PRESENTATION ON SUMMER
TRAINING
UTTAR PRADESH
PUBLIC WORKS DEPARTMENT
VARANASI
2
3
SUBMITTED TO - SUBMITTED BY-
H.O.D CIVIL
ENGINEERING
Dr .V.K.GUPTA
HINDUSTAN COLLEGE
OF SCIENCE &
TECHNOLOGY
ANIL GUPTA
VII SEM
1206400013
PUBLIC WORKS DEPARTMENT- AN
OVERVIEW
 Public Works Department (PWD), under the Ministry of
Public Works department, is the pioneer in construction
arena of Uttar Pradesh.
 It plays a pivotal role in the implementation of government
construction projects
 To accelerate the construction of bridges in the state, Uttar
Pradesh State Bridge Corporation was founded in 1973.
 In year 2004-05, Uttar Pradesh state highways authority
was established to overcome with problem of pavements in
state.
4
5
INTRODUCTION
 Development of a country depends on the connectivity of various places with adequate
road network.
 Roads constitute the most important mode of communication in areas where railways
have not developed much.
 India has one of the largest road networks in the world (over 3 million km at
present).For the purpose of management and administration, roads in India are divided
into the following five categories:
• National Highways (NH)
• State Highways (SH)
• Major District Roads (MDR)
• Other District Roads (ODR)
• Village Roads (VR)
WHAT IS ROAD AND PAVEMENT ?
 Road is an open, generally public way for the passage of vehicles,
people, and animals.
 Pavement is finished with a hard smooth surface. It helped make
them durable and able to withstand traffic and the environment.
They have a life span of between 20 – 30 years.
• FUNCTIONS
• One of the primary functions of pavement is load distribution. It
can be characterized by the tire loads, tire configurations, repetition
of loads, and distribution of traffic across the pavement, and vehicle
speed
6
7
TYPES OF PAVEMENTS
There are various types of pavements depending upon the materials used; a briefs
description of all types is given here-
FLEXIBLE PAVEMENT
Bitumen has been widely used in the construction of flexible pavements for a long time.
This is the most convenient and simple type of construction. The cost of construction of
single lane bituminous pavement varies from 20 to 30 lakhs per km in plain area.
Flexible pavement have-
 Have low flexural strength
 Load is transferred by grain to grain contact
 Have low completion cost but repairing cost is high
 Have low life span (High Maintenance Cost)
RIGID PAVEMENT
• Rigid pavements, though costly in initial investment, are cheap in long run because
of low maintenance costs, The cost of construction of single lane rigid pavement
varies from 35 to 50 lakhs per km in plain area,
• Rigid pavement have-
 Deformation in the sub grade is not transferred to subsequent layers
 Design is based on flexural strength or slab action
 Have high flexural strength
 No such phenomenon of grain to grain load transfer exists
 Have low repairing cost but completion cost is high
 Life span is more as compare to flexible (Low Maintenance Cost)
8
9
Longitudinal joint
Transverse joint
Subgrade
Base
Surface Texture
Surface smoothness Thickness Design
Dowel bars
Concrete materials
Tiebars
Basic Components of a Concrete
Pavement
1. Preparation of base
2. Form working
3. Preparation of subgrade
4. Watering of base
5. Joints
6. Material mix & placing
7. Compaction
10
Using mix Concrete , there some
Point to construct the road
11
8. Finishing of surface
8A. Floating
8B. Belting
8C. Brooming
9. Curing
10. Joint filling
11. Edging
12. Open to traffic
1. Rolling on sub grade by roller
2. Filling the granular soil in the weak part and
pot holes
3. Correct the soil coat , Camber , longitudinal
slop
When concrete direct laid on subgrade, For
preventing the water-seepaging into the soil ,
used water proof paper on entire length.
12
13
PREPERATION OF SUB GRADE
14
ROLLING OF SUBGRADE
Choose any one type of base
1. W.B.M. base
As base material of W.B.M. Road; stone ballast,
concrete 10-15cm layer are used. For bonding
between concrete slab & W.B.M. used 1:2 cement
wash on W.B.M.
2. Concrete base
On the road used 10cm Cement concrete(1:2:4) or
lime concrete(16:32:64)
15
3. Granular medium material layer
10-15cm composite layer of sand , moorum ,
bajri are used for better drainage facilities
4. Stabilization soil
16
Material for form work-
Wooden sheets, battens, plywood, fibre hard
board, steel plates, angles, rope, minerals.
1. before using form work, it should free from all
type material like as dust ,cement.
2. To placing the concrete in appropriate depth
used 2.5-5cm thick and 3mtr long wooden sheeting.
17
3. The depth of wooden block must be same
as level of slab thick.
4. After 24hrs form work displaced next length
of road.
18
If base is dry
Than using the sprinkling process on it properly
after that placing the concrete.
19
Where is necessary to provide transverse,
Longitudinal joints; there wedge of woods,
metals fix on level of concrete.
After setting of concrete it should be pull
out.
If provided the dowel bar in joints, bars
should be fit at right position.
20
Mixer is equipment that mix the concrete using distinct
amount of cement , concrete, sand and water. Concrete
slab should have more than 5-10cm thick cause of drying.
Used two type mixer-
1. Batch mixer-
at site, used for small road construction
2. Continuous mixer-
Continuous mixer used for large construction .
if distance is more from site , mix concrete
transported at site within setting time.
21
22
23
Laying of polyethylene sheet over DLC
24
Two methods generally used in placing of
concrete-
1. Alternate bay method-
Placed the concrete on both side of road
alternatively like as1,3,5… part at one side and
2,4,6… part other side .
1st side
2nd side
This method have slow process due to road
traffic problems.
25
2. Continuous bay method-
construct one side of road regularly, if
completed some part of first side than
construct other side.
this method have fast process without no
obstruction of traffic
26
Purpose of compaction is that to pull out air
from void and make concrete harden.
Compaction done by-
1.mechanically surface vibrator
2. manually hand tempers
27
8. Finishing of surface
1.Floating-
For levelling the surface use floating, scree-
ding , power trowel. So that there is no acceptable
more than 3mm variation in concrete level surface.
2.Belting-
For making surface clean used belting process.
Belt is nothing but a 15-30cm thick sheets of
canvass which have more length than road.
28
29
3. Brooming-
Brooming is the process in which we made
rough surface parallel to road by brush.
It useful in avoiding slip & comfortable
travelling on road .
the depth of line on road no more than
1.5mm.
30
31
Texturing of finished surface by texturing machine
9. Curing
Curing is the name of increasing the
hydration process of cement.
after setting the concrete , curing process
done till 14-28days.
32
Some method of curing are-
1.Shading concrete works
2. Covering with hessian & gunny bags
3. Sprinkling of water
4.By ponding
5. Membrane curing
6. Steam curing
33
34
CURING
10. Filling joint
After drying road, clean the joints and fill the
shelling compound or hot bitumen .
also bitumen fill road bank.
35
11. Edging
To protect damaging the sides of concrete
pavements used over burnt brick work.
in place of brick, provided kerb of pre mix
concrete.
36
Generally after a month, road should be open
to traffic.
If used rapid hardening cement it take 7 days to
open traffic.
37
Advantages of Concrete Road
• Durability and maintenance free life
• Vehicles consume less fuel
• Resistant to automobile fuel spillage and
extreme weather
• Greener process
• Saving of natural resources
• Eco friendly process
38
39
40

More Related Content

What's hot

cement concrete road construction procedure
cement concrete road construction procedure cement concrete road construction procedure
cement concrete road construction procedure
jaknap123456
 
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORT
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORTPWD CC ROAD CONSTRUCTION WORK TRAINING REPORT
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORT
Satyam Anand
 

What's hot (20)

FINAL REPORT
FINAL REPORTFINAL REPORT
FINAL REPORT
 
Project report on CC road
Project report on CC roadProject report on CC road
Project report on CC road
 
Road construction ppt
Road construction pptRoad construction ppt
Road construction ppt
 
Summer training report on cement Road Construction
 Summer training report on cement Road Construction Summer training report on cement Road Construction
Summer training report on cement Road Construction
 
Highway failure & their maintenance seminar report
Highway failure & their maintenance seminar reportHighway failure & their maintenance seminar report
Highway failure & their maintenance seminar report
 
Bituminous road construction
Bituminous road constructionBituminous road construction
Bituminous road construction
 
CONSTRUCTION OF CEMENT CONCRETE ROAD
CONSTRUCTION OF CEMENT CONCRETE ROADCONSTRUCTION OF CEMENT CONCRETE ROAD
CONSTRUCTION OF CEMENT CONCRETE ROAD
 
water bound macadam road
water bound macadam roadwater bound macadam road
water bound macadam road
 
Concrete Road Pavement
Concrete Road Pavement Concrete Road Pavement
Concrete Road Pavement
 
cement concrete road construction procedure
cement concrete road construction procedure cement concrete road construction procedure
cement concrete road construction procedure
 
ROAD CONSTRUCTION(BITUMEN) SUMMER TRAINING REPORT
ROAD CONSTRUCTION(BITUMEN) SUMMER TRAINING REPORTROAD CONSTRUCTION(BITUMEN) SUMMER TRAINING REPORT
ROAD CONSTRUCTION(BITUMEN) SUMMER TRAINING REPORT
 
Construction of Road
Construction of RoadConstruction of Road
Construction of Road
 
Summer Training Report On Bituminous (Asphalt) Road
Summer Training Report On Bituminous (Asphalt) RoadSummer Training Report On Bituminous (Asphalt) Road
Summer Training Report On Bituminous (Asphalt) Road
 
Rigid pavement
Rigid pavementRigid pavement
Rigid pavement
 
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORT
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORTPWD CC ROAD CONSTRUCTION WORK TRAINING REPORT
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORT
 
Bitumin road construction
Bitumin road constructionBitumin road construction
Bitumin road construction
 
Traning report on pwd cement concrete road pavement
Traning report on pwd cement concrete road pavementTraning report on pwd cement concrete road pavement
Traning report on pwd cement concrete road pavement
 
Presentation on Summer internship on Road Construction
Presentation on Summer internship on Road ConstructionPresentation on Summer internship on Road Construction
Presentation on Summer internship on Road Construction
 
Road Construction
Road ConstructionRoad Construction
Road Construction
 
Pavement failures and maintenance
Pavement failures and maintenancePavement failures and maintenance
Pavement failures and maintenance
 

Viewers also liked

Aryan k tranning file road ppt 07
Aryan k tranning file road ppt 07Aryan k tranning file road ppt 07
Aryan k tranning file road ppt 07
aryan kumar
 
Final year design project report - Studies in application of augmented realit...
Final year design project report - Studies in application of augmented realit...Final year design project report - Studies in application of augmented realit...
Final year design project report - Studies in application of augmented realit...
Mannu Amrit
 

Viewers also liked (18)

Final Year Project Report
Final Year Project ReportFinal Year Project Report
Final Year Project Report
 
Stv cc ppt unit i (1.1)em&ce introduction-construction layout
Stv cc ppt unit i (1.1)em&ce  introduction-construction layoutStv cc ppt unit i (1.1)em&ce  introduction-construction layout
Stv cc ppt unit i (1.1)em&ce introduction-construction layout
 
building construction,ppt
building construction,pptbuilding construction,ppt
building construction,ppt
 
Aryan k tranning file road ppt 07
Aryan k tranning file road ppt 07Aryan k tranning file road ppt 07
Aryan k tranning file road ppt 07
 
Construction Of Road
Construction Of RoadConstruction Of Road
Construction Of Road
 
Mukesh ppt cc road
Mukesh ppt cc roadMukesh ppt cc road
Mukesh ppt cc road
 
ppt on pwd cement concrete road pavement
ppt on pwd cement concrete road pavementppt on pwd cement concrete road pavement
ppt on pwd cement concrete road pavement
 
Construction of cc_road
Construction of cc_roadConstruction of cc_road
Construction of cc_road
 
Selecting topic 4 FYP v3
Selecting topic 4 FYP v3Selecting topic 4 FYP v3
Selecting topic 4 FYP v3
 
final year Project (civil)
final year Project (civil)final year Project (civil)
final year Project (civil)
 
Cc road summer training ppt @akshay kumar
Cc road summer training ppt @akshay kumarCc road summer training ppt @akshay kumar
Cc road summer training ppt @akshay kumar
 
JYOTI THAKURIA CV
JYOTI THAKURIA CVJYOTI THAKURIA CV
JYOTI THAKURIA CV
 
Introduction & under ground water tank problem
Introduction & under ground water tank problemIntroduction & under ground water tank problem
Introduction & under ground water tank problem
 
Final year design project report - Studies in application of augmented realit...
Final year design project report - Studies in application of augmented realit...Final year design project report - Studies in application of augmented realit...
Final year design project report - Studies in application of augmented realit...
 
Minor Project Report On Construction of Pipe Culvert
Minor Project Report  On Construction of  Pipe CulvertMinor Project Report  On Construction of  Pipe Culvert
Minor Project Report On Construction of Pipe Culvert
 
project final year civil
project final year civilproject final year civil
project final year civil
 
Construction Equipment Management
Construction Equipment ManagementConstruction Equipment Management
Construction Equipment Management
 
Smart card system ppt
Smart card system ppt Smart card system ppt
Smart card system ppt
 

Similar to RIGID PAVEMENT -ANIL GUPTA (P.W.D)

FOUNDATION ENGINEERING.pptx
FOUNDATION ENGINEERING.pptxFOUNDATION ENGINEERING.pptx
FOUNDATION ENGINEERING.pptx
DolanGhosh4
 
foundation and pavement lec 3 Road Construction Methods and Techniques.pptx
foundation and pavement lec 3 Road Construction Methods and Techniques.pptxfoundation and pavement lec 3 Road Construction Methods and Techniques.pptx
foundation and pavement lec 3 Road Construction Methods and Techniques.pptx
fazl ullah
 

Similar to RIGID PAVEMENT -ANIL GUPTA (P.W.D) (20)

Naresh kumar ppt
Naresh kumar  pptNaresh kumar  ppt
Naresh kumar ppt
 
cement road construction in the rural areas
cement road construction in the rural areas cement road construction in the rural areas
cement road construction in the rural areas
 
Anshuman.pptx
Anshuman.pptxAnshuman.pptx
Anshuman.pptx
 
Highway construction PPT
Highway construction PPTHighway construction PPT
Highway construction PPT
 
Highway report
Highway reportHighway report
Highway report
 
MD NEHAL 8TH SEM PPT- 2pptx.pptx
MD NEHAL 8TH SEM PPT- 2pptx.pptxMD NEHAL 8TH SEM PPT- 2pptx.pptx
MD NEHAL 8TH SEM PPT- 2pptx.pptx
 
Roadconstructionequipment pptx2-130310150329-phpapp01 - copy (2)
Roadconstructionequipment pptx2-130310150329-phpapp01 - copy (2)Roadconstructionequipment pptx2-130310150329-phpapp01 - copy (2)
Roadconstructionequipment pptx2-130310150329-phpapp01 - copy (2)
 
Rigid pavement
Rigid pavementRigid pavement
Rigid pavement
 
Low cost road
Low cost roadLow cost road
Low cost road
 
Concrete (types of road)
Concrete (types of road)Concrete (types of road)
Concrete (types of road)
 
EM-203 Final MTE PPT 141-152.pptx
EM-203 Final MTE PPT 141-152.pptxEM-203 Final MTE PPT 141-152.pptx
EM-203 Final MTE PPT 141-152.pptx
 
ROAD CONSTRUCTION (FLEXIBLE & RIGID) - SLIDES.pdf
ROAD CONSTRUCTION (FLEXIBLE & RIGID) - SLIDES.pdfROAD CONSTRUCTION (FLEXIBLE & RIGID) - SLIDES.pdf
ROAD CONSTRUCTION (FLEXIBLE & RIGID) - SLIDES.pdf
 
Highway construction and equipments
Highway construction and equipmentsHighway construction and equipments
Highway construction and equipments
 
Construction of rigid pavement
Construction of rigid pavement Construction of rigid pavement
Construction of rigid pavement
 
FOUNDATION ENGINEERING.pptx
FOUNDATION ENGINEERING.pptxFOUNDATION ENGINEERING.pptx
FOUNDATION ENGINEERING.pptx
 
foundation and pavement lec 3 Road Construction Methods and Techniques.pptx
foundation and pavement lec 3 Road Construction Methods and Techniques.pptxfoundation and pavement lec 3 Road Construction Methods and Techniques.pptx
foundation and pavement lec 3 Road Construction Methods and Techniques.pptx
 
PPT FINAL.pptx
PPT FINAL.pptxPPT FINAL.pptx
PPT FINAL.pptx
 
Highway Construction Materials and Practice
Highway Construction Materials and PracticeHighway Construction Materials and Practice
Highway Construction Materials and Practice
 
Road bridge & railway construction pdf
Road bridge & railway construction pdfRoad bridge & railway construction pdf
Road bridge & railway construction pdf
 
CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
CONSTRUCTION_OF_RIGID_PAVEMENT.pptxCONSTRUCTION_OF_RIGID_PAVEMENT.pptx
CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
 

Recently uploaded

"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
mphochane1998
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
AldoGarca30
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 

Recently uploaded (20)

Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 

RIGID PAVEMENT -ANIL GUPTA (P.W.D)

  • 1. 1 PRESENTATION ON SUMMER TRAINING UTTAR PRADESH PUBLIC WORKS DEPARTMENT VARANASI
  • 2. 2
  • 3. 3 SUBMITTED TO - SUBMITTED BY- H.O.D CIVIL ENGINEERING Dr .V.K.GUPTA HINDUSTAN COLLEGE OF SCIENCE & TECHNOLOGY ANIL GUPTA VII SEM 1206400013
  • 4. PUBLIC WORKS DEPARTMENT- AN OVERVIEW  Public Works Department (PWD), under the Ministry of Public Works department, is the pioneer in construction arena of Uttar Pradesh.  It plays a pivotal role in the implementation of government construction projects  To accelerate the construction of bridges in the state, Uttar Pradesh State Bridge Corporation was founded in 1973.  In year 2004-05, Uttar Pradesh state highways authority was established to overcome with problem of pavements in state. 4
  • 5. 5 INTRODUCTION  Development of a country depends on the connectivity of various places with adequate road network.  Roads constitute the most important mode of communication in areas where railways have not developed much.  India has one of the largest road networks in the world (over 3 million km at present).For the purpose of management and administration, roads in India are divided into the following five categories: • National Highways (NH) • State Highways (SH) • Major District Roads (MDR) • Other District Roads (ODR) • Village Roads (VR)
  • 6. WHAT IS ROAD AND PAVEMENT ?  Road is an open, generally public way for the passage of vehicles, people, and animals.  Pavement is finished with a hard smooth surface. It helped make them durable and able to withstand traffic and the environment. They have a life span of between 20 – 30 years. • FUNCTIONS • One of the primary functions of pavement is load distribution. It can be characterized by the tire loads, tire configurations, repetition of loads, and distribution of traffic across the pavement, and vehicle speed 6
  • 7. 7 TYPES OF PAVEMENTS There are various types of pavements depending upon the materials used; a briefs description of all types is given here- FLEXIBLE PAVEMENT Bitumen has been widely used in the construction of flexible pavements for a long time. This is the most convenient and simple type of construction. The cost of construction of single lane bituminous pavement varies from 20 to 30 lakhs per km in plain area. Flexible pavement have-  Have low flexural strength  Load is transferred by grain to grain contact  Have low completion cost but repairing cost is high  Have low life span (High Maintenance Cost)
  • 8. RIGID PAVEMENT • Rigid pavements, though costly in initial investment, are cheap in long run because of low maintenance costs, The cost of construction of single lane rigid pavement varies from 35 to 50 lakhs per km in plain area, • Rigid pavement have-  Deformation in the sub grade is not transferred to subsequent layers  Design is based on flexural strength or slab action  Have high flexural strength  No such phenomenon of grain to grain load transfer exists  Have low repairing cost but completion cost is high  Life span is more as compare to flexible (Low Maintenance Cost) 8
  • 9. 9 Longitudinal joint Transverse joint Subgrade Base Surface Texture Surface smoothness Thickness Design Dowel bars Concrete materials Tiebars Basic Components of a Concrete Pavement
  • 10. 1. Preparation of base 2. Form working 3. Preparation of subgrade 4. Watering of base 5. Joints 6. Material mix & placing 7. Compaction 10
  • 11. Using mix Concrete , there some Point to construct the road 11 8. Finishing of surface 8A. Floating 8B. Belting 8C. Brooming 9. Curing 10. Joint filling 11. Edging 12. Open to traffic
  • 12. 1. Rolling on sub grade by roller 2. Filling the granular soil in the weak part and pot holes 3. Correct the soil coat , Camber , longitudinal slop When concrete direct laid on subgrade, For preventing the water-seepaging into the soil , used water proof paper on entire length. 12
  • 15. Choose any one type of base 1. W.B.M. base As base material of W.B.M. Road; stone ballast, concrete 10-15cm layer are used. For bonding between concrete slab & W.B.M. used 1:2 cement wash on W.B.M. 2. Concrete base On the road used 10cm Cement concrete(1:2:4) or lime concrete(16:32:64) 15
  • 16. 3. Granular medium material layer 10-15cm composite layer of sand , moorum , bajri are used for better drainage facilities 4. Stabilization soil 16
  • 17. Material for form work- Wooden sheets, battens, plywood, fibre hard board, steel plates, angles, rope, minerals. 1. before using form work, it should free from all type material like as dust ,cement. 2. To placing the concrete in appropriate depth used 2.5-5cm thick and 3mtr long wooden sheeting. 17
  • 18. 3. The depth of wooden block must be same as level of slab thick. 4. After 24hrs form work displaced next length of road. 18
  • 19. If base is dry Than using the sprinkling process on it properly after that placing the concrete. 19
  • 20. Where is necessary to provide transverse, Longitudinal joints; there wedge of woods, metals fix on level of concrete. After setting of concrete it should be pull out. If provided the dowel bar in joints, bars should be fit at right position. 20
  • 21. Mixer is equipment that mix the concrete using distinct amount of cement , concrete, sand and water. Concrete slab should have more than 5-10cm thick cause of drying. Used two type mixer- 1. Batch mixer- at site, used for small road construction 2. Continuous mixer- Continuous mixer used for large construction . if distance is more from site , mix concrete transported at site within setting time. 21
  • 22. 22
  • 23. 23 Laying of polyethylene sheet over DLC
  • 24. 24
  • 25. Two methods generally used in placing of concrete- 1. Alternate bay method- Placed the concrete on both side of road alternatively like as1,3,5… part at one side and 2,4,6… part other side . 1st side 2nd side This method have slow process due to road traffic problems. 25
  • 26. 2. Continuous bay method- construct one side of road regularly, if completed some part of first side than construct other side. this method have fast process without no obstruction of traffic 26
  • 27. Purpose of compaction is that to pull out air from void and make concrete harden. Compaction done by- 1.mechanically surface vibrator 2. manually hand tempers 27
  • 28. 8. Finishing of surface 1.Floating- For levelling the surface use floating, scree- ding , power trowel. So that there is no acceptable more than 3mm variation in concrete level surface. 2.Belting- For making surface clean used belting process. Belt is nothing but a 15-30cm thick sheets of canvass which have more length than road. 28
  • 29. 29
  • 30. 3. Brooming- Brooming is the process in which we made rough surface parallel to road by brush. It useful in avoiding slip & comfortable travelling on road . the depth of line on road no more than 1.5mm. 30
  • 31. 31 Texturing of finished surface by texturing machine
  • 32. 9. Curing Curing is the name of increasing the hydration process of cement. after setting the concrete , curing process done till 14-28days. 32
  • 33. Some method of curing are- 1.Shading concrete works 2. Covering with hessian & gunny bags 3. Sprinkling of water 4.By ponding 5. Membrane curing 6. Steam curing 33
  • 35. 10. Filling joint After drying road, clean the joints and fill the shelling compound or hot bitumen . also bitumen fill road bank. 35
  • 36. 11. Edging To protect damaging the sides of concrete pavements used over burnt brick work. in place of brick, provided kerb of pre mix concrete. 36
  • 37. Generally after a month, road should be open to traffic. If used rapid hardening cement it take 7 days to open traffic. 37
  • 38. Advantages of Concrete Road • Durability and maintenance free life • Vehicles consume less fuel • Resistant to automobile fuel spillage and extreme weather • Greener process • Saving of natural resources • Eco friendly process 38
  • 39. 39