ON THE SAME PAGE Sye presentation 2014

ON THE SAME PAGE
Liz LeBlanc, Simon Søgnen Tveit, Line T. Bogen, Rickard Jensen
8 December 2014
Sykehjemsetaten
Oslo Kommune
Systems Oriented Design Fall 2014
A project in partnership with:
ON THE SAME PAGE // Final Presentation 8.12.14
INTRODUCTION
SHORT & LONG TERM
MITT HJEM HELSE HUS
ON THE SAME PAGE // Final Presentation 8.12.14
MOVING VIDEO
ON THE SAME PAGE // Final Presentation 8.12.14
PROJECT LANDSCAPE
NORD
BYDEL
HELSEHUS
MITT HJEM
HJEMMETJENESTE
SENTRUM VEST SØR
BESTILLERKONTORET
ON THE SAME PAGE // Final Presentation 8.12.14
FINAL COMMUNICATION TOOL
ON THE SAME PAGE // Final Presentation 8.12.14
FIRST CHAT WITH SYE
ON THE SAME PAGE // Final Presentation 8.12.14
RUNNING INTO THE WOODS
Bjørn
AHUS
Marit
Alna 

Bestillerkontoret
Teresa
Solvang
Honey Fee
Lilleborg
Bente
Grorud 

Hjemmetjeneste
ON THE SAME PAGE // Final Presentation 8.12.14
MAIN TAKE AWAYS
Effects of
Reform
Lack of
Communication
Nothing is
standard
ON THE SAME PAGE // Final Presentation 8.12.14
MAIN TAKE AWAYS
Effects of
Reform
Lack of
Communication
Nothing is
standard
ON THE SAME PAGE // Final Presentation 8.12.14
MAIN TAKE AWAYS
Effects of
Reform
Lack of
Communication
Nothing is
standard
ON THE SAME PAGE // Final Presentation 8.12.14
FIRST BIG MAP
ON THE SAME PAGE // Final Presentation 8.12.14
FOUR DESIGN DIRECTIONS
Keeping people at home
Dynamics within the Helsehus
Evaluation Process
Organizational Structure
impact radius
ripple effect
ON THE SAME PAGE // Final Presentation 8.12.14
FOUR DESIGN DIRECTIONS
Keeping people at home
Dynamics within the Helsehus
Evaluation Process
Organizational Structure
medium medium
ON THE SAME PAGE // Final Presentation 8.12.14
FOUR DESIGN DIRECTIONS
Keeping people at home
Dynamics within the Helsehus
Evaluation Process
Organizational Structure
small high
ON THE SAME PAGE // Final Presentation 8.12.14
FOUR DESIGN DIRECTIONS
Keeping people at home
Dynamics within the Helsehus
Evaluation Process
Organizational Structure
high high
ON THE SAME PAGE // Final Presentation 8.12.14
FOUR DESIGN DIRECTIONS
Keeping people at home
Dynamics within the Helsehus
Evaluation Process
Organizational Structure
high high
ON THE SAME PAGE // Final Presentation 8.12.14
THE INSIGHTS BOOK
ON THE SAME PAGE // Final Presentation 8.12.14
WHAT ABOUT NOW?
SEPTEMBER
OCTOBER
NOVEMBER
DECEMBER
SATURDAY SUNDAY MONDAY TUESDAY FRIDAY SATURDAY SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY SUNDAY SUNDAYMONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
| |Systems Oriented Design (SOD) |Autumn 2014
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Milestone presentations
AHO WORKS EXHIBITION
09:00 - 16:00
Big & Small
Auditorium
Final
Presentations.
Invite your
project
partners.
Exhibition is part of the
evaluation.
(price for best
exhibition)
09:00 - 16:00
Big & Small
Auditorium
Exhibition
space
presentation.
Exhibition is part of the
evaluation.
(price for best
exhibition)
Exhibition
Setup
Exhibition
Setup
WEDNESDAY THURSDAY FRIDAY
MONDAY TUESDAYMONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY SUNDAY SUNDAYMONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
SATURDAY SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY
MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY
09:00 - 16:00
Group Room 4&5
Elevator Pitch.
Implementation.
3 posters.
(Pecha Kucha
Format - 20 slides
and 20 seconds
each slide)
09:00 - 16:00
Tegnesal 9
Rich Design
Space and 3
elevator pitch
posters.
09:00 - 16:00
Reverse
Archaeology
Presentation.
The future systems
landscape.
09:00 - 16:00
Tegnesal 9
giga map
presentations
of future
systems.
Proposed
Day
Stakeholder
Workshop
Making DeliverablesConcept DevelopmentInsight Work Testing & Iterations
WEDNESDAY THURSDAY
Decision
Day:
Narrow
Down Scope
Decision
Day:
Individual
Problems
Defined
Decision Day:
Final
Deliverables
Determined
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
ON THE SAME PAGE // Final Presentation 8.12.14
BLENDING
THEIR
HOMEMADE
SYSTEM
AND OUR
EXPERTISE
ON THE SAME PAGE // Final Presentation 8.12.14
MAKING SENSE OF IT ALL
ON THE SAME PAGE // Final Presentation 8.12.14
September October November December January
2015 2016
February March April May June July August September October November December January
October
2015
27 1714 9 22
Hoveseter Smestad Sofienberg
7 5
Romsås Grunerløkka
3221 6 917 17 5 16 17
Majorstua Kingosgate
28
Rødtvet Ammerud
2023
FurusetMadserudLambertseter Lillohjemmet Akerselva
17
Akerselva
Vålerenga
29 927 26 10 19 20178
8
13961513
Moving Patients
& Staff Between
Nursing Homes
HOW TO READ THIS MAP
The top portion also shows staff that will need to move in order to fill
the needs of the new patient population. The bottom portion shows
the different type of patients that will be relocated. This lower portion is
based on a time line over the next 14 months.
For example:
Akerselva, a newly long term facility is
moving 17 regular short term patients
spaces to Lilleborg, a new short term
home, or Helse Hus. They are also
receiving 8, regular long term places
in return. Akerselva will send 14.26
FTEs to Lilleborg to assist with this
new patient population. Akerselva will
receive 8 FTEs from Lillohjemmet
because they cannot send patients
to Tåsen, because it is privately held.
MAP LEGEND
POINTS OF INTEREST
Lambertseter
MovingStaffMovingPatients
Langerud
Abildsø
Furuset
Ammerud
Rødtvet
Romsås Madserud
Smestad
Majorstua
Lillohjemmet
Vålerenga
Sofienberg
Kingosgate
Grunerløkka
Akerselva
41
28
33
51.6
1.75
13
14
3.9
14.26
7
24.26
7
44.66
24
6.4
9
8
Lillohjemmet
8
RYEN SOLVANG TÅSEN LILLEBORG
LILLEBORG
Akerselva 14.26
Short Term Patients Long Term Patients
Facilities
Staff
Ordinary RehabRus Ordinary Intensive Care
Unspecified Specialty
UDI
Direction of the move:
Origin Destination
Number of
Patients or
FTEs
17
Public Long Term Home
Private Long Term Home PRIVATE SHORT TERM
PUBLIC SHORT TERM
A
A
B
BB
A
Romsås is becoming private and the Oslo Kommune wants to keep substance
abuse treatment competences within the public sector. This means that the
employees with this special training must also move into Ryen before the
privatization is finalized.
B
Tåsen is private so employees will have to find a new place to work after the
short term patients leave. They will have to move into a different quadrant of the
city to find work at a short term facility, as there is only one health house for each.
D
C C C C C
C
These matches may seem equal, but remember that short term and long term
patients require very different needs. Between Grunerløkka and Lilleborg they
switch the correct amount of FTEs to match the patient move. The other four
are between public and private homes, which makes it difficult to move staff.
D
While the moves have individual deadlines over the next 14 months, the patients
and employees could be moved at any time before their date. The markers here
are spread out in the month prior to their deadline. For instance, a move that
should happen before June 1 2015 looks like it will take place in May 2015.
E
E
FTEs may look easy to trade back and forth, but this does not yet take into
account the different competence such as rehabilitation, physical or ergo
therapies, nurses, or non-medical staff.
Note: There are some exceptions to this moving system. Some patients are moving between long term facilities due to
special medical needs. These are not listed on this version but will be added later on in the project. This map reflects the
knowledge we have as of October 14, 2014 and is subject to change.
FIRST VERSION OF THE MAP
September October November December January
2015 2016
February March April May June July August September October November December January
October
2015
27 1714 9 22
Hoveseter Smestad Sofienberg
7 5
Romsås Grunerløkka
3221 6 917 17 5 16 17
Majorstua Kingosgate
28
Rødtvet Ammerud
2023
FurusetMadserudLambertseter Lillohjemmet Akerselva
17
Akerselva
Vålerenga
29 927 26 10 19 20178
8
13961513
Moving Patients
& Staff Between
Nursing Homes
HOW TO READ THIS MAP
The top portion also shows staff that will need to move in order to fill
the needs of the new patient population. The bottom portion shows
the different type of patients that will be relocated. This lower portion is
based on a time line over the next 14 months.
For example:
Akerselva, a newly long term facility is
moving 17 regular short term patients
spaces to Lilleborg, a new short term
home, or Helse Hus. They are also
receiving 8, regular long term places
in return. Akerselva will send 14.26
FTEs to Lilleborg to assist with this
new patient population. Akerselva will
receive 8 FTEs from Lillohjemmet
because they cannot send patients
to Tåsen, because it is privately held.
MAP LEGEND
POINTS OF INTEREST
Lambertseter
MovingStaffMovingPatients
Langerud
Abildsø
Furuset
Ammerud
Rødtvet
Romsås Madserud
Smestad
Majorstua
Lillohjemmet
Vålerenga
Sofienberg
Kingosgate
Grunerløkka
Akerselva
41
28
33
51.6
1.75
13
14
3.9
14.26
7
24.26
7
44.66
24
6.4
9
8
Lillohjemmet
8
RYEN SOLVANG TÅSEN LILLEBORG
LILLEBORG
Akerselva 14.26
Short Term Patients Long Term Patients
Facilities
Staff
Ordinary RehabRus Ordinary Intensive Care
Unspecified Specialty
UDI
Direction of the move:
Origin Destination
Number of
Patients or
FTEs
17
Public Long Term Home
Private Long Term Home PRIVATE SHORT TERM
PUBLIC SHORT TERM
A
A
B
BB
A
Romsås is becoming private and the Oslo Kommune wants to keep substance
abuse treatment competences within the public sector. This means that the
employees with this special training must also move into Ryen before the
privatization is finalized.
B
Tåsen is private so employees will have to find a new place to work after the
short term patients leave. They will have to move into a different quadrant of the
city to find work at a short term facility, as there is only one health house for each.
D
C C C C C
C
These matches may seem equal, but remember that short term and long term
patients require very different needs. Between Grunerløkka and Lilleborg they
switch the correct amount of FTEs to match the patient move. The other four
are between public and private homes, which makes it difficult to move staff.
D
While the moves have individual deadlines over the next 14 months, the patients
and employees could be moved at any time before their date. The markers here
are spread out in the month prior to their deadline. For instance, a move that
should happen before June 1 2015 looks like it will take place in May 2015.
E
E
FTEs may look easy to trade back and forth, but this does not yet take into
account the different competence such as rehabilitation, physical or ergo
therapies, nurses, or non-medical staff.
Note: There are some exceptions to this moving system. Some patients are moving between long term facilities due to
special medical needs. These are not listed on this version but will be added later on in the project. This map reflects the
knowledge we have as of October 14, 2014 and is subject to change.
ON THE SAME PAGE // Final Presentation 8.12.14
PUT YOUR FINGER ON IT
ON THE SAME PAGE // Final Presentation 8.12.14
WE REALIZED
WE WERE
LOOKING
TOO FAR
AHEAD.
ON THE SAME PAGE // Final Presentation 8.12.14
PUT YOUR FINGER ON IT
ON THE SAME PAGE // Final Presentation 8.12.14
THE TOOL 1.0
ON THE SAME PAGE // Final Presentation 8.12.14
ITERATE & IMPROVE
ON THE SAME PAGE // Final Presentation 8.12.14
ADDING STRUCTURE
Post2
Korttid1
RUS
Post4
Post5
Bydel Østensjø
Post4
Bydel Østensjo
Post3
Bydel Nordstrand
og RUS
Post2 avd 4
Bydel Østensjø og Søndre Nordstrand
Post1
Bydel Nordstrand
September October November
November
December January
2015 2016
February March April May June July August September October November December January
Establishing
RYEN helsehus
HOW TO READ THIS MAP
The middle portion is illustrating how Ryen helsehus will arragne their
patiens during the move. On the left and right side you will find the
actors involved in the relocation. The timeline on the bottom shows the
tentative schedule.
HOW TO READ THE TIMELINE
The timeline keeps track on important dates regarding the different
movingprocesses.
MAP LEGEND
POINTS OF INTEREST
Short Term Patients Long Term Patients
Facilities
Staff
Ordinary RehabRus Ordinary Intensive Care
Unspecified Specialty
UDI
Direction of the move:
Origin Destination
Number of
Patients or FTEs
17
Public Long Term Home
Private Long Term Home PRIVATE SHORT TERM
PUBLIC SHORT TERM
A
A
C
One department moving from Abildsø to Ryen.
Dpt. 5 at Ryen can only house 26 patients. 3 groups will fit in at dpt. 5.
One group of 8 patients from abildsø will move in to dpt. 2.
Staff will follow patients.
B
Abildsø is getting 6 intensive care patients from Tåsen.
Tåsen iss is run by private - employees will not follow.
Abildsø might need some physical adjustments to their interiour plans before they
can take in the patients from tåsen. The possebility of encreasing the number from 6
to 8 int. care patients is being explored. This may cause less rebuilding at Abildsø as
they may arrange their parients differently. BUT this means economic impact!
C
Internal relocation at Ryen.
Patients from borough Nordstrand are moved from post 3 to post 1,
to make room for the dpt. for RUS.
Post 3 is the most suitble location for the RUS dpt. due to interiour solutions, being
separated from other patientgroups, facilities as smokingroom and so on.
D
D
Lambertseter - Ryen move should happen before the the daily operations of
Lamberseter nursing home is taken over by private business
Lambertseter
Abildsø Langerud
Romsås
A
26
16
16
7
7
23
16
26
6
8
13
12.1111.1110.11
A3 move to
A1
CLEAN and
make ready
for RUS to
move in to
A3
Clear out
A1 - CLEAN
RUS moving
IN to A3 Ryen
B
RYEN
30LT
BESKRIVE ANSATTE I PROTOKOLL
ansatte med turnus overflyttes
Abilds post 2 gr 4
5.46 årsverk renregna - ikke reel
etter prinsipp om gruppeflytt
HR systemet GAT:
Hvem + f.nr.
stilling
stillingsprosent
vedlegg er oversikt over ansatte.
3 gr ansatte flytter med turnus
hjelpeturnus?? midlertidig“overlapp”
Birgit: kan ikke bare flytteog endra arb
tid. beholde turus - varsling - dag/kveld
Varsel for endring. si opp turnus etter
regler+lage ny. 2uker varsel.
finregnet: 20.28
årsverk
til post 2 gr 1,2,3
20.70 årsverk med
turnus
ink leder
flytte avdeling
ikke finregne på årsverk
telle eksisterende årsverk - justere etterhvert!
minus leger fysio ergo renhold
Hjelpeturnus for 3 + 1 gruppe.
Wenche og Birgit setter opp for Ryen
Bygg endring Abildsø:
penger
hvem
hva -
SKJERMA:
armerte glassvegger
hindre hopp. doku stasjoner.
ulåst hus - trenger gjerde
HelgeMorten, Sølvi, Bente
prioritet!! Steinar fransen på befaring
FORSTERKET:
en gruppe i uka - skjermet
gr. 1,2,3,4. ALT fra post 2 Abildsø.
prosjektgrupper som håndterer flytt.
sammen med Nina - Formidl.
17. nov ferdig til 14 .desember
varsle bydel
østensjo
søndre nordstrand
KONTAKTPERSONER
OPPRETTE/AVSLUTTE
senger i gerica; Nina
TRANSPORT:
Ansvar?? - institusjonene.
Prosjektleder kan hjelpe til -
ABILDSØ sjekker og informerer. Tar ansvar for dette.
noen trenger ambulanse
kjørekontor: foresp bidrag
logistikkplan
pasienttransport
Flyttelass - ting og tang priv - sykehjem sjekker
pårørende hjelp
LT har til og med stooore sofaer!!
Korttid 1 Abilds 16 spydspiss
ansatte: 0,78x16 - 12,48 årsverk (xxx realitet)
Hele pakka flytter. uten legel. ikke hjelpeturnus
Avd 4 post 2 Ryen 8 ord. somatisk langtid
ansatte: uten leder.
Abildsø må lage hjelpeturnus.
Abildsø ønsker en 100% vakant hjelpestilling på
skjerma. Om ryen kan legge til rette for dette:)
Flytt i samme periode - tentativt
ON THE SAME PAGE Sye presentation 2014
ON THE SAME PAGE // Final Presentation 8.12.14
FINAL COMMUNICATION TOOL
ON THE SAME PAGE // Final Presentation 8.12.14
MAP TEMPLATE
ON THE SAME PAGE // Final Presentation 8.12.14
HOW IT IS USED
email meeting update
email
repeat
ON THE SAME PAGE // Final Presentation 8.12.14
IMMEDIATE IMPACT
Everyone working on their own papers
Coming late to the meeting
Talking past each other
Communicating to other employees
BEFORE
AFTER
ON THE SAME PAGE // Final Presentation 8.12.14
TOTAL DELIVERABLES
The communication tool
The maps for them to reference
The workshops
Insight book and poster
ON THE SAME PAGE // Final Presentation 8.12.14
Insight book and poster
TOTAL DELIVERABLES
The communication tool
The maps for them to reference
The workshops
September October November December January
2015
February March April May June July August September
14 9
Hoveseter SmestadAbildsø Kingosgate Langerud
197 5
Romsås Grunerløkka
21 6 7 4117 17 1613
Majorstua
31
Rødtvet Ammerud
23 323
MadserudLambertseter LillohjemmAkerselva
2912 927 31 10 1661513 3232
Lambertseter
FlyttingavansatteFlyttingavplasser/pasienter
Langerud
Abildsø
Furuset
Ammerud
Rødtvet
RomsåsRomsås Madserud
Smestad
Majorstua
Lillohjemmet40
28
30
51
1
13
14
3.9
7
44
22
8
RYEN SOLVANG TÅSEN
A
A
B
BB
D
C C
E
ON THE SAME PAGE // Final Presentation 8.12.14
TOTAL DELIVERABLES
The communication tool
The maps for them to reference
The workshops
Insight book and poster
ON THE SAME PAGE // Final Presentation 8.12.14
Insight book and poster
TOTAL DELIVERABLES
The communication tool
The maps for them to reference
The workshops
ON THE SAME PAGE Sye presentation 2014
ON THE SAME PAGE
Liz LeBlanc, Simon Søgnen Tveit, Line T. Bogen, Rickard Jensen
8 December 2014
Sykehjemsetaten
Oslo Kommune
Systems Oriented Design Fall 2014
A project in partnership with:
ON THE SAME PAGE
1 sur 38

Recommandé

ON THE SAME PAGE process book par
ON THE SAME PAGE process bookON THE SAME PAGE process book
ON THE SAME PAGE process bookBirger Sevaldson
1K vues59 diapositives
ON THE SAME PAGE insights book par
ON THE SAME PAGE insights bookON THE SAME PAGE insights book
ON THE SAME PAGE insights bookBirger Sevaldson
871 vues29 diapositives
Holistic and dynamic concepts in design 2017 par
Holistic and dynamic concepts in design 2017Holistic and dynamic concepts in design 2017
Holistic and dynamic concepts in design 2017Birger Sevaldson
446 vues39 diapositives
Final report Gjestebud Alfred B C Holmen- AHO 2015 par
Final report Gjestebud Alfred B C Holmen- AHO 2015Final report Gjestebud Alfred B C Holmen- AHO 2015
Final report Gjestebud Alfred B C Holmen- AHO 2015Birger Sevaldson
593 vues75 diapositives
Erik Haugen Murvold NRK Filmarkiv Rapport 3 par
Erik Haugen Murvold NRK Filmarkiv Rapport 3Erik Haugen Murvold NRK Filmarkiv Rapport 3
Erik Haugen Murvold NRK Filmarkiv Rapport 3Birger Sevaldson
598 vues32 diapositives
Erik Haugen Murvold NRK Filmarkiv Rapport 2 par
Erik Haugen Murvold NRK Filmarkiv Rapport 2Erik Haugen Murvold NRK Filmarkiv Rapport 2
Erik Haugen Murvold NRK Filmarkiv Rapport 2Birger Sevaldson
647 vues16 diapositives

Contenu connexe

Plus de Birger Sevaldson

Mitt siste hjem par
Mitt siste hjemMitt siste hjem
Mitt siste hjemBirger Sevaldson
1.5K vues64 diapositives
Rapport brukermedvirkning ABUP par
Rapport brukermedvirkning ABUPRapport brukermedvirkning ABUP
Rapport brukermedvirkning ABUPBirger Sevaldson
1.6K vues55 diapositives
Brukermedvirkning ABUP par
Brukermedvirkning ABUPBrukermedvirkning ABUP
Brukermedvirkning ABUPBirger Sevaldson
2.1K vues62 diapositives
Conceptual Library project S.O.D. sod2014 par
Conceptual Library project S.O.D. sod2014Conceptual Library project S.O.D. sod2014
Conceptual Library project S.O.D. sod2014Birger Sevaldson
882 vues50 diapositives
Lillehammer Youth Olympics 2016 Final presentation (sajedeh) par
Lillehammer Youth Olympics 2016 Final presentation (sajedeh) Lillehammer Youth Olympics 2016 Final presentation (sajedeh)
Lillehammer Youth Olympics 2016 Final presentation (sajedeh) Birger Sevaldson
810 vues79 diapositives
Lillehammer 2016 Winter Youth Olympics concept project par
Lillehammer 2016 Winter Youth Olympics concept projectLillehammer 2016 Winter Youth Olympics concept project
Lillehammer 2016 Winter Youth Olympics concept projectBirger Sevaldson
728 vues56 diapositives

Dernier

Designing Effective AR Experiences par
Designing Effective AR ExperiencesDesigning Effective AR Experiences
Designing Effective AR ExperiencesKumar Ahir
5 vues46 diapositives
My Creative Resume DIAPOS.pptx par
My Creative Resume DIAPOS.pptxMy Creative Resume DIAPOS.pptx
My Creative Resume DIAPOS.pptxBrayanQuispe23
18 vues82 diapositives
Antifungal agents-Medicinal Chemistry par
Antifungal agents-Medicinal Chemistry Antifungal agents-Medicinal Chemistry
Antifungal agents-Medicinal Chemistry NarminHamaaminHussen
7 vues27 diapositives
Benzodiazepines--Medicinal Chemistry par
Benzodiazepines--Medicinal ChemistryBenzodiazepines--Medicinal Chemistry
Benzodiazepines--Medicinal ChemistryNarminHamaaminHussen
7 vues32 diapositives
StratPlanning Manual 220713.pdf par
StratPlanning Manual 220713.pdfStratPlanning Manual 220713.pdf
StratPlanning Manual 220713.pdfLakewalk Media
15 vues43 diapositives
Design System in Figma A to Z.pdf par
Design System in Figma A to Z.pdfDesign System in Figma A to Z.pdf
Design System in Figma A to Z.pdfAtiqur Rahaman
22 vues16 diapositives

Dernier(20)

Designing Effective AR Experiences par Kumar Ahir
Designing Effective AR ExperiencesDesigning Effective AR Experiences
Designing Effective AR Experiences
Kumar Ahir5 vues
The Report is Dead, Long Live the Report ! Communicating Usability Research F... par Centralis
The Report is Dead, Long Live the Report ! Communicating Usability Research F...The Report is Dead, Long Live the Report ! Communicating Usability Research F...
The Report is Dead, Long Live the Report ! Communicating Usability Research F...
Centralis5 vues
Sudden Deafness Design Document par wyfangherman
Sudden Deafness Design DocumentSudden Deafness Design Document
Sudden Deafness Design Document
wyfangherman48 vues
SS25 Fashion Key Items trend book par Peclers Paris
SS25 Fashion Key Items trend bookSS25 Fashion Key Items trend book
SS25 Fashion Key Items trend book
Peclers Paris148 vues
Free World aids day Template from Best presentation design agency par slideceotemplates
Free World aids day Template from Best presentation design agencyFree World aids day Template from Best presentation design agency
Free World aids day Template from Best presentation design agency
217 Drive - All on upper.pptx par vidstor282
217 Drive - All on upper.pptx217 Drive - All on upper.pptx
217 Drive - All on upper.pptx
vidstor28215 vues
IEC 600068-2-39 ENVIROMENT TESTING COMBINED TEMPERATURE LOW HUMIDTY.pdf par NirmalanGanapathy1
IEC 600068-2-39 ENVIROMENT TESTING COMBINED TEMPERATURE LOW HUMIDTY.pdfIEC 600068-2-39 ENVIROMENT TESTING COMBINED TEMPERATURE LOW HUMIDTY.pdf
IEC 600068-2-39 ENVIROMENT TESTING COMBINED TEMPERATURE LOW HUMIDTY.pdf

ON THE SAME PAGE Sye presentation 2014

  • 1. ON THE SAME PAGE Liz LeBlanc, Simon Søgnen Tveit, Line T. Bogen, Rickard Jensen 8 December 2014 Sykehjemsetaten Oslo Kommune Systems Oriented Design Fall 2014 A project in partnership with:
  • 2. ON THE SAME PAGE // Final Presentation 8.12.14 INTRODUCTION SHORT & LONG TERM MITT HJEM HELSE HUS
  • 3. ON THE SAME PAGE // Final Presentation 8.12.14 MOVING VIDEO
  • 4. ON THE SAME PAGE // Final Presentation 8.12.14 PROJECT LANDSCAPE NORD BYDEL HELSEHUS MITT HJEM HJEMMETJENESTE SENTRUM VEST SØR BESTILLERKONTORET
  • 5. ON THE SAME PAGE // Final Presentation 8.12.14 FINAL COMMUNICATION TOOL
  • 6. ON THE SAME PAGE // Final Presentation 8.12.14 FIRST CHAT WITH SYE
  • 7. ON THE SAME PAGE // Final Presentation 8.12.14 RUNNING INTO THE WOODS Bjørn AHUS Marit Alna Bestillerkontoret Teresa Solvang Honey Fee Lilleborg Bente Grorud Hjemmetjeneste
  • 8. ON THE SAME PAGE // Final Presentation 8.12.14 MAIN TAKE AWAYS Effects of Reform Lack of Communication Nothing is standard
  • 9. ON THE SAME PAGE // Final Presentation 8.12.14 MAIN TAKE AWAYS Effects of Reform Lack of Communication Nothing is standard
  • 10. ON THE SAME PAGE // Final Presentation 8.12.14 MAIN TAKE AWAYS Effects of Reform Lack of Communication Nothing is standard
  • 11. ON THE SAME PAGE // Final Presentation 8.12.14 FIRST BIG MAP
  • 12. ON THE SAME PAGE // Final Presentation 8.12.14 FOUR DESIGN DIRECTIONS Keeping people at home Dynamics within the Helsehus Evaluation Process Organizational Structure impact radius ripple effect
  • 13. ON THE SAME PAGE // Final Presentation 8.12.14 FOUR DESIGN DIRECTIONS Keeping people at home Dynamics within the Helsehus Evaluation Process Organizational Structure medium medium
  • 14. ON THE SAME PAGE // Final Presentation 8.12.14 FOUR DESIGN DIRECTIONS Keeping people at home Dynamics within the Helsehus Evaluation Process Organizational Structure small high
  • 15. ON THE SAME PAGE // Final Presentation 8.12.14 FOUR DESIGN DIRECTIONS Keeping people at home Dynamics within the Helsehus Evaluation Process Organizational Structure high high
  • 16. ON THE SAME PAGE // Final Presentation 8.12.14 FOUR DESIGN DIRECTIONS Keeping people at home Dynamics within the Helsehus Evaluation Process Organizational Structure high high
  • 17. ON THE SAME PAGE // Final Presentation 8.12.14 THE INSIGHTS BOOK
  • 18. ON THE SAME PAGE // Final Presentation 8.12.14 WHAT ABOUT NOW? SEPTEMBER OCTOBER NOVEMBER DECEMBER SATURDAY SUNDAY MONDAY TUESDAY FRIDAY SATURDAY SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY SUNDAY SUNDAYMONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY | |Systems Oriented Design (SOD) |Autumn 2014 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 Milestone presentations AHO WORKS EXHIBITION 09:00 - 16:00 Big & Small Auditorium Final Presentations. Invite your project partners. Exhibition is part of the evaluation. (price for best exhibition) 09:00 - 16:00 Big & Small Auditorium Exhibition space presentation. Exhibition is part of the evaluation. (price for best exhibition) Exhibition Setup Exhibition Setup WEDNESDAY THURSDAY FRIDAY MONDAY TUESDAYMONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY SUNDAY SUNDAYMONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY SATURDAY SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY 09:00 - 16:00 Group Room 4&5 Elevator Pitch. Implementation. 3 posters. (Pecha Kucha Format - 20 slides and 20 seconds each slide) 09:00 - 16:00 Tegnesal 9 Rich Design Space and 3 elevator pitch posters. 09:00 - 16:00 Reverse Archaeology Presentation. The future systems landscape. 09:00 - 16:00 Tegnesal 9 giga map presentations of future systems. Proposed Day Stakeholder Workshop Making DeliverablesConcept DevelopmentInsight Work Testing & Iterations WEDNESDAY THURSDAY Decision Day: Narrow Down Scope Decision Day: Individual Problems Defined Decision Day: Final Deliverables Determined 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
  • 19. ON THE SAME PAGE // Final Presentation 8.12.14 BLENDING THEIR HOMEMADE SYSTEM AND OUR EXPERTISE
  • 20. ON THE SAME PAGE // Final Presentation 8.12.14 MAKING SENSE OF IT ALL
  • 21. ON THE SAME PAGE // Final Presentation 8.12.14 September October November December January 2015 2016 February March April May June July August September October November December January October 2015 27 1714 9 22 Hoveseter Smestad Sofienberg 7 5 Romsås Grunerløkka 3221 6 917 17 5 16 17 Majorstua Kingosgate 28 Rødtvet Ammerud 2023 FurusetMadserudLambertseter Lillohjemmet Akerselva 17 Akerselva Vålerenga 29 927 26 10 19 20178 8 13961513 Moving Patients & Staff Between Nursing Homes HOW TO READ THIS MAP The top portion also shows staff that will need to move in order to fill the needs of the new patient population. The bottom portion shows the different type of patients that will be relocated. This lower portion is based on a time line over the next 14 months. For example: Akerselva, a newly long term facility is moving 17 regular short term patients spaces to Lilleborg, a new short term home, or Helse Hus. They are also receiving 8, regular long term places in return. Akerselva will send 14.26 FTEs to Lilleborg to assist with this new patient population. Akerselva will receive 8 FTEs from Lillohjemmet because they cannot send patients to Tåsen, because it is privately held. MAP LEGEND POINTS OF INTEREST Lambertseter MovingStaffMovingPatients Langerud Abildsø Furuset Ammerud Rødtvet Romsås Madserud Smestad Majorstua Lillohjemmet Vålerenga Sofienberg Kingosgate Grunerløkka Akerselva 41 28 33 51.6 1.75 13 14 3.9 14.26 7 24.26 7 44.66 24 6.4 9 8 Lillohjemmet 8 RYEN SOLVANG TÅSEN LILLEBORG LILLEBORG Akerselva 14.26 Short Term Patients Long Term Patients Facilities Staff Ordinary RehabRus Ordinary Intensive Care Unspecified Specialty UDI Direction of the move: Origin Destination Number of Patients or FTEs 17 Public Long Term Home Private Long Term Home PRIVATE SHORT TERM PUBLIC SHORT TERM A A B BB A Romsås is becoming private and the Oslo Kommune wants to keep substance abuse treatment competences within the public sector. This means that the employees with this special training must also move into Ryen before the privatization is finalized. B Tåsen is private so employees will have to find a new place to work after the short term patients leave. They will have to move into a different quadrant of the city to find work at a short term facility, as there is only one health house for each. D C C C C C C These matches may seem equal, but remember that short term and long term patients require very different needs. Between Grunerløkka and Lilleborg they switch the correct amount of FTEs to match the patient move. The other four are between public and private homes, which makes it difficult to move staff. D While the moves have individual deadlines over the next 14 months, the patients and employees could be moved at any time before their date. The markers here are spread out in the month prior to their deadline. For instance, a move that should happen before June 1 2015 looks like it will take place in May 2015. E E FTEs may look easy to trade back and forth, but this does not yet take into account the different competence such as rehabilitation, physical or ergo therapies, nurses, or non-medical staff. Note: There are some exceptions to this moving system. Some patients are moving between long term facilities due to special medical needs. These are not listed on this version but will be added later on in the project. This map reflects the knowledge we have as of October 14, 2014 and is subject to change. FIRST VERSION OF THE MAP September October November December January 2015 2016 February March April May June July August September October November December January October 2015 27 1714 9 22 Hoveseter Smestad Sofienberg 7 5 Romsås Grunerløkka 3221 6 917 17 5 16 17 Majorstua Kingosgate 28 Rødtvet Ammerud 2023 FurusetMadserudLambertseter Lillohjemmet Akerselva 17 Akerselva Vålerenga 29 927 26 10 19 20178 8 13961513 Moving Patients & Staff Between Nursing Homes HOW TO READ THIS MAP The top portion also shows staff that will need to move in order to fill the needs of the new patient population. The bottom portion shows the different type of patients that will be relocated. This lower portion is based on a time line over the next 14 months. For example: Akerselva, a newly long term facility is moving 17 regular short term patients spaces to Lilleborg, a new short term home, or Helse Hus. They are also receiving 8, regular long term places in return. Akerselva will send 14.26 FTEs to Lilleborg to assist with this new patient population. Akerselva will receive 8 FTEs from Lillohjemmet because they cannot send patients to Tåsen, because it is privately held. MAP LEGEND POINTS OF INTEREST Lambertseter MovingStaffMovingPatients Langerud Abildsø Furuset Ammerud Rødtvet Romsås Madserud Smestad Majorstua Lillohjemmet Vålerenga Sofienberg Kingosgate Grunerløkka Akerselva 41 28 33 51.6 1.75 13 14 3.9 14.26 7 24.26 7 44.66 24 6.4 9 8 Lillohjemmet 8 RYEN SOLVANG TÅSEN LILLEBORG LILLEBORG Akerselva 14.26 Short Term Patients Long Term Patients Facilities Staff Ordinary RehabRus Ordinary Intensive Care Unspecified Specialty UDI Direction of the move: Origin Destination Number of Patients or FTEs 17 Public Long Term Home Private Long Term Home PRIVATE SHORT TERM PUBLIC SHORT TERM A A B BB A Romsås is becoming private and the Oslo Kommune wants to keep substance abuse treatment competences within the public sector. This means that the employees with this special training must also move into Ryen before the privatization is finalized. B Tåsen is private so employees will have to find a new place to work after the short term patients leave. They will have to move into a different quadrant of the city to find work at a short term facility, as there is only one health house for each. D C C C C C C These matches may seem equal, but remember that short term and long term patients require very different needs. Between Grunerløkka and Lilleborg they switch the correct amount of FTEs to match the patient move. The other four are between public and private homes, which makes it difficult to move staff. D While the moves have individual deadlines over the next 14 months, the patients and employees could be moved at any time before their date. The markers here are spread out in the month prior to their deadline. For instance, a move that should happen before June 1 2015 looks like it will take place in May 2015. E E FTEs may look easy to trade back and forth, but this does not yet take into account the different competence such as rehabilitation, physical or ergo therapies, nurses, or non-medical staff. Note: There are some exceptions to this moving system. Some patients are moving between long term facilities due to special medical needs. These are not listed on this version but will be added later on in the project. This map reflects the knowledge we have as of October 14, 2014 and is subject to change.
  • 22. ON THE SAME PAGE // Final Presentation 8.12.14 PUT YOUR FINGER ON IT
  • 23. ON THE SAME PAGE // Final Presentation 8.12.14 WE REALIZED WE WERE LOOKING TOO FAR AHEAD.
  • 24. ON THE SAME PAGE // Final Presentation 8.12.14 PUT YOUR FINGER ON IT
  • 25. ON THE SAME PAGE // Final Presentation 8.12.14 THE TOOL 1.0
  • 26. ON THE SAME PAGE // Final Presentation 8.12.14 ITERATE & IMPROVE
  • 27. ON THE SAME PAGE // Final Presentation 8.12.14 ADDING STRUCTURE Post2 Korttid1 RUS Post4 Post5 Bydel Østensjø Post4 Bydel Østensjo Post3 Bydel Nordstrand og RUS Post2 avd 4 Bydel Østensjø og Søndre Nordstrand Post1 Bydel Nordstrand September October November November December January 2015 2016 February March April May June July August September October November December January Establishing RYEN helsehus HOW TO READ THIS MAP The middle portion is illustrating how Ryen helsehus will arragne their patiens during the move. On the left and right side you will find the actors involved in the relocation. The timeline on the bottom shows the tentative schedule. HOW TO READ THE TIMELINE The timeline keeps track on important dates regarding the different movingprocesses. MAP LEGEND POINTS OF INTEREST Short Term Patients Long Term Patients Facilities Staff Ordinary RehabRus Ordinary Intensive Care Unspecified Specialty UDI Direction of the move: Origin Destination Number of Patients or FTEs 17 Public Long Term Home Private Long Term Home PRIVATE SHORT TERM PUBLIC SHORT TERM A A C One department moving from Abildsø to Ryen. Dpt. 5 at Ryen can only house 26 patients. 3 groups will fit in at dpt. 5. One group of 8 patients from abildsø will move in to dpt. 2. Staff will follow patients. B Abildsø is getting 6 intensive care patients from Tåsen. Tåsen iss is run by private - employees will not follow. Abildsø might need some physical adjustments to their interiour plans before they can take in the patients from tåsen. The possebility of encreasing the number from 6 to 8 int. care patients is being explored. This may cause less rebuilding at Abildsø as they may arrange their parients differently. BUT this means economic impact! C Internal relocation at Ryen. Patients from borough Nordstrand are moved from post 3 to post 1, to make room for the dpt. for RUS. Post 3 is the most suitble location for the RUS dpt. due to interiour solutions, being separated from other patientgroups, facilities as smokingroom and so on. D D Lambertseter - Ryen move should happen before the the daily operations of Lamberseter nursing home is taken over by private business Lambertseter Abildsø Langerud Romsås A 26 16 16 7 7 23 16 26 6 8 13 12.1111.1110.11 A3 move to A1 CLEAN and make ready for RUS to move in to A3 Clear out A1 - CLEAN RUS moving IN to A3 Ryen B RYEN 30LT BESKRIVE ANSATTE I PROTOKOLL ansatte med turnus overflyttes Abilds post 2 gr 4 5.46 årsverk renregna - ikke reel etter prinsipp om gruppeflytt HR systemet GAT: Hvem + f.nr. stilling stillingsprosent vedlegg er oversikt over ansatte. 3 gr ansatte flytter med turnus hjelpeturnus?? midlertidig“overlapp” Birgit: kan ikke bare flytteog endra arb tid. beholde turus - varsling - dag/kveld Varsel for endring. si opp turnus etter regler+lage ny. 2uker varsel. finregnet: 20.28 årsverk til post 2 gr 1,2,3 20.70 årsverk med turnus ink leder flytte avdeling ikke finregne på årsverk telle eksisterende årsverk - justere etterhvert! minus leger fysio ergo renhold Hjelpeturnus for 3 + 1 gruppe. Wenche og Birgit setter opp for Ryen Bygg endring Abildsø: penger hvem hva - SKJERMA: armerte glassvegger hindre hopp. doku stasjoner. ulåst hus - trenger gjerde HelgeMorten, Sølvi, Bente prioritet!! Steinar fransen på befaring FORSTERKET: en gruppe i uka - skjermet gr. 1,2,3,4. ALT fra post 2 Abildsø. prosjektgrupper som håndterer flytt. sammen med Nina - Formidl. 17. nov ferdig til 14 .desember varsle bydel østensjo søndre nordstrand KONTAKTPERSONER OPPRETTE/AVSLUTTE senger i gerica; Nina TRANSPORT: Ansvar?? - institusjonene. Prosjektleder kan hjelpe til - ABILDSØ sjekker og informerer. Tar ansvar for dette. noen trenger ambulanse kjørekontor: foresp bidrag logistikkplan pasienttransport Flyttelass - ting og tang priv - sykehjem sjekker pårørende hjelp LT har til og med stooore sofaer!! Korttid 1 Abilds 16 spydspiss ansatte: 0,78x16 - 12,48 årsverk (xxx realitet) Hele pakka flytter. uten legel. ikke hjelpeturnus Avd 4 post 2 Ryen 8 ord. somatisk langtid ansatte: uten leder. Abildsø må lage hjelpeturnus. Abildsø ønsker en 100% vakant hjelpestilling på skjerma. Om ryen kan legge til rette for dette:) Flytt i samme periode - tentativt
  • 29. ON THE SAME PAGE // Final Presentation 8.12.14 FINAL COMMUNICATION TOOL
  • 30. ON THE SAME PAGE // Final Presentation 8.12.14 MAP TEMPLATE
  • 31. ON THE SAME PAGE // Final Presentation 8.12.14 HOW IT IS USED email meeting update email repeat
  • 32. ON THE SAME PAGE // Final Presentation 8.12.14 IMMEDIATE IMPACT Everyone working on their own papers Coming late to the meeting Talking past each other Communicating to other employees BEFORE AFTER
  • 33. ON THE SAME PAGE // Final Presentation 8.12.14 TOTAL DELIVERABLES The communication tool The maps for them to reference The workshops Insight book and poster
  • 34. ON THE SAME PAGE // Final Presentation 8.12.14 Insight book and poster TOTAL DELIVERABLES The communication tool The maps for them to reference The workshops September October November December January 2015 February March April May June July August September 14 9 Hoveseter SmestadAbildsø Kingosgate Langerud 197 5 Romsås Grunerløkka 21 6 7 4117 17 1613 Majorstua 31 Rødtvet Ammerud 23 323 MadserudLambertseter LillohjemmAkerselva 2912 927 31 10 1661513 3232 Lambertseter FlyttingavansatteFlyttingavplasser/pasienter Langerud Abildsø Furuset Ammerud Rødtvet RomsåsRomsås Madserud Smestad Majorstua Lillohjemmet40 28 30 51 1 13 14 3.9 7 44 22 8 RYEN SOLVANG TÅSEN A A B BB D C C E
  • 35. ON THE SAME PAGE // Final Presentation 8.12.14 TOTAL DELIVERABLES The communication tool The maps for them to reference The workshops Insight book and poster
  • 36. ON THE SAME PAGE // Final Presentation 8.12.14 Insight book and poster TOTAL DELIVERABLES The communication tool The maps for them to reference The workshops
  • 38. ON THE SAME PAGE Liz LeBlanc, Simon Søgnen Tveit, Line T. Bogen, Rickard Jensen 8 December 2014 Sykehjemsetaten Oslo Kommune Systems Oriented Design Fall 2014 A project in partnership with: ON THE SAME PAGE