The Power of Virtual
Collaboration in Project
      Management
           by
    Terrence Gargiulo
TABLE OF CONTENTS


This eBook will show you how to implement virtual collaboration tools throughout
      the life cycle of a project to leverage the benefits of collaboration and
                                      partnership.


Setting the Stage
  The Stories of Rodrigo, Fran & Tony…………………………………………………….. 3

The Power of Collaboration & Partnership…………………………………………                          4

Initiating Process……………………………………………………………………………..…                                8
  1. Conducting Risk Analysis with All Stakeholders…………………………………..                10
       Suggested Actions………………………………………………………………………..                             10
  2. Demonstrating Executive Support…………………………………………………….                         12
       Suggested Actions………………………………………………………………………..                             12

Planning Process…………………………………………………………………………………                                   13
  1. Accelerating the Development & Accuracy of Estimates……………………….               14
       Suggested Actions………………………………………………………………………..                             16
  2. Synchronizing Scope Management with Disperse Stakeholder………………               17
       Suggested Actions………………………………………………………………………..                             18



  ©2009, MAKINGSTORIES.net – Terrence Gargiulo – http://www.makingstories.net – 415-948-8087, page 1
Executing & Monitoring/Control Processes………………………………………                                                19
  1. Integrate Creative and Interactive Communications with Stakeholders.                              20
      Suggested Actions……………………………………………………………………….                                                    21
  2. Maintain Easily Accessible Project Dashboards and Solicit Feedback……                              22
      Suggested Actions……………………………………………………………………….                                                    23

Closing Process.....................................................................................   24
  1. Demonstrate Acceptance and Usability……………………………………………..                                           25
       Suggested Actions……………………………………………………………………….                                                   26
  2. Facilitate Knowledge Transfer………………………………………………………….                                              27
       Suggested Actions……………………………………………………………………….                                                   28

Three Opportunities Unique to Virtual Collaboration.........................                           29
 1. Stakeholder Outreach……………………………………………………………………..                                                   29
 2. Accountability…………………………………………………………………………………                                                      30
 3. Project Transparency………………………………………………………………………                                                    31

Pitfalls to Avoid..................................................................................... 33

Five Best Practices to Start Using Today………………………………………….. 34

About Terrence Gargiulo & MAKINGSTORIES.net……………………………. 35




    ©2009, MAKINGSTORIES.net – Terrence Gargiulo – http://www.makingstories.net – 415-948-8087, page 2
SETTING THE STAGE…


                                                Rodrigo  shook  his  head.  He  was  inheriting  an  18‐
                                                month  enterprise  software  development  project 
                                                intended  to  revolutionize  the  organization.  The 
                                                technology  was  not  daunting.  Rodrigo  had 
                                                tremendous  confidence  in  his  team  of  cracker‐jack 
                                                programmers. What troubled Rodrigo was the task of 
                                                keeping  the  four  central  champions  of  the  project 
                                                located in Seoul, Houston, Guadalajara, and Frankfurt 
                                                informed, involved and happy. 

                                                Fran was proud of herself. Two years ago she and her 
                                                team  had  adopted  ITIL  standards  (Information 
                                                Technology Infrastructure Library). She glanced at the 
                                                Standard Operating Procedures for Capacity Planning 
                                                and  Availability  Planning  for  new  applications  and 
                                                saw  that  the  process  was  rock  solid.  What  troubled 
                                                Fran was how she would manage all of the risks and 
                                                unknowns of working with a business unit with which 
                                                she  had  no  prior  experience  and  a  new  project 
                                                manager she had never met. 



  ©2009, MAKINGSTORIES.net – Terrence Gargiulo – http://www.makingstories.net – 415-948-8087, page 3
Tony  closed  the  door  of  his  office  to  clear  his  head. 
                                                 After thirteen months of requirements analysis he had 
                                                 a  blueprint  of  the  new  Web‐based  reporting  system. 
                                                 These  data  warehousing  projects  kept  him  awake 
                                                 nights.  Fifty  percent  of  previous  projects  of  a  similar 
                                                 nature  had  failed.  It  was  always  an  issue  of  scope. 
                                                 With  multiple  hands  owning  and  touching  the  data 
                                                 from so many different parts of the organization, how 
                                                 was  Tony  going  to  keep  these  requirements  stable 
                                                 enough  to  actually  produce  a  valuable  tool  for 
                                                 everyone? 


THE POWER OF COLLABORATION & PARTNERSHIPS

Collaboration and partnership are not a choice. They are business imperatives. Interaction is king.
Today our organizations and the projects we do in support of their missions have too many
working parts and too many integration points to be achieved in solitude.

We would never expect an entire network to rely on one node, so why would we assume that
projects need to be centrally managed and controlled by a project team? The days of throwing the
requirements over the walls and letting the brainiacs figure out what we really need or want are




   ©2009, MAKINGSTORIES.net – Terrence Gargiulo – http://www.makingstories.net – 415-948-8087, page 4
over. It’s time to roll up your sleeves and prepare to meet your stakeholders up close and
personal. Trust me, it’s not as bad as it might sound.

Your business partners don’t have to be part of the problem if you make them part of the solution.
Granted, not every business partner is going to roll out the red carpet and invite you to the
executive table. However, just as you are hopefully realizing that technical prowess is not enough,
your business partners are beginning to realize that viewing you as a service provider ready to
cater to their every whim will not benefit them or the organization.

Projects must produce value. Projects are endlessly balancing risk with value. When risk outweighs
the potential value of a project, or if something changes in the environment whereby the
realization of the value is no longer possible, then a project needs to be killed. How would you like
success to be measured – by jointly deciding with your business partners that a project should be
killed? Say goodbye to the days of marching to Napoleonic Waterloos.




    We Sink or                    The proliferation of virtual collaboration tools has ushered in a
                                  new age of projects. Living and breathing the tactical moves and
      Swim                        grooves of collaboration and partnership has gotten easier.
                                  Forget about socializing the soft and fuzzy tenets of your new-
    Together                      found convictions. Work flows, business processes and the tools
                                  of engagement have made it easier for you to start walking the
                                  talk. Once you start walking others will follow – and they won’t
                                  even know you are enlightening them at the same time.



   ©2009, MAKINGSTORIES.net – Terrence Gargiulo – http://www.makingstories.net – 415-948-8087, page 5
This eBook will show you how to implement virtual collaboration tools throughout the life
cycle of a project to leverage all of the benefits of partnership and collaboration.




   ©2009, MAKINGSTORIES.net – Terrence Gargiulo – http://www.makingstories.net – 415-948-8087, page 6
INITIATING PROCESS

The purpose of the Initiating Process Group is to “facilitate the formal authorization to start a new
project or project phase” (PMBOK® Guide, Third Edition). The culmination of the Initiating Process
is a Project Charter. This is a proposal to the sponsor seeking project authorization. There are a
host of activities that go from defining an initial problem to be solved and producing a signed
project charter. Among all of these activities there are two that stand out as key opportunities for
strategically using virtual collaboration tools.




                                    Top Two Ideas for Using
                                     Virtual Collaboration
                                             Tools

             RISK                                                              EXECUTIVE
           ANALYSIS                1. Conducting Extensive
                                      Risk Analysis with All                    SUPPORT
                                      Stakeholders

                                   2. Demonstrating Executive
                                      Support




   ©2009, MAKINGSTORIES.net – Terrence Gargiulo – http://www.makingstories.net – 415-948-8087, page 7
1. Conducting Risk Analysis with All Stakeholders

Risk is everything. Every member of a project team must keep his or her eyes locked on risks. It’s
not about being paranoid. Balancing risk with business value lies at the success of every project.

Managing risk is done throughout the project life cycle. However, the quality and depth of risk
analysis during the Initiating Process sets the foundation of a project. Go slow to go fast.

Every project begins with the risk of not conducting a thorough enough risk analysis.
Thoroughness implies more than extensiveness. Are you engaging with stakeholders to discover
and analyze project risks? Stakeholders are scattered. Have you reached out to all of these
stakeholders?

Collect comprehensive lists of risks then collaboratively prioritize them according to probability of
the risk occurring and the impact of the risk if it occurs.


                          Risk                    Probability Impact            Impact Score
                                                  (1-10)      (1-10)            (prob. X impact)
     TOOL
                         Note: 1= Low, 10=High




   ©2009, MAKINGSTORIES.net – Terrence Gargiulo – http://www.makingstories.net – 415-948-8087, page 8
Virtual Collaboration Tools and Risk Analysis



                             Of course the quality and effectiveness
                             of    the   collaboration   with   your        “Technology makes
                             partnerships can only be managed by
                                                                               collaboration
                             you, but technology increases the
                             opportunities for communication and the             easier…”
                             diversity of interaction techniques you
                             can use with your stakeholders.



                             • Virtual meeting tools are essential for conducting focus groups with
                               stakeholders you might otherwise have very limited contact with.

                             • Polls and online forms should be used to extend your reach and
                               ongoing contact with stakeholders to identify and monitor risk.




   ©2009, MAKINGSTORIES.net – Terrence Gargiulo – http://www.makingstories.net – 415-948-8087, page 9
Suggested Actions for Risk Analysis…

1. Complete your stakeholder analysis and be thorough!
2. Use online forms to collect lists of risks from stakeholders.
3. Consolidate and categorize risks into a master list.
4. Post risks.
5. Ask stakeholders to rate risks according to probability and
   impact.
6. Collect ideas for risk mitigation and counter measures.
7. Maintain a high-level, online risk register as an ongoing
   communication tool with your stakeholders.



                         2. Demonstrating Executive Support

                         Lack of executive support or project champions is a leading reason for
       EXECUTIVE
        SUPPORT          project failure. Assuming you have strong champions for your project,
                         how are you getting the word out? Have you found ways to keep the
                         voice of your champions strong throughout the life of a project? Virtual
                         collaboration tools offer some surprising strategies.



   ©2009, MAKINGSTORIES.net – Terrence Gargiulo – http://www.makingstories.net – 415-948-8087, page 10
Virtual Collaboration Tools and Executive Support


                              Parading     around    your     champions,
                              especially for a large enterprise software           “Virtual
                              development project, is time consuming
                              and cost prohibitive. Virtual collaboration
                                                                                technologies
                              tools can be used to magnify their voice          amplify your
                              and influence in an ongoing and                     voice and
                              sustainable way. You can even make it             influence…”
                              easy for them. After all, champions are
                              usually busy people.


                              • Record presentations and archive them for ongoing distribution.

                              • Develop short, live virtual and recorded meeting updates spaced
                                throughout a project around major milestones.

                              • Use registration tools of virtual meeting software to track review
                                of recorded messages.

                              • Leverage the polling capabilities of virtual meeting software to
                                capture ongoing feedback, reactions, and ideas from
                                stakeholders.



  ©2009, MAKINGSTORIES.net – Terrence Gargiulo – http://www.makingstories.net – 415-948-8087, page 11
Suggested Actions for Demonstrating Executive
Support…

1. Make it as easy as possible for champions to communicate their
   support. Technology streamlines their time commitment and can
   elevate the effectiveness of their message.

2. Facilitate the development of archived presentations that use short
   sound bites and compelling stories and visuals.

3. Incorporate dynamic content into recorded presentations (i.e., demos
   of evolving software apps, audio sound bites, and text-based quotes
   from stakeholders).

4. Partner with stakeholders to act as rotating media sponsors of your
   champions’ recorded presentations. Feature these stakeholders and
   their perceptions of the project’s progress and importance as a key
   part of the presentations. This serves to spread the care and
   investment people have in your project communications. It also takes
   the communication load off of the champions’ shoulders. They just
   need to virtually show up.




  ©2009, MAKINGSTORIES.net – Terrence Gargiulo – http://www.makingstories.net – 415-948-8087, page 12
PLANNING PROCESS

The purpose of the Planning Process Group is to “define and mature the project scope, develop
the project management plan, and identify and schedule the project activities that occur within the
project” (PMBOK® Guide, Third Edition). The planning processes occur iteratively.

As new project information is discovered, one or more of the planning processes may need to be
revisited. New project information could identify additional dependencies, requirements, and risks
that need to be taken into account. However, changes and refinement cannot continue
indefinitely. The project manager, working with the sponsor, must at some point determine when
changes and refinements can no longer be accepted without making major changes to the
project’s schedule or costs. Stakeholders should be involved in the planning process, leveraging
their skills and knowledge, and setting the stage for open communication.

                                     Top Two Ideas for Using
                                    Virtual Collaboration Tools


                                   1. Accelerating the Development
         ESTIMATING                and Accuracy of Estimates                        SCOPE

                                   2. Synchronizing Scope
                                   Management with Dispersed
                                   Stakeholders




  ©2009, MAKINGSTORIES.net – Terrence Gargiulo – http://www.makingstories.net – 415-948-8087, page 13
1. Accelerating the Development and Accuracy of Estimates

The most daunting aspect of the initial planning effort is estimating. Almost every aspect of the
project is touched by it. The project plan hinges on the thoroughness and quality of estimates.
Costs, level of effort (Work Breakdown Structure/WBS) and schedule are some of the areas most
affected. As time moves forward confidence in estimates increases. Are there any ways of
accelerating this process? Here are a few factors that make estimating difficult:

   •   Lack of information
   •   No previous experience to benchmark efforts
   •   Complex project dependencies
   •   Moving scope
   •   Requirements in flux
   •   Too many stakeholders

Virtual Collaboration Tools and Estimating

Take a simple task from a work breakdown structure. For example,             “Technology
consider trying to estimate coding time for writing an object-          improves your reach
oriented algorithm for a method of a class that calculates
something. Let’s say this method represents one small software              and increases
behavior of a new set of business processes being implemented.            interactions with
Normally you would ask the developers to provide an estimate for         people involved in
the amount of effort required to write the code. You’d plug this             estimating.”
one small estimation into your work breakdown structure and voilà.



  ©2009, MAKINGSTORIES.net – Terrence Gargiulo – http://www.makingstories.net – 415-948-8087, page 14
I am simplifying the picture, but stay with me. This estimate fails to take into account two
dynamic variables that you can collect if you use virtual collaboration tools. For one, it fails to
capture the iterative nature of clarifying questions between the drivers of the business change and
the technical team of software engineers. It also relies too heavily on lots of small estimates from
single individuals or small workgroups.

Let’s go back to our coding example. Sure, you may build into your schedule some back and forth
communications between the technical teams and stakeholders driving the business process
changes, but how well did you engage each of them in determining the level of effort? How many
assumptions did you make in your infinite wisdom as a project manager? And because you are
human, you can only meet with some stakeholders to involve them in the intricate twists and turns
of estimating. As a project manager you are supposed to have the requisite experience to make
these inconsequential rough order of magnitude estimates. It all gets ironed out as you move
along, right? Not exactly!


            “Virtual collaboration tools provide us with endless
        opportunities to set up real-time poll devices to facilitate true
                          collaborative estimating.”


What if there was a way to involve more people in estimating the process on an ongoing basis?
What if estimates were not dependent upon single individuals or small workgroups but a team of
people (perhaps even anonymously sometimes) providing estimating information along the way?




  ©2009, MAKINGSTORIES.net – Terrence Gargiulo – http://www.makingstories.net – 415-948-8087, page 15
Suggested Actions for Estimating…

1. Target areas of time or budgetary estimations, where the most
   number of people are involved and where you have the greatest
   degree of uncertainty.

2. Develop a list of the individuals that might have valuable input,
   including those both internal and external to your organization.

3. Write a short description of the process you plan to follow and
   communicate it to all invited estimating stakeholders.

4. Use Web-based services to create a poll or other tool for collecting
   people’s estimates.

5. Analyze the data collected. Consider throwing out the high and low
   estimates and averaging the rest. All of this depends on sample size.
   If you are unsure, ask someone well-versed in statistics to give you
   a hand.

6. Communicate the results back to participants. Fold the results into
   your Project Planning artifacts (e.g., WBS and timeline).




  ©2009, MAKINGSTORIES.net – Terrence Gargiulo – http://www.makingstories.net – 415-948-8087, page 16
2. Synchronizing Scope Management with Dispersed Stakeholders

When a project gets a-rolling, scope gets a-creeping. Many projects adhere to an organization’s
existing change management processes. Recording your project’s intentions to follow these
standard practices in the project plan is not enough. Think about all of the non-technical
stakeholders who may have never sat on one of these change configuration management boards.
Besides, you will still need to state constraints parameters for managing scope change. For
example, change items will be accepted from “date x” to “date y.”


Virtual Collaboration Tools and Scope Management

During the Planning Process, virtual collaboration tools need to be used to extend your active
outreach to all stakeholders affected by your project. Anyone and everyone who might have valid
or even invalid change requests needs to know how, when and if they can have any input in the
process. Managing expectations reduces risk, especially during the implementation stage when
suddenly new requirements surface that can radically alter the course of the project or jeopardize
its success.

    “Managing              Aggressive, early, proactive, frequent, and short virtual town hall
                           meetings with stakeholders focused solely on scope management will
   expectations            save you and your project teams lots of headaches up the road. The
  reduces risk…”           larger and more complex your project is, the more critical this
                           becomes.




  ©2009, MAKINGSTORIES.net – Terrence Gargiulo – http://www.makingstories.net – 415-948-8087, page 17
Suggested Actions for Scope Management…

 1. Document your scope management plan. As a project team,
    state what, if any, existing change processes you will follow
    and the parameters for how, when, from whom, and what
    you will accept as change requests.

 2. Articulate all of the items that will be out of scope. This
    gives people a starting point. If and when they request any
    kind of change or requirement that relates to your “out of
    scope” descriptors, you will be able to better manage their
    disappointment. Always be ready to listen. There will be
    plenty of times when something you have stated as being
    out of scope may need to be re-evaluated with new
    stakeholder feedback and information.

 3. Enlist the support of your project champions to stand
    behind these critical constraints.

 4. Create a schedule of virtual town hall meetings using Web
    conferencing software. Make sure it coincides well with the
    start and end dates of your acceptance of change request
    items.



 ©2009, MAKINGSTORIES.net – Terrence Gargiulo – http://www.makingstories.net – 415-948-8087, page 18
EXECUTING & MONITORING/CONTROLLING PROCESSES

The purpose of the Executing Process Group is to “complete the work defined in the project
management plan to accomplish the project’s objectives defined in the project scope statement”
(PMBOK® Guide, Third Edition). During the Executing Process of a project, schedules developed
during planning cycles are followed, the team produces project deliverables, and the project
manager oversees the team’s progress to the planned end of the project.

Monitoring and Controlling Processes occur simultaneously during the Executing Process, as during
other Process Groups. As a result, variances in activity durations, resource availability or
productivity, or unanticipated risks may be discovered. This could trigger change requests that
may require re-planning and changes to the project management plan.

                                     Top Two Ideas for Using
                                    Virtual Collaboration Tools


                                   1. Integrate Creative and
                                                                                   SOLICIT
                                   Interactive Communications with
        INTERACTIVE                                                               FEEDBACK
                                   Stakeholders

                                   2. Maintain Easily Accessible
                                   Project Dashboards and Solicit
                                   Feedback




  ©2009, MAKINGSTORIES.net – Terrence Gargiulo – http://www.makingstories.net – 415-948-8087, page 19
1. Integrate Creative and Interactive Communications with Stakeholders


                                    Given the plethora of wonderful technologies available,
                                    communication plans for projects can include a wide variety of
                                    creative and interactive communications. The key here is to
                                    make them short, compelling, and most of all relevant to the
                                    stakeholder. Don’t worry about being thorough. You do not
                                    need to brief every stakeholder on every aspect of your
                                    project.


Save thorough and detailed communications for more formal types of reports that you post in
public areas for those wishing to get more information. Use interaction communications to focus
on the “what’s in it for them” stuff. In other words, design these bursts of communication with
your receiver in mind and not your message.

Make the communications run two ways. Provide a mechanism for people to leave comments. If
possible, for larger, long-term projects, allow people’s comments to be made in one or more
modalities (i.e., text, video, or even audio response). There’s really no excuse for not
implementing these types of communications. There are plenty of platforms that support the
incorporation of these kinds of interactions. There are security implications and if you decide to
use any public-facing tools these need to be discussed and reviewed carefully. However, even
then there are ways to make the information secure and not compromise the confidential nature
of your organization’s project.



  ©2009, MAKINGSTORIES.net – Terrence Gargiulo – http://www.makingstories.net – 415-948-8087, page 20
Speed, interacting in ways most likely to cut through people’s congested bandwidth and reaching
out as far and as wide as possible are most important. These benefits outweigh quality. I’ve even
seen some companies start to use Twitter-style broadcasts to keep people updated. These work
best within very specialized groups of people that need to follow each others’ progress closely, for
example, where there are dependencies in a project such as between software engineers and
testers.

Suggested Actions for Interactive Communications…

1. Commit to creative, interactive strategies in your communications plan.

2. Partner with other areas of the organization to help you produce and
   support these communication vehicles.

3. Include communication planning as a regular part of your activities for
   each stakeholder. Think about the project from their vantage point and
   provide rich, just-in-time briefings that keep them engaged, excited
   and committed to the success of the project.

4. Weave stories and examples (use cases or testimonials in the form of
   personal narratives) told in visually compelling ways as much as
   possible.




  ©2009, MAKINGSTORIES.net – Terrence Gargiulo – http://www.makingstories.net – 415-948-8087, page 21
2. Maintain Easily Accessible Project Dashboards and Solicit Feedback



                           Dashboards come in a variety of shapes and sizes. Dashboards provide
                           a snapshot of a project across key indicators. Metrics are color coded
                           using red, yellow, and green to indicate the status of each measure of
                           a project being presented.

                           Dashboards are not just for the organization’s top brass. Making project
                           dashboards visible to a wider group of stakeholders gives your project
                           better exposure. Granted, you may be concerned that some of that
                           exposure is unwanted, especially when there are problem areas.
                           Although it’s a bit counter-intuitive, project transparency is a fabulous
                           way of minimizing project risk. If there are enough effective channels
                           of communication, dashboards can alert seemingly uninvolved
                           stakeholders to step forward to offer resources, ideas, or solutions to
                           issues that are surfacing.


Measures marked green offer people a chance to celebrate and take pride in how their
achievements and the achievements of others have made a difference. For metrics marked yellow
or red, feedback helps cut down on the inevitable caustic finger pointing.




  ©2009, MAKINGSTORIES.net – Terrence Gargiulo – http://www.makingstories.net – 415-948-8087, page 22
Providing a view of the metrics is not enough. There must be a way for people to provide
feedback. When doing so, people must believe that their feedback is wanted, heard, and
appreciated. Don’t go through the motions of soliciting feedback if you have no intention of taking
it seriously. Look at your project as a village. Given a chance, every person in the village has
something to bring to your stone soup (“the project”). Depending on the project, I do not
recommend making every metric available to every person. It’s just too much detail. Also be sure
you are changing these metrics over time. Throughout the life of a project some measures are
more important than others.

Suggested Actions for Using Dashboards & Soliciting
Feedback…

1. Review your project’s critical success factors articulated in your project
   charter. Compare these with the metrics beings used in your dashboard. There
   will of course be a relationship between the two.

2. Prioritize key critical success factors and the activities and stakeholders aligned
   with them.

3. Develop Web-based interactive presentations of a select number of indicators.

4. Solicit qualitative feedback on measures. These can be a combination of
   threaded comments, links to other documents with detailed information, short
   pre-recorded presentations with background information, creation of a virtual
   suggestion box, etc.



   ©2009, MAKINGSTORIES.net – Terrence Gargiulo – http://www.makingstories.net – 415-948-8087, page 23
CLOSING PROCESS

The purpose of the Closing Process Group is to “formally terminate all activities of a project,
transfer the complete project to others or close a cancelled project” (PMBOK® Guide, Third
Edition).

Officially closing projects is often overlooked and undervalued. Closing a project entails more than
getting sponsors to sign off on the project, filling out artifacts for your project management office
and handing it off to the implementation team. Closing a project is the ideal opportunity for
capturing lessons learned and facilitating knowledge transfer.



                                     Top Two Ideas for Using
                                    Virtual Collaboration Tools


                                   1. Demonstrate Acceptance and
                                      Usability
                                                                                 KNOWLEDGE
         ACCEPTANCE                                                               TRANSFER
                                   2. Facilitate Knowledge Transfer




  ©2009, MAKINGSTORIES.net – Terrence Gargiulo – http://www.makingstories.net – 415-948-8087, page 24
1. Demonstrate Acceptance and Usability

For enterprise software development projects, user acceptance is a toll gate for project closure.
When stakeholders are dispersed, pockets of resistance are almost guaranteed. Leveraging virtual
collaboration tools allows you to showcase success stories while opening up honest dialog where
change is either problematic or painful. Hosting virtual software demos and using online
presentations to feature digital short success and failure stories of how people have been working
with the software can help everyone.


   “Leveraging virtual collaboration tools allows you to showcase success
 stories while opening up honest dialog where change is either problematic
                                 or painful.”


Actions always speak louder than words. Give people examples. Invite people to share their early
experiences. Don’t be afraid of the good, bad or even ugly. Manage and constrain feedback but do
not control it. In other words, you need to architect these communications so they do not become
a virtual gripe session with a long laundry list of change requests. On other hand, if people feel
like you are only looking for kudos you will slam the door in the face of any real dialog.


    “Dialog and pain facilitate change, not coercion or perfectly contrived
                          communication campaigns.


  ©2009, MAKINGSTORIES.net – Terrence Gargiulo – http://www.makingstories.net – 415-948-8087, page 25
Suggested Actions for Demonstrating Acceptance…

1. Recruit your “poster children” early on in the project. These are
   either testers, early adopters, or anyone else who has been using
   the software. They will have a few good stories to share. Remember
   they do not need to share all golden stories but these folks will have
   a history with the project. Their perspectives provide context for
   others.

2. Use Web-based technologies to collect people’s experiences
   throughout the life of the project.

3. Design usability studies during prototyping, testing, and
   implementation that incorporate virtual meetings. By doing so you
   will be able to include dispersed stakeholders. Virtual usability
   studies encourage positive cross-talk and take people out of the
   dark when it comes time to embrace change. Record these events.
   Use the key highlights from these throughout the Closing Process.




  ©2009, MAKINGSTORIES.net – Terrence Gargiulo – http://www.makingstories.net – 415-948-8087, page 26
2. Facilitate Knowledge Transfer

Lessons learned from a project must be more than bullets in a report. Just as you go slow at the
beginning of a project in order to move fast later, so must you go slow at the end of a project to
ensure the greatest transfer of knowledge. Reflection is underrated and the lack of it gets
organizations into trouble all the time.

Somebody needs to be the beneficiary of all the accumulated knowledge and wisdom of people
who have participated on a project. Organizations cannot afford to relearn lessons already
learned. Likewise, organizations face much greater turnover in their ranks. People move around a
lot more even if they stay with the same organization. Finding effective ways of sharing
experiences and getting a “return on experiences” is key to future success.


                                    “ROE”
                             Return on Experience                “Virtual collaboration tools
                                                                   are vital in reaching and
                          Experiences are best shared
                                  as stories.                     involving people in active
                                                                    reflections that lead to
     X                      “Reflecting on stories leads                 performance.”
                        to knowledge transfer that results
                          in performance improvements.”




  ©2009, MAKINGSTORIES.net – Terrence Gargiulo – http://www.makingstories.net – 415-948-8087, page 27
Suggested Actions for Facilitating Knowledge
Transfer…

1. Develop an online timeline of the project. Include major
   milestones. Be sure to use pictures and graphics of the people,
   places, and events that defined the project.

2. Use the timeline to trigger people’s stories.

3. Organize virtual after-action meetings for people to share their
   experiences. Offer incentives for people to share information.

4. Scan a portfolio of projects on the horizon. Look for potential
   matches where the people, skills, technologies, unique
   methodologies, or business processes that will be required are
   similar to ones just used on the current project. Record short
   informal interviews with these people.




  ©2009, MAKINGSTORIES.net – Terrence Gargiulo – http://www.makingstories.net – 415-948-8087, page 28
THREE OPPORTUNITIES UNIQUE TO VIRTUAL COLLABORATION TOOLS

1. Stakeholder Outreach

                    For most organizations, the complexity of projects keeps increasing. There
                    are more people, more resources, and more integration points in today’s
                    projects than ever before. Unless it’s a small project the resources you need
                    are unlikely to all sit beneath the same roof. The number of critical touch
                    points and the economics of travel and time make travel only part of the
                    potential solution.

                    Leveraging the tools of virtual collaboration extends your reach. Even when a
                    project may not demand the active involvement of many stakeholders, people
                    expect to be in the loop. We live in a connected world.

Virtual collaboration tools expand your direct and indirect spheres of influence. Here are some
questions to ask:

• Are we using virtual meetings and presentations to keep people up to date in ways that are
  engaging and relevant?

• Are we continually pulling feedback and information from people?

• Are we eliciting and disseminating stories to create realistic buzz that helps our projects attract
  the support, attention, and commitment they need to succeed?



  ©2009, MAKINGSTORIES.net – Terrence Gargiulo – http://www.makingstories.net – 415-948-8087, page 29
2. Accountability

The more people are involved in a project, the more they are also accountable to each other and
to the project’s success. Project management teams do not have to be the only ones holding
people’s noses to the grindstones. When there is visibility people become more accountable to
each other. My favorite example of this is a room full of students taking a test under the honor
code. Students are less likely to cheat when they hold each other accountable for taking the test
fairly.

Virtual collaboration tools improve accountability. Communication is ongoing with a combination of
“push and pull strategies” that create a project culture of participation.


  “When people can picture themselves as having a role in the project, its
   outcome and what it means for the enterprise, they will self-assume a
                       position of accountability.”


Imagine you work in a luxurious hotel and you love your job. You love everything about what the
hotel is about. Now imagine seeing a piece of trash on the floor. Even if you are not part of a
cleaning crew you are likely to pick up that piece of trash. Job description aside, you feel a
connection with the mission of your organization. Virtual collaboration tools can facilitate this kind
of involvement and engagement.




  ©2009, MAKINGSTORIES.net – Terrence Gargiulo – http://www.makingstories.net – 415-948-8087, page 30
3. Project Transparency



                             Think of your project as a CNN news show on 24 hours a day, 7 days
                             a week. When you increase people’s exposure to your project and
                             offer them a way to interact with each other, your project grows in
                             visibility. Whatever visibility you do not give to your project willingly
                             or knowingly is assumed by the peer-to-peer connections between
                             stakeholders.


Word travels fast and when projects are peppered with opportunities for people across the
enterprise to interact with each other your project becomes transparent. Forget about trying to
bury information. Here’s the good news: your project will become a more integral part of the
enterprise. People will sense and respond to the ebbs and flows of events impacting your project.

Compare this to the reactionary model that most projects assume. Often by the time an issue
surfaces through formal channels it’s too late. For example, a project manager may believe the
critical path of a project is not affected by a few missed dependencies. He or she may believe the
project can stay on course. In reality there may be other things not on the radar scope or out of
the project manager’s purview that could send the project schedule into a tail spin.




  ©2009, MAKINGSTORIES.net – Terrence Gargiulo – http://www.makingstories.net – 415-948-8087, page 31
“Project transparency
                                   enables many people to act
                                   as the eyes and ears of the
                                            project.”



Of course at times this will create missteps or cause some reactionary ripples throughout the
enterprise but with ongoing two-way communication even things that fall out of sync will naturally
correct themselves.

Think of your project as a living organism. All of the differentiated parts are well integrated with
each other. That means communication and interaction between the parts are humming. As
transparency increases it becomes more critical for you to lessen command and control models of
management and communication.

How well and creatively you implement virtual collaboration tools will translate into how you
manage the side effects of project transparency. Trust people to get your back. With high visibility
even the few people who will try to knife you in the back won’t last very long and their influence in
the long run will be very minimal. Like an infection in the body, the white blood cells of your
enterprise will eventually clean up the mess and eradicate their destructive force.




  ©2009, MAKINGSTORIES.net – Terrence Gargiulo – http://www.makingstories.net – 415-948-8087, page 32
Pitfalls of Virtual Collaboration to Avoid…

• Using virtual collaboration tools to replicate the standard
  dog-and-pony, death-by-PowerPoint style of briefings and
  report. Move to more story-based forms of communications.

• Too much communication. Less is more in terms of
  information. Offer many different opportunities and
  channels for people to communicate. Use technologies to
  broadcast less and spend more time soliciting people’s
  feedback.

• Lack of follow-up with people. As the number and types of
  virtual interaction with stakeholders increases your risk of
  managing people’s expectation increases. Follow-up is
  crucial. Put in place well thought out processes for
  managing the feedback you receive. Be clear with people
  and if you drop a communication ball (which is inevitable)
  use it as an opportunity to be honest, apologetic, and
  transparent. Most people, if you are really being genuine,
  will graciously receive your apology.




  ©2009, MAKINGSTORIES.net – Terrence Gargiulo – http://www.makingstories.net – 415-948-8087, page 33
FIVE BEST PRACTICES TO START USING TODAY


1. Create strong ongoing visibility for your project champions through the
   use of virtual collaboration tools and short media-rich presentations.

2. Increase your stakeholders’ role in risk management with virtual
   collaboration tools.

3. Implement more virtual all-hands meetings that are less information
   based and more story based.

4. Elicit stories from stakeholders throughout the life of a project. Share
   stories to trigger the sharing of other people’s stories. Scan these stories
   for patterns of meaning and knowledge. Incorporate analysis of story
   patterns as one of many important inputs into project decisions.

5. Incorporate virtual knowledge transfer opportunities as part of your
   project closing activities.




  ©2009, MAKINGSTORIES.net – Terrence Gargiulo – http://www.makingstories.net – 415-948-8087, page 34
Terrence L. Gargiulo, MMHS is an eight times author, international speaker, organizational
                         development consultant and group process facilitator specializing in the use of stories. He
                         holds a Master of Management in Human Services from the Florence Heller School, at Brandeis
                         University, and is a recipient of Inc. Magazine's Marketing Master Award, the 2008 HR
                         Leadership Award from the Asia Pacific HRM Congress, and is a member of Brandeis
                         University’s athletic Hall of Fame. He has appeared on Fox TV, CN8, and on CNN radio among
                         others.

                         Highlights of some of his past and present clients include, GM, HP, DTE Energy, MicroStrategy,
                         Citrix, Fidelity, Federal Reserve Bank, Ceridian, Countrywide Financial, Washington Mutual,
                         Dreyers Ice Cream, UNUM, US Coast Guard, Boston University, Raytheon, City of Lowell,
                         Arthur D. Little, KANA Communications, Merck-Medco, Coca-Cola, Harvard Business School,
                         and Cambridge Savings Bank.




                                                                  Terrence Gargiulo
                                                           President, MAKINGSTORIES.net
                                                           http://www.makingstories.net
                                                             terrence@makingstories.net
                                                                phone – 415-948-8087




©2009, MAKINGSTORIES.net – Terrence Gargiulo – http://www.makingstories.net – 415-948-8087, page 35
WORKSHOPS & CONSULTING 
 
BUSINESS ACUMEN FOR PROJECT  STORY‐BASED COMMUNICATION                     PROJECT TEAM LEADERSHIP 
         MANAGERS                    ASSESSMENT 
 
Developing business acumen is an                                        Relationships are at the heart of 
imperative for Project Management                                       project management. This highly 
professionals. Business acumen is                                       charged experiential workshop 
defined as the collection of                                            thrusts participants into safe but 
knowledge, skills, and experience                                       demanding learning situations to 
that transforms us into indispensable                                   test drive the skills they need to 
strategic partners in our                                               succeed. Participants work with their 
organizations. Project management                                       strengths and inevitable blind spots 
professionals equipped to lead                                          to become agile leaders who 
collaborative work efforts in their                                     facilitate performance and 
enterprises will become leaders in                                      connections with all stakeholders 
their organizations.                                                    rather than trying to control them. 

 
Coaching for Project Managers 
Consulting ‐ Organizational Development, Learning & Communication Architectures 
Facilitating ‐ Focus Groups, JAR/JAD, After Action Reviews, Knowledge Transfer, Strategic Planning 



    ©2009, MAKINGSTORIES.net – Terrence Gargiulo – http://www.makingstories.net – 415-948-8087, page 36
SOME CLOSING THOUGHTS… 
                                                                       
                                           Stories fold in and out of themselves to reveal subtle 
                                              worlds of meanings, purpose, and connections. 
                                                                        
                                           They are gentle transporters bound by time but that 
                                               travel beyond the boundaries of what we have 
                                                   experienced at any given point in time. 
                                                                        
                                               Stories free us to move through a landscape of 
                                           change. We leave the dusty road of the familiar and 
                                             embrace a void where we can find the freedom to 
                                          chose and perceive new realities and project worlds of 
                                                               our own making. 
                                                                        
                                             Stories can either crush illusions we have become 
                                            enslaved to due to habit or they can lift our veils of 
                                          fear and familiarity and give us a glimpse of new ways 
                                            of being. Here we will find a place where we can be 
                                            our unique selves while in communion with others. 
                                                             Terrence L. Gargiulo

 



    ©2009, MAKINGSTORIES.net – Terrence Gargiulo – http://www.makingstories.net – 415-948-8087, page 37

More Related Content

What's hot

Steljes video and data conferencing survey report
Steljes video and data conferencing survey reportSteljes video and data conferencing survey report
Steljes video and data conferencing survey report
Gordon Rimmer
 
CDPR107-Final_Project-Nguyen_Sophia
CDPR107-Final_Project-Nguyen_SophiaCDPR107-Final_Project-Nguyen_Sophia
CDPR107-Final_Project-Nguyen_Sophia
Sophia Nguyen
 

What's hot (20)

Yorktel Whitepaper: Save Money, Leverage Time Return on Engagement Using Coll...
Yorktel Whitepaper: Save Money, Leverage Time Return on Engagement Using Coll...Yorktel Whitepaper: Save Money, Leverage Time Return on Engagement Using Coll...
Yorktel Whitepaper: Save Money, Leverage Time Return on Engagement Using Coll...
 
Steljes video and data conferencing survey report
Steljes video and data conferencing survey reportSteljes video and data conferencing survey report
Steljes video and data conferencing survey report
 
Capstone Project
Capstone ProjectCapstone Project
Capstone Project
 
7 Experts on How to Deliver a Secure, Productive Remote Employee Experience
7 Experts on How to Deliver a Secure, Productive Remote Employee Experience  7 Experts on How to Deliver a Secure, Productive Remote Employee Experience
7 Experts on How to Deliver a Secure, Productive Remote Employee Experience
 
Sharktower: Will AI change the way you manage change?
Sharktower: Will AI change the way you manage change?Sharktower: Will AI change the way you manage change?
Sharktower: Will AI change the way you manage change?
 
Higher Education Computing - Best Practices for Cloud Migration
Higher Education Computing - Best Practices for Cloud MigrationHigher Education Computing - Best Practices for Cloud Migration
Higher Education Computing - Best Practices for Cloud Migration
 
Re imagine the future of remote team
Re imagine the future of remote teamRe imagine the future of remote team
Re imagine the future of remote team
 
Intranätens tillstånd och framtid
Intranätens tillstånd och framtidIntranätens tillstånd och framtid
Intranätens tillstånd och framtid
 
Digital Workplace Trends and Transformation
Digital Workplace Trends and TransformationDigital Workplace Trends and Transformation
Digital Workplace Trends and Transformation
 
Insights on building and managing virtual teams
Insights on building and managing virtual teamsInsights on building and managing virtual teams
Insights on building and managing virtual teams
 
BT Common Ground Whitepaper Nichola Millard
BT Common Ground Whitepaper Nichola MillardBT Common Ground Whitepaper Nichola Millard
BT Common Ground Whitepaper Nichola Millard
 
The Digital Workplace at Grundfos From Content to Collaboration
The Digital Workplace at Grundfos  From Content to CollaborationThe Digital Workplace at Grundfos  From Content to Collaboration
The Digital Workplace at Grundfos From Content to Collaboration
 
Expanding Educational Opportunity - Assistive Technology
Expanding Educational Opportunity - Assistive Technology Expanding Educational Opportunity - Assistive Technology
Expanding Educational Opportunity - Assistive Technology
 
Enterprise Knowledge Workers: Understanding Risks and Opportunities
Enterprise Knowledge Workers: Understanding Risks and OpportunitiesEnterprise Knowledge Workers: Understanding Risks and Opportunities
Enterprise Knowledge Workers: Understanding Risks and Opportunities
 
Digital Strategies for Employee Engagement
Digital Strategies for Employee EngagementDigital Strategies for Employee Engagement
Digital Strategies for Employee Engagement
 
Benefit thru-communication-improvement
Benefit thru-communication-improvementBenefit thru-communication-improvement
Benefit thru-communication-improvement
 
Workfront - 9 Experts on How to Align IT's Work to Company Strategy
Workfront - 9 Experts on How to Align IT's Work to Company StrategyWorkfront - 9 Experts on How to Align IT's Work to Company Strategy
Workfront - 9 Experts on How to Align IT's Work to Company Strategy
 
The Hybrid Workforce - Aquire Structure 2011
The Hybrid Workforce - Aquire Structure 2011The Hybrid Workforce - Aquire Structure 2011
The Hybrid Workforce - Aquire Structure 2011
 
CDPR107-Final_Project-Nguyen_Sophia
CDPR107-Final_Project-Nguyen_SophiaCDPR107-Final_Project-Nguyen_Sophia
CDPR107-Final_Project-Nguyen_Sophia
 
How Focus on Digital Employee Experience (DEX) Improves Digital Workplace Ado...
How Focus on Digital Employee Experience (DEX) Improves Digital Workplace Ado...How Focus on Digital Employee Experience (DEX) Improves Digital Workplace Ado...
How Focus on Digital Employee Experience (DEX) Improves Digital Workplace Ado...
 

Viewers also liked

Week 4 5352
Week 4 5352Week 4 5352
Week 4 5352
abby20
 
1993 Doubles Features Film Can Set
1993 Doubles Features   Film Can Set1993 Doubles Features   Film Can Set
1993 Doubles Features Film Can Set
Elvis Presley Blues
 
(3 A12) 何耀萍
(3 A12) 何耀萍(3 A12) 何耀萍
(3 A12) 何耀萍
bmf20071061
 
Week5 Assignment
Week5 AssignmentWeek5 Assignment
Week5 Assignment
tykl94
 
2period ReviewANDANSWERS
2period ReviewANDANSWERS2period ReviewANDANSWERS
2period ReviewANDANSWERS
mrsbere
 
პრეზენტაცია
პრეზენტაციაპრეზენტაცია
პრეზენტაცია
guestf61bbbc
 
Seminari pile sessió 5 ceb
Seminari pile sessió 5 cebSeminari pile sessió 5 ceb
Seminari pile sessió 5 ceb
albertingles
 

Viewers also liked (20)

Report 40 under 40 EYL Athens
Report 40 under 40 EYL AthensReport 40 under 40 EYL Athens
Report 40 under 40 EYL Athens
 
Idioms In English
Idioms In EnglishIdioms In English
Idioms In English
 
Week 4 5352
Week 4 5352Week 4 5352
Week 4 5352
 
1993 Doubles Features Film Can Set
1993 Doubles Features   Film Can Set1993 Doubles Features   Film Can Set
1993 Doubles Features Film Can Set
 
зима
зимазима
зима
 
Elvis Collection11
Elvis Collection11Elvis Collection11
Elvis Collection11
 
IBM Social Apps
IBM Social AppsIBM Social Apps
IBM Social Apps
 
Untitled Presentation
Untitled PresentationUntitled Presentation
Untitled Presentation
 
(3 A12) 何耀萍
(3 A12) 何耀萍(3 A12) 何耀萍
(3 A12) 何耀萍
 
Le Illusioni Ottiche
Le Illusioni OtticheLe Illusioni Ottiche
Le Illusioni Ottiche
 
Five Disruptive Forces that are Shaking Up Indian Pharma!
Five Disruptive Forces that are Shaking Up Indian Pharma! Five Disruptive Forces that are Shaking Up Indian Pharma!
Five Disruptive Forces that are Shaking Up Indian Pharma!
 
Резекции почек по поводу опухолей
Резекции почек по поводу опухолейРезекции почек по поводу опухолей
Резекции почек по поводу опухолей
 
Point pictux
Point pictuxPoint pictux
Point pictux
 
Re emphasizing awareness & education
Re emphasizing awareness & educationRe emphasizing awareness & education
Re emphasizing awareness & education
 
Week5 Assignment
Week5 AssignmentWeek5 Assignment
Week5 Assignment
 
2period ReviewANDANSWERS
2period ReviewANDANSWERS2period ReviewANDANSWERS
2period ReviewANDANSWERS
 
Album Photo Blog Spot
Album Photo Blog SpotAlbum Photo Blog Spot
Album Photo Blog Spot
 
პრეზენტაცია
პრეზენტაციაპრეზენტაცია
პრეზენტაცია
 
Seminari pile sessió 5 ceb
Seminari pile sessió 5 cebSeminari pile sessió 5 ceb
Seminari pile sessió 5 ceb
 
How to Measure Your Social Media Impact
How to Measure Your Social Media ImpactHow to Measure Your Social Media Impact
How to Measure Your Social Media Impact
 

Similar to The Power of Virtual Collaboration in Project Management

Presentation by ashish sadekar
Presentation by ashish sadekarPresentation by ashish sadekar
Presentation by ashish sadekar
PMI_IREP_TP
 
Virtual Project Management
Virtual Project ManagementVirtual Project Management
Virtual Project Management
Monzer Osama Alchikh WARAK
 
White paper plan_for_paperless
White paper plan_for_paperlessWhite paper plan_for_paperless
White paper plan_for_paperless
Joseph Manzelli Jr
 

Similar to The Power of Virtual Collaboration in Project Management (20)

Value-driven business in the Clowd
Value-driven business in the ClowdValue-driven business in the Clowd
Value-driven business in the Clowd
 
Presentation by ashish sadekar
Presentation by ashish sadekarPresentation by ashish sadekar
Presentation by ashish sadekar
 
Enhancing the usability of your intranet
Enhancing the usability of your intranetEnhancing the usability of your intranet
Enhancing the usability of your intranet
 
Real storygroup sample
Real storygroup sampleReal storygroup sample
Real storygroup sample
 
A White Paper by SMART: achieving broad deployment of collaboration technologies
A White Paper by SMART: achieving broad deployment of collaboration technologiesA White Paper by SMART: achieving broad deployment of collaboration technologies
A White Paper by SMART: achieving broad deployment of collaboration technologies
 
Virtual Project Management
Virtual Project ManagementVirtual Project Management
Virtual Project Management
 
A MARKETER'S GUIDE : " INTEGRATION PLATFORM AS A SERVICE (iPaaS) "
A MARKETER'S GUIDE : " INTEGRATION PLATFORM AS A SERVICE (iPaaS)  "A MARKETER'S GUIDE : " INTEGRATION PLATFORM AS A SERVICE (iPaaS)  "
A MARKETER'S GUIDE : " INTEGRATION PLATFORM AS A SERVICE (iPaaS) "
 
Quality Management Practice in IT Projects
Quality Management Practice in IT ProjectsQuality Management Practice in IT Projects
Quality Management Practice in IT Projects
 
How UC Pays For Itself
How UC Pays For ItselfHow UC Pays For Itself
How UC Pays For Itself
 
How Unified Communications Pays For Itself
How Unified Communications Pays For ItselfHow Unified Communications Pays For Itself
How Unified Communications Pays For Itself
 
@Note 35 digital transformation series 1 0
@Note 35 digital transformation series 1 0@Note 35 digital transformation series 1 0
@Note 35 digital transformation series 1 0
 
EMDT_2
EMDT_2EMDT_2
EMDT_2
 
Technovision 2014 technology_building_blocks_for_digital_transformation - cap...
Technovision 2014 technology_building_blocks_for_digital_transformation - cap...Technovision 2014 technology_building_blocks_for_digital_transformation - cap...
Technovision 2014 technology_building_blocks_for_digital_transformation - cap...
 
White paper plan_for_paperless
White paper plan_for_paperlessWhite paper plan_for_paperless
White paper plan_for_paperless
 
Scalable light weight processes
Scalable light weight processesScalable light weight processes
Scalable light weight processes
 
Interaction Room - Creating Space for Developments (Software Projects)
Interaction Room - Creating Space for Developments (Software Projects)Interaction Room - Creating Space for Developments (Software Projects)
Interaction Room - Creating Space for Developments (Software Projects)
 
5 Intranet Realities For Business In The Web 2 World
5 Intranet Realities For Business In The Web 2 World5 Intranet Realities For Business In The Web 2 World
5 Intranet Realities For Business In The Web 2 World
 
BriefingsDirect Analysts Unpack the Psychology of Project Management Via 'Pra...
BriefingsDirect Analysts Unpack the Psychology of Project Management Via 'Pra...BriefingsDirect Analysts Unpack the Psychology of Project Management Via 'Pra...
BriefingsDirect Analysts Unpack the Psychology of Project Management Via 'Pra...
 
BriefingsDirect : Psychology of project management and SOA governance
BriefingsDirect : Psychology of project management and SOA governanceBriefingsDirect : Psychology of project management and SOA governance
BriefingsDirect : Psychology of project management and SOA governance
 
The Cloud Disaster Recovery "Cookbook''
 The Cloud Disaster Recovery "Cookbook''  The Cloud Disaster Recovery "Cookbook''
The Cloud Disaster Recovery "Cookbook''
 

More from Citrix Online

More from Citrix Online (12)

How To Stay Covered in the Mobile Work Downpour
How To Stay Covered in the Mobile Work DownpourHow To Stay Covered in the Mobile Work Downpour
How To Stay Covered in the Mobile Work Downpour
 
Emergency Telecommuting Guide
Emergency Telecommuting GuideEmergency Telecommuting Guide
Emergency Telecommuting Guide
 
Business Continuity And Disaster Recovery Are Top IT Priorities For 2010 And ...
Business Continuity And Disaster Recovery Are Top IT Priorities For 2010 And ...Business Continuity And Disaster Recovery Are Top IT Priorities For 2010 And ...
Business Continuity And Disaster Recovery Are Top IT Priorities For 2010 And ...
 
Connecting And Engaging Teams In A Distributed Workforce
Connecting And Engaging Teams In A Distributed WorkforceConnecting And Engaging Teams In A Distributed Workforce
Connecting And Engaging Teams In A Distributed Workforce
 
The Employee Point of View: The Economic Downturn
The Employee Point of View: The Economic DownturnThe Employee Point of View: The Economic Downturn
The Employee Point of View: The Economic Downturn
 
9 Management Practices for Exceptional Webinars
9 Management Practices for Exceptional Webinars9 Management Practices for Exceptional Webinars
9 Management Practices for Exceptional Webinars
 
What's Working in Small Business Marketing and Webinars
What's Working in Small Business Marketing and WebinarsWhat's Working in Small Business Marketing and Webinars
What's Working in Small Business Marketing and Webinars
 
Deer In The Headlights How To Create Content Without Blinking
Deer In The Headlights How To Create Content Without BlinkingDeer In The Headlights How To Create Content Without Blinking
Deer In The Headlights How To Create Content Without Blinking
 
Making the Most of Your Marketing Budget in 2010
Making the Most of Your Marketing Budget in 2010Making the Most of Your Marketing Budget in 2010
Making the Most of Your Marketing Budget in 2010
 
Actionable Strategies for Driving Sales and Increasing ROI
Actionable Strategies for Driving Sales and Increasing ROIActionable Strategies for Driving Sales and Increasing ROI
Actionable Strategies for Driving Sales and Increasing ROI
 
Driving Growth and Cutting Costs in 2010 with Online Collaboration
Driving Growth and Cutting Costs in 2010 with Online CollaborationDriving Growth and Cutting Costs in 2010 with Online Collaboration
Driving Growth and Cutting Costs in 2010 with Online Collaboration
 
Training Trends for 2010: How to Embrace the New Training Landscape
Training Trends for 2010: How to Embrace the New Training LandscapeTraining Trends for 2010: How to Embrace the New Training Landscape
Training Trends for 2010: How to Embrace the New Training Landscape
 

Recently uploaded

Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
amitlee9823
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
amitlee9823
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
Abortion pills in Kuwait Cytotec pills in Kuwait
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Sheetaleventcompany
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Anamikakaur10
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
lizamodels9
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
amitlee9823
 

Recently uploaded (20)

Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture concept
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 

The Power of Virtual Collaboration in Project Management

  • 1. The Power of Virtual Collaboration in Project Management by Terrence Gargiulo
  • 2. TABLE OF CONTENTS This eBook will show you how to implement virtual collaboration tools throughout the life cycle of a project to leverage the benefits of collaboration and partnership. Setting the Stage The Stories of Rodrigo, Fran & Tony…………………………………………………….. 3 The Power of Collaboration & Partnership………………………………………… 4 Initiating Process……………………………………………………………………………..… 8 1. Conducting Risk Analysis with All Stakeholders………………………………….. 10 Suggested Actions……………………………………………………………………….. 10 2. Demonstrating Executive Support……………………………………………………. 12 Suggested Actions……………………………………………………………………….. 12 Planning Process………………………………………………………………………………… 13 1. Accelerating the Development & Accuracy of Estimates………………………. 14 Suggested Actions……………………………………………………………………….. 16 2. Synchronizing Scope Management with Disperse Stakeholder……………… 17 Suggested Actions……………………………………………………………………….. 18 ©2009, MAKINGSTORIES.net – Terrence Gargiulo – http://www.makingstories.net – 415-948-8087, page 1
  • 3. Executing & Monitoring/Control Processes……………………………………… 19 1. Integrate Creative and Interactive Communications with Stakeholders. 20 Suggested Actions………………………………………………………………………. 21 2. Maintain Easily Accessible Project Dashboards and Solicit Feedback…… 22 Suggested Actions………………………………………………………………………. 23 Closing Process..................................................................................... 24 1. Demonstrate Acceptance and Usability…………………………………………….. 25 Suggested Actions………………………………………………………………………. 26 2. Facilitate Knowledge Transfer…………………………………………………………. 27 Suggested Actions………………………………………………………………………. 28 Three Opportunities Unique to Virtual Collaboration......................... 29 1. Stakeholder Outreach…………………………………………………………………….. 29 2. Accountability………………………………………………………………………………… 30 3. Project Transparency……………………………………………………………………… 31 Pitfalls to Avoid..................................................................................... 33 Five Best Practices to Start Using Today………………………………………….. 34 About Terrence Gargiulo & MAKINGSTORIES.net……………………………. 35 ©2009, MAKINGSTORIES.net – Terrence Gargiulo – http://www.makingstories.net – 415-948-8087, page 2
  • 4. SETTING THE STAGE… Rodrigo  shook  his  head.  He  was  inheriting  an  18‐ month  enterprise  software  development  project  intended  to  revolutionize  the  organization.  The  technology  was  not  daunting.  Rodrigo  had  tremendous  confidence  in  his  team  of  cracker‐jack  programmers. What troubled Rodrigo was the task of  keeping  the  four  central  champions  of  the  project  located in Seoul, Houston, Guadalajara, and Frankfurt  informed, involved and happy.  Fran was proud of herself. Two years ago she and her  team  had  adopted  ITIL  standards  (Information  Technology Infrastructure Library). She glanced at the  Standard Operating Procedures for Capacity Planning  and  Availability  Planning  for  new  applications  and  saw  that  the  process  was  rock  solid.  What  troubled  Fran was how she would manage all of the risks and  unknowns of working with a business unit with which  she  had  no  prior  experience  and  a  new  project  manager she had never met.  ©2009, MAKINGSTORIES.net – Terrence Gargiulo – http://www.makingstories.net – 415-948-8087, page 3
  • 5. Tony  closed  the  door  of  his  office  to  clear  his  head.  After thirteen months of requirements analysis he had  a  blueprint  of  the  new  Web‐based  reporting  system.  These  data  warehousing  projects  kept  him  awake  nights.  Fifty  percent  of  previous  projects  of  a  similar  nature  had  failed.  It  was  always  an  issue  of  scope.  With  multiple  hands  owning  and  touching  the  data  from so many different parts of the organization, how  was  Tony  going  to  keep  these  requirements  stable  enough  to  actually  produce  a  valuable  tool  for  everyone?  THE POWER OF COLLABORATION & PARTNERSHIPS Collaboration and partnership are not a choice. They are business imperatives. Interaction is king. Today our organizations and the projects we do in support of their missions have too many working parts and too many integration points to be achieved in solitude. We would never expect an entire network to rely on one node, so why would we assume that projects need to be centrally managed and controlled by a project team? The days of throwing the requirements over the walls and letting the brainiacs figure out what we really need or want are ©2009, MAKINGSTORIES.net – Terrence Gargiulo – http://www.makingstories.net – 415-948-8087, page 4
  • 6. over. It’s time to roll up your sleeves and prepare to meet your stakeholders up close and personal. Trust me, it’s not as bad as it might sound. Your business partners don’t have to be part of the problem if you make them part of the solution. Granted, not every business partner is going to roll out the red carpet and invite you to the executive table. However, just as you are hopefully realizing that technical prowess is not enough, your business partners are beginning to realize that viewing you as a service provider ready to cater to their every whim will not benefit them or the organization. Projects must produce value. Projects are endlessly balancing risk with value. When risk outweighs the potential value of a project, or if something changes in the environment whereby the realization of the value is no longer possible, then a project needs to be killed. How would you like success to be measured – by jointly deciding with your business partners that a project should be killed? Say goodbye to the days of marching to Napoleonic Waterloos. We Sink or The proliferation of virtual collaboration tools has ushered in a new age of projects. Living and breathing the tactical moves and Swim grooves of collaboration and partnership has gotten easier. Forget about socializing the soft and fuzzy tenets of your new- Together found convictions. Work flows, business processes and the tools of engagement have made it easier for you to start walking the talk. Once you start walking others will follow – and they won’t even know you are enlightening them at the same time. ©2009, MAKINGSTORIES.net – Terrence Gargiulo – http://www.makingstories.net – 415-948-8087, page 5
  • 7. This eBook will show you how to implement virtual collaboration tools throughout the life cycle of a project to leverage all of the benefits of partnership and collaboration. ©2009, MAKINGSTORIES.net – Terrence Gargiulo – http://www.makingstories.net – 415-948-8087, page 6
  • 8. INITIATING PROCESS The purpose of the Initiating Process Group is to “facilitate the formal authorization to start a new project or project phase” (PMBOK® Guide, Third Edition). The culmination of the Initiating Process is a Project Charter. This is a proposal to the sponsor seeking project authorization. There are a host of activities that go from defining an initial problem to be solved and producing a signed project charter. Among all of these activities there are two that stand out as key opportunities for strategically using virtual collaboration tools. Top Two Ideas for Using Virtual Collaboration Tools RISK  EXECUTIVE ANALYSIS 1. Conducting Extensive Risk Analysis with All SUPPORT Stakeholders 2. Demonstrating Executive Support ©2009, MAKINGSTORIES.net – Terrence Gargiulo – http://www.makingstories.net – 415-948-8087, page 7
  • 9. 1. Conducting Risk Analysis with All Stakeholders Risk is everything. Every member of a project team must keep his or her eyes locked on risks. It’s not about being paranoid. Balancing risk with business value lies at the success of every project. Managing risk is done throughout the project life cycle. However, the quality and depth of risk analysis during the Initiating Process sets the foundation of a project. Go slow to go fast. Every project begins with the risk of not conducting a thorough enough risk analysis. Thoroughness implies more than extensiveness. Are you engaging with stakeholders to discover and analyze project risks? Stakeholders are scattered. Have you reached out to all of these stakeholders? Collect comprehensive lists of risks then collaboratively prioritize them according to probability of the risk occurring and the impact of the risk if it occurs. Risk Probability Impact Impact Score (1-10) (1-10) (prob. X impact) TOOL Note: 1= Low, 10=High ©2009, MAKINGSTORIES.net – Terrence Gargiulo – http://www.makingstories.net – 415-948-8087, page 8
  • 10. Virtual Collaboration Tools and Risk Analysis Of course the quality and effectiveness of the collaboration with your “Technology makes partnerships can only be managed by collaboration you, but technology increases the opportunities for communication and the easier…” diversity of interaction techniques you can use with your stakeholders. • Virtual meeting tools are essential for conducting focus groups with stakeholders you might otherwise have very limited contact with. • Polls and online forms should be used to extend your reach and ongoing contact with stakeholders to identify and monitor risk. ©2009, MAKINGSTORIES.net – Terrence Gargiulo – http://www.makingstories.net – 415-948-8087, page 9
  • 11. Suggested Actions for Risk Analysis… 1. Complete your stakeholder analysis and be thorough! 2. Use online forms to collect lists of risks from stakeholders. 3. Consolidate and categorize risks into a master list. 4. Post risks. 5. Ask stakeholders to rate risks according to probability and impact. 6. Collect ideas for risk mitigation and counter measures. 7. Maintain a high-level, online risk register as an ongoing communication tool with your stakeholders. 2. Demonstrating Executive Support Lack of executive support or project champions is a leading reason for EXECUTIVE SUPPORT project failure. Assuming you have strong champions for your project, how are you getting the word out? Have you found ways to keep the voice of your champions strong throughout the life of a project? Virtual collaboration tools offer some surprising strategies. ©2009, MAKINGSTORIES.net – Terrence Gargiulo – http://www.makingstories.net – 415-948-8087, page 10
  • 12. Virtual Collaboration Tools and Executive Support Parading around your champions, especially for a large enterprise software “Virtual development project, is time consuming and cost prohibitive. Virtual collaboration technologies tools can be used to magnify their voice amplify your and influence in an ongoing and voice and sustainable way. You can even make it influence…” easy for them. After all, champions are usually busy people. • Record presentations and archive them for ongoing distribution. • Develop short, live virtual and recorded meeting updates spaced throughout a project around major milestones. • Use registration tools of virtual meeting software to track review of recorded messages. • Leverage the polling capabilities of virtual meeting software to capture ongoing feedback, reactions, and ideas from stakeholders. ©2009, MAKINGSTORIES.net – Terrence Gargiulo – http://www.makingstories.net – 415-948-8087, page 11
  • 13. Suggested Actions for Demonstrating Executive Support… 1. Make it as easy as possible for champions to communicate their support. Technology streamlines their time commitment and can elevate the effectiveness of their message. 2. Facilitate the development of archived presentations that use short sound bites and compelling stories and visuals. 3. Incorporate dynamic content into recorded presentations (i.e., demos of evolving software apps, audio sound bites, and text-based quotes from stakeholders). 4. Partner with stakeholders to act as rotating media sponsors of your champions’ recorded presentations. Feature these stakeholders and their perceptions of the project’s progress and importance as a key part of the presentations. This serves to spread the care and investment people have in your project communications. It also takes the communication load off of the champions’ shoulders. They just need to virtually show up. ©2009, MAKINGSTORIES.net – Terrence Gargiulo – http://www.makingstories.net – 415-948-8087, page 12
  • 14. PLANNING PROCESS The purpose of the Planning Process Group is to “define and mature the project scope, develop the project management plan, and identify and schedule the project activities that occur within the project” (PMBOK® Guide, Third Edition). The planning processes occur iteratively. As new project information is discovered, one or more of the planning processes may need to be revisited. New project information could identify additional dependencies, requirements, and risks that need to be taken into account. However, changes and refinement cannot continue indefinitely. The project manager, working with the sponsor, must at some point determine when changes and refinements can no longer be accepted without making major changes to the project’s schedule or costs. Stakeholders should be involved in the planning process, leveraging their skills and knowledge, and setting the stage for open communication. Top Two Ideas for Using Virtual Collaboration Tools 1. Accelerating the Development ESTIMATING and Accuracy of Estimates SCOPE 2. Synchronizing Scope Management with Dispersed Stakeholders ©2009, MAKINGSTORIES.net – Terrence Gargiulo – http://www.makingstories.net – 415-948-8087, page 13
  • 15. 1. Accelerating the Development and Accuracy of Estimates The most daunting aspect of the initial planning effort is estimating. Almost every aspect of the project is touched by it. The project plan hinges on the thoroughness and quality of estimates. Costs, level of effort (Work Breakdown Structure/WBS) and schedule are some of the areas most affected. As time moves forward confidence in estimates increases. Are there any ways of accelerating this process? Here are a few factors that make estimating difficult: • Lack of information • No previous experience to benchmark efforts • Complex project dependencies • Moving scope • Requirements in flux • Too many stakeholders Virtual Collaboration Tools and Estimating Take a simple task from a work breakdown structure. For example, “Technology consider trying to estimate coding time for writing an object- improves your reach oriented algorithm for a method of a class that calculates something. Let’s say this method represents one small software and increases behavior of a new set of business processes being implemented. interactions with Normally you would ask the developers to provide an estimate for people involved in the amount of effort required to write the code. You’d plug this estimating.” one small estimation into your work breakdown structure and voilà. ©2009, MAKINGSTORIES.net – Terrence Gargiulo – http://www.makingstories.net – 415-948-8087, page 14
  • 16. I am simplifying the picture, but stay with me. This estimate fails to take into account two dynamic variables that you can collect if you use virtual collaboration tools. For one, it fails to capture the iterative nature of clarifying questions between the drivers of the business change and the technical team of software engineers. It also relies too heavily on lots of small estimates from single individuals or small workgroups. Let’s go back to our coding example. Sure, you may build into your schedule some back and forth communications between the technical teams and stakeholders driving the business process changes, but how well did you engage each of them in determining the level of effort? How many assumptions did you make in your infinite wisdom as a project manager? And because you are human, you can only meet with some stakeholders to involve them in the intricate twists and turns of estimating. As a project manager you are supposed to have the requisite experience to make these inconsequential rough order of magnitude estimates. It all gets ironed out as you move along, right? Not exactly! “Virtual collaboration tools provide us with endless opportunities to set up real-time poll devices to facilitate true collaborative estimating.” What if there was a way to involve more people in estimating the process on an ongoing basis? What if estimates were not dependent upon single individuals or small workgroups but a team of people (perhaps even anonymously sometimes) providing estimating information along the way? ©2009, MAKINGSTORIES.net – Terrence Gargiulo – http://www.makingstories.net – 415-948-8087, page 15
  • 17. Suggested Actions for Estimating… 1. Target areas of time or budgetary estimations, where the most number of people are involved and where you have the greatest degree of uncertainty. 2. Develop a list of the individuals that might have valuable input, including those both internal and external to your organization. 3. Write a short description of the process you plan to follow and communicate it to all invited estimating stakeholders. 4. Use Web-based services to create a poll or other tool for collecting people’s estimates. 5. Analyze the data collected. Consider throwing out the high and low estimates and averaging the rest. All of this depends on sample size. If you are unsure, ask someone well-versed in statistics to give you a hand. 6. Communicate the results back to participants. Fold the results into your Project Planning artifacts (e.g., WBS and timeline). ©2009, MAKINGSTORIES.net – Terrence Gargiulo – http://www.makingstories.net – 415-948-8087, page 16
  • 18. 2. Synchronizing Scope Management with Dispersed Stakeholders When a project gets a-rolling, scope gets a-creeping. Many projects adhere to an organization’s existing change management processes. Recording your project’s intentions to follow these standard practices in the project plan is not enough. Think about all of the non-technical stakeholders who may have never sat on one of these change configuration management boards. Besides, you will still need to state constraints parameters for managing scope change. For example, change items will be accepted from “date x” to “date y.” Virtual Collaboration Tools and Scope Management During the Planning Process, virtual collaboration tools need to be used to extend your active outreach to all stakeholders affected by your project. Anyone and everyone who might have valid or even invalid change requests needs to know how, when and if they can have any input in the process. Managing expectations reduces risk, especially during the implementation stage when suddenly new requirements surface that can radically alter the course of the project or jeopardize its success. “Managing Aggressive, early, proactive, frequent, and short virtual town hall meetings with stakeholders focused solely on scope management will expectations save you and your project teams lots of headaches up the road. The reduces risk…” larger and more complex your project is, the more critical this becomes. ©2009, MAKINGSTORIES.net – Terrence Gargiulo – http://www.makingstories.net – 415-948-8087, page 17
  • 19. Suggested Actions for Scope Management… 1. Document your scope management plan. As a project team, state what, if any, existing change processes you will follow and the parameters for how, when, from whom, and what you will accept as change requests. 2. Articulate all of the items that will be out of scope. This gives people a starting point. If and when they request any kind of change or requirement that relates to your “out of scope” descriptors, you will be able to better manage their disappointment. Always be ready to listen. There will be plenty of times when something you have stated as being out of scope may need to be re-evaluated with new stakeholder feedback and information. 3. Enlist the support of your project champions to stand behind these critical constraints. 4. Create a schedule of virtual town hall meetings using Web conferencing software. Make sure it coincides well with the start and end dates of your acceptance of change request items. ©2009, MAKINGSTORIES.net – Terrence Gargiulo – http://www.makingstories.net – 415-948-8087, page 18
  • 20. EXECUTING & MONITORING/CONTROLLING PROCESSES The purpose of the Executing Process Group is to “complete the work defined in the project management plan to accomplish the project’s objectives defined in the project scope statement” (PMBOK® Guide, Third Edition). During the Executing Process of a project, schedules developed during planning cycles are followed, the team produces project deliverables, and the project manager oversees the team’s progress to the planned end of the project. Monitoring and Controlling Processes occur simultaneously during the Executing Process, as during other Process Groups. As a result, variances in activity durations, resource availability or productivity, or unanticipated risks may be discovered. This could trigger change requests that may require re-planning and changes to the project management plan. Top Two Ideas for Using Virtual Collaboration Tools 1. Integrate Creative and SOLICIT Interactive Communications with INTERACTIVE FEEDBACK Stakeholders 2. Maintain Easily Accessible Project Dashboards and Solicit Feedback ©2009, MAKINGSTORIES.net – Terrence Gargiulo – http://www.makingstories.net – 415-948-8087, page 19
  • 21. 1. Integrate Creative and Interactive Communications with Stakeholders Given the plethora of wonderful technologies available, communication plans for projects can include a wide variety of creative and interactive communications. The key here is to make them short, compelling, and most of all relevant to the stakeholder. Don’t worry about being thorough. You do not need to brief every stakeholder on every aspect of your project. Save thorough and detailed communications for more formal types of reports that you post in public areas for those wishing to get more information. Use interaction communications to focus on the “what’s in it for them” stuff. In other words, design these bursts of communication with your receiver in mind and not your message. Make the communications run two ways. Provide a mechanism for people to leave comments. If possible, for larger, long-term projects, allow people’s comments to be made in one or more modalities (i.e., text, video, or even audio response). There’s really no excuse for not implementing these types of communications. There are plenty of platforms that support the incorporation of these kinds of interactions. There are security implications and if you decide to use any public-facing tools these need to be discussed and reviewed carefully. However, even then there are ways to make the information secure and not compromise the confidential nature of your organization’s project. ©2009, MAKINGSTORIES.net – Terrence Gargiulo – http://www.makingstories.net – 415-948-8087, page 20
  • 22. Speed, interacting in ways most likely to cut through people’s congested bandwidth and reaching out as far and as wide as possible are most important. These benefits outweigh quality. I’ve even seen some companies start to use Twitter-style broadcasts to keep people updated. These work best within very specialized groups of people that need to follow each others’ progress closely, for example, where there are dependencies in a project such as between software engineers and testers. Suggested Actions for Interactive Communications… 1. Commit to creative, interactive strategies in your communications plan. 2. Partner with other areas of the organization to help you produce and support these communication vehicles. 3. Include communication planning as a regular part of your activities for each stakeholder. Think about the project from their vantage point and provide rich, just-in-time briefings that keep them engaged, excited and committed to the success of the project. 4. Weave stories and examples (use cases or testimonials in the form of personal narratives) told in visually compelling ways as much as possible. ©2009, MAKINGSTORIES.net – Terrence Gargiulo – http://www.makingstories.net – 415-948-8087, page 21
  • 23. 2. Maintain Easily Accessible Project Dashboards and Solicit Feedback Dashboards come in a variety of shapes and sizes. Dashboards provide a snapshot of a project across key indicators. Metrics are color coded using red, yellow, and green to indicate the status of each measure of a project being presented. Dashboards are not just for the organization’s top brass. Making project dashboards visible to a wider group of stakeholders gives your project better exposure. Granted, you may be concerned that some of that exposure is unwanted, especially when there are problem areas. Although it’s a bit counter-intuitive, project transparency is a fabulous way of minimizing project risk. If there are enough effective channels of communication, dashboards can alert seemingly uninvolved stakeholders to step forward to offer resources, ideas, or solutions to issues that are surfacing. Measures marked green offer people a chance to celebrate and take pride in how their achievements and the achievements of others have made a difference. For metrics marked yellow or red, feedback helps cut down on the inevitable caustic finger pointing. ©2009, MAKINGSTORIES.net – Terrence Gargiulo – http://www.makingstories.net – 415-948-8087, page 22
  • 24. Providing a view of the metrics is not enough. There must be a way for people to provide feedback. When doing so, people must believe that their feedback is wanted, heard, and appreciated. Don’t go through the motions of soliciting feedback if you have no intention of taking it seriously. Look at your project as a village. Given a chance, every person in the village has something to bring to your stone soup (“the project”). Depending on the project, I do not recommend making every metric available to every person. It’s just too much detail. Also be sure you are changing these metrics over time. Throughout the life of a project some measures are more important than others. Suggested Actions for Using Dashboards & Soliciting Feedback… 1. Review your project’s critical success factors articulated in your project charter. Compare these with the metrics beings used in your dashboard. There will of course be a relationship between the two. 2. Prioritize key critical success factors and the activities and stakeholders aligned with them. 3. Develop Web-based interactive presentations of a select number of indicators. 4. Solicit qualitative feedback on measures. These can be a combination of threaded comments, links to other documents with detailed information, short pre-recorded presentations with background information, creation of a virtual suggestion box, etc. ©2009, MAKINGSTORIES.net – Terrence Gargiulo – http://www.makingstories.net – 415-948-8087, page 23
  • 25. CLOSING PROCESS The purpose of the Closing Process Group is to “formally terminate all activities of a project, transfer the complete project to others or close a cancelled project” (PMBOK® Guide, Third Edition). Officially closing projects is often overlooked and undervalued. Closing a project entails more than getting sponsors to sign off on the project, filling out artifacts for your project management office and handing it off to the implementation team. Closing a project is the ideal opportunity for capturing lessons learned and facilitating knowledge transfer. Top Two Ideas for Using Virtual Collaboration Tools 1. Demonstrate Acceptance and Usability KNOWLEDGE ACCEPTANCE TRANSFER 2. Facilitate Knowledge Transfer ©2009, MAKINGSTORIES.net – Terrence Gargiulo – http://www.makingstories.net – 415-948-8087, page 24
  • 26. 1. Demonstrate Acceptance and Usability For enterprise software development projects, user acceptance is a toll gate for project closure. When stakeholders are dispersed, pockets of resistance are almost guaranteed. Leveraging virtual collaboration tools allows you to showcase success stories while opening up honest dialog where change is either problematic or painful. Hosting virtual software demos and using online presentations to feature digital short success and failure stories of how people have been working with the software can help everyone. “Leveraging virtual collaboration tools allows you to showcase success stories while opening up honest dialog where change is either problematic or painful.” Actions always speak louder than words. Give people examples. Invite people to share their early experiences. Don’t be afraid of the good, bad or even ugly. Manage and constrain feedback but do not control it. In other words, you need to architect these communications so they do not become a virtual gripe session with a long laundry list of change requests. On other hand, if people feel like you are only looking for kudos you will slam the door in the face of any real dialog. “Dialog and pain facilitate change, not coercion or perfectly contrived communication campaigns. ©2009, MAKINGSTORIES.net – Terrence Gargiulo – http://www.makingstories.net – 415-948-8087, page 25
  • 27. Suggested Actions for Demonstrating Acceptance… 1. Recruit your “poster children” early on in the project. These are either testers, early adopters, or anyone else who has been using the software. They will have a few good stories to share. Remember they do not need to share all golden stories but these folks will have a history with the project. Their perspectives provide context for others. 2. Use Web-based technologies to collect people’s experiences throughout the life of the project. 3. Design usability studies during prototyping, testing, and implementation that incorporate virtual meetings. By doing so you will be able to include dispersed stakeholders. Virtual usability studies encourage positive cross-talk and take people out of the dark when it comes time to embrace change. Record these events. Use the key highlights from these throughout the Closing Process. ©2009, MAKINGSTORIES.net – Terrence Gargiulo – http://www.makingstories.net – 415-948-8087, page 26
  • 28. 2. Facilitate Knowledge Transfer Lessons learned from a project must be more than bullets in a report. Just as you go slow at the beginning of a project in order to move fast later, so must you go slow at the end of a project to ensure the greatest transfer of knowledge. Reflection is underrated and the lack of it gets organizations into trouble all the time. Somebody needs to be the beneficiary of all the accumulated knowledge and wisdom of people who have participated on a project. Organizations cannot afford to relearn lessons already learned. Likewise, organizations face much greater turnover in their ranks. People move around a lot more even if they stay with the same organization. Finding effective ways of sharing experiences and getting a “return on experiences” is key to future success. “ROE” Return on Experience “Virtual collaboration tools are vital in reaching and Experiences are best shared as stories. involving people in active reflections that lead to X “Reflecting on stories leads performance.” to knowledge transfer that results in performance improvements.” ©2009, MAKINGSTORIES.net – Terrence Gargiulo – http://www.makingstories.net – 415-948-8087, page 27
  • 29. Suggested Actions for Facilitating Knowledge Transfer… 1. Develop an online timeline of the project. Include major milestones. Be sure to use pictures and graphics of the people, places, and events that defined the project. 2. Use the timeline to trigger people’s stories. 3. Organize virtual after-action meetings for people to share their experiences. Offer incentives for people to share information. 4. Scan a portfolio of projects on the horizon. Look for potential matches where the people, skills, technologies, unique methodologies, or business processes that will be required are similar to ones just used on the current project. Record short informal interviews with these people. ©2009, MAKINGSTORIES.net – Terrence Gargiulo – http://www.makingstories.net – 415-948-8087, page 28
  • 30. THREE OPPORTUNITIES UNIQUE TO VIRTUAL COLLABORATION TOOLS 1. Stakeholder Outreach For most organizations, the complexity of projects keeps increasing. There are more people, more resources, and more integration points in today’s projects than ever before. Unless it’s a small project the resources you need are unlikely to all sit beneath the same roof. The number of critical touch points and the economics of travel and time make travel only part of the potential solution. Leveraging the tools of virtual collaboration extends your reach. Even when a project may not demand the active involvement of many stakeholders, people expect to be in the loop. We live in a connected world. Virtual collaboration tools expand your direct and indirect spheres of influence. Here are some questions to ask: • Are we using virtual meetings and presentations to keep people up to date in ways that are engaging and relevant? • Are we continually pulling feedback and information from people? • Are we eliciting and disseminating stories to create realistic buzz that helps our projects attract the support, attention, and commitment they need to succeed? ©2009, MAKINGSTORIES.net – Terrence Gargiulo – http://www.makingstories.net – 415-948-8087, page 29
  • 31. 2. Accountability The more people are involved in a project, the more they are also accountable to each other and to the project’s success. Project management teams do not have to be the only ones holding people’s noses to the grindstones. When there is visibility people become more accountable to each other. My favorite example of this is a room full of students taking a test under the honor code. Students are less likely to cheat when they hold each other accountable for taking the test fairly. Virtual collaboration tools improve accountability. Communication is ongoing with a combination of “push and pull strategies” that create a project culture of participation. “When people can picture themselves as having a role in the project, its outcome and what it means for the enterprise, they will self-assume a position of accountability.” Imagine you work in a luxurious hotel and you love your job. You love everything about what the hotel is about. Now imagine seeing a piece of trash on the floor. Even if you are not part of a cleaning crew you are likely to pick up that piece of trash. Job description aside, you feel a connection with the mission of your organization. Virtual collaboration tools can facilitate this kind of involvement and engagement. ©2009, MAKINGSTORIES.net – Terrence Gargiulo – http://www.makingstories.net – 415-948-8087, page 30
  • 32. 3. Project Transparency Think of your project as a CNN news show on 24 hours a day, 7 days a week. When you increase people’s exposure to your project and offer them a way to interact with each other, your project grows in visibility. Whatever visibility you do not give to your project willingly or knowingly is assumed by the peer-to-peer connections between stakeholders. Word travels fast and when projects are peppered with opportunities for people across the enterprise to interact with each other your project becomes transparent. Forget about trying to bury information. Here’s the good news: your project will become a more integral part of the enterprise. People will sense and respond to the ebbs and flows of events impacting your project. Compare this to the reactionary model that most projects assume. Often by the time an issue surfaces through formal channels it’s too late. For example, a project manager may believe the critical path of a project is not affected by a few missed dependencies. He or she may believe the project can stay on course. In reality there may be other things not on the radar scope or out of the project manager’s purview that could send the project schedule into a tail spin. ©2009, MAKINGSTORIES.net – Terrence Gargiulo – http://www.makingstories.net – 415-948-8087, page 31
  • 33. “Project transparency enables many people to act as the eyes and ears of the project.” Of course at times this will create missteps or cause some reactionary ripples throughout the enterprise but with ongoing two-way communication even things that fall out of sync will naturally correct themselves. Think of your project as a living organism. All of the differentiated parts are well integrated with each other. That means communication and interaction between the parts are humming. As transparency increases it becomes more critical for you to lessen command and control models of management and communication. How well and creatively you implement virtual collaboration tools will translate into how you manage the side effects of project transparency. Trust people to get your back. With high visibility even the few people who will try to knife you in the back won’t last very long and their influence in the long run will be very minimal. Like an infection in the body, the white blood cells of your enterprise will eventually clean up the mess and eradicate their destructive force. ©2009, MAKINGSTORIES.net – Terrence Gargiulo – http://www.makingstories.net – 415-948-8087, page 32
  • 34. Pitfalls of Virtual Collaboration to Avoid… • Using virtual collaboration tools to replicate the standard dog-and-pony, death-by-PowerPoint style of briefings and report. Move to more story-based forms of communications. • Too much communication. Less is more in terms of information. Offer many different opportunities and channels for people to communicate. Use technologies to broadcast less and spend more time soliciting people’s feedback. • Lack of follow-up with people. As the number and types of virtual interaction with stakeholders increases your risk of managing people’s expectation increases. Follow-up is crucial. Put in place well thought out processes for managing the feedback you receive. Be clear with people and if you drop a communication ball (which is inevitable) use it as an opportunity to be honest, apologetic, and transparent. Most people, if you are really being genuine, will graciously receive your apology. ©2009, MAKINGSTORIES.net – Terrence Gargiulo – http://www.makingstories.net – 415-948-8087, page 33
  • 35. FIVE BEST PRACTICES TO START USING TODAY 1. Create strong ongoing visibility for your project champions through the use of virtual collaboration tools and short media-rich presentations. 2. Increase your stakeholders’ role in risk management with virtual collaboration tools. 3. Implement more virtual all-hands meetings that are less information based and more story based. 4. Elicit stories from stakeholders throughout the life of a project. Share stories to trigger the sharing of other people’s stories. Scan these stories for patterns of meaning and knowledge. Incorporate analysis of story patterns as one of many important inputs into project decisions. 5. Incorporate virtual knowledge transfer opportunities as part of your project closing activities. ©2009, MAKINGSTORIES.net – Terrence Gargiulo – http://www.makingstories.net – 415-948-8087, page 34
  • 36. Terrence L. Gargiulo, MMHS is an eight times author, international speaker, organizational development consultant and group process facilitator specializing in the use of stories. He holds a Master of Management in Human Services from the Florence Heller School, at Brandeis University, and is a recipient of Inc. Magazine's Marketing Master Award, the 2008 HR Leadership Award from the Asia Pacific HRM Congress, and is a member of Brandeis University’s athletic Hall of Fame. He has appeared on Fox TV, CN8, and on CNN radio among others. Highlights of some of his past and present clients include, GM, HP, DTE Energy, MicroStrategy, Citrix, Fidelity, Federal Reserve Bank, Ceridian, Countrywide Financial, Washington Mutual, Dreyers Ice Cream, UNUM, US Coast Guard, Boston University, Raytheon, City of Lowell, Arthur D. Little, KANA Communications, Merck-Medco, Coca-Cola, Harvard Business School, and Cambridge Savings Bank. Terrence Gargiulo President, MAKINGSTORIES.net http://www.makingstories.net terrence@makingstories.net phone – 415-948-8087 ©2009, MAKINGSTORIES.net – Terrence Gargiulo – http://www.makingstories.net – 415-948-8087, page 35
  • 37. WORKSHOPS & CONSULTING    BUSINESS ACUMEN FOR PROJECT  STORY‐BASED COMMUNICATION  PROJECT TEAM LEADERSHIP  MANAGERS  ASSESSMENT    Developing business acumen is an  Relationships are at the heart of  imperative for Project Management  project management. This highly  professionals. Business acumen is  charged experiential workshop  defined as the collection of  thrusts participants into safe but  knowledge, skills, and experience  demanding learning situations to  that transforms us into indispensable  test drive the skills they need to  strategic partners in our  succeed. Participants work with their  organizations. Project management  strengths and inevitable blind spots  professionals equipped to lead  to become agile leaders who  collaborative work efforts in their  facilitate performance and  enterprises will become leaders in  connections with all stakeholders  their organizations.  rather than trying to control them.    Coaching for Project Managers  Consulting ‐ Organizational Development, Learning & Communication Architectures  Facilitating ‐ Focus Groups, JAR/JAD, After Action Reviews, Knowledge Transfer, Strategic Planning  ©2009, MAKINGSTORIES.net – Terrence Gargiulo – http://www.makingstories.net – 415-948-8087, page 36
  • 38. SOME CLOSING THOUGHTS…    Stories fold in and out of themselves to reveal subtle  worlds of meanings, purpose, and connections.    They are gentle transporters bound by time but that  travel beyond the boundaries of what we have  experienced at any given point in time.    Stories free us to move through a landscape of  change. We leave the dusty road of the familiar and  embrace a void where we can find the freedom to  chose and perceive new realities and project worlds of  our own making.    Stories can either crush illusions we have become  enslaved to due to habit or they can lift our veils of  fear and familiarity and give us a glimpse of new ways  of being. Here we will find a place where we can be  our unique selves while in communion with others.  Terrence L. Gargiulo   ©2009, MAKINGSTORIES.net – Terrence Gargiulo – http://www.makingstories.net – 415-948-8087, page 37