SlideShare a Scribd company logo
1 of 3
Download to read offline
LS'PS
1
SHYAM INDUS POWER SOLUTIONS PVT. LTD.
(An ISO 9001:2000 Certified Comparry)
Regd. office : !29, Transport centre, Rohtak Road, punjabi Bagh, New Delhi-35
Ref:
To
SIP S/P SEB.HVDS/SEP L / 3 5
Saraf lndustries,
Bathinda Road, Rampura Phul-1 51 103
Kind Attn: Mr.Amrinder Singh Khipat (9781524900)
Sub.: PURCHASE ORDER FOR StIppLy OF MATERIALS
Dear Sir,
This is u'ith reference toyour offer mentioned in the above cited subject. We are pleased to accept
the offer and award our Purchase order on you as per the following terms anci conditions:
1. Scope of Work: The scope of work covered under the contract, interalia, includes the following:
i) Design, engineering, manufacture, testing, supply of specified equipments and materials
as per the Annexure-f enclosed herewith.
Date: 05th Muy, 2010
The scope of supplies under this contract shall be as per PSEB SPECIFICATION include
all such items and material which are not specifically mentioned in the documents
referred above but are necessary under the scope ofsupplies /works.
The supplies shall strictly conform to the documents referred above and in line with the
PSEB specifications attached herewith.
You shall submit immediately to us but not later than one week all the relevant Technical
details, drawings, Catalogues, Guaranteed Technical Particulars etc.of the material /
equipments, in line with the PSEB specification. These details offered shall be the same as
the one which are type tested and are already approved by PSEB. Copies of the approved
GTPs, Drawings etc. are also required to be submitted.
After successful inspection of the material and on receipt of specific Dispatch instructions
in writing from us, you shall make arrangement immediatelybut not laier than 7 days to
dispatch the material to the consignee notified by us in the dispatch instructions.
ii)
iii)
iv)
v) The scope also includes to get the Drawings and GTPs approved from pSEB immediateiy
by deputing your engineer to PSEB whenever required, after submission of thesl
docurnents and subrnitting us the manufacturing, inspection and testing schedule after
obtaining the approval from PSEB. 1
vi) After manufacture of the materials, you are required to give us atleast 7 days notice,
unless and otherwise agreed specifically, for arranging the Final inspection of the
materials at your works by Our/PSEB representative at no extra cost to us.
vii)
viii)
naI tF-at^AA Aar
2. Contract Price:
We agree to pay you a total sum of Rs. 62,80,000 /- (Rupees Sixty lwo tacs Eighty Thousands
only) inclusive of all taxes, duties etc. Details are as under:
:Given Quantities are tentative and may be increasG/decrease as per site requirement.
: Given Rate are baseri onSi August 2009 w.r.t. IEEMA FORIviULA/Iii.t)MA INDICES
3. Taxes/Duties:
i)Above rates are variabale & areinclusive of Central Excise duty @ lL.3l%and will be
adjusted as per actual against documentary evidence on the Ei-w:orks component of the
Price.
ii) Above rates are Variable & are inclusive of VAT @ 5.5 Yo and, will be adjusted as per
actual against documentary evidence on the Ex-workJcomponent of the price.
iii) Freight & Insurance inclusive, for transporting the material from your works to pSEB
store and from PSEB store to Site.
iv) Packaging & Forwarding inclusive.
v) Any Changes in taxes and duties wiII be in SIpS Account.
4. Type Test : The design of the offered material should be type tested and the type test report
should be acceptable to PSEB. Failing to meet this requirement or app.wul of GTps
necessitating type test by the client shall be done at no extra cost to us.
5. Inspection: All routine and acceptable test as per the relevant IS shall be done free of cost at
your works in the presence of our/PSEB representative. Your material supplied to PSEB store/site
shall also be subjected to various testing as per PSEB specification.
6. fnvoice will be raised in the name of lWS Shyam Indus Power Solutions Pvt. Ltd., punjab
7. Delivery: The FOR delivery shall be as mentioned hereunder:
under:-Manufacturine clearance has been sianuraclurlng clearance nas en grven as under:-
S.No

Capacity of Transformer Qtv
upto
20.05.2010
L 10 KVA 200 200
a)
.b)
US
i)
(10 KVA-200 Nos) :-_Dispatch should
Delivery period indicated above shall
by way of Penalty charges as:
be completed on 20tn Muy 2010.
be guaranteed. In case of del dy, you shall be liable to pay
@0.5% of order value for week of delay subject to maximum of 5Yo of total order value
b) Place of delivery will be informed with dispatch instruction.
c) In case of non-supply of the material within stipulated period mentioned at para 7 (a)
hereinabove, SIPS shall be at liberty to place the order on some other vendor/supplier ior
supply of the whole andlor part of undelivered quantity.g--,!t!;.material and you rvill bl^liable to
"'"':'-r1rii'li'1
j;:;''
,,1/-.r'. ra
, -'-*,.t i ,_ r"..
S.No Description UOM Qtv
Rate
(FoRD) Total Amount
L
Stack core Type(Conventional ) 10 KVA
copper wound 3 phase Distribution
Transformer along with terminal connector Nos 200 31400 62,90,000
Amount in Figure: 62,90,000
Amount In words: Rupees Sixty Two Lacs Eighty Thousands Only
pay the bills of such other vendor/supplier at such rates that are chargeable by the other
vendor/supplier.
8. Embossing of PSEB and markinglprintinglcolouring and/or any other details must be done in
accordance with the specifications of PSEB.
9. Terms of Payment:
(A) You shall submit the following documents
i) Invoice in original with 2 copies.
ii) Excise Invoice.
iii) Packing list.
iv) Copy of the Inspection report
v) Copy of LR/GR
vi) Dispatch clearance issued by PSEB/SIPS after inspection at works of the Vendor/Supplier.
vii) Acknowledgement of receipt of material by SIPS store.
viii) Guarantee certificate for satisfactory nerformance.
x) Corporate warranty on stamp paper as per inutual agreed proforma which shall be valid
upto 120 days after the end of warranty period i.e. defectJ tability period of 12 months
from the date of commissioning and taking over by PSEB and CIB shall be extended on
prorata basis for the material/ equpment and for such period as per defects Liability period
mentioned at Sl.No.11 here in under.
(B) (i) Advance zl0o/" of manufacturing clearance against Security cheque of same amount.
and it will be returned after receipt of material at site..
(ii) 45 %o will be paid Against Dispatch Instruction
(iii) 45% as 25 days PDC Against Dispatch Instruction.
10. Consignee: We shall inform alongwith the dispatch instructions.
I 1. Defects Liability period: The defects liability period will be 12 months from the date of taking
over by PSEB of all the llKV works and allied materials etc. The supplier is liable to remedy
defects and damage, as if such replacement and renewals had been taken over on the date they werl
completed to the satisfaction of the PSEB, but not so-as-to extend the defects Liability period in
respect thereofbeyond three (3) years from the date oftaking over.
12. Correspondence: All correspondences will be done at:
lt{/s Shyam Indus Power Solutions Pvt. Ltd.
129, Transport Centre, Rohtak Road, Punjabi Bagh, Delhi-110035
Telo; +9 i', i-457 54140,457 54441 Ftrx :. 0 i i -!,57 544i5,1 57 6143 5
E_mail:ca.sheetalkhurana@shyamindus.com, vinayparkash@shyamindus.com,
Thanks &
For
(sh
HOD
Encl:
C & Pr'ocgrQment)::''
As Stated Abovti'

More Related Content

Viewers also liked

Tamela Fish Letter 1.17.16
Tamela Fish Letter 1.17.16Tamela Fish Letter 1.17.16
Tamela Fish Letter 1.17.16Tamela Fish
 
Comunidad humana persona y la sociedad
Comunidad humana  persona y la sociedadComunidad humana  persona y la sociedad
Comunidad humana persona y la sociedadShirley Flores Gomez
 
Comunidades software libre + Comunidad OpenERP
Comunidades software libre + Comunidad OpenERPComunidades software libre + Comunidad OpenERP
Comunidades software libre + Comunidad OpenERPejordi
 
Chambal Fertilizer vs Coromandel Fertilizer
Chambal Fertilizer vs Coromandel FertilizerChambal Fertilizer vs Coromandel Fertilizer
Chambal Fertilizer vs Coromandel FertilizerRahul Shetty
 
016_20160722 Molecular Circuits For Dynamic Noise Filtering
016_20160722 Molecular Circuits For Dynamic Noise Filtering016_20160722 Molecular Circuits For Dynamic Noise Filtering
016_20160722 Molecular Circuits For Dynamic Noise FilteringHa Phuong
 
Marketing Inmobiliario online
Marketing Inmobiliario onlineMarketing Inmobiliario online
Marketing Inmobiliario onlinecesar villasante
 
The nervous system(1)
The nervous system(1)The nervous system(1)
The nervous system(1)hscteacher04
 

Viewers also liked (11)

My future vacations
My future vacationsMy future vacations
My future vacations
 
Tamela Fish Letter 1.17.16
Tamela Fish Letter 1.17.16Tamela Fish Letter 1.17.16
Tamela Fish Letter 1.17.16
 
Ser trascendental
Ser trascendentalSer trascendental
Ser trascendental
 
Comunidad humana persona y la sociedad
Comunidad humana  persona y la sociedadComunidad humana  persona y la sociedad
Comunidad humana persona y la sociedad
 
Comunidades software libre + Comunidad OpenERP
Comunidades software libre + Comunidad OpenERPComunidades software libre + Comunidad OpenERP
Comunidades software libre + Comunidad OpenERP
 
I'm ok you're ok
I'm ok   you're okI'm ok   you're ok
I'm ok you're ok
 
Chambal Fertilizer vs Coromandel Fertilizer
Chambal Fertilizer vs Coromandel FertilizerChambal Fertilizer vs Coromandel Fertilizer
Chambal Fertilizer vs Coromandel Fertilizer
 
016_20160722 Molecular Circuits For Dynamic Noise Filtering
016_20160722 Molecular Circuits For Dynamic Noise Filtering016_20160722 Molecular Circuits For Dynamic Noise Filtering
016_20160722 Molecular Circuits For Dynamic Noise Filtering
 
Marketing Inmobiliario online
Marketing Inmobiliario onlineMarketing Inmobiliario online
Marketing Inmobiliario online
 
The nervous system(1)
The nervous system(1)The nervous system(1)
The nervous system(1)
 
SwissQ Culture Code
SwissQ Culture CodeSwissQ Culture Code
SwissQ Culture Code
 

Similar to shyam 3

Scope of work and terms and conditions fin al
Scope of work and terms and conditions fin alScope of work and terms and conditions fin al
Scope of work and terms and conditions fin alAshish Khandelwal
 
ZA CONTRACT AL NOOR.docx
ZA CONTRACT AL NOOR.docxZA CONTRACT AL NOOR.docx
ZA CONTRACT AL NOOR.docxFairFASST
 
Conditions of CPWD contract in INDIA
Conditions of CPWD contract in INDIAConditions of CPWD contract in INDIA
Conditions of CPWD contract in INDIAAvinash Kumar Gupta
 
(Interior const) instruction to bidders
(Interior const) instruction to bidders(Interior const) instruction to bidders
(Interior const) instruction to bidderspiyush1266
 
General notes to BSR BUILDING SCHEDULE OF RATES
General notes to BSR BUILDING SCHEDULE OF RATESGeneral notes to BSR BUILDING SCHEDULE OF RATES
General notes to BSR BUILDING SCHEDULE OF RATESR.R.G.S Bandara
 
General notes to building schedule of rates
General notes to building schedule of ratesGeneral notes to building schedule of rates
General notes to building schedule of ratesVj NiroSh
 
RDSO Guidelines for new Vendors- Rajni Ranjan
RDSO Guidelines for new Vendors- Rajni RanjanRDSO Guidelines for new Vendors- Rajni Ranjan
RDSO Guidelines for new Vendors- Rajni RanjanRajni Ranjan
 
Rdso vendor registration guideline
Rdso vendor registration guidelineRdso vendor registration guideline
Rdso vendor registration guidelineSamsher Singh
 
Presentation on contract agreement of gis
Presentation on contract agreement of gisPresentation on contract agreement of gis
Presentation on contract agreement of gisHafizullah Sadat
 
Cost estimates & contract documents ce224 pdf
Cost estimates & contract documents   ce224 pdfCost estimates & contract documents   ce224 pdf
Cost estimates & contract documents ce224 pdfSaqib Imran
 
Boq of khadeja storage tank, well, and booster pumping station
Boq of khadeja storage tank, well, and booster pumping stationBoq of khadeja storage tank, well, and booster pumping station
Boq of khadeja storage tank, well, and booster pumping stationHarish Mahavar
 
CE-CONTRACTS-REPORT.pdf
CE-CONTRACTS-REPORT.pdfCE-CONTRACTS-REPORT.pdf
CE-CONTRACTS-REPORT.pdfChelDems
 
'DRISHTI' Chapter 16: Checklist for Contract Document (कॉन्ट्रैक्ट डॉक्युमेंट...
'DRISHTI' Chapter 16: Checklist for Contract Document (कॉन्ट्रैक्ट डॉक्युमेंट...'DRISHTI' Chapter 16: Checklist for Contract Document (कॉन्ट्रैक्ट डॉक्युमेंट...
'DRISHTI' Chapter 16: Checklist for Contract Document (कॉन्ट्रैक्ट डॉक्युमेंट...Vipin Bakiwala
 

Similar to shyam 3 (20)

Shapoorji Pallonji PO
Shapoorji Pallonji POShapoorji Pallonji PO
Shapoorji Pallonji PO
 
GVPR 1
GVPR 1GVPR 1
GVPR 1
 
Scope of work and terms and conditions fin al
Scope of work and terms and conditions fin alScope of work and terms and conditions fin al
Scope of work and terms and conditions fin al
 
ZA CONTRACT AL NOOR.docx
ZA CONTRACT AL NOOR.docxZA CONTRACT AL NOOR.docx
ZA CONTRACT AL NOOR.docx
 
Conditions of CPWD contract in INDIA
Conditions of CPWD contract in INDIAConditions of CPWD contract in INDIA
Conditions of CPWD contract in INDIA
 
(Interior const) instruction to bidders
(Interior const) instruction to bidders(Interior const) instruction to bidders
(Interior const) instruction to bidders
 
Instruction
InstructionInstruction
Instruction
 
SOW T&C.pdf
SOW T&C.pdfSOW T&C.pdf
SOW T&C.pdf
 
scope - CCTV Tender.pdf
scope - CCTV Tender.pdfscope - CCTV Tender.pdf
scope - CCTV Tender.pdf
 
PROCUREMENT
PROCUREMENTPROCUREMENT
PROCUREMENT
 
General notes to BSR BUILDING SCHEDULE OF RATES
General notes to BSR BUILDING SCHEDULE OF RATESGeneral notes to BSR BUILDING SCHEDULE OF RATES
General notes to BSR BUILDING SCHEDULE OF RATES
 
General notes to building schedule of rates
General notes to building schedule of ratesGeneral notes to building schedule of rates
General notes to building schedule of rates
 
RDSO Guidelines for new Vendors- Rajni Ranjan
RDSO Guidelines for new Vendors- Rajni RanjanRDSO Guidelines for new Vendors- Rajni Ranjan
RDSO Guidelines for new Vendors- Rajni Ranjan
 
Rdso vendor registration guideline
Rdso vendor registration guidelineRdso vendor registration guideline
Rdso vendor registration guideline
 
Presentation on contract agreement of gis
Presentation on contract agreement of gisPresentation on contract agreement of gis
Presentation on contract agreement of gis
 
Pp1 seminar
Pp1 seminarPp1 seminar
Pp1 seminar
 
Cost estimates & contract documents ce224 pdf
Cost estimates & contract documents   ce224 pdfCost estimates & contract documents   ce224 pdf
Cost estimates & contract documents ce224 pdf
 
Boq of khadeja storage tank, well, and booster pumping station
Boq of khadeja storage tank, well, and booster pumping stationBoq of khadeja storage tank, well, and booster pumping station
Boq of khadeja storage tank, well, and booster pumping station
 
CE-CONTRACTS-REPORT.pdf
CE-CONTRACTS-REPORT.pdfCE-CONTRACTS-REPORT.pdf
CE-CONTRACTS-REPORT.pdf
 
'DRISHTI' Chapter 16: Checklist for Contract Document (कॉन्ट्रैक्ट डॉक्युमेंट...
'DRISHTI' Chapter 16: Checklist for Contract Document (कॉन्ट्रैक्ट डॉक्युमेंट...'DRISHTI' Chapter 16: Checklist for Contract Document (कॉन्ट्रैक्ट डॉक्युमेंट...
'DRISHTI' Chapter 16: Checklist for Contract Document (कॉन्ट्रैक्ट डॉक्युमेंट...
 

shyam 3

  • 1. LS'PS 1 SHYAM INDUS POWER SOLUTIONS PVT. LTD. (An ISO 9001:2000 Certified Comparry) Regd. office : !29, Transport centre, Rohtak Road, punjabi Bagh, New Delhi-35 Ref: To SIP S/P SEB.HVDS/SEP L / 3 5 Saraf lndustries, Bathinda Road, Rampura Phul-1 51 103 Kind Attn: Mr.Amrinder Singh Khipat (9781524900) Sub.: PURCHASE ORDER FOR StIppLy OF MATERIALS Dear Sir, This is u'ith reference toyour offer mentioned in the above cited subject. We are pleased to accept the offer and award our Purchase order on you as per the following terms anci conditions: 1. Scope of Work: The scope of work covered under the contract, interalia, includes the following: i) Design, engineering, manufacture, testing, supply of specified equipments and materials as per the Annexure-f enclosed herewith. Date: 05th Muy, 2010 The scope of supplies under this contract shall be as per PSEB SPECIFICATION include all such items and material which are not specifically mentioned in the documents referred above but are necessary under the scope ofsupplies /works. The supplies shall strictly conform to the documents referred above and in line with the PSEB specifications attached herewith. You shall submit immediately to us but not later than one week all the relevant Technical details, drawings, Catalogues, Guaranteed Technical Particulars etc.of the material / equipments, in line with the PSEB specification. These details offered shall be the same as the one which are type tested and are already approved by PSEB. Copies of the approved GTPs, Drawings etc. are also required to be submitted. After successful inspection of the material and on receipt of specific Dispatch instructions in writing from us, you shall make arrangement immediatelybut not laier than 7 days to dispatch the material to the consignee notified by us in the dispatch instructions. ii) iii) iv) v) The scope also includes to get the Drawings and GTPs approved from pSEB immediateiy by deputing your engineer to PSEB whenever required, after submission of thesl docurnents and subrnitting us the manufacturing, inspection and testing schedule after obtaining the approval from PSEB. 1 vi) After manufacture of the materials, you are required to give us atleast 7 days notice, unless and otherwise agreed specifically, for arranging the Final inspection of the materials at your works by Our/PSEB representative at no extra cost to us. vii) viii) naI tF-at^AA Aar
  • 2. 2. Contract Price: We agree to pay you a total sum of Rs. 62,80,000 /- (Rupees Sixty lwo tacs Eighty Thousands only) inclusive of all taxes, duties etc. Details are as under: :Given Quantities are tentative and may be increasG/decrease as per site requirement. : Given Rate are baseri onSi August 2009 w.r.t. IEEMA FORIviULA/Iii.t)MA INDICES 3. Taxes/Duties: i)Above rates are variabale & areinclusive of Central Excise duty @ lL.3l%and will be adjusted as per actual against documentary evidence on the Ei-w:orks component of the Price. ii) Above rates are Variable & are inclusive of VAT @ 5.5 Yo and, will be adjusted as per actual against documentary evidence on the Ex-workJcomponent of the price. iii) Freight & Insurance inclusive, for transporting the material from your works to pSEB store and from PSEB store to Site. iv) Packaging & Forwarding inclusive. v) Any Changes in taxes and duties wiII be in SIpS Account. 4. Type Test : The design of the offered material should be type tested and the type test report should be acceptable to PSEB. Failing to meet this requirement or app.wul of GTps necessitating type test by the client shall be done at no extra cost to us. 5. Inspection: All routine and acceptable test as per the relevant IS shall be done free of cost at your works in the presence of our/PSEB representative. Your material supplied to PSEB store/site shall also be subjected to various testing as per PSEB specification. 6. fnvoice will be raised in the name of lWS Shyam Indus Power Solutions Pvt. Ltd., punjab 7. Delivery: The FOR delivery shall be as mentioned hereunder: under:-Manufacturine clearance has been sianuraclurlng clearance nas en grven as under:- S.No Capacity of Transformer Qtv upto 20.05.2010 L 10 KVA 200 200 a) .b) US i) (10 KVA-200 Nos) :-_Dispatch should Delivery period indicated above shall by way of Penalty charges as: be completed on 20tn Muy 2010. be guaranteed. In case of del dy, you shall be liable to pay @0.5% of order value for week of delay subject to maximum of 5Yo of total order value b) Place of delivery will be informed with dispatch instruction. c) In case of non-supply of the material within stipulated period mentioned at para 7 (a) hereinabove, SIPS shall be at liberty to place the order on some other vendor/supplier ior supply of the whole andlor part of undelivered quantity.g--,!t!;.material and you rvill bl^liable to "'"':'-r1rii'li'1 j;:;'' ,,1/-.r'. ra , -'-*,.t i ,_ r".. S.No Description UOM Qtv Rate (FoRD) Total Amount L Stack core Type(Conventional ) 10 KVA copper wound 3 phase Distribution Transformer along with terminal connector Nos 200 31400 62,90,000 Amount in Figure: 62,90,000 Amount In words: Rupees Sixty Two Lacs Eighty Thousands Only
  • 3. pay the bills of such other vendor/supplier at such rates that are chargeable by the other vendor/supplier. 8. Embossing of PSEB and markinglprintinglcolouring and/or any other details must be done in accordance with the specifications of PSEB. 9. Terms of Payment: (A) You shall submit the following documents i) Invoice in original with 2 copies. ii) Excise Invoice. iii) Packing list. iv) Copy of the Inspection report v) Copy of LR/GR vi) Dispatch clearance issued by PSEB/SIPS after inspection at works of the Vendor/Supplier. vii) Acknowledgement of receipt of material by SIPS store. viii) Guarantee certificate for satisfactory nerformance. x) Corporate warranty on stamp paper as per inutual agreed proforma which shall be valid upto 120 days after the end of warranty period i.e. defectJ tability period of 12 months from the date of commissioning and taking over by PSEB and CIB shall be extended on prorata basis for the material/ equpment and for such period as per defects Liability period mentioned at Sl.No.11 here in under. (B) (i) Advance zl0o/" of manufacturing clearance against Security cheque of same amount. and it will be returned after receipt of material at site.. (ii) 45 %o will be paid Against Dispatch Instruction (iii) 45% as 25 days PDC Against Dispatch Instruction. 10. Consignee: We shall inform alongwith the dispatch instructions. I 1. Defects Liability period: The defects liability period will be 12 months from the date of taking over by PSEB of all the llKV works and allied materials etc. The supplier is liable to remedy defects and damage, as if such replacement and renewals had been taken over on the date they werl completed to the satisfaction of the PSEB, but not so-as-to extend the defects Liability period in respect thereofbeyond three (3) years from the date oftaking over. 12. Correspondence: All correspondences will be done at: lt{/s Shyam Indus Power Solutions Pvt. Ltd. 129, Transport Centre, Rohtak Road, Punjabi Bagh, Delhi-110035 Telo; +9 i', i-457 54140,457 54441 Ftrx :. 0 i i -!,57 544i5,1 57 6143 5 E_mail:ca.sheetalkhurana@shyamindus.com, vinayparkash@shyamindus.com, Thanks & For (sh HOD Encl: C & Pr'ocgrQment)::'' As Stated Abovti'