Ce diaporama a bien été signalé.
Nous utilisons votre profil LinkedIn et vos données d’activité pour vous proposer des publicités personnalisées et pertinentes. Vous pouvez changer vos préférences de publicités à tout moment.
www.TS-Industries.com
FS1
Slide 1
FS1 Frank Spears, 7/28/2013
“Our position in the value chain is to provide a
product that can meet the quality and
manufacturing requirements of our c...
Headquarters - Raleigh, NC
Manufacturing - Shenzhen, China
Provides
• Team unification throughout the world
• A unique site for each project
• Activity alerts
• History and timestam...
Factory Communications
• Gantt charts posted weekly
• T1 date established
• Progression photos are posted
Shared Communica...
T1 Trial is Run and Results Posted
• Samples
• AQL – PPAP
• Video of T1
• Process parameters
Customer
• Acceptance
Shipping
We have NEVER missed a T1 date
Stamping DieStamping DieStamping DieStamping Die
Suspension Part
Bumper
Clutch Part
Chassis Part
Automotive Industry
Window Lift System Part
Brake System Part
Seating
Syst...
Household Appliance & Office Equipment
In house tool building can help the
stamping division to control the cost of
manufa...
Tool Assembly
Our shop overview
Tube Bending & WeldingTube Bending & Welding
Differentiators
A Few ofA Few ofA Few ofA Few of OOOOur Customersur Customersur Customersur Customers
• FoundedFoundedFoundedFounded onononon thethethethe principlesprinciplesprinciplesprinciples ofofofof quality,quality,qua...
Last but most important is our communications!
ALL project communications happen on our Portal
24/7 project updates
Weekly...
Quality … at a cost effective price.
Prochain SlideShare
Chargement dans…5
×

TS-Industries shortform ver 9 - Stamping

  • Soyez le premier à commenter

  • Soyez le premier à aimer ceci

TS-Industries shortform ver 9 - Stamping

  1. 1. www.TS-Industries.com FS1
  2. 2. Slide 1 FS1 Frank Spears, 7/28/2013
  3. 3. “Our position in the value chain is to provide a product that can meet the quality and manufacturing requirements of our clients as well as cost savings at many levels. We stand behind our products and believe our value goes beyond our molds and into a partnership for tomorrow.”
  4. 4. Headquarters - Raleigh, NC Manufacturing - Shenzhen, China
  5. 5. Provides • Team unification throughout the world • A unique site for each project • Activity alerts • History and timestamps Results • Reduces total cost of acquisition • Improved Quality and Time
  6. 6. Factory Communications • Gantt charts posted weekly • T1 date established • Progression photos are posted Shared Communications • Change Requests • Revisions • Questions • Concerns • Constructive Discussions
  7. 7. T1 Trial is Run and Results Posted • Samples • AQL – PPAP • Video of T1 • Process parameters Customer • Acceptance Shipping
  8. 8. We have NEVER missed a T1 date
  9. 9. Stamping DieStamping DieStamping DieStamping Die
  10. 10. Suspension Part Bumper Clutch Part Chassis Part Automotive Industry Window Lift System Part Brake System Part Seating System Part
  11. 11. Household Appliance & Office Equipment In house tool building can help the stamping division to control the cost of manufacturing. We supply precision tools for household appliances, office equipment, electric and electronic industries.
  12. 12. Tool Assembly Our shop overview
  13. 13. Tube Bending & WeldingTube Bending & Welding
  14. 14. Differentiators A Few ofA Few ofA Few ofA Few of OOOOur Customersur Customersur Customersur Customers
  15. 15. • FoundedFoundedFoundedFounded onononon thethethethe principlesprinciplesprinciplesprinciples ofofofof quality,quality,quality,quality, speed,speed,speed,speed, serviceserviceserviceservice &&&& valuevaluevaluevalue • CommunicationsCommunicationsCommunicationsCommunications inininin EnglishEnglishEnglishEnglish • SingleSingleSingleSingle pointpointpointpoint ofofofof contactcontactcontactcontact • AdvancedAdvancedAdvancedAdvanced tooltooltooltool makingmakingmakingmaking processesprocessesprocessesprocesses andandandand technologiestechnologiestechnologiestechnologies • LatestLatestLatestLatest CADCADCADCAD withwithwithwith highlyhighlyhighlyhighly trainedtrainedtrainedtrained engineeringengineeringengineeringengineering staffstaffstaffstaff • PPAPPPAPPPAPPPAP reportreportreportreport andandandand videovideovideovideo isisisis includedincludedincludedincluded withwithwithwith TTTT1111 samplessamplessamplessamples • WeWeWeWe handlehandlehandlehandle allallallall logisticslogisticslogisticslogistics totototo youryouryouryour doordoordoordoor • MaterialsMaterialsMaterialsMaterials &&&& workmanshipworkmanshipworkmanshipworkmanship areareareare 100100100100%%%% guaranteedguaranteedguaranteedguaranteed • MaterialMaterialMaterialMaterial CertCertCertCert andandandand fullfullfullfull 3333DDDD drawingsdrawingsdrawingsdrawings providedprovidedprovidedprovided
  16. 16. Last but most important is our communications! ALL project communications happen on our Portal 24/7 project updates Weekly Ganttt Charts with photos Seamless communications
  17. 17. Quality … at a cost effective price.

×