1 SECI(150) Nov-18 50
Uttar
Pradesh
Floating
Solar
Design, engineering,
procurement, supply,
installation, testing, and
commissioning of the grid-
connected, floating solar
PV project.
Shapoorji
Pallongi
(3.29
Rs./kWh)
2
UPNEDA
(500)
Dec-18 20
Uttar
Pradesh
Ground
Mounted
Design, engineering,
procurement, supply,
installation, testing, and
commissioning of the grid-
connected, solar PV
project.
Maheshwari
Mining
(3.17
Rs./kWh)
Dec-18 140
Uttar
Pradesh
Ground
Mounted
Design, engineering,
procurement, supply,
installation, testing, and
commissioning of the grid-
connected, solar PV
project.
NTPC
Limited
(3.17
Rs./kWh)
Dec-18 50
Uttar
Pradesh
Ground
Mounted
Design, engineering,
procurement, supply,
installation, testing, and
commissioning of the grid-
connected, solar PV
project.
Adani
(3.19
Rs./kWh)
Dec-18 50
Uttar
Pradesh
Ground
Mounted
Design, engineering,
procurement, supply,
installation, testing, and
commissioning of the grid-
connected, solar PV
project.
Adani
(3.22
Rs./kWh)
Dec-18 50
Uttar
Pradesh
Ground
Mounted
Design, engineering,
procurement, supply,
installation, testing, and
commissioning of the grid-
connected, solar PV
project.
Sukhbir
Agro
(3.20
Rs./kWh)
Dec-18 50
Uttar
Pradesh
Ground
Mounted
Design, engineering,
procurement, supply,
installation, testing, and
commissioning of the grid-
connected, solar PV
project.
Solar Arise
(3.21
Rs./kWh)
Dec-18
50
Uttar
Pradesh
Ground
Mounted
Design, engineering,
procurement, supply,
installation, testing, and
commissioning of the grid-
connected, solar PV
project.
EDEN
Renewable
(3.21
Rs./kWh)
Dec-18 50
Uttar
Pradesh
Ground
Mounted
Design, engineering,
procurement, supply,
installation, testing, and
commissioning of the grid-
connected, solar PV
project.
Giriraj
Renewable
(3.23
Rs./kWh)
3
MSEDCL
(1000)
Feb-19 50
Maharash
tra
Ground
Mounted
Design, engineering,
procurement, supply,
installation, testing, and
commissioning of the grid-
connected, solar PV
project (Phase-II).
Shiv Solar
(2.74
Rs./kWh)
Feb-19 300
Maharash
tra
Ground
Mounted
Design, engineering,
procurement, supply,
installation, testing, and
commissioning of the grid-
connected, solar PV
project (Phase-II).
ACME Solar
(2.74
Rs./kWh)
Feb-19 300
Maharash
tra
Ground
Mounted
Design, engineering,
procurement, supply,
installation, testing, and
commissioning of the grid-
connected, solar PV
project (Phase-II).
ReNew
Power
(2.75
Rs./kWh)
Feb-19 350
Maharash
tra
Ground
Mounted
Design, engineering,
procurement, supply,
installation, testing, and
commissioning of the grid-
connected, solar PV
project (Phase-II).
Avaada
Energy
(2.75
Rs./kWh)
4
SECI
(1200)
Feb-19 300
ISTS-
Connecte
d Solar
Projects
Develop ISTS-Connected
Solar Projects
ReNew
Power
(2.55
Rs./kWh)
Feb-19 300
ISTS-
Connecte
d Solar
Projects
Develop ISTS-Connected
Solar Projects
Azure
Power
(2.58
Rs./kWh)
Feb-19 300
ISTS-
Connecte
d Solar
Projects
Develop ISTS-Connected
Solar Projects
EDEN
Renewable
(2.60
Rs./kWh)
Feb-19 300
ISTS-
Connecte
d Solar
Projects
Develop ISTS-Connected
Solar Projects
SBSR Power
Cleantech
Eleven
Private
Limited
(SoftBank)
(2.61
Rs./kWh)
5 SECI(750)
Mar-19 250 Rajasthan
Ground
Mounted
Design, engineering,
procurement, supply,
installation, testing, and
commissioning of the grid-
connected, solar PV
project.
Fortum
Solar
(2.48
Rs./kWh)
Mar-19 40 Rajasthan
Ground
Mounted
Design, engineering,
procurement, supply,
installation, testing, and
commissioning of the grid-
connected, solar PV
project.
Palimarwar
Solar House
(LNB Group)
(2.48
Rs./kWh)
Mar-19 250 Rajasthan
Ground
Mounted
Design, engineering,
procurement, supply,
installation, testing, and
commissioning of the grid-
connected, solar PV
project.
ACME Solar
(2.48
Rs./kWh)
Mar-19 100 Rajasthan
Ground
Mounted
Design, engineering,
procurement, supply,
installation, testing, and
commissioning of the grid-
connected, solar PV
project.
Sitara Solar
Energy (UPC
Renewables
)
(2.48
Rs./kWh)
Mar-19 110 Rajasthan
Ground
Mounted
Design, engineering,
procurement, supply,
installation, testing, and
commissioning of the grid-
connected, solar PV
project.
ReNew
Power
(2.49
Rs./kWh)

Contenu connexe

Tendances

Bidding for Profitability
Bidding for ProfitabilityBidding for Profitability
Bidding for ProfitabilityPuneet Jaggi
 
Solar Energy Corporation of India (SECI) Subsidy for Rooftop Solar Projects
Solar Energy Corporation of India (SECI) Subsidy for Rooftop Solar Projects Solar Energy Corporation of India (SECI) Subsidy for Rooftop Solar Projects
Solar Energy Corporation of India (SECI) Subsidy for Rooftop Solar Projects Gensol Engineering Limited
 
Gensol Engineering Limited - Investor Deck_26.09.2019
Gensol Engineering Limited - Investor Deck_26.09.2019Gensol Engineering Limited - Investor Deck_26.09.2019
Gensol Engineering Limited - Investor Deck_26.09.2019Gensol Engineering Limited
 
Rfp document for Solar PV Project in Delhi
Rfp document for Solar PV Project in DelhiRfp document for Solar PV Project in Delhi
Rfp document for Solar PV Project in DelhiHeadway Solar
 
Zorays Solar Pakistan Presentation in University of Lahore
Zorays Solar Pakistan Presentation in University of LahoreZorays Solar Pakistan Presentation in University of Lahore
Zorays Solar Pakistan Presentation in University of LahoreZorays Solar Pakistan
 
Grid-Connected Solar Rooftop Systems: Financial Viability/Benefits, Installat...
Grid-Connected Solar Rooftop Systems: Financial Viability/Benefits, Installat...Grid-Connected Solar Rooftop Systems: Financial Viability/Benefits, Installat...
Grid-Connected Solar Rooftop Systems: Financial Viability/Benefits, Installat...Nilam Shah
 
DHEERAJ SHARMA RESUME(1)(1)
DHEERAJ SHARMA RESUME(1)(1)DHEERAJ SHARMA RESUME(1)(1)
DHEERAJ SHARMA RESUME(1)(1)Dheeraj Sharma
 

Tendances (20)

Solarig Gensol 'An Overview'
Solarig Gensol 'An Overview' Solarig Gensol 'An Overview'
Solarig Gensol 'An Overview'
 
Bidding for Profitability
Bidding for ProfitabilityBidding for Profitability
Bidding for Profitability
 
Solar Energy Corporation of India (SECI) Subsidy for Rooftop Solar Projects
Solar Energy Corporation of India (SECI) Subsidy for Rooftop Solar Projects Solar Energy Corporation of India (SECI) Subsidy for Rooftop Solar Projects
Solar Energy Corporation of India (SECI) Subsidy for Rooftop Solar Projects
 
Presented by Munjal Rangwala
Presented by Munjal RangwalaPresented by Munjal Rangwala
Presented by Munjal Rangwala
 
Nl energy sep 12 - 18, 2015
Nl energy sep 12 - 18, 2015Nl energy sep 12 - 18, 2015
Nl energy sep 12 - 18, 2015
 
L&T Solar
L&T SolarL&T Solar
L&T Solar
 
Gensol Permits Procurement Services
Gensol Permits Procurement ServicesGensol Permits Procurement Services
Gensol Permits Procurement Services
 
Solar Parks - SSAEL
Solar Parks - SSAELSolar Parks - SSAEL
Solar Parks - SSAEL
 
Presentation By Rahul Galgate
Presentation By Rahul GalgatePresentation By Rahul Galgate
Presentation By Rahul Galgate
 
Gensol Engineering Limited - Investor Deck_26.09.2019
Gensol Engineering Limited - Investor Deck_26.09.2019Gensol Engineering Limited - Investor Deck_26.09.2019
Gensol Engineering Limited - Investor Deck_26.09.2019
 
Gensol - EPC Services
Gensol - EPC ServicesGensol - EPC Services
Gensol - EPC Services
 
Technical Risks in Solar PV Projects 18.03.18
Technical Risks in Solar PV Projects 18.03.18Technical Risks in Solar PV Projects 18.03.18
Technical Risks in Solar PV Projects 18.03.18
 
MI cv
MI cvMI cv
MI cv
 
Rfp document for Solar PV Project in Delhi
Rfp document for Solar PV Project in DelhiRfp document for Solar PV Project in Delhi
Rfp document for Solar PV Project in Delhi
 
Ntpc
NtpcNtpc
Ntpc
 
Zorays Solar Pakistan Presentation in University of Lahore
Zorays Solar Pakistan Presentation in University of LahoreZorays Solar Pakistan Presentation in University of Lahore
Zorays Solar Pakistan Presentation in University of Lahore
 
CVIPL-PROFILE
CVIPL-PROFILECVIPL-PROFILE
CVIPL-PROFILE
 
CURRICULUM VITAE
CURRICULUM VITAECURRICULUM VITAE
CURRICULUM VITAE
 
Grid-Connected Solar Rooftop Systems: Financial Viability/Benefits, Installat...
Grid-Connected Solar Rooftop Systems: Financial Viability/Benefits, Installat...Grid-Connected Solar Rooftop Systems: Financial Viability/Benefits, Installat...
Grid-Connected Solar Rooftop Systems: Financial Viability/Benefits, Installat...
 
DHEERAJ SHARMA RESUME(1)(1)
DHEERAJ SHARMA RESUME(1)(1)DHEERAJ SHARMA RESUME(1)(1)
DHEERAJ SHARMA RESUME(1)(1)
 

Similaire à List of successful bidders 11.03.2019

YKJain_Solar020915
YKJain_Solar020915YKJain_Solar020915
YKJain_Solar020915YK Jain
 
Suryakiran Engineers - Solar Projects Specialist
Suryakiran Engineers - Solar Projects SpecialistSuryakiran Engineers - Solar Projects Specialist
Suryakiran Engineers - Solar Projects SpecialistRatnakar Sortur
 
Results punjab Solar RfP
Results punjab Solar RfPResults punjab Solar RfP
Results punjab Solar RfPSpark Network
 
SOLAR POTENTIAL IN INDIA - AN OVERVIEW
SOLAR POTENTIAL IN INDIA - AN OVERVIEWSOLAR POTENTIAL IN INDIA - AN OVERVIEW
SOLAR POTENTIAL IN INDIA - AN OVERVIEWShaantanu Gaur
 
RESUME (AjitDas)
RESUME (AjitDas)RESUME (AjitDas)
RESUME (AjitDas)Ajit Das
 

Similaire à List of successful bidders 11.03.2019 (7)

YKJain_Solar020915
YKJain_Solar020915YKJain_Solar020915
YKJain_Solar020915
 
Suryakiran Engineers - Solar Projects Specialist
Suryakiran Engineers - Solar Projects SpecialistSuryakiran Engineers - Solar Projects Specialist
Suryakiran Engineers - Solar Projects Specialist
 
CV Solar
CV SolarCV Solar
CV Solar
 
Results punjab Solar RfP
Results punjab Solar RfPResults punjab Solar RfP
Results punjab Solar RfP
 
SOLAR POTENTIAL IN INDIA - AN OVERVIEW
SOLAR POTENTIAL IN INDIA - AN OVERVIEWSOLAR POTENTIAL IN INDIA - AN OVERVIEW
SOLAR POTENTIAL IN INDIA - AN OVERVIEW
 
Kishore resume
Kishore resumeKishore resume
Kishore resume
 
RESUME (AjitDas)
RESUME (AjitDas)RESUME (AjitDas)
RESUME (AjitDas)
 

Plus de Gensol Engineering Limited

Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020
Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020
Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020Gensol Engineering Limited
 
Ground measured data vs meteo data sets:57 locations in India_01.01.2020
Ground measured data vs meteo data sets:57 locations in India_01.01.2020Ground measured data vs meteo data sets:57 locations in India_01.01.2020
Ground measured data vs meteo data sets:57 locations in India_01.01.2020Gensol Engineering Limited
 
Electric Vehicles - Tax Benefits & Incentives_20.09.19
Electric Vehicles - Tax Benefits & Incentives_20.09.19Electric Vehicles - Tax Benefits & Incentives_20.09.19
Electric Vehicles - Tax Benefits & Incentives_20.09.19Gensol Engineering Limited
 
Phases of Construction & Erection for Wind Power Project_03 09 2019
Phases of Construction & Erection for Wind Power Project_03 09 2019Phases of Construction & Erection for Wind Power Project_03 09 2019
Phases of Construction & Erection for Wind Power Project_03 09 2019Gensol Engineering Limited
 
Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019
Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019
Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019Gensol Engineering Limited
 
Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)
Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)
Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)Gensol Engineering Limited
 
List of Solar PV Tenders Floated in India - 11.03.2019
List of Solar PV Tenders Floated in India - 11.03.2019List of Solar PV Tenders Floated in India - 11.03.2019
List of Solar PV Tenders Floated in India - 11.03.2019Gensol Engineering Limited
 
Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19
Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19
Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19Gensol Engineering Limited
 
Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019
Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019
Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019Gensol Engineering Limited
 
Comparison of Solar-Wind Hybrid Policies-07.02.2019
Comparison of Solar-Wind Hybrid Policies-07.02.2019Comparison of Solar-Wind Hybrid Policies-07.02.2019
Comparison of Solar-Wind Hybrid Policies-07.02.2019Gensol Engineering Limited
 
Indian Solar Rooftop PV - A Bright Investment (21.08.18)
Indian Solar Rooftop PV - A Bright Investment (21.08.18)Indian Solar Rooftop PV - A Bright Investment (21.08.18)
Indian Solar Rooftop PV - A Bright Investment (21.08.18)Gensol Engineering Limited
 
Tender summary for SECI 2500 MW Wind-Solar Hybrid Tender
Tender summary for SECI 2500 MW Wind-Solar Hybrid TenderTender summary for SECI 2500 MW Wind-Solar Hybrid Tender
Tender summary for SECI 2500 MW Wind-Solar Hybrid TenderGensol Engineering Limited
 
Emerging Opportunities - Wind Solar Hybrid System
Emerging Opportunities - Wind Solar Hybrid System Emerging Opportunities - Wind Solar Hybrid System
Emerging Opportunities - Wind Solar Hybrid System Gensol Engineering Limited
 
Wind Turbine Generator (WTG) Audit Checklist by Gensol - 16.06.18
Wind Turbine Generator (WTG) Audit Checklist by Gensol - 16.06.18Wind Turbine Generator (WTG) Audit Checklist by Gensol - 16.06.18
Wind Turbine Generator (WTG) Audit Checklist by Gensol - 16.06.18Gensol Engineering Limited
 
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018Gensol Engineering Limited
 
Quality Inspection for Solar Modules - Raw Material, Manufacturing & Lab Test...
Quality Inspection for Solar Modules - Raw Material, Manufacturing & Lab Test...Quality Inspection for Solar Modules - Raw Material, Manufacturing & Lab Test...
Quality Inspection for Solar Modules - Raw Material, Manufacturing & Lab Test...Gensol Engineering Limited
 
Gensol's Lender Engineer Credentials - 20.03.18
Gensol's Lender Engineer Credentials - 20.03.18Gensol's Lender Engineer Credentials - 20.03.18
Gensol's Lender Engineer Credentials - 20.03.18Gensol Engineering Limited
 

Plus de Gensol Engineering Limited (20)

Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020
Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020
Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020
 
Ground measured data vs meteo data sets:57 locations in India_01.01.2020
Ground measured data vs meteo data sets:57 locations in India_01.01.2020Ground measured data vs meteo data sets:57 locations in India_01.01.2020
Ground measured data vs meteo data sets:57 locations in India_01.01.2020
 
Electric Vehicles - Tax Benefits & Incentives_20.09.19
Electric Vehicles - Tax Benefits & Incentives_20.09.19Electric Vehicles - Tax Benefits & Incentives_20.09.19
Electric Vehicles - Tax Benefits & Incentives_20.09.19
 
Phases of Construction & Erection for Wind Power Project_03 09 2019
Phases of Construction & Erection for Wind Power Project_03 09 2019Phases of Construction & Erection for Wind Power Project_03 09 2019
Phases of Construction & Erection for Wind Power Project_03 09 2019
 
Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019
Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019
Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019
 
Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)
Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)
Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)
 
List of Solar PV Tenders Floated in India - 11.03.2019
List of Solar PV Tenders Floated in India - 11.03.2019List of Solar PV Tenders Floated in India - 11.03.2019
List of Solar PV Tenders Floated in India - 11.03.2019
 
Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19
Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19
Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19
 
Module Price Trend Analysis
Module Price Trend AnalysisModule Price Trend Analysis
Module Price Trend Analysis
 
Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019
Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019
Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019
 
Comparison of Solar-Wind Hybrid Policies-07.02.2019
Comparison of Solar-Wind Hybrid Policies-07.02.2019Comparison of Solar-Wind Hybrid Policies-07.02.2019
Comparison of Solar-Wind Hybrid Policies-07.02.2019
 
Indian Solar Rooftop PV - A Bright Investment (21.08.18)
Indian Solar Rooftop PV - A Bright Investment (21.08.18)Indian Solar Rooftop PV - A Bright Investment (21.08.18)
Indian Solar Rooftop PV - A Bright Investment (21.08.18)
 
Tender summary for SECI 2500 MW Wind-Solar Hybrid Tender
Tender summary for SECI 2500 MW Wind-Solar Hybrid TenderTender summary for SECI 2500 MW Wind-Solar Hybrid Tender
Tender summary for SECI 2500 MW Wind-Solar Hybrid Tender
 
Emerging Opportunities - Wind Solar Hybrid System
Emerging Opportunities - Wind Solar Hybrid System Emerging Opportunities - Wind Solar Hybrid System
Emerging Opportunities - Wind Solar Hybrid System
 
Wind Turbine Generator (WTG) Audit Checklist by Gensol - 16.06.18
Wind Turbine Generator (WTG) Audit Checklist by Gensol - 16.06.18Wind Turbine Generator (WTG) Audit Checklist by Gensol - 16.06.18
Wind Turbine Generator (WTG) Audit Checklist by Gensol - 16.06.18
 
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
 
Quality Inspection for Solar Modules - Raw Material, Manufacturing & Lab Test...
Quality Inspection for Solar Modules - Raw Material, Manufacturing & Lab Test...Quality Inspection for Solar Modules - Raw Material, Manufacturing & Lab Test...
Quality Inspection for Solar Modules - Raw Material, Manufacturing & Lab Test...
 
Gensol's Lender Engineer Credentials - 20.03.18
Gensol's Lender Engineer Credentials - 20.03.18Gensol's Lender Engineer Credentials - 20.03.18
Gensol's Lender Engineer Credentials - 20.03.18
 
Basics of Solar PV O&M - Solarig Gensol
Basics of Solar PV O&M - Solarig GensolBasics of Solar PV O&M - Solarig Gensol
Basics of Solar PV O&M - Solarig Gensol
 
Floating Solar PV - An Introduction
Floating Solar PV -  An Introduction Floating Solar PV -  An Introduction
Floating Solar PV - An Introduction
 

Dernier

GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdfGUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdfDanny Diep To
 
NAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors DataNAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdfChris Skinner
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Americas Got Grants
 
Planetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in LifePlanetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in LifeBhavana Pujan Kendra
 
Send Files | Sendbig.comSend Files | Sendbig.com
Send Files | Sendbig.comSend Files | Sendbig.comSend Files | Sendbig.comSend Files | Sendbig.com
Send Files | Sendbig.comSend Files | Sendbig.comSendBig4
 
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...Operational Excellence Consulting
 
business environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxbusiness environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxShruti Mittal
 
Healthcare Feb. & Mar. Healthcare Newsletter
Healthcare Feb. & Mar. Healthcare NewsletterHealthcare Feb. & Mar. Healthcare Newsletter
Healthcare Feb. & Mar. Healthcare NewsletterJamesConcepcion7
 
Introducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applicationsIntroducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applicationsKnowledgeSeed
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdfShaun Heinrichs
 
Jewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreJewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreNZSG
 
Unveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic ExperiencesUnveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic ExperiencesDoe Paoro
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxmbikashkanyari
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024Adnet Communications
 

Dernier (20)

GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdfGUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
 
NAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors DataNAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors Data
 
20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...
 
Planetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in LifePlanetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in Life
 
Send Files | Sendbig.comSend Files | Sendbig.com
Send Files | Sendbig.comSend Files | Sendbig.comSend Files | Sendbig.comSend Files | Sendbig.com
Send Files | Sendbig.comSend Files | Sendbig.com
 
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
 
business environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxbusiness environment micro environment macro environment.pptx
business environment micro environment macro environment.pptx
 
The Bizz Quiz-E-Summit-E-Cell-IITPatna.pptx
The Bizz Quiz-E-Summit-E-Cell-IITPatna.pptxThe Bizz Quiz-E-Summit-E-Cell-IITPatna.pptx
The Bizz Quiz-E-Summit-E-Cell-IITPatna.pptx
 
Healthcare Feb. & Mar. Healthcare Newsletter
Healthcare Feb. & Mar. Healthcare NewsletterHealthcare Feb. & Mar. Healthcare Newsletter
Healthcare Feb. & Mar. Healthcare Newsletter
 
Introducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applicationsIntroducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applications
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf
 
Jewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreJewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource Centre
 
Unveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic ExperiencesUnveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic Experiences
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024
 

List of successful bidders 11.03.2019

  • 1. List of Successful Bidders-November 2018 onwards Sr. No. Tender Floated By Tender Opened Awarded Capacity (MW) Project Location Project Type Scope/Service Successful bidder 1 SECI(150) Nov-18 50 Uttar Pradesh Floating Solar Design, engineering, procurement, supply, installation, testing, and commissioning of the grid- connected, floating solar PV project. Shapoorji Pallongi (3.29 Rs./kWh) 2 UPNEDA (500) Dec-18 20 Uttar Pradesh Ground Mounted Design, engineering, procurement, supply, installation, testing, and commissioning of the grid- connected, solar PV project. Maheshwari Mining (3.17 Rs./kWh) Dec-18 140 Uttar Pradesh Ground Mounted Design, engineering, procurement, supply, installation, testing, and commissioning of the grid- connected, solar PV project. NTPC Limited (3.17 Rs./kWh) Dec-18 50 Uttar Pradesh Ground Mounted Design, engineering, procurement, supply, installation, testing, and commissioning of the grid- connected, solar PV project. Adani (3.19 Rs./kWh) Dec-18 50 Uttar Pradesh Ground Mounted Design, engineering, procurement, supply, installation, testing, and commissioning of the grid- connected, solar PV project. Adani (3.22 Rs./kWh) Dec-18 50 Uttar Pradesh Ground Mounted Design, engineering, procurement, supply, installation, testing, and commissioning of the grid- connected, solar PV project. Sukhbir Agro (3.20 Rs./kWh) Dec-18 50 Uttar Pradesh Ground Mounted Design, engineering, procurement, supply, installation, testing, and commissioning of the grid- connected, solar PV project. Solar Arise (3.21 Rs./kWh)
  • 2. Dec-18 50 Uttar Pradesh Ground Mounted Design, engineering, procurement, supply, installation, testing, and commissioning of the grid- connected, solar PV project. EDEN Renewable (3.21 Rs./kWh) Dec-18 50 Uttar Pradesh Ground Mounted Design, engineering, procurement, supply, installation, testing, and commissioning of the grid- connected, solar PV project. Giriraj Renewable (3.23 Rs./kWh) 3 MSEDCL (1000) Feb-19 50 Maharash tra Ground Mounted Design, engineering, procurement, supply, installation, testing, and commissioning of the grid- connected, solar PV project (Phase-II). Shiv Solar (2.74 Rs./kWh) Feb-19 300 Maharash tra Ground Mounted Design, engineering, procurement, supply, installation, testing, and commissioning of the grid- connected, solar PV project (Phase-II). ACME Solar (2.74 Rs./kWh) Feb-19 300 Maharash tra Ground Mounted Design, engineering, procurement, supply, installation, testing, and commissioning of the grid- connected, solar PV project (Phase-II). ReNew Power (2.75 Rs./kWh) Feb-19 350 Maharash tra Ground Mounted Design, engineering, procurement, supply, installation, testing, and commissioning of the grid- connected, solar PV project (Phase-II). Avaada Energy (2.75 Rs./kWh) 4 SECI (1200) Feb-19 300 ISTS- Connecte d Solar Projects Develop ISTS-Connected Solar Projects ReNew Power (2.55 Rs./kWh) Feb-19 300 ISTS- Connecte d Solar Projects Develop ISTS-Connected Solar Projects Azure Power (2.58 Rs./kWh) Feb-19 300 ISTS- Connecte d Solar Projects Develop ISTS-Connected Solar Projects EDEN Renewable (2.60 Rs./kWh)
  • 3. Feb-19 300 ISTS- Connecte d Solar Projects Develop ISTS-Connected Solar Projects SBSR Power Cleantech Eleven Private Limited (SoftBank) (2.61 Rs./kWh) 5 SECI(750) Mar-19 250 Rajasthan Ground Mounted Design, engineering, procurement, supply, installation, testing, and commissioning of the grid- connected, solar PV project. Fortum Solar (2.48 Rs./kWh) Mar-19 40 Rajasthan Ground Mounted Design, engineering, procurement, supply, installation, testing, and commissioning of the grid- connected, solar PV project. Palimarwar Solar House (LNB Group) (2.48 Rs./kWh) Mar-19 250 Rajasthan Ground Mounted Design, engineering, procurement, supply, installation, testing, and commissioning of the grid- connected, solar PV project. ACME Solar (2.48 Rs./kWh) Mar-19 100 Rajasthan Ground Mounted Design, engineering, procurement, supply, installation, testing, and commissioning of the grid- connected, solar PV project. Sitara Solar Energy (UPC Renewables ) (2.48 Rs./kWh) Mar-19 110 Rajasthan Ground Mounted Design, engineering, procurement, supply, installation, testing, and commissioning of the grid- connected, solar PV project. ReNew Power (2.49 Rs./kWh)