Ashraf Yehia CV E01 1 (1)

Ashraf AlyYehia
Address: 13 Slouly St., Mesaha Sq., Dokki, Giza, Egypt
Mobile: 00966545837360 – 01098781843 - 01147308285
Home: 0020237629539
E-mail: Ashrafyehia_1@hotmail.com
Date of Birth: 19/8/1960
Marital Status: Married
Nationality: Egyptian
IQAMA : Transferable
Education
1979 – 1983 BSc. in Faculty of Engineering, Architecture Department, Cairo University
Acum. Grade: Very Good
1985 – 1986 Master diploma in Urbanism. Faculty of Engineering, Cairo University
1989 – 1990 Master diploma in Urbanism. Faculty of Urban, Cairo University
Working Experience
Over Thirty Four (34) of professional experience in Project Management & Construction
Management of Building Construction, Malls, Hotels, High Rise Heavy civil, and
Infrastructure, both public and private, Diversified experience within the Construction
Industry with hands on the Experience in Program Management of Building Construction,
Industrial, Power Plants, Drainage, Sewerage, Water (Infrastructure) Projects.
 2013-2016, Ashi& Bushnag Co Ltd, Yanbu, KSA; Project Manager (Construction
Supervision).
Responsibilities included for ensuring the proper Project management,
implementation of tools in order to achieve Project objectives and to meet the Client
satisfaction. Responsible for attending the higher management meetings with the
Client to review and discuss the key performance indicators and to resolve any
bottlenecks in order to ensure that Project is on track as planned. Recognizing and
resolving key problems like timely availability of funds required for arrangement of
resources like equipment, manpower & materials etc. to ensure Project requirements
are fulfilled as planned. Achieved a lot of appreciation from all Project stakeholders
especially the Client higher management due to proper implementation of multi-
dimensional target oriented management approach in a planned, efficient, effective
and professional manner to achieve Project key milestones.
Responsible for ensuring strict compliance of Project quality and management tools
required for Project completion within the stipulated time period. Recognize and
solve potential problems in a professional manner and re-evaluating Project
effectiveness in line with the stakeholder requirements & Project goals Report to
Deputy General Manager for the following project:
 Secondary School in Royal Commission Consultant PARSONS
 Intermediate School in Royal commission Consultant PARSONS
 2006-2013, Abu TalebCompany for construction, Madinah,KSA Project Director.
Responsibilities included direct, coordinate, and exercises functional authority for
planning, organization, control, integration, and completion of engineering project
within area of assigned responsibility. Plans and formulates engineering program and
organize project staff according to the project requirements. Assigns project
personnel to specific phases or aspects of project, such as technical studies, design,
preparation of specifications and technical plans, and testing, in accordance with
engineering disciplines of staff. Develop detailed project plans and track team
progress against plan. Analyze and document business requirements. Establish a
project scope baseline and ensure changes to the baseline are managed according to
change control procedures. Identify and manager issues and risks that may impact
project delivery. Assist in the establishment and refinement of corporate technology
project management policies and procedures. Ensure the overall success of the
project pre-construction phase by overseeing the pre-construction process and
integration of the design/build elements of the project. Managing all the design team
(Architect, MEP, and the Structural) to ensure the output documents as per the
project requirements. Report to General Manager for the following
project:
 El Khozamy Hospital in Jeddah for the amount of 40,000,000.00 SAR Consultant:
Civil Defense
 Several projects in Medina
 2004-2005 Momayaz Company , UAE; Project Manager
Responsibilities included monitor the overall construction progress, Liaise with the
client, consultant & subcontractor/s. Assure the Compliance with all technical
aspects of the contract. Approve engineering design, drawings of the project for
implementation. Plan, mobilize & demobilize the personnel, equipment & material
from one project to another. Resolve daily site problems; follow up on payments
from client. Implement the HSE procedures, and other contractual obligations for the
following project:
 Governmental projects for the amount of around 120,000,000.00 AED
 2002-2004, Haddab Company, Riyadh ; KSA; Project Manager.
Responsibilities included projects included management of Construction Services and
Engineering. Responsible for scheduling tasks assigning resources and monitoring
budget. Managed contractors as well as internal resources to insure timely
construction process within budgeted cost of works scheduled (BCWS). Responsible
for managing, coordinating, and administering the projects from the conceptual
stages through planning, engineering, procurement, construction start-up,
performance testing, initial operations, and prime contract close-out. Supervises the
development of budgets and schedules, manages performance, reports progress, and
initiates action to assure program/project objectives and schedules are met and work
is performed within budget and according to specifications. The job entails
coordination with the engineering design, pre-qualification and appointing of Staff,
Suppliers, Service providers and Subcontractors, Responsible for all the
Procurements. Has overall responsibility for Program/Project execution, ensuring that
Program/Project is delivered within contract requirements, standards of quality and
safety and to Customer for the following project:
 Jabal Ajyaad Street networks and MEP facilities
 El Nada district in Riyadh Planning and MEP facilities
 El Tahlia Mall Design-built project
 Renovation of el hawdag Shopping center in Rabwa neighborhood
 El Haddab Mosque in Rabwa neighborhood
 1991-2001, Egypt Gulf,Egypt; Project Manager.
Responsibilities included monitor the overall construction progress, Liaise with the
client, consultant & subcontractor/s. Assure the Compliance with all technical aspects
of the contract. Approve engineering design, drawings of the project for
implementation. Plan, mobilize & demobilize the personnel, equipment & material
from one project to another. Resolve daily site problems; follow up on payments from
client. Implement the HSE procedures, and other contractual obligations for the
following project:
 Test Cells in Abu swayur Military Air Base
 6 Factories in 6th of October City
 Villas
 Residential buildings
 1989-1991, SADELMI New York Company; Egypt; Technical Office Manager.
Responsibilities included the job entails coordination with the engineering design
consultant, prequalification and appointing of suppliers, service providers and
subcontractors. Supervise the preparation of MTO’s for construction key items,
technical submittals, and PO’s. In addition to, technical assistance offered to project
& construction teams in line with contract specifications. On top of the above, full
supervision of the civil estimation department for the following project:
 Harpoon weapon station for the amount of 4,000,000.00 $
 1987-1989, Ahmed seliman el dekheel Office , KSA; Architect in the following projects:
- Metro Stations
- Residential buildings
- Banks
- Commercial Buildings
 1983-1987, Architectural Egypt group, Egypt; Architect in the following projects:
- Urban Planning of el fananiin district in sadat city
- Design of administrative Complex in Al Abbasseya neighborhood
- King Maryut Finishing Works
- Malls
- Industrial Projects
- Residential buildings
- Commercial buildings
Related Courses
 Course “how to be a successful manager” Al Ahram Center
 Dec 2002 AutoCAD 2000
 Dec 2004 AutoCAD 2005
 Photoshop
 Free hand
 Corel draw
Skills
Interpersonal Skills:
 Good Communication skills – both written and verbal
 Good presentation skills
 Strong organizational and time management skills, with the ability to manage a
number of projects simultaneously
 Well-developed problem-solving ability
 An imaginative and creative mind
Computer Skills:
 Microsoft Office.
 AutoCAD
 Photoshop
Sketching Skills:
 Three Dimension Sketching
 Freehand Pencil and ink sketching techniques
Language Skills:
 Arabic: Mother Tongue
 English: Very Good
 German: Fair
Attached Pictures of the latest finished project
References Furnished Upon Request.

Recommandé

AHMED SAKR 2016 par
AHMED SAKR 2016AHMED SAKR 2016
AHMED SAKR 2016Ahmed Sakr
260 vues5 diapositives
Cv said mohamed_1810 par
Cv said mohamed_1810Cv said mohamed_1810
Cv said mohamed_1810Mohamed Said Amer
68 vues4 diapositives
Moustapha El Gharbawy Resume March 2015 par
Moustapha El Gharbawy Resume March 2015Moustapha El Gharbawy Resume March 2015
Moustapha El Gharbawy Resume March 2015Moustapha El Gharbawy
245 vues3 diapositives
C V - par
C V -C V -
C V -Hani Fathi
402 vues11 diapositives
01. Karim Absawi updated on 22-04-2016 par
01. Karim Absawi updated on 22-04-201601. Karim Absawi updated on 22-04-2016
01. Karim Absawi updated on 22-04-2016Karim Absawi
199 vues6 diapositives
Waleed moustafa alexandria-head of structural department par
Waleed moustafa  alexandria-head of structural departmentWaleed moustafa  alexandria-head of structural department
Waleed moustafa alexandria-head of structural departmentWaleed Moustafa
174 vues4 diapositives

Contenu connexe

Tendances

Abo-Eldardaa_CV_2015 & Duties par
Abo-Eldardaa_CV_2015 & DutiesAbo-Eldardaa_CV_2015 & Duties
Abo-Eldardaa_CV_2015 & Dutiesabo.eldardaa mahmoud
226 vues5 diapositives
Mohamed Abdelaal cv par
Mohamed Abdelaal cvMohamed Abdelaal cv
Mohamed Abdelaal cvMOHAMED ABDELAAL,PRMG
479 vues5 diapositives
cv civil ahmed mansour par
cv civil ahmed mansourcv civil ahmed mansour
cv civil ahmed mansourahmed mansour
225 vues7 diapositives
Resume maincv construction manager par
Resume maincv construction managerResume maincv construction manager
Resume maincv construction managerMuiz Mohamed
129 vues6 diapositives
Moataz enaba cv may2016 par
Moataz enaba cv may2016Moataz enaba cv may2016
Moataz enaba cv may2016almoataz bellah enaba
197 vues4 diapositives
Curriculum Vitae par
Curriculum VitaeCurriculum Vitae
Curriculum VitaeAhmed Al Sisi
1.1K vues4 diapositives

Tendances(20)

Resume maincv construction manager par Muiz Mohamed
Resume maincv construction managerResume maincv construction manager
Resume maincv construction manager
Muiz Mohamed129 vues
ALAA MOHAN ALI CV par Alaa Mohan
ALAA MOHAN ALI CVALAA MOHAN ALI CV
ALAA MOHAN ALI CV
Alaa Mohan218 vues
Eng. tarek ali cv - 29 oct 2015 par Tarek Ali
Eng. tarek ali   cv - 29 oct 2015Eng. tarek ali   cv - 29 oct 2015
Eng. tarek ali cv - 29 oct 2015
Tarek Ali422 vues
Portfolio of Architect Mohamed ElTarabily معمارى محمد الطرابيلي par Tasamim Online
Portfolio of Architect Mohamed ElTarabily معمارى محمد الطرابيليPortfolio of Architect Mohamed ElTarabily معمارى محمد الطرابيلي
Portfolio of Architect Mohamed ElTarabily معمارى محمد الطرابيلي
Tasamim Online548 vues
MEP Construction Manager - JD par ericaeksander
MEP Construction Manager - JDMEP Construction Manager - JD
MEP Construction Manager - JD
ericaeksander1.3K vues

Similaire à Ashraf Yehia CV E01 1 (1)

Abdulrahman Shakboua15 par
Abdulrahman Shakboua15Abdulrahman Shakboua15
Abdulrahman Shakboua15abdulrhman shakboua
155 vues5 diapositives
mona par
monamona
monaMona Abd-Elnaby
190 vues4 diapositives
Mohamed Shipl PMP CV par
Mohamed Shipl PMP CVMohamed Shipl PMP CV
Mohamed Shipl PMP CVMohamed Shipl , PMP
103 vues3 diapositives
Resume (final cv) par
Resume (final cv)Resume (final cv)
Resume (final cv)Mohamed Ossman Rajab
359 vues4 diapositives
Resume of zahir hussain par
Resume of zahir hussainResume of zahir hussain
Resume of zahir hussainZahir Hussain
323 vues6 diapositives
Resume of zahir hussain par
Resume of zahir hussainResume of zahir hussain
Resume of zahir hussainZahir Hussain
166 vues6 diapositives

Similaire à Ashraf Yehia CV E01 1 (1)(20)

Amer Kallas resume ,Civil Engineer par amer kallas
Amer Kallas resume ,Civil EngineerAmer Kallas resume ,Civil Engineer
Amer Kallas resume ,Civil Engineer
amer kallas536 vues
John CV par John W.
John CVJohn CV
John CV
John W.566 vues
Maged Mahmoud Hemeda - Architect Project Engineer CV Apr. 2016 par maged mahmoud
Maged Mahmoud Hemeda - Architect Project Engineer CV  Apr. 2016Maged Mahmoud Hemeda - Architect Project Engineer CV  Apr. 2016
Maged Mahmoud Hemeda - Architect Project Engineer CV Apr. 2016
maged mahmoud332 vues
Iad Zalaf C.V par iad zalaf
Iad Zalaf C.VIad Zalaf C.V
Iad Zalaf C.V
iad zalaf204 vues

Ashraf Yehia CV E01 1 (1)

  • 1. Ashraf AlyYehia Address: 13 Slouly St., Mesaha Sq., Dokki, Giza, Egypt Mobile: 00966545837360 – 01098781843 - 01147308285 Home: 0020237629539 E-mail: Ashrafyehia_1@hotmail.com Date of Birth: 19/8/1960 Marital Status: Married Nationality: Egyptian IQAMA : Transferable Education 1979 – 1983 BSc. in Faculty of Engineering, Architecture Department, Cairo University Acum. Grade: Very Good 1985 – 1986 Master diploma in Urbanism. Faculty of Engineering, Cairo University 1989 – 1990 Master diploma in Urbanism. Faculty of Urban, Cairo University Working Experience Over Thirty Four (34) of professional experience in Project Management & Construction Management of Building Construction, Malls, Hotels, High Rise Heavy civil, and Infrastructure, both public and private, Diversified experience within the Construction Industry with hands on the Experience in Program Management of Building Construction, Industrial, Power Plants, Drainage, Sewerage, Water (Infrastructure) Projects.  2013-2016, Ashi& Bushnag Co Ltd, Yanbu, KSA; Project Manager (Construction Supervision). Responsibilities included for ensuring the proper Project management, implementation of tools in order to achieve Project objectives and to meet the Client satisfaction. Responsible for attending the higher management meetings with the Client to review and discuss the key performance indicators and to resolve any bottlenecks in order to ensure that Project is on track as planned. Recognizing and resolving key problems like timely availability of funds required for arrangement of resources like equipment, manpower & materials etc. to ensure Project requirements are fulfilled as planned. Achieved a lot of appreciation from all Project stakeholders especially the Client higher management due to proper implementation of multi- dimensional target oriented management approach in a planned, efficient, effective and professional manner to achieve Project key milestones. Responsible for ensuring strict compliance of Project quality and management tools required for Project completion within the stipulated time period. Recognize and solve potential problems in a professional manner and re-evaluating Project effectiveness in line with the stakeholder requirements & Project goals Report to Deputy General Manager for the following project:  Secondary School in Royal Commission Consultant PARSONS  Intermediate School in Royal commission Consultant PARSONS
  • 2.  2006-2013, Abu TalebCompany for construction, Madinah,KSA Project Director. Responsibilities included direct, coordinate, and exercises functional authority for planning, organization, control, integration, and completion of engineering project within area of assigned responsibility. Plans and formulates engineering program and organize project staff according to the project requirements. Assigns project personnel to specific phases or aspects of project, such as technical studies, design, preparation of specifications and technical plans, and testing, in accordance with engineering disciplines of staff. Develop detailed project plans and track team progress against plan. Analyze and document business requirements. Establish a project scope baseline and ensure changes to the baseline are managed according to change control procedures. Identify and manager issues and risks that may impact project delivery. Assist in the establishment and refinement of corporate technology project management policies and procedures. Ensure the overall success of the project pre-construction phase by overseeing the pre-construction process and integration of the design/build elements of the project. Managing all the design team (Architect, MEP, and the Structural) to ensure the output documents as per the project requirements. Report to General Manager for the following project:  El Khozamy Hospital in Jeddah for the amount of 40,000,000.00 SAR Consultant: Civil Defense  Several projects in Medina  2004-2005 Momayaz Company , UAE; Project Manager Responsibilities included monitor the overall construction progress, Liaise with the client, consultant & subcontractor/s. Assure the Compliance with all technical aspects of the contract. Approve engineering design, drawings of the project for implementation. Plan, mobilize & demobilize the personnel, equipment & material from one project to another. Resolve daily site problems; follow up on payments from client. Implement the HSE procedures, and other contractual obligations for the following project:  Governmental projects for the amount of around 120,000,000.00 AED  2002-2004, Haddab Company, Riyadh ; KSA; Project Manager. Responsibilities included projects included management of Construction Services and Engineering. Responsible for scheduling tasks assigning resources and monitoring budget. Managed contractors as well as internal resources to insure timely construction process within budgeted cost of works scheduled (BCWS). Responsible for managing, coordinating, and administering the projects from the conceptual stages through planning, engineering, procurement, construction start-up, performance testing, initial operations, and prime contract close-out. Supervises the development of budgets and schedules, manages performance, reports progress, and initiates action to assure program/project objectives and schedules are met and work is performed within budget and according to specifications. The job entails coordination with the engineering design, pre-qualification and appointing of Staff,
  • 3. Suppliers, Service providers and Subcontractors, Responsible for all the Procurements. Has overall responsibility for Program/Project execution, ensuring that Program/Project is delivered within contract requirements, standards of quality and safety and to Customer for the following project:  Jabal Ajyaad Street networks and MEP facilities  El Nada district in Riyadh Planning and MEP facilities  El Tahlia Mall Design-built project  Renovation of el hawdag Shopping center in Rabwa neighborhood  El Haddab Mosque in Rabwa neighborhood  1991-2001, Egypt Gulf,Egypt; Project Manager. Responsibilities included monitor the overall construction progress, Liaise with the client, consultant & subcontractor/s. Assure the Compliance with all technical aspects of the contract. Approve engineering design, drawings of the project for implementation. Plan, mobilize & demobilize the personnel, equipment & material from one project to another. Resolve daily site problems; follow up on payments from client. Implement the HSE procedures, and other contractual obligations for the following project:  Test Cells in Abu swayur Military Air Base  6 Factories in 6th of October City  Villas  Residential buildings  1989-1991, SADELMI New York Company; Egypt; Technical Office Manager. Responsibilities included the job entails coordination with the engineering design consultant, prequalification and appointing of suppliers, service providers and subcontractors. Supervise the preparation of MTO’s for construction key items, technical submittals, and PO’s. In addition to, technical assistance offered to project & construction teams in line with contract specifications. On top of the above, full supervision of the civil estimation department for the following project:  Harpoon weapon station for the amount of 4,000,000.00 $  1987-1989, Ahmed seliman el dekheel Office , KSA; Architect in the following projects: - Metro Stations - Residential buildings - Banks - Commercial Buildings  1983-1987, Architectural Egypt group, Egypt; Architect in the following projects: - Urban Planning of el fananiin district in sadat city - Design of administrative Complex in Al Abbasseya neighborhood - King Maryut Finishing Works
  • 4. - Malls - Industrial Projects - Residential buildings - Commercial buildings Related Courses  Course “how to be a successful manager” Al Ahram Center  Dec 2002 AutoCAD 2000  Dec 2004 AutoCAD 2005  Photoshop  Free hand  Corel draw Skills Interpersonal Skills:  Good Communication skills – both written and verbal  Good presentation skills  Strong organizational and time management skills, with the ability to manage a number of projects simultaneously  Well-developed problem-solving ability  An imaginative and creative mind Computer Skills:  Microsoft Office.  AutoCAD  Photoshop Sketching Skills:  Three Dimension Sketching  Freehand Pencil and ink sketching techniques Language Skills:  Arabic: Mother Tongue  English: Very Good  German: Fair Attached Pictures of the latest finished project References Furnished Upon Request.