JSA-Piling or Concreting for Foundations & Building

JSA-Piling or Concreting for Foundations & Building
Sr. Activity Potential Hazards Control Measures
1.
Mobilization of equipment &
Materials
1.Involvement of unskilled personnel
2.Piling machine hit with plant/equipment & structures
3.Unauthorised/ uninspected equipment/tools at site
4.Personnel injury/property damage
5.Overhead structures/pipe racks
6.Slip, Trip & Fall
7.Inclement weather condition
 Trained & skilled staff to be authorized for working
 Ensure JSA briefing & Daily TBT to all workforce before commencing the
activity
 Use of authorized & designated routes
 Only inspected Equipment/Tools must be allowed at the worksite
 Use the right tools for the right job
 Ensure safe transportation of equipment/materials at the worksite
 Avoid throwing of materials
 All of the materials to be secured while its transportation to work site
 Ensure a safe distance of piling machine from overhead structures/pipe racks
 Water sprinkling to be carried out on regular biases to avoid dust
 Take care of overhead structure/pipe racks
 Keep access/walkways always clear from any obstruction
 Stop work in case of any inclement weather conditions (rain, storm, fog etc.)
 Restrict movement of heavy vehicles/equipment in rain/fog
2. Piling with Piling Machine 1.Uncertified piling Machine & Operator,
2.Personnel hit by the movement of the piling machine,
3.Working in live areas
4.Sling broken, load drop
5.Slip, Trip & Fall
6.Inclement weather condition
7.Fire & explosion
 Pile machine & its operator should be certified
 Banks man should be available at the site to control the movement of heavy
vehicles/equipment
 Keep away all unauthorized people during movement of heavy vehicle/equipment
 Be careful of nearby live areas
 Ensure Close HSE monitoring /supervision
 Ensure proper & inspected accessories being used for drilling
 Ensure that drilling bit is properly fixed with locking pins
 Keep away during the drilling operation
 the working area should properly be barricaded
JSA-Piling or Concreting for Foundations & Building
Project/Facility: Reference No:
Client: Date of Assessments:
Assessed by: Date of Next Assessment:
Reviewed by: Approved by:
Activity: JSA-Piling or Concreting for Foundations & Building
Emergency Plans. Standard PPE’s: First aid kit must be present at the worksite and the HSE personnel will be the first response in case of emergency, ERPs &
Emergency contact numbers to be in place at the job location
Review Process. After the job has been completed, JSA leader should note: any hazards, which were identified in the original JSA? In case of any new hazard
identified by any of the working team members during the job, the JSA review process should be carried on.
JSA-Piling or Concreting for Foundations & Building
 Ensure proper stacking of all materials at the site
 Keep access/walkways always clear from any obstruction
 Ensure proper housekeeping of the workplace all the time
 Stop work in case of any inclement weather conditions (rain, storm, fog etc.)
 Restrict movement of heavy vehicles/equipment in rain/fog
 Ensure availability of inspected fire extinguishers at site
 Conduct proper gas test before start job
 Flame arrestor to be installed in all vehicles/equipment
3. Lowering of Steel Cage
structure & Concreting of
piles
1.Personnel hand injury while handling with steel
2.People under a suspended load
3.Unbalancing of load
4.Miscommunication between operator & signalman
5.Improper signalling during lowering of the steel cage
structure
6.Inappropriate PPE’s/Tools during concrete work
7.Skin contact with concrete or other chemicals
 Ensure the Involvement of skilled labour
 Ensure use of proper PPE’s
 Deliver TBT before commencing work
 Ensure use of inspected & colour coded hand tools & rigging accessories
 The area should be properly barricaded during lifting operations
 Ensure proper stacking of all materials at the worksite
 Maintain good housekeeping all the time
 Use of appropriate PPE’s during concrete
 Ensure use of inspected tools for the right job
 Availability of freshwater at site
4. Working at night shift hours 1.Poor visibility at night hours
2.Vehicles/equipment hit with people, equipment or
structure
3.Slip, trip & fall
 Ensure proper lighting arrangement for late-night working hours
 Careful movement of vehicles/equipment in night hours
 Place refection tapes at hard barriers, structures
 Banks men should wear high visibility reflection vests
 No working should be allowed in poor lighting conditions
 Ensure proper housekeeping to avoid tripping
1 sur 2

Recommandé

risk assessment - pile cap.pdf par
risk assessment - pile cap.pdfrisk assessment - pile cap.pdf
risk assessment - pile cap.pdfmydl2
593 vues4 diapositives
JHA HEAVY LIFTING OF VESSEL.pdf par
JHA HEAVY LIFTING OF VESSEL.pdfJHA HEAVY LIFTING OF VESSEL.pdf
JHA HEAVY LIFTING OF VESSEL.pdfHaroon AbdulRahim
12 vues11 diapositives
HAZARD IDENTIFICATION RISK ASSESSMENT 561 KWH BASF DAHEJ GUJARAT.pdf par
HAZARD IDENTIFICATION RISK ASSESSMENT 561 KWH  BASF DAHEJ GUJARAT.pdfHAZARD IDENTIFICATION RISK ASSESSMENT 561 KWH  BASF DAHEJ GUJARAT.pdf
HAZARD IDENTIFICATION RISK ASSESSMENT 561 KWH BASF DAHEJ GUJARAT.pdfMohsinKhan281076
255 vues6 diapositives
Methodstatement welding par
Methodstatement weldingMethodstatement welding
Methodstatement weldingAanand Subi
10.9K vues9 diapositives
Mawaz CV par
Mawaz CVMawaz CV
Mawaz CVMawaz Akhter
240 vues5 diapositives
update 20feb1 par
update 20feb1update 20feb1
update 20feb1CHRISTOPHER Rickie CHRISTIE
149 vues6 diapositives

Contenu connexe

Similaire à JSA-Piling or Concreting for Foundations & Building

Project par
ProjectProject
ProjectKhurram Shahzad
176 vues25 diapositives
Turn Key Group Services - OHS Toolkit par
Turn Key Group Services - OHS ToolkitTurn Key Group Services - OHS Toolkit
Turn Key Group Services - OHS Toolkitturnkeygroupservices
1.1K vues37 diapositives
Plant ; equipment dismantling of scaffold par
Plant ; equipment dismantling of scaffoldPlant ; equipment dismantling of scaffold
Plant ; equipment dismantling of scaffoldBimal Chandra Das
211 vues3 diapositives
Lifting equipment at work par
Lifting equipment at workLifting equipment at work
Lifting equipment at workPaul Smith
5.2K vues36 diapositives
AHU.pdf par
AHU.pdfAHU.pdf
AHU.pdfSyedMoazzamAliAli1
35 vues6 diapositives
LPG Chloride treaters foundation execution_Rev.00.pdf par
LPG Chloride treaters foundation execution_Rev.00.pdfLPG Chloride treaters foundation execution_Rev.00.pdf
LPG Chloride treaters foundation execution_Rev.00.pdfJESUSBASILIOANTONIO
12 vues6 diapositives

Similaire à JSA-Piling or Concreting for Foundations & Building (20)

Lifting equipment at work par Paul Smith
Lifting equipment at workLifting equipment at work
Lifting equipment at work
Paul Smith5.2K vues
Construction safety lecture-3 par Saleem Malik
Construction safety  lecture-3Construction safety  lecture-3
Construction safety lecture-3
Saleem Malik1.4K vues
150 Question Answers | Occupational Health & Safety par Muhammad Usman
150 Question Answers | Occupational Health & Safety150 Question Answers | Occupational Health & Safety
150 Question Answers | Occupational Health & Safety
Muhammad Usman24.8K vues
Safety protocols of construction site.pptx par Zeeshan Yousaf
Safety protocols of construction site.pptxSafety protocols of construction site.pptx
Safety protocols of construction site.pptx
Demolition of existing boiler house par AnatoliZ
Demolition of existing boiler houseDemolition of existing boiler house
Demolition of existing boiler house
AnatoliZ3.8K vues
Excavations par FFSafety
ExcavationsExcavations
Excavations
FFSafety1.7K vues
Jha rock drill use and maintenance romo par nafable
Jha rock drill use and maintenance romoJha rock drill use and maintenance romo
Jha rock drill use and maintenance romo
nafable1.2K vues
hot works for construction of temporary facilities par Fãrük Ñäzmî
hot works for construction of temporary facilitieshot works for construction of temporary facilities
hot works for construction of temporary facilities
Fãrük Ñäzmî925 vues

Dernier

Web Dev Session 1.pptx par
Web Dev Session 1.pptxWeb Dev Session 1.pptx
Web Dev Session 1.pptxVedVekhande
20 vues22 diapositives
Proposal Presentation.pptx par
Proposal Presentation.pptxProposal Presentation.pptx
Proposal Presentation.pptxkeytonallamon
76 vues36 diapositives
Module-1, Chapter-2 Data Types, Variables, and Arrays par
Module-1, Chapter-2 Data Types, Variables, and ArraysModule-1, Chapter-2 Data Types, Variables, and Arrays
Module-1, Chapter-2 Data Types, Variables, and ArraysDemian Antony D'Mello
6 vues44 diapositives
Renewal Projects in Seismic Construction par
Renewal Projects in Seismic ConstructionRenewal Projects in Seismic Construction
Renewal Projects in Seismic ConstructionEngineering & Seismic Construction
6 vues8 diapositives
sam_software_eng_cv.pdf par
sam_software_eng_cv.pdfsam_software_eng_cv.pdf
sam_software_eng_cv.pdfsammyigbinovia
11 vues5 diapositives
2023Dec ASU Wang NETR Group Research Focus and Facility Overview.pptx par
2023Dec ASU Wang NETR Group Research Focus and Facility Overview.pptx2023Dec ASU Wang NETR Group Research Focus and Facility Overview.pptx
2023Dec ASU Wang NETR Group Research Focus and Facility Overview.pptxlwang78
188 vues19 diapositives

Dernier(20)

2023Dec ASU Wang NETR Group Research Focus and Facility Overview.pptx par lwang78
2023Dec ASU Wang NETR Group Research Focus and Facility Overview.pptx2023Dec ASU Wang NETR Group Research Focus and Facility Overview.pptx
2023Dec ASU Wang NETR Group Research Focus and Facility Overview.pptx
lwang78188 vues
Design of machine elements-UNIT 3.pptx par gopinathcreddy
Design of machine elements-UNIT 3.pptxDesign of machine elements-UNIT 3.pptx
Design of machine elements-UNIT 3.pptx
gopinathcreddy38 vues
Créativité dans le design mécanique à l’aide de l’optimisation topologique par LIEGE CREATIVE
Créativité dans le design mécanique à l’aide de l’optimisation topologiqueCréativité dans le design mécanique à l’aide de l’optimisation topologique
Créativité dans le design mécanique à l’aide de l’optimisation topologique
Design_Discover_Develop_Campaign.pptx par ShivanshSeth6
Design_Discover_Develop_Campaign.pptxDesign_Discover_Develop_Campaign.pptx
Design_Discover_Develop_Campaign.pptx
ShivanshSeth655 vues
Unlocking Research Visibility.pdf par KhatirNaima
Unlocking Research Visibility.pdfUnlocking Research Visibility.pdf
Unlocking Research Visibility.pdf
KhatirNaima11 vues
Ansari: Practical experiences with an LLM-based Islamic Assistant par M Waleed Kadous
Ansari: Practical experiences with an LLM-based Islamic AssistantAnsari: Practical experiences with an LLM-based Islamic Assistant
Ansari: Practical experiences with an LLM-based Islamic Assistant
M Waleed Kadous11 vues
Design of Structures and Foundations for Vibrating Machines, Arya-ONeill-Pinc... par csegroupvn
Design of Structures and Foundations for Vibrating Machines, Arya-ONeill-Pinc...Design of Structures and Foundations for Vibrating Machines, Arya-ONeill-Pinc...
Design of Structures and Foundations for Vibrating Machines, Arya-ONeill-Pinc...
csegroupvn13 vues
BCIC - Manufacturing Conclave - Technology-Driven Manufacturing for Growth par Innomantra
BCIC - Manufacturing Conclave -  Technology-Driven Manufacturing for GrowthBCIC - Manufacturing Conclave -  Technology-Driven Manufacturing for Growth
BCIC - Manufacturing Conclave - Technology-Driven Manufacturing for Growth
Innomantra 20 vues

JSA-Piling or Concreting for Foundations & Building

  • 1. JSA-Piling or Concreting for Foundations & Building Sr. Activity Potential Hazards Control Measures 1. Mobilization of equipment & Materials 1.Involvement of unskilled personnel 2.Piling machine hit with plant/equipment & structures 3.Unauthorised/ uninspected equipment/tools at site 4.Personnel injury/property damage 5.Overhead structures/pipe racks 6.Slip, Trip & Fall 7.Inclement weather condition  Trained & skilled staff to be authorized for working  Ensure JSA briefing & Daily TBT to all workforce before commencing the activity  Use of authorized & designated routes  Only inspected Equipment/Tools must be allowed at the worksite  Use the right tools for the right job  Ensure safe transportation of equipment/materials at the worksite  Avoid throwing of materials  All of the materials to be secured while its transportation to work site  Ensure a safe distance of piling machine from overhead structures/pipe racks  Water sprinkling to be carried out on regular biases to avoid dust  Take care of overhead structure/pipe racks  Keep access/walkways always clear from any obstruction  Stop work in case of any inclement weather conditions (rain, storm, fog etc.)  Restrict movement of heavy vehicles/equipment in rain/fog 2. Piling with Piling Machine 1.Uncertified piling Machine & Operator, 2.Personnel hit by the movement of the piling machine, 3.Working in live areas 4.Sling broken, load drop 5.Slip, Trip & Fall 6.Inclement weather condition 7.Fire & explosion  Pile machine & its operator should be certified  Banks man should be available at the site to control the movement of heavy vehicles/equipment  Keep away all unauthorized people during movement of heavy vehicle/equipment  Be careful of nearby live areas  Ensure Close HSE monitoring /supervision  Ensure proper & inspected accessories being used for drilling  Ensure that drilling bit is properly fixed with locking pins  Keep away during the drilling operation  the working area should properly be barricaded JSA-Piling or Concreting for Foundations & Building Project/Facility: Reference No: Client: Date of Assessments: Assessed by: Date of Next Assessment: Reviewed by: Approved by: Activity: JSA-Piling or Concreting for Foundations & Building Emergency Plans. Standard PPE’s: First aid kit must be present at the worksite and the HSE personnel will be the first response in case of emergency, ERPs & Emergency contact numbers to be in place at the job location Review Process. After the job has been completed, JSA leader should note: any hazards, which were identified in the original JSA? In case of any new hazard identified by any of the working team members during the job, the JSA review process should be carried on.
  • 2. JSA-Piling or Concreting for Foundations & Building  Ensure proper stacking of all materials at the site  Keep access/walkways always clear from any obstruction  Ensure proper housekeeping of the workplace all the time  Stop work in case of any inclement weather conditions (rain, storm, fog etc.)  Restrict movement of heavy vehicles/equipment in rain/fog  Ensure availability of inspected fire extinguishers at site  Conduct proper gas test before start job  Flame arrestor to be installed in all vehicles/equipment 3. Lowering of Steel Cage structure & Concreting of piles 1.Personnel hand injury while handling with steel 2.People under a suspended load 3.Unbalancing of load 4.Miscommunication between operator & signalman 5.Improper signalling during lowering of the steel cage structure 6.Inappropriate PPE’s/Tools during concrete work 7.Skin contact with concrete or other chemicals  Ensure the Involvement of skilled labour  Ensure use of proper PPE’s  Deliver TBT before commencing work  Ensure use of inspected & colour coded hand tools & rigging accessories  The area should be properly barricaded during lifting operations  Ensure proper stacking of all materials at the worksite  Maintain good housekeeping all the time  Use of appropriate PPE’s during concrete  Ensure use of inspected tools for the right job  Availability of freshwater at site 4. Working at night shift hours 1.Poor visibility at night hours 2.Vehicles/equipment hit with people, equipment or structure 3.Slip, trip & fall  Ensure proper lighting arrangement for late-night working hours  Careful movement of vehicles/equipment in night hours  Place refection tapes at hard barriers, structures  Banks men should wear high visibility reflection vests  No working should be allowed in poor lighting conditions  Ensure proper housekeeping to avoid tripping