Important Definitions
Surveying and Levelling
True meridian:
Line or plane passing through
geographical north pole and
geographical south pole
North pole
True meridian
Magnetic meridian
True bearing
Magnetic bearing
Magnetic meridian:
The direction indicated by a freely suspended and properly
balanced magnetic needle is known as Magnetic Meridian. The
angle between the magnetic meridian and a line is known as
magnetic bearing or simple bearing of the line.
By Dr. Muhammad Umair
Important Definations
Arbitrary Meridian:
Convenient direction is assumed as a meridian.
Grid meridian:
Sometimes for preparing a map some state agencies assume several
lines parallel to the true meridian for a particular zone these lines
are termed as grid meridian.
Surveying and Levelling
By Dr. Muhammad Umair
Designation of Magnetic Bearing
Whole circle bearing (WCB)
The magnetic bearing of a line
measured clockwise from the North
Pole towards the line is known as WCB.
Varies 0-360°
Quadrantal bearing (QB)
The magnetic bearing of a line
measured clockwise or anticlockwise
from NP or SP (whichever is nearer to
the line) towards the east or west is
known as QB. This system consists of 4-
quadrants NE, SE, NW, SW. The values
lie between 0-90°
O
A
B
C
O
A
BC
N
S
EW
N
EW
S
D
D
NE
SE
NW
SW
N50°E
Surveying and Levelling
By Dr. Muhammad Umair
Conversion of W.C.B into R.B
Surveying and Levelling
CASE
W.C.B
between
Rule for R.B Quadrant
I 0˚ and 90˚ W.C.B N.E.
II
90˚ and 180˚
180˚ - W.C.B S.E.
III
180˚ and
270˚ W.C.B - 180˚ S.W.
IV
270˚ and
360˚ 360˚ - W.C.B N.W.
Reduced Bearing (RB)
When the whole circle bearing of a line is converted to quadrantal bearing it
is termed as reduced bearing.
By Dr. Muhammad Umair
Fore and Back Bearing
Fore Bearing (F.B)
The bearing of a line in the direction of
the progress of survey, is called Fore or
Forward Bearing (F.B)
B
A
N
S
N
S
Every line may be defined by two bearings,
one observed at either end of the line. Both
the bearings expressed in W.C.B System differ
each other by 180°.
Back Bearing (B.B)
while the bearing in the opposite
direction of the progress of survey is
known as Reverse or Back Bearing (B.B).
FB
BB
180°
 In WCB the difference between FB
and BB should be exactly 180°
 BB=FB+/-180°
 Use the +ve sign when FB<180°
 Use the –ve sign when FB> 180°
Surveying and Levelling
By Dr. Muhammad Umair
Compass surveying
Surveying and Levelling
 In Compass survey chain or tape is used for linear
measurements and compass is used for fixing direction.
 In compass freely suspended magnetic needle directs to
north- south and the bearing of line is obtained by line of
sight.
By Dr. Muhammad Umair
Prismatic Compass
Surveying and Levelling
By Dr. Muhammad Umair
Prismatic Compass
Surveying and Levelling
 Box with center point
 Magnetized Needle
Lift needle
 Blade Sights
 Level tubes
 Base
Jacob’s staff
Tripod
By Dr. Muhammad Umair
Prismatic Compass
Surveying and Levelling
By Dr. Muhammad Umair
Prismatic Compass
Surveying and Levelling
 Magnetic declination: The horizontal angle between the magnetic
meridian and true meridian is known as magnetic declination.
 Dip of the magnetic needle: If the needle is perfectly balanced before
magnetisation, it does not remain in the balanced position after it is
magnetised. This is due to the magnetic influence of the earth. The needle
is found to be inclined towards the pole. This inclination of the needle
with the horizontal is known as dip of the magnetic needle.
 Local Attraction
 Method of correction for traverse:
 First method: Sum of the interior angle should be equal to (2n-4) x 90.
if not than distribute the total error equally to all interior angles of the
traverse. Then starting from unaffected line the bearings of all the
lines are corrected using corrected interior angles.
 Second method: Unaffected line is first detected. Then, commencing
from the unaffected line, the bearing of other affected lines are
corrected by finding the amount of correction at each station.
By Dr. Muhammad Umair
Prismatic Compass
Surveying and Levelling
By Dr. Muhammad Umair
Problems
Surveying and Levelling
 Convert the following WCBs to QBs
 (a) WCB of AB = 45°30’
(Ans 45°30’)
 (b) WCB of BC = 125°45’
(Ans 180- 125°45’ = 54° 15’)
 Fore bearing of the following lines are given. Find back bearing
 AB=S 30°30’ E
 BC=N 40°30’ W
 The magnetic bearing of a line AB is 135°30’ what will be the true
bearing, if the declination is 5°15’ W.
By Dr. Muhammad Umair
Problems
Surveying and Levelling

More Related Content

What's hot

Chap.6 traverse surveys
Chap.6 traverse surveysChap.6 traverse surveys
Chap.6 traverse surveys
student
 
Compass surveying
Compass surveyingCompass surveying
Compass surveying
Ahmed Eid
 
Curves and there application in Survey
Curves and there application in SurveyCurves and there application in Survey
Curves and there application in Survey
Lord1911
 
Lecture 04 angle corrections
Lecture 04 angle correctionsLecture 04 angle corrections
Lecture 04 angle corrections
Rehan Hanif
 

What's hot (20)

Surveying i
Surveying iSurveying i
Surveying i
 
Theodolite surveying
Theodolite surveyingTheodolite surveying
Theodolite surveying
 
Chap.6 traverse surveys
Chap.6 traverse surveysChap.6 traverse surveys
Chap.6 traverse surveys
 
traversing of survey
traversing of surveytraversing of survey
traversing of survey
 
1.1 Linear measurement original: Chaining & Ranging
1.1 Linear measurement original: Chaining & Ranging1.1 Linear measurement original: Chaining & Ranging
1.1 Linear measurement original: Chaining & Ranging
 
Compass surveying
Compass surveyingCompass surveying
Compass surveying
 
Curves and there application in Survey
Curves and there application in SurveyCurves and there application in Survey
Curves and there application in Survey
 
Ge 105 lecture 4 (TRIANGULATION ADJUSTMENT) by: Broddett B. Abatayo
Ge 105 lecture 4 (TRIANGULATION ADJUSTMENT) by: Broddett B. AbatayoGe 105 lecture 4 (TRIANGULATION ADJUSTMENT) by: Broddett B. Abatayo
Ge 105 lecture 4 (TRIANGULATION ADJUSTMENT) by: Broddett B. Abatayo
 
Contouring in "Survey & Levelling".
Contouring in "Survey & Levelling".Contouring in "Survey & Levelling".
Contouring in "Survey & Levelling".
 
Lecture 07 leveling field procedures and computations
Lecture 07 leveling field procedures and computationsLecture 07 leveling field procedures and computations
Lecture 07 leveling field procedures and computations
 
Prismatic surveying
Prismatic surveyingPrismatic surveying
Prismatic surveying
 
Lecture 11 traverse computations
Lecture 11 traverse computations Lecture 11 traverse computations
Lecture 11 traverse computations
 
LEVELING AND CONTOURING
LEVELING AND CONTOURINGLEVELING AND CONTOURING
LEVELING AND CONTOURING
 
Introduction to surveying
Introduction to surveyingIntroduction to surveying
Introduction to surveying
 
Lecture 04 angle corrections
Lecture 04 angle correctionsLecture 04 angle corrections
Lecture 04 angle corrections
 
Angular measurement for surveying
Angular measurement for surveyingAngular measurement for surveying
Angular measurement for surveying
 
Control surveying
Control surveyingControl surveying
Control surveying
 
Traverse Survey Part 2/2
Traverse Survey Part 2/2Traverse Survey Part 2/2
Traverse Survey Part 2/2
 
Ch 5 levelling
Ch 5 levellingCh 5 levelling
Ch 5 levelling
 
Chapter 4 Levelling
Chapter 4 LevellingChapter 4 Levelling
Chapter 4 Levelling
 

Viewers also liked

Theodolite ppt in 7
Theodolite ppt in 7Theodolite ppt in 7
Theodolite ppt in 7
Arun Kama
 
Theodolite traversing, purpose and principles of theodolite traversing
Theodolite traversing, purpose and principles of theodolite traversingTheodolite traversing, purpose and principles of theodolite traversing
Theodolite traversing, purpose and principles of theodolite traversing
Dolat Ram
 
Site surveying report ii
Site surveying   report iiSite surveying   report ii
Site surveying report ii
마 이환
 

Viewers also liked (20)

Traverse Calculation
Traverse Calculation Traverse Calculation
Traverse Calculation
 
PROBLEMS ON BEARINGS
PROBLEMS ON BEARINGSPROBLEMS ON BEARINGS
PROBLEMS ON BEARINGS
 
Traversing final-report
Traversing final-reportTraversing final-report
Traversing final-report
 
Theodolite Traversing
Theodolite TraversingTheodolite Traversing
Theodolite Traversing
 
Site Surveying Report - Traversing
Site Surveying Report - TraversingSite Surveying Report - Traversing
Site Surveying Report - Traversing
 
Compass surveying
Compass surveyingCompass surveying
Compass surveying
 
Levelling
LevellingLevelling
Levelling
 
Site Surveying Report 2 (Traversing)
Site Surveying Report 2 (Traversing)Site Surveying Report 2 (Traversing)
Site Surveying Report 2 (Traversing)
 
Compass Surveying
Compass Surveying Compass Surveying
Compass Surveying
 
Surveying
Surveying Surveying
Surveying
 
1392741020 traverse survey
1392741020 traverse survey1392741020 traverse survey
1392741020 traverse survey
 
Theodolite and measurement of angles
Theodolite and measurement of anglesTheodolite and measurement of angles
Theodolite and measurement of angles
 
Levelling in Surveying
Levelling in SurveyingLevelling in Surveying
Levelling in Surveying
 
Assignment 2 - Traverse
Assignment 2 - TraverseAssignment 2 - Traverse
Assignment 2 - Traverse
 
Theodolite ppt in 7
Theodolite ppt in 7Theodolite ppt in 7
Theodolite ppt in 7
 
Surveying - Module II - compass surveying
Surveying - Module  II - compass surveyingSurveying - Module  II - compass surveying
Surveying - Module II - compass surveying
 
Fw2
Fw2Fw2
Fw2
 
Closed Traverse Surveying - Report
Closed Traverse Surveying - ReportClosed Traverse Surveying - Report
Closed Traverse Surveying - Report
 
Theodolite traversing, purpose and principles of theodolite traversing
Theodolite traversing, purpose and principles of theodolite traversingTheodolite traversing, purpose and principles of theodolite traversing
Theodolite traversing, purpose and principles of theodolite traversing
 
Site surveying report ii
Site surveying   report iiSite surveying   report ii
Site surveying report ii
 

Similar to Traverse surveiying

Unit3AngularMeasurementpptx__2022_01_08_11_22_11.pptx
Unit3AngularMeasurementpptx__2022_01_08_11_22_11.pptxUnit3AngularMeasurementpptx__2022_01_08_11_22_11.pptx
Unit3AngularMeasurementpptx__2022_01_08_11_22_11.pptx
OKOKILOUISmefgi
 
COMPASS SURVEYING btech civil ...-I.pptx
COMPASS SURVEYING btech civil ...-I.pptxCOMPASS SURVEYING btech civil ...-I.pptx
COMPASS SURVEYING btech civil ...-I.pptx
Ayushsharma131736
 

Similar to Traverse surveiying (20)

Compass surveying.ppt
Compass surveying.pptCompass surveying.ppt
Compass surveying.ppt
 
Compass surveying (1).ppt
Compass surveying (1).pptCompass surveying (1).ppt
Compass surveying (1).ppt
 
Compass surveying
Compass surveyingCompass surveying
Compass surveying
 
Compass surveying
Compass surveyingCompass surveying
Compass surveying
 
Compasssurveying 160050106053
Compasssurveying 160050106053Compasssurveying 160050106053
Compasssurveying 160050106053
 
Compass Survaying
Compass SurvayingCompass Survaying
Compass Survaying
 
BEARING AND ITS TYPES
BEARING AND ITS TYPESBEARING AND ITS TYPES
BEARING AND ITS TYPES
 
types of bearing
types of bearingtypes of bearing
types of bearing
 
Compass surveying
Compass surveyingCompass surveying
Compass surveying
 
Compass survey part 2
Compass survey part 2Compass survey part 2
Compass survey part 2
 
Prismetic compass ppt 3rd sem diploma and b.tech as per mdu and hsbte syllabus
Prismetic compass ppt 3rd sem diploma and b.tech as per mdu and hsbte syllabusPrismetic compass ppt 3rd sem diploma and b.tech as per mdu and hsbte syllabus
Prismetic compass ppt 3rd sem diploma and b.tech as per mdu and hsbte syllabus
 
3.compass surveying
3.compass surveying3.compass surveying
3.compass surveying
 
Unit3AngularMeasurementpptx__2022_01_08_11_22_11.pptx
Unit3AngularMeasurementpptx__2022_01_08_11_22_11.pptxUnit3AngularMeasurementpptx__2022_01_08_11_22_11.pptx
Unit3AngularMeasurementpptx__2022_01_08_11_22_11.pptx
 
Compass surveying
Compass surveyingCompass surveying
Compass surveying
 
Compass surveying
Compass surveyingCompass surveying
Compass surveying
 
Compass Surveying.ppt
Compass Surveying.pptCompass Surveying.ppt
Compass Surveying.ppt
 
Compass surveying
Compass surveyingCompass surveying
Compass surveying
 
Chapter No. 04 - Angles and Directions.pptx
Chapter No. 04 - Angles and Directions.pptxChapter No. 04 - Angles and Directions.pptx
Chapter No. 04 - Angles and Directions.pptx
 
chain and compass traversing.pptx
chain and compass traversing.pptxchain and compass traversing.pptx
chain and compass traversing.pptx
 
COMPASS SURVEYING btech civil ...-I.pptx
COMPASS SURVEYING btech civil ...-I.pptxCOMPASS SURVEYING btech civil ...-I.pptx
COMPASS SURVEYING btech civil ...-I.pptx
 

Recently uploaded

Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Christo Ananth
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
rknatarajan
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Dr.Costas Sachpazis
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 

Recently uploaded (20)

Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spain
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 

Traverse surveiying

  • 1. Course offered by Dr. Muhammad Umair Assistant Professor Faculty of Agricultural Engineering & Technology, PMAS-Arid Agriculture University, Rawalpindi. Traverse Surveying FSEE-401 Surveying and Leveling
  • 2. By Dr. Muhammad Umair Important Definitions Surveying and Levelling True meridian: Line or plane passing through geographical north pole and geographical south pole North pole True meridian Magnetic meridian True bearing Magnetic bearing Magnetic meridian: The direction indicated by a freely suspended and properly balanced magnetic needle is known as Magnetic Meridian. The angle between the magnetic meridian and a line is known as magnetic bearing or simple bearing of the line.
  • 3. By Dr. Muhammad Umair Important Definations Arbitrary Meridian: Convenient direction is assumed as a meridian. Grid meridian: Sometimes for preparing a map some state agencies assume several lines parallel to the true meridian for a particular zone these lines are termed as grid meridian. Surveying and Levelling
  • 4. By Dr. Muhammad Umair Designation of Magnetic Bearing Whole circle bearing (WCB) The magnetic bearing of a line measured clockwise from the North Pole towards the line is known as WCB. Varies 0-360° Quadrantal bearing (QB) The magnetic bearing of a line measured clockwise or anticlockwise from NP or SP (whichever is nearer to the line) towards the east or west is known as QB. This system consists of 4- quadrants NE, SE, NW, SW. The values lie between 0-90° O A B C O A BC N S EW N EW S D D NE SE NW SW N50°E Surveying and Levelling
  • 5. By Dr. Muhammad Umair Conversion of W.C.B into R.B Surveying and Levelling CASE W.C.B between Rule for R.B Quadrant I 0˚ and 90˚ W.C.B N.E. II 90˚ and 180˚ 180˚ - W.C.B S.E. III 180˚ and 270˚ W.C.B - 180˚ S.W. IV 270˚ and 360˚ 360˚ - W.C.B N.W. Reduced Bearing (RB) When the whole circle bearing of a line is converted to quadrantal bearing it is termed as reduced bearing.
  • 6. By Dr. Muhammad Umair Fore and Back Bearing Fore Bearing (F.B) The bearing of a line in the direction of the progress of survey, is called Fore or Forward Bearing (F.B) B A N S N S Every line may be defined by two bearings, one observed at either end of the line. Both the bearings expressed in W.C.B System differ each other by 180°. Back Bearing (B.B) while the bearing in the opposite direction of the progress of survey is known as Reverse or Back Bearing (B.B). FB BB 180°  In WCB the difference between FB and BB should be exactly 180°  BB=FB+/-180°  Use the +ve sign when FB<180°  Use the –ve sign when FB> 180° Surveying and Levelling
  • 7. By Dr. Muhammad Umair Compass surveying Surveying and Levelling  In Compass survey chain or tape is used for linear measurements and compass is used for fixing direction.  In compass freely suspended magnetic needle directs to north- south and the bearing of line is obtained by line of sight.
  • 8. By Dr. Muhammad Umair Prismatic Compass Surveying and Levelling
  • 9. By Dr. Muhammad Umair Prismatic Compass Surveying and Levelling  Box with center point  Magnetized Needle Lift needle  Blade Sights  Level tubes  Base Jacob’s staff Tripod
  • 10. By Dr. Muhammad Umair Prismatic Compass Surveying and Levelling
  • 11. By Dr. Muhammad Umair Prismatic Compass Surveying and Levelling  Magnetic declination: The horizontal angle between the magnetic meridian and true meridian is known as magnetic declination.  Dip of the magnetic needle: If the needle is perfectly balanced before magnetisation, it does not remain in the balanced position after it is magnetised. This is due to the magnetic influence of the earth. The needle is found to be inclined towards the pole. This inclination of the needle with the horizontal is known as dip of the magnetic needle.  Local Attraction  Method of correction for traverse:  First method: Sum of the interior angle should be equal to (2n-4) x 90. if not than distribute the total error equally to all interior angles of the traverse. Then starting from unaffected line the bearings of all the lines are corrected using corrected interior angles.  Second method: Unaffected line is first detected. Then, commencing from the unaffected line, the bearing of other affected lines are corrected by finding the amount of correction at each station.
  • 12. By Dr. Muhammad Umair Prismatic Compass Surveying and Levelling
  • 13. By Dr. Muhammad Umair Problems Surveying and Levelling  Convert the following WCBs to QBs  (a) WCB of AB = 45°30’ (Ans 45°30’)  (b) WCB of BC = 125°45’ (Ans 180- 125°45’ = 54° 15’)  Fore bearing of the following lines are given. Find back bearing  AB=S 30°30’ E  BC=N 40°30’ W  The magnetic bearing of a line AB is 135°30’ what will be the true bearing, if the declination is 5°15’ W.
  • 14. By Dr. Muhammad Umair Problems Surveying and Levelling