMAIC ComponentsDMAIC Components
DMAIC Components
 
Profolio
ProfolioProfolio
Profolio
 
Basic Six Sigma Presentation
Basic Six Sigma PresentationBasic Six Sigma Presentation
Basic Six Sigma Presentation
 
Structured approach to problem solving
Structured approach to problem solvingStructured approach to problem solving
Structured approach to problem solving
 
Six Sigma For Managers
Six Sigma For Managers   Six Sigma For Managers
Six Sigma For Managers
 
QM-029-Six Sigma Overview
QM-029-Six Sigma OverviewQM-029-Six Sigma Overview
QM-029-Six Sigma Overview
 
Lean Six Sigma Leadership 062507
Lean Six Sigma Leadership 062507Lean Six Sigma Leadership 062507
Lean Six Sigma Leadership 062507
 
Six sigma
Six sigmaSix sigma
Six sigma
 
Six Sigma For Managers
Six Sigma For ManagersSix Sigma For Managers
Six Sigma For Managers
 
Six Sigma For Managers 185
Six Sigma For Managers 185Six Sigma For Managers 185
Six Sigma For Managers 185
 
QM-021-PDCA
QM-021-PDCAQM-021-PDCA
QM-021-PDCA
 
PDCA
PDCAPDCA
PDCA
 
Lean Six Sigma: DMAIC In-Depth
Lean Six Sigma: DMAIC In-DepthLean Six Sigma: DMAIC In-Depth
Lean Six Sigma: DMAIC In-Depth
 
Introduction to Six Sigma.pptx
Introduction to Six Sigma.pptxIntroduction to Six Sigma.pptx
Introduction to Six Sigma.pptx
 
CMMI & Six Sigma Integration
CMMI & Six Sigma IntegrationCMMI & Six Sigma Integration
CMMI & Six Sigma Integration
 
ASAP Methodology in Implementing ERP
ASAP Methodology in Implementing ERPASAP Methodology in Implementing ERP
ASAP Methodology in Implementing ERP
 
Six Sigma presentation
Six Sigma  presentationSix Sigma  presentation
Six Sigma presentation
 
Six Sigma Process Improvement
Six Sigma Process ImprovementSix Sigma Process Improvement
Six Sigma Process Improvement
 
Quality Engineering material
Quality Engineering materialQuality Engineering material
Quality Engineering material
 
Applying Lean Sigma Into Validation
Applying Lean Sigma Into ValidationApplying Lean Sigma Into Validation
Applying Lean Sigma Into Validation
 

Recently uploaded

Recently uploaded (20)

HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptx
 
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
 
How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
 
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structure
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
Plant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptxPlant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptx
 

Understand dmaic

  • 1. DMAIC Understand the Process of DMAIC . The Articles defined for help and to educate our Six Sigma Certified Associates to run business and process in dynamic way. Ajit Kumar 6/28/2012 In every interview , the interviewer basically ask about six sigma and importance of it, You can search Google and understand the purpose of six sigma , definition of six sigma but you stuck while talking about DMAIC, primarily when interviewer ask in which phase what tool to be used. Here We go to simplify your all questions. 6∂
  • 2. * 8 – Discipline Methodology (by ford) DMAIC Methodology DFSS (DMADV)  Used for –  Problem solving  RCA  Permanent Corrective Action  Systemic Action Used For  Problem Solving &  Process Improvement Used For  Design new product or process  Re-design existing product or process Leads to  Continual Improvement Leads to  Continual Improvement  Breakthrough Improvement Leads to  Design / Redesign or P n P with fewer defects means 4.5 sigma at least. Before Creating any project you must know what Method can fit for your project, Basically there are 3 tool which we used while designing any project. 1. TQM – Total quality management – 8D Method 2. DMAIC – Define Measure Analyze Improve & Control Method 3. DMADV – Define Measure Analyze Design & Verify Method
  • 3. * Define: - Based on your CTQ /CTP Define Phase Steps / Tools  Define customer and their requirements (CTQs)  Develop Project Charter  Develop High Level Process Map  Action plan for process standardization  V.O.C Gathering and CTQ definitions  Problem Statement - Goal Statement - Business Need Addressed - Scope / Boundaries of the project - Constraints - Resources Needed - Assumption - Team Guidelines - Team Composition - Preliminary Project Milestones  SIRPOC (SIPOC)  Interim Containment Action Define Tollgate Review ( Check List ) In Define Phase we Define Project Charter which includes Business Goal , Problem Statement , High Level Process Map , what Action we are going to place and who all would be team member during this project execution.
  • 4. Measure: - Gather data to establish the current / baseline status, what is the actually going on at the work place with the process as it works today quantify the problem. Measure Phase Steps / Tools  Define Defect, Opportunity , Unit & Metrics  Identify the CTPs  Develop the data collection plan & format  Validate the Measurement system.  Collect the data  Begin Developing Y = f(x) Relationship  Calculate process capability and sigma baseline  Based on CTQs and process knowledge , Benchmarking  Using Pareto , Correlation analysis, CT matrix  Questionnaires, Sampling plans  Measurement System Analysis / Gage R & R  Check Sheet , Data Sets  Correlation Analysis , Regression analysis , Design of Experiments  CP , CPK , DPMO , / Sigma Level Calculation Measure : - Measure your Problematic Area
  • 5. Analyze and determine the root cause of the defects. Interpret the data to establish cause effect relationship. Analyze Phase Steps / Tools  Identify Value / Non-value added process steps.  Identify source of variation.  Determine Root cause  Determine vital few X’s , Y = f(X)  Prepare Action plan to explore various solution for the causes.  Process Map Review and vale Analysis.  Histogram, Control Chart Box, Whisker Plot.  Cause and effect fishbone diagram , Ask Why 5 Times , Pareto  Correlation Analysis, Regression Analysis, Hypothesis, Testing, Design of experiments.  Brainstorming, SWOT analysis. Analyze : What went wrong and how it will correct.
  • 6. Improve : - Develop solution targeted at the confirmed causes. Design work Flow Improve Phase Steps / Tools  Develop Potential ideas & Solutions  Assess failure modes of potential solution  Reduce risks associated with potential solution.  Plan & Execute Solution on pilot basis.  Fine tune the Potential Solutions.  Check performance levels after improvement.  Brainstorming, DOE.  FMEA  Mistake proofing  Verification  Validation  CP, CPK, DPMO , Sigma Level Improve : - during this phase FMEA, Brainstorming play vital role to get the work flow designed , What & How to perform action.
  • 7. Control : - Develop consequence management to control , Conduct FMEA Control Phase Steps / Tools  Authenticated calculation of saving achieved.  Develop & Implement the document plan.  Develop & Implement the training Plan.  Develop & Implement the Control Plan  Plan the Audit schedules & audit requirements  Transfer of project to process owner.  Determining improvement in process capability & Process sigma.  Standardized work (SOPs, WIS , etc)  Competency Matrix  Control charts.  PDCACP , CPK, DPMO , Sigma Level Control : - Applying consequence management to control the improvement , Design SOPs to sustain the achievements, develop & Implement training plan to improve more.
  • 8. Thank you Reader Like | Subscribe & Share with your friends and colleagues………………………………… Write me for your query – mailonajit@gmail.com