SlideShare a Scribd company logo
1 of 5
Download to read offline
Cameron Ian Pistorius- Curriculum Vitae January 2017
Address: 94C Birdhurst Road, Westville North
Contact Number: 082 499 4686
Email: cameron@gavbrown.co.za
Nationality: South African Citizen
Marital status: Single
Date of Birth: 3 October 1989
ID no. 8910035181082
Sex: Male
Dependents: None
Driver’s license: Code B/ Code A
Languages: English
1. Career Status and Overview
I have 4 years’ experience in the Civil and Structural Industry. My expertise is in the structural sector
motivated by my fascination with Architecture and high rise buildings. I have been privileged to be a part of
numerous investigations into structural failures and serviceability failures which has given invaluable
insight on how buildings perform overtime as well as determining the modes of failure with regards to
design, detailing and construction.
I am currently employed at Gavin Brown and Associates. I am privileged to work for a small firm that
tackles challenging jobs both in the private and public sector. Gavin Brown is a Professional Civil and
Structural Engineer as well as a Professional Architect. By practicing in both Architecture and Structural
Engineering which is an added advantage when working with other Architects, as I have a firm
understanding of both form and function as well as the application of the National Building Regulations.
My ambition is to become a High Rise Specialist and Bridge Engineer.
2. Academic Qualifications:
ITC Timber Roof Inspectors Course Institute for Timber Construction
2016
B- Tech in Structural Engineering University of South Africa (UNISA)
Passed Cum Laude 2015
National Diploma in Civil Engineering University of South Africa (UNISA)
Passed Cum Laude 2014
ICDL Computer Driving Licence University of South Africa (UNISA)
2009
Matriculated Westville Boys High School
Passed with Merit Exemption 2007
Cameron Ian Pistorius- Curriculum Vitae January 2017
3. Work Experience
July 2015 - current Gavin Brown and Associates
Position Held: Civil & Structural Technologist
Responsibilities include:
− Structural Design & Detailing or Reinforced Concrete and Structural Steel.
− Site Inspections to approve concrete pours.
− Stormwater management and design.
− Preparation of Architectural Plans for Submission to Council (industrial and
residential)
− Geotechnical Investigations- Soil Profiling, DCP tests, Percolation Tests
− Submission of Plans to the Civil Aviation Authority for Helipads, Helistops
and Runways.
− ECSA Forensic Investigations
Jan 2013 – July 2015 Vawda Engineers
Position Held: Civil & Structural Technician
Responsibilities included:
− Structural Design & Detailing or Reinforced Concrete and Structural Steel.
− Site Inspections to approve concrete pours.
− Stormwater management and design.
− Compile stormwater management plans and reports.
− Compile structural reports.
− Structural Rehabilitation Design
Reasons for Leaving:
Better job opportunities and the desire to expand my knowledge base.
4. Civil / Structural Engineering Projects I have been involved in:
Xoloxolo Primary School (2015 - Current) (R45 Million)
Project Description: 25 Class Room School Situated in Kokstad.
Job Responsibilities: Design and Detail RC Structural Members;
Stormwater Management;
Attend Site Meetings with the Department of Public Works and the Project
Team; and
Reinforcing steel inspections for concrete pours
Bhongweni Youth Centre (2015 - 2017) (R12 Million)
Project Description: Youth Centre based in Kokstad comprising of a multipurpose hall, grand stand
seating and tennis court.
Job Responsibilities: Design and Detail Grand Stand Seating;
Stormwater management; and
Attend site meetings.
Monier Coverland– Avoca Plant (2015 - 2016) (R2 Million)
Project Description: 8.5m high portal framed steel structure to cover a Ridge Tile manufacturing
Plant.
Job Responsibilities: Derive Architectural Layout based on the clients requirements;
Foundation Design & Detailing;
Cameron Ian Pistorius- Curriculum Vitae January 2017
Structural Steel Design and Detailing;
Compiled all structural Drawings and details;
Invite Tenders and Tender adjudication; and
Conduct Site Meeting.
Frontier Hospital (2016) (R4.4 Million)
Project Description: New Elevated R.C framed Helistop in Queenstown.
Job responsibilities: Identify any potential elevated hazards in the direction of approach/
departure;
Determined the safe approach/departure slopes as well as transitional slopes
in accordance with the Civil Aviation Authority;
Updated the site plan showing which trees require trimming and service
poles that required lowering or relocation; and
Developed the lighting and markings drawing in compliance with the Civil
Aviation Authority.
PRD Building Mthata Helistop (2016)
Project Description: Helistop on top of an 18 storey high rise building, Existing Helistop did not
comply with the Civil Aviation Requirements. We were appointed as the
architects to obtain CAA approval.
Job Responsibilities: Determine safe approach/ departure slopes;
Lighting specs and details;
Fire Management; and
Paint/ light markings.
Doctor Pixley Ka Isaka Seme Memorial hospital Helistop (2015 - 2016)
Project Description: New Helistop located at roof slab level.
Job Responsibilities: Determine safe approach/ departure slopes;
Lighting specs and details; and
Paint/ light markings.
Umzolozolo Private Safari Lodge (2015 - 2017) (R7.1 Million)
Project Description: 5 Star Lodge based in Ladysmith. Main Lodge Extension, 4 additional chalet
units, kitchen extension, new health spa, pool area bar and deck extensions.
Job responsibilities: Compile architectural plans;
Compile finishing schedules;
Obtain quotes for finishes;
Structural design and detailing;
Structural drawings;
Attend site meetings; and
Site inspections
Regal Inn Umhlanga (2013 - 2015) (R60 Million)
Project Description: Six floor – 60 Bedroom hotel.
Job Responsibilities: Concrete layout drawings and detailing;
Design of foundations (piles, pile caps, strap beams);
Design of reinforced concrete columns;
Design of retaining walls;
Cameron Ian Pistorius- Curriculum Vitae January 2017
Design of lift shaft, lift pit and attenuation tank;
Design of reinforced concrete beams, canopy and pent house slabs;
Design of suspended entrance and exit ramps; and
Site Inspections.
Caltex Garage, Uvongo – Marine Drive (2015)
Project Description: Additions and alterations to an existing Caltex Service Station.
Job Responsibilities: Executed the stormwater management plan and report.
JMH City Hospital (2015)
Project Description: Multi story hospital showing signs of structural distress.
North Block – 7 suspended floors – structural strengthening of columns and
slabs;
Link Slabs – 7 suspended floors, structural strengthening of columns and
slabs; and
South Block – 12 suspended floors, structural strengthening of columns and
slabs.
Job responsibilities: Full design check of the existing structure;
Design and detail slab and column strengthening requirements;
Compilation of a structural forensic report into existing cracks; and
Excessive deflections in slabs.
Silver Oaks (2013 - 2014)
Project Description: Three floor apartment building with mezzanine floor.
Half framed structure, half load bearing brickwork.
Job Responsibilities: Prepare all concrete layout drawings and detailing.
Phoenix Medical Centre (2013)
Project Description: Three floor reinforced concrete framed medical centre.
Job Responsibilities: Prepare all concrete layout drawings and detailing; and
Design of all foundations (pad footings and combined bases).
Habib Overseas Bank (2013)
Project Description: Four floor reinforced concrete framed bank.
Job Responsibilities: Detailing of R.C. beams and slabs.
Epic Centre (2013 - 2014)
Project Description: Proposed electronic signboard comprised of structural steel, 14m high and
70m long.
Job Responsibilities: Structural steel design using Prokon and drawing all steel layouts and
detailing; and
Design and detailing of the pad footing for the plinth.
LED Street Light Suppliers – Scissor Lightpole (2014)
Project Description: A structural steel light pole whereby the mast is split in half with a hinge at
approximately its centre of gravity. Half of the mast is fixed while the other
half pivots to permit replacing the luminaries without the need for specialist
lift equipment.
Cameron Ian Pistorius- Curriculum Vitae January 2017
Job Responsibilities: Prepare all preliminary designs for a 20m, 15m and 12m tall mast as well as
producing all of the detailed working drawings.
Inanda Supermarket (2014)
Project Description: A 5404m² supermarket and associated small shops in KwaMashu.
Job Responsibilities: By using the survey diagram, I developed a site layout plan with the objective
of maximising space and maintaining the prescribed municipal distances from
the site boundary; and
Executed the stormwater management plan and report.
McDonalds, King Williams Town (2014)
Project Description: Fast Food Outlet.
Job Responsibilities: Stormwater management plan; and
Design and detailing of reinforced concrete beams and suspended slab
5. Computer Literacy
Skilled in following computer programs:
Microsoft Office, Autocad, Padds, Prokon, Tekla Structures and Tekla Structural Designer.
6. Hobbies and Interests
Motocross, BMXing, Hiking, 4x4 driving and overlanding.
7. References
Ahmed Vawda
Vawda Engineers
Director
Email: mail@vawdaeng.co.za
Tel: 031 577 3848
Cell: 082 823 4786

More Related Content

What's hot (20)

Land Surveyor Akmal Khan
Land Surveyor Akmal KhanLand Surveyor Akmal Khan
Land Surveyor Akmal Khan
 
Land Surveyor Updated CV
Land Surveyor Updated CVLand Surveyor Updated CV
Land Surveyor Updated CV
 
BULLETIN CONSTRUCTION SERVICE New 14
BULLETIN CONSTRUCTION SERVICE New 14BULLETIN CONSTRUCTION SERVICE New 14
BULLETIN CONSTRUCTION SERVICE New 14
 
Cv of ian shannon
Cv of ian shannonCv of ian shannon
Cv of ian shannon
 
Bulletin construction secvice business profile 24.06.2016 word
Bulletin construction secvice business profile 24.06.2016  wordBulletin construction secvice business profile 24.06.2016  word
Bulletin construction secvice business profile 24.06.2016 word
 
RESUME-MANIKANDAN
RESUME-MANIKANDANRESUME-MANIKANDAN
RESUME-MANIKANDAN
 
Jake-Oussoren (2)
Jake-Oussoren (2)Jake-Oussoren (2)
Jake-Oussoren (2)
 
cv 8-8-2016
cv 8-8-2016cv 8-8-2016
cv 8-8-2016
 
Salem mohamed curriculum vitae
Salem mohamed curriculum vitaeSalem mohamed curriculum vitae
Salem mohamed curriculum vitae
 
Romany resume 2016
Romany resume 2016Romany resume 2016
Romany resume 2016
 
Surveyor cv
Surveyor cvSurveyor cv
Surveyor cv
 
modified cv khaled
modified  cv khaledmodified  cv khaled
modified cv khaled
 
C v surveyor( Mumtaz )
C v surveyor( Mumtaz )C v surveyor( Mumtaz )
C v surveyor( Mumtaz )
 
Irshad (Autocad CV)
Irshad (Autocad CV)Irshad (Autocad CV)
Irshad (Autocad CV)
 
john jacob cv
john jacob cvjohn jacob cv
john jacob cv
 
Curriculum Vitae Renold Pereira Ptc
Curriculum Vitae Renold Pereira  PtcCurriculum Vitae Renold Pereira  Ptc
Curriculum Vitae Renold Pereira Ptc
 
CV F 2016
CV  F 2016CV  F 2016
CV F 2016
 
HUM-Surveyor-CV
HUM-Surveyor-CVHUM-Surveyor-CV
HUM-Surveyor-CV
 
Naveed Asif C.V Updated
Naveed Asif C.V UpdatedNaveed Asif C.V Updated
Naveed Asif C.V Updated
 
Abdul Hameed Civil supervisor
Abdul Hameed Civil supervisorAbdul Hameed Civil supervisor
Abdul Hameed Civil supervisor
 

Similar to Cameron ian pistorius curriculum vitae

Career History - Ross Ullman - March 2015
Career History - Ross Ullman - March 2015Career History - Ross Ullman - March 2015
Career History - Ross Ullman - March 2015Ross Ullman
 
Steve Miller CV 2017
Steve Miller CV 2017Steve Miller CV 2017
Steve Miller CV 2017Steven Miller
 
Ibrahim S. Al-Shayea CV (Project Engineer)
Ibrahim S. Al-Shayea CV (Project Engineer)Ibrahim S. Al-Shayea CV (Project Engineer)
Ibrahim S. Al-Shayea CV (Project Engineer)Ibrahim Al-Shayea
 
Brent Maskell Resume May 2016
Brent Maskell Resume May 2016Brent Maskell Resume May 2016
Brent Maskell Resume May 2016Brent Maskell
 
Stephen parish c.v. 14 03-17
Stephen parish c.v. 14 03-17Stephen parish c.v. 14 03-17
Stephen parish c.v. 14 03-17stephen parish
 
Resume of Gohar Rehman
Resume of Gohar RehmanResume of Gohar Rehman
Resume of Gohar RehmanGohar Rehman
 
David Smith 2016 CV
David Smith 2016 CVDavid Smith 2016 CV
David Smith 2016 CVDavid Smith
 
Resume of ken hagan. 1
Resume of ken hagan. 1Resume of ken hagan. 1
Resume of ken hagan. 1Kenny Hagan
 
Raymond Guo 2016
Raymond Guo 2016Raymond Guo 2016
Raymond Guo 2016Raymond Guo
 
Abanoub ghobrial , Senior planning engineer
Abanoub ghobrial , Senior planning engineerAbanoub ghobrial , Senior planning engineer
Abanoub ghobrial , Senior planning engineerAbanoubGhobrial1
 
new cv ali - Copy
new cv ali - Copynew cv ali - Copy
new cv ali - Copyali haider
 
new cv ali - Copy
new cv ali - Copynew cv ali - Copy
new cv ali - Copyali haider
 

Similar to Cameron ian pistorius curriculum vitae (20)

Career History - Ross Ullman - March 2015
Career History - Ross Ullman - March 2015Career History - Ross Ullman - March 2015
Career History - Ross Ullman - March 2015
 
BAFFOUR CV
BAFFOUR CVBAFFOUR CV
BAFFOUR CV
 
Steve Miller CV 2017
Steve Miller CV 2017Steve Miller CV 2017
Steve Miller CV 2017
 
Connelly Darren (CV1)
Connelly Darren (CV1)Connelly Darren (CV1)
Connelly Darren (CV1)
 
KENRICK RAMOS 2017
KENRICK RAMOS 2017KENRICK RAMOS 2017
KENRICK RAMOS 2017
 
Ibrahim S. Al-Shayea CV (Project Engineer)
Ibrahim S. Al-Shayea CV (Project Engineer)Ibrahim S. Al-Shayea CV (Project Engineer)
Ibrahim S. Al-Shayea CV (Project Engineer)
 
Brent Maskell Resume May 2016
Brent Maskell Resume May 2016Brent Maskell Resume May 2016
Brent Maskell Resume May 2016
 
Sameem Resume-Civil
Sameem Resume-CivilSameem Resume-Civil
Sameem Resume-Civil
 
Hafiz's CV
Hafiz's CVHafiz's CV
Hafiz's CV
 
HAFIZ'S Cv
HAFIZ'S Cv HAFIZ'S Cv
HAFIZ'S Cv
 
Stephen parish c.v. 14 03-17
Stephen parish c.v. 14 03-17Stephen parish c.v. 14 03-17
Stephen parish c.v. 14 03-17
 
Resume of Gohar Rehman
Resume of Gohar RehmanResume of Gohar Rehman
Resume of Gohar Rehman
 
Resume -Amarnath
Resume -AmarnathResume -Amarnath
Resume -Amarnath
 
Resume -Amarnath
Resume -AmarnathResume -Amarnath
Resume -Amarnath
 
David Smith 2016 CV
David Smith 2016 CVDavid Smith 2016 CV
David Smith 2016 CV
 
Resume of ken hagan. 1
Resume of ken hagan. 1Resume of ken hagan. 1
Resume of ken hagan. 1
 
Raymond Guo 2016
Raymond Guo 2016Raymond Guo 2016
Raymond Guo 2016
 
Abanoub ghobrial , Senior planning engineer
Abanoub ghobrial , Senior planning engineerAbanoub ghobrial , Senior planning engineer
Abanoub ghobrial , Senior planning engineer
 
new cv ali - Copy
new cv ali - Copynew cv ali - Copy
new cv ali - Copy
 
new cv ali - Copy
new cv ali - Copynew cv ali - Copy
new cv ali - Copy
 

Recently uploaded

complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
An introduction to Semiconductor and its types.pptx
An introduction to Semiconductor and its types.pptxAn introduction to Semiconductor and its types.pptx
An introduction to Semiconductor and its types.pptxPurva Nikam
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...Chandu841456
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfROCENODodongVILLACER
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncssuser2ae721
 
computer application and construction management
computer application and construction managementcomputer application and construction management
computer application and construction managementMariconPadriquez1
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 

Recently uploaded (20)

complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
An introduction to Semiconductor and its types.pptx
An introduction to Semiconductor and its types.pptxAn introduction to Semiconductor and its types.pptx
An introduction to Semiconductor and its types.pptx
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdf
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
computer application and construction management
computer application and construction managementcomputer application and construction management
computer application and construction management
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 

Cameron ian pistorius curriculum vitae

  • 1. Cameron Ian Pistorius- Curriculum Vitae January 2017 Address: 94C Birdhurst Road, Westville North Contact Number: 082 499 4686 Email: cameron@gavbrown.co.za Nationality: South African Citizen Marital status: Single Date of Birth: 3 October 1989 ID no. 8910035181082 Sex: Male Dependents: None Driver’s license: Code B/ Code A Languages: English 1. Career Status and Overview I have 4 years’ experience in the Civil and Structural Industry. My expertise is in the structural sector motivated by my fascination with Architecture and high rise buildings. I have been privileged to be a part of numerous investigations into structural failures and serviceability failures which has given invaluable insight on how buildings perform overtime as well as determining the modes of failure with regards to design, detailing and construction. I am currently employed at Gavin Brown and Associates. I am privileged to work for a small firm that tackles challenging jobs both in the private and public sector. Gavin Brown is a Professional Civil and Structural Engineer as well as a Professional Architect. By practicing in both Architecture and Structural Engineering which is an added advantage when working with other Architects, as I have a firm understanding of both form and function as well as the application of the National Building Regulations. My ambition is to become a High Rise Specialist and Bridge Engineer. 2. Academic Qualifications: ITC Timber Roof Inspectors Course Institute for Timber Construction 2016 B- Tech in Structural Engineering University of South Africa (UNISA) Passed Cum Laude 2015 National Diploma in Civil Engineering University of South Africa (UNISA) Passed Cum Laude 2014 ICDL Computer Driving Licence University of South Africa (UNISA) 2009 Matriculated Westville Boys High School Passed with Merit Exemption 2007
  • 2. Cameron Ian Pistorius- Curriculum Vitae January 2017 3. Work Experience July 2015 - current Gavin Brown and Associates Position Held: Civil & Structural Technologist Responsibilities include: − Structural Design & Detailing or Reinforced Concrete and Structural Steel. − Site Inspections to approve concrete pours. − Stormwater management and design. − Preparation of Architectural Plans for Submission to Council (industrial and residential) − Geotechnical Investigations- Soil Profiling, DCP tests, Percolation Tests − Submission of Plans to the Civil Aviation Authority for Helipads, Helistops and Runways. − ECSA Forensic Investigations Jan 2013 – July 2015 Vawda Engineers Position Held: Civil & Structural Technician Responsibilities included: − Structural Design & Detailing or Reinforced Concrete and Structural Steel. − Site Inspections to approve concrete pours. − Stormwater management and design. − Compile stormwater management plans and reports. − Compile structural reports. − Structural Rehabilitation Design Reasons for Leaving: Better job opportunities and the desire to expand my knowledge base. 4. Civil / Structural Engineering Projects I have been involved in: Xoloxolo Primary School (2015 - Current) (R45 Million) Project Description: 25 Class Room School Situated in Kokstad. Job Responsibilities: Design and Detail RC Structural Members; Stormwater Management; Attend Site Meetings with the Department of Public Works and the Project Team; and Reinforcing steel inspections for concrete pours Bhongweni Youth Centre (2015 - 2017) (R12 Million) Project Description: Youth Centre based in Kokstad comprising of a multipurpose hall, grand stand seating and tennis court. Job Responsibilities: Design and Detail Grand Stand Seating; Stormwater management; and Attend site meetings. Monier Coverland– Avoca Plant (2015 - 2016) (R2 Million) Project Description: 8.5m high portal framed steel structure to cover a Ridge Tile manufacturing Plant. Job Responsibilities: Derive Architectural Layout based on the clients requirements; Foundation Design & Detailing;
  • 3. Cameron Ian Pistorius- Curriculum Vitae January 2017 Structural Steel Design and Detailing; Compiled all structural Drawings and details; Invite Tenders and Tender adjudication; and Conduct Site Meeting. Frontier Hospital (2016) (R4.4 Million) Project Description: New Elevated R.C framed Helistop in Queenstown. Job responsibilities: Identify any potential elevated hazards in the direction of approach/ departure; Determined the safe approach/departure slopes as well as transitional slopes in accordance with the Civil Aviation Authority; Updated the site plan showing which trees require trimming and service poles that required lowering or relocation; and Developed the lighting and markings drawing in compliance with the Civil Aviation Authority. PRD Building Mthata Helistop (2016) Project Description: Helistop on top of an 18 storey high rise building, Existing Helistop did not comply with the Civil Aviation Requirements. We were appointed as the architects to obtain CAA approval. Job Responsibilities: Determine safe approach/ departure slopes; Lighting specs and details; Fire Management; and Paint/ light markings. Doctor Pixley Ka Isaka Seme Memorial hospital Helistop (2015 - 2016) Project Description: New Helistop located at roof slab level. Job Responsibilities: Determine safe approach/ departure slopes; Lighting specs and details; and Paint/ light markings. Umzolozolo Private Safari Lodge (2015 - 2017) (R7.1 Million) Project Description: 5 Star Lodge based in Ladysmith. Main Lodge Extension, 4 additional chalet units, kitchen extension, new health spa, pool area bar and deck extensions. Job responsibilities: Compile architectural plans; Compile finishing schedules; Obtain quotes for finishes; Structural design and detailing; Structural drawings; Attend site meetings; and Site inspections Regal Inn Umhlanga (2013 - 2015) (R60 Million) Project Description: Six floor – 60 Bedroom hotel. Job Responsibilities: Concrete layout drawings and detailing; Design of foundations (piles, pile caps, strap beams); Design of reinforced concrete columns; Design of retaining walls;
  • 4. Cameron Ian Pistorius- Curriculum Vitae January 2017 Design of lift shaft, lift pit and attenuation tank; Design of reinforced concrete beams, canopy and pent house slabs; Design of suspended entrance and exit ramps; and Site Inspections. Caltex Garage, Uvongo – Marine Drive (2015) Project Description: Additions and alterations to an existing Caltex Service Station. Job Responsibilities: Executed the stormwater management plan and report. JMH City Hospital (2015) Project Description: Multi story hospital showing signs of structural distress. North Block – 7 suspended floors – structural strengthening of columns and slabs; Link Slabs – 7 suspended floors, structural strengthening of columns and slabs; and South Block – 12 suspended floors, structural strengthening of columns and slabs. Job responsibilities: Full design check of the existing structure; Design and detail slab and column strengthening requirements; Compilation of a structural forensic report into existing cracks; and Excessive deflections in slabs. Silver Oaks (2013 - 2014) Project Description: Three floor apartment building with mezzanine floor. Half framed structure, half load bearing brickwork. Job Responsibilities: Prepare all concrete layout drawings and detailing. Phoenix Medical Centre (2013) Project Description: Three floor reinforced concrete framed medical centre. Job Responsibilities: Prepare all concrete layout drawings and detailing; and Design of all foundations (pad footings and combined bases). Habib Overseas Bank (2013) Project Description: Four floor reinforced concrete framed bank. Job Responsibilities: Detailing of R.C. beams and slabs. Epic Centre (2013 - 2014) Project Description: Proposed electronic signboard comprised of structural steel, 14m high and 70m long. Job Responsibilities: Structural steel design using Prokon and drawing all steel layouts and detailing; and Design and detailing of the pad footing for the plinth. LED Street Light Suppliers – Scissor Lightpole (2014) Project Description: A structural steel light pole whereby the mast is split in half with a hinge at approximately its centre of gravity. Half of the mast is fixed while the other half pivots to permit replacing the luminaries without the need for specialist lift equipment.
  • 5. Cameron Ian Pistorius- Curriculum Vitae January 2017 Job Responsibilities: Prepare all preliminary designs for a 20m, 15m and 12m tall mast as well as producing all of the detailed working drawings. Inanda Supermarket (2014) Project Description: A 5404m² supermarket and associated small shops in KwaMashu. Job Responsibilities: By using the survey diagram, I developed a site layout plan with the objective of maximising space and maintaining the prescribed municipal distances from the site boundary; and Executed the stormwater management plan and report. McDonalds, King Williams Town (2014) Project Description: Fast Food Outlet. Job Responsibilities: Stormwater management plan; and Design and detailing of reinforced concrete beams and suspended slab 5. Computer Literacy Skilled in following computer programs: Microsoft Office, Autocad, Padds, Prokon, Tekla Structures and Tekla Structural Designer. 6. Hobbies and Interests Motocross, BMXing, Hiking, 4x4 driving and overlanding. 7. References Ahmed Vawda Vawda Engineers Director Email: mail@vawdaeng.co.za Tel: 031 577 3848 Cell: 082 823 4786