SlideShare une entreprise Scribd logo
1  sur  22
Introduction to Qasim pur
grid Station
Qasim pur grid Station Overview
Two Sub-Transmission lines come to the Qasim-pur grid station
• From New Multan 500 kv---step down----132kv
• Vehari 132
Main yard:
• The area where substation’s equipments are installed.
Main components of grid station:
• Current transformers(CT).
• Isolators.
• Circuit breakers & tie breakers.
• Bus bars.
• Lightning arresters.
• Potential transformers(PT)
• Capacitor bank.
• Control room.
• Battery room.
Current transformers(CT).
• It is use for measuring current.
• In current measuring process we take some tapping from secondary
transformers, it give the minute value of current and scale of CT are
design according to this minute current (200/5).
• If we obtain 5A from secondary of CT then its scale indicate 200A
current at its primary.
Current transformers(CT).
Isolators:
• It is OFF load device.
• Actually it is a mechanical switch.
Circuit breakers & tie breakers:
• CB can be manual or automatic
• It use to connect and disconnect circuit in case of short circuit
conditions and normal conditions.
• Types.
• Air circuit breakers.
• Oil circuit breakers.
• Air blast circuit breakers.
• Minimum oil circuit breakers.
• SF6 circuit breakers.
Circuit breakers
Tie circuit breakers:
• It is use to energize and de energize bus bars
Bus bars
• Qasim pur grid station uses double bus bar scheme.
• Advantages;
• Reliable.
• Any CB can be take out of service for maintenance.
• Any bus can be take out of service for maintenance.
Bus bars:
Lightning arresters:
• It is like a protecting valves.
• It protect the grid station’s equipments from over voltages, surges
and lightning.
Potential transformers(PT):
• It is a step down transformers.
• It step down the incoming voltage up to the distributive requirement
Power factor improvement
Uses to maintain the power factor.
• Power factor improving techniques;
1. Capacitor bank.
2. Synchronous condensor.
3. Phase advancer.
Capacitor bank:
Tapping(available on transformer’s HV).
• it is used for voltage regulation according to requirement.
Control room:
• It consist of measuring, controlling and isolating devices.
• Following devices which are use:
• Relays(analogue & digital).
• Circuit breakers.
• Ampere meters.
• Energy meters(US Aid).
• Power factor meters.
Control room:
Battery room:
• It consist of Dry batteries, which are connected in series.
• Each battery act as 2V cell, in order to produce 110V, 55 batteries are
connected in series.
Importance:
• It is backbone of grid station, because all controlling devices operate
on DC supply, e.g relays, alarms, etc………………………
Battery room:

Contenu connexe

Tendances

A report on 220 kv gss mansarovar, jaipur by ravindra kumar goma
A report on 220 kv gss mansarovar, jaipur by ravindra kumar gomaA report on 220 kv gss mansarovar, jaipur by ravindra kumar goma
A report on 220 kv gss mansarovar, jaipur by ravindra kumar gomaravindragoma
 
220 KV Switchyard general overview
220 KV Switchyard general overview220 KV Switchyard general overview
220 KV Switchyard general overviewThien Huynh
 
132kv Gss report of sitapura jaipur
132kv Gss report of sitapura jaipur132kv Gss report of sitapura jaipur
132kv Gss report of sitapura jaipurkishankky
 
Rrvpnl summer-industrial-training-ajmer-in-power-line-carrier-communication
Rrvpnl summer-industrial-training-ajmer-in-power-line-carrier-communicationRrvpnl summer-industrial-training-ajmer-in-power-line-carrier-communication
Rrvpnl summer-industrial-training-ajmer-in-power-line-carrier-communicationDushyant Singh Chouhan
 
Ppt on 132 kv gss by ashok khoja
Ppt on  132 kv gss  by ashok khojaPpt on  132 kv gss  by ashok khoja
Ppt on 132 kv gss by ashok khojaASHOK KHOJA
 
220kV Grid Transmission Substation vt report
220kV Grid Transmission Substation vt report220kV Grid Transmission Substation vt report
220kV Grid Transmission Substation vt reportk,l polytechnic roorkee
 
Unified Power Flow Controller(upfc) 2
Unified Power Flow Controller(upfc) 2Unified Power Flow Controller(upfc) 2
Unified Power Flow Controller(upfc) 2JayakalyanReddy
 
132 kv gss summer training report from CPWD vidhyadar nagar jaipur
132 kv gss summer training report from CPWD vidhyadar nagar jaipur132 kv gss summer training report from CPWD vidhyadar nagar jaipur
132 kv gss summer training report from CPWD vidhyadar nagar jaipurramesh kumawat
 
Smart energy metering system
Smart energy metering systemSmart energy metering system
Smart energy metering systemravi kant
 
HVDC & FACTS
HVDC & FACTSHVDC & FACTS
HVDC & FACTSBrunda R
 
Fuzzy Logic Control of Hybrid Energy System
Fuzzy Logic Control of Hybrid Energy SystemFuzzy Logic Control of Hybrid Energy System
Fuzzy Logic Control of Hybrid Energy SystemSuraj Shandilya
 
Power Quality Improvement using Shunt Active Power Filter
Power Quality Improvement using Shunt Active Power FilterPower Quality Improvement using Shunt Active Power Filter
Power Quality Improvement using Shunt Active Power Filterijtsrd
 

Tendances (20)

A report on 220 kv gss mansarovar, jaipur by ravindra kumar goma
A report on 220 kv gss mansarovar, jaipur by ravindra kumar gomaA report on 220 kv gss mansarovar, jaipur by ravindra kumar goma
A report on 220 kv gss mansarovar, jaipur by ravindra kumar goma
 
PPT ON 220KV GSS
PPT ON 220KV GSSPPT ON 220KV GSS
PPT ON 220KV GSS
 
220 KV Switchyard general overview
220 KV Switchyard general overview220 KV Switchyard general overview
220 KV Switchyard general overview
 
132kv Gss report of sitapura jaipur
132kv Gss report of sitapura jaipur132kv Gss report of sitapura jaipur
132kv Gss report of sitapura jaipur
 
Rrvpnl summer-industrial-training-ajmer-in-power-line-carrier-communication
Rrvpnl summer-industrial-training-ajmer-in-power-line-carrier-communicationRrvpnl summer-industrial-training-ajmer-in-power-line-carrier-communication
Rrvpnl summer-industrial-training-ajmer-in-power-line-carrier-communication
 
Thyristor switched capacitor
Thyristor switched capacitorThyristor switched capacitor
Thyristor switched capacitor
 
Ppt on 132 kv gss by ashok khoja
Ppt on  132 kv gss  by ashok khojaPpt on  132 kv gss  by ashok khoja
Ppt on 132 kv gss by ashok khoja
 
220kV Grid Transmission Substation vt report
220kV Grid Transmission Substation vt report220kV Grid Transmission Substation vt report
220kV Grid Transmission Substation vt report
 
Unified Power Flow Controller(upfc) 2
Unified Power Flow Controller(upfc) 2Unified Power Flow Controller(upfc) 2
Unified Power Flow Controller(upfc) 2
 
220 kv gss
220 kv gss220 kv gss
220 kv gss
 
132 kv gss summer training report from CPWD vidhyadar nagar jaipur
132 kv gss summer training report from CPWD vidhyadar nagar jaipur132 kv gss summer training report from CPWD vidhyadar nagar jaipur
132 kv gss summer training report from CPWD vidhyadar nagar jaipur
 
Smart energy metering system
Smart energy metering systemSmart energy metering system
Smart energy metering system
 
Presentation On Fact Device
Presentation On Fact Device Presentation On Fact Device
Presentation On Fact Device
 
HVDC & FACTS
HVDC & FACTSHVDC & FACTS
HVDC & FACTS
 
Fuzzy Logic Control of Hybrid Energy System
Fuzzy Logic Control of Hybrid Energy SystemFuzzy Logic Control of Hybrid Energy System
Fuzzy Logic Control of Hybrid Energy System
 
Power flow analysis
Power flow analysisPower flow analysis
Power flow analysis
 
1.substation layouts
1.substation  layouts1.substation  layouts
1.substation layouts
 
Power Quality Improvement using Shunt Active Power Filter
Power Quality Improvement using Shunt Active Power FilterPower Quality Improvement using Shunt Active Power Filter
Power Quality Improvement using Shunt Active Power Filter
 
load flow 1
 load flow 1 load flow 1
load flow 1
 
132kV GSS ppt
132kV GSS ppt132kV GSS ppt
132kV GSS ppt
 

En vedette

Grid Station Construction (GSC) NTDCL
Grid Station Construction (GSC) NTDCL Grid Station Construction (GSC) NTDCL
Grid Station Construction (GSC) NTDCL MUDASSAR AFZAL
 
Laminas leyes especiales
Laminas leyes especialesLaminas leyes especiales
Laminas leyes especialesRafael Isea
 
Guestbook Hotel Tirsus Aggiornato Maggio 2012
Guestbook Hotel Tirsus Aggiornato Maggio  2012Guestbook Hotel Tirsus Aggiornato Maggio  2012
Guestbook Hotel Tirsus Aggiornato Maggio 2012hoteltirsus
 
Ussage and impediments of technology enabled services in banking sector
Ussage and impediments of technology enabled services in banking sectorUssage and impediments of technology enabled services in banking sector
Ussage and impediments of technology enabled services in banking sectorIAEME Publication
 
Nmevans presentation
Nmevans presentationNmevans presentation
Nmevans presentationjscarlson
 
Keynote capitals india morning note 08 november-12
Keynote capitals india morning note 08 november-12Keynote capitals india morning note 08 november-12
Keynote capitals india morning note 08 november-12Keynote Capitals Ltd.
 
Customer development at Value Hub
Customer development at Value HubCustomer development at Value Hub
Customer development at Value HubValueHub
 
Standard prestasi bm sk thn 2
Standard prestasi  bm sk thn 2Standard prestasi  bm sk thn 2
Standard prestasi bm sk thn 2lailihjdaud
 
Percezione: la luce ne combina di tutti i colori!
Percezione: la luce ne combina di tutti i colori!Percezione: la luce ne combina di tutti i colori!
Percezione: la luce ne combina di tutti i colori!Graziano Scotto di Clemente
 
2Q16 CBD Market Report
2Q16 CBD Market Report2Q16 CBD Market Report
2Q16 CBD Market ReportAmy Binstein
 

En vedette (16)

Grid Station Construction (GSC) NTDCL
Grid Station Construction (GSC) NTDCL Grid Station Construction (GSC) NTDCL
Grid Station Construction (GSC) NTDCL
 
Transmission lines
Transmission linesTransmission lines
Transmission lines
 
Laminas leyes especiales
Laminas leyes especialesLaminas leyes especiales
Laminas leyes especiales
 
Representation
Representation Representation
Representation
 
Guestbook Hotel Tirsus Aggiornato Maggio 2012
Guestbook Hotel Tirsus Aggiornato Maggio  2012Guestbook Hotel Tirsus Aggiornato Maggio  2012
Guestbook Hotel Tirsus Aggiornato Maggio 2012
 
Ussage and impediments of technology enabled services in banking sector
Ussage and impediments of technology enabled services in banking sectorUssage and impediments of technology enabled services in banking sector
Ussage and impediments of technology enabled services in banking sector
 
Nmevans presentation
Nmevans presentationNmevans presentation
Nmevans presentation
 
Ppt mt 1 (2)
Ppt mt 1 (2)Ppt mt 1 (2)
Ppt mt 1 (2)
 
Ejercicios de algoritmos
Ejercicios de algoritmosEjercicios de algoritmos
Ejercicios de algoritmos
 
Keynote capitals india morning note 08 november-12
Keynote capitals india morning note 08 november-12Keynote capitals india morning note 08 november-12
Keynote capitals india morning note 08 november-12
 
F.csr on stock markets
F.csr on stock marketsF.csr on stock markets
F.csr on stock markets
 
Customer development at Value Hub
Customer development at Value HubCustomer development at Value Hub
Customer development at Value Hub
 
Standard prestasi bm sk thn 2
Standard prestasi  bm sk thn 2Standard prestasi  bm sk thn 2
Standard prestasi bm sk thn 2
 
Biaya Peluang
Biaya PeluangBiaya Peluang
Biaya Peluang
 
Percezione: la luce ne combina di tutti i colori!
Percezione: la luce ne combina di tutti i colori!Percezione: la luce ne combina di tutti i colori!
Percezione: la luce ne combina di tutti i colori!
 
2Q16 CBD Market Report
2Q16 CBD Market Report2Q16 CBD Market Report
2Q16 CBD Market Report
 

Similaire à Qasim Pur colony Grid Station Multan

presentation on substation layout and BUS bar arrangement.
presentation on substation layout and BUS bar arrangement.presentation on substation layout and BUS bar arrangement.
presentation on substation layout and BUS bar arrangement.Hemendra Kumar Rajput
 
Transformer protection using microcontroller and gsm technology
Transformer protection using microcontroller and gsm technologyTransformer protection using microcontroller and gsm technology
Transformer protection using microcontroller and gsm technologyKartik Patel
 
Gayatri Engineers presentation
Gayatri Engineers presentationGayatri Engineers presentation
Gayatri Engineers presentationGayatri Engineers
 
Chapter 1 Introduction to power Electronic Devices.pdf
Chapter 1 Introduction to power Electronic Devices.pdfChapter 1 Introduction to power Electronic Devices.pdf
Chapter 1 Introduction to power Electronic Devices.pdfLiewChiaPing
 
Electric-Traction-Railways.ppt
Electric-Traction-Railways.pptElectric-Traction-Railways.ppt
Electric-Traction-Railways.pptssuserf805c8
 
TDU - Unit 02 - HVDC, FACTS and sub-stations
TDU - Unit  02 - HVDC, FACTS and sub-stations TDU - Unit  02 - HVDC, FACTS and sub-stations
TDU - Unit 02 - HVDC, FACTS and sub-stations PremanandDesai
 
powersystemprotectiondevices-161120193617 (1).pdf
powersystemprotectiondevices-161120193617 (1).pdfpowersystemprotectiondevices-161120193617 (1).pdf
powersystemprotectiondevices-161120193617 (1).pdfMonalPandey1
 
Power system protection devices
Power system protection devicesPower system protection devices
Power system protection devicesPrakash_13209
 
BASIC ELECTRO MECHANICAL ARRANGEMENTS.pptx
BASIC ELECTRO MECHANICAL ARRANGEMENTS.pptxBASIC ELECTRO MECHANICAL ARRANGEMENTS.pptx
BASIC ELECTRO MECHANICAL ARRANGEMENTS.pptxVenkataLokeshMamidis
 
Lecture 2-intro-to-switchgear
Lecture 2-intro-to-switchgearLecture 2-intro-to-switchgear
Lecture 2-intro-to-switchgearAliRaza1718
 
1590053 634881478003587500
1590053 6348814780035875001590053 634881478003587500
1590053 634881478003587500Navyasri Jiguru
 
Psoc voltage control 2018
Psoc voltage control 2018Psoc voltage control 2018
Psoc voltage control 2018Mohamed Samir
 

Similaire à Qasim Pur colony Grid Station Multan (20)

presentation on substation layout and BUS bar arrangement.
presentation on substation layout and BUS bar arrangement.presentation on substation layout and BUS bar arrangement.
presentation on substation layout and BUS bar arrangement.
 
Transformer protection using microcontroller and gsm technology
Transformer protection using microcontroller and gsm technologyTransformer protection using microcontroller and gsm technology
Transformer protection using microcontroller and gsm technology
 
Distribution System
Distribution SystemDistribution System
Distribution System
 
Gayatri Engineers presentation
Gayatri Engineers presentationGayatri Engineers presentation
Gayatri Engineers presentation
 
Introduction to PLC
Introduction to PLCIntroduction to PLC
Introduction to PLC
 
PQH 3rd chapter.pptx
PQH 3rd chapter.pptxPQH 3rd chapter.pptx
PQH 3rd chapter.pptx
 
CT & PT.pptx
CT & PT.pptxCT & PT.pptx
CT & PT.pptx
 
Chapter 1 Introduction to power Electronic Devices.pdf
Chapter 1 Introduction to power Electronic Devices.pdfChapter 1 Introduction to power Electronic Devices.pdf
Chapter 1 Introduction to power Electronic Devices.pdf
 
Electric-Traction-Railways.ppt
Electric-Traction-Railways.pptElectric-Traction-Railways.ppt
Electric-Traction-Railways.ppt
 
TDU - Unit 02 - HVDC, FACTS and sub-stations
TDU - Unit  02 - HVDC, FACTS and sub-stations TDU - Unit  02 - HVDC, FACTS and sub-stations
TDU - Unit 02 - HVDC, FACTS and sub-stations
 
powersystemprotectiondevices-161120193617 (1).pdf
powersystemprotectiondevices-161120193617 (1).pdfpowersystemprotectiondevices-161120193617 (1).pdf
powersystemprotectiondevices-161120193617 (1).pdf
 
Power system protection devices
Power system protection devicesPower system protection devices
Power system protection devices
 
EDS Unit 6.pptx
EDS Unit 6.pptxEDS Unit 6.pptx
EDS Unit 6.pptx
 
BASIC ELECTRO MECHANICAL ARRANGEMENTS.pptx
BASIC ELECTRO MECHANICAL ARRANGEMENTS.pptxBASIC ELECTRO MECHANICAL ARRANGEMENTS.pptx
BASIC ELECTRO MECHANICAL ARRANGEMENTS.pptx
 
Phase 4
Phase 4Phase 4
Phase 4
 
Lecture 2-intro-to-switchgear
Lecture 2-intro-to-switchgearLecture 2-intro-to-switchgear
Lecture 2-intro-to-switchgear
 
1590053 634881478003587500
1590053 6348814780035875001590053 634881478003587500
1590053 634881478003587500
 
Psoc voltage control 2018
Psoc voltage control 2018Psoc voltage control 2018
Psoc voltage control 2018
 
SMPS
SMPSSMPS
SMPS
 
Voltmeter
VoltmeterVoltmeter
Voltmeter
 

Dernier

High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSHigh Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSsandhya757531
 
Immutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfImmutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfDrew Moseley
 
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Sumanth A
 
11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdfHafizMudaserAhmad
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingBootNeck1
 
Levelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument methodLevelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument methodManicka Mamallan Andavar
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdfCaalaaAbdulkerim
 
Cost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionCost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionSneha Padhiar
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTESCME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTESkarthi keyan
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating SystemRashmi Bhat
 
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.elesangwon
 
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书rnrncn29
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating SystemRashmi Bhat
 
Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Coursebim.edu.pl
 
Engineering Drawing section of solid
Engineering Drawing     section of solidEngineering Drawing     section of solid
Engineering Drawing section of solidnamansinghjarodiya
 
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTFUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTSneha Padhiar
 
TEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACHTEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACHSneha Padhiar
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionMebane Rash
 
Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfModule-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfManish Kumar
 

Dernier (20)

High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSHigh Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
 
Immutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfImmutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdf
 
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
 
11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event Scheduling
 
Levelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument methodLevelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument method
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdf
 
Cost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionCost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based question
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTESCME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating System
 
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
 
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating System
 
Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Course
 
Engineering Drawing section of solid
Engineering Drawing     section of solidEngineering Drawing     section of solid
Engineering Drawing section of solid
 
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTFUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
 
TEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACHTEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACH
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of Action
 
Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfModule-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
 

Qasim Pur colony Grid Station Multan

  • 1. Introduction to Qasim pur grid Station
  • 2. Qasim pur grid Station Overview Two Sub-Transmission lines come to the Qasim-pur grid station • From New Multan 500 kv---step down----132kv • Vehari 132
  • 3.
  • 4. Main yard: • The area where substation’s equipments are installed.
  • 5. Main components of grid station: • Current transformers(CT). • Isolators. • Circuit breakers & tie breakers. • Bus bars. • Lightning arresters. • Potential transformers(PT) • Capacitor bank. • Control room. • Battery room.
  • 6. Current transformers(CT). • It is use for measuring current. • In current measuring process we take some tapping from secondary transformers, it give the minute value of current and scale of CT are design according to this minute current (200/5). • If we obtain 5A from secondary of CT then its scale indicate 200A current at its primary.
  • 8. Isolators: • It is OFF load device. • Actually it is a mechanical switch.
  • 9. Circuit breakers & tie breakers: • CB can be manual or automatic • It use to connect and disconnect circuit in case of short circuit conditions and normal conditions. • Types. • Air circuit breakers. • Oil circuit breakers. • Air blast circuit breakers. • Minimum oil circuit breakers. • SF6 circuit breakers.
  • 11. Tie circuit breakers: • It is use to energize and de energize bus bars
  • 12. Bus bars • Qasim pur grid station uses double bus bar scheme. • Advantages; • Reliable. • Any CB can be take out of service for maintenance. • Any bus can be take out of service for maintenance.
  • 14. Lightning arresters: • It is like a protecting valves. • It protect the grid station’s equipments from over voltages, surges and lightning.
  • 15. Potential transformers(PT): • It is a step down transformers. • It step down the incoming voltage up to the distributive requirement
  • 16. Power factor improvement Uses to maintain the power factor. • Power factor improving techniques; 1. Capacitor bank. 2. Synchronous condensor. 3. Phase advancer.
  • 18. Tapping(available on transformer’s HV). • it is used for voltage regulation according to requirement.
  • 19. Control room: • It consist of measuring, controlling and isolating devices. • Following devices which are use: • Relays(analogue & digital). • Circuit breakers. • Ampere meters. • Energy meters(US Aid). • Power factor meters.
  • 21. Battery room: • It consist of Dry batteries, which are connected in series. • Each battery act as 2V cell, in order to produce 110V, 55 batteries are connected in series. Importance: • It is backbone of grid station, because all controlling devices operate on DC supply, e.g relays, alarms, etc………………………