The document discusses a proposed public utility corridor through Lick Creek Park to allow Municipal Utility District #1 to install a wastewater line. Key details include: 1) MUD-1 agreements from May 2016 need modifications to account for developments like a defined fire station location and wastewater impact fees. 2) Approval is needed to divert park land for the utility corridor, as the only feasible route for the wastewater line is through Lick Creek Park. 3) The proposed corridor would be 30 feet wide permanently and 20 feet wide temporarily for construction. The developer would minimize cutting and re-seed the corridor, while the city would create a new trail in the park.