Sample-Construction-Programme.pdf
1. ID Task Name Duration Start Finish
1 Submit tender 1 d 14/01/13 14/01/13
2 Design finalization & construction dwg issue 7 d 14/01/13 23/01/13
3 Tender assessment 6 d 15/01/13 22/01/13
4 Building permit 10 d 16/01/13 31/01/13
5 Tender award 1 d 22/01/13 22/01/13
6 Finalize key trades 17 d 23/01/13 19/02/13
7 PIC issued 1 d 13/03/13 14/03/13
8 Off-site works 61 d 1/02/13 14/05/13
9 Structural steel - shop dwg preparation 21 d 1/02/13 5/03/13
12 DB - shop dwg preparation 19 d 26/02/13 26/03/13
10 Structural steel - shop dwg approval 5 d 6/03/13 14/03/13
11 Structural steel - manufacture 22 d 15/03/13 23/04/13
13 DB - shop dwg approval 4 d 27/03/13 9/04/13
14 DB - manufacture 23 d 10/04/13 14/05/13
15 Site Activities 140 d 20/02/13 2/10/13
16 Establishment 5 d 20/02/13 27/02/13
17 Tree / site clearing 5 d 21/02/13 28/02/13
18 Site Survey & setout 2 d 22/02/13 26/02/13
19 Building construction 136 d 27/02/13 2/10/13
20 Earthworks prep. to building footprint 9 d 27/02/13 13/03/13
21 Services rough in - below slab 7 d 14/03/13 22/03/13
22 Slab 1 (East slab) 14 d 19/03/13 15/04/13
23 Detailed excavation 5 d 19/03/13 25/03/13
25 Lift pit base - prep, tank & pour 4 d 21/03/13 26/03/13
24 Blinding 1 d 26/03/13 26/03/13
26 Lift pit sides - prep & pour 4 d 27/03/13 9/04/13
28 Prepare / form (not lift) 7 d 27/03/13 12/04/13
27 Lift pit walls - tank & backfill 2 d 10/04/13 11/04/13
29 Concrete pour 1 d 15/04/13 15/04/13
30 Slab 2 (Central slab) 15 d 28/03/13 26/04/13
31 Detailed excavation 5 d 28/03/13 12/04/13
32 Blinding 1 d 12/04/13 15/04/13
33 Prepare / form 7 d 16/04/13 24/04/13
34 Concrete pour 1 d 26/04/13 26/04/13
40 Structural steel - install east slab columns 4 d 18/04/13 23/04/13
35 Slab 3 (West slab) 9 d 22/04/13 3/05/13
36 Detailed excavation 2 d 22/04/13 24/04/13
37 Blinding 1 d 24/04/13 26/04/13
38 Prepare / form 4 d 29/04/13 2/05/13
39 Concrete pour 1 d 3/05/13 3/05/13
43 Framing - east slab walls 13 d 24/04/13 14/05/13
41 Structural steel - install Central slab zone 8 d 29/04/13 9/05/13
42 Blockwork - structural blade wall 3 d 7/05/13 9/05/13
44 Roof purlins - upper level 4 d 10/05/13 15/05/13
46 Framing - west slab walls 7 d 10/05/13 20/05/13
47 Timber roof trusses / LVL's (east slab) 5 d 15/05/13 21/05/13
48 Timber roof trusses / LVL's (west slab) 3 d 21/05/13 23/05/13
60 Roller shutter / doors - site measure agreed 1 d 21/05/13 21/05/13
45 Roofing - line / sheet roofs 11 d 22/05/13 6/06/13
52 Services rough in (walls / ceiling space) 17 d 22/05/13 18/06/13
49 Window / door frames install 9 d 23/05/13 5/06/13
50 Wall linings - external (Brickwork) 9 d 29/05/13 12/06/13
77 Lift pit infill floor 4 d 30/05/13 4/06/13
51 Wall linings - external (metal cladding) 13 d 6/06/13 27/06/13
53 Services - mech duct / pipe rough-in 8 d 17/06/13 27/06/13
55 Wall linings - internal (PB/villaboard) 16 d 19/06/13 12/07/13
61 Roller shutters - install 5 d 28/06/13 4/07/13
62 Roller doors - install 5 d 28/06/13 4/07/13
78 Wall linings - external (render) 4 d 28/06/13 3/07/13
64 Services - elec DB install 6 d 2/07/13 10/07/13
56 Ceilings - frame & line 15 d 15/07/13 6/08/13
57 2nd. Fix (doors / skirtings) 12 d 15/07/13 31/07/13
59 Paint - interior 25 d 31/07/13 5/09/13
67 Floor finishes - screeds & tanking 4 d 2/08/13 8/08/13
63 Services - mech fit off 9 d 8/08/13 21/08/13
Submit tender
Design finalization & construction dwg issue
Tender assessment
Building permit
Tender award
Finalize key trades
PIC issued
Off-site works
Structural steel - shop dwg preparation
DB - shop dwg preparation
Structural steel - shop dwg approval
Structural steel - manufacture
DB - shop dwg approval
DB - manufacture
Site Activities
Establishment
Tree / site clearing
Site Survey & setout
Building construction
Earthworks prep. to building footprint
Services rough in - below slab
Detailed excavation
Lift pit base - prep, tank & pour
Blinding
Lift pit sides - prep & pour
Prepare / form (not lift)
Lift pit walls - tank & backfill
Concrete pour
Detailed excavation
Blinding
Prepare / form
Concrete pour
Structural steel - install east slab columns
Detailed excavation
Blinding
Prepare / form
Concrete pour
Framing - east slab walls
Structural steel - install Central slab zone
Blockwork - structural blade wall
Roof purlins - upper level
Framing - west slab walls
Timber roof trusses / LVL's (east slab)
Timber roof trusses / LVL's (west slab)
Roller shutter / doors - site measure agreed
Roofing - line / sheet roofs
Services rough in (walls / ceiling space)
Window / door frames install
Wall linings - external (Brickwork)
Lift pit infill floor
Wall linings - external (metal cladding)
Services - mech duct / pipe rough-in
Wall linings - internal (PB/villaboard)
Roller shutters - install
Roller doors - install
Wall linings - external (render)
Services - elec DB install
Ceilings - frame & line
2nd. Fix (doors / skirtings)
Paint - interior
Floor finishes - screeds & tanking
Services - mech fit off
7/1 4/1 1/1 7/01 4/0 1/0 8/0 4/02 1/0 8/0 5/0 4/03 1/0 8/0 5/0 1/04 8/04 5/0 2/0 9/0 6/05 3/0 0/0 7/0 3/06 0/0 7/0 4/0 1/07 8/07 5/0 2/0 9/0 5/08 2/0 9/0 6/0 2/09 9/09 6/0 3/0 0/0 7/10 4/1 1/1 8/1 4/11 1/1 8
Jan '13 Feb '13 Mar '13 Apr '13 May '13 Jun '13 Jul '13 Aug '13 Sep '13 Oct '13 Nov '13
Sample Construction Programme Issue: A
Print date: 10/01/13 Project: sample
Construction Programme
Page 1 of 2
2. ID Task Name Duration Start Finish
65 Services - elec / comms fit off 15 d 8/08/13 29/08/13
72 Joinery install - wet areas 5 d 9/08/13 15/08/13
54 Wall linings - internal (feature) 9 d 14/08/13 28/08/13
58 Paint - exterior elements 19 d 16/08/13 13/09/13
68 Floor finishes - vinyl 8 d 16/08/13 28/08/13
70 Floor finishes - epoxy 8 d 28/08/13 6/09/13
71 Wall vinyl 12 d 29/08/13 16/09/13
69 Floor finishes - carpet 6 d 11/09/13 18/09/13
66 Services - hyd fit off 8 d 12/09/13 23/09/13
73 Joinery install - balance areas 7 d 19/09/13 27/09/13
74 Toilet / shower partitions 3 d 20/09/13 24/09/13
75 Services - commission 6 d 24/09/13 2/10/13
76 Accessories 5 d 25/09/13 2/10/13
79 Clean & hand over 3 d 27/09/13 2/10/13
80 External civil works 119 d 25/03/13 1/10/13
83 Sewer - site reticulation works 6 d 25/03/13 9/04/13
84 Sewer - rising main works 13 d 10/04/13 29/04/13
85 Sewer - pump station installation 6 d 30/04/13 8/05/13
87 Water / fire service - street tapping 9 d 1/05/13 15/05/13
82 Stormwater - site reticulation works 19 d 7/05/13 3/06/13
86 Water / fire service - site reticulation works 9 d 15/05/13 28/05/13
89 Elec / comms - site reticulation works 14 d 22/05/13 13/06/13
88 Non-potable water service - site reticulation works 6 d 29/05/13 5/06/13
81 Civil earthworks 8 d 14/06/13 26/06/13
97 Retaining walls 9 d 19/06/13 2/07/13
90 Concrete pavement - prep subgrade 13 d 27/06/13 16/07/13
96 Shed slab - prep & install 18 d 27/06/13 24/07/13
91 Concrete pavement - kerb & channel 7 d 16/07/13 25/07/13
92 Concrete pavement - prep & place concrete 12 d 25/07/13 12/08/13
93 Cross-over works 6 d 13/08/13 21/08/13
95 Perimeter fencing & gates 20 d 13/08/13 11/09/13
98 Water tanks - install & commission 6 d 13/08/13 21/08/13
100 Landscape - soft landscaping works 19 d 28/08/13 24/09/13
99 Landscape accessories 7 d 18/09/13 26/09/13
94 Carpark - line marking 4 d 25/09/13 1/10/13
101 De-establish site 5 d 25/09/13 2/10/13
102 Project Hand Over 1 d 2/10/13 2/10/13
Services - elec / comms fit off
Joinery install - wet areas
Wall linings - internal (feature)
Paint - exterior elements
Floor finishes - vinyl
Floor finishes - epoxy
Wall vinyl
Floor finishes - carpet
Services - hyd fit off
Joinery install - balance areas
Toilet / shower partitions
Services - commission
Accessories
Clean & hand over
External civil works
Sewer - site reticulation works
Sewer - rising main works
Sewer - pump station installation
Water / fire service - street tapping
Stormwater - site reticulation works
Water / fire service - site reticulation works
Elec / comms - site reticulation works
Non-potable water service - site reticulation works
Civil earthworks
Retaining walls
Concrete pavement - prep subgrade
Shed slab - prep & install
Concrete pavement - kerb & channel
Concrete pavement - prep & place concrete
Cross-over works
Perimeter fencing & gates
Water tanks - install & commission
Landscape - soft landscaping works
Landscape accessories
Carpark - line marking
De-establish site
Project Hand Over
7/1 4/1 1/1 7/01 4/0 1/0 8/0 4/02 1/0 8/0 5/0 4/03 1/0 8/0 5/0 1/04 8/04 5/0 2/0 9/0 6/05 3/0 0/0 7/0 3/06 0/0 7/0 4/0 1/07 8/07 5/0 2/0 9/0 5/08 2/0 9/0 6/0 2/09 9/09 6/0 3/0 0/0 7/10 4/1 1/1 8/1 4/11 1/1 8
Jan '13 Feb '13 Mar '13 Apr '13 May '13 Jun '13 Jul '13 Aug '13 Sep '13 Oct '13 Nov '13
Sample Construction Programme Issue: A
Print date: 10/01/13 Project: sample
Construction Programme
Page 2 of 2