Lick Creek Wastewater Treatment Plant Expansion
1. Update on the Lick Creek
WWTP Expansion Project
February 14, 2019
City Council Workshop
2. Background
2
• 2016 WW Master Plan Approved by City Council on 12/8/16
• Future demands based on Land Use Plan and growth rate
• Plan listed projects required to:
– Accommodate growth
– Install large interceptors
– Add capacity to WWTPs
– Replace aging infrastructure
• Wastewater Projects for Growth:
– 2016-2021: $115 m
– 2022-2026: $56 m
– 2027-Buildout: $62 m
4. LCWWTP Bids/Proposals
• Design complete in September 2018 (on schedule)
• Bids opened on December 2018
• Competitive Sealed Proposals process utilized due to:
– Specialty construction
– Project Size
– Best value procurement process in compliance with Texas law
• Nine (9) initial proposers attend pre-bids, only 2 submitted
– CSA - $34,305,000
– PLW - $37,470,000
• Bids higher than anticipated
– Engineer’s estimate - $31,389,000
– City’s Construction budget estimate - $32,113,000
5. Drivers for Higher Bid Pricing
• Labor Cost Increases
– Hurricane Harvey projects now bidding
– Impacting jobs in Texas and Oklahoma
– Imported labor required
• Materials Costs
– 2018 Aluminum and Steel Tariffs higher impact than expected
– Higher costs for concrete and steel due to demand
• Non-Competitive Bidding
– Rich marketplace for municipal construction impacted by Harvey projects
– Actively worked to invite contractors to bid
– All indicated competition, other pursuits, and remoteness of BCS market
6. Next Steps
• Review and reschedule projects
• Reduced cost approximately $267,500 through work with selected
contractor and engineer
• Bring budget amendment and construction contract to Council on
February 25th, 2019 with staff recommendation to approve
LCWWTP Expansion
Budget 32,113,000$
Adjusted bid 34,037,500$
Budget shortfall 1,924,500$
COCS contingency 1,762,500$
Total with COCS contingency 35,800,000$
Total Additional Requested 3,687,000$
7. SLUDGE
HOLDIN
G TANKLIFT
STATI
ON
CENTRIFU
GE
BUILDING
SHTBLOWERS
TRANSFORME
RS
GENERATORPAD
BLOWERBLD.
ADMIN
BUILDIN
G
SPLT
R.
BOX
CLARIFIE
R NO. 3
RA
S/
W
AS
P.S
.
CLARIFIE
R NO. 4
FILTERS
COARS
E
SCREE
NS
LIFT
STATI
ON
AERATIONBASINNO.
1
AERATIONBASINNO.
2
AERATIONBASINNO.
3
AERATIONBASINNO.
4
AERATIONBASINNO.
5
AERATIONBASINNO.
6
SPLTR
. BOX
AERATIONBASINNO.
7
AERATIONBASINNO.
8
AERATIONBASINNO.
9
AERATIONBASINNO.
10
CLARIFIE
R NO. 5
CLARIFIE
R NO. 6
RA
S/
W
AS
P.S
.
CLARIFIE
R NO. 7
CLARIFIE
R NO. 8
SPLTR
. BOX
SPLT
R.
BOX
AERATIONBASINNO.
11
AERATIONBASINNO.
12
CLARIFIE
R NO. 1
CLARIFIE
R NO. 2
PRIMARY
CLARIFIE
R NO. 1
PRIMARY
CLARIFIE
R NO. 2
PRIMARY
CLARIFIE
R NO. 3
PRIMARY
CLARIFIE
R NO. 4
SPLTR.
BOX
PRIMARY
SLUDGE P.S.
DIGESTER
NO. 1
DIGESTER
NO. 2
DIGESTER
BUILDIN
G
N
O
.2
N
O
.3
N
O
.1
N
O
.4
N
O
.5
N
O
.6
SLUDGEHOLDINGTANK
NO.1
WITHMEMBRANE
THICKENER
SLUDGEHOLDINGTANKNO.
2
WITHMEMBRANE
THICKENER
SHTBLOWERS
HEADWORKS
EL
EC.
MEMBRA
NE
THICKENE
R
UV
FACILI
TYUV
FACILITY
ADMIN
BUILDIN
G
HEADWORKS
SCREENINGS
PROCESSING
SPLTR.
BOX
PRIMARY
SLUDGE P.S.
ELEC.
LEGEND
EXISTING FACILITIES TO REMAIN
EXISTING FACILITIES TO BE MOVED,
REPURPOSED OR DECOMMISSIONED
FACILITIES NEEDED FOR 5 MGD AADF
EXPANSION
FACILITIES NEEDED FOR 8 MGD AADF
EXPANSION
FACILITIES NEEDED FOR 12 MGD AADF
EXPANSION
FACILITIES NEEDED FOR BIOLOGICAL
NUTRIENT REMOVAL IMPROVEMENTS