DRY RISER SYSTEM
1.0 DESIGN STANDARDS 
• Part 1  Hydrant systems, hose 
reels and foam inlets. 
• Part 2  Landing valves for dry 
risers. 
• Part 3  Inlet breeching for riser 
inlets. 
• Part 4 Boxes for landing valves 
for dry risers.
1.1 LANDING VALVE 
• Provided in each floor and comply with 
landing valve for dry risers. 
• Located at fire access lobbies, protected 
staircases and protected lobbies. 
• Installed not more than 0.75m above floor 
level. 
• To protect landing valves, box are 
provided. 
• Fire hose not less 38mm diameter, 30m 
length, 60mm diameter and nozzle should 
be provided.
1.2 BREECHING INLET 
• Fire brigade breeching inlet installed at bottom of 
riser should comply with inlet breeching. 
• Breeching inlets enclosed within a box and labeled 
‘Dry Riser Inlet’. 
• Drain should be provided at bottom of riser to 
drain the system after use. 
• Two-way breeching inlet should provided 100mm 
diameter dry riser. 
• Four-way breeching inlet installed with 150mm 
diameter dry riser. 
• Breeching inlets should located not more than 18m 
from appliance access road and not more 30m from 
near external hydrant outlet.
1.3 RISER PIPE 
• Riser pipe diameter located within fire access 
lobby or staircase at 150m if highest outlet more 
than 22.875m above breeching inlet or otherwise 
pipe riser diameter is 100mm. 
• Riser pipe will galvanised iron to heavy gauzed or 
class c tested to 21 bar. 
• Horizontal runs pipework feeding the risers should 
slope to enable proper draining. 
• Air release valve should installed at top of riser to 
relief air trapped. 
• Riser pipe should electrically earthed or connected 
to building earth to avoid equipotential.
WET RISER SYSTEM
2.0 DESIGN STANDARDS 
• Part 1  Hydrant systems, hose reels 
and foam inlets. 
• Part 1  Landing valves for wet risers. 
• Part 3  Inlet breeching for riser inlets. 
• Part 4 Boxes for landing valves for 
dry risers.
2.1 WET RISER LANDING VALVE 
• Landing valves are provided on each floor and 
comply with hydrant systems, hose reels and 
foam inlets. 
• Located within fire fighting access lobbies, 
protected staircases or protected lobbies and 
installed not more than 0.75m from floor. 
• To protect landing valves, boxes are provided 
and should comply with boxes for landing 
valves for dry risers. 
• Pressure at landing valve should be no 
lessthan 4 bars and not more 7 bars.
• Two type of landing valves 
i) pressure reducing with outlet 
(required wet riser return pipe) 
ii) pressure reducing without outlet 
• Fire hose of canvas not less 38mm 
diameter, 30m length, 6mm diameter 
quick coupling and jet spray nozzle are 
provided in hose crdle beside landing 
valve.
2.2 BREECHING INLET 
• Breeching inlet should 4-way type comply 
with inlet breeching for riser inlets. 
• Breeching inlet is enclosed within a box 
and labelled with ‘ Wet Riser Inlet’. 
• A drain are provided at bottom of riser to 
clean the system. 
• Breeching inlets should located not more 
than 18m from fire appliance access road 
not more than m from nearest external 
hydrant.
2.3 WET RISER PIPE 
• Located with in smoke free lobby, 
protected areas within 45m coverage from 
landing valve. 
• More than one riser are required for each 
floor and distance between risers not 
more 60m. 
• Distance between lowest and topmost 
landing valve in upper stage riser not 
more 60m. 
• Riser pipe diameter should 150mm 
galvanised iron to heavy gauge.
• Relief pipe are required with return pipe 
minimum 100mm diameter, galvanised iron to 
medium gauge, discharging back to wet riser tank 
whenever possible. 
• Air release valve should installed at top of riser to 
relief air trapped in system. 
• Wet riser pipes should coated with primer and 
finished with red gloss paint or coded by red 
bands 100mm width and elbows and tees painted 
red. 
• Wet riser pipes should electrically earthed to 
achieve equipotential.
2.4 WET RISER PUMPS 
• Wet riser pumps draw water from wet riser 
storage tank and two sets of pump. 
• Pump capacity usually sized to deliver a flow rate 
1500l/min at running pressure not less 4 bars but 
not more 7 bars. 
• Standby wet riser pumpset should supplied with 
power from emergency generator it available or it 
should be diesel engine driven. 
• Fuel supply should adequate minimum 2 hours 
continuous operation.
• Electrical cabling to supply power wet riser 
pumps should MICC or fire rated type. 
• Batteries for diesel engine should maintain free 
type. 
• Wet riser pumpsets should protected from fire 
and away from locations likely to be flood. 
• Some are installed in fire pump room located at 
basement below external drainage levels. 
• It should ventilated by natural or mechanical 
means and provide with signage. 
• Carbon dioxide type portable extinguisher should 
be provided.
2.5 WET RISER TANKS 
• Fire water storage tank should sized for 
minimum capacity 45 500l with automatic 
refill rate 455l/min. 
• Intermediate break tank for upper stages 
not less than 11, 375l with automatic make-up 
flow of 1365l/min. 
• Wet riser tank should be pressed steel, 
FRP or concrete. 
• Pressed steel tanks should hot dipped 
galvanized and coated internally with 
bituminous for corrosion protection.
• Water tank should be compartmented 
unless it was reinforced concrete. 
• Ball float valves, overflow pipes, drain 
pipes and water level indicators should be 
provided at each compartment. 
• External surface of tank should painted 
red or red band minimum 200mm are 
painted to indicate it is a fire tank. 
• Wet riser tank usually are located at 
ground level, first or second basement. 
• Wet and dry tank usually seperated from 
others tank.
• It may be combine with hose reel tank 
when tank capacity equal to total 
water storage for both wet riser for 
hose reel system. 
• Hose reel tap off level should be above 
riser tap off level to reserve it maintain.
2.6 PUMP STARTER PANELS AND 
CONTROLS 
• Pump starter panel should complete 
with indicator lights. 
• Ventilation slot are provided with insect 
screen to prevent entry of vermin. 
• Cables should be MICC or fire rated 
type routed. 
• It should be located at same room 
where fire pump are located.
• Wet riser pumps are automatically started 
upon actuation of pressure switches but 
stopped manually. 
• Three pressure switches are: 
i) starting duty pumpset at 80% 
ii) starting standby pumpset at 60% 
Iii )starting and stopping jockey pumpset at 90% and 
110% 
• Pressure switches normally installed in test 
drain line on pump discharge side. 
• Pressure setting should be clearly labelled 
on tags attached to each pressure switch.
DOWNCOMER SYSTEM
3.0 DESIGN STANDARDS 
• Part 1  Hydrant systems, hose reels 
and foam inlets. 
• Part 1  Landing valves for wet risers. 
• Part 3  Inlet breeching for riser inlets. 
• Part 4 Boxes for landing valves for 
dry risers.
3.1 DOWNCOMER LANDING 
VALVE 
• Landing valves are provided on each 
floor and comply with hydrant system, 
hose reels and foam inlets. 
• Located within fire fighting access 
lobbies, protected staircases or 
protected lobbies installed not more 
0.75m from floor. 
• Pressure at landing valve depends on 
static pressure on valve from roof tank.
• Semi-rigid 40mm diameter hose and 
nozzles should provided at every 
landing valve on floor. 
• Two sets fire hose of canvas type not 
less than 38mm diameter, 30m length 
complete with 65mm diameter quick 
coupling and jet spray nozzle should 
provided at caretakers unit or 
management office.
3.2 BREECHING INLETS 
• Fire brigade breeching inlets into 
firemen pumps water provided at 
bottom of riser at ground floor. 
• It should 4-way type comply with inlet 
breeching for riser inlets. 
• Where it is enclosed within box and 
label ‘Downcomer Inlet’ 
• Drain should be provided at bottom of 
riser to drain system.
• Breeching inlets should located not 
more 18m from fire appliance access 
road and not more 30m from nearest 
external hydrant. 
• Check valve installed between topmost 
landing valve and tank to prevent back 
flow.
3.3 DOWNCOMER PIPE 
• Located within some free lobby or 
protected areas within 45m coverage 
from landing valve. 
• More than one riser are required for 
each floor, distance not more 60m. 
• Riser pipe diameter should 150mm 
galvanised iron to heavy gauge. 
• Released valve should installed at top 
of riser to relief air trapped.
• Downcomer pipes should be coated 
with primer and finished with red gloss 
paint. 
• Pipe can be colour coded with red 
bands 100mm width and elbows and 
tees painted red. 
• Riser pipe should electrically earthed.
3.4 FIRE WATER TANKS 
• Fire water storage tank should be sized 
minimum 45 500l, automatic refill rate of 455l/min. 
• Tanks maybe pressed steel, FRP or concrete. 
• It should hot dipped galvanized and coated 
internally with bituminous for corrosion 
protection. 
• Water tanks should compartmented unless 
they are reinforced concrete and ball float 
valves, overflow pipes, drain pipes and water 
level indicators should provided.
• External surface of tank should painted 
red white or red band 200mm should be 
painted to indicate it was a tank. 
• Usually located on the roof to provide 
maximum static pressure and seperated 
from other tank. 
• It may be combine with hose reel tank 
when tank capacity equal to total water 
storage for downcomer for hose reel 
system. 
• Hose reel tap off level should be above 
downcomer tap off level to reserved for 
downcomer.

More Related Content

What's hot

Active fire protection system
Active fire protection systemActive fire protection system
Active fire protection systemgauravashist
 
Fire fighting system in buildings
Fire fighting system  in buildingsFire fighting system  in buildings
Fire fighting system in buildingsHetvi Trada
 
Active and passive fire protection system
Active and passive fire protection systemActive and passive fire protection system
Active and passive fire protection systemKamran Hassan
 
Fire Safety on High Raise Buildings
Fire Safety on High Raise BuildingsFire Safety on High Raise Buildings
Fire Safety on High Raise BuildingsMohamed Anas
 
Fire Fighting and Solution for Globus Shopping Mall (bandra)
Fire Fighting and Solution for Globus Shopping  Mall (bandra)Fire Fighting and Solution for Globus Shopping  Mall (bandra)
Fire Fighting and Solution for Globus Shopping Mall (bandra)Esa Shaikh
 
Building Services II Presentation Slides
Building Services II Presentation SlidesBuilding Services II Presentation Slides
Building Services II Presentation Slidesashleyyeap
 
Basements light and ventilation
Basements light and ventilationBasements light and ventilation
Basements light and ventilationDanishPathan7
 
Basics of dry riser & wet riser
Basics of dry riser & wet riserBasics of dry riser & wet riser
Basics of dry riser & wet riserSubanMondal
 
Fire sprinkler systems
Fire sprinkler systemsFire sprinkler systems
Fire sprinkler systemsjosebolis
 
Group housing case study
Group housing case studyGroup housing case study
Group housing case studyARYAN GUPTA
 
Fire fighting system
Fire fighting systemFire fighting system
Fire fighting systemAmit Kumar
 
Building Services (Fire)
Building Services (Fire)Building Services (Fire)
Building Services (Fire)Mehul Hotwani
 
Fire Safety and Building Materials
Fire Safety and Building MaterialsFire Safety and Building Materials
Fire Safety and Building MaterialsSorab Mishra
 

What's hot (20)

Active fire protection system
Active fire protection systemActive fire protection system
Active fire protection system
 
Fire fighting active system
Fire fighting active systemFire fighting active system
Fire fighting active system
 
Fire fighting system in buildings
Fire fighting system  in buildingsFire fighting system  in buildings
Fire fighting system in buildings
 
Active and passive fire protection system
Active and passive fire protection systemActive and passive fire protection system
Active and passive fire protection system
 
Building Services
Building ServicesBuilding Services
Building Services
 
Fire Safety on High Raise Buildings
Fire Safety on High Raise BuildingsFire Safety on High Raise Buildings
Fire Safety on High Raise Buildings
 
Fire Fighting and Solution for Globus Shopping Mall (bandra)
Fire Fighting and Solution for Globus Shopping  Mall (bandra)Fire Fighting and Solution for Globus Shopping  Mall (bandra)
Fire Fighting and Solution for Globus Shopping Mall (bandra)
 
jamia polytechnique delhi
jamia polytechnique delhijamia polytechnique delhi
jamia polytechnique delhi
 
Building Services II Presentation Slides
Building Services II Presentation SlidesBuilding Services II Presentation Slides
Building Services II Presentation Slides
 
Basements light and ventilation
Basements light and ventilationBasements light and ventilation
Basements light and ventilation
 
Basics of dry riser & wet riser
Basics of dry riser & wet riserBasics of dry riser & wet riser
Basics of dry riser & wet riser
 
Fire sprinkler systems
Fire sprinkler systemsFire sprinkler systems
Fire sprinkler systems
 
Fs sprinkler systems
Fs sprinkler systemsFs sprinkler systems
Fs sprinkler systems
 
LOW RISE MEDIUM SCALE COMMERCIAL COMPLEX
LOW RISE MEDIUM SCALE COMMERCIAL COMPLEXLOW RISE MEDIUM SCALE COMMERCIAL COMPLEX
LOW RISE MEDIUM SCALE COMMERCIAL COMPLEX
 
Group housing case study
Group housing case studyGroup housing case study
Group housing case study
 
Fire fighting system
Fire fighting systemFire fighting system
Fire fighting system
 
Advance services
Advance services Advance services
Advance services
 
Building Services (Fire)
Building Services (Fire)Building Services (Fire)
Building Services (Fire)
 
Chapter 05
Chapter 05Chapter 05
Chapter 05
 
Fire Safety and Building Materials
Fire Safety and Building MaterialsFire Safety and Building Materials
Fire Safety and Building Materials
 

Viewers also liked

Breeching Inlet
Breeching InletBreeching Inlet
Breeching Inletbansalash
 
Wet riser fire hydrant system
Wet riser fire hydrant systemWet riser fire hydrant system
Wet riser fire hydrant systemFIRE KNOCK
 
Building Services Report Sunway Medical Centre
Building Services Report Sunway Medical CentreBuilding Services Report Sunway Medical Centre
Building Services Report Sunway Medical CentreDexter Ng
 
Fire fighting presentation
Fire  fighting presentationFire  fighting presentation
Fire fighting presentationRaghunath Patil
 
Fire hydrant system
Fire hydrant systemFire hydrant system
Fire hydrant systemFIRE KNOCK
 
Fire Protection Systems Unit-I
Fire Protection Systems Unit-IFire Protection Systems Unit-I
Fire Protection Systems Unit-IGAURAV. H .TANDON
 
Fire Detection and Alarm Systems
Fire Detection and Alarm SystemsFire Detection and Alarm Systems
Fire Detection and Alarm SystemsJ.T.A.JONES
 
Passive Fire Protection According to UBBL Malaysia
Passive Fire Protection According to UBBL MalaysiaPassive Fire Protection According to UBBL Malaysia
Passive Fire Protection According to UBBL MalaysiaZhao Wei Kim
 
Fire Evacuation Plan
Fire Evacuation PlanFire Evacuation Plan
Fire Evacuation Planemmmily
 
Fire prevention.ppt
Fire prevention.pptFire prevention.ppt
Fire prevention.pptSahl Ahmed
 
Somke detector project presentation
Somke detector project presentationSomke detector project presentation
Somke detector project presentationRija Fatima
 
Fire Code
Fire CodeFire Code
Fire CodeNUS SDE
 
Fighting Fires in Sprinklered Buildings
Fighting Fires in Sprinklered BuildingsFighting Fires in Sprinklered Buildings
Fighting Fires in Sprinklered BuildingsAaron Johnson
 
Heat Tracing - Fire Protection Association's RC38 Recommendation for Frost Pr...
Heat Tracing - Fire Protection Association's RC38 Recommendation for Frost Pr...Heat Tracing - Fire Protection Association's RC38 Recommendation for Frost Pr...
Heat Tracing - Fire Protection Association's RC38 Recommendation for Frost Pr...Thorne & Derrick UK
 

Viewers also liked (20)

Breeching Inlet
Breeching InletBreeching Inlet
Breeching Inlet
 
Basics of Fire fighting
Basics of Fire fightingBasics of Fire fighting
Basics of Fire fighting
 
Wet riser fire hydrant system
Wet riser fire hydrant systemWet riser fire hydrant system
Wet riser fire hydrant system
 
Building Services Report Sunway Medical Centre
Building Services Report Sunway Medical CentreBuilding Services Report Sunway Medical Centre
Building Services Report Sunway Medical Centre
 
UBBL 1984 pdf
UBBL 1984 pdfUBBL 1984 pdf
UBBL 1984 pdf
 
Fire fighting presentation
Fire  fighting presentationFire  fighting presentation
Fire fighting presentation
 
Fire pumps
Fire pumpsFire pumps
Fire pumps
 
Fire hydrant system
Fire hydrant systemFire hydrant system
Fire hydrant system
 
Fire Protection Systems Unit-I
Fire Protection Systems Unit-IFire Protection Systems Unit-I
Fire Protection Systems Unit-I
 
Fire Detection and Alarm Systems
Fire Detection and Alarm SystemsFire Detection and Alarm Systems
Fire Detection and Alarm Systems
 
Passive Fire Protection According to UBBL Malaysia
Passive Fire Protection According to UBBL MalaysiaPassive Fire Protection According to UBBL Malaysia
Passive Fire Protection According to UBBL Malaysia
 
Smoke detector
Smoke detectorSmoke detector
Smoke detector
 
Fire Evacuation Plan
Fire Evacuation PlanFire Evacuation Plan
Fire Evacuation Plan
 
Building services
Building servicesBuilding services
Building services
 
Fire prevention.ppt
Fire prevention.pptFire prevention.ppt
Fire prevention.ppt
 
Somke detector project presentation
Somke detector project presentationSomke detector project presentation
Somke detector project presentation
 
Fire Code
Fire CodeFire Code
Fire Code
 
Fighting Fires in Sprinklered Buildings
Fighting Fires in Sprinklered BuildingsFighting Fires in Sprinklered Buildings
Fighting Fires in Sprinklered Buildings
 
2.5 suppression.sprinklers.wk12b
2.5 suppression.sprinklers.wk12b2.5 suppression.sprinklers.wk12b
2.5 suppression.sprinklers.wk12b
 
Heat Tracing - Fire Protection Association's RC38 Recommendation for Frost Pr...
Heat Tracing - Fire Protection Association's RC38 Recommendation for Frost Pr...Heat Tracing - Fire Protection Association's RC38 Recommendation for Frost Pr...
Heat Tracing - Fire Protection Association's RC38 Recommendation for Frost Pr...
 

Similar to Dry riser system

Marine piping systems
Marine piping systemsMarine piping systems
Marine piping systemskmsu
 
wetriser-170324110344.pdf
wetriser-170324110344.pdfwetriser-170324110344.pdf
wetriser-170324110344.pdfaymenaudayhatim
 
marine piping system and Pipe Design and Production
marine piping system and Pipe Design and Productionmarine piping system and Pipe Design and Production
marine piping system and Pipe Design and ProductionInkiPasung
 
FIRE FIGHTING Syllabus for for suppresion.pdf
FIRE FIGHTING Syllabus for for suppresion.pdfFIRE FIGHTING Syllabus for for suppresion.pdf
FIRE FIGHTING Syllabus for for suppresion.pdfKj Aswin
 
Central heating level 3
Central heating level 3Central heating level 3
Central heating level 3Barry Everard
 
API 682 Seal piping plans.pdf
API 682 Seal piping plans.pdfAPI 682 Seal piping plans.pdf
API 682 Seal piping plans.pdfTeddy Setiady
 
API682 Mechanical Seal Plan and Requirements of Mechanical Seals
API682 Mechanical Seal Plan and Requirements of Mechanical SealsAPI682 Mechanical Seal Plan and Requirements of Mechanical Seals
API682 Mechanical Seal Plan and Requirements of Mechanical SealsElango Palaniappan
 
Library study on hospital
Library study on hospital Library study on hospital
Library study on hospital manjul gambhir
 
Comparision between NFPA and TAc rules for Power plants
Comparision between NFPA and TAc rules for Power plantsComparision between NFPA and TAc rules for Power plants
Comparision between NFPA and TAc rules for Power plantsvakil jagdish
 
5 traps & sovent
5 traps & sovent5 traps & sovent
5 traps & soventVan Heina
 
Bio medical incinerator by Anirban Maity, B.TECH, ELECTRICAL ENGINEERING
Bio medical incinerator by Anirban Maity, B.TECH, ELECTRICAL ENGINEERINGBio medical incinerator by Anirban Maity, B.TECH, ELECTRICAL ENGINEERING
Bio medical incinerator by Anirban Maity, B.TECH, ELECTRICAL ENGINEERINGanirbanmaity1992
 
Service core
Service coreService core
Service coreaduiti
 

Similar to Dry riser system (20)

wetRiser.pptx
wetRiser.pptxwetRiser.pptx
wetRiser.pptx
 
2. Hydrant System.pdf
2. Hydrant System.pdf2. Hydrant System.pdf
2. Hydrant System.pdf
 
Marine piping systems
Marine piping systemsMarine piping systems
Marine piping systems
 
Boiler Mountings
Boiler MountingsBoiler Mountings
Boiler Mountings
 
wetriser-170324110344.pdf
wetriser-170324110344.pdfwetriser-170324110344.pdf
wetriser-170324110344.pdf
 
MODULE - 5 (2).pdf
MODULE - 5 (2).pdfMODULE - 5 (2).pdf
MODULE - 5 (2).pdf
 
marine piping system and Pipe Design and Production
marine piping system and Pipe Design and Productionmarine piping system and Pipe Design and Production
marine piping system and Pipe Design and Production
 
FIRE FIGHTING Syllabus for for suppresion.pdf
FIRE FIGHTING Syllabus for for suppresion.pdfFIRE FIGHTING Syllabus for for suppresion.pdf
FIRE FIGHTING Syllabus for for suppresion.pdf
 
Central heating level 3
Central heating level 3Central heating level 3
Central heating level 3
 
Fixed or semi fixed-d10 d03192
Fixed or semi fixed-d10 d03192Fixed or semi fixed-d10 d03192
Fixed or semi fixed-d10 d03192
 
Fire fighting -1 By Er. Ezaz
Fire fighting -1 By Er. EzazFire fighting -1 By Er. Ezaz
Fire fighting -1 By Er. Ezaz
 
API 682 Seal piping plans.pdf
API 682 Seal piping plans.pdfAPI 682 Seal piping plans.pdf
API 682 Seal piping plans.pdf
 
API682 Mechanical Seal Plan and Requirements of Mechanical Seals
API682 Mechanical Seal Plan and Requirements of Mechanical SealsAPI682 Mechanical Seal Plan and Requirements of Mechanical Seals
API682 Mechanical Seal Plan and Requirements of Mechanical Seals
 
Pumping Stations
Pumping StationsPumping Stations
Pumping Stations
 
Library study on hospital
Library study on hospital Library study on hospital
Library study on hospital
 
Comparision between NFPA and TAc rules for Power plants
Comparision between NFPA and TAc rules for Power plantsComparision between NFPA and TAc rules for Power plants
Comparision between NFPA and TAc rules for Power plants
 
5 traps & sovent
5 traps & sovent5 traps & sovent
5 traps & sovent
 
Manual filtro pentair
Manual filtro pentair Manual filtro pentair
Manual filtro pentair
 
Bio medical incinerator by Anirban Maity, B.TECH, ELECTRICAL ENGINEERING
Bio medical incinerator by Anirban Maity, B.TECH, ELECTRICAL ENGINEERINGBio medical incinerator by Anirban Maity, B.TECH, ELECTRICAL ENGINEERING
Bio medical incinerator by Anirban Maity, B.TECH, ELECTRICAL ENGINEERING
 
Service core
Service coreService core
Service core
 

Recently uploaded

Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substationstephanwindworld
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgsaravananr517913
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdfCaalaaAbdulkerim
 
Solving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptSolving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptJasonTagapanGulla
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHC Sai Kiran
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
welding defects observed during the welding
welding defects observed during the weldingwelding defects observed during the welding
welding defects observed during the weldingMuhammadUzairLiaqat
 
Industrial Safety Unit-I SAFETY TERMINOLOGIES
Industrial Safety Unit-I SAFETY TERMINOLOGIESIndustrial Safety Unit-I SAFETY TERMINOLOGIES
Industrial Safety Unit-I SAFETY TERMINOLOGIESNarmatha D
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
NO1 Certified Black Magic Specialist Expert Amil baba in Uae Dubai Abu Dhabi ...
NO1 Certified Black Magic Specialist Expert Amil baba in Uae Dubai Abu Dhabi ...NO1 Certified Black Magic Specialist Expert Amil baba in Uae Dubai Abu Dhabi ...
NO1 Certified Black Magic Specialist Expert Amil baba in Uae Dubai Abu Dhabi ...Amil Baba Dawood bangali
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
National Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfNational Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfRajuKanojiya4
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxsiddharthjain2303
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm Systemirfanmechengr
 

Recently uploaded (20)

Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substation
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdf
 
Solving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptSolving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.ppt
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECH
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
welding defects observed during the welding
welding defects observed during the weldingwelding defects observed during the welding
welding defects observed during the welding
 
Industrial Safety Unit-I SAFETY TERMINOLOGIES
Industrial Safety Unit-I SAFETY TERMINOLOGIESIndustrial Safety Unit-I SAFETY TERMINOLOGIES
Industrial Safety Unit-I SAFETY TERMINOLOGIES
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
NO1 Certified Black Magic Specialist Expert Amil baba in Uae Dubai Abu Dhabi ...
NO1 Certified Black Magic Specialist Expert Amil baba in Uae Dubai Abu Dhabi ...NO1 Certified Black Magic Specialist Expert Amil baba in Uae Dubai Abu Dhabi ...
NO1 Certified Black Magic Specialist Expert Amil baba in Uae Dubai Abu Dhabi ...
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
National Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfNational Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdf
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptx
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm System
 

Dry riser system

  • 2. 1.0 DESIGN STANDARDS • Part 1  Hydrant systems, hose reels and foam inlets. • Part 2  Landing valves for dry risers. • Part 3  Inlet breeching for riser inlets. • Part 4 Boxes for landing valves for dry risers.
  • 3. 1.1 LANDING VALVE • Provided in each floor and comply with landing valve for dry risers. • Located at fire access lobbies, protected staircases and protected lobbies. • Installed not more than 0.75m above floor level. • To protect landing valves, box are provided. • Fire hose not less 38mm diameter, 30m length, 60mm diameter and nozzle should be provided.
  • 4. 1.2 BREECHING INLET • Fire brigade breeching inlet installed at bottom of riser should comply with inlet breeching. • Breeching inlets enclosed within a box and labeled ‘Dry Riser Inlet’. • Drain should be provided at bottom of riser to drain the system after use. • Two-way breeching inlet should provided 100mm diameter dry riser. • Four-way breeching inlet installed with 150mm diameter dry riser. • Breeching inlets should located not more than 18m from appliance access road and not more 30m from near external hydrant outlet.
  • 5. 1.3 RISER PIPE • Riser pipe diameter located within fire access lobby or staircase at 150m if highest outlet more than 22.875m above breeching inlet or otherwise pipe riser diameter is 100mm. • Riser pipe will galvanised iron to heavy gauzed or class c tested to 21 bar. • Horizontal runs pipework feeding the risers should slope to enable proper draining. • Air release valve should installed at top of riser to relief air trapped. • Riser pipe should electrically earthed or connected to building earth to avoid equipotential.
  • 7. 2.0 DESIGN STANDARDS • Part 1  Hydrant systems, hose reels and foam inlets. • Part 1  Landing valves for wet risers. • Part 3  Inlet breeching for riser inlets. • Part 4 Boxes for landing valves for dry risers.
  • 8. 2.1 WET RISER LANDING VALVE • Landing valves are provided on each floor and comply with hydrant systems, hose reels and foam inlets. • Located within fire fighting access lobbies, protected staircases or protected lobbies and installed not more than 0.75m from floor. • To protect landing valves, boxes are provided and should comply with boxes for landing valves for dry risers. • Pressure at landing valve should be no lessthan 4 bars and not more 7 bars.
  • 9. • Two type of landing valves i) pressure reducing with outlet (required wet riser return pipe) ii) pressure reducing without outlet • Fire hose of canvas not less 38mm diameter, 30m length, 6mm diameter quick coupling and jet spray nozzle are provided in hose crdle beside landing valve.
  • 10. 2.2 BREECHING INLET • Breeching inlet should 4-way type comply with inlet breeching for riser inlets. • Breeching inlet is enclosed within a box and labelled with ‘ Wet Riser Inlet’. • A drain are provided at bottom of riser to clean the system. • Breeching inlets should located not more than 18m from fire appliance access road not more than m from nearest external hydrant.
  • 11. 2.3 WET RISER PIPE • Located with in smoke free lobby, protected areas within 45m coverage from landing valve. • More than one riser are required for each floor and distance between risers not more 60m. • Distance between lowest and topmost landing valve in upper stage riser not more 60m. • Riser pipe diameter should 150mm galvanised iron to heavy gauge.
  • 12. • Relief pipe are required with return pipe minimum 100mm diameter, galvanised iron to medium gauge, discharging back to wet riser tank whenever possible. • Air release valve should installed at top of riser to relief air trapped in system. • Wet riser pipes should coated with primer and finished with red gloss paint or coded by red bands 100mm width and elbows and tees painted red. • Wet riser pipes should electrically earthed to achieve equipotential.
  • 13. 2.4 WET RISER PUMPS • Wet riser pumps draw water from wet riser storage tank and two sets of pump. • Pump capacity usually sized to deliver a flow rate 1500l/min at running pressure not less 4 bars but not more 7 bars. • Standby wet riser pumpset should supplied with power from emergency generator it available or it should be diesel engine driven. • Fuel supply should adequate minimum 2 hours continuous operation.
  • 14. • Electrical cabling to supply power wet riser pumps should MICC or fire rated type. • Batteries for diesel engine should maintain free type. • Wet riser pumpsets should protected from fire and away from locations likely to be flood. • Some are installed in fire pump room located at basement below external drainage levels. • It should ventilated by natural or mechanical means and provide with signage. • Carbon dioxide type portable extinguisher should be provided.
  • 15. 2.5 WET RISER TANKS • Fire water storage tank should sized for minimum capacity 45 500l with automatic refill rate 455l/min. • Intermediate break tank for upper stages not less than 11, 375l with automatic make-up flow of 1365l/min. • Wet riser tank should be pressed steel, FRP or concrete. • Pressed steel tanks should hot dipped galvanized and coated internally with bituminous for corrosion protection.
  • 16. • Water tank should be compartmented unless it was reinforced concrete. • Ball float valves, overflow pipes, drain pipes and water level indicators should be provided at each compartment. • External surface of tank should painted red or red band minimum 200mm are painted to indicate it is a fire tank. • Wet riser tank usually are located at ground level, first or second basement. • Wet and dry tank usually seperated from others tank.
  • 17. • It may be combine with hose reel tank when tank capacity equal to total water storage for both wet riser for hose reel system. • Hose reel tap off level should be above riser tap off level to reserve it maintain.
  • 18. 2.6 PUMP STARTER PANELS AND CONTROLS • Pump starter panel should complete with indicator lights. • Ventilation slot are provided with insect screen to prevent entry of vermin. • Cables should be MICC or fire rated type routed. • It should be located at same room where fire pump are located.
  • 19. • Wet riser pumps are automatically started upon actuation of pressure switches but stopped manually. • Three pressure switches are: i) starting duty pumpset at 80% ii) starting standby pumpset at 60% Iii )starting and stopping jockey pumpset at 90% and 110% • Pressure switches normally installed in test drain line on pump discharge side. • Pressure setting should be clearly labelled on tags attached to each pressure switch.
  • 21. 3.0 DESIGN STANDARDS • Part 1  Hydrant systems, hose reels and foam inlets. • Part 1  Landing valves for wet risers. • Part 3  Inlet breeching for riser inlets. • Part 4 Boxes for landing valves for dry risers.
  • 22. 3.1 DOWNCOMER LANDING VALVE • Landing valves are provided on each floor and comply with hydrant system, hose reels and foam inlets. • Located within fire fighting access lobbies, protected staircases or protected lobbies installed not more 0.75m from floor. • Pressure at landing valve depends on static pressure on valve from roof tank.
  • 23. • Semi-rigid 40mm diameter hose and nozzles should provided at every landing valve on floor. • Two sets fire hose of canvas type not less than 38mm diameter, 30m length complete with 65mm diameter quick coupling and jet spray nozzle should provided at caretakers unit or management office.
  • 24. 3.2 BREECHING INLETS • Fire brigade breeching inlets into firemen pumps water provided at bottom of riser at ground floor. • It should 4-way type comply with inlet breeching for riser inlets. • Where it is enclosed within box and label ‘Downcomer Inlet’ • Drain should be provided at bottom of riser to drain system.
  • 25. • Breeching inlets should located not more 18m from fire appliance access road and not more 30m from nearest external hydrant. • Check valve installed between topmost landing valve and tank to prevent back flow.
  • 26. 3.3 DOWNCOMER PIPE • Located within some free lobby or protected areas within 45m coverage from landing valve. • More than one riser are required for each floor, distance not more 60m. • Riser pipe diameter should 150mm galvanised iron to heavy gauge. • Released valve should installed at top of riser to relief air trapped.
  • 27. • Downcomer pipes should be coated with primer and finished with red gloss paint. • Pipe can be colour coded with red bands 100mm width and elbows and tees painted red. • Riser pipe should electrically earthed.
  • 28. 3.4 FIRE WATER TANKS • Fire water storage tank should be sized minimum 45 500l, automatic refill rate of 455l/min. • Tanks maybe pressed steel, FRP or concrete. • It should hot dipped galvanized and coated internally with bituminous for corrosion protection. • Water tanks should compartmented unless they are reinforced concrete and ball float valves, overflow pipes, drain pipes and water level indicators should provided.
  • 29. • External surface of tank should painted red white or red band 200mm should be painted to indicate it was a tank. • Usually located on the roof to provide maximum static pressure and seperated from other tank. • It may be combine with hose reel tank when tank capacity equal to total water storage for downcomer for hose reel system. • Hose reel tap off level should be above downcomer tap off level to reserved for downcomer.