2. About Studio Klaschka
We have been using BIM since the practice start in 2001•
Nearly every project from £100K-£15M in the office has used BIM•
Our business model is to integrate with contractors and consultants to give•
them easy access to information we produce
2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013
start
BIM
BS1192 implementation
pointclouds
The Future of BIM is Open
3. About Studio Klaschka
We have advised other practices on their BIM systems and implementation•
We have sat on numerous industry panels, advisory groups•
We have written for various industry journals•
We have a high profile as a small practice who use BIM through speaking at•
numerous conferences in the UK, Europe and the US.
Our systems, conventions and protocols are based on BS1192•
The Future of BIM is Open
4. Are these the communication formats of BIM?
Closed, proprietary, commercial
Revit AECOSIM ArchiCAD
perhaps unfair!
The Future of BIM is Open
5. Or are these these?
Open, documented, free
SQL XML
The Future of BIM is Open
8. “Customers need to be given control of their own
data - not being tied into a certain manufacturer
so that when there are problems they are always
obliged to go back to them.”
Tim Berners-Lee
The Future of BIM is Open
9. Locked together or Locked In?
building data data analysis
The Future of BIM is Open
10. building data data analysis
Data and process not linked at all
The Future of BIM is Open
11. “Compared even to the development of the phone
or TV, the Web developed very quickly.”
Tim Berners-Lee
The Future of BIM is Open
12. The Future of BIM is Open
IFC 2x3 : Did you Know?
Geometry•
Unique Asset ID•
Spatial Relationships (Outside/Inside, Space to Space, Enclosure)•
Phasing•
Performance (Fire, Thermal, Structural, Access)•
Management (Capacity, Usage, Lifecycle, Warranty)•
Quantities•
Specification•
Connections•
13. “The client owns the model.”
Paul Morrell
The Future of BIM is Open
14. building data
Thermal Analysis
what
if?
Acoustic Analysis
Upgrade Re-design
Scheduling
Construction Planning
Drawing Production
Facility Management
Spatial Analysis
Data Visualisation
Accessibility Checking
Quantity Take-off
The Future of BIM is Open
Proprietary Data moves a fast as one developer
Forget it you’ll have
to wait in line
15. building data
Thermal Analysis
what
if?
Acoustic Analysis
Upgrade Re-design
Scheduling
Construction Planning
Drawing Production
Facility Management
Spatial Analysis
Data Visualisation
Accessibility Checking
Quantity Take-off
The Future of BIM is Open
Open Building Data is a Marketplace for Services
16. “Data is a precious thing and will last longer than
the systems themselves.”
Tim Berners-Lee
The Future of BIM is Open