SlideShare a Scribd company logo
1 of 10
The art of Engineering
The art of Engineering 
OUR SERVICES 
DESIGN PRODUCTION GEARS REPLACEMENT
The art of Engineering 
OUR SERVICES 
WE DESIGN AND MANUFACTURE GEARBOXES COMPLETELY UP TO OUR COSTUMERS NEEDS. 
• WIND MILL GEARBOX BETWEEN 1-5000 KW 
• PARALLEL GEARBOXES BETWEEN 1-3000 KW 
• BEVEL PINION GEARBOXES BETWEEN 1-1500 KW 
• PLANETARY GEARBOXES 1-300 KW 
• WORM GEAR REDUCERS BETWEEN 1-250 KW 
• ARROW GEAR UP TO Ø2500 MN: 25 
• 90 ° ENTRY GEARBOXES 
• GLOBOID WORM GEAR REDUCERS 
• DIRECTION CONVERTER GEARBOXES 
REDUCER BOXES ARE PRODUCES IN VARIOUS DIMENSIONS AS BRAZED BODY OR CASTING. 
GEARS HAVE BEEN PRODUCED VIA MATERIALS AISI 4140, 17CRNİMO6 AND AISI 8620, AND 
HAVE BEEN HARDENED BY GAS CEMENTING AND INDUCTION BETWEEN 53-60 HRC. TEETH 
PROFILES OF THE GEARS OF PITTA VIA GRINDING
The art of Engineering 
OUR SERVICES DESIGN 
2D – DESIGN
The art of Engineering 
3D – DESIGN 
OUR SERVICES DESIGN
The art of Engineering 
3D – ANI. DESIGN 
OUR SERVICES DESIGN
The art of Engineering 
PRODUCTIONS 
OUR SERVICES DESIGN 
REDUCER BOXES ARE PRODUCES IN VARIOUS DIMENSIONS AS BRAZED BODY OR CASTING. 
• PARALLEL GEARBOXES BETWEEN 1-3000 KW 
• BEVEL PINION GEARBOXES BETWEEN 1-1500 KW 
• WORM GEAR REDUCERS BETWEEN 1-250 KW 
• WORM GEAR REDUCERS BETWEEN 1-250 KW 
• 90 ° ENTRY GEARBOXES 
• GLOBOID WORM GEAR REDUCERS
The art of Engineering 
OUR WORKS 
PRODUCTIONS
The art of Engineering 
OUR WORKS 
GEARS 
 Cylindrical Gears 
• Spur Gears 
• Helical Gears 
• Herringbone Gears 
 Internal (Hub) Gears 
 Ring Gears 
•Cylindrical Gears, 
•Internal Gears, 
 Planetary ( Epicyclic ) Gears 
 Racks 
 Sprockets 
 Straight Bevel Gears 
 Shafts (with Splines) 
 Worm Gears 
OUR GEAR ALWAYS FOLLOWS STANDARDS BY ISO, ANSI, 
DIN AND TSE, AND HOLDS ISO 9001 CERTIFICATE
The art of Engineering 
+90 532 163 62 90 
+90 216 395 20 34 
Info@BerrIndustry.com 
Berr.Industry 
www.BerrIndustry.com 
www.BerrMuhendislik.com

More Related Content

More from Berr Industry

Berr Process Equipment - 2018-001
Berr Process Equipment - 2018-001Berr Process Equipment - 2018-001
Berr Process Equipment - 2018-001Berr Industry
 
Zambia/Mozambique/Comoros Island ** Feasibility Study **
Zambia/Mozambique/Comoros Island ** Feasibility Study **Zambia/Mozambique/Comoros Island ** Feasibility Study **
Zambia/Mozambique/Comoros Island ** Feasibility Study **Berr Industry
 
GENERAL PRESENTATION FILE of THE BERR INDUSTRY
GENERAL PRESENTATION FILE of THE BERR INDUSTRYGENERAL PRESENTATION FILE of THE BERR INDUSTRY
GENERAL PRESENTATION FILE of THE BERR INDUSTRYBerr Industry
 
MANPOWER - SKILLED LABOR FORCE PROVIDING
MANPOWER - SKILLED LABOR FORCE PROVIDINGMANPOWER - SKILLED LABOR FORCE PROVIDING
MANPOWER - SKILLED LABOR FORCE PROVIDINGBerr Industry
 
RE-LOCATION ENGINEERING SERVICES
RE-LOCATION ENGINEERING SERVICESRE-LOCATION ENGINEERING SERVICES
RE-LOCATION ENGINEERING SERVICESBerr Industry
 
BERR EXHAUST SILENCERS
BERR EXHAUST SILENCERSBERR EXHAUST SILENCERS
BERR EXHAUST SILENCERSBerr Industry
 
BERR INDUSTRY - TR : PRESENTATION OF THE WORKS
BERR INDUSTRY - TR : PRESENTATION OF THE WORKSBERR INDUSTRY - TR : PRESENTATION OF THE WORKS
BERR INDUSTRY - TR : PRESENTATION OF THE WORKSBerr Industry
 
Berr Industrial Construction
Berr Industrial ConstructionBerr Industrial Construction
Berr Industrial ConstructionBerr Industry
 
Lastik Geri Kazanım Tesis Dizel Enerji Santrali
Lastik Geri Kazanım Tesis Dizel Enerji SantraliLastik Geri Kazanım Tesis Dizel Enerji Santrali
Lastik Geri Kazanım Tesis Dizel Enerji SantraliBerr Industry
 
Trijenerasyon Kojenerasyon Projelendirme Mühendislik Danışmanlık
Trijenerasyon Kojenerasyon Projelendirme Mühendislik DanışmanlıkTrijenerasyon Kojenerasyon Projelendirme Mühendislik Danışmanlık
Trijenerasyon Kojenerasyon Projelendirme Mühendislik DanışmanlıkBerr Industry
 
Turbine of the Power Plants Maintenance Replacement Engineering
Turbine of the Power Plants Maintenance Replacement EngineeringTurbine of the Power Plants Maintenance Replacement Engineering
Turbine of the Power Plants Maintenance Replacement EngineeringBerr Industry
 
TriGenerasyon Projesi / Tri-Generation Project
TriGenerasyon Projesi / Tri-Generation ProjectTriGenerasyon Projesi / Tri-Generation Project
TriGenerasyon Projesi / Tri-Generation ProjectBerr Industry
 
BERR Industry Relocation Management Engineering Services
BERR Industry Relocation Management Engineering ServicesBERR Industry Relocation Management Engineering Services
BERR Industry Relocation Management Engineering ServicesBerr Industry
 
Power Plants & Industrial Equipment Procurement Engineering Services
Power Plants & Industrial Equipment Procurement Engineering ServicesPower Plants & Industrial Equipment Procurement Engineering Services
Power Plants & Industrial Equipment Procurement Engineering ServicesBerr Industry
 
Industrial Cooling Systems Construction Engineering Consulting
Industrial Cooling Systems Construction Engineering ConsultingIndustrial Cooling Systems Construction Engineering Consulting
Industrial Cooling Systems Construction Engineering ConsultingBerr Industry
 
Industrial Engineering Services: Gas & Steam Turbines Maintenance and Refurbi...
Industrial Engineering Services: Gas & Steam Turbines Maintenance and Refurbi...Industrial Engineering Services: Gas & Steam Turbines Maintenance and Refurbi...
Industrial Engineering Services: Gas & Steam Turbines Maintenance and Refurbi...Berr Industry
 
Endüstriyel Soğutma Sistemleri / Industrial Cooling Solutions
Endüstriyel Soğutma Sistemleri / Industrial Cooling SolutionsEndüstriyel Soğutma Sistemleri / Industrial Cooling Solutions
Endüstriyel Soğutma Sistemleri / Industrial Cooling SolutionsBerr Industry
 
HFO Diesel Power Plant Erection Case Studies
HFO Diesel Power Plant Erection Case StudiesHFO Diesel Power Plant Erection Case Studies
HFO Diesel Power Plant Erection Case StudiesBerr Industry
 
Engine and Turbine Power Plants Engineering and Commissioning Services
Engine and Turbine Power Plants Engineering and Commissioning ServicesEngine and Turbine Power Plants Engineering and Commissioning Services
Engine and Turbine Power Plants Engineering and Commissioning ServicesBerr Industry
 

More from Berr Industry (20)

Berr Process Equipment - 2018-001
Berr Process Equipment - 2018-001Berr Process Equipment - 2018-001
Berr Process Equipment - 2018-001
 
Zambia/Mozambique/Comoros Island ** Feasibility Study **
Zambia/Mozambique/Comoros Island ** Feasibility Study **Zambia/Mozambique/Comoros Island ** Feasibility Study **
Zambia/Mozambique/Comoros Island ** Feasibility Study **
 
GENERAL PRESENTATION FILE of THE BERR INDUSTRY
GENERAL PRESENTATION FILE of THE BERR INDUSTRYGENERAL PRESENTATION FILE of THE BERR INDUSTRY
GENERAL PRESENTATION FILE of THE BERR INDUSTRY
 
MANPOWER - SKILLED LABOR FORCE PROVIDING
MANPOWER - SKILLED LABOR FORCE PROVIDINGMANPOWER - SKILLED LABOR FORCE PROVIDING
MANPOWER - SKILLED LABOR FORCE PROVIDING
 
POWER SOLUTIONS
POWER SOLUTIONSPOWER SOLUTIONS
POWER SOLUTIONS
 
RE-LOCATION ENGINEERING SERVICES
RE-LOCATION ENGINEERING SERVICESRE-LOCATION ENGINEERING SERVICES
RE-LOCATION ENGINEERING SERVICES
 
BERR EXHAUST SILENCERS
BERR EXHAUST SILENCERSBERR EXHAUST SILENCERS
BERR EXHAUST SILENCERS
 
BERR INDUSTRY - TR : PRESENTATION OF THE WORKS
BERR INDUSTRY - TR : PRESENTATION OF THE WORKSBERR INDUSTRY - TR : PRESENTATION OF THE WORKS
BERR INDUSTRY - TR : PRESENTATION OF THE WORKS
 
Berr Industrial Construction
Berr Industrial ConstructionBerr Industrial Construction
Berr Industrial Construction
 
Lastik Geri Kazanım Tesis Dizel Enerji Santrali
Lastik Geri Kazanım Tesis Dizel Enerji SantraliLastik Geri Kazanım Tesis Dizel Enerji Santrali
Lastik Geri Kazanım Tesis Dizel Enerji Santrali
 
Trijenerasyon Kojenerasyon Projelendirme Mühendislik Danışmanlık
Trijenerasyon Kojenerasyon Projelendirme Mühendislik DanışmanlıkTrijenerasyon Kojenerasyon Projelendirme Mühendislik Danışmanlık
Trijenerasyon Kojenerasyon Projelendirme Mühendislik Danışmanlık
 
Turbine of the Power Plants Maintenance Replacement Engineering
Turbine of the Power Plants Maintenance Replacement EngineeringTurbine of the Power Plants Maintenance Replacement Engineering
Turbine of the Power Plants Maintenance Replacement Engineering
 
TriGenerasyon Projesi / Tri-Generation Project
TriGenerasyon Projesi / Tri-Generation ProjectTriGenerasyon Projesi / Tri-Generation Project
TriGenerasyon Projesi / Tri-Generation Project
 
BERR Industry Relocation Management Engineering Services
BERR Industry Relocation Management Engineering ServicesBERR Industry Relocation Management Engineering Services
BERR Industry Relocation Management Engineering Services
 
Power Plants & Industrial Equipment Procurement Engineering Services
Power Plants & Industrial Equipment Procurement Engineering ServicesPower Plants & Industrial Equipment Procurement Engineering Services
Power Plants & Industrial Equipment Procurement Engineering Services
 
Industrial Cooling Systems Construction Engineering Consulting
Industrial Cooling Systems Construction Engineering ConsultingIndustrial Cooling Systems Construction Engineering Consulting
Industrial Cooling Systems Construction Engineering Consulting
 
Industrial Engineering Services: Gas & Steam Turbines Maintenance and Refurbi...
Industrial Engineering Services: Gas & Steam Turbines Maintenance and Refurbi...Industrial Engineering Services: Gas & Steam Turbines Maintenance and Refurbi...
Industrial Engineering Services: Gas & Steam Turbines Maintenance and Refurbi...
 
Endüstriyel Soğutma Sistemleri / Industrial Cooling Solutions
Endüstriyel Soğutma Sistemleri / Industrial Cooling SolutionsEndüstriyel Soğutma Sistemleri / Industrial Cooling Solutions
Endüstriyel Soğutma Sistemleri / Industrial Cooling Solutions
 
HFO Diesel Power Plant Erection Case Studies
HFO Diesel Power Plant Erection Case StudiesHFO Diesel Power Plant Erection Case Studies
HFO Diesel Power Plant Erection Case Studies
 
Engine and Turbine Power Plants Engineering and Commissioning Services
Engine and Turbine Power Plants Engineering and Commissioning ServicesEngine and Turbine Power Plants Engineering and Commissioning Services
Engine and Turbine Power Plants Engineering and Commissioning Services
 

Recently uploaded

priority interrupt computer organization
priority interrupt computer organizationpriority interrupt computer organization
priority interrupt computer organizationchnrketan
 
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithmComputer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithmDeepika Walanjkar
 
Levelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument methodLevelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument methodManicka Mamallan Andavar
 
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTFUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTSneha Padhiar
 
KCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosKCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosVictor Morales
 
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfComprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfalene1
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONjhunlian
 
Cost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionCost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionSneha Padhiar
 
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork
 
Turn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptxTurn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptxStephen Sitton
 
Secure Key Crypto - Tech Paper JET Tech Labs
Secure Key Crypto - Tech Paper JET Tech LabsSecure Key Crypto - Tech Paper JET Tech Labs
Secure Key Crypto - Tech Paper JET Tech Labsamber724300
 
Robotics Group 10 (Control Schemes) cse.pdf
Robotics Group 10  (Control Schemes) cse.pdfRobotics Group 10  (Control Schemes) cse.pdf
Robotics Group 10 (Control Schemes) cse.pdfsahilsajad201
 
Triangulation survey (Basic Mine Surveying)_MI10412MI.pptx
Triangulation survey (Basic Mine Surveying)_MI10412MI.pptxTriangulation survey (Basic Mine Surveying)_MI10412MI.pptx
Triangulation survey (Basic Mine Surveying)_MI10412MI.pptxRomil Mishra
 
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSHigh Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSsandhya757531
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionMebane Rash
 
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Sumanth A
 
Novel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending ActuatorsNovel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending ActuatorsResearcher Researcher
 
Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Romil Mishra
 
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书rnrncn29
 
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.pptROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.pptJohnWilliam111370
 

Recently uploaded (20)

priority interrupt computer organization
priority interrupt computer organizationpriority interrupt computer organization
priority interrupt computer organization
 
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithmComputer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithm
 
Levelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument methodLevelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument method
 
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTFUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
 
KCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosKCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitos
 
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfComprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
 
Cost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionCost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based question
 
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
 
Turn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptxTurn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptx
 
Secure Key Crypto - Tech Paper JET Tech Labs
Secure Key Crypto - Tech Paper JET Tech LabsSecure Key Crypto - Tech Paper JET Tech Labs
Secure Key Crypto - Tech Paper JET Tech Labs
 
Robotics Group 10 (Control Schemes) cse.pdf
Robotics Group 10  (Control Schemes) cse.pdfRobotics Group 10  (Control Schemes) cse.pdf
Robotics Group 10 (Control Schemes) cse.pdf
 
Triangulation survey (Basic Mine Surveying)_MI10412MI.pptx
Triangulation survey (Basic Mine Surveying)_MI10412MI.pptxTriangulation survey (Basic Mine Surveying)_MI10412MI.pptx
Triangulation survey (Basic Mine Surveying)_MI10412MI.pptx
 
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSHigh Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of Action
 
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
 
Novel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending ActuatorsNovel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending Actuators
 
Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________
 
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
 
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.pptROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
 

BERR Industry Gear Boxes Engineering Services

  • 1. The art of Engineering
  • 2. The art of Engineering OUR SERVICES DESIGN PRODUCTION GEARS REPLACEMENT
  • 3. The art of Engineering OUR SERVICES WE DESIGN AND MANUFACTURE GEARBOXES COMPLETELY UP TO OUR COSTUMERS NEEDS. • WIND MILL GEARBOX BETWEEN 1-5000 KW • PARALLEL GEARBOXES BETWEEN 1-3000 KW • BEVEL PINION GEARBOXES BETWEEN 1-1500 KW • PLANETARY GEARBOXES 1-300 KW • WORM GEAR REDUCERS BETWEEN 1-250 KW • ARROW GEAR UP TO Ø2500 MN: 25 • 90 ° ENTRY GEARBOXES • GLOBOID WORM GEAR REDUCERS • DIRECTION CONVERTER GEARBOXES REDUCER BOXES ARE PRODUCES IN VARIOUS DIMENSIONS AS BRAZED BODY OR CASTING. GEARS HAVE BEEN PRODUCED VIA MATERIALS AISI 4140, 17CRNİMO6 AND AISI 8620, AND HAVE BEEN HARDENED BY GAS CEMENTING AND INDUCTION BETWEEN 53-60 HRC. TEETH PROFILES OF THE GEARS OF PITTA VIA GRINDING
  • 4. The art of Engineering OUR SERVICES DESIGN 2D – DESIGN
  • 5. The art of Engineering 3D – DESIGN OUR SERVICES DESIGN
  • 6. The art of Engineering 3D – ANI. DESIGN OUR SERVICES DESIGN
  • 7. The art of Engineering PRODUCTIONS OUR SERVICES DESIGN REDUCER BOXES ARE PRODUCES IN VARIOUS DIMENSIONS AS BRAZED BODY OR CASTING. • PARALLEL GEARBOXES BETWEEN 1-3000 KW • BEVEL PINION GEARBOXES BETWEEN 1-1500 KW • WORM GEAR REDUCERS BETWEEN 1-250 KW • WORM GEAR REDUCERS BETWEEN 1-250 KW • 90 ° ENTRY GEARBOXES • GLOBOID WORM GEAR REDUCERS
  • 8. The art of Engineering OUR WORKS PRODUCTIONS
  • 9. The art of Engineering OUR WORKS GEARS  Cylindrical Gears • Spur Gears • Helical Gears • Herringbone Gears  Internal (Hub) Gears  Ring Gears •Cylindrical Gears, •Internal Gears,  Planetary ( Epicyclic ) Gears  Racks  Sprockets  Straight Bevel Gears  Shafts (with Splines)  Worm Gears OUR GEAR ALWAYS FOLLOWS STANDARDS BY ISO, ANSI, DIN AND TSE, AND HOLDS ISO 9001 CERTIFICATE
  • 10. The art of Engineering +90 532 163 62 90 +90 216 395 20 34 Info@BerrIndustry.com Berr.Industry www.BerrIndustry.com www.BerrMuhendislik.com