Presenter: Maya Cariyappa, Aras
Coming just over the horizon is the new Manufacturing Process Planning application, which supports integrated creation and management of Process Plans, MBOMs, Work Instructions and more. Come see a live demo and understand what it can do to streamline your manufacturing processes.
4. The Challenge
Disconnected Engineering / Manufacturing data and processes
▫ Manual MBOM authoring
▫ No EBOM / MBOM reconciliation
▫ No MBOM / Process Plan synchronization
▫ No Process Plan / Work Instruction integration
▫ Huge traceability gaps
▫ Unmanaged manufacturing data everywhere
▫ Archaic, manual authoring environments
Aras Confidential aras.com
8. Why create an MBOM?
Aras Confidential aras.com8
Door Assembly
Frame Assembly
Hinge
Vertical Frame
Knob
Door
Hardware Assembly
Horizontal Frame
Latch
2
2
6
EBOM
(As-Designed)
MBOM
(As-Planned)
Horizontal
Vertical Frame - Rt
3
3
3
3
Vertical Frame
Vertical Frame - Lt
Door Assembly
Frame Assembly
Door - Rt
Vertical Frame
Door Slab
Hinge
Latch
Door Slab
Hinge
Door - Lt
Knob
Pin
6
Hinge
Hinge
9. Concurrent Process Plan/MBOM
Aras Confidential aras.com9
Process Plan Door Rt
OP10 OP20
OP20
Process Plan Door Lt
OP10Hinge
Knob
Door Slab
Hinge
Latch
Door Slab
Door Rt
Door Lt
Process Plan
Consumed Parts
Process Plan Door Assembly
OP10 OP20 OP30 OP40Door Lt
Pin
Door Rt
Frame Assembly
Door Assembly
Produced Part
OP10
OP10 OP20
Process Plan Vertical Frame Lt
OP20Hinge
Vertical Frame
Hinge
Vertical Frame
Vertical Frame Rt
Vertical Frame Lt
Process Plan Vertical Frame Rt
OP10 OP20 OP30
Vertical Frame Rt
Vertical Frame Lt
Frame AssemblyProcess Plan Frame Assembly
Horizontal
10. Concurrent Process Plan/MBOM
Aras Confidential aras.com10
Horizontal
Vertical Frame - Rt
3
3
3
3
Vertical Frame
Vertical Frame - Lt
Door Assembly
Frame Assembly
Door - Rt
Vertical Frame
Door Slab
Hinge
Latch
Door Slab
Hinge
Door - Lt
Knob
Pin
6
Hinge
Hinge
16. Benefits
Bridge the gap between engineering and manufacturing
▫ Eliminate error-prone manual processes
▫ Prevent time consuming and costly EBOM/MBOM conflicts
Synchronize Process Plans, MBOMs and Work Instructions
▫ Start anywhere, switch between views
▫ Changes are reflected across all three views
Preserve As-Designed to As-Planned Traceability
▫ Automatic reconciliation
▫ Manufacturing view of EBOM, Engineering view of MBOM
Aras Confidential aras.com