There are several industry players out there (GE is one, we
are one, Jay Z is definitely one) who believe that they can
be better at business software than the software
companies can be at ‘business’.
Geoff Smith, CEO
EllisDon & Gate Three
Gate Three tackles the fundamental obstacle to fact-based decision-making.
Accessibility and availability of quality information, which in the construction
industry is essential to project completion while data integrity critically serves
as legal evidence and protecting companies against claim.
Inefficiencies are evident among countless industries as workflow is contingent
upon interoperability of multiple data sources comprising of core, internally
developed programs; externally developed mobile applications and shrink-
wrapped software. The construction industry compounds its problems with its
reluctant adoption of technology.
However, when used effectively technology can deliver business with
company-wide decision-making capabilities, integrating structured to
unstructured sources of information so it can be harnessed for commercial gain.
WELCOME TO GATE THREE
OUR PEDIGREE
Over 60 years of proven success in the
construction industry
Completing CAD 3.4 Billion in
construction value annually
An additional CAD 6.6 Billion in backlog
Financially stable ownership structure
Proudly 50% employee-owned with over
1,800 employees
REAL TIME ERP DATA
ANYTIME, ANYWHERE FROM ANY DEVICE
Mobile user access to ERP and other back
office systems has become a core
requirement to operational efficiency and
deepening customer engagement.
Mobile apps have enabled organizational
transformation by accelerating decision
time.
Mobile accessibility can provide a
competitive differentiation.
DRIVING DIGITAL DATA
ENTERPRISE MOBILITY
Data needs to be ubiquitous for both
collaboration and fostering decision making.
Example:
 Cloud based applications (SaaS)
 Building Information Systems -(3D)
 Sensor technology (Telematics)
 Social applications
QUALITY DATA = QUALITY DECISION
Delivering completed
buildings shall no longer
present the same challenges
of a decade ago when
accessing data was
cumbersome to access from
a collection of bulky binders.
Today clients expect all
information be transferable
as well as encompass the
Building Information Model
(BIM) including ‘as built’
specifications.
EFFICIENT CONSTRUCTION OPERATION
INTEROPERABILITY
In the US an estimated losses of $15.6 Billion per year are due to lack of
interoperability (NIST 2004).
"Interoperability is more than the automation of current work processes. That is,
more than just doing the same things that are done at present only faster.
Interoperable technologies and applications change work processes and the
relationships among project owners, clients, contractors and subcontractors.” (NRC
2009)
The construction industry has leveraged technological advancements to help
manage the workload. However 60% of the industry’s efforts remain lost to
inefficiencies.
CONSTRUCTION PRODUCTIVITY
Widespread use of interoperable technology is
still not easy. We need more effective interfacing
of stakeholders, processes and information.
Diverse stakeholders: Owners, Designers,
Builders, Suppliers, Manufacturers, Trades
Segregated processes: planning, financing, design,
engineering, procurement, construction,
operations, maintenance
Applications and technologies are rarely
integrated across all phases of a project
Allow “Best of Breed” software and collaboration tools
where needed, but manage the data end-to-end.
ENHANCING PRODUCTIVITY
Opportunity to capitalize on
Interoperability between, BIM, Facilities
Management and your construction
management system.
Construction Management Software ex: Gate Three
Mobile Apps
Project
Schedule
BIM
Construction
Accounting System
Preferred Suppliers FM SystemsEstimates
DESIGN CONSTRUCTION BUILDING OPERATIONS
Gate Three offers users the
advantage of a connected,
shared work environment,
combined with intuitive
processes that help each
individual on your project
team efficiently complete
tasks.
A truly collaborative online
software benefits your
team and overall project
management.
ONE TEAM. ONE WORKSPACE.
ENHANCED CONTROL
Gate Three enables control of every document,
dollar and process associated with a project.
All construction documents which may include
(and not limited to) Submissions, RFIs, Change
Orders are tracked and shared for all stakeholders
in accordance to a controlled Access Level.
Project workflows can are easily be configured.
Gate Three controls project budget by automating
commitments, changes and pay approval of POs,
time cards and invoices.
ENHANCED CONTROL
Control, customize and
automate workflow (SIs, RFIs,
Submissions, and more)
Improve quality and safety by
automating your QA/ QC
programs (or leverage ours)
Enable teams to collaborate on
critical construction-related
information and documents
Track project milestones and
LEED progress
MITIGATE RISK
Construction projects are riddled with
countless potential risks related to scope,
budget, schedule, safety and quality.
Gate Three mitigates risk with integrated
change control workflow; a clear view of
project budget details and key milestones.
Safety and quality are paramount as Gate
Three™ integrates your QA/QC programs with
the rest of your project.
MITIGATE RISK
Clear view of project budget
details at all time
Reduce project risk through
integrated change control
process
Gain financial control by
replicating your procurement
processes through configurable
workflow
IMPROVE EFFICIENCY
Gate Three significantly boosts productivity across
all departments/stakeholders with single entry and
accessible ‘on demand’ data.
Completed projects build your library of costing
reference points.
Continual use Gate Three is leveraged to bid
smarter and serve as a learning tool for potential
dangers in executing future projects.
Efficient execution results in improved P&L.
IMPROVE EFFICIENCY
Streamlined and accurate
project communication with
all stakeholders and
personnel
Single and collaborative view
of the project progress
Improve efficiencies with a
single and customizable
workflow business processes
BETTER DECISIONS
Gate Three is a communication platform
integrating document control, workflows, budget
controls, cash flows, milestones, and management
reporting.
Everyone is on the same page.
A single version of the truth.
Foundation for electronic collaboration.
Visibility of important details required to make
profitable business decisions.
BETTER DECISIONS
Complete clarity of a project’s
financial picture - high level
down to the most detailed views
Full integration of all financial
information
Improve efficiency through
computerized monthly Progress
Reports
Accounting system integration
eliminates double entry

Contenu connexe

Tendances

058 Lean Construction (PART 2) Construction productivity
058 Lean Construction  (PART 2) Construction productivity 058 Lean Construction  (PART 2) Construction productivity
058 Lean Construction (PART 2) Construction productivity Dr Fereidoun Dejahang
 
Organisational Productivity
Organisational ProductivityOrganisational Productivity
Organisational ProductivityDavid Alman
 
Sumanth's total productivity model
Sumanth's total productivity modelSumanth's total productivity model
Sumanth's total productivity modelAnil Prajapati
 
Overview -productivity management
Overview -productivity managementOverview -productivity management
Overview -productivity managementBharat Parmar
 
1. productivity concept and calculation.
1. productivity concept and calculation.1. productivity concept and calculation.
1. productivity concept and calculation.Samir Potale-sylvester
 
Importance of Performance Management And Measurement of Productivity
Importance of Performance Management  And Measurement of ProductivityImportance of Performance Management  And Measurement of Productivity
Importance of Performance Management And Measurement of ProductivityNational Productivity Secretariat
 
Productivity
ProductivityProductivity
Productivitybappykazi
 
Operations And Productivity
Operations And ProductivityOperations And Productivity
Operations And ProductivityJoanmaines
 
059 LEAN CONSTRUCTION SUPPLY CHAIN-SCM &LPS
059 LEAN CONSTRUCTION SUPPLY CHAIN-SCM &LPS059 LEAN CONSTRUCTION SUPPLY CHAIN-SCM &LPS
059 LEAN CONSTRUCTION SUPPLY CHAIN-SCM &LPSDr Fereidoun Dejahang
 
Productivity & work force unit 2
Productivity & work force unit  2Productivity & work force unit  2
Productivity & work force unit 2Sangita_Banga
 
Productivity
ProductivityProductivity
Productivityvijaynitd
 

Tendances (19)

058 Lean Construction (PART 2) Construction productivity
058 Lean Construction  (PART 2) Construction productivity 058 Lean Construction  (PART 2) Construction productivity
058 Lean Construction (PART 2) Construction productivity
 
092 Productivity Improvement
092 Productivity Improvement092 Productivity Improvement
092 Productivity Improvement
 
094 Productivity Measurement
094 Productivity Measurement094 Productivity Measurement
094 Productivity Measurement
 
Organisational Productivity
Organisational ProductivityOrganisational Productivity
Organisational Productivity
 
Productivity
ProductivityProductivity
Productivity
 
Sumanth's total productivity model
Sumanth's total productivity modelSumanth's total productivity model
Sumanth's total productivity model
 
Overview -productivity management
Overview -productivity managementOverview -productivity management
Overview -productivity management
 
Productivity Improvement R
Productivity Improvement RProductivity Improvement R
Productivity Improvement R
 
1. productivity concept and calculation.
1. productivity concept and calculation.1. productivity concept and calculation.
1. productivity concept and calculation.
 
Productivity concepts
Productivity conceptsProductivity concepts
Productivity concepts
 
Importance of Performance Management And Measurement of Productivity
Importance of Performance Management  And Measurement of ProductivityImportance of Performance Management  And Measurement of Productivity
Importance of Performance Management And Measurement of Productivity
 
Lean construction
Lean constructionLean construction
Lean construction
 
056 Labour Productivity
056 Labour Productivity056 Labour Productivity
056 Labour Productivity
 
Productivity
ProductivityProductivity
Productivity
 
Operations And Productivity
Operations And ProductivityOperations And Productivity
Operations And Productivity
 
059 LEAN CONSTRUCTION SUPPLY CHAIN-SCM &LPS
059 LEAN CONSTRUCTION SUPPLY CHAIN-SCM &LPS059 LEAN CONSTRUCTION SUPPLY CHAIN-SCM &LPS
059 LEAN CONSTRUCTION SUPPLY CHAIN-SCM &LPS
 
Productivity & work force unit 2
Productivity & work force unit  2Productivity & work force unit  2
Productivity & work force unit 2
 
(Productivity)
(Productivity)(Productivity)
(Productivity)
 
Productivity
ProductivityProductivity
Productivity
 

En vedette

Automation in Construction
Automation in Construction Automation in Construction
Automation in Construction rgbimbochamp
 
James Dearsley ARVR Innovate Conference
James Dearsley ARVR Innovate ConferenceJames Dearsley ARVR Innovate Conference
James Dearsley ARVR Innovate ConferenceARMarketing.org
 
Construction Industry Augmented Reality
Construction Industry Augmented RealityConstruction Industry Augmented Reality
Construction Industry Augmented RealityARMarketing.org
 
Who is Jason Theodor?
Who is Jason Theodor?Who is Jason Theodor?
Who is Jason Theodor?Jason Theodor
 
Introducing Gate Three's Daily Site Report
Introducing Gate Three's Daily Site Report Introducing Gate Three's Daily Site Report
Introducing Gate Three's Daily Site Report Christine Zakrajsek, PMP
 
Technology + Singapore Math = Number Sense
Technology + Singapore Math = Number SenseTechnology + Singapore Math = Number Sense
Technology + Singapore Math = Number SenseCassandra Turner
 
The Pinocchio Effect
The Pinocchio EffectThe Pinocchio Effect
The Pinocchio EffectJason Theodor
 
Red Riding Hood Remix
Red Riding Hood RemixRed Riding Hood Remix
Red Riding Hood RemixJason Theodor
 
82 words and phrases instead of good, great and interesting + examples
82 words and phrases instead of good, great and interesting + examples82 words and phrases instead of good, great and interesting + examples
82 words and phrases instead of good, great and interesting + examplesAlina Dashkewitz
 
Special Marketing Edition of Chaos and Creativity
Special Marketing Edition of Chaos and CreativitySpecial Marketing Edition of Chaos and Creativity
Special Marketing Edition of Chaos and CreativityJason Theodor
 
How to Create More Better Different
How to Create More Better DifferentHow to Create More Better Different
How to Create More Better DifferentJason Theodor
 
Presentation on The Use of automation in construction industry
Presentation on The Use of automation in construction industryPresentation on The Use of automation in construction industry
Presentation on The Use of automation in construction industryIEI GSC
 
The 8 Creative Types
The 8 Creative TypesThe 8 Creative Types
The 8 Creative TypesJason Theodor
 
VR for Cinema 4D 세미나 (2016) - VR/AR 콘텐츠와 테크놀로지의 현재와 미래(더부스터)
VR for Cinema 4D 세미나 (2016) - VR/AR 콘텐츠와 테크놀로지의 현재와 미래(더부스터)VR for Cinema 4D 세미나 (2016) - VR/AR 콘텐츠와 테크놀로지의 현재와 미래(더부스터)
VR for Cinema 4D 세미나 (2016) - VR/AR 콘텐츠와 테크놀로지의 현재와 미래(더부스터)HYEONSU BAE
 
Jason Theodor's Creative Method and Systems
Jason Theodor's Creative Method and SystemsJason Theodor's Creative Method and Systems
Jason Theodor's Creative Method and SystemsJason Theodor
 
Creative Method Workshop Edition
Creative Method Workshop EditionCreative Method Workshop Edition
Creative Method Workshop EditionJason Theodor
 

En vedette (19)

Automation in Construction
Automation in Construction Automation in Construction
Automation in Construction
 
James Dearsley ARVR Innovate Conference
James Dearsley ARVR Innovate ConferenceJames Dearsley ARVR Innovate Conference
James Dearsley ARVR Innovate Conference
 
Construction Industry Augmented Reality
Construction Industry Augmented RealityConstruction Industry Augmented Reality
Construction Industry Augmented Reality
 
Who is Jason Theodor?
Who is Jason Theodor?Who is Jason Theodor?
Who is Jason Theodor?
 
Introducing Gate Three's Daily Site Report
Introducing Gate Three's Daily Site Report Introducing Gate Three's Daily Site Report
Introducing Gate Three's Daily Site Report
 
Technology + Singapore Math = Number Sense
Technology + Singapore Math = Number SenseTechnology + Singapore Math = Number Sense
Technology + Singapore Math = Number Sense
 
The Pinocchio Effect
The Pinocchio EffectThe Pinocchio Effect
The Pinocchio Effect
 
How to BS* Better
How to BS* BetterHow to BS* Better
How to BS* Better
 
Red Riding Hood Remix
Red Riding Hood RemixRed Riding Hood Remix
Red Riding Hood Remix
 
82 words and phrases instead of good, great and interesting + examples
82 words and phrases instead of good, great and interesting + examples82 words and phrases instead of good, great and interesting + examples
82 words and phrases instead of good, great and interesting + examples
 
Special Marketing Edition of Chaos and Creativity
Special Marketing Edition of Chaos and CreativitySpecial Marketing Edition of Chaos and Creativity
Special Marketing Edition of Chaos and Creativity
 
Creative Ignition
Creative IgnitionCreative Ignition
Creative Ignition
 
How to Create More Better Different
How to Create More Better DifferentHow to Create More Better Different
How to Create More Better Different
 
Presentation on The Use of automation in construction industry
Presentation on The Use of automation in construction industryPresentation on The Use of automation in construction industry
Presentation on The Use of automation in construction industry
 
The 8 Creative Types
The 8 Creative TypesThe 8 Creative Types
The 8 Creative Types
 
VR for Cinema 4D 세미나 (2016) - VR/AR 콘텐츠와 테크놀로지의 현재와 미래(더부스터)
VR for Cinema 4D 세미나 (2016) - VR/AR 콘텐츠와 테크놀로지의 현재와 미래(더부스터)VR for Cinema 4D 세미나 (2016) - VR/AR 콘텐츠와 테크놀로지의 현재와 미래(더부스터)
VR for Cinema 4D 세미나 (2016) - VR/AR 콘텐츠와 테크놀로지의 현재와 미래(더부스터)
 
Jason Theodor's Creative Method and Systems
Jason Theodor's Creative Method and SystemsJason Theodor's Creative Method and Systems
Jason Theodor's Creative Method and Systems
 
Tweenland Sept07
Tweenland  Sept07Tweenland  Sept07
Tweenland Sept07
 
Creative Method Workshop Edition
Creative Method Workshop EditionCreative Method Workshop Edition
Creative Method Workshop Edition
 

Similaire à Increasing Construction Productivity with Information Management

Top 8 Technologies for Construction Risk Management
Top 8 Technologies for Construction  Risk ManagementTop 8 Technologies for Construction  Risk Management
Top 8 Technologies for Construction Risk ManagementBIMEngus1
 
The potential of a true construction management platform.pdf
The potential of a true construction management platform.pdfThe potential of a true construction management platform.pdf
The potential of a true construction management platform.pdfiFieldsmart Technologies
 
How GCs can diminish onsite risks with preemptive field data-converted.pptx
How GCs can diminish onsite risks with preemptive field data-converted.pptxHow GCs can diminish onsite risks with preemptive field data-converted.pptx
How GCs can diminish onsite risks with preemptive field data-converted.pptxiFieldsmart Technologies
 
Leveraging Construction Technology Trends for Maximum Impact.pdf
Leveraging Construction Technology Trends for Maximum Impact.pdfLeveraging Construction Technology Trends for Maximum Impact.pdf
Leveraging Construction Technology Trends for Maximum Impact.pdfLaura Miller
 
How to harness big data to drive performance across your project portfolio
How to harness big data to drive performance across your project portfolioHow to harness big data to drive performance across your project portfolio
How to harness big data to drive performance across your project portfolioSmart ERP Solutions, Inc.
 
The impact of AI in construction - An Overview.pdf
The impact of AI in construction - An Overview.pdfThe impact of AI in construction - An Overview.pdf
The impact of AI in construction - An Overview.pdfJamieDornan2
 
Top 4 construction obstacles and how technology can be a transformational sol...
Top 4 construction obstacles and how technology can be a transformational sol...Top 4 construction obstacles and how technology can be a transformational sol...
Top 4 construction obstacles and how technology can be a transformational sol...iFieldsmart Technologies
 
Mobile app development in construction industry
Mobile app development in construction industryMobile app development in construction industry
Mobile app development in construction industryJane Brewer
 
Construction document management 2017-white paper
Construction document management 2017-white paperConstruction document management 2017-white paper
Construction document management 2017-white paperPeter Cholakis
 
Digital Revolution - Driving Construction Excellence
Digital Revolution -  Driving Construction ExcellenceDigital Revolution -  Driving Construction Excellence
Digital Revolution - Driving Construction ExcellenceSNC-Lavalin
 
Big Data, Big Problems: Avoid System Failure with Quality Analysis - Webinar ...
Big Data, Big Problems: Avoid System Failure with Quality Analysis - Webinar ...Big Data, Big Problems: Avoid System Failure with Quality Analysis - Webinar ...
Big Data, Big Problems: Avoid System Failure with Quality Analysis - Webinar ...CAST
 
Maximizing Project Value with Construction Management Platforms..pdf
Maximizing Project Value with Construction Management Platforms..pdfMaximizing Project Value with Construction Management Platforms..pdf
Maximizing Project Value with Construction Management Platforms..pdfiFieldsmart Technologies
 
How GCs can diminish onsite risks with preemptive field data.pdf
How GCs can diminish onsite risks with preemptive field data.pdfHow GCs can diminish onsite risks with preemptive field data.pdf
How GCs can diminish onsite risks with preemptive field data.pdfiFieldsmart Technologies
 
Computer Applications in Manufacturing Systems, 2009
Computer Applications in Manufacturing Systems, 2009Computer Applications in Manufacturing Systems, 2009
Computer Applications in Manufacturing Systems, 2009Rodzidah Mohd Rodzi
 
Sales_2015_IBS_NoMatrix
Sales_2015_IBS_NoMatrixSales_2015_IBS_NoMatrix
Sales_2015_IBS_NoMatrixGreg Adcock
 
White Paper IDC | The Business Value of VCE Vblock Systems: Leveraging Conver...
White Paper IDC | The Business Value of VCE Vblock Systems: Leveraging Conver...White Paper IDC | The Business Value of VCE Vblock Systems: Leveraging Conver...
White Paper IDC | The Business Value of VCE Vblock Systems: Leveraging Conver...Melissa Luongo
 
idc-business-value-whitepaper
idc-business-value-whitepaperidc-business-value-whitepaper
idc-business-value-whitepaperSteve Brown
 
idc-business-value-whitepaper2015
idc-business-value-whitepaper2015idc-business-value-whitepaper2015
idc-business-value-whitepaper2015Timothy Ori
 
The future of mobility in Construction
The future of mobility in ConstructionThe future of mobility in Construction
The future of mobility in ConstructionRigel Networks LLC
 

Similaire à Increasing Construction Productivity with Information Management (20)

Top 8 Technologies for Construction Risk Management
Top 8 Technologies for Construction  Risk ManagementTop 8 Technologies for Construction  Risk Management
Top 8 Technologies for Construction Risk Management
 
The potential of a true construction management platform.pdf
The potential of a true construction management platform.pdfThe potential of a true construction management platform.pdf
The potential of a true construction management platform.pdf
 
How GCs can diminish onsite risks with preemptive field data-converted.pptx
How GCs can diminish onsite risks with preemptive field data-converted.pptxHow GCs can diminish onsite risks with preemptive field data-converted.pptx
How GCs can diminish onsite risks with preemptive field data-converted.pptx
 
Leveraging Construction Technology Trends for Maximum Impact.pdf
Leveraging Construction Technology Trends for Maximum Impact.pdfLeveraging Construction Technology Trends for Maximum Impact.pdf
Leveraging Construction Technology Trends for Maximum Impact.pdf
 
How to harness big data to drive performance across your project portfolio
How to harness big data to drive performance across your project portfolioHow to harness big data to drive performance across your project portfolio
How to harness big data to drive performance across your project portfolio
 
The impact of AI in construction - An Overview.pdf
The impact of AI in construction - An Overview.pdfThe impact of AI in construction - An Overview.pdf
The impact of AI in construction - An Overview.pdf
 
Top 4 construction obstacles and how technology can be a transformational sol...
Top 4 construction obstacles and how technology can be a transformational sol...Top 4 construction obstacles and how technology can be a transformational sol...
Top 4 construction obstacles and how technology can be a transformational sol...
 
Mobile app development in construction industry
Mobile app development in construction industryMobile app development in construction industry
Mobile app development in construction industry
 
Construction document management 2017-white paper
Construction document management 2017-white paperConstruction document management 2017-white paper
Construction document management 2017-white paper
 
Digital Revolution - Driving Construction Excellence
Digital Revolution -  Driving Construction ExcellenceDigital Revolution -  Driving Construction Excellence
Digital Revolution - Driving Construction Excellence
 
Big Data, Big Problems: Avoid System Failure with Quality Analysis - Webinar ...
Big Data, Big Problems: Avoid System Failure with Quality Analysis - Webinar ...Big Data, Big Problems: Avoid System Failure with Quality Analysis - Webinar ...
Big Data, Big Problems: Avoid System Failure with Quality Analysis - Webinar ...
 
Maximizing Project Value with Construction Management Platforms..pdf
Maximizing Project Value with Construction Management Platforms..pdfMaximizing Project Value with Construction Management Platforms..pdf
Maximizing Project Value with Construction Management Platforms..pdf
 
How GCs can diminish onsite risks with preemptive field data.pdf
How GCs can diminish onsite risks with preemptive field data.pdfHow GCs can diminish onsite risks with preemptive field data.pdf
How GCs can diminish onsite risks with preemptive field data.pdf
 
Voxell Brochure
Voxell BrochureVoxell Brochure
Voxell Brochure
 
Computer Applications in Manufacturing Systems, 2009
Computer Applications in Manufacturing Systems, 2009Computer Applications in Manufacturing Systems, 2009
Computer Applications in Manufacturing Systems, 2009
 
Sales_2015_IBS_NoMatrix
Sales_2015_IBS_NoMatrixSales_2015_IBS_NoMatrix
Sales_2015_IBS_NoMatrix
 
White Paper IDC | The Business Value of VCE Vblock Systems: Leveraging Conver...
White Paper IDC | The Business Value of VCE Vblock Systems: Leveraging Conver...White Paper IDC | The Business Value of VCE Vblock Systems: Leveraging Conver...
White Paper IDC | The Business Value of VCE Vblock Systems: Leveraging Conver...
 
idc-business-value-whitepaper
idc-business-value-whitepaperidc-business-value-whitepaper
idc-business-value-whitepaper
 
idc-business-value-whitepaper2015
idc-business-value-whitepaper2015idc-business-value-whitepaper2015
idc-business-value-whitepaper2015
 
The future of mobility in Construction
The future of mobility in ConstructionThe future of mobility in Construction
The future of mobility in Construction
 

Dernier

Appkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxAppkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxappkodes
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMintel Group
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?Olivia Kresic
 
PB Project 1: Exploring Your Personal Brand
PB Project 1: Exploring Your Personal BrandPB Project 1: Exploring Your Personal Brand
PB Project 1: Exploring Your Personal BrandSharisaBethune
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
Call Girls Contact Number Andheri 9920874524
Call Girls Contact Number Andheri 9920874524Call Girls Contact Number Andheri 9920874524
Call Girls Contact Number Andheri 9920874524najka9823
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfrichard876048
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
Entrepreneurship lessons in Philippines
Entrepreneurship lessons in  PhilippinesEntrepreneurship lessons in  Philippines
Entrepreneurship lessons in PhilippinesDavidSamuel525586
 
8447779800, Low rate Call girls in Dwarka mor Delhi NCR
8447779800, Low rate Call girls in Dwarka mor Delhi NCR8447779800, Low rate Call girls in Dwarka mor Delhi NCR
8447779800, Low rate Call girls in Dwarka mor Delhi NCRashishs7044
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 

Dernier (20)

Appkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxAppkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptx
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 Edition
 
Call Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North GoaCall Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North Goa
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?
 
PB Project 1: Exploring Your Personal Brand
PB Project 1: Exploring Your Personal BrandPB Project 1: Exploring Your Personal Brand
PB Project 1: Exploring Your Personal Brand
 
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 
Call Girls Contact Number Andheri 9920874524
Call Girls Contact Number Andheri 9920874524Call Girls Contact Number Andheri 9920874524
Call Girls Contact Number Andheri 9920874524
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdf
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
Entrepreneurship lessons in Philippines
Entrepreneurship lessons in  PhilippinesEntrepreneurship lessons in  Philippines
Entrepreneurship lessons in Philippines
 
8447779800, Low rate Call girls in Dwarka mor Delhi NCR
8447779800, Low rate Call girls in Dwarka mor Delhi NCR8447779800, Low rate Call girls in Dwarka mor Delhi NCR
8447779800, Low rate Call girls in Dwarka mor Delhi NCR
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 

Increasing Construction Productivity with Information Management

  • 2. There are several industry players out there (GE is one, we are one, Jay Z is definitely one) who believe that they can be better at business software than the software companies can be at ‘business’. Geoff Smith, CEO EllisDon & Gate Three
  • 3. Gate Three tackles the fundamental obstacle to fact-based decision-making. Accessibility and availability of quality information, which in the construction industry is essential to project completion while data integrity critically serves as legal evidence and protecting companies against claim. Inefficiencies are evident among countless industries as workflow is contingent upon interoperability of multiple data sources comprising of core, internally developed programs; externally developed mobile applications and shrink- wrapped software. The construction industry compounds its problems with its reluctant adoption of technology. However, when used effectively technology can deliver business with company-wide decision-making capabilities, integrating structured to unstructured sources of information so it can be harnessed for commercial gain. WELCOME TO GATE THREE
  • 4. OUR PEDIGREE Over 60 years of proven success in the construction industry Completing CAD 3.4 Billion in construction value annually An additional CAD 6.6 Billion in backlog Financially stable ownership structure Proudly 50% employee-owned with over 1,800 employees
  • 5. REAL TIME ERP DATA ANYTIME, ANYWHERE FROM ANY DEVICE Mobile user access to ERP and other back office systems has become a core requirement to operational efficiency and deepening customer engagement. Mobile apps have enabled organizational transformation by accelerating decision time. Mobile accessibility can provide a competitive differentiation.
  • 6. DRIVING DIGITAL DATA ENTERPRISE MOBILITY Data needs to be ubiquitous for both collaboration and fostering decision making. Example:  Cloud based applications (SaaS)  Building Information Systems -(3D)  Sensor technology (Telematics)  Social applications
  • 7. QUALITY DATA = QUALITY DECISION Delivering completed buildings shall no longer present the same challenges of a decade ago when accessing data was cumbersome to access from a collection of bulky binders. Today clients expect all information be transferable as well as encompass the Building Information Model (BIM) including ‘as built’ specifications.
  • 8. EFFICIENT CONSTRUCTION OPERATION INTEROPERABILITY In the US an estimated losses of $15.6 Billion per year are due to lack of interoperability (NIST 2004). "Interoperability is more than the automation of current work processes. That is, more than just doing the same things that are done at present only faster. Interoperable technologies and applications change work processes and the relationships among project owners, clients, contractors and subcontractors.” (NRC 2009) The construction industry has leveraged technological advancements to help manage the workload. However 60% of the industry’s efforts remain lost to inefficiencies.
  • 9. CONSTRUCTION PRODUCTIVITY Widespread use of interoperable technology is still not easy. We need more effective interfacing of stakeholders, processes and information. Diverse stakeholders: Owners, Designers, Builders, Suppliers, Manufacturers, Trades Segregated processes: planning, financing, design, engineering, procurement, construction, operations, maintenance Applications and technologies are rarely integrated across all phases of a project
  • 10. Allow “Best of Breed” software and collaboration tools where needed, but manage the data end-to-end. ENHANCING PRODUCTIVITY Opportunity to capitalize on Interoperability between, BIM, Facilities Management and your construction management system. Construction Management Software ex: Gate Three Mobile Apps Project Schedule BIM Construction Accounting System Preferred Suppliers FM SystemsEstimates DESIGN CONSTRUCTION BUILDING OPERATIONS
  • 11. Gate Three offers users the advantage of a connected, shared work environment, combined with intuitive processes that help each individual on your project team efficiently complete tasks. A truly collaborative online software benefits your team and overall project management. ONE TEAM. ONE WORKSPACE.
  • 12. ENHANCED CONTROL Gate Three enables control of every document, dollar and process associated with a project. All construction documents which may include (and not limited to) Submissions, RFIs, Change Orders are tracked and shared for all stakeholders in accordance to a controlled Access Level. Project workflows can are easily be configured. Gate Three controls project budget by automating commitments, changes and pay approval of POs, time cards and invoices.
  • 13. ENHANCED CONTROL Control, customize and automate workflow (SIs, RFIs, Submissions, and more) Improve quality and safety by automating your QA/ QC programs (or leverage ours) Enable teams to collaborate on critical construction-related information and documents Track project milestones and LEED progress
  • 14. MITIGATE RISK Construction projects are riddled with countless potential risks related to scope, budget, schedule, safety and quality. Gate Three mitigates risk with integrated change control workflow; a clear view of project budget details and key milestones. Safety and quality are paramount as Gate Three™ integrates your QA/QC programs with the rest of your project.
  • 15. MITIGATE RISK Clear view of project budget details at all time Reduce project risk through integrated change control process Gain financial control by replicating your procurement processes through configurable workflow
  • 16. IMPROVE EFFICIENCY Gate Three significantly boosts productivity across all departments/stakeholders with single entry and accessible ‘on demand’ data. Completed projects build your library of costing reference points. Continual use Gate Three is leveraged to bid smarter and serve as a learning tool for potential dangers in executing future projects. Efficient execution results in improved P&L.
  • 17. IMPROVE EFFICIENCY Streamlined and accurate project communication with all stakeholders and personnel Single and collaborative view of the project progress Improve efficiencies with a single and customizable workflow business processes
  • 18. BETTER DECISIONS Gate Three is a communication platform integrating document control, workflows, budget controls, cash flows, milestones, and management reporting. Everyone is on the same page. A single version of the truth. Foundation for electronic collaboration. Visibility of important details required to make profitable business decisions.
  • 19. BETTER DECISIONS Complete clarity of a project’s financial picture - high level down to the most detailed views Full integration of all financial information Improve efficiency through computerized monthly Progress Reports Accounting system integration eliminates double entry