SlideShare a Scribd company logo
1 of 8
CURRICULUM VITE
Engineer : Ali Kamil Hasan
PERSONAL PROFILE:
Name : Ali Kamil Hasan
Place & Date Of Birth: Iraq - Karbala 26/1/1986
Nationality: Iraqi
Martial Status: Married
Email: eng.alikamil85@yahoo.com // alikamil11985@gmail.com
Mobile: (00 964)7702725455
EDUCATION:
2007 - 2008 : Technology university in Baghdad – Electrical system
& control engineering department
* Degree Awarded: B.Sc. in Engineering Technology
WORK EXPERIENCE:
1. Work with Karbala investment commission as a member of
Follow-up Committee of industrial projects like Iron and steel
factory in Karbala& Supervision of all electrical works within the
factory and other industrial projects.
2. Work with Ministry of electric from 2010 to 2011 in project
department and work in AL Qudus project .
1
3. Work with Seimens company as below :
 Member in construction team of AL Maimonah
Substation ( 132 / 33 KV AIS system ) & installing
main& auxiliary transformers and installing 132 KV&
33KV switchgear panels and extension & wiring cables
to their equipment's and panels and installing all
equipment's like circuit breaker and disconectors and
earth switch disconnector and all AIS grid and installing
earth system of substation .
 Member in construction team of AL Basrah North
Substation ( 132 / 33 KV GIS system ) & installing
main& auxiliary transformers and installing 132 KV
switchgear panels and extension & wiring cables to their
equipment's and panels and installing all equipment's like
circuit breaker and disconectors and earth switch
disconnector and installing earth system of substation .
 Member in construction team of AL Ameer Substation
( 33 / 11 kv AIS system ) in AL Najaf & installing
main& auxiliary transformers and installing 33KV
switchgear panels and extension & wiring cables to their
equipment's and panels and installing all equipment's like
circuit breaker and disconectors and earth switch
disconnector and installing earth system of substation .
 Member in construction team of AL Al alaminuiom
2
Substation ( 33 / 11 kv AIS system ) in AL Nasirya &
installing main& auxiliary transformers and installing
33KV switchgear panels and extension & wiring cables
to their equipment's and panels and installing all
equipment's like circuit breaker and disconectors and
earth switch disconnector and installing earth system of
substation .
 Member in construction team of AL Naseej Substation
( 33 / 11 KV AIS system ) in Babel & installing main&
auxiliary transformers and installing 33KV switchgear
panels and extension & wiring cables to their equipment's
and panels and installing all equipment's like circuit
breaker and disconectors and earth switch disconector
and installing earth system of substation .
 Testing &commissioning of AL Salam substation (33/11
KV) in Karbala by made all tests for main & auxiliary
Transformers and Circuit breakers and Disconectors and
current & voltage transformers and All protection system
of relays and functional tests for Switchgear and all
equipment's according to its plans and tests for all power
cables .
 Testing &commissioning of AL Ameer substation (33/11
KV) in AL Najaf by made all tests for main & auxiliary
Transformers and Circuit breakers and Disconectors and
current & voltage transformers and All protection system
of relays and functional tests for Switchgear and all
equipment's according to its plans and tests for all power
3
cables .
 Testing &commissioning of AL Auruba substation
(33/11 KV) in AL Najaf by made all tests for main &
auxiliary Transformers and Circuit breakers and
Disconectors and current & voltage transformers and All
protection system of relays and functional tests for
Switchgear and all equipment's according to its plans and
tests for all power cables .
 Testing &commissioning of AL Fadhlia substation
(33/11 KV) in AL Nasirya by made all tests for main &
auxiliary Transformers and Circuit breakers and
Disconectors and current & voltage transformers and All
protection system of relays and functional tests for
Switchgear and all equipment's according to its plans and
tests for all main & secondary cables .
 Testing &commissioning of AL Shuhadaa substation
(33/11 KV) in AL Kut by made all tests for main &
auxiliary Transformers and Circuit breakers and
Disconectors and current & voltage transformers and All
protection system of relays and functional tests for
Switchgear and all equipment's according to its plans and
tests for all power cables .
 Testing &commissioning of AL Basra North substation
(132/33 KV GIS system ) in AL Basrah by made all
tests for main & auxiliary Transformers and Circuit
4
breakers and Disconectors and current & voltage
transformers and All protection system of relays and
functional tests for Switchgear & all equipment's
according to the plans and tests for all power cables .
 Testing &commissioning of AL Ali Algarbi substation
(132/33 KV GIS system ) in AL Aumara by made all
tests for main & auxiliary Transformers and Circuit
breakers and Disconectors and current & voltage
transformers and All protection system of relays and
functional tests for Switchgear & all equipment's
according to the plans and tests for all main & secondary
cables .
 Testing &commissioning of AL Qurnah substation
(400/132 KV GIS system ) in AL Basrah by made all
tests for main & auxiliary Transformers and Circuit
breakers and Disconectors and current & voltage
transformers and All protection system of relays and
functional tests for Switchgear & all equipment's
according to the plans and tests for all power& control
cables .
4- Work with future will company as below :
5
 Install 132 KV / 6.6 KV fixed Substation in AL Aumara
installing main& auxiliary transformers and installing
132 KV / 6.6 KV switchgear panels and extension &
wiring cables to their equipment's and panels and
installing all equipment's like circuit breaker and
disconectors .
 132 KV / 6.6 KV Fixed Substation in AL Aumara
(132/6.6 KV GIS system ) by made all tests for main &
auxiliary Transformers and Circuit breakers and
Disconectors and current & voltage transformers and All
protection system of relays and functional tests for
Switchgear & all equipment's according to the plans and
tests for all main & secondary cables .
5- Work with AL-BILAL company as below :
 Team Leader of testing & commissioning 400KV/ 132
KV / 11 KV GIS System (ALSTOM Manufactured)
Substation in AL-Basra ( AL – FAO) by made all tests
for main & auxiliary and Earthing Transformers and
Circuit breakers and Disconectors and current & voltage
transformers and Reactors & Capacitors and All
protection system of relays and functional tests for
Switchgear & all equipment's according to the plans
(in progress) .
6
Devises work with :
• Omicron CPC100
• Omicron CT analyzer
• Omicron 256 , 356
• TTR
• AC Hypot
• DC Hypot
• Breaker Analyzer
• Megger
• DC Contact
• DC Supply
TECHNICAL SKILLS:
1. Good Analytical Design Skills using : (AutoCAD).
2. Proficient Computer Skills (Ms-Office (Word , PowerPoint , Excel
& Access).
LANGUAGES:
1 Arabic: Native Language.
2 English: Very Good.
7
8

More Related Content

What's hot

Estimation of a_pole_mounted_substation
Estimation of a_pole_mounted_substationEstimation of a_pole_mounted_substation
Estimation of a_pole_mounted_substationSupardi Amaludin
 
Loss of excitation
Loss of excitationLoss of excitation
Loss of excitationNTPC
 
Power system stability issues and Defence Mechanism in Indian Grid
Power system stability issues and Defence Mechanism in Indian GridPower system stability issues and Defence Mechanism in Indian Grid
Power system stability issues and Defence Mechanism in Indian GridChandan Kumar
 
Power System Stability Issues
Power System Stability IssuesPower System Stability Issues
Power System Stability IssuesChandan Kumar
 
Sizing generators-for-leading-power-factor white-paper-24_feb14
Sizing generators-for-leading-power-factor white-paper-24_feb14Sizing generators-for-leading-power-factor white-paper-24_feb14
Sizing generators-for-leading-power-factor white-paper-24_feb14Insanul Aziz
 
Variabe voltage and variable frequency drives
Variabe voltage and variable frequency drivesVariabe voltage and variable frequency drives
Variabe voltage and variable frequency drivesDr. Bibhu Prasad Ganthia
 
Preventing circulating current in parallel generator applications
Preventing circulating current in parallel generator applicationsPreventing circulating current in parallel generator applications
Preventing circulating current in parallel generator applicationsMirus International
 
Motor bus transfer
Motor bus transferMotor bus transfer
Motor bus transfermichaeljmack
 
File 1 power system fault analysis
File 1 power system fault analysisFile 1 power system fault analysis
File 1 power system fault analysiskirkusawi
 
analysis of induction motor drive using slip power recovery scheme
analysis of induction motor drive using slip power recovery schemeanalysis of induction motor drive using slip power recovery scheme
analysis of induction motor drive using slip power recovery schemePrakash_13209
 
Study on Excitation system in Power sector
Study on Excitation system in Power sectorStudy on Excitation system in Power sector
Study on Excitation system in Power sectorBoben Anto Chemmannoor
 
Rotor earth fault protection of electric generator
Rotor earth fault protection of electric generatorRotor earth fault protection of electric generator
Rotor earth fault protection of electric generatorCS V
 
Y R ENGG Company Profile 2
Y R ENGG Company Profile 2Y R ENGG Company Profile 2
Y R ENGG Company Profile 2R.K. Mathuria
 
Alternator protection
Alternator protectionAlternator protection
Alternator protectionjawaharramaya
 
automatic voltage regulator
automatic voltage regulator automatic voltage regulator
automatic voltage regulator Sumit Patel
 

What's hot (20)

Estimation of a_pole_mounted_substation
Estimation of a_pole_mounted_substationEstimation of a_pole_mounted_substation
Estimation of a_pole_mounted_substation
 
Loss of excitation
Loss of excitationLoss of excitation
Loss of excitation
 
Power system stability issues and Defence Mechanism in Indian Grid
Power system stability issues and Defence Mechanism in Indian GridPower system stability issues and Defence Mechanism in Indian Grid
Power system stability issues and Defence Mechanism in Indian Grid
 
Power System Stability Issues
Power System Stability IssuesPower System Stability Issues
Power System Stability Issues
 
Sizing generators-for-leading-power-factor white-paper-24_feb14
Sizing generators-for-leading-power-factor white-paper-24_feb14Sizing generators-for-leading-power-factor white-paper-24_feb14
Sizing generators-for-leading-power-factor white-paper-24_feb14
 
Speed control of dc motor
Speed control of dc motorSpeed control of dc motor
Speed control of dc motor
 
Variabe voltage and variable frequency drives
Variabe voltage and variable frequency drivesVariabe voltage and variable frequency drives
Variabe voltage and variable frequency drives
 
Speed control of motor
Speed control of motorSpeed control of motor
Speed control of motor
 
Preventing circulating current in parallel generator applications
Preventing circulating current in parallel generator applicationsPreventing circulating current in parallel generator applications
Preventing circulating current in parallel generator applications
 
Motor bus transfer
Motor bus transferMotor bus transfer
Motor bus transfer
 
File 1 power system fault analysis
File 1 power system fault analysisFile 1 power system fault analysis
File 1 power system fault analysis
 
Gss ppt by kanhaiya
Gss ppt  by kanhaiyaGss ppt  by kanhaiya
Gss ppt by kanhaiya
 
Chopper
 Chopper Chopper
Chopper
 
analysis of induction motor drive using slip power recovery scheme
analysis of induction motor drive using slip power recovery schemeanalysis of induction motor drive using slip power recovery scheme
analysis of induction motor drive using slip power recovery scheme
 
Study on Excitation system in Power sector
Study on Excitation system in Power sectorStudy on Excitation system in Power sector
Study on Excitation system in Power sector
 
Rotor earth fault protection of electric generator
Rotor earth fault protection of electric generatorRotor earth fault protection of electric generator
Rotor earth fault protection of electric generator
 
Y R ENGG Company Profile 2
Y R ENGG Company Profile 2Y R ENGG Company Profile 2
Y R ENGG Company Profile 2
 
Alternator protection
Alternator protectionAlternator protection
Alternator protection
 
automatic voltage regulator
automatic voltage regulator automatic voltage regulator
automatic voltage regulator
 
GLPT-6008-EN
GLPT-6008-ENGLPT-6008-EN
GLPT-6008-EN
 

Viewers also liked

SB College Diploma
SB College DiplomaSB College Diploma
SB College DiplomaVida Hunt
 
Bobs kal hue legacy vol.1 551
Bobs kal hue legacy vol.1 551Bobs kal hue legacy vol.1 551
Bobs kal hue legacy vol.1 551Gumload Seller
 
Nouveautés et limitations de JMS 2
Nouveautés et limitations de JMS 2Nouveautés et limitations de JMS 2
Nouveautés et limitations de JMS 2Florian Beaufumé
 
Keen io - Présentation de l'outil
Keen io - Présentation de l'outilKeen io - Présentation de l'outil
Keen io - Présentation de l'outilJb Gabellieri
 
Curriculum2
Curriculum2Curriculum2
Curriculum2aliana15
 

Viewers also liked (9)

SB College Diploma
SB College DiplomaSB College Diploma
SB College Diploma
 
Bobs kal hue legacy vol.1 551
Bobs kal hue legacy vol.1 551Bobs kal hue legacy vol.1 551
Bobs kal hue legacy vol.1 551
 
MENTES LIBRES
MENTES LIBRES MENTES LIBRES
MENTES LIBRES
 
Vallerie Resume..pdf
Vallerie Resume..pdfVallerie Resume..pdf
Vallerie Resume..pdf
 
Nouveautés et limitations de JMS 2
Nouveautés et limitations de JMS 2Nouveautés et limitations de JMS 2
Nouveautés et limitations de JMS 2
 
Keen io - Présentation de l'outil
Keen io - Présentation de l'outilKeen io - Présentation de l'outil
Keen io - Présentation de l'outil
 
SPS-Power BI Introduction
SPS-Power BI IntroductionSPS-Power BI Introduction
SPS-Power BI Introduction
 
Curriculum2
Curriculum2Curriculum2
Curriculum2
 
CV English (1)
CV English (1)CV English (1)
CV English (1)
 

Similar to Ali Kamil CV

SHAIK IRFAN VALI ...resume Projects
SHAIK IRFAN VALI ...resume ProjectsSHAIK IRFAN VALI ...resume Projects
SHAIK IRFAN VALI ...resume ProjectsIrfan Vali
 
SHAIK IRFAN VALI .... resume O&M
SHAIK IRFAN VALI .... resume O&MSHAIK IRFAN VALI .... resume O&M
SHAIK IRFAN VALI .... resume O&MIrfan Vali
 
SHAIK IRFAN VALI resume (solar)
SHAIK IRFAN VALI  resume (solar)SHAIK IRFAN VALI  resume (solar)
SHAIK IRFAN VALI resume (solar)Irfan Vali
 
Ashok Resume-2015
Ashok Resume-2015Ashok Resume-2015
Ashok Resume-2015ashok kumar
 
ELECHTRICAL COMMISSIONING TECHNICIAN 2201622
ELECHTRICAL   COMMISSIONING  TECHNICIAN   2201622ELECHTRICAL   COMMISSIONING  TECHNICIAN   2201622
ELECHTRICAL COMMISSIONING TECHNICIAN 2201622MOHAMMAD KHALID MUSTAFA
 
Osama Atef Abd El Aty (1) new
Osama Atef Abd El Aty (1) newOsama Atef Abd El Aty (1) new
Osama Atef Abd El Aty (1) newosama atef
 
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)asish jana
 
nathan_resume(2)
nathan_resume(2)nathan_resume(2)
nathan_resume(2)Sri Nathan
 
resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986sheik syedali
 
3856 basem azzouz cv june-2016
3856 basem azzouz cv june-20163856 basem azzouz cv june-2016
3856 basem azzouz cv june-2016basem ali
 
Presentation MES GS 1
Presentation MES GS 1Presentation MES GS 1
Presentation MES GS 1Rai Zeeshan
 
Engineer Mr. AR.Mohamed Iqbal Resume
Engineer Mr. AR.Mohamed Iqbal ResumeEngineer Mr. AR.Mohamed Iqbal Resume
Engineer Mr. AR.Mohamed Iqbal ResumeIqbal Mohamed
 

Similar to Ali Kamil CV (20)

SHAIK IRFAN VALI ...resume Projects
SHAIK IRFAN VALI ...resume ProjectsSHAIK IRFAN VALI ...resume Projects
SHAIK IRFAN VALI ...resume Projects
 
SHAIK IRFAN VALI .... resume O&M
SHAIK IRFAN VALI .... resume O&MSHAIK IRFAN VALI .... resume O&M
SHAIK IRFAN VALI .... resume O&M
 
SHAIK IRFAN VALI resume (solar)
SHAIK IRFAN VALI  resume (solar)SHAIK IRFAN VALI  resume (solar)
SHAIK IRFAN VALI resume (solar)
 
Ashok Resume-2015
Ashok Resume-2015Ashok Resume-2015
Ashok Resume-2015
 
FAZIL PASHA CV 3.6.2015
FAZIL PASHA CV 3.6.2015FAZIL PASHA CV 3.6.2015
FAZIL PASHA CV 3.6.2015
 
ELECHTRICAL COMMISSIONING TECHNICIAN 2201622
ELECHTRICAL   COMMISSIONING  TECHNICIAN   2201622ELECHTRICAL   COMMISSIONING  TECHNICIAN   2201622
ELECHTRICAL COMMISSIONING TECHNICIAN 2201622
 
Osama Atef Abd El Aty (1) new
Osama Atef Abd El Aty (1) newOsama Atef Abd El Aty (1) new
Osama Atef Abd El Aty (1) new
 
ANBARASAN R CV
ANBARASAN R CV ANBARASAN R CV
ANBARASAN R CV
 
QA/QC ENGINEER
QA/QC ENGINEERQA/QC ENGINEER
QA/QC ENGINEER
 
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
 
nathan_resume(2)
nathan_resume(2)nathan_resume(2)
nathan_resume(2)
 
asaires
asairesasaires
asaires
 
MY CV
MY CVMY CV
MY CV
 
resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986
 
3856 basem azzouz cv june-2016
3856 basem azzouz cv june-20163856 basem azzouz cv june-2016
3856 basem azzouz cv june-2016
 
Presentation MES GS 1
Presentation MES GS 1Presentation MES GS 1
Presentation MES GS 1
 
Commission resume
Commission resumeCommission resume
Commission resume
 
Engr kashif cv
Engr kashif cvEngr kashif cv
Engr kashif cv
 
Jose_Transmission_Engineer
Jose_Transmission_EngineerJose_Transmission_Engineer
Jose_Transmission_Engineer
 
Engineer Mr. AR.Mohamed Iqbal Resume
Engineer Mr. AR.Mohamed Iqbal ResumeEngineer Mr. AR.Mohamed Iqbal Resume
Engineer Mr. AR.Mohamed Iqbal Resume
 

Ali Kamil CV

  • 1. CURRICULUM VITE Engineer : Ali Kamil Hasan PERSONAL PROFILE: Name : Ali Kamil Hasan Place & Date Of Birth: Iraq - Karbala 26/1/1986 Nationality: Iraqi Martial Status: Married Email: eng.alikamil85@yahoo.com // alikamil11985@gmail.com Mobile: (00 964)7702725455 EDUCATION: 2007 - 2008 : Technology university in Baghdad – Electrical system & control engineering department * Degree Awarded: B.Sc. in Engineering Technology WORK EXPERIENCE: 1. Work with Karbala investment commission as a member of Follow-up Committee of industrial projects like Iron and steel factory in Karbala& Supervision of all electrical works within the factory and other industrial projects. 2. Work with Ministry of electric from 2010 to 2011 in project department and work in AL Qudus project . 1
  • 2. 3. Work with Seimens company as below :  Member in construction team of AL Maimonah Substation ( 132 / 33 KV AIS system ) & installing main& auxiliary transformers and installing 132 KV& 33KV switchgear panels and extension & wiring cables to their equipment's and panels and installing all equipment's like circuit breaker and disconectors and earth switch disconnector and all AIS grid and installing earth system of substation .  Member in construction team of AL Basrah North Substation ( 132 / 33 KV GIS system ) & installing main& auxiliary transformers and installing 132 KV switchgear panels and extension & wiring cables to their equipment's and panels and installing all equipment's like circuit breaker and disconectors and earth switch disconnector and installing earth system of substation .  Member in construction team of AL Ameer Substation ( 33 / 11 kv AIS system ) in AL Najaf & installing main& auxiliary transformers and installing 33KV switchgear panels and extension & wiring cables to their equipment's and panels and installing all equipment's like circuit breaker and disconectors and earth switch disconnector and installing earth system of substation .  Member in construction team of AL Al alaminuiom 2
  • 3. Substation ( 33 / 11 kv AIS system ) in AL Nasirya & installing main& auxiliary transformers and installing 33KV switchgear panels and extension & wiring cables to their equipment's and panels and installing all equipment's like circuit breaker and disconectors and earth switch disconnector and installing earth system of substation .  Member in construction team of AL Naseej Substation ( 33 / 11 KV AIS system ) in Babel & installing main& auxiliary transformers and installing 33KV switchgear panels and extension & wiring cables to their equipment's and panels and installing all equipment's like circuit breaker and disconectors and earth switch disconector and installing earth system of substation .  Testing &commissioning of AL Salam substation (33/11 KV) in Karbala by made all tests for main & auxiliary Transformers and Circuit breakers and Disconectors and current & voltage transformers and All protection system of relays and functional tests for Switchgear and all equipment's according to its plans and tests for all power cables .  Testing &commissioning of AL Ameer substation (33/11 KV) in AL Najaf by made all tests for main & auxiliary Transformers and Circuit breakers and Disconectors and current & voltage transformers and All protection system of relays and functional tests for Switchgear and all equipment's according to its plans and tests for all power 3
  • 4. cables .  Testing &commissioning of AL Auruba substation (33/11 KV) in AL Najaf by made all tests for main & auxiliary Transformers and Circuit breakers and Disconectors and current & voltage transformers and All protection system of relays and functional tests for Switchgear and all equipment's according to its plans and tests for all power cables .  Testing &commissioning of AL Fadhlia substation (33/11 KV) in AL Nasirya by made all tests for main & auxiliary Transformers and Circuit breakers and Disconectors and current & voltage transformers and All protection system of relays and functional tests for Switchgear and all equipment's according to its plans and tests for all main & secondary cables .  Testing &commissioning of AL Shuhadaa substation (33/11 KV) in AL Kut by made all tests for main & auxiliary Transformers and Circuit breakers and Disconectors and current & voltage transformers and All protection system of relays and functional tests for Switchgear and all equipment's according to its plans and tests for all power cables .  Testing &commissioning of AL Basra North substation (132/33 KV GIS system ) in AL Basrah by made all tests for main & auxiliary Transformers and Circuit 4
  • 5. breakers and Disconectors and current & voltage transformers and All protection system of relays and functional tests for Switchgear & all equipment's according to the plans and tests for all power cables .  Testing &commissioning of AL Ali Algarbi substation (132/33 KV GIS system ) in AL Aumara by made all tests for main & auxiliary Transformers and Circuit breakers and Disconectors and current & voltage transformers and All protection system of relays and functional tests for Switchgear & all equipment's according to the plans and tests for all main & secondary cables .  Testing &commissioning of AL Qurnah substation (400/132 KV GIS system ) in AL Basrah by made all tests for main & auxiliary Transformers and Circuit breakers and Disconectors and current & voltage transformers and All protection system of relays and functional tests for Switchgear & all equipment's according to the plans and tests for all power& control cables . 4- Work with future will company as below : 5
  • 6.  Install 132 KV / 6.6 KV fixed Substation in AL Aumara installing main& auxiliary transformers and installing 132 KV / 6.6 KV switchgear panels and extension & wiring cables to their equipment's and panels and installing all equipment's like circuit breaker and disconectors .  132 KV / 6.6 KV Fixed Substation in AL Aumara (132/6.6 KV GIS system ) by made all tests for main & auxiliary Transformers and Circuit breakers and Disconectors and current & voltage transformers and All protection system of relays and functional tests for Switchgear & all equipment's according to the plans and tests for all main & secondary cables . 5- Work with AL-BILAL company as below :  Team Leader of testing & commissioning 400KV/ 132 KV / 11 KV GIS System (ALSTOM Manufactured) Substation in AL-Basra ( AL – FAO) by made all tests for main & auxiliary and Earthing Transformers and Circuit breakers and Disconectors and current & voltage transformers and Reactors & Capacitors and All protection system of relays and functional tests for Switchgear & all equipment's according to the plans (in progress) . 6
  • 7. Devises work with : • Omicron CPC100 • Omicron CT analyzer • Omicron 256 , 356 • TTR • AC Hypot • DC Hypot • Breaker Analyzer • Megger • DC Contact • DC Supply TECHNICAL SKILLS: 1. Good Analytical Design Skills using : (AutoCAD). 2. Proficient Computer Skills (Ms-Office (Word , PowerPoint , Excel & Access). LANGUAGES: 1 Arabic: Native Language. 2 English: Very Good. 7
  • 8. 8