SlideShare a Scribd company logo
1 of 2
SOP & SMP

Operating Rules for Crane Operators

1. The crane should be centered over the load before starting the hoist to avoid swinging of the load
   as lifting starts. Load should not be swung by cranes to reach areas not under or within reach of
   crane.

2. Crane should be operated smoothly to avoid jerk & abrupt movements of the load. Slack must be
   taken from the sling & hoisting ropes before the load is lifted.

3. The crane hoisting ropes should be kept vertical. Crane must not be used for side pulls.

4. The area should be clear and all persons in the area aware when load is lifted. This is to be ensured
   by a warning signal while lifting, lowering & while moving. Additional warning signal to be used
   in high traffic density area.

5. The load should be checked to be certain that it is lifted high enough to clear all obstructions and
   personnel when moving.

6. Loads must not be carried over people, especially loads carried by magnets. Load or part of loads,
   held magnetically may drop. Failure in power to magnets will result in dropping of the load unless
   back up power supply is furnished.

7. Lifts should not be attempted beyond the rated load capacity of the crane, sling ropes chains etc.

8. On all capacity or near capacity loads, the hoist brakes should be tested by returning the motor
   switch or push button to the OFF position after raising the load a few inches off the floor. If the
   hoist brakes do not hold the load should be set on the floor and the crane not further operated. The
   defect should be reported immediately to the supervisor.

9. Before moving a load, load slings, load chains or other load lifting devices must be fully seated on
   the saddle of the hook.

10. The block should never be lowered below the point where less than two full wraps of the rope
    remain on the drum. Should all the rope get unwrapped from the drum, it should be rewound in
    the drum groove in the correct direction and seated properly in the groove otherwise the rope may
    get damaged and the hoist limit switch will not operate to stop the hoist in the high position

11. At no time a load should be held suspended from the crane with the power "ON" unless the
   operator is at the operator's switch. Under this condition the load should be kept as close as
   possible to the floor to minimize the possibility of an injury if the load should drop.

12. When a hitcher is used, it is the joint responsibility of the crane operator and the hitcher to see that
    hitches are secure and that all loose materials has been removed from the load before starting a
    lift.

13. Sling hooks hanging loose should not be used to lift loads (if slings hooks are not needed, they
    should be properly stored).

14. All slings or ropes should be removed from the crane hooks when not in use (Dangling slings or
    hooks hung in sling rings can inadvertently snag other objects when moving the crane).

15. The crane should not be operated if limit switches are out of order or if ropes show defects or
    wear.

16. Crane operators should not use limit switches to stop the hoist under normal operating conditions.
(These are emergency device and should not be used as operating controls).

17. Limit switch should not be blocked adjusted or disconnected in order to go higher than what
    switch will allow.

18. Electrical limit switches or warning devices should never be by passed.

19. Upper limit switches and lower limit switches should be tested in stopping the hoist at the
    beginning of each shift or as frequently as may be directed.

20. Load limit switch or overload devices must not be used to measure loads being lifted. This is an
    emergency switching device and is not to be used as a production operating control.

21. A crane should never move or bump another crane that has a warning signal displayed.

22. Contact with runway stops or other cranes shall be made with extreme caution. The operator must
    take particular care for the safety of persons on or below the crane and only after making certain
    that persons on the other cranes are aware of what is being done.

23. If plugging protector is not provided, the controller must always be stopped momentarily in OFF
     position before reversing (A slight pause is necessary to give the braking mechanism time to
     operate).

24. In case of an emergency or swing inspection, repairing, cleaning or lubricating a warning sign or
    signal should be displayed and the main switch should be locked in OFF position.

25. An attempt should never be made to close a switch that has an OUT OF ORDER or DO NOT
     OPERATE card on it. It is necessary to make a careful check to determine that no one else is
     working on crane, before removing the card.

26. If the electrical power is disrupted, the controllers must be placed in OFF position and kept there
     until power is again available.

27. Before closing main or emergency switches, all controllers must be in OFF position before
     reversing except to avoid accidents (a slight pause is necessary to give the braking mechanism
     time to operate)

28. Before leaving the crane the operator should perform the following:

a. Raise all hooks to an intermediate position.

b. Spot the crane at an approved designated location

c.   Place all controls in OFF position.

d.   Open the main switch to the OFF position,.

e. Make visual check before leaving the crane.

More Related Content

What's hot

Electrical overhead crane safety
Electrical overhead crane safetyElectrical overhead crane safety
Electrical overhead crane safetyaliashraf mohammady
 
8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templates8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templatesDwarika Bhushan Sharma
 
Permit to work training
Permit to work trainingPermit to work training
Permit to work trainingKarnav Rana
 
A Part 6 Lifting Operations
A  Part 6 Lifting OperationsA  Part 6 Lifting Operations
A Part 6 Lifting OperationsJames McCann
 
Forklift Operator Safety Training by Platteville
Forklift Operator Safety Training by PlattevilleForklift Operator Safety Training by Platteville
Forklift Operator Safety Training by PlattevilleAtlantic Training, LLC.
 
Risk assessment for testing & commissioning of cranes
Risk assessment for  testing & commissioning of cranesRisk assessment for  testing & commissioning of cranes
Risk assessment for testing & commissioning of cranesAzmeel Contracting Company
 
Safety handbook Saudi Aramco BY Muhammad Fahad Ansari 12IEEM14
Safety handbook Saudi Aramco  BY Muhammad Fahad Ansari  12IEEM14Safety handbook Saudi Aramco  BY Muhammad Fahad Ansari  12IEEM14
Safety handbook Saudi Aramco BY Muhammad Fahad Ansari 12IEEM14fahadansari131
 
Job safety analysis
Job safety analysis Job safety analysis
Job safety analysis soumenmakar
 
Safety in mechanical maintenance
Safety in mechanical  maintenanceSafety in mechanical  maintenance
Safety in mechanical maintenancePrasadroshan Mythin
 
LOTO Training
LOTO TrainingLOTO Training
LOTO TrainingCM Tiwari
 

What's hot (20)

Lifting Operation Safety ppt.pptx
Lifting Operation Safety ppt.pptxLifting Operation Safety ppt.pptx
Lifting Operation Safety ppt.pptx
 
Crane Operation - Lifting
Crane Operation -  LiftingCrane Operation -  Lifting
Crane Operation - Lifting
 
Electrical overhead crane safety
Electrical overhead crane safetyElectrical overhead crane safety
Electrical overhead crane safety
 
8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templates8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templates
 
Permit to work training
Permit to work trainingPermit to work training
Permit to work training
 
Overhead Crane
Overhead CraneOverhead Crane
Overhead Crane
 
A Part 6 Lifting Operations
A  Part 6 Lifting OperationsA  Part 6 Lifting Operations
A Part 6 Lifting Operations
 
Forklift Operator Safety Training by Platteville
Forklift Operator Safety Training by PlattevilleForklift Operator Safety Training by Platteville
Forklift Operator Safety Training by Platteville
 
Mobile crane
Mobile craneMobile crane
Mobile crane
 
Risk assessment for testing & commissioning of cranes
Risk assessment for  testing & commissioning of cranesRisk assessment for  testing & commissioning of cranes
Risk assessment for testing & commissioning of cranes
 
Safety handbook Saudi Aramco BY Muhammad Fahad Ansari 12IEEM14
Safety handbook Saudi Aramco  BY Muhammad Fahad Ansari  12IEEM14Safety handbook Saudi Aramco  BY Muhammad Fahad Ansari  12IEEM14
Safety handbook Saudi Aramco BY Muhammad Fahad Ansari 12IEEM14
 
Lifting & Rigging Safety.pptx
Lifting & Rigging Safety.pptxLifting & Rigging Safety.pptx
Lifting & Rigging Safety.pptx
 
Lifting Operation.ppt
Lifting Operation.pptLifting Operation.ppt
Lifting Operation.ppt
 
Work safe with grinder
Work safe with grinderWork safe with grinder
Work safe with grinder
 
Job safety analysis
Job safety analysis Job safety analysis
Job safety analysis
 
Forklift training
Forklift training Forklift training
Forklift training
 
Safety in mechanical maintenance
Safety in mechanical  maintenanceSafety in mechanical  maintenance
Safety in mechanical maintenance
 
LOTO Training
LOTO TrainingLOTO Training
LOTO Training
 
Working at height slides
Working at height slidesWorking at height slides
Working at height slides
 
Forklift training
Forklift trainingForklift training
Forklift training
 

Similar to Standard Operating Practices (SOPs) and Standard Maintenance Practices (SMPs) , By B C Das

1910.179 osha class
1910.179 osha class1910.179 osha class
1910.179 osha classBill Brown
 
WINCH-SAFETY-TRAINING-ppt.pdf
WINCH-SAFETY-TRAINING-ppt.pdfWINCH-SAFETY-TRAINING-ppt.pdf
WINCH-SAFETY-TRAINING-ppt.pdfssuser54b5c5
 
overhead_crane_operator_safety_manual.ppt
overhead_crane_operator_safety_manual.pptoverhead_crane_operator_safety_manual.ppt
overhead_crane_operator_safety_manual.pptNeerajTiwari965955
 
overhead_crane_operator_safety_manual.ppt
overhead_crane_operator_safety_manual.pptoverhead_crane_operator_safety_manual.ppt
overhead_crane_operator_safety_manual.pptGeneralCommunication1
 
Train the trainer overhead Cranes operation training
Train the trainer overhead Cranes operation training  Train the trainer overhead Cranes operation training
Train the trainer overhead Cranes operation training BILL Bill Brown
 
Crane operator safety procedure
Crane operator safety procedureCrane operator safety procedure
Crane operator safety procedureAbdul Shukur
 
Mining Accident alerts 2016 Safety Training
Mining Accident alerts 2016 Safety TrainingMining Accident alerts 2016 Safety Training
Mining Accident alerts 2016 Safety TrainingKevin Zahner
 
HSE-BMS-011 Crane & Lifting Safety.ppt...
HSE-BMS-011 Crane & Lifting Safety.ppt...HSE-BMS-011 Crane & Lifting Safety.ppt...
HSE-BMS-011 Crane & Lifting Safety.ppt...AhmedAliKhan38
 
Safe lifting practices
Safe lifting practicesSafe lifting practices
Safe lifting practicesViktor Bily
 
Mechanical Handling updated.ppt
Mechanical Handling updated.pptMechanical Handling updated.ppt
Mechanical Handling updated.pptCheDillon1
 
Aerial_Lift_1.ppt
Aerial_Lift_1.pptAerial_Lift_1.ppt
Aerial_Lift_1.pptWaqasSidhu4
 
Overhead-Cranes safety training.ppt
Overhead-Cranes safety training.pptOverhead-Cranes safety training.ppt
Overhead-Cranes safety training.pptRazFazwan
 
New holland d255 crawler dozer service repair manual
New holland d255 crawler dozer service repair manualNew holland d255 crawler dozer service repair manual
New holland d255 crawler dozer service repair manualdueikdkmem
 
Truck crane training bill brown
Truck crane training bill brownTruck crane training bill brown
Truck crane training bill brownBill Brown
 
S ky jack_scissorlift_manlift
S ky jack_scissorlift_manliftS ky jack_scissorlift_manlift
S ky jack_scissorlift_manliftPunya Benja
 

Similar to Standard Operating Practices (SOPs) and Standard Maintenance Practices (SMPs) , By B C Das (20)

1910.179 osha class
1910.179 osha class1910.179 osha class
1910.179 osha class
 
WINCH-SAFETY-TRAINING-ppt.pdf
WINCH-SAFETY-TRAINING-ppt.pdfWINCH-SAFETY-TRAINING-ppt.pdf
WINCH-SAFETY-TRAINING-ppt.pdf
 
overhead_crane_operator_safety_manual.ppt
overhead_crane_operator_safety_manual.pptoverhead_crane_operator_safety_manual.ppt
overhead_crane_operator_safety_manual.ppt
 
overhead_crane_operator_safety_manual.ppt
overhead_crane_operator_safety_manual.pptoverhead_crane_operator_safety_manual.ppt
overhead_crane_operator_safety_manual.ppt
 
Train the trainer overhead Cranes operation training
Train the trainer overhead Cranes operation training  Train the trainer overhead Cranes operation training
Train the trainer overhead Cranes operation training
 
Crane operator safety procedure
Crane operator safety procedureCrane operator safety procedure
Crane operator safety procedure
 
Mining Accident alerts 2016 Safety Training
Mining Accident alerts 2016 Safety TrainingMining Accident alerts 2016 Safety Training
Mining Accident alerts 2016 Safety Training
 
HSE-BMS-011 Crane & Lifting Safety.ppt...
HSE-BMS-011 Crane & Lifting Safety.ppt...HSE-BMS-011 Crane & Lifting Safety.ppt...
HSE-BMS-011 Crane & Lifting Safety.ppt...
 
Loading and unloading white
Loading and unloading whiteLoading and unloading white
Loading and unloading white
 
Safe lifting practices
Safe lifting practicesSafe lifting practices
Safe lifting practices
 
Cranes hoists 2010
Cranes  hoists 2010Cranes  hoists 2010
Cranes hoists 2010
 
Mechanical Handling updated.ppt
Mechanical Handling updated.pptMechanical Handling updated.ppt
Mechanical Handling updated.ppt
 
Aerial_Lift_1.ppt
Aerial_Lift_1.pptAerial_Lift_1.ppt
Aerial_Lift_1.ppt
 
Overhead-Cranes safety training.ppt
Overhead-Cranes safety training.pptOverhead-Cranes safety training.ppt
Overhead-Cranes safety training.ppt
 
New holland d255 crawler dozer service repair manual
New holland d255 crawler dozer service repair manualNew holland d255 crawler dozer service repair manual
New holland d255 crawler dozer service repair manual
 
Truck crane training bill brown
Truck crane training bill brownTruck crane training bill brown
Truck crane training bill brown
 
ESF1 Piling Vibrator - Operating instructions
ESF1 Piling Vibrator - Operating instructionsESF1 Piling Vibrator - Operating instructions
ESF1 Piling Vibrator - Operating instructions
 
Operating Instruction for THE ESF03 Piling Vibrator
Operating Instruction for THE ESF03 Piling VibratorOperating Instruction for THE ESF03 Piling Vibrator
Operating Instruction for THE ESF03 Piling Vibrator
 
safe lift EMERSON EDUARDO RODRIGUES
safe lift EMERSON EDUARDO RODRIGUESsafe lift EMERSON EDUARDO RODRIGUES
safe lift EMERSON EDUARDO RODRIGUES
 
S ky jack_scissorlift_manlift
S ky jack_scissorlift_manliftS ky jack_scissorlift_manlift
S ky jack_scissorlift_manlift
 

More from Bimal Chandra Das

More from Bimal Chandra Das (20)

EMPLOYEE PARTICIPATION IN SAFETY.pdf
EMPLOYEE PARTICIPATION IN SAFETY.pdfEMPLOYEE PARTICIPATION IN SAFETY.pdf
EMPLOYEE PARTICIPATION IN SAFETY.pdf
 
construction macheinery Safety.pdf
construction macheinery Safety.pdfconstruction macheinery Safety.pdf
construction macheinery Safety.pdf
 
INTRODUCTION TO SAFETY.pdf
INTRODUCTION TO SAFETY.pdfINTRODUCTION TO SAFETY.pdf
INTRODUCTION TO SAFETY.pdf
 
IS 14489 Q.doc
IS 14489 Q.docIS 14489 Q.doc
IS 14489 Q.doc
 
Safety Audit as per IS 14489.ppt
Safety Audit as per IS 14489.pptSafety Audit as per IS 14489.ppt
Safety Audit as per IS 14489.ppt
 
Indian Electricity Act 1910.pdf
Indian  Electricity  Act 1910.pdfIndian  Electricity  Act 1910.pdf
Indian Electricity Act 1910.pdf
 
Indian electricity IE RULES 1956.pdf
Indian electricity  IE RULES 1956.pdfIndian electricity  IE RULES 1956.pdf
Indian electricity IE RULES 1956.pdf
 
ACT&RULE West Bengal.ppt
ACT&RULE West Bengal.pptACT&RULE West Bengal.ppt
ACT&RULE West Bengal.ppt
 
Factories -ACT & RULE.ppt
Factories -ACT &  RULE.pptFactories -ACT &  RULE.ppt
Factories -ACT & RULE.ppt
 
Contractor's _obligation.ppt
Contractor's _obligation.pptContractor's _obligation.ppt
Contractor's _obligation.ppt
 
SAFETY COMMITTEE.pdf
SAFETY COMMITTEE.pdfSAFETY COMMITTEE.pdf
SAFETY COMMITTEE.pdf
 
Check List for Crane Inspection.pdf
Check List for Crane Inspection.pdfCheck List for Crane Inspection.pdf
Check List for Crane Inspection.pdf
 
COST OF ACCIDENT.ppt
COST OF ACCIDENT.pptCOST OF ACCIDENT.ppt
COST OF ACCIDENT.ppt
 
Plant ; equipment dismantling of scaffold
Plant ; equipment dismantling of scaffoldPlant ; equipment dismantling of scaffold
Plant ; equipment dismantling of scaffold
 
Safety in use of ladder
Safety in use of ladderSafety in use of ladder
Safety in use of ladder
 
Check list for conveyor belt inspection
Check list for conveyor belt inspectionCheck list for conveyor belt inspection
Check list for conveyor belt inspection
 
Selection of safety appliances
Selection of safety appliancesSelection of safety appliances
Selection of safety appliances
 
Risk
RiskRisk
Risk
 
Safety education and training
Safety education and trainingSafety education and training
Safety education and training
 
Use of PPEs
Use of PPEsUse of PPEs
Use of PPEs
 

Recently uploaded

Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application ) Sakshi Ghasle
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppCeline George
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpinRaunakKeshri1
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxRoyAbrique
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 

Recently uploaded (20)

Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application )
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website App
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpin
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 

Standard Operating Practices (SOPs) and Standard Maintenance Practices (SMPs) , By B C Das

  • 1. SOP & SMP Operating Rules for Crane Operators 1. The crane should be centered over the load before starting the hoist to avoid swinging of the load as lifting starts. Load should not be swung by cranes to reach areas not under or within reach of crane. 2. Crane should be operated smoothly to avoid jerk & abrupt movements of the load. Slack must be taken from the sling & hoisting ropes before the load is lifted. 3. The crane hoisting ropes should be kept vertical. Crane must not be used for side pulls. 4. The area should be clear and all persons in the area aware when load is lifted. This is to be ensured by a warning signal while lifting, lowering & while moving. Additional warning signal to be used in high traffic density area. 5. The load should be checked to be certain that it is lifted high enough to clear all obstructions and personnel when moving. 6. Loads must not be carried over people, especially loads carried by magnets. Load or part of loads, held magnetically may drop. Failure in power to magnets will result in dropping of the load unless back up power supply is furnished. 7. Lifts should not be attempted beyond the rated load capacity of the crane, sling ropes chains etc. 8. On all capacity or near capacity loads, the hoist brakes should be tested by returning the motor switch or push button to the OFF position after raising the load a few inches off the floor. If the hoist brakes do not hold the load should be set on the floor and the crane not further operated. The defect should be reported immediately to the supervisor. 9. Before moving a load, load slings, load chains or other load lifting devices must be fully seated on the saddle of the hook. 10. The block should never be lowered below the point where less than two full wraps of the rope remain on the drum. Should all the rope get unwrapped from the drum, it should be rewound in the drum groove in the correct direction and seated properly in the groove otherwise the rope may get damaged and the hoist limit switch will not operate to stop the hoist in the high position 11. At no time a load should be held suspended from the crane with the power "ON" unless the operator is at the operator's switch. Under this condition the load should be kept as close as possible to the floor to minimize the possibility of an injury if the load should drop. 12. When a hitcher is used, it is the joint responsibility of the crane operator and the hitcher to see that hitches are secure and that all loose materials has been removed from the load before starting a lift. 13. Sling hooks hanging loose should not be used to lift loads (if slings hooks are not needed, they should be properly stored). 14. All slings or ropes should be removed from the crane hooks when not in use (Dangling slings or hooks hung in sling rings can inadvertently snag other objects when moving the crane). 15. The crane should not be operated if limit switches are out of order or if ropes show defects or wear. 16. Crane operators should not use limit switches to stop the hoist under normal operating conditions.
  • 2. (These are emergency device and should not be used as operating controls). 17. Limit switch should not be blocked adjusted or disconnected in order to go higher than what switch will allow. 18. Electrical limit switches or warning devices should never be by passed. 19. Upper limit switches and lower limit switches should be tested in stopping the hoist at the beginning of each shift or as frequently as may be directed. 20. Load limit switch or overload devices must not be used to measure loads being lifted. This is an emergency switching device and is not to be used as a production operating control. 21. A crane should never move or bump another crane that has a warning signal displayed. 22. Contact with runway stops or other cranes shall be made with extreme caution. The operator must take particular care for the safety of persons on or below the crane and only after making certain that persons on the other cranes are aware of what is being done. 23. If plugging protector is not provided, the controller must always be stopped momentarily in OFF position before reversing (A slight pause is necessary to give the braking mechanism time to operate). 24. In case of an emergency or swing inspection, repairing, cleaning or lubricating a warning sign or signal should be displayed and the main switch should be locked in OFF position. 25. An attempt should never be made to close a switch that has an OUT OF ORDER or DO NOT OPERATE card on it. It is necessary to make a careful check to determine that no one else is working on crane, before removing the card. 26. If the electrical power is disrupted, the controllers must be placed in OFF position and kept there until power is again available. 27. Before closing main or emergency switches, all controllers must be in OFF position before reversing except to avoid accidents (a slight pause is necessary to give the braking mechanism time to operate) 28. Before leaving the crane the operator should perform the following: a. Raise all hooks to an intermediate position. b. Spot the crane at an approved designated location c. Place all controls in OFF position. d. Open the main switch to the OFF position,. e. Make visual check before leaving the crane.