Project - Newcastle 
Total Investment - $502,083,310 in three phases over three years 
Year 1, Phase 1 
 Bamboo Plantation + equipment $ 8,938,427 
 Transport vehicles $ 562,857 
 Development fee $ 48,490,706 
Subtotal Phase 1 $ 57,991,989 
Year 1, Phase 2 
 Initial carbonising plant (20 ton/h) & steam turbine $ 7,500,000 
 Design of the Biomass-to-Liquid (BTL) refinery 
Subtotal Phases 1 & 2 $ 65,491,989 
Year 2 & 3, Phase 3 
 2nd year: Infrastructure BTL and final carbonising plant $ 225,000,000 
 3rd year: Finalise construction of all plants $ 211,591,320 
Subtotal Phase 3 $ 
436,591,320 
Offset value from 750,000 tons of Met Coke = $259 395 000 over 20 
years
Background to Bamboo 
 Over 13 years of research and development 
 Raw material to be grown in Swaziland & South Africa 
– Favourable Land Agreements 
– High demand for bamboo by many industries 
– Carbon Credits for Bamboo plantations 
– Offset credits for Power, BamCoke and fuel 
 Current South Africa 
– Bamboo embryo genesis labs and nurseries
Investor Criteria: Core 
NewCo Farming in Swaziland: 
•Produce bamboo for BioCarbon, BTL & electricity 
•4,000 hectare farm & Bamboo Nursery 
•Average plantation cost: $1,927 /hectare 
•Average income per hectare from year 4 to 10: $5,980 
•IRR: 62%+ from Farming Operations 
•NPV: $ 107,986,477 @ a 12% cost of Capital.
Development Steps 
Mth Mth Mth Mth Mth Mth Mth Mth Mth Mth Mth Mth 
Nursery 1 2 3 4 5 6 7 8 9 10 11 12 
Order Plants 
TC delivery @ 50,000 every 2 weeks from 
Plant deleveries to Farm from other source 
Order Farming equipment delivery 
Farming 
Finilse agreements + Land Survies 
Order fertilise & Delivery 
Fencing Land Prep
Operational Steps 
Mth Mth Mth Mth Mth Mth Mth Mth Mth Mth Mth Mth 
Farming year 1 13 14 15 16 17 18 19 20 21 22 23 24 
Pitting and Planting 
Watering for six mooths after rains if rainfall <600 mm 
Weeding till two weeks after rains 
Watering after planting 
Mth Mth Mth Mth Mth Mth Mth Mth Mth Mth Mth Mth 
Farming year 2 25 26 27 28 29 30 31 32 33 34 35 36 
Shoot Harvest 
Weeding till two weeks after rains 
Slashing 
Farming year 3 37 38 39 40 41 42 43 44 45 46 48 49 
Shoot Harvest 
Slashing 
Farming year 4 
Shoot Harvest 
Culm Harvest
Operational Steps 
Mth Mth Mth Mth Mth Mth Mth Mth Mth Mth Mth Mth 
Bio Carbon Plant 1 2 3 4 5 6 7 8 9 10 11 12 
Order Carboniser Delivery & Tes ting 
Order BTL (Des ign and engineering) 
Carbonis ing 
BTL Construction 13 14 15 16 17 18 19 20 21 22 23 24 
Des ign and engineering then Cons truction 
Carbonis ing + Power generation 
25 26 27 28 29 31 33 35 37 39 41 43 
Cons trcution and tes ting - Handover 
Carbonis ing + Power generation 
44 45 46 48 49 50 51 52 53 54 55 56 
Supply BioCoke, Fuel & Power
Investor Criteria: Non-core 
 Transportation 
 Bamboo Splitting then Chipping 
 Community Based Industries 
– Food security 
– Making of Flooring etc. 
– Low Cost Housing
Current Status 
 Lab and Nursery: Facilities ready to start production 
 Carbonising: Feasibility completed on 500 tons of 
carbonized bamboo and 500 tons of black wattle 
 Market : Agreements from Smelters to purchase 
BamCoke 
 Farms: Initial Agreements with land owners being 
finalized
Profit and Loss 
Production Statistics Yr-1 Yr-2 Yr-3 Yr-4 Yr-5 Yr-6 Yr-7 Yr-8 Yr-9 Yr-10 
Diesel Sold (litres) - - - 356 792 666 468 604 354 469 376 099 476 391 092 472 244 539 470 803 012 474 462 465 
BamChar/ Sold (t) - 98 112 98 112 571 252 750 271 751 507 762 738 756 099 753 791 759 650 
Power Generated (kWh) - 87 600 000 87 600 000 1 896 093 120 2 215 769 909 2 217 976 376 2 238 032 692 2 226 177 431 2 222 056 014 2 232 518 624 
Quantity of shoots & Leaf sold (t) - - 14 240 16 040 25 480 32 040 34 480 38 400 43 200 47 600 
Quantity of bamboo culms sold (t) - - - 1 020 093 1 339 770 1 341 976 1 362 033 1 350 177 1 346 056 1 356 519 
CO2 Sequestered (MT) - - - 0 0 0 0 0 0 0 
mega watts per hour 10 10 216 253 253 255 254 254 255 
Net Sales - 35 390 400 38 102 781 784 548 343 981 823 631 984 548 055 997 306 303 990 870 114 989 326 316 993 007 281 
Cost of Goods Sold 
Purchased Biomass - 2 502 857 2 502 857 14 572 759 19 139 570 19 171 091 19 457 610 19 288 249 19 229 372 19 378 837 
BTL Operating Costs - - - 127 215 198 130 795 634 134 022 264 137 353 799 140 724 472 144 190 350 147 762 880 
BamChar Production Costs - 637 085 651 722 2 205 467 9 721 167 10 095 160 10 517 654 10 905 978 11 327 706 11 795 367 
Plantation Costs - - 369 945 380 832 399 874 411 877 432 471 454 094 476 799 500 639 
Harvesting Costs - - 102 043 723 682 982 095 1 030 421 1 059 874 1 080 890 1 134 934 1 191 681 
Logistics - - 14 240 1 567 402 1 898 283 1 907 721 1 930 482 1 922 831 1 923 812 1 920 070 
Total Cost of Goods Sold - 3 139 942 3 640 807 146 665 339 162 936 623 166 638 534 170 751 891 174 376 513 178 282 973 182 549 474 
Gross Profit - 32 250 458 34 461 974 637 883 003 818 887 008 817 909 521 826 554 412 816 493 601 811 043 343 810 457 806 
Gross margin (%) 0% 91% 90% 81% 83% 83% 83% 82% 82% 82% 
Admin/Overhead - - 837 866 837 866 837 866 837 866 837 866 837 866 837 866 837 866 
Amortization expense 25 572 880 25 572 880 26 050 359 26 050 359 26 050 359 25 895 595 25 895 595 25 895 595 25 895 595 25 895 597 
Operating Profit/(Loss) -25 572 880 6 677 578 7 573 748 610 994 778 791 998 783 791 176 059 799 820 951 789 760 139 784 309 881 783 724 343 
Operating Margin (%) 78% 81% 80% 80% 80% 79% 79% 
Financial Expense 
Financial Expense 0 35 250 609 26 408 259 16 653 034 6 088 131 22 869 - 
Total Financial Expenses 0 35 250 609 26 408 259 16 653 034 6 088 131 22 869 - - - - 
Profit before Tax -25 572 880 -28 573 031 -18 834 511 594 341 743 785 910 652 791 153 190 799 820 951 789 760 139 784 309 881 783 724 343 
Profit before Tax margin 0% -81% -49% 76% 80% 80% 80% 80% 79% 79% 
Net Profit/(Loss) -25 572 880 -28 573 031 -18 834 511 594 341 743 785 910 652 791 153 190 799 820 951 789 760 139 784 309 881 783 724 343 
Net margin 76% 80% 80% 80% 80% 79% 79% 
EBITDA 0 32 250 458 33 624 107 637 045 137 818 049 141 817 071 654 825 716 546 815 655 735 810 205 477 809 619 940
Use of Funds 
Investment Cost Schedule (US$) % of total Total ($USD) 
Investments 
Plantation and Farm Infrastructure 1,80% 8 166 667 
Equipment and Machinery 0,17% 771 761 
Vehicles/Transport 0,12% 562 857 
Bam Char BamCoke 13,79% 62 548 786 
BTL Plant & Equipment 84% 381 013 333 
Office Equipment 0,01% 29 201 
Working Capital 0,11% 500 000 
Total 100% 453 592 604 
Development Cost 48 490 705 
Total Investments $ 502 083 310
Profit Center Returns: 
Farming 
(10 years) 
 Gross Profit Margin 
• >250% 
 NPV $ 78,943,302 
 12% Cost of Capital 
 IRR 86 % 
 Capital Investment Required - $9,501,284
Profit Center Returns: BamCoke & 
Power 
 First Profits by year 2 
 10 year NPV $627,074,620 
• 12% Cost of Capital 
 IRR – 77% 
 Capital Investment - $78,712,354
Profit Center Returns: BTL & 
Power 
 First Profits: 
• 4 years from start of project, i.e. when 
smelters start to be built 
 10 year NPV $2,837,752,250 
• 12% Cost of Capital 
 IRR – 77% 
 Capital Investment - $397,176,902 
 Development - $16,692,769
Offsets 
 Offset value from 750,000 tons of Met Coke could be as high as 
$787,398,857 (over 20 years) 
 If you use BamCoal in the power station instead of Thermal Coal an 
extended project would be able to offset 3,000,000 tons of coal over 10 
years to the value of $1,567,606,857 
 Total investment in project excluding BamCoal over three years 
is $502,083,310. 
 Exclusive of a further 10,000 hectares, to mitigate the coal used 
in the power stations. 
 10,000 hectares farming - $21 789 235 
 BamCoal Production + Power - $155 621 423
Summary 
Investor Returns: 
IRR 62% 
NPV $2 087 905 347 
12% Cost of Capital 
Job Creation 
Major New Industry for Swaziland 
Expansion into Africa 
Massive potential for carbon offsets from 
innovative planning & thinking.
Thank You

More Related Content

What's hot

How to unlock productivity savings in mining operations part 2. "Show me the ...
How to unlock productivity savings in mining operations part 2. "Show me the ...How to unlock productivity savings in mining operations part 2. "Show me the ...
How to unlock productivity savings in mining operations part 2. "Show me the ...David Mallinson MAICD
 
Bvg on line training
Bvg on line trainingBvg on line training
Bvg on line trainingVijay Singh
 
To study The dross generation
To study The dross generationTo study The dross generation
To study The dross generationAbhishek Roy
 
US EIA's Drilling Productivity Report - Sep 2014
US EIA's Drilling Productivity Report - Sep 2014US EIA's Drilling Productivity Report - Sep 2014
US EIA's Drilling Productivity Report - Sep 2014Marcellus Drilling News
 
Carbon Intensity of Electricity: Towards More Realistic Numbers | Professor G...
Carbon Intensity of Electricity: Towards More Realistic Numbers | Professor G...Carbon Intensity of Electricity: Towards More Realistic Numbers | Professor G...
Carbon Intensity of Electricity: Towards More Realistic Numbers | Professor G...icarb
 
Efficient 20 - reducing fuel consumption in agriculture
Efficient 20 - reducing fuel consumption in agricultureEfficient 20 - reducing fuel consumption in agriculture
Efficient 20 - reducing fuel consumption in agriculturedavidell
 
Advanced Energy Storage Sizing
Advanced Energy Storage SizingAdvanced Energy Storage Sizing
Advanced Energy Storage SizingViktorSinenko
 
EIA Drilling Productivity Report - October 2014
EIA Drilling Productivity Report - October 2014EIA Drilling Productivity Report - October 2014
EIA Drilling Productivity Report - October 2014Marcellus Drilling News
 
EIA Drilling Productivity Report - August 2014
EIA Drilling Productivity Report - August 2014EIA Drilling Productivity Report - August 2014
EIA Drilling Productivity Report - August 2014Marcellus Drilling News
 
Ebay t2000 db-acme
Ebay t2000 db-acmeEbay t2000 db-acme
Ebay t2000 db-acmeBill Harper
 
Factory analysis simulation 2
Factory analysis simulation 2Factory analysis simulation 2
Factory analysis simulation 2Ra'uf Tailony
 
Modelling of offshore wind
Modelling of offshore windModelling of offshore wind
Modelling of offshore windIEA-ETSAP
 
Talvivaara Update - Saila Miettinen-Lähde, Talvivaara
Talvivaara Update - Saila Miettinen-Lähde, TalvivaaraTalvivaara Update - Saila Miettinen-Lähde, Talvivaara
Talvivaara Update - Saila Miettinen-Lähde, TalvivaaraMining On Top
 
Fuel supply agreement
Fuel supply agreementFuel supply agreement
Fuel supply agreement1ks06me005
 
U.S. EIA's Drilling Productivity Report - August 2015
U.S. EIA's Drilling Productivity Report - August 2015U.S. EIA's Drilling Productivity Report - August 2015
U.S. EIA's Drilling Productivity Report - August 2015Marcellus Drilling News
 

What's hot (17)

How to unlock productivity savings in mining operations part 2. "Show me the ...
How to unlock productivity savings in mining operations part 2. "Show me the ...How to unlock productivity savings in mining operations part 2. "Show me the ...
How to unlock productivity savings in mining operations part 2. "Show me the ...
 
Bvg on line training
Bvg on line trainingBvg on line training
Bvg on line training
 
To study The dross generation
To study The dross generationTo study The dross generation
To study The dross generation
 
US EIA's Drilling Productivity Report - Sep 2014
US EIA's Drilling Productivity Report - Sep 2014US EIA's Drilling Productivity Report - Sep 2014
US EIA's Drilling Productivity Report - Sep 2014
 
7⃣fa❓s (& the ✅s)
7⃣fa❓s (& the ✅s)7⃣fa❓s (& the ✅s)
7⃣fa❓s (& the ✅s)
 
Elevator pitch
Elevator pitchElevator pitch
Elevator pitch
 
Carbon Intensity of Electricity: Towards More Realistic Numbers | Professor G...
Carbon Intensity of Electricity: Towards More Realistic Numbers | Professor G...Carbon Intensity of Electricity: Towards More Realistic Numbers | Professor G...
Carbon Intensity of Electricity: Towards More Realistic Numbers | Professor G...
 
Efficient 20 - reducing fuel consumption in agriculture
Efficient 20 - reducing fuel consumption in agricultureEfficient 20 - reducing fuel consumption in agriculture
Efficient 20 - reducing fuel consumption in agriculture
 
Advanced Energy Storage Sizing
Advanced Energy Storage SizingAdvanced Energy Storage Sizing
Advanced Energy Storage Sizing
 
EIA Drilling Productivity Report - October 2014
EIA Drilling Productivity Report - October 2014EIA Drilling Productivity Report - October 2014
EIA Drilling Productivity Report - October 2014
 
EIA Drilling Productivity Report - August 2014
EIA Drilling Productivity Report - August 2014EIA Drilling Productivity Report - August 2014
EIA Drilling Productivity Report - August 2014
 
Ebay t2000 db-acme
Ebay t2000 db-acmeEbay t2000 db-acme
Ebay t2000 db-acme
 
Factory analysis simulation 2
Factory analysis simulation 2Factory analysis simulation 2
Factory analysis simulation 2
 
Modelling of offshore wind
Modelling of offshore windModelling of offshore wind
Modelling of offshore wind
 
Talvivaara Update - Saila Miettinen-Lähde, Talvivaara
Talvivaara Update - Saila Miettinen-Lähde, TalvivaaraTalvivaara Update - Saila Miettinen-Lähde, Talvivaara
Talvivaara Update - Saila Miettinen-Lähde, Talvivaara
 
Fuel supply agreement
Fuel supply agreementFuel supply agreement
Fuel supply agreement
 
U.S. EIA's Drilling Productivity Report - August 2015
U.S. EIA's Drilling Productivity Report - August 2015U.S. EIA's Drilling Productivity Report - August 2015
U.S. EIA's Drilling Productivity Report - August 2015
 

Viewers also liked (20)

Blackbelt
BlackbeltBlackbelt
Blackbelt
 
Cinema
CinemaCinema
Cinema
 
Blacharz samochodowy
Blacharz samochodowyBlacharz samochodowy
Blacharz samochodowy
 
Thesis Proposal KMITL
Thesis Proposal KMITLThesis Proposal KMITL
Thesis Proposal KMITL
 
Birkegaarden logo-1
Birkegaarden logo-1Birkegaarden logo-1
Birkegaarden logo-1
 
Hereglegdehuun tsetsegee
Hereglegdehuun tsetsegee Hereglegdehuun tsetsegee
Hereglegdehuun tsetsegee
 
Buyer secretsbook[1]
Buyer secretsbook[1]Buyer secretsbook[1]
Buyer secretsbook[1]
 
Hpa training activity 1.1
Hpa training activity 1.1Hpa training activity 1.1
Hpa training activity 1.1
 
How to make team collaboration suck less!
How to make team collaboration suck less!How to make team collaboration suck less!
How to make team collaboration suck less!
 
Deltek First Cloud Solutions for PS Firms
Deltek First Cloud Solutions for PS FirmsDeltek First Cloud Solutions for PS Firms
Deltek First Cloud Solutions for PS Firms
 
Birkram Yoga
Birkram YogaBirkram Yoga
Birkram Yoga
 
Irk Bitig - Gramer İncelemesi
Irk Bitig - Gramer İncelemesiIrk Bitig - Gramer İncelemesi
Irk Bitig - Gramer İncelemesi
 
Blackspot 3 bawen
Blackspot 3   bawenBlackspot 3   bawen
Blackspot 3 bawen
 
Le mamme e i figli
Le mamme e i figli Le mamme e i figli
Le mamme e i figli
 
Biseri
BiseriBiseri
Biseri
 
3 Ways To Screw Up Your Startup
3 Ways To Screw Up Your Startup3 Ways To Screw Up Your Startup
3 Ways To Screw Up Your Startup
 
Blackjackets
BlackjacketsBlackjackets
Blackjackets
 
SRDC seminar
SRDC seminarSRDC seminar
SRDC seminar
 
Biy daalt1.daashka
Biy daalt1.daashkaBiy daalt1.daashka
Biy daalt1.daashka
 
Miblagh (4)
Miblagh (4)Miblagh (4)
Miblagh (4)
 

Similar to B'dAfrique newco biocarbon 1

Amur sts september-2014
Amur sts september-2014Amur sts september-2014
Amur sts september-2014desperada_i
 
Dalmia Cement Ariyalur_240314_114438.pdf
Dalmia Cement Ariyalur_240314_114438.pdfDalmia Cement Ariyalur_240314_114438.pdf
Dalmia Cement Ariyalur_240314_114438.pdfBlentBulut5
 
Gopika viswanath
Gopika viswanathGopika viswanath
Gopika viswanathgopika v
 
Review Week_12_Customer_PulauPanggung (PT.BAS).pptx
Review Week_12_Customer_PulauPanggung (PT.BAS).pptxReview Week_12_Customer_PulauPanggung (PT.BAS).pptx
Review Week_12_Customer_PulauPanggung (PT.BAS).pptxnoelmanroe1
 
Presentations
PresentationsPresentations
PresentationsEucatexRI
 
JLL Pittsburgh Industrial Insight & Statistics - Q4 201itt
JLL Pittsburgh Industrial Insight & Statistics - Q4 201ittJLL Pittsburgh Industrial Insight & Statistics - Q4 201itt
JLL Pittsburgh Industrial Insight & Statistics - Q4 201ittTobiah Bilski
 
Michael Reese - Electric and Thermal Energy Strategies for Minnesota Swine Farms
Michael Reese - Electric and Thermal Energy Strategies for Minnesota Swine FarmsMichael Reese - Electric and Thermal Energy Strategies for Minnesota Swine Farms
Michael Reese - Electric and Thermal Energy Strategies for Minnesota Swine FarmsJohn Blue
 
Eni 2014 Third Quarter Results
Eni 2014 Third Quarter ResultsEni 2014 Third Quarter Results
Eni 2014 Third Quarter ResultsEni
 
Green Energy From Heat - Themo Electric Generation (TEG)
Green Energy From Heat  - Themo Electric Generation (TEG)Green Energy From Heat  - Themo Electric Generation (TEG)
Green Energy From Heat - Themo Electric Generation (TEG)jamietpe
 
The watergate confidential
The watergate confidentialThe watergate confidential
The watergate confidentialHaris Memon
 
Diesel generator rent service (long term) for Telecom Operator
Diesel generator rent service (long term) for Telecom OperatorDiesel generator rent service (long term) for Telecom Operator
Diesel generator rent service (long term) for Telecom OperatorOtgontugs Ulziisuren
 
Bellatrix Exploration - Investor Presentation 2014
Bellatrix Exploration - Investor Presentation 2014Bellatrix Exploration - Investor Presentation 2014
Bellatrix Exploration - Investor Presentation 2014BRS Resources Ltd.
 
Apresentação Institucional - Inglês
Apresentação Institucional - InglêsApresentação Institucional - Inglês
Apresentação Institucional - InglêsAES Tietê
 
Review W24 & Plan Week 25 2022 MUM_BAS.pptx
Review W24 & Plan Week 25 2022 MUM_BAS.pptxReview W24 & Plan Week 25 2022 MUM_BAS.pptx
Review W24 & Plan Week 25 2022 MUM_BAS.pptxnoelmanroe1
 
الدكتور / علي المراكبي استشاري الهندسة الميكانيكية وخبير ترشيد الطاقة بعنوان...
 الدكتور / علي المراكبي استشاري الهندسة الميكانيكية وخبير ترشيد الطاقة بعنوان... الدكتور / علي المراكبي استشاري الهندسة الميكانيكية وخبير ترشيد الطاقة بعنوان...
الدكتور / علي المراكبي استشاري الهندسة الميكانيكية وخبير ترشيد الطاقة بعنوان...Egyptian Engineers Association
 
Ppt presentation on contracting with philphos & century with graph
Ppt presentation on contracting with philphos & century with graphPpt presentation on contracting with philphos & century with graph
Ppt presentation on contracting with philphos & century with graphChristian Jayson Jamandra
 
Scenario analysis of data centres in the Irish energy system
Scenario analysis of data centres in the Irish energy systemScenario analysis of data centres in the Irish energy system
Scenario analysis of data centres in the Irish energy systemIEA-ETSAP
 
Samit Jain - Advit Foundation
Samit Jain - Advit FoundationSamit Jain - Advit Foundation
Samit Jain - Advit Foundationguest17a0764
 

Similar to B'dAfrique newco biocarbon 1 (20)

Amur sts september-2014
Amur sts september-2014Amur sts september-2014
Amur sts september-2014
 
Dalmia Cement Ariyalur_240314_114438.pdf
Dalmia Cement Ariyalur_240314_114438.pdfDalmia Cement Ariyalur_240314_114438.pdf
Dalmia Cement Ariyalur_240314_114438.pdf
 
Gopika viswanath
Gopika viswanathGopika viswanath
Gopika viswanath
 
Review Week_12_Customer_PulauPanggung (PT.BAS).pptx
Review Week_12_Customer_PulauPanggung (PT.BAS).pptxReview Week_12_Customer_PulauPanggung (PT.BAS).pptx
Review Week_12_Customer_PulauPanggung (PT.BAS).pptx
 
Presentations
PresentationsPresentations
Presentations
 
JLL Pittsburgh Industrial Insight & Statistics - Q4 201itt
JLL Pittsburgh Industrial Insight & Statistics - Q4 201ittJLL Pittsburgh Industrial Insight & Statistics - Q4 201itt
JLL Pittsburgh Industrial Insight & Statistics - Q4 201itt
 
MRWD Water Production Proposals Comparison
MRWD Water Production Proposals ComparisonMRWD Water Production Proposals Comparison
MRWD Water Production Proposals Comparison
 
Sudan Leather Industrial Estate
Sudan Leather Industrial Estate Sudan Leather Industrial Estate
Sudan Leather Industrial Estate
 
Michael Reese - Electric and Thermal Energy Strategies for Minnesota Swine Farms
Michael Reese - Electric and Thermal Energy Strategies for Minnesota Swine FarmsMichael Reese - Electric and Thermal Energy Strategies for Minnesota Swine Farms
Michael Reese - Electric and Thermal Energy Strategies for Minnesota Swine Farms
 
Eni 2014 Third Quarter Results
Eni 2014 Third Quarter ResultsEni 2014 Third Quarter Results
Eni 2014 Third Quarter Results
 
Green Energy From Heat - Themo Electric Generation (TEG)
Green Energy From Heat  - Themo Electric Generation (TEG)Green Energy From Heat  - Themo Electric Generation (TEG)
Green Energy From Heat - Themo Electric Generation (TEG)
 
The watergate confidential
The watergate confidentialThe watergate confidential
The watergate confidential
 
Diesel generator rent service (long term) for Telecom Operator
Diesel generator rent service (long term) for Telecom OperatorDiesel generator rent service (long term) for Telecom Operator
Diesel generator rent service (long term) for Telecom Operator
 
Bellatrix Exploration - Investor Presentation 2014
Bellatrix Exploration - Investor Presentation 2014Bellatrix Exploration - Investor Presentation 2014
Bellatrix Exploration - Investor Presentation 2014
 
Apresentação Institucional - Inglês
Apresentação Institucional - InglêsApresentação Institucional - Inglês
Apresentação Institucional - Inglês
 
Review W24 & Plan Week 25 2022 MUM_BAS.pptx
Review W24 & Plan Week 25 2022 MUM_BAS.pptxReview W24 & Plan Week 25 2022 MUM_BAS.pptx
Review W24 & Plan Week 25 2022 MUM_BAS.pptx
 
الدكتور / علي المراكبي استشاري الهندسة الميكانيكية وخبير ترشيد الطاقة بعنوان...
 الدكتور / علي المراكبي استشاري الهندسة الميكانيكية وخبير ترشيد الطاقة بعنوان... الدكتور / علي المراكبي استشاري الهندسة الميكانيكية وخبير ترشيد الطاقة بعنوان...
الدكتور / علي المراكبي استشاري الهندسة الميكانيكية وخبير ترشيد الطاقة بعنوان...
 
Ppt presentation on contracting with philphos & century with graph
Ppt presentation on contracting with philphos & century with graphPpt presentation on contracting with philphos & century with graph
Ppt presentation on contracting with philphos & century with graph
 
Scenario analysis of data centres in the Irish energy system
Scenario analysis of data centres in the Irish energy systemScenario analysis of data centres in the Irish energy system
Scenario analysis of data centres in the Irish energy system
 
Samit Jain - Advit Foundation
Samit Jain - Advit FoundationSamit Jain - Advit Foundation
Samit Jain - Advit Foundation
 

Recently uploaded

Financial Leverage Definition, Advantages, and Disadvantages
Financial Leverage Definition, Advantages, and DisadvantagesFinancial Leverage Definition, Advantages, and Disadvantages
Financial Leverage Definition, Advantages, and Disadvantagesjayjaymabutot13
 
Call Girls In Yusuf Sarai Women Seeking Men 9654467111
Call Girls In Yusuf Sarai Women Seeking Men 9654467111Call Girls In Yusuf Sarai Women Seeking Men 9654467111
Call Girls In Yusuf Sarai Women Seeking Men 9654467111Sapana Sha
 
fca-bsps-decision-letter-redacted (1).pdf
fca-bsps-decision-letter-redacted (1).pdffca-bsps-decision-letter-redacted (1).pdf
fca-bsps-decision-letter-redacted (1).pdfHenry Tapper
 
letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...
letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...
letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...Henry Tapper
 
原版1:1复刻堪萨斯大学毕业证KU毕业证留信学历认证
原版1:1复刻堪萨斯大学毕业证KU毕业证留信学历认证原版1:1复刻堪萨斯大学毕业证KU毕业证留信学历认证
原版1:1复刻堪萨斯大学毕业证KU毕业证留信学历认证jdkhjh
 
Call Girls Near Delhi Pride Hotel, New Delhi|9873777170
Call Girls Near Delhi Pride Hotel, New Delhi|9873777170Call Girls Near Delhi Pride Hotel, New Delhi|9873777170
Call Girls Near Delhi Pride Hotel, New Delhi|9873777170Sonam Pathan
 
House of Commons ; CDC schemes overview document
House of Commons ; CDC schemes overview documentHouse of Commons ; CDC schemes overview document
House of Commons ; CDC schemes overview documentHenry Tapper
 
call girls in Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in  Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in  Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
212MTAMount Durham University Bachelor's Diploma in Technology
212MTAMount Durham University Bachelor's Diploma in Technology212MTAMount Durham University Bachelor's Diploma in Technology
212MTAMount Durham University Bachelor's Diploma in Technologyz xss
 
magnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdf
magnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdfmagnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdf
magnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdfHenry Tapper
 
原版1:1复刻温哥华岛大学毕业证Vancouver毕业证留信学历认证
原版1:1复刻温哥华岛大学毕业证Vancouver毕业证留信学历认证原版1:1复刻温哥华岛大学毕业证Vancouver毕业证留信学历认证
原版1:1复刻温哥华岛大学毕业证Vancouver毕业证留信学历认证rjrjkk
 
Authentic No 1 Amil Baba In Pakistan Authentic No 1 Amil Baba In Karachi No 1...
Authentic No 1 Amil Baba In Pakistan Authentic No 1 Amil Baba In Karachi No 1...Authentic No 1 Amil Baba In Pakistan Authentic No 1 Amil Baba In Karachi No 1...
Authentic No 1 Amil Baba In Pakistan Authentic No 1 Amil Baba In Karachi No 1...First NO1 World Amil baba in Faisalabad
 
Lundin Gold April 2024 Corporate Presentation v4.pdf
Lundin Gold April 2024 Corporate Presentation v4.pdfLundin Gold April 2024 Corporate Presentation v4.pdf
Lundin Gold April 2024 Corporate Presentation v4.pdfAdnet Communications
 
Quantitative Analysis of Retail Sector Companies
Quantitative Analysis of Retail Sector CompaniesQuantitative Analysis of Retail Sector Companies
Quantitative Analysis of Retail Sector Companiesprashantbhati354
 
NO1 WorldWide online istikhara for love marriage vashikaran specialist love p...
NO1 WorldWide online istikhara for love marriage vashikaran specialist love p...NO1 WorldWide online istikhara for love marriage vashikaran specialist love p...
NO1 WorldWide online istikhara for love marriage vashikaran specialist love p...Amil Baba Dawood bangali
 
Economic Risk Factor Update: April 2024 [SlideShare]
Economic Risk Factor Update: April 2024 [SlideShare]Economic Risk Factor Update: April 2024 [SlideShare]
Economic Risk Factor Update: April 2024 [SlideShare]Commonwealth
 
(办理学位证)加拿大萨省大学毕业证成绩单原版一比一
(办理学位证)加拿大萨省大学毕业证成绩单原版一比一(办理学位证)加拿大萨省大学毕业证成绩单原版一比一
(办理学位证)加拿大萨省大学毕业证成绩单原版一比一S SDS
 
Current Economic situation of Pakistan .pptx
Current Economic situation of Pakistan .pptxCurrent Economic situation of Pakistan .pptx
Current Economic situation of Pakistan .pptxuzma244191
 
AfRESFullPaper22018EmpiricalPerformanceofRealEstateInvestmentTrustsandShareho...
AfRESFullPaper22018EmpiricalPerformanceofRealEstateInvestmentTrustsandShareho...AfRESFullPaper22018EmpiricalPerformanceofRealEstateInvestmentTrustsandShareho...
AfRESFullPaper22018EmpiricalPerformanceofRealEstateInvestmentTrustsandShareho...yordanosyohannes2
 

Recently uploaded (20)

Financial Leverage Definition, Advantages, and Disadvantages
Financial Leverage Definition, Advantages, and DisadvantagesFinancial Leverage Definition, Advantages, and Disadvantages
Financial Leverage Definition, Advantages, and Disadvantages
 
Call Girls In Yusuf Sarai Women Seeking Men 9654467111
Call Girls In Yusuf Sarai Women Seeking Men 9654467111Call Girls In Yusuf Sarai Women Seeking Men 9654467111
Call Girls In Yusuf Sarai Women Seeking Men 9654467111
 
fca-bsps-decision-letter-redacted (1).pdf
fca-bsps-decision-letter-redacted (1).pdffca-bsps-decision-letter-redacted (1).pdf
fca-bsps-decision-letter-redacted (1).pdf
 
letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...
letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...
letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...
 
原版1:1复刻堪萨斯大学毕业证KU毕业证留信学历认证
原版1:1复刻堪萨斯大学毕业证KU毕业证留信学历认证原版1:1复刻堪萨斯大学毕业证KU毕业证留信学历认证
原版1:1复刻堪萨斯大学毕业证KU毕业证留信学历认证
 
Call Girls Near Delhi Pride Hotel, New Delhi|9873777170
Call Girls Near Delhi Pride Hotel, New Delhi|9873777170Call Girls Near Delhi Pride Hotel, New Delhi|9873777170
Call Girls Near Delhi Pride Hotel, New Delhi|9873777170
 
House of Commons ; CDC schemes overview document
House of Commons ; CDC schemes overview documentHouse of Commons ; CDC schemes overview document
House of Commons ; CDC schemes overview document
 
call girls in Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in  Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in  Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
212MTAMount Durham University Bachelor's Diploma in Technology
212MTAMount Durham University Bachelor's Diploma in Technology212MTAMount Durham University Bachelor's Diploma in Technology
212MTAMount Durham University Bachelor's Diploma in Technology
 
magnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdf
magnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdfmagnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdf
magnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdf
 
原版1:1复刻温哥华岛大学毕业证Vancouver毕业证留信学历认证
原版1:1复刻温哥华岛大学毕业证Vancouver毕业证留信学历认证原版1:1复刻温哥华岛大学毕业证Vancouver毕业证留信学历认证
原版1:1复刻温哥华岛大学毕业证Vancouver毕业证留信学历认证
 
Authentic No 1 Amil Baba In Pakistan Authentic No 1 Amil Baba In Karachi No 1...
Authentic No 1 Amil Baba In Pakistan Authentic No 1 Amil Baba In Karachi No 1...Authentic No 1 Amil Baba In Pakistan Authentic No 1 Amil Baba In Karachi No 1...
Authentic No 1 Amil Baba In Pakistan Authentic No 1 Amil Baba In Karachi No 1...
 
Lundin Gold April 2024 Corporate Presentation v4.pdf
Lundin Gold April 2024 Corporate Presentation v4.pdfLundin Gold April 2024 Corporate Presentation v4.pdf
Lundin Gold April 2024 Corporate Presentation v4.pdf
 
Quantitative Analysis of Retail Sector Companies
Quantitative Analysis of Retail Sector CompaniesQuantitative Analysis of Retail Sector Companies
Quantitative Analysis of Retail Sector Companies
 
NO1 WorldWide online istikhara for love marriage vashikaran specialist love p...
NO1 WorldWide online istikhara for love marriage vashikaran specialist love p...NO1 WorldWide online istikhara for love marriage vashikaran specialist love p...
NO1 WorldWide online istikhara for love marriage vashikaran specialist love p...
 
Economic Risk Factor Update: April 2024 [SlideShare]
Economic Risk Factor Update: April 2024 [SlideShare]Economic Risk Factor Update: April 2024 [SlideShare]
Economic Risk Factor Update: April 2024 [SlideShare]
 
(办理学位证)加拿大萨省大学毕业证成绩单原版一比一
(办理学位证)加拿大萨省大学毕业证成绩单原版一比一(办理学位证)加拿大萨省大学毕业证成绩单原版一比一
(办理学位证)加拿大萨省大学毕业证成绩单原版一比一
 
Current Economic situation of Pakistan .pptx
Current Economic situation of Pakistan .pptxCurrent Economic situation of Pakistan .pptx
Current Economic situation of Pakistan .pptx
 
AfRESFullPaper22018EmpiricalPerformanceofRealEstateInvestmentTrustsandShareho...
AfRESFullPaper22018EmpiricalPerformanceofRealEstateInvestmentTrustsandShareho...AfRESFullPaper22018EmpiricalPerformanceofRealEstateInvestmentTrustsandShareho...
AfRESFullPaper22018EmpiricalPerformanceofRealEstateInvestmentTrustsandShareho...
 
Monthly Economic Monitoring of Ukraine No 231, April 2024
Monthly Economic Monitoring of Ukraine No 231, April 2024Monthly Economic Monitoring of Ukraine No 231, April 2024
Monthly Economic Monitoring of Ukraine No 231, April 2024
 

B'dAfrique newco biocarbon 1

  • 1. Bam d’Afrique and NewCo BioCarbon Investor Presentation 2014
  • 2. Project - Newcastle Total Investment - $502,083,310 in three phases over three years Year 1, Phase 1  Bamboo Plantation + equipment $ 8,938,427  Transport vehicles $ 562,857  Development fee $ 48,490,706 Subtotal Phase 1 $ 57,991,989 Year 1, Phase 2  Initial carbonising plant (20 ton/h) & steam turbine $ 7,500,000  Design of the Biomass-to-Liquid (BTL) refinery Subtotal Phases 1 & 2 $ 65,491,989 Year 2 & 3, Phase 3  2nd year: Infrastructure BTL and final carbonising plant $ 225,000,000  3rd year: Finalise construction of all plants $ 211,591,320 Subtotal Phase 3 $ 436,591,320 Offset value from 750,000 tons of Met Coke = $259 395 000 over 20 years
  • 3. Background to Bamboo  Over 13 years of research and development  Raw material to be grown in Swaziland & South Africa – Favourable Land Agreements – High demand for bamboo by many industries – Carbon Credits for Bamboo plantations – Offset credits for Power, BamCoke and fuel  Current South Africa – Bamboo embryo genesis labs and nurseries
  • 4. Investor Criteria: Core NewCo Farming in Swaziland: •Produce bamboo for BioCarbon, BTL & electricity •4,000 hectare farm & Bamboo Nursery •Average plantation cost: $1,927 /hectare •Average income per hectare from year 4 to 10: $5,980 •IRR: 62%+ from Farming Operations •NPV: $ 107,986,477 @ a 12% cost of Capital.
  • 5. Development Steps Mth Mth Mth Mth Mth Mth Mth Mth Mth Mth Mth Mth Nursery 1 2 3 4 5 6 7 8 9 10 11 12 Order Plants TC delivery @ 50,000 every 2 weeks from Plant deleveries to Farm from other source Order Farming equipment delivery Farming Finilse agreements + Land Survies Order fertilise & Delivery Fencing Land Prep
  • 6. Operational Steps Mth Mth Mth Mth Mth Mth Mth Mth Mth Mth Mth Mth Farming year 1 13 14 15 16 17 18 19 20 21 22 23 24 Pitting and Planting Watering for six mooths after rains if rainfall <600 mm Weeding till two weeks after rains Watering after planting Mth Mth Mth Mth Mth Mth Mth Mth Mth Mth Mth Mth Farming year 2 25 26 27 28 29 30 31 32 33 34 35 36 Shoot Harvest Weeding till two weeks after rains Slashing Farming year 3 37 38 39 40 41 42 43 44 45 46 48 49 Shoot Harvest Slashing Farming year 4 Shoot Harvest Culm Harvest
  • 7. Operational Steps Mth Mth Mth Mth Mth Mth Mth Mth Mth Mth Mth Mth Bio Carbon Plant 1 2 3 4 5 6 7 8 9 10 11 12 Order Carboniser Delivery & Tes ting Order BTL (Des ign and engineering) Carbonis ing BTL Construction 13 14 15 16 17 18 19 20 21 22 23 24 Des ign and engineering then Cons truction Carbonis ing + Power generation 25 26 27 28 29 31 33 35 37 39 41 43 Cons trcution and tes ting - Handover Carbonis ing + Power generation 44 45 46 48 49 50 51 52 53 54 55 56 Supply BioCoke, Fuel & Power
  • 8. Investor Criteria: Non-core  Transportation  Bamboo Splitting then Chipping  Community Based Industries – Food security – Making of Flooring etc. – Low Cost Housing
  • 9. Current Status  Lab and Nursery: Facilities ready to start production  Carbonising: Feasibility completed on 500 tons of carbonized bamboo and 500 tons of black wattle  Market : Agreements from Smelters to purchase BamCoke  Farms: Initial Agreements with land owners being finalized
  • 10. Profit and Loss Production Statistics Yr-1 Yr-2 Yr-3 Yr-4 Yr-5 Yr-6 Yr-7 Yr-8 Yr-9 Yr-10 Diesel Sold (litres) - - - 356 792 666 468 604 354 469 376 099 476 391 092 472 244 539 470 803 012 474 462 465 BamChar/ Sold (t) - 98 112 98 112 571 252 750 271 751 507 762 738 756 099 753 791 759 650 Power Generated (kWh) - 87 600 000 87 600 000 1 896 093 120 2 215 769 909 2 217 976 376 2 238 032 692 2 226 177 431 2 222 056 014 2 232 518 624 Quantity of shoots & Leaf sold (t) - - 14 240 16 040 25 480 32 040 34 480 38 400 43 200 47 600 Quantity of bamboo culms sold (t) - - - 1 020 093 1 339 770 1 341 976 1 362 033 1 350 177 1 346 056 1 356 519 CO2 Sequestered (MT) - - - 0 0 0 0 0 0 0 mega watts per hour 10 10 216 253 253 255 254 254 255 Net Sales - 35 390 400 38 102 781 784 548 343 981 823 631 984 548 055 997 306 303 990 870 114 989 326 316 993 007 281 Cost of Goods Sold Purchased Biomass - 2 502 857 2 502 857 14 572 759 19 139 570 19 171 091 19 457 610 19 288 249 19 229 372 19 378 837 BTL Operating Costs - - - 127 215 198 130 795 634 134 022 264 137 353 799 140 724 472 144 190 350 147 762 880 BamChar Production Costs - 637 085 651 722 2 205 467 9 721 167 10 095 160 10 517 654 10 905 978 11 327 706 11 795 367 Plantation Costs - - 369 945 380 832 399 874 411 877 432 471 454 094 476 799 500 639 Harvesting Costs - - 102 043 723 682 982 095 1 030 421 1 059 874 1 080 890 1 134 934 1 191 681 Logistics - - 14 240 1 567 402 1 898 283 1 907 721 1 930 482 1 922 831 1 923 812 1 920 070 Total Cost of Goods Sold - 3 139 942 3 640 807 146 665 339 162 936 623 166 638 534 170 751 891 174 376 513 178 282 973 182 549 474 Gross Profit - 32 250 458 34 461 974 637 883 003 818 887 008 817 909 521 826 554 412 816 493 601 811 043 343 810 457 806 Gross margin (%) 0% 91% 90% 81% 83% 83% 83% 82% 82% 82% Admin/Overhead - - 837 866 837 866 837 866 837 866 837 866 837 866 837 866 837 866 Amortization expense 25 572 880 25 572 880 26 050 359 26 050 359 26 050 359 25 895 595 25 895 595 25 895 595 25 895 595 25 895 597 Operating Profit/(Loss) -25 572 880 6 677 578 7 573 748 610 994 778 791 998 783 791 176 059 799 820 951 789 760 139 784 309 881 783 724 343 Operating Margin (%) 78% 81% 80% 80% 80% 79% 79% Financial Expense Financial Expense 0 35 250 609 26 408 259 16 653 034 6 088 131 22 869 - Total Financial Expenses 0 35 250 609 26 408 259 16 653 034 6 088 131 22 869 - - - - Profit before Tax -25 572 880 -28 573 031 -18 834 511 594 341 743 785 910 652 791 153 190 799 820 951 789 760 139 784 309 881 783 724 343 Profit before Tax margin 0% -81% -49% 76% 80% 80% 80% 80% 79% 79% Net Profit/(Loss) -25 572 880 -28 573 031 -18 834 511 594 341 743 785 910 652 791 153 190 799 820 951 789 760 139 784 309 881 783 724 343 Net margin 76% 80% 80% 80% 80% 79% 79% EBITDA 0 32 250 458 33 624 107 637 045 137 818 049 141 817 071 654 825 716 546 815 655 735 810 205 477 809 619 940
  • 11. Use of Funds Investment Cost Schedule (US$) % of total Total ($USD) Investments Plantation and Farm Infrastructure 1,80% 8 166 667 Equipment and Machinery 0,17% 771 761 Vehicles/Transport 0,12% 562 857 Bam Char BamCoke 13,79% 62 548 786 BTL Plant & Equipment 84% 381 013 333 Office Equipment 0,01% 29 201 Working Capital 0,11% 500 000 Total 100% 453 592 604 Development Cost 48 490 705 Total Investments $ 502 083 310
  • 12. Profit Center Returns: Farming (10 years)  Gross Profit Margin • >250%  NPV $ 78,943,302  12% Cost of Capital  IRR 86 %  Capital Investment Required - $9,501,284
  • 13. Profit Center Returns: BamCoke & Power  First Profits by year 2  10 year NPV $627,074,620 • 12% Cost of Capital  IRR – 77%  Capital Investment - $78,712,354
  • 14. Profit Center Returns: BTL & Power  First Profits: • 4 years from start of project, i.e. when smelters start to be built  10 year NPV $2,837,752,250 • 12% Cost of Capital  IRR – 77%  Capital Investment - $397,176,902  Development - $16,692,769
  • 15. Offsets  Offset value from 750,000 tons of Met Coke could be as high as $787,398,857 (over 20 years)  If you use BamCoal in the power station instead of Thermal Coal an extended project would be able to offset 3,000,000 tons of coal over 10 years to the value of $1,567,606,857  Total investment in project excluding BamCoal over three years is $502,083,310.  Exclusive of a further 10,000 hectares, to mitigate the coal used in the power stations.  10,000 hectares farming - $21 789 235  BamCoal Production + Power - $155 621 423
  • 16. Summary Investor Returns: IRR 62% NPV $2 087 905 347 12% Cost of Capital Job Creation Major New Industry for Swaziland Expansion into Africa Massive potential for carbon offsets from innovative planning & thinking.

Editor's Notes

  1. The projected use of funds covers three (3) years of corporate start-up expenses. Initial expenses grow over time.
  2. Nursery IRR projections assume R60 million invested over a three (3) year period, building three (3) nurseries over the same period of time.
  3. First profits directly tie into the timing of the first substantial (4,000 hectare) bamboo harvest. Thus on the ten (10) year NPV there is no income for the first three (3) to five (5) years. Since the plants should produce for twenty-five (25) years or more, the twenty (20) year projections are reasonable and the twenty (20) year NPV would be R 13,085,288,138 or R 3,904,197,761.
  4. First profits directly tie into the timing of the first substantial (10,000 hectare) bamboo harvest. Thus on the ten (10) year NPV there is no income for the first three (3) to five (5) years. Since the plants should produce for twenty-five (25) years or more, the twenty (20) year projections are reasonable and the twenty (20) year NPV would be R 13,085,288,138 or R 3,904,197,761.