INTRODUCTION TO
IMMERSED TUBE TUNNEL TECHNOLOGY
BY
ABHAY OCEAN INDIA PVT LTD
BACKGROUND
TRADITIONALLY LARGE (SEA) CROSSINGS CARRIED OUT BY MEANS OF THE
APPARENT MOST ECONOMIC OPTION –BRIDGE.
IF A TUNNEL OPTION IS CONSIDERED - BORED TUNNEL SEEMS FAVOURITE .
IN RECENT PAST NEW DEVELOPMENTS AND INNOVATIONS HAVE LEAD TO
REVIVAL OF IMMERSED TUNNEL AS A COMPETITIVE ALTERNATIVE FOR LARGE
FIXED LINKS .
THE ØRESUND LINK BETWEEN DENMARK AND SWEDEN GAVE THE IMMERSED
TUNNEL TECHNIQUE THE FIRST BOOST.
THIS WAS FOLLOWED BY OTHER MAJOR LINKS IN WHICH IMMERSED TUNNEL
TECHNIQUE IS APPLIED ON LARGE SCALE.
THE LAST IMPRESSIVE EXAMPLE IS THE FEHMERNBELT LINK, THE LINK
BETWEEN DENMARK AND GERMANY COMPRISING AN IMMERSED TUNNEL OF
ALMOST 19 KM.
MAJOR SEA CROSSING ØRESUND LINK BETWEEN DENMARK AND SWEDEN
INTRODUCTION TO IMMERSED TUNNELS
AN ALTERNATIVE TO BRIDGES AND BORED TUNNELS .
IMMERSED TUBE TUNNEL UNITS OF LENGTH OF ABOUT 100M LONG,
FORMING COMPLETE TUNNEL CROSS-SECTIONS WITH BOTH ENDS
TEMPORARILY SEALED BY A BULKHEAD ARE FABRICATED IN A DRY DOCK.
TUNNEL ELEMENTS IN CASTING BASIN (ANTWERP TUNNEL ELEMENTS FLOODED CASTING BASIN
SEALED UNITS ARE FLOATED AND TOWED TO TUNNEL LOCATION AND LOWERED INTO
A PRE- DREDGED TRENCH IN THE SEA OR RIVER BED
OFF SHORE TRANSPORT TUNNEL ELEMENTS OF PIET HEINTUNNEL (THE NETHERLANDS)
TUNNEL ELEMENT AT PROJECT LOCATION TUNNEL ELEMENT DURING IMMERSION
TOWING & IMMERSION OF TUNNEL ELEMENTS
AN ALTERNATIVE TO BRIDGES AND BORED TUNNELS.
IMMERSED TUBE TUNNEL UNITS OF LENGTH OF ABOUT 100M LONG, FORMING COMPLETE
TUNNEL CROSS-SECTIONS WITH BOTH ENDS TEMPORARILY SEALED BY A BULKHEAD ARE
FABRICATED IN A DRY DOCK.
SEALED UNITS ARE FLOATED AND TOWED TO TUNNEL LOCATION AND LOWERED INTO A PRE
DREDGED TRENCH IN THE SEA OR RIVER BED.
ON ONE END OF EACH TUNNEL ELEMENT, AN ENDLESS GINA GASKET IS MOUNTED.
UPON TUNNEL UNIT BEING IMMERSED, IT IS THEN PULLED FIRMLY UP AGAINST THE
PRECEDING IMMERSED TUNNEL UNIT WITH A HYDRAULIC JACK.
WHEN THE GINA GASKET HAS FULL CONTACT AROUND THE TOTAL CIRCUMFERENCE OF THE
ADJACENT TUNNEL UNIT, THE WATER BETWEEN THE BULKHEADS IS PUMPED OUT.
DUE TO THE PRESSURE DIFFERENCE BETWEEN THE BULKHEADS AND THE HYDROSTATIC
PRESSURE ON THE OUTSIDE OF THE TUNNEL, THE GINA PROFILE COMPRESSES AND SEALS
THE JOINT. THE UNITS WILL THEN FORM A CONTINUOUS TUBE AND THE TRENCH IS
BACKFILLED PROGRESSIVELY.
IMMERSED TUBE TUNNEL
WHAT IS AN IMMERSED TUNNEL
PRECAST TUNNEL ELEMENTS,
CONSTRUCTED IN THE DRY.
FLOATED TO THE DESTINATION.
LOWERED INTO PLACE, JOINED AND
COVERED UP.
HISTORY
FIRST CONSTRUCTED ABOUT 120 YEARS AGO.
ABOUT 200 HAVE BEEN CONSTRUCTED ALL
OVER THE WORLD.
ABOUT 150 ARE FOR ROAD OR RAIL.
FIRST PROPOSED 1860
Harlem River Tunnel, New York 1911
TUNNEL CROSS SECTIONS
Selection of cross-sections determined by local experience and practice.
In the U.S.A. use of steel shell tunnels is more common .
In Europe and Japan reinforced concrete tunnels are more popular .
Structure of steel shell tunnel is of relatively thin-walled composite steel and
concrete rings.
There are a wide range of cross-sectional configurations, depending on
intended use of the tunnel.
Circular-shape section, binocular and rectangular shape section are used for
immersed tube tunnels.
The trench is then backfilled and any necessary protection, such as Rock Armor,
added over the top .
The ground beside each end tunnel element is reinforced, to permit a tunnel
boring machine to drill the final links to the portals on land.
After these stages the tunnel is complete, and the internal fit out can be carried
out.
LAND-SIDE INTERFACES
VENTILATION BUILDINGS
EARTHQUAKE JOINTS
CUT-AND-COVER TUNNEL
OPEN APPROACHES
SEQUENCE IMT-C&C SCHEDULE
DRIVEN
IMMERSED TUNNEL CHALLENGES
Use Advanced Construction
Techniques.
Use Latest Ventilation Techniques.
Select ideal Immersed Tunnel
Alignments.
Determine Construction and
Staging Locations.
Deal with Difficult Ground
Conditions.
Dredging and Disposal.
The Gina gasket and Omega seal are used between the sectional elements
of immersed tunnels to prevent water ingress due to external water
pressure.
The combination of seals allows for sealing, for the transfer of the
hydrostatic loads and movements between the tunnel ends due to soil
settlement, creep of concrete, temperature effects and if required
earthquakes The designs are generally based on the expected tunnel
lifetime of 100 years. Pressure difference between the bulkheads and the
hydrostatic pressure on the outside of the tunnel, the Gina profile
compresses and seals the joint.
GINA GASKETS
FINAL PLACEMENT OF IMMERSED TUBE ELEMENTS
Immersed tunnel elements floated to site using their buoyant state.
Ends of tunnel elements equipped with bulkheads (dam plates) across
ends to keep inside dry.
Bulkheads located to allow only about 1.0 m between the bulkheads of
adjacent elements at immersion joint.
This space is emptied once an initial seal is obtained during the joining
process.
Joints usually equipped with gaskets to create seal with the adjacent
element.
Adjustment devices allow placement of the elements on line and grade.
Tunnel elements lowered into their location after adding temporary water
ballast in designated water ballast tank.
After installation of back fill, ballast water is exchanged with ballast
concrete, installed on the tunnel base slab.
Subsequently finishing of tunnel and tunnel installations place.
TUNNEL CROSS SECTION
SELECTION OF TYPICAL CROSS-SECTIONS IS DETERMINED BY LOCAL
EXPERIENCE AND PRACTICE .
IN THE U.S.A. USE OF STEEL SHELL TUNNELS ARE MORE COMMON.
IN THE EUROPE AND JAPAN REINFORCED CONCRETE TUNNELS ARE MORE
POPULAR CONCRETE TUNNEL.
STEEL TUNNELS
SINGLE SHELL
DOUBLE SHELL
SANDWICH TUNNEL – RECENT DEVELOPMENT IN JAPAN
Both internal &external structures are Steel plates.
Internal steel diaphragms, Connect plates.
No reinforcement.
Filled with non shrink self compacting concrete.
DOUBLE SHELL TUNNELS
WHY AND WHEN ARE IMMERSED TUNNELS COMPETITIVE / ADVANTAGES
Immersed tunnels have advantage over bored tunnels for water
crossing locations .
They lie only a short distance below water bed level. Approaches are
therefore relatively shorter .
Compared with high level bridges or bored tunnels, the overall length
of crossing will be shorter.
FLEXIBILITY IN CROSS SECTION SHAPES
IMMERSED TUNNELSPOSSIBLE CROSS SECTION SHAPES -
OTHER ADVANTAGES OF IMMERSED TUNNELS
MAIN ADVANTAGE IS THEY CAN BE CONSIDERABLY MORE COST EFFECTIVE THAN
BORED TUNNEL BENEATH THE WATER OR A BRIDGE
OTHER ADVANTAGES RELATIVE TO THESE ALTERNATIVES INCLUDE:
SPEED OF CONSTRUCTION
MINIMAL DISRUPTION TO RIVER/CHANNEL, IF CROSSING A SHIPPING ROUTE
RESISTANCE TO SEISMIC ACTIVITY
SAFETY OF CONSTRUCTION (WORK IN A DRY DOCK AS OPPOSED TO BORING
BENEATH A RIVER)
DREDGED MATERIAL CAN BE USED MAKING ARTIFICIAL ISLANDS / LAND
RECLAMATION
DISADVANTAGES ARE:
DIRECT CONTACT WITH WATER - CAREFUL WATERPROOFING DESIGN AROUND
JOINTS
THE SEGMENTAL APPROACH REQUIRES CAREFUL DESIGN OF THE CONNECTIONS
ENVIRONMENTAL IMPACT OF TUBE AND UNDERWATER EMBANKMENT ON
EXISTING CHANNEL / SEA BED.
ILLUSTRATIVE EXAMPLES - IMMERSED TUNNEL PROJECTS
The Øresund Link - First major sea crossing using immersed tunnel technique and
bridge connection between Denmark and Sweden.
16.7 km link is Road and train carriageway
The transition between the tunnel and the bridge is accommodated by a large
artificial island approx 4 km long
At the Denmark shore a significant land reclamation extending 430 m in the sea was
established. Øresund Link (aerial view)
THE ORESUND LINK…. CONTD
Immersed part of the tunnel length - 3500 m
Tunnel is divided into 20 elements, each 176m long; each element is made up
of 8 segments of 22m each
The tunnel includes two railway tubes, two motorway tubes and an escape
gallery
Outer dimensions of the cross section are 8.5m by 41.7 m.
Cross section immersed tunnel
Busan Geoje Crossing, South Korea
Road connection in south eastern part of South Korea between Busan and Geoje.
Link comprises of two cable stayed bridges and a concrete immersed tube tunnel
Tube Tunnel comprises of 18 tunnel elements with a length of 180m each
Immersed tunnel is 3.2 km long and deepest (max water depth of 48 m) in world
INSTALLATION OF BUSAN GEOJE TUNNEL ELEMENTS
HONGKONG ZHUHAI MACAO LINK, CHINA
A challenging infrastructure project - HZBM Link under construction
Main project is offshore section of HZMB Link of approx. 30km, crossing the Pearl River
Estuary from border with Hong Kong to Macao and Zhuhai (Mainland China).
Link comprises various bridges, artificial islands and tunnels to accommodate a dual
carriageway with 3 traffic lanes in each direction.
Crossing of main shipping channels at the eastern side of the Pearl River Estuary will be
realised using a 6.75km long tunnel, of which 6km will be immersed.
Transition from bridges to tunnel will be by artificial islands with a length of 625m each.
ISLANDS DESIGN FOR HONGKONG ZHUHAI MACAO LINK
ILLUSTRATIONS ARTIFICIAL ISLANDS AND TUNNEL ENTRANCE (ON ISLAND
In HZMB Link transition between bridges and the immersed tunnel will be
realized by artificial islands.
The islands are approximately 625 m long and 160 m wide.
Technical service buildings for the tunnel are located at the islands
FEHMERNBELT LINK, DENMARK
Fehmernbelt Fixed Link planned to cross the Fehmernbelt between Rødbyhavn,
140km south of Copenhagen, and Puttgarden, on the north coast of Germany
Comprehensive studies including environmental studies resulted in decision
that immersed tunnel is best solution
Project combines records such as a length of 18.5 km and a water depth of 30
m, while crossing a busy navigational channel.
IMMERSED TUNNEL SOLUTION - FOR FEHMERNBELT LINK, DENMARK
Tunnel elements consist of combined road and rail cross-section all at one
level within concrete structure
Each Standard element of immersed tunnel has length of approximately
217 m.
Underneath the road and rail tubes there will be access to all areas of the
tunnel to reduce disruption of the traffic to a minimum.
IMMERSED TUBE TUNNEL CONSTRUCTION IN HONG KONG
1: Cross Harbour Tunnel. 2: Mass Transit Railway Tunnel.
3: Eastern Harbour Crossing Tunnel. 4:Airport Railway Western Immersed tube
5: Western Harbour Crossing Tunnel. Tunnel.
•Hong Kong has extensive immersed tube tunnel experience
•First steel immersed tube tunnel was placed across the Victoria Harbour in
1972.
•There are four other vehicle/railway tunnels crossing the Harbour using
immersed tube techniques.
•The layout plan of the five immersed tube tunnels is shown in the Figure
below
OUTFITTING SITE
Finish elements
Ready them for immersion
Attach elements to
winches or cranes
Pontoons or barges needed
COMPRESSION
OF RUBBER
GASKET
COMPLETING THE INSTALLATION
FINISHING
Foundation
Backfill trench
Protect top of tunnel
Finish insides
LAND-SIDE INTERFACES
Ventilation buildings
Earthquake joints
Cut-and-cover tunnel
Open approaches
Sequence IMT-C&C schedule
driven
IMMERSED TUNNEL CHALLENGES
Use Advanced Construction Techniques
Use Latest Ventilation Techniques
Select ideal Immersed Tunnel Alignments
Determine Construction and Staging Locations
Deal with Difficult Ground Conditions
Dredging and Disposal
FINDINGS OF STUDY FOR OF AN IMMERSED TUNNEL IN IZMIR BAY, TURKEY
The proposed izmir bay immersed tube tunnel (ibitt) will measure 40 m in width
and 7.6 km in length. The tunnel is characterized by a rectangular cross-section, and
will have 2x3 road traffic lanes on both sides, and a 2x1 railway tracks in the middle.
An immersed tube tunnel construction is considered along this route for the
following reasons:
Izmir bay is relatively shallow (<25 m) so it meets the maximum depth criteria (60
m) for constructability
Seabed soil is generally made of the non-cohesive very loose to loose silt-sand
mixtures, with a very low bearing capacity, which can be improved by suitable soil-
improvement technique
By selection of a straight-line route between two sides of the bay, the tunnel can
be connected to the existing highway junctions and nearby railway lines
The buried tube tunnel surrounded with a selected compacted fill in the tunnel’s
dredged ditch has a better earthquake response when compared to a much heavier
elevated bridge structure
Substantial foundation cost savings, compared to other fixed-crossing options, will
be realized due to the fact that the immersed tube tunnel makes use of water-
buoyancy (Archimedes principle), which enables smaller load transfer to the very
loose seabed soil with very low bearing capacity.
CONSTRUCTION OF AN IMMERSED TUBE TUNNEL ACROSS THE IZMIR BAY WILL ENABLE:
Direct link to the existing highway and railway junctions in the north and
the south districts.
Also, traffic congestion in the centre of the city will diminish substantially.
The tunnel will considerably shorten the commuting distance between the
Çeşme-Motorway and Izmir-Çanakkale Highway by about 40 km.
Shorter distance & smooth drive -- Leads to considerably Lower petrol
consumption leading to considerable reduction in foreign exchange outgo
for the import of petrol -- highly beneficial to national economy.
Quality of life and air for people living in the city will be improved, as
transport difficulties and environmental pollution will decrease.
CHINA’S PLANS LONGEST UNDERWATER TUNNEL ON THE PLANET
PLANNED SUBMERGED TUNNEL IN CHINA
ESTIMATED LENGTH - 123KM
LONGER THAN COMBINED LENGTH OF WORLD’S TWO
LONGEST UNDERWATER TUNNELS—JAPAN’S SEIKAN TUNNEL
AND CHANNEL TUNNEL BETWEEN THE UK AND FRANCE.
CONNECT PORTS OF DALIAN AND YANTAI – 105 MILES APART
AS CROW FLIES
AT PRESENT DRIVE BETWEEN PORTS TAKES – 7-8 HRS
TUNNEL WILL SHORTEN DRIVING TIME TO ONE HOUR.
PASSES THROUGH TWO SEISMIC FAULT ZONES –
CONSTRUCTION TO WITHSTAND EARTHQUAKE OF EIGHT
MAGNITUDE
Development of International cities across water bodies
http://www.airpano.com/360Degree-VirtualTour.php?3D=Shanghai-China
Development of International cities across water bodies
http://www.airpano.com/360Degree-VirtualTour.php?3D=Honkong
THANK YOU

Contenu connexe

Tendances

Bridge engineering
Bridge engineeringBridge engineering
Bridge engineeringPooja Lonare
 
Limit state, working stress, ultimate load method - Detailed Concept
Limit state, working stress, ultimate load method - Detailed ConceptLimit state, working stress, ultimate load method - Detailed Concept
Limit state, working stress, ultimate load method - Detailed ConceptCivil Insider
 
Bridge
Bridge Bridge
Bridge illpa
 
Submerged tunnel technical seminar
Submerged tunnel technical seminarSubmerged tunnel technical seminar
Submerged tunnel technical seminarPrashant Ojha
 
Design of t beam bridge using wsm(2)
Design of t beam bridge using wsm(2)Design of t beam bridge using wsm(2)
Design of t beam bridge using wsm(2)Ankit Singh
 
Post-tensioning in Prestressed Concrete
Post-tensioning in Prestressed ConcretePost-tensioning in Prestressed Concrete
Post-tensioning in Prestressed ConcreteDavinderpal Singh
 
Pre stressed concrete Bridge
Pre stressed concrete BridgePre stressed concrete Bridge
Pre stressed concrete BridgeShubham Das
 
Flyover Bridge construction project
Flyover Bridge construction projectFlyover Bridge construction project
Flyover Bridge construction projectAxay Sharma
 
Prestressing Concept, Materilas and Prestressing System
Prestressing Concept, Materilas and Prestressing SystemPrestressing Concept, Materilas and Prestressing System
Prestressing Concept, Materilas and Prestressing SystemLatif Hyder Wadho
 
Types of joints in rigid pavement
Types of joints in rigid pavementTypes of joints in rigid pavement
Types of joints in rigid pavementBhavya Jaiswal
 
Analysis & design of T-Beam bridge
Analysis & design of T-Beam bridgeAnalysis & design of T-Beam bridge
Analysis & design of T-Beam bridgeElamathy Murugan
 

Tendances (20)

Bridge engineering
Bridge engineeringBridge engineering
Bridge engineering
 
Tunnelling methods
Tunnelling methodsTunnelling methods
Tunnelling methods
 
Bridge loading
Bridge loadingBridge loading
Bridge loading
 
Prestressed concrete continuous beam
Prestressed concrete continuous beamPrestressed concrete continuous beam
Prestressed concrete continuous beam
 
Limit state, working stress, ultimate load method - Detailed Concept
Limit state, working stress, ultimate load method - Detailed ConceptLimit state, working stress, ultimate load method - Detailed Concept
Limit state, working stress, ultimate load method - Detailed Concept
 
Bridge
Bridge Bridge
Bridge
 
Submerged tunnel technical seminar
Submerged tunnel technical seminarSubmerged tunnel technical seminar
Submerged tunnel technical seminar
 
Pipe Jacking
Pipe JackingPipe Jacking
Pipe Jacking
 
Prestressing ppt
Prestressing pptPrestressing ppt
Prestressing ppt
 
Design of t beam bridge using wsm(2)
Design of t beam bridge using wsm(2)Design of t beam bridge using wsm(2)
Design of t beam bridge using wsm(2)
 
Cofferdam
CofferdamCofferdam
Cofferdam
 
Post-tensioning in Prestressed Concrete
Post-tensioning in Prestressed ConcretePost-tensioning in Prestressed Concrete
Post-tensioning in Prestressed Concrete
 
Pre stressed concrete Bridge
Pre stressed concrete BridgePre stressed concrete Bridge
Pre stressed concrete Bridge
 
Flyover Bridge construction project
Flyover Bridge construction projectFlyover Bridge construction project
Flyover Bridge construction project
 
Intze tank design
Intze tank designIntze tank design
Intze tank design
 
Prestressing Concept, Materilas and Prestressing System
Prestressing Concept, Materilas and Prestressing SystemPrestressing Concept, Materilas and Prestressing System
Prestressing Concept, Materilas and Prestressing System
 
Bridge
BridgeBridge
Bridge
 
Types of joints in rigid pavement
Types of joints in rigid pavementTypes of joints in rigid pavement
Types of joints in rigid pavement
 
Analysis & design of T-Beam bridge
Analysis & design of T-Beam bridgeAnalysis & design of T-Beam bridge
Analysis & design of T-Beam bridge
 
Bridge foundation
Bridge foundationBridge foundation
Bridge foundation
 

En vedette

Design of An Immersed Tube Tunnel
Design of An Immersed Tube TunnelDesign of An Immersed Tube Tunnel
Design of An Immersed Tube Tunnelneilirish
 
Immersed Tunnels Recent developments
Immersed Tunnels Recent developmentsImmersed Tunnels Recent developments
Immersed Tunnels Recent developmentsStatybos Akademija
 
Underwater Tunnels
Underwater TunnelsUnderwater Tunnels
Underwater TunnelsIshan Parekh
 
GeoBIM – a tool for optimal use of geotechnical data
GeoBIM – a tool for optimal use of geotechnical dataGeoBIM – a tool for optimal use of geotechnical data
GeoBIM – a tool for optimal use of geotechnical dataStatybos Akademija
 
Busan geoje fixed link
Busan   geoje fixed linkBusan   geoje fixed link
Busan geoje fixed linkVicky Matwan
 
The Penang-Langkawi Tunnel (Proposal) report
The Penang-Langkawi Tunnel (Proposal) reportThe Penang-Langkawi Tunnel (Proposal) report
The Penang-Langkawi Tunnel (Proposal) reportSifat Zahan
 
International Highway Peace Project: Japan - Korea Tunnel Proposal by Dr. Kat...
International Highway Peace Project: Japan - Korea Tunnel Proposal by Dr. Kat...International Highway Peace Project: Japan - Korea Tunnel Proposal by Dr. Kat...
International Highway Peace Project: Japan - Korea Tunnel Proposal by Dr. Kat...Universal Peace Federation -UK
 
Underwater construction
Underwater constructionUnderwater construction
Underwater constructionAjay Reddy
 
Submerged Floating Tunnel by Shantanu Patil
Submerged Floating Tunnel by Shantanu PatilSubmerged Floating Tunnel by Shantanu Patil
Submerged Floating Tunnel by Shantanu PatilShantanu Patil
 
RAILWAYS,HARBOR, TUNNEL ENGINEERING
RAILWAYS,HARBOR, TUNNEL ENGINEERINGRAILWAYS,HARBOR, TUNNEL ENGINEERING
RAILWAYS,HARBOR, TUNNEL ENGINEERINGbhavin_pindoriya
 
Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...
Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...
Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...Hitesh Khanna
 
Study of tunnel engineering
Study of tunnel engineeringStudy of tunnel engineering
Study of tunnel engineeringAdil Shaikh
 

En vedette (20)

Design of An Immersed Tube Tunnel
Design of An Immersed Tube TunnelDesign of An Immersed Tube Tunnel
Design of An Immersed Tube Tunnel
 
Immersed Tunnels Recent developments
Immersed Tunnels Recent developmentsImmersed Tunnels Recent developments
Immersed Tunnels Recent developments
 
Underwater Tunnels
Underwater TunnelsUnderwater Tunnels
Underwater Tunnels
 
Submerged tunnel ppt
Submerged tunnel pptSubmerged tunnel ppt
Submerged tunnel ppt
 
floating tunnels
floating tunnelsfloating tunnels
floating tunnels
 
GeoBIM – a tool for optimal use of geotechnical data
GeoBIM – a tool for optimal use of geotechnical dataGeoBIM – a tool for optimal use of geotechnical data
GeoBIM – a tool for optimal use of geotechnical data
 
Chatelier proj1
Chatelier   proj1Chatelier   proj1
Chatelier proj1
 
Busan geoje fixed link
Busan   geoje fixed linkBusan   geoje fixed link
Busan geoje fixed link
 
Transatlantic Tunnel
Transatlantic TunnelTransatlantic Tunnel
Transatlantic Tunnel
 
Vactrains
VactrainsVactrains
Vactrains
 
The Penang-Langkawi Tunnel (Proposal) report
The Penang-Langkawi Tunnel (Proposal) reportThe Penang-Langkawi Tunnel (Proposal) report
The Penang-Langkawi Tunnel (Proposal) report
 
International Highway Peace Project: Japan - Korea Tunnel Proposal by Dr. Kat...
International Highway Peace Project: Japan - Korea Tunnel Proposal by Dr. Kat...International Highway Peace Project: Japan - Korea Tunnel Proposal by Dr. Kat...
International Highway Peace Project: Japan - Korea Tunnel Proposal by Dr. Kat...
 
Pont oresund
Pont oresundPont oresund
Pont oresund
 
Underwater construction
Underwater constructionUnderwater construction
Underwater construction
 
Tunneling
TunnelingTunneling
Tunneling
 
Submerged Floating Tunnel by Shantanu Patil
Submerged Floating Tunnel by Shantanu PatilSubmerged Floating Tunnel by Shantanu Patil
Submerged Floating Tunnel by Shantanu Patil
 
RAILWAYS,HARBOR, TUNNEL ENGINEERING
RAILWAYS,HARBOR, TUNNEL ENGINEERINGRAILWAYS,HARBOR, TUNNEL ENGINEERING
RAILWAYS,HARBOR, TUNNEL ENGINEERING
 
Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...
Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...
Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...
 
Study of tunnel engineering
Study of tunnel engineeringStudy of tunnel engineering
Study of tunnel engineering
 
Tunnel engineering
  Tunnel engineering  Tunnel engineering
Tunnel engineering
 

Similaire à Immersed tunnels Proposal Mumbai, India

TRANSATLANTIC-TUNNEL-Floating-Tunnel.pptx
TRANSATLANTIC-TUNNEL-Floating-Tunnel.pptxTRANSATLANTIC-TUNNEL-Floating-Tunnel.pptx
TRANSATLANTIC-TUNNEL-Floating-Tunnel.pptxSoulLoad
 
Submerged floating tunnel
Submerged floating tunnelSubmerged floating tunnel
Submerged floating tunnelShaikh Ismail
 
Submerged floating tunnel ppt
Submerged floating tunnel pptSubmerged floating tunnel ppt
Submerged floating tunnel pptjishnukpkp
 
Transatlantic tunnel-floating-tunnel
Transatlantic tunnel-floating-tunnelTransatlantic tunnel-floating-tunnel
Transatlantic tunnel-floating-tunnelAglaia Connect
 
SUBMERGED FLOATING TUNNEL Civil engineering presentation
SUBMERGED FLOATING TUNNEL Civil engineering presentationSUBMERGED FLOATING TUNNEL Civil engineering presentation
SUBMERGED FLOATING TUNNEL Civil engineering presentationunofficialdevil48
 
SUBMERGED FLOATING TUNNEL
SUBMERGED FLOATING TUNNELSUBMERGED FLOATING TUNNEL
SUBMERGED FLOATING TUNNELseminarppts
 
SUBMERGED FLOATING TUNNELS
SUBMERGED FLOATING TUNNELSSUBMERGED FLOATING TUNNELS
SUBMERGED FLOATING TUNNELSsathish sak
 
BHUSAN GEOJE FIXED LINK presentation
BHUSAN GEOJE FIXED LINK presentationBHUSAN GEOJE FIXED LINK presentation
BHUSAN GEOJE FIXED LINK presentationAmir Amdani
 
Submerged floating tunnel
Submerged floating tunnel Submerged floating tunnel
Submerged floating tunnel Aditya Parida
 
7. TUNNEL ENGINEERING
7. TUNNEL ENGINEERING7. TUNNEL ENGINEERING
7. TUNNEL ENGINEERINGVATSAL PATEL
 
Nhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAM
Nhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAMNhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAM
Nhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAMIshant Gautam.
 
Submerged Floating Tunnel
Submerged Floating TunnelSubmerged Floating Tunnel
Submerged Floating TunnelIntikhab Alam
 
Tunnel constructions
Tunnel constructionsTunnel constructions
Tunnel constructionsVinay Vb
 
Seikan tunnel - The Longest Underwater Rail Tunnel
Seikan tunnel - The Longest Underwater Rail TunnelSeikan tunnel - The Longest Underwater Rail Tunnel
Seikan tunnel - The Longest Underwater Rail TunnelJuhi Aggarwal
 
CH6 Water Passages.pptx
CH6 Water Passages.pptxCH6 Water Passages.pptx
CH6 Water Passages.pptxDawit Girma
 
Golden gate bridge, San Francisco
Golden gate bridge, San Francisco Golden gate bridge, San Francisco
Golden gate bridge, San Francisco Ankur Saxena
 
ATAL TUNNEL.pptx
ATAL TUNNEL.pptxATAL TUNNEL.pptx
ATAL TUNNEL.pptxAditya Mane
 

Similaire à Immersed tunnels Proposal Mumbai, India (20)

TRANSATLANTIC-TUNNEL-Floating-Tunnel.pptx
TRANSATLANTIC-TUNNEL-Floating-Tunnel.pptxTRANSATLANTIC-TUNNEL-Floating-Tunnel.pptx
TRANSATLANTIC-TUNNEL-Floating-Tunnel.pptx
 
Submerged floating tunnel
Submerged floating tunnelSubmerged floating tunnel
Submerged floating tunnel
 
Submerged floating tunnel ppt
Submerged floating tunnel pptSubmerged floating tunnel ppt
Submerged floating tunnel ppt
 
Transatlantic tunnel-floating-tunnel
Transatlantic tunnel-floating-tunnelTransatlantic tunnel-floating-tunnel
Transatlantic tunnel-floating-tunnel
 
SUBMERGED FLOATING TUNNEL Civil engineering presentation
SUBMERGED FLOATING TUNNEL Civil engineering presentationSUBMERGED FLOATING TUNNEL Civil engineering presentation
SUBMERGED FLOATING TUNNEL Civil engineering presentation
 
SUBMERGED FLOATING TUNNEL
SUBMERGED FLOATING TUNNELSUBMERGED FLOATING TUNNEL
SUBMERGED FLOATING TUNNEL
 
SUBMERGED FLOATING TUNNELS
SUBMERGED FLOATING TUNNELSSUBMERGED FLOATING TUNNELS
SUBMERGED FLOATING TUNNELS
 
BHUSAN GEOJE FIXED LINK presentation
BHUSAN GEOJE FIXED LINK presentationBHUSAN GEOJE FIXED LINK presentation
BHUSAN GEOJE FIXED LINK presentation
 
PPT
PPTPPT
PPT
 
Submerged floating tunnel
Submerged floating tunnel Submerged floating tunnel
Submerged floating tunnel
 
7. TUNNEL ENGINEERING
7. TUNNEL ENGINEERING7. TUNNEL ENGINEERING
7. TUNNEL ENGINEERING
 
Busan Geoje
Busan GeojeBusan Geoje
Busan Geoje
 
Nhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAM
Nhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAMNhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAM
Nhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAM
 
Submerged Floating Tunnel
Submerged Floating TunnelSubmerged Floating Tunnel
Submerged Floating Tunnel
 
Tunnel constructions
Tunnel constructionsTunnel constructions
Tunnel constructions
 
Seikan tunnel - The Longest Underwater Rail Tunnel
Seikan tunnel - The Longest Underwater Rail TunnelSeikan tunnel - The Longest Underwater Rail Tunnel
Seikan tunnel - The Longest Underwater Rail Tunnel
 
CH6 Water Passages.pptx
CH6 Water Passages.pptxCH6 Water Passages.pptx
CH6 Water Passages.pptx
 
tunneling & its effects
tunneling & its effectstunneling & its effects
tunneling & its effects
 
Golden gate bridge, San Francisco
Golden gate bridge, San Francisco Golden gate bridge, San Francisco
Golden gate bridge, San Francisco
 
ATAL TUNNEL.pptx
ATAL TUNNEL.pptxATAL TUNNEL.pptx
ATAL TUNNEL.pptx
 

Plus de Abhay Ocean India ltd. (13)

Aoil profile 2016
Aoil  profile  2016 Aoil  profile  2016
Aoil profile 2016
 
Proposed subsea power grid AOIL
Proposed subsea power grid AOILProposed subsea power grid AOIL
Proposed subsea power grid AOIL
 
Aoil Tidal energy ppt
Aoil Tidal energy pptAoil Tidal energy ppt
Aoil Tidal energy ppt
 
Aoil wind power ppt 2015
Aoil wind power ppt 2015Aoil wind power ppt 2015
Aoil wind power ppt 2015
 
Technical catalogue submarine installations of pipes
Technical catalogue submarine installations of pipesTechnical catalogue submarine installations of pipes
Technical catalogue submarine installations of pipes
 
Aoil diving code,& standards 2016
Aoil diving code,& standards 2016 Aoil diving code,& standards 2016
Aoil diving code,& standards 2016
 
Aoil floating solar power plant ppt 2015
Aoil floating solar power plant ppt 2015Aoil floating solar power plant ppt 2015
Aoil floating solar power plant ppt 2015
 
Floating resorts Project in India
Floating resorts Project in  IndiaFloating resorts Project in  India
Floating resorts Project in India
 
Funicular railways Proposal ppt
Funicular railways Proposal pptFunicular railways Proposal ppt
Funicular railways Proposal ppt
 
Submarine outfalls & intakes ppt
Submarine outfalls & intakes pptSubmarine outfalls & intakes ppt
Submarine outfalls & intakes ppt
 
Aoil survey presentation
Aoil survey presentation Aoil survey presentation
Aoil survey presentation
 
Aoil dredging ppt
Aoil dredging ppt Aoil dredging ppt
Aoil dredging ppt
 
Aoil diving
Aoil diving Aoil diving
Aoil diving
 

Dernier

TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
DEVICE DRIVERS AND INTERRUPTS SERVICE MECHANISM.pdf
DEVICE DRIVERS AND INTERRUPTS  SERVICE MECHANISM.pdfDEVICE DRIVERS AND INTERRUPTS  SERVICE MECHANISM.pdf
DEVICE DRIVERS AND INTERRUPTS SERVICE MECHANISM.pdfAkritiPradhan2
 
Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdf
Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdfPaper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdf
Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdfNainaShrivastava14
 
Artificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewArtificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewsandhya757531
 
KCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosKCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosVictor Morales
 
Python Programming for basic beginners.pptx
Python Programming for basic beginners.pptxPython Programming for basic beginners.pptx
Python Programming for basic beginners.pptxmohitesoham12
 
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTFUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTSneha Padhiar
 
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork
 
multiple access in wireless communication
multiple access in wireless communicationmultiple access in wireless communication
multiple access in wireless communicationpanditadesh123
 
Robotics Group 10 (Control Schemes) cse.pdf
Robotics Group 10  (Control Schemes) cse.pdfRobotics Group 10  (Control Schemes) cse.pdf
Robotics Group 10 (Control Schemes) cse.pdfsahilsajad201
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONjhunlian
 
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.elesangwon
 
List of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdfList of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdfisabel213075
 
Levelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument methodLevelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument methodManicka Mamallan Andavar
 
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithmComputer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithmDeepika Walanjkar
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdfCaalaaAbdulkerim
 
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfComprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfalene1
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substationstephanwindworld
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingBootNeck1
 

Dernier (20)

TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
DEVICE DRIVERS AND INTERRUPTS SERVICE MECHANISM.pdf
DEVICE DRIVERS AND INTERRUPTS  SERVICE MECHANISM.pdfDEVICE DRIVERS AND INTERRUPTS  SERVICE MECHANISM.pdf
DEVICE DRIVERS AND INTERRUPTS SERVICE MECHANISM.pdf
 
Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdf
Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdfPaper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdf
Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdf
 
Artificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewArtificial Intelligence in Power System overview
Artificial Intelligence in Power System overview
 
KCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosKCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitos
 
Python Programming for basic beginners.pptx
Python Programming for basic beginners.pptxPython Programming for basic beginners.pptx
Python Programming for basic beginners.pptx
 
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTFUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
 
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
 
multiple access in wireless communication
multiple access in wireless communicationmultiple access in wireless communication
multiple access in wireless communication
 
Robotics Group 10 (Control Schemes) cse.pdf
Robotics Group 10  (Control Schemes) cse.pdfRobotics Group 10  (Control Schemes) cse.pdf
Robotics Group 10 (Control Schemes) cse.pdf
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
 
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
 
List of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdfList of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdf
 
Levelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument methodLevelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument method
 
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithmComputer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithm
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdf
 
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfComprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substation
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event Scheduling
 
Designing pile caps according to ACI 318-19.pptx
Designing pile caps according to ACI 318-19.pptxDesigning pile caps according to ACI 318-19.pptx
Designing pile caps according to ACI 318-19.pptx
 

Immersed tunnels Proposal Mumbai, India

  • 1. INTRODUCTION TO IMMERSED TUBE TUNNEL TECHNOLOGY BY ABHAY OCEAN INDIA PVT LTD
  • 2. BACKGROUND TRADITIONALLY LARGE (SEA) CROSSINGS CARRIED OUT BY MEANS OF THE APPARENT MOST ECONOMIC OPTION –BRIDGE. IF A TUNNEL OPTION IS CONSIDERED - BORED TUNNEL SEEMS FAVOURITE . IN RECENT PAST NEW DEVELOPMENTS AND INNOVATIONS HAVE LEAD TO REVIVAL OF IMMERSED TUNNEL AS A COMPETITIVE ALTERNATIVE FOR LARGE FIXED LINKS . THE ØRESUND LINK BETWEEN DENMARK AND SWEDEN GAVE THE IMMERSED TUNNEL TECHNIQUE THE FIRST BOOST. THIS WAS FOLLOWED BY OTHER MAJOR LINKS IN WHICH IMMERSED TUNNEL TECHNIQUE IS APPLIED ON LARGE SCALE. THE LAST IMPRESSIVE EXAMPLE IS THE FEHMERNBELT LINK, THE LINK BETWEEN DENMARK AND GERMANY COMPRISING AN IMMERSED TUNNEL OF ALMOST 19 KM.
  • 3. MAJOR SEA CROSSING ØRESUND LINK BETWEEN DENMARK AND SWEDEN
  • 4. INTRODUCTION TO IMMERSED TUNNELS AN ALTERNATIVE TO BRIDGES AND BORED TUNNELS . IMMERSED TUBE TUNNEL UNITS OF LENGTH OF ABOUT 100M LONG, FORMING COMPLETE TUNNEL CROSS-SECTIONS WITH BOTH ENDS TEMPORARILY SEALED BY A BULKHEAD ARE FABRICATED IN A DRY DOCK. TUNNEL ELEMENTS IN CASTING BASIN (ANTWERP TUNNEL ELEMENTS FLOODED CASTING BASIN
  • 5. SEALED UNITS ARE FLOATED AND TOWED TO TUNNEL LOCATION AND LOWERED INTO A PRE- DREDGED TRENCH IN THE SEA OR RIVER BED OFF SHORE TRANSPORT TUNNEL ELEMENTS OF PIET HEINTUNNEL (THE NETHERLANDS)
  • 6. TUNNEL ELEMENT AT PROJECT LOCATION TUNNEL ELEMENT DURING IMMERSION TOWING & IMMERSION OF TUNNEL ELEMENTS
  • 7. AN ALTERNATIVE TO BRIDGES AND BORED TUNNELS. IMMERSED TUBE TUNNEL UNITS OF LENGTH OF ABOUT 100M LONG, FORMING COMPLETE TUNNEL CROSS-SECTIONS WITH BOTH ENDS TEMPORARILY SEALED BY A BULKHEAD ARE FABRICATED IN A DRY DOCK. SEALED UNITS ARE FLOATED AND TOWED TO TUNNEL LOCATION AND LOWERED INTO A PRE DREDGED TRENCH IN THE SEA OR RIVER BED. ON ONE END OF EACH TUNNEL ELEMENT, AN ENDLESS GINA GASKET IS MOUNTED. UPON TUNNEL UNIT BEING IMMERSED, IT IS THEN PULLED FIRMLY UP AGAINST THE PRECEDING IMMERSED TUNNEL UNIT WITH A HYDRAULIC JACK. WHEN THE GINA GASKET HAS FULL CONTACT AROUND THE TOTAL CIRCUMFERENCE OF THE ADJACENT TUNNEL UNIT, THE WATER BETWEEN THE BULKHEADS IS PUMPED OUT. DUE TO THE PRESSURE DIFFERENCE BETWEEN THE BULKHEADS AND THE HYDROSTATIC PRESSURE ON THE OUTSIDE OF THE TUNNEL, THE GINA PROFILE COMPRESSES AND SEALS THE JOINT. THE UNITS WILL THEN FORM A CONTINUOUS TUBE AND THE TRENCH IS BACKFILLED PROGRESSIVELY. IMMERSED TUBE TUNNEL
  • 8. WHAT IS AN IMMERSED TUNNEL PRECAST TUNNEL ELEMENTS, CONSTRUCTED IN THE DRY. FLOATED TO THE DESTINATION. LOWERED INTO PLACE, JOINED AND COVERED UP. HISTORY FIRST CONSTRUCTED ABOUT 120 YEARS AGO. ABOUT 200 HAVE BEEN CONSTRUCTED ALL OVER THE WORLD. ABOUT 150 ARE FOR ROAD OR RAIL. FIRST PROPOSED 1860 Harlem River Tunnel, New York 1911
  • 9. TUNNEL CROSS SECTIONS Selection of cross-sections determined by local experience and practice. In the U.S.A. use of steel shell tunnels is more common . In Europe and Japan reinforced concrete tunnels are more popular . Structure of steel shell tunnel is of relatively thin-walled composite steel and concrete rings. There are a wide range of cross-sectional configurations, depending on intended use of the tunnel. Circular-shape section, binocular and rectangular shape section are used for immersed tube tunnels. The trench is then backfilled and any necessary protection, such as Rock Armor, added over the top . The ground beside each end tunnel element is reinforced, to permit a tunnel boring machine to drill the final links to the portals on land. After these stages the tunnel is complete, and the internal fit out can be carried out.
  • 10. LAND-SIDE INTERFACES VENTILATION BUILDINGS EARTHQUAKE JOINTS CUT-AND-COVER TUNNEL OPEN APPROACHES SEQUENCE IMT-C&C SCHEDULE DRIVEN
  • 11. IMMERSED TUNNEL CHALLENGES Use Advanced Construction Techniques. Use Latest Ventilation Techniques. Select ideal Immersed Tunnel Alignments. Determine Construction and Staging Locations. Deal with Difficult Ground Conditions. Dredging and Disposal.
  • 12. The Gina gasket and Omega seal are used between the sectional elements of immersed tunnels to prevent water ingress due to external water pressure. The combination of seals allows for sealing, for the transfer of the hydrostatic loads and movements between the tunnel ends due to soil settlement, creep of concrete, temperature effects and if required earthquakes The designs are generally based on the expected tunnel lifetime of 100 years. Pressure difference between the bulkheads and the hydrostatic pressure on the outside of the tunnel, the Gina profile compresses and seals the joint. GINA GASKETS
  • 13. FINAL PLACEMENT OF IMMERSED TUBE ELEMENTS Immersed tunnel elements floated to site using their buoyant state. Ends of tunnel elements equipped with bulkheads (dam plates) across ends to keep inside dry. Bulkheads located to allow only about 1.0 m between the bulkheads of adjacent elements at immersion joint. This space is emptied once an initial seal is obtained during the joining process. Joints usually equipped with gaskets to create seal with the adjacent element. Adjustment devices allow placement of the elements on line and grade. Tunnel elements lowered into their location after adding temporary water ballast in designated water ballast tank. After installation of back fill, ballast water is exchanged with ballast concrete, installed on the tunnel base slab. Subsequently finishing of tunnel and tunnel installations place.
  • 14.
  • 15. TUNNEL CROSS SECTION SELECTION OF TYPICAL CROSS-SECTIONS IS DETERMINED BY LOCAL EXPERIENCE AND PRACTICE . IN THE U.S.A. USE OF STEEL SHELL TUNNELS ARE MORE COMMON. IN THE EUROPE AND JAPAN REINFORCED CONCRETE TUNNELS ARE MORE POPULAR CONCRETE TUNNEL.
  • 17. SANDWICH TUNNEL – RECENT DEVELOPMENT IN JAPAN Both internal &external structures are Steel plates. Internal steel diaphragms, Connect plates. No reinforcement. Filled with non shrink self compacting concrete.
  • 18.
  • 20.
  • 21.
  • 22. WHY AND WHEN ARE IMMERSED TUNNELS COMPETITIVE / ADVANTAGES Immersed tunnels have advantage over bored tunnels for water crossing locations . They lie only a short distance below water bed level. Approaches are therefore relatively shorter . Compared with high level bridges or bored tunnels, the overall length of crossing will be shorter.
  • 23. FLEXIBILITY IN CROSS SECTION SHAPES IMMERSED TUNNELSPOSSIBLE CROSS SECTION SHAPES -
  • 24. OTHER ADVANTAGES OF IMMERSED TUNNELS MAIN ADVANTAGE IS THEY CAN BE CONSIDERABLY MORE COST EFFECTIVE THAN BORED TUNNEL BENEATH THE WATER OR A BRIDGE OTHER ADVANTAGES RELATIVE TO THESE ALTERNATIVES INCLUDE: SPEED OF CONSTRUCTION MINIMAL DISRUPTION TO RIVER/CHANNEL, IF CROSSING A SHIPPING ROUTE RESISTANCE TO SEISMIC ACTIVITY SAFETY OF CONSTRUCTION (WORK IN A DRY DOCK AS OPPOSED TO BORING BENEATH A RIVER) DREDGED MATERIAL CAN BE USED MAKING ARTIFICIAL ISLANDS / LAND RECLAMATION DISADVANTAGES ARE: DIRECT CONTACT WITH WATER - CAREFUL WATERPROOFING DESIGN AROUND JOINTS THE SEGMENTAL APPROACH REQUIRES CAREFUL DESIGN OF THE CONNECTIONS ENVIRONMENTAL IMPACT OF TUBE AND UNDERWATER EMBANKMENT ON EXISTING CHANNEL / SEA BED.
  • 25. ILLUSTRATIVE EXAMPLES - IMMERSED TUNNEL PROJECTS The Øresund Link - First major sea crossing using immersed tunnel technique and bridge connection between Denmark and Sweden. 16.7 km link is Road and train carriageway The transition between the tunnel and the bridge is accommodated by a large artificial island approx 4 km long At the Denmark shore a significant land reclamation extending 430 m in the sea was established. Øresund Link (aerial view)
  • 26. THE ORESUND LINK…. CONTD Immersed part of the tunnel length - 3500 m Tunnel is divided into 20 elements, each 176m long; each element is made up of 8 segments of 22m each The tunnel includes two railway tubes, two motorway tubes and an escape gallery Outer dimensions of the cross section are 8.5m by 41.7 m. Cross section immersed tunnel
  • 27. Busan Geoje Crossing, South Korea Road connection in south eastern part of South Korea between Busan and Geoje. Link comprises of two cable stayed bridges and a concrete immersed tube tunnel Tube Tunnel comprises of 18 tunnel elements with a length of 180m each Immersed tunnel is 3.2 km long and deepest (max water depth of 48 m) in world
  • 28. INSTALLATION OF BUSAN GEOJE TUNNEL ELEMENTS
  • 29. HONGKONG ZHUHAI MACAO LINK, CHINA A challenging infrastructure project - HZBM Link under construction Main project is offshore section of HZMB Link of approx. 30km, crossing the Pearl River Estuary from border with Hong Kong to Macao and Zhuhai (Mainland China). Link comprises various bridges, artificial islands and tunnels to accommodate a dual carriageway with 3 traffic lanes in each direction. Crossing of main shipping channels at the eastern side of the Pearl River Estuary will be realised using a 6.75km long tunnel, of which 6km will be immersed. Transition from bridges to tunnel will be by artificial islands with a length of 625m each.
  • 30. ISLANDS DESIGN FOR HONGKONG ZHUHAI MACAO LINK ILLUSTRATIONS ARTIFICIAL ISLANDS AND TUNNEL ENTRANCE (ON ISLAND In HZMB Link transition between bridges and the immersed tunnel will be realized by artificial islands. The islands are approximately 625 m long and 160 m wide. Technical service buildings for the tunnel are located at the islands
  • 31. FEHMERNBELT LINK, DENMARK Fehmernbelt Fixed Link planned to cross the Fehmernbelt between Rødbyhavn, 140km south of Copenhagen, and Puttgarden, on the north coast of Germany Comprehensive studies including environmental studies resulted in decision that immersed tunnel is best solution Project combines records such as a length of 18.5 km and a water depth of 30 m, while crossing a busy navigational channel.
  • 32. IMMERSED TUNNEL SOLUTION - FOR FEHMERNBELT LINK, DENMARK Tunnel elements consist of combined road and rail cross-section all at one level within concrete structure Each Standard element of immersed tunnel has length of approximately 217 m. Underneath the road and rail tubes there will be access to all areas of the tunnel to reduce disruption of the traffic to a minimum.
  • 33. IMMERSED TUBE TUNNEL CONSTRUCTION IN HONG KONG 1: Cross Harbour Tunnel. 2: Mass Transit Railway Tunnel. 3: Eastern Harbour Crossing Tunnel. 4:Airport Railway Western Immersed tube 5: Western Harbour Crossing Tunnel. Tunnel. •Hong Kong has extensive immersed tube tunnel experience •First steel immersed tube tunnel was placed across the Victoria Harbour in 1972. •There are four other vehicle/railway tunnels crossing the Harbour using immersed tube techniques. •The layout plan of the five immersed tube tunnels is shown in the Figure below
  • 34. OUTFITTING SITE Finish elements Ready them for immersion Attach elements to winches or cranes Pontoons or barges needed COMPRESSION OF RUBBER GASKET
  • 35. COMPLETING THE INSTALLATION FINISHING Foundation Backfill trench Protect top of tunnel Finish insides
  • 36. LAND-SIDE INTERFACES Ventilation buildings Earthquake joints Cut-and-cover tunnel Open approaches Sequence IMT-C&C schedule driven
  • 37. IMMERSED TUNNEL CHALLENGES Use Advanced Construction Techniques Use Latest Ventilation Techniques Select ideal Immersed Tunnel Alignments Determine Construction and Staging Locations Deal with Difficult Ground Conditions Dredging and Disposal
  • 38. FINDINGS OF STUDY FOR OF AN IMMERSED TUNNEL IN IZMIR BAY, TURKEY The proposed izmir bay immersed tube tunnel (ibitt) will measure 40 m in width and 7.6 km in length. The tunnel is characterized by a rectangular cross-section, and will have 2x3 road traffic lanes on both sides, and a 2x1 railway tracks in the middle. An immersed tube tunnel construction is considered along this route for the following reasons: Izmir bay is relatively shallow (<25 m) so it meets the maximum depth criteria (60 m) for constructability Seabed soil is generally made of the non-cohesive very loose to loose silt-sand mixtures, with a very low bearing capacity, which can be improved by suitable soil- improvement technique By selection of a straight-line route between two sides of the bay, the tunnel can be connected to the existing highway junctions and nearby railway lines The buried tube tunnel surrounded with a selected compacted fill in the tunnel’s dredged ditch has a better earthquake response when compared to a much heavier elevated bridge structure Substantial foundation cost savings, compared to other fixed-crossing options, will be realized due to the fact that the immersed tube tunnel makes use of water- buoyancy (Archimedes principle), which enables smaller load transfer to the very loose seabed soil with very low bearing capacity.
  • 39. CONSTRUCTION OF AN IMMERSED TUBE TUNNEL ACROSS THE IZMIR BAY WILL ENABLE: Direct link to the existing highway and railway junctions in the north and the south districts. Also, traffic congestion in the centre of the city will diminish substantially. The tunnel will considerably shorten the commuting distance between the Çeşme-Motorway and Izmir-Çanakkale Highway by about 40 km. Shorter distance & smooth drive -- Leads to considerably Lower petrol consumption leading to considerable reduction in foreign exchange outgo for the import of petrol -- highly beneficial to national economy. Quality of life and air for people living in the city will be improved, as transport difficulties and environmental pollution will decrease.
  • 40. CHINA’S PLANS LONGEST UNDERWATER TUNNEL ON THE PLANET
  • 41. PLANNED SUBMERGED TUNNEL IN CHINA ESTIMATED LENGTH - 123KM LONGER THAN COMBINED LENGTH OF WORLD’S TWO LONGEST UNDERWATER TUNNELS—JAPAN’S SEIKAN TUNNEL AND CHANNEL TUNNEL BETWEEN THE UK AND FRANCE. CONNECT PORTS OF DALIAN AND YANTAI – 105 MILES APART AS CROW FLIES AT PRESENT DRIVE BETWEEN PORTS TAKES – 7-8 HRS TUNNEL WILL SHORTEN DRIVING TIME TO ONE HOUR. PASSES THROUGH TWO SEISMIC FAULT ZONES – CONSTRUCTION TO WITHSTAND EARTHQUAKE OF EIGHT MAGNITUDE
  • 42. Development of International cities across water bodies http://www.airpano.com/360Degree-VirtualTour.php?3D=Shanghai-China
  • 43. Development of International cities across water bodies http://www.airpano.com/360Degree-VirtualTour.php?3D=Honkong