 Alignment is the layout of the central line of highway on the ground.
Includes two parts:
 Horizontal alignment
 Vertical alignment
 Horizontal alignment in road design consists of straight sections of road, known
as tangents, connected by circular horizontal curves. Circular curves are
defined by radius and deflection angle (extent). The design of a horizontal
curve entails the determination of a minimum radius (based on speed limit),
curve length, and objects obstructing the view of the driver.
 Projection of highway in vertical plane is thevertical alignment
consists of gradients and vertical curve
ALIGNMENT SELECTION
 It is the process of selecting the best suited alignment among the possible
alternatives
 Alignment decision is important because a bad alignment will increase the
construction, maintenance and vehicle operating costs.
 Once an alignment is fixed and constructed, it is not easy to change it due
to increase in cost of adjoining land and construction of costly structures by
the roadside.
 It consists of three major drawings:
 Plan of the road
 Longitudinal Profile
 Cross Section
Requirements of Highway Alignment
SESEC
 Short
 Easy
 Safe
 Economical
 Comfort
 Short: The alignment between two terminal stations
should be short and as far as possible be straight, but
due to some practical considerations deviations may be
needed.
Requirements of Highway Alignment
 Easy: The alignment should be easy to construct and
maintain. It should be easy for the operation of vehicles.
So to the maximum extend easy gradients and curves
should be provided.
 Safe: It should be safe both from the construction and
operating point of especially at slopes,
view
embankments, and cutting. It should have safe
geometric features.
 Economical: The alignment should be economical and it
can be considered so only when the initial cost,
maintenance cost, and operating cost are minimum.
Requirements of Highway Alignment
 Comfort: it should provide comfort to the users.
 The alignment should be such that it would offer maximum
utility by serving maximum possible population and products
Factors Controlling Highway Alignment
 The various factors that control the alignment are as
follows:
 Government Requirement
 Obligatory Points
 Traffic
 Geometric design
 Economics
 Other considerations
 Government Requirements:
Government should be clear about the road requirement due to heavy
investment in the project.
 They should be prepared for when to construct, what type of road to
construct, how to construct and why to construct.
Factors Controlling Highway Alignment
 Obligatory Points:
 These are the control points governing the highway alignment. These points are
classified into two categories.
 (i) Points through which it should pass (Positive Obligatory Point)
 (ii)Points through which it should not pass. (Negative Obligatory Points)
 Obligatory points through which the road alignment has
to pass may cause the alignment to often deviate from
the shortest or easiest path.
 Examples of positive obligatory points:
 Bridge site: The bridge can be located only where the
river has straight and permanent path and also where
the abutment and pier can be strongly founded. The
road approach to the bridge should not be curved and
skew crossing should be avoided as possible. Thus to
locate a bridge the highway alignment may be
changed.
Factors Controlling Highway Alignment
Factors Controlling Highway Alignment
 Mountain: While the alignment passes through a
mountain, the various alternatives are to either construct
a tunnel or to go round the hills.
 The suitability of the alternative depends on factors like
topography, site conditions and construction and
operation cost.
Factors Controlling Highway Alignment
Factors Controlling Highway Alignment
 Intermediate town: The alignment may be slightly
deviated to connect an intermediate town or village
nearby.
Factors Controlling Highway Alignment
 Examples of negative obligatory points:
 Religious places: These have been protected by the law from being
acquired for any purpose. Therefore, these points should be avoided while
aligning.
Factors Controlling Highway Alignment
 Very costly structures: Acquiring such structures means heavy compensation
which would result in an increase in initial cost. So the alignment may be
deviated not to pass through that point.
 Lakes/Ponds etc: The presence of a lake or pond on the alignment path would also
necessitate deviation of the alignment.
 Marshy place, waterlogged areas
 Historically and archeologically important property
 Restricted zone for defense, national security
 Densely populated area
Factors Controlling Highway Alignment
 Traffic:
• The alignment should suit the traffic requirements. Based on the
origin-destination data of the area, the desire lines should be
drawn. The new alignment should be drawn keeping in view the
desire lines, traffic flow pattern etc.
Factors Controlling Highway Alignment
 Geological Condition:
 Alignment should pass through the stable slopes and if not the area
should be properly stabilized or treated with engineering aspects.
 Geometric design: Geometric design factors such as gradient, radius of curve,
sight distance etc. also govern the alignment of the highway. To keep the radius of
curve minimum, it may be required to change the alignment. The alignments
should be finalized such that the obstructions to visibility do not restrict the
minimum requirements of sight distance. The design standards vary with the class
of road and the terrain and accordingly the highway should be aligned.
Factors Controlling Highway Alignment
 Economy: The alignment finalised should be economical. All the three costs i.e.
construction, maintenance, and operating cost should be minimum. The
construction cost can be decreased much if it is possible to maintain a balance
between cutting and filling. Also try to avoid very high embankments and very
deep cuttings as the construction cost will be very higher in these cases.
 Other considerations: Various other factors that govern the alignment
are drainage considerations, political factors, monotony and
hydrological factors..
 Drainage: Deviation of highway to minimize cross drainage structures
 Political: If a foreign territory comes across a straight alignment,
we will have to deviate the alignment around the foreign land.
 Resisting Length: keep the ineffective rise and excessive fall to
minimum.
Factors Controlling Highway Alignment
The route Location Process
Route
Location
Region
Bands 8-16 Km
Corridors 3-10
Km
Route Strips 1-
1.5 Km
Alignments 30-
50m
Engineering Survey and its Stages
(Finalization of the alignment)
 Out of all possible alignments the best alignment has to be
selected
 The best alignment is selected based on socio-economical
and environmental considerations for which detailed
engineering survey has to be carried out i.e. Before a
highway alignment is finalised in highway project, the
engineering surveys are to be carried out.
 The survey may be completed in four stages i.e.
 (a) Map study
 (b) Reconnaissance
 (c) Preliminary surveys
 (d) Final location and detailed surveys
 Map study: With the help of topographic map it is possible to
analyze the likely routes of the road. In India, topographic
maps are available from the survey of India with 15 of 30 m
contour interval(In Nepal they are available in scale of
1:25000 ). The :main features like rivers, hills, valleys, etc., are
also shown on these maps.
 Alignment avoiding valleys, ponds or lake.
 When the road has to cross a row of hills; mountain pass
 Approximate location of Bridges
Engineering Survey and its Stages
Engineering Survey and its Stages
 Reconnaissance(Fact finding Survey): It is a rapid and rough survey. During the
survey, the physical characteristics of the areal are inspected and the
proposed route is thoroughly examined. it is done without accurate instruments.
Clinometers are used to determine the slopes of the ground. It provides
additional information not available in top sheets.
Engineering Survey and its Stages
 Objectives: -
 i)To study the feasibility or practicability of the proposed route
 ii)To reduce the number of alternative routes to the minimum to select the best 2 or 3
routes.
 iii) Source of construction materials, water and location of
stone quarries.
 iv) Number and type of cross drainage structure, maximum flood level and natural
ground water level along the probable routes.
 The different date to be observed in this stage are
 Valley, Ponds, Lakes, marshy land, other obstructions along
the route which are not available on the map
 Approximate grade values, lengths, and radius of curves
 No. and type of cross drainage structures, HFL, Natural GWL
 Soil type
 Sources of Materials, water and stone quarries location
 Geological formations, types of rocks, dip, seepage etc
Engineering Survey and its Stages
 Preliminary Survey: This survey can be started on the basis of reconnaissance. It
consists of detailed survey of the alternative routes selected. After reconnaissance. It
is done by using the instruments such as chain, compass, tape, level & theodolite. This
stage aims to select the best possible alignment from the available one using the
evaluation techniques and data obtained
Engineering Survey and its Stages
 Objectives: -
 a. To select the best route.
 b. To determine the centre line to be followed
 c. To collect the additional information found necessary after reconnaissance.
 d. To estimate quantity of earthwork materials and other construction aspects and
to work out the cost of alternate proposals
 E. to compare different proposals in view of requirement
of a good alignment
 Preliminary Survey Survey can be carried out by any
one of the following ways:
 Conventional Approach, in which a survey team carries
out surveys using the required field equipment, taking
measurement, collecting topographical and other data
and soil survey
 Modern Rapid Approach, by aerial photographs and
photogrammetric methods and photo interpretation
techniues
Engineering Survey and its Stages
Procedure for conventional method:
 Primary Traverse:
 For alternate alignments either secondary traverse or
independent primary traverses may be necessary
 Length of the center line should be measured by using very good
and accurate method of chaining or tachometry.
 Topographical Features:
 All geographical and man made features along the traverses and
for certain width on either side are surveyed and plotted
 Levelling:
 Carried out side by side to give the center line profiles and typical cross sections
Procedure for conventional method:
 Drainage Studies and Hydrological Data:
 Estimation of the type, number and approximate size of
cross drainage structures
 Soil Survey:
 To work out details of earthwork, slopes, stability of materials, subsoil and surface
drainage requirement, pavement type and its approximate thickness
requirement
 Compare the data and analyse the results of all
alternate alignments
 Material Survey:
 Naturally occurring materials like sand, stones, aggregates and
identification of quarries should be done
 Availability of manufactured materials like cement, lime, brick etc and their
location Should be ascertained.
Procedure for conventional method:
 Traffic Survey:
 Decision of number of traffic lanes, roadway width, pavement design, and
economic analysis of project.
 Determination of Final alignment center line:
 It is decided in the office before final locationsurvey.
 Preliminary survey maps consisting of contour plan, longitudinal profile, cross sections of
the alternate alignments should be carefully studied to decide the best alignment
which must satisfy the engineering and economic requirement
Modern Approach:
 Taking aerial photographs of various strips of land with required
longitudinal and lateral overlaps.
 Photographs are examined under stereoscopes and control points
are selected for establishing the traverses of all alternate proposals
 Using stereo-pair observations, the spot levels and
subsequently contour lines may be obtained
 The photo interpretation methods are used to assess the geological
features, soil conditions, drainage requirements etc
 The alignment finalized after the preliminary survey is to be first
located on the field by established the centre line.
 This is done accurately by using instruments.
Modern Approach:
Final Location and Detailed Survey
 The final route selected after the preliminary survey is surveyed and located on
the ground. And final survey is carried out with the purpose of implementation
 This provies further accurate quantities of works so that if any variations necessary
can be done within time (In Nepal this is done post contracting and called
construction survey)
 Objectives:
 To establish temporary bench marks
 To collect information required for
 The preparation of working drawings
 The preparation of detailed estimates
 The design of road & bridges
 Preparing specifications
 Land acquisition
 Location:
 The center line of the finalized road in the drawing
needs to be translated on the ground
 Major and minor control points are established and central pegs are driven, checking the
geometric design requirements
 If essential, modifications can be done after approval
Final Location and Detailed Survey
 Detailed Survey:
 TBM are fixed at drainages and under pass structures.
 Levels along the center line is taken
 Vertical alignment, earthwork calculation and drainage details are to be worked out from
the level noted.
 The cross sections are taken upto desired width
 River crossing valley should be surveyed in detail n either side
 All topographical and hydrographical details are collected and recorded
 Soil profile depth upto 1.5 to 3 meters below the GL or finished grade line of the
road whichever is lower.
 In case of high embankments, the depth should be upto
twice the height of the finished embankment
 The detail survey should be elaborate enough for preparing detailed plans,
designs and estimates
Final Location and Detailed Survey
1. ii Highway Alignment,, Engineering Survey and feasibility study.pdf

More Related Content

What's hot

Unit 1:- HIGHWAY DEVELOPMENT AND PLANNING
Unit 1:- HIGHWAY DEVELOPMENT AND PLANNINGUnit 1:- HIGHWAY DEVELOPMENT AND PLANNING
Unit 1:- HIGHWAY DEVELOPMENT AND PLANNINGRNRANGANATH
 
AIRPORT PLANNING AND DESIGN
AIRPORT PLANNING AND DESIGNAIRPORT PLANNING AND DESIGN
AIRPORT PLANNING AND DESIGNNiranjan Varma
 
Traffic volume study
Traffic volume studyTraffic volume study
Traffic volume studyZawad khalil
 
Stations and Yards of Railway
Stations and Yards of RailwayStations and Yards of Railway
Stations and Yards of RailwaySouvik Mondal
 
Traffic studies volume study
Traffic studies volume studyTraffic studies volume study
Traffic studies volume studyAglaia Connect
 
2 - Route Surveys and Location.pptx
2 - Route Surveys and Location.pptx2 - Route Surveys and Location.pptx
2 - Route Surveys and Location.pptxnatan82253
 
Rail gauges & rail sections Railway Engineering
Rail gauges & rail sections  Railway EngineeringRail gauges & rail sections  Railway Engineering
Rail gauges & rail sections Railway EngineeringLatif Hyder Wadho
 
Chapter 1 Introduction to road
Chapter 1 Introduction to roadChapter 1 Introduction to road
Chapter 1 Introduction to roadKHUSHBU SHAH
 
7-Traffic-Introduction ( Transportation and Traffic Engineering Dr. Sheriff E...
7-Traffic-Introduction ( Transportation and Traffic Engineering Dr. Sheriff E...7-Traffic-Introduction ( Transportation and Traffic Engineering Dr. Sheriff E...
7-Traffic-Introduction ( Transportation and Traffic Engineering Dr. Sheriff E...Hossam Shafiq I
 
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)RAMPRASAD KUMAWAT
 
Subgrade Stabilization: Materials & Methods
Subgrade Stabilization: Materials & MethodsSubgrade Stabilization: Materials & Methods
Subgrade Stabilization: Materials & MethodsJill Reeves
 
L2 Highway planning and development Unit 1.1
L2 Highway planning and development Unit 1.1  L2 Highway planning and development Unit 1.1
L2 Highway planning and development Unit 1.1 Sachin PatiL
 

What's hot (20)

Airport engineering
Airport engineering Airport engineering
Airport engineering
 
Unit 1:- HIGHWAY DEVELOPMENT AND PLANNING
Unit 1:- HIGHWAY DEVELOPMENT AND PLANNINGUnit 1:- HIGHWAY DEVELOPMENT AND PLANNING
Unit 1:- HIGHWAY DEVELOPMENT AND PLANNING
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
 
Highway planning
Highway planningHighway planning
Highway planning
 
AIRPORT PLANNING AND DESIGN
AIRPORT PLANNING AND DESIGNAIRPORT PLANNING AND DESIGN
AIRPORT PLANNING AND DESIGN
 
Traffic volume study
Traffic volume studyTraffic volume study
Traffic volume study
 
Stations and Yards of Railway
Stations and Yards of RailwayStations and Yards of Railway
Stations and Yards of Railway
 
Traffic studies volume study
Traffic studies volume studyTraffic studies volume study
Traffic studies volume study
 
2 - Route Surveys and Location.pptx
2 - Route Surveys and Location.pptx2 - Route Surveys and Location.pptx
2 - Route Surveys and Location.pptx
 
Rail gauges & rail sections Railway Engineering
Rail gauges & rail sections  Railway EngineeringRail gauges & rail sections  Railway Engineering
Rail gauges & rail sections Railway Engineering
 
Unit 1
Unit 1Unit 1
Unit 1
 
Traffic regulations
Traffic regulationsTraffic regulations
Traffic regulations
 
O & d survey
O & d survey O & d survey
O & d survey
 
Interchange design
Interchange designInterchange design
Interchange design
 
Chapter 1 Introduction to road
Chapter 1 Introduction to roadChapter 1 Introduction to road
Chapter 1 Introduction to road
 
7-Traffic-Introduction ( Transportation and Traffic Engineering Dr. Sheriff E...
7-Traffic-Introduction ( Transportation and Traffic Engineering Dr. Sheriff E...7-Traffic-Introduction ( Transportation and Traffic Engineering Dr. Sheriff E...
7-Traffic-Introduction ( Transportation and Traffic Engineering Dr. Sheriff E...
 
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
 
Subgrade Stabilization: Materials & Methods
Subgrade Stabilization: Materials & MethodsSubgrade Stabilization: Materials & Methods
Subgrade Stabilization: Materials & Methods
 
L2 Highway planning and development Unit 1.1
L2 Highway planning and development Unit 1.1  L2 Highway planning and development Unit 1.1
L2 Highway planning and development Unit 1.1
 
Pavement
PavementPavement
Pavement
 

Similar to 1. ii Highway Alignment,, Engineering Survey and feasibility study.pdf

1_Highway Engg-Ch.1 Introduction_full.pdf
1_Highway Engg-Ch.1 Introduction_full.pdf1_Highway Engg-Ch.1 Introduction_full.pdf
1_Highway Engg-Ch.1 Introduction_full.pdfShivamKumar423966
 
chapter 2 teyba powerpoint.pptx
chapter 2 teyba powerpoint.pptxchapter 2 teyba powerpoint.pptx
chapter 2 teyba powerpoint.pptxestifanosdemeke1
 
2. Geometric Design of Highways.pdf
2. Geometric Design of Highways.pdf2. Geometric Design of Highways.pdf
2. Geometric Design of Highways.pdfEr. Bam Bhandari
 
Highway Geometric Design.pptx
Highway Geometric Design.pptxHighway Geometric Design.pptx
Highway Geometric Design.pptxPriya Sarita Mane
 
2. Geometric Design of Highways.pdf
2. Geometric Design of Highways.pdf2. Geometric Design of Highways.pdf
2. Geometric Design of Highways.pdfRoshani Shahi
 
Chapter 3 geometric design
Chapter 3 geometric  designChapter 3 geometric  design
Chapter 3 geometric designBashaFayissa1
 
Lecture 2_Route selection, Earthworks.pdf
Lecture 2_Route selection, Earthworks.pdfLecture 2_Route selection, Earthworks.pdf
Lecture 2_Route selection, Earthworks.pdfOmarAbdi39
 
Design & Construction of B.I.T. Driveway (As per rural specification)
Design & Construction of B.I.T. Driveway (As per rural specification)Design & Construction of B.I.T. Driveway (As per rural specification)
Design & Construction of B.I.T. Driveway (As per rural specification)IJERA Editor
 
Design Methodology for Feasible Railway Alignment
Design Methodology for Feasible Railway AlignmentDesign Methodology for Feasible Railway Alignment
Design Methodology for Feasible Railway AlignmentIRJET Journal
 
Unit 1.pptx Transportation Engineering Civil Engineering
Unit 1.pptx Transportation Engineering Civil EngineeringUnit 1.pptx Transportation Engineering Civil Engineering
Unit 1.pptx Transportation Engineering Civil Engineering03ManishBangade
 
Module 1 Highway Engg (1).pdf
Module 1 Highway Engg (1).pdfModule 1 Highway Engg (1).pdf
Module 1 Highway Engg (1).pdfDhananjayM13
 
3.alignment of railway lines
3.alignment of railway lines3.alignment of railway lines
3.alignment of railway linesMani Vel
 
ALIGNMENT OF RAILWAY LINE |ALIGNMENT OF RAILWAY TRACK |RAILWAY ENGINEERING
ALIGNMENT OF RAILWAY LINE |ALIGNMENT OF RAILWAY TRACK |RAILWAY ENGINEERINGALIGNMENT OF RAILWAY LINE |ALIGNMENT OF RAILWAY TRACK |RAILWAY ENGINEERING
ALIGNMENT OF RAILWAY LINE |ALIGNMENT OF RAILWAY TRACK |RAILWAY ENGINEERINGEduHUBOnline
 
transportation Engineering.Highway planning,alignment and geometry.
transportation Engineering.Highway planning,alignment and geometry.transportation Engineering.Highway planning,alignment and geometry.
transportation Engineering.Highway planning,alignment and geometry.ayudge
 

Similar to 1. ii Highway Alignment,, Engineering Survey and feasibility study.pdf (20)

1_Highway Engg-Ch.1 Introduction_full.pdf
1_Highway Engg-Ch.1 Introduction_full.pdf1_Highway Engg-Ch.1 Introduction_full.pdf
1_Highway Engg-Ch.1 Introduction_full.pdf
 
Geological investigations for highways
Geological investigations for highwaysGeological investigations for highways
Geological investigations for highways
 
R E T 565construction Technology Infrastructure
R E T 565construction Technology InfrastructureR E T 565construction Technology Infrastructure
R E T 565construction Technology Infrastructure
 
Construction Technology
Construction TechnologyConstruction Technology
Construction Technology
 
chapter 2 teyba powerpoint.pptx
chapter 2 teyba powerpoint.pptxchapter 2 teyba powerpoint.pptx
chapter 2 teyba powerpoint.pptx
 
Highway Alignment
Highway AlignmentHighway Alignment
Highway Alignment
 
2. Geometric Design of Highways.pdf
2. Geometric Design of Highways.pdf2. Geometric Design of Highways.pdf
2. Geometric Design of Highways.pdf
 
Highway Geometric Design.pptx
Highway Geometric Design.pptxHighway Geometric Design.pptx
Highway Geometric Design.pptx
 
2. Geometric Design of Highways.pdf
2. Geometric Design of Highways.pdf2. Geometric Design of Highways.pdf
2. Geometric Design of Highways.pdf
 
Chapter 3 geometric design
Chapter 3 geometric  designChapter 3 geometric  design
Chapter 3 geometric design
 
Lecture 2_Route selection, Earthworks.pdf
Lecture 2_Route selection, Earthworks.pdfLecture 2_Route selection, Earthworks.pdf
Lecture 2_Route selection, Earthworks.pdf
 
Design & Construction of B.I.T. Driveway (As per rural specification)
Design & Construction of B.I.T. Driveway (As per rural specification)Design & Construction of B.I.T. Driveway (As per rural specification)
Design & Construction of B.I.T. Driveway (As per rural specification)
 
Design Methodology for Feasible Railway Alignment
Design Methodology for Feasible Railway AlignmentDesign Methodology for Feasible Railway Alignment
Design Methodology for Feasible Railway Alignment
 
Unit 1.pptx
Unit 1.pptxUnit 1.pptx
Unit 1.pptx
 
Unit 1.pptx Transportation Engineering Civil Engineering
Unit 1.pptx Transportation Engineering Civil EngineeringUnit 1.pptx Transportation Engineering Civil Engineering
Unit 1.pptx Transportation Engineering Civil Engineering
 
transportation
transportationtransportation
transportation
 
Module 1 Highway Engg (1).pdf
Module 1 Highway Engg (1).pdfModule 1 Highway Engg (1).pdf
Module 1 Highway Engg (1).pdf
 
3.alignment of railway lines
3.alignment of railway lines3.alignment of railway lines
3.alignment of railway lines
 
ALIGNMENT OF RAILWAY LINE |ALIGNMENT OF RAILWAY TRACK |RAILWAY ENGINEERING
ALIGNMENT OF RAILWAY LINE |ALIGNMENT OF RAILWAY TRACK |RAILWAY ENGINEERINGALIGNMENT OF RAILWAY LINE |ALIGNMENT OF RAILWAY TRACK |RAILWAY ENGINEERING
ALIGNMENT OF RAILWAY LINE |ALIGNMENT OF RAILWAY TRACK |RAILWAY ENGINEERING
 
transportation Engineering.Highway planning,alignment and geometry.
transportation Engineering.Highway planning,alignment and geometry.transportation Engineering.Highway planning,alignment and geometry.
transportation Engineering.Highway planning,alignment and geometry.
 

More from Er. Bam Bhandari

chapter; 13 general karnali psc.pdf
chapter; 13 general karnali psc.pdfchapter; 13 general karnali psc.pdf
chapter; 13 general karnali psc.pdfEr. Bam Bhandari
 
8. Road Construction Technology.pdf
8. Road Construction Technology.pdf8. Road Construction Technology.pdf
8. Road Construction Technology.pdfEr. Bam Bhandari
 
advanced concrete technology book.docx
advanced concrete technology book.docxadvanced concrete technology book.docx
advanced concrete technology book.docxEr. Bam Bhandari
 
Human resource management.docx
Human resource management.docxHuman resource management.docx
Human resource management.docxEr. Bam Bhandari
 
advanced concrete technology.docx
advanced concrete technology.docxadvanced concrete technology.docx
advanced concrete technology.docxEr. Bam Bhandari
 
advanced concrete technology book.docx
advanced concrete technology book.docxadvanced concrete technology book.docx
advanced concrete technology book.docxEr. Bam Bhandari
 
Motivating_for_Safety_MScCM.pptx
 Motivating_for_Safety_MScCM.pptx Motivating_for_Safety_MScCM.pptx
Motivating_for_Safety_MScCM.pptxEr. Bam Bhandari
 
Workplace_Safety_Management_MScCM.pptx
 Workplace_Safety_Management_MScCM.pptx Workplace_Safety_Management_MScCM.pptx
Workplace_Safety_Management_MScCM.pptxEr. Bam Bhandari
 
Documentation_for_Safety_Management_MScC.pptx
Documentation_for_Safety_Management_MScC.pptxDocumentation_for_Safety_Management_MScC.pptx
Documentation_for_Safety_Management_MScC.pptxEr. Bam Bhandari
 
3. Accidents_and_their_Causes_MScCM.pptx
3. Accidents_and_their_Causes_MScCM.pptx3. Accidents_and_their_Causes_MScCM.pptx
3. Accidents_and_their_Causes_MScCM.pptxEr. Bam Bhandari
 
4. Managing_the_Emergency_for_Safety_MScCM_.pptx
4. Managing_the_Emergency_for_Safety_MScCM_.pptx4. Managing_the_Emergency_for_Safety_MScCM_.pptx
4. Managing_the_Emergency_for_Safety_MScCM_.pptxEr. Bam Bhandari
 
3. Accidents_and_their_Causes_MScCM.pptx
3. Accidents_and_their_Causes_MScCM.pptx3. Accidents_and_their_Causes_MScCM.pptx
3. Accidents_and_their_Causes_MScCM.pptxEr. Bam Bhandari
 
Modern Safety Concept of safety for master construction management.pptx
Modern Safety Concept of safety for master construction management.pptxModern Safety Concept of safety for master construction management.pptx
Modern Safety Concept of safety for master construction management.pptxEr. Bam Bhandari
 

More from Er. Bam Bhandari (20)

chapter; 13 general karnali psc.pdf
chapter; 13 general karnali psc.pdfchapter; 13 general karnali psc.pdf
chapter; 13 general karnali psc.pdf
 
9. Highway Maintenance.pdf
9. Highway Maintenance.pdf9. Highway Maintenance.pdf
9. Highway Maintenance.pdf
 
8. Road Construction Technology.pdf
8. Road Construction Technology.pdf8. Road Construction Technology.pdf
8. Road Construction Technology.pdf
 
6. Pavement Engineering.pdf
6. Pavement Engineering.pdf6. Pavement Engineering.pdf
6. Pavement Engineering.pdf
 
5. Hill Roads.pdf
5. Hill Roads.pdf5. Hill Roads.pdf
5. Hill Roads.pdf
 
4. Highway Materials.pdf
4. Highway Materials.pdf4. Highway Materials.pdf
4. Highway Materials.pdf
 
3. Highway Drainage.pdf
3. Highway Drainage.pdf3. Highway Drainage.pdf
3. Highway Drainage.pdf
 
1. i Highway Planning.pdf
1. i  Highway Planning.pdf1. i  Highway Planning.pdf
1. i Highway Planning.pdf
 
advanced concrete technology book.docx
advanced concrete technology book.docxadvanced concrete technology book.docx
advanced concrete technology book.docx
 
Human resource management.docx
Human resource management.docxHuman resource management.docx
Human resource management.docx
 
advanced concrete technology.docx
advanced concrete technology.docxadvanced concrete technology.docx
advanced concrete technology.docx
 
advanced concrete technology book.docx
advanced concrete technology book.docxadvanced concrete technology book.docx
advanced concrete technology book.docx
 
Cost_of_Accident_MScCM.pptx
Cost_of_Accident_MScCM.pptxCost_of_Accident_MScCM.pptx
Cost_of_Accident_MScCM.pptx
 
Motivating_for_Safety_MScCM.pptx
 Motivating_for_Safety_MScCM.pptx Motivating_for_Safety_MScCM.pptx
Motivating_for_Safety_MScCM.pptx
 
Workplace_Safety_Management_MScCM.pptx
 Workplace_Safety_Management_MScCM.pptx Workplace_Safety_Management_MScCM.pptx
Workplace_Safety_Management_MScCM.pptx
 
Documentation_for_Safety_Management_MScC.pptx
Documentation_for_Safety_Management_MScC.pptxDocumentation_for_Safety_Management_MScC.pptx
Documentation_for_Safety_Management_MScC.pptx
 
3. Accidents_and_their_Causes_MScCM.pptx
3. Accidents_and_their_Causes_MScCM.pptx3. Accidents_and_their_Causes_MScCM.pptx
3. Accidents_and_their_Causes_MScCM.pptx
 
4. Managing_the_Emergency_for_Safety_MScCM_.pptx
4. Managing_the_Emergency_for_Safety_MScCM_.pptx4. Managing_the_Emergency_for_Safety_MScCM_.pptx
4. Managing_the_Emergency_for_Safety_MScCM_.pptx
 
3. Accidents_and_their_Causes_MScCM.pptx
3. Accidents_and_their_Causes_MScCM.pptx3. Accidents_and_their_Causes_MScCM.pptx
3. Accidents_and_their_Causes_MScCM.pptx
 
Modern Safety Concept of safety for master construction management.pptx
Modern Safety Concept of safety for master construction management.pptxModern Safety Concept of safety for master construction management.pptx
Modern Safety Concept of safety for master construction management.pptx
 

Recently uploaded

Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilVinayVitekari
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxchumtiyababu
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdfAldoGarca30
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdfKamal Acharya
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxmaisarahman1
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesMayuraD1
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...Amil baba
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Call Girls Mumbai
 
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxNadaHaitham1
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARKOUSTAV SARKAR
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 

Recently uploaded (20)

Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech Civil
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptx
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 

1. ii Highway Alignment,, Engineering Survey and feasibility study.pdf

  • 1. HIGHWAY ALIGNMENT , ENGINEERING SURVEY and FEASIBILITY
  • 2. HIGHWAY ALIGNMENT  Alignment is the layout of the central line of highway on the ground. Includes two parts:  Horizontal alignment  Vertical alignment  Horizontal alignment in road design consists of straight sections of road, known as tangents, connected by circular horizontal curves. Circular curves are defined by radius and deflection angle (extent). The design of a horizontal curve entails the determination of a minimum radius (based on speed limit), curve length, and objects obstructing the view of the driver.  Projection of highway in vertical plane is thevertical alignment consists of gradients and vertical curve
  • 3. ALIGNMENT SELECTION  It is the process of selecting the best suited alignment among the possible alternatives  Alignment decision is important because a bad alignment will increase the construction, maintenance and vehicle operating costs.  Once an alignment is fixed and constructed, it is not easy to change it due to increase in cost of adjoining land and construction of costly structures by the roadside.  It consists of three major drawings:  Plan of the road  Longitudinal Profile  Cross Section
  • 4. Requirements of Highway Alignment SESEC  Short  Easy  Safe  Economical  Comfort
  • 5.  Short: The alignment between two terminal stations should be short and as far as possible be straight, but due to some practical considerations deviations may be needed. Requirements of Highway Alignment  Easy: The alignment should be easy to construct and maintain. It should be easy for the operation of vehicles. So to the maximum extend easy gradients and curves should be provided.  Safe: It should be safe both from the construction and operating point of especially at slopes, view embankments, and cutting. It should have safe geometric features.
  • 6.  Economical: The alignment should be economical and it can be considered so only when the initial cost, maintenance cost, and operating cost are minimum. Requirements of Highway Alignment  Comfort: it should provide comfort to the users.  The alignment should be such that it would offer maximum utility by serving maximum possible population and products
  • 7. Factors Controlling Highway Alignment  The various factors that control the alignment are as follows:  Government Requirement  Obligatory Points  Traffic  Geometric design  Economics  Other considerations
  • 8.  Government Requirements: Government should be clear about the road requirement due to heavy investment in the project.  They should be prepared for when to construct, what type of road to construct, how to construct and why to construct. Factors Controlling Highway Alignment  Obligatory Points:  These are the control points governing the highway alignment. These points are classified into two categories.  (i) Points through which it should pass (Positive Obligatory Point)  (ii)Points through which it should not pass. (Negative Obligatory Points)
  • 9.  Obligatory points through which the road alignment has to pass may cause the alignment to often deviate from the shortest or easiest path.  Examples of positive obligatory points:  Bridge site: The bridge can be located only where the river has straight and permanent path and also where the abutment and pier can be strongly founded. The road approach to the bridge should not be curved and skew crossing should be avoided as possible. Thus to locate a bridge the highway alignment may be changed. Factors Controlling Highway Alignment
  • 11.  Mountain: While the alignment passes through a mountain, the various alternatives are to either construct a tunnel or to go round the hills.  The suitability of the alternative depends on factors like topography, site conditions and construction and operation cost. Factors Controlling Highway Alignment
  • 13.  Intermediate town: The alignment may be slightly deviated to connect an intermediate town or village nearby. Factors Controlling Highway Alignment
  • 14.  Examples of negative obligatory points:  Religious places: These have been protected by the law from being acquired for any purpose. Therefore, these points should be avoided while aligning. Factors Controlling Highway Alignment  Very costly structures: Acquiring such structures means heavy compensation which would result in an increase in initial cost. So the alignment may be deviated not to pass through that point.  Lakes/Ponds etc: The presence of a lake or pond on the alignment path would also necessitate deviation of the alignment.  Marshy place, waterlogged areas  Historically and archeologically important property  Restricted zone for defense, national security  Densely populated area
  • 16.  Traffic: • The alignment should suit the traffic requirements. Based on the origin-destination data of the area, the desire lines should be drawn. The new alignment should be drawn keeping in view the desire lines, traffic flow pattern etc. Factors Controlling Highway Alignment  Geological Condition:  Alignment should pass through the stable slopes and if not the area should be properly stabilized or treated with engineering aspects.
  • 17.  Geometric design: Geometric design factors such as gradient, radius of curve, sight distance etc. also govern the alignment of the highway. To keep the radius of curve minimum, it may be required to change the alignment. The alignments should be finalized such that the obstructions to visibility do not restrict the minimum requirements of sight distance. The design standards vary with the class of road and the terrain and accordingly the highway should be aligned. Factors Controlling Highway Alignment  Economy: The alignment finalised should be economical. All the three costs i.e. construction, maintenance, and operating cost should be minimum. The construction cost can be decreased much if it is possible to maintain a balance between cutting and filling. Also try to avoid very high embankments and very deep cuttings as the construction cost will be very higher in these cases.
  • 18.  Other considerations: Various other factors that govern the alignment are drainage considerations, political factors, monotony and hydrological factors..  Drainage: Deviation of highway to minimize cross drainage structures  Political: If a foreign territory comes across a straight alignment, we will have to deviate the alignment around the foreign land.  Resisting Length: keep the ineffective rise and excessive fall to minimum. Factors Controlling Highway Alignment
  • 19. The route Location Process Route Location Region Bands 8-16 Km Corridors 3-10 Km Route Strips 1- 1.5 Km Alignments 30- 50m
  • 20. Engineering Survey and its Stages (Finalization of the alignment)  Out of all possible alignments the best alignment has to be selected  The best alignment is selected based on socio-economical and environmental considerations for which detailed engineering survey has to be carried out i.e. Before a highway alignment is finalised in highway project, the engineering surveys are to be carried out.  The survey may be completed in four stages i.e.  (a) Map study  (b) Reconnaissance  (c) Preliminary surveys  (d) Final location and detailed surveys
  • 21.  Map study: With the help of topographic map it is possible to analyze the likely routes of the road. In India, topographic maps are available from the survey of India with 15 of 30 m contour interval(In Nepal they are available in scale of 1:25000 ). The :main features like rivers, hills, valleys, etc., are also shown on these maps.  Alignment avoiding valleys, ponds or lake.  When the road has to cross a row of hills; mountain pass  Approximate location of Bridges Engineering Survey and its Stages
  • 23.  Reconnaissance(Fact finding Survey): It is a rapid and rough survey. During the survey, the physical characteristics of the areal are inspected and the proposed route is thoroughly examined. it is done without accurate instruments. Clinometers are used to determine the slopes of the ground. It provides additional information not available in top sheets. Engineering Survey and its Stages  Objectives: -  i)To study the feasibility or practicability of the proposed route  ii)To reduce the number of alternative routes to the minimum to select the best 2 or 3 routes.  iii) Source of construction materials, water and location of stone quarries.  iv) Number and type of cross drainage structure, maximum flood level and natural ground water level along the probable routes.
  • 24.  The different date to be observed in this stage are  Valley, Ponds, Lakes, marshy land, other obstructions along the route which are not available on the map  Approximate grade values, lengths, and radius of curves  No. and type of cross drainage structures, HFL, Natural GWL  Soil type  Sources of Materials, water and stone quarries location  Geological formations, types of rocks, dip, seepage etc Engineering Survey and its Stages
  • 25.  Preliminary Survey: This survey can be started on the basis of reconnaissance. It consists of detailed survey of the alternative routes selected. After reconnaissance. It is done by using the instruments such as chain, compass, tape, level & theodolite. This stage aims to select the best possible alignment from the available one using the evaluation techniques and data obtained Engineering Survey and its Stages  Objectives: -  a. To select the best route.  b. To determine the centre line to be followed  c. To collect the additional information found necessary after reconnaissance.  d. To estimate quantity of earthwork materials and other construction aspects and to work out the cost of alternate proposals  E. to compare different proposals in view of requirement of a good alignment
  • 26.  Preliminary Survey Survey can be carried out by any one of the following ways:  Conventional Approach, in which a survey team carries out surveys using the required field equipment, taking measurement, collecting topographical and other data and soil survey  Modern Rapid Approach, by aerial photographs and photogrammetric methods and photo interpretation techniues Engineering Survey and its Stages
  • 27. Procedure for conventional method:  Primary Traverse:  For alternate alignments either secondary traverse or independent primary traverses may be necessary  Length of the center line should be measured by using very good and accurate method of chaining or tachometry.  Topographical Features:  All geographical and man made features along the traverses and for certain width on either side are surveyed and plotted
  • 28.  Levelling:  Carried out side by side to give the center line profiles and typical cross sections Procedure for conventional method:  Drainage Studies and Hydrological Data:  Estimation of the type, number and approximate size of cross drainage structures  Soil Survey:  To work out details of earthwork, slopes, stability of materials, subsoil and surface drainage requirement, pavement type and its approximate thickness requirement  Compare the data and analyse the results of all alternate alignments
  • 29.  Material Survey:  Naturally occurring materials like sand, stones, aggregates and identification of quarries should be done  Availability of manufactured materials like cement, lime, brick etc and their location Should be ascertained. Procedure for conventional method:  Traffic Survey:  Decision of number of traffic lanes, roadway width, pavement design, and economic analysis of project.  Determination of Final alignment center line:  It is decided in the office before final locationsurvey.  Preliminary survey maps consisting of contour plan, longitudinal profile, cross sections of the alternate alignments should be carefully studied to decide the best alignment which must satisfy the engineering and economic requirement
  • 30. Modern Approach:  Taking aerial photographs of various strips of land with required longitudinal and lateral overlaps.  Photographs are examined under stereoscopes and control points are selected for establishing the traverses of all alternate proposals  Using stereo-pair observations, the spot levels and subsequently contour lines may be obtained  The photo interpretation methods are used to assess the geological features, soil conditions, drainage requirements etc
  • 31.  The alignment finalized after the preliminary survey is to be first located on the field by established the centre line.  This is done accurately by using instruments. Modern Approach:
  • 32. Final Location and Detailed Survey  The final route selected after the preliminary survey is surveyed and located on the ground. And final survey is carried out with the purpose of implementation  This provies further accurate quantities of works so that if any variations necessary can be done within time (In Nepal this is done post contracting and called construction survey)  Objectives:  To establish temporary bench marks  To collect information required for  The preparation of working drawings  The preparation of detailed estimates  The design of road & bridges  Preparing specifications  Land acquisition
  • 33.  Location:  The center line of the finalized road in the drawing needs to be translated on the ground  Major and minor control points are established and central pegs are driven, checking the geometric design requirements  If essential, modifications can be done after approval Final Location and Detailed Survey  Detailed Survey:  TBM are fixed at drainages and under pass structures.  Levels along the center line is taken  Vertical alignment, earthwork calculation and drainage details are to be worked out from the level noted.  The cross sections are taken upto desired width  River crossing valley should be surveyed in detail n either side
  • 34.  All topographical and hydrographical details are collected and recorded  Soil profile depth upto 1.5 to 3 meters below the GL or finished grade line of the road whichever is lower.  In case of high embankments, the depth should be upto twice the height of the finished embankment  The detail survey should be elaborate enough for preparing detailed plans, designs and estimates Final Location and Detailed Survey