DCPL
NEW SOUTHWEST LIBRARY
SEPTEMBER 27, 2018 - COMMUNITY MEETING
AGENDA
•	PROJECT TIMELINE
•	INTERIM LIBRARY
•	WHAT WE’VE...
DESIGN CONSTRUCTION
SPRING 2019 WINTER 2020
SPRING 2020
WINTER 2018SUMMER 2017
OPEN
INTERIM
LIBRARY
+ CLOSE
LIBRARY
OPEN
N...
Sign up for periodic emails at:
dclibrary.org/newsouthwestlibrary
Email questions or comments to:
Martha.Saccocio@dc.gov
•...
INTERIM LIBRARY
INTERIM LIBRARY / TIMELINE
I STREET SW
K STREET SW K STREET SW
M STREET SW
3RDSTREETSW
4THSTREETSW
6THSTREETSW
WESLEYPLACE...
INTERIM LIBRARY
DCPL, NEW SOUTHWEST LIBRARY // COMMUNITY MEETING 5 // 09.27.18 // 6
INTERIM LIBRARY
DCPL, NEW SOUTHWEST LIBRARY // COMMUNITY MEETING 5 // 09.27.18 // 7
COMMUNITY FEEDBACK
PERKINS+WILL / TURNER CONSTRUCTION COMPANY DCPL, NEW SOUTHWEST LIBRARY // COMMUNITY MEETING 5 // 09.27....
•	Welcoming entrance, canopy for weather protection,
•	Connection between the playground and the library
•	Outdoor program...
COMMUNITY / WHAT WE’VE HEARD
ENGAGEMENT
•	Online Survey
		 248 responses
•	Focus Groups
		 Adults
		 Parents of young chil...
BUILDING DESIGN UPDATE
River Park Tiber Island Westminster Church Town Center
SITE / CONTEXT
MARYLAND
WASHINGTON DC
NW
SW
NE
SE
VIRGINIA
SOUTHWES...
Arena Stage United Methodist Church Duck PondSW Waterfront
I STREET SW
K STREET SW K STREET SW
M STREET SW
3RDSTREETSW
4TH...
NO CONNECTION TO ADJACENT PARK
NO ACCESS TO DAYLIGHT
NO VIEWS TO THE OUTDOORS

UNINVITING ENTRANCE
BASEMENT BELOW FLOODPLA...
ADJACENT PARK
NEW CONNECTION TO PARK
MAXIMIZE OUTDOOR VIEWS +
DIFFUSE NORTHERN DAYLIGHT
FUNCTIONAL EXTERIOR SPACES
SENSE O...
SIDEWALK + BIO-RETENTION ENTRANCE
BALCONY
SITE / PROPOSED
PERKINS+WILL / TURNER CONSTRUCTION COMPANY DCPL, NEW SOUTHWEST L...
exposed aggregate
precast stair
c.i.p.concreteband
TERRACE| Paving Enlargement
12
SITE / LANDSCAPE PLAN
CANOPY TREES| Hone...
SPACE PROGRAM / UPDATED SUMMARY
14,784,
67%
7,221,
33%
EXISTING PUBLIC/NONPUBLIC
15,768
83%
3,278
17%
NEW PUBLIC/NONPUBLIC...
1. ENTRY
2. MARKET PLACE
3. FRONT DESK
4. MULTI-PURPOSE
5. STAFF SPACE
6. CHILDREN’S OUTDOOR
7. CHILDREN’S SERVICES
8. MEP...
1. SEATING
2. COMPUTERS
3. INNOVATION LAB
4. OPEN TO BELOW
5. STAFF SPACE
6. ADULT OUTDOOR
7. ADULT SERVICES
8. MEETING SP...
NORTH ELEVATION
SOUTH ELEVATION
BUILDING DESIGN / ELEVATIONS
TOP OF ROOF
55’ - 0”
TOP OF ROOF
55’ - 0”
LEVEL 02
30’ - 10”
...
EAST ELEVATION
WEST ELEVATION
BUILDING DESIGN / ELEVATIONS
TOP OF ROOF
55’ - 0”
TOP OF ROOF
55’ - 0”
LEVEL 02
30’ - 10”
LE...
BUILDING MATERIALS / TYPICAL NORTH BAY
5
METAL
PANEL
7
RIVER
ROCK
3
PHOTOVOLTAIC
PANELS
4
ULTRA CLEAR
GLASS
8
CONCRETE
6
W...
KSTREETSW
BUILDING DESIGN / ENTRY + PORCH
BUILDING DESIGN / SOUTHWEST AERIAL
BUILDING DESIGN / NORTH FACADE
PERKINS+WILL / TURNER CONSTRUCTION COMPANY DCPL, NEW SOUTHWEST LIBRARY // COMMUNITY MEETING...
MARKET PLACE / INTUITION
PERKINS+WILL / TURNER CONSTRUCTION COMPANY DCPL, NEW SOUTHWEST LIBRARY // COMMUNITY MEETING 5 // ...
CHILDREN’S SERVICES / CURIOSITY + STIMULATION
PERKINS+WILL / TURNER CONSTRUCTION COMPANY DCPL, NEW SOUTHWEST LIBRARY // CO...
CHILDREN’S SERVICES / CURIOSITY + STIMULATION
PERKINS+WILL / TURNER CONSTRUCTION COMPANY DCPL, NEW SOUTHWEST LIBRARY // CO...
MEETING SPACES / LEVEL 01 MULTI-PURPOSE ROOM
PERKINS+WILL / TURNER CONSTRUCTION COMPANY DCPL, NEW SOUTHWEST LIBRARY // COM...
No color scheme
assigned to view
FULL LECTURE:
108 PEOPLE IN CHAIRS
FULL RECEPTION:
60 PEOPLE AT TABLES
1/2 TRAINING: 40 P...
MEETING SPACES / MULTI-PURPOSE ROOM
MULTI PURPOSE ROOM ENLARGED PLAN
NOT TO SCALE
1
MULTI PURPOSE ROOM WET BAR ELEVATION
N...
ADULT SERVICES / SANCTUARY
PERKINS+WILL / TURNER CONSTRUCTION COMPANY DCPL, NEW SOUTHWEST LIBRARY // COMMUNITY MEETING 5 /...
MEETING SPACES / LEVEL 02 TRANSFORMATION LAB
PERKINS+WILL / TURNER CONSTRUCTION COMPANY DCPL, NEW SOUTHWEST LIBRARY // COM...
MEETING / TRANSFORMATION LAB:
20 + 2-3 STOOLS
TRAINING / TRANSFORMATION LAB:
20 + 2-3 STOOLS
TRANSFORMATION LAB / FLEXIBLE...
MEETING SPACES / TRANSFORMATION LAB
 





LAPTOP
P
P
CNC
F LC
TV
TRANSFORMATION LAB ENLARGED FLOO...
MEETING SPACES / LEVEL 02 STUDY ROOMS
PERKINS+WILL / TURNER CONSTRUCTION COMPANY DCPL, NEW SOUTHWEST LIBRARY // COMMUNITY ...
MEETING SPACES / LEVEL 02 CONFERENCE ROOM
PERKINS+WILL / TURNER CONSTRUCTION COMPANY DCPL, NEW SOUTHWEST LIBRARY // COMMUN...
PERKINS+WILL / TURNER CONSTRUCTION COMPANY DCPL, NEW SOUTHWEST LIBRARY // COMMUNITY MEETING 5 // 09.27.18 // 39
PERKINS+WILL / TURNER CONSTRUCTION COMPANY DCPL, NEW SOUTHWEST LIBRARY // COMMUNITY MEETING 5 // 09.27.18 // 40
PERKINS+WILL / TURNER CONSTRUCTION COMPANY DCPL, NEW SOUTHWEST LIBRARY // COMMUNITY MEETING 5 // 09.27.18 // 41
PERKINS+WILL / TURNER CONSTRUCTION COMPANY DCPL, NEW SOUTHWEST LIBRARY // COMMUNITY MEETING 5 // 09.27.18 // 42
NEXT STEPS
•	CFA MEETING
•	PERMITTING
•	CONSTRUCTION
Sign up for periodic emails at:
dclibrary.org/newsouthwestlibrary
Ema...
W
ESLEYPLACE
KSTREETSW
PERKINS+WILL / TURNER CONSTRUCTION COMPANY DCPL, NEW SOUTHWEST LIBRARY // COMMUNITY MEETING 5 // 09...
Prochain SlideShare
Chargement dans…5
×

Sow design final slide show 9 27-2018

513 vues

Publié le

Southwest Library final design presentation.

Publié dans : Formation
  • Soyez le premier à commenter

Sow design final slide show 9 27-2018

  1. 1. DCPL NEW SOUTHWEST LIBRARY SEPTEMBER 27, 2018 - COMMUNITY MEETING AGENDA • PROJECT TIMELINE • INTERIM LIBRARY • WHAT WE’VE HEARD • BUILDING DESIGN UPDATE • NEXT STEPS PERKINS+WILL / TURNER CONSTRUCTION COMPANY DCPL, NEW SOUTHWEST LIBRARY // COMMUNITY MEETING 5 // 09.27.18 // 1
  2. 2. DESIGN CONSTRUCTION SPRING 2019 WINTER 2020 SPRING 2020 WINTER 2018SUMMER 2017 OPEN INTERIM LIBRARY + CLOSE LIBRARY OPEN NEW LIBRARY PROJECT TIMELINE / SPRING 2019 PERKINS+WILL / TURNER CONSTRUCTION COMPANY DCPL, NEW SOUTHWEST LIBRARY // COMMUNITY MEETING 5 // 09.27.18 // 2
  3. 3. Sign up for periodic emails at: dclibrary.org/newsouthwestlibrary Email questions or comments to: Martha.Saccocio@dc.gov • CFA MEETING • PERMITTING • CONSTRUCTION PROJECT TIMELINE / NEXT STEPS PERKINS+WILL / TURNER CONSTRUCTION COMPANY DCPL, NEW SOUTHWEST LIBRARY // COMMUNITY MEETING 5 // 09.27.18 // 3
  4. 4. INTERIM LIBRARY
  5. 5. INTERIM LIBRARY / TIMELINE I STREET SW K STREET SW K STREET SW M STREET SW 3RDSTREETSW 4THSTREETSW 6THSTREETSW WESLEYPLACE MAINE AVE SW N Mmetro DCPL, NEW SOUTHWEST LIBRARY // COMMUNITY MEETING 5 // 09.27.18 // 5 INTERIM LIBRARY 425 M STREET SW EXISTING LIBRARY CLOSES SPRING 2019 INTERIM LIBRARY OPENS SPRING 2019 NEW LIBRARY OPENS SPRING 2020 SPRING 2020SPRING 2019
  6. 6. INTERIM LIBRARY DCPL, NEW SOUTHWEST LIBRARY // COMMUNITY MEETING 5 // 09.27.18 // 6
  7. 7. INTERIM LIBRARY DCPL, NEW SOUTHWEST LIBRARY // COMMUNITY MEETING 5 // 09.27.18 // 7
  8. 8. COMMUNITY FEEDBACK PERKINS+WILL / TURNER CONSTRUCTION COMPANY DCPL, NEW SOUTHWEST LIBRARY // COMMUNITY MEETING 5 // 09.27.18 // 8
  9. 9. • Welcoming entrance, canopy for weather protection, • Connection between the playground and the library • Outdoor programming space COMMUNITY / WHAT WE’VE HEARD • Meeting rooms of different sizes • Space for hosting events like book clubs • Acoustically appropriate meeting rooms • Quiet spaces to study or read • Area for children’s programs – reading stories, show & tell • Exploratory kids area • Open sight lines in the children’s area MEETING SPACES CHILDREN’S AREA OUTDOOR SPACE JULY 11, 2017 MEETING • Technology, more outlets and better WiFi • More computers • Informal areas for adults i.e., benches to have small conversations OTHER FEATURES PERKINS+WILL / TURNER CONSTRUCTION COMPANY DCPL, NEW SOUTHWEST LIBRARY // COMMUNITY MEETING 5 // 09.27.18 // 9
  10. 10. COMMUNITY / WHAT WE’VE HEARD ENGAGEMENT • Online Survey 248 responses • Focus Groups Adults Parents of young children Seniors Greenleaf Residents • Staff Visioning Exercise • SWNA New Southwest Library Task Force Report • Visit to Area Libraries To view all comments, visit dclibrary.org/newsouthwestlibrary PERKINS+WILL / TURNER CONSTRUCTION COMPANY DCPL, NEW SOUTHWEST LIBRARY // COMMUNITY MEETING 5 // 09.27.18 // 10
  11. 11. BUILDING DESIGN UPDATE
  12. 12. River Park Tiber Island Westminster Church Town Center SITE / CONTEXT MARYLAND WASHINGTON DC NW SW NE SE VIRGINIA SOUTHWEST LIBRARY N PERKINS+WILL / TURNER CONSTRUCTION COMPANY DCPL, NEW SOUTHWEST LIBRARY // COMMUNITY MEETING 5 // 09.27.18 // 12
  13. 13. Arena Stage United Methodist Church Duck PondSW Waterfront I STREET SW K STREET SW K STREET SW M STREET SW 3RDSTREETSW 4THSTREETSW 6THSTREETSW WESLEYPLACE MAINE AVE SW N N SITE / CONTEXT DUCK POND UNITED METHODIST CHURCH SOUTHWEST LIBRARY FUTURE DEVELOPMENTS TOWN CENTER WATERFRONT STATION ARENA STAGE Mmetro PERKINS+WILL / TURNER CONSTRUCTION COMPANY DCPL, NEW SOUTHWEST LIBRARY // COMMUNITY MEETING 5 // 09.27.18 // 13
  14. 14. NO CONNECTION TO ADJACENT PARK NO ACCESS TO DAYLIGHT NO VIEWS TO THE OUTDOORS UNINVITING ENTRANCE BASEMENT BELOW FLOODPLAIN NO NEIGHBORHOOD CONNECTION SITE / EXISTING WESLEYPL. 3RDSTREETSW K STREET SW 210’ 105’ 5’0’ 10’ 25’ 50’ Main Entrance Interior View From Park N PARKING EXISTING CURB CUT EXISTING CURB CUT PERKINS+WILL / TURNER CONSTRUCTION COMPANY DCPL, NEW SOUTHWEST LIBRARY // COMMUNITY MEETING 5 // 09.27.18 // 14
  15. 15. ADJACENT PARK NEW CONNECTION TO PARK MAXIMIZE OUTDOOR VIEWS + DIFFUSE NORTHERN DAYLIGHT FUNCTIONAL EXTERIOR SPACES SENSE OF ARRIVAL PEDESTRIAN PATH CONNECTION BUILDING RAISED ON 3’ PODIUM SUSTAINABLE SITE SUSTAINABLE BUILDING PERFORMANCE NEW TWO-STORY LIBRARY BUILDING SITE / PROPOSED N 7 PARKING SPACES CURB CUT NEWSIDEWALK 16’-0” SETBACK16’-0”SETBACK 47’-9”SETBACK 13’-0” SETBACK TRASH/ RECYCLING OUTLINE OF EXISTING BUILDING NEW SIDEWALK MULTIPURPOSE PLAZA/PARKING PERKINS+WILL / TURNER CONSTRUCTION COMPANY DCPL, NEW SOUTHWEST LIBRARY // COMMUNITY MEETING 5 // 09.27.18 // 15
  16. 16. SIDEWALK + BIO-RETENTION ENTRANCE BALCONY SITE / PROPOSED PERKINS+WILL / TURNER CONSTRUCTION COMPANY DCPL, NEW SOUTHWEST LIBRARY // COMMUNITY MEETING 5 // 09.27.18 // 16
  17. 17. exposed aggregate precast stair c.i.p.concreteband TERRACE| Paving Enlargement 12 SITE / LANDSCAPE PLAN CANOPY TREES| Honeylocust FLOWERING TREE| Carolina Silverbell SHRUBS, GRASSES PERENNIALSBIO-RETENTION AREA HEDGE TO SCREEN PARKING LOT 1. STEPS DOWN TO PARK 2. TERRACE/PORCH 3. ENTRY PLAZA/RAMP 4. BIO-RETENTION GARDEN 5. CANOPY TREES 6. FLOWERING TREES 7. ACCESS TO PARKING 8. MULTIFUNCTION PARKING 9. IMPROVED PLANTING HEDGE 10. BUILDING OVERHANG 11. MONUMENTAL SIGNAGE 12. TRASH ENCLOSURE N NEW TWO-STORY LIBRARY BUILDING 7 8 9 10 11 6 6 5 5 5 4 4 4 3 2 1 PERKINS+WILL / TURNER CONSTRUCTION COMPANY DCPL, NEW SOUTHWEST LIBRARY // COMMUNITY MEETING 5 // 09.27.18 // 17
  18. 18. SPACE PROGRAM / UPDATED SUMMARY 14,784, 67% 7,221, 33% EXISTING PUBLIC/NONPUBLIC 15,768 83% 3,278 17% NEW PUBLIC/NONPUBLIC EXISTING LIBRARY NEW LIBRARY PERKINS+WILL / TURNER CONSTRUCTION COMPANY DCPL, NEW SOUTHWEST LIBRARY // COMMUNITY MEETING 5 // 09.27.18 // 18
  19. 19. 1. ENTRY 2. MARKET PLACE 3. FRONT DESK 4. MULTI-PURPOSE 5. STAFF SPACE 6. CHILDREN’S OUTDOOR 7. CHILDREN’S SERVICES 8. MEP PUBLIC ENTRY STAFF ENTRY N 1 2 3 4 5 7 6 8 5 FLOOR PLAN / LEVEL 01 PERKINS+WILL / TURNER CONSTRUCTION COMPANY DCPL, NEW SOUTHWEST LIBRARY // COMMUNITY MEETING 5 // 09.27.18 // 19
  20. 20. 1. SEATING 2. COMPUTERS 3. INNOVATION LAB 4. OPEN TO BELOW 5. STAFF SPACE 6. ADULT OUTDOOR 7. ADULT SERVICES 8. MEETING SPACE 9. TEEN/MIXED EXITS 1 2 3 4 5 5 5 7 6 8 8 8 8 8 89 5 N FLOOR PLAN / LEVEL 02 PERKINS+WILL / TURNER CONSTRUCTION COMPANY DCPL, NEW SOUTHWEST LIBRARY // COMMUNITY MEETING 5 // 09.27.18 // 20
  21. 21. NORTH ELEVATION SOUTH ELEVATION BUILDING DESIGN / ELEVATIONS TOP OF ROOF 55’ - 0” TOP OF ROOF 55’ - 0” LEVEL 02 30’ - 10” LEVEL 02 30’ - 10” LEVEL 01 16’ - 10” LEVEL 01 16’ - 10” PERKINS+WILL / TURNER CONSTRUCTION COMPANY DCPL, NEW SOUTHWEST LIBRARY // COMMUNITY MEETING 5 // 09.27.18 // 21
  22. 22. EAST ELEVATION WEST ELEVATION BUILDING DESIGN / ELEVATIONS TOP OF ROOF 55’ - 0” TOP OF ROOF 55’ - 0” LEVEL 02 30’ - 10” LEVEL 02 30’ - 10” LEVEL 01 16’ - 10” LEVEL 01 16’ - 10” PERKINS+WILL / TURNER CONSTRUCTION COMPANY DCPL, NEW SOUTHWEST LIBRARY // COMMUNITY MEETING 5 // 09.27.18 // 22
  23. 23. BUILDING MATERIALS / TYPICAL NORTH BAY 5 METAL PANEL 7 RIVER ROCK 3 PHOTOVOLTAIC PANELS 4 ULTRA CLEAR GLASS 8 CONCRETE 6 WHITE ROOF MEMBRANE 1 2 4 5 7 36 8 8 8 1 SPF DLT ROOF SPRUCE, PINE, FIR DOWEL LAMINATED TIMBER 2 SPRUCE GLULAM COLUMNS PERKINS+WILL / TURNER CONSTRUCTION COMPANY DCPL, NEW SOUTHWEST LIBRARY // COMMUNITY MEETING 5 // 09.27.18 // 23
  24. 24. KSTREETSW BUILDING DESIGN / ENTRY + PORCH
  25. 25. BUILDING DESIGN / SOUTHWEST AERIAL
  26. 26. BUILDING DESIGN / NORTH FACADE PERKINS+WILL / TURNER CONSTRUCTION COMPANY DCPL, NEW SOUTHWEST LIBRARY // COMMUNITY MEETING 5 // 09.27.18 // 26
  27. 27. MARKET PLACE / INTUITION PERKINS+WILL / TURNER CONSTRUCTION COMPANY DCPL, NEW SOUTHWEST LIBRARY // COMMUNITY MEETING 5 // 09.27.18 // 27
  28. 28. CHILDREN’S SERVICES / CURIOSITY + STIMULATION PERKINS+WILL / TURNER CONSTRUCTION COMPANY DCPL, NEW SOUTHWEST LIBRARY // COMMUNITY MEETING 5 // 09.27.18 // 28
  29. 29. CHILDREN’S SERVICES / CURIOSITY + STIMULATION PERKINS+WILL / TURNER CONSTRUCTION COMPANY DCPL, NEW SOUTHWEST LIBRARY // COMMUNITY MEETING 5 // 09.27.18 // 29
  30. 30. MEETING SPACES / LEVEL 01 MULTI-PURPOSE ROOM PERKINS+WILL / TURNER CONSTRUCTION COMPANY DCPL, NEW SOUTHWEST LIBRARY // COMMUNITY MEETING 5 // 09.27.18 // 30
  31. 31. No color scheme assigned to view FULL LECTURE: 108 PEOPLE IN CHAIRS FULL RECEPTION: 60 PEOPLE AT TABLES 1/2 TRAINING: 40 PEOPLE 1/2 STORY TIME: FLEXIBLE 1/2 CONFERENCE: 28+ 1/2 CHILDREN’S CRAFTS: 40 MULTI-PURPOSE ROOM / FLEXIBLE LAYOUT OPTIONS No color scheme assigned to view No color scheme assigned to view No color scheme assigned to view PERKINS+WILL / TURNER CONSTRUCTION COMPANY DCPL, NEW SOUTHWEST LIBRARY // COMMUNITY MEETING 5 // 09.27.18 // 31
  32. 32. MEETING SPACES / MULTI-PURPOSE ROOM MULTI PURPOSE ROOM ENLARGED PLAN NOT TO SCALE 1 MULTI PURPOSE ROOM WET BAR ELEVATION NOT TO SCALE 2                                                   PERKINS+WILL / TURNER CONSTRUCTION COMPANY DCPL, NEW SOUTHWEST LIBRARY // COMMUNITY MEETING 5 // 09.27.18 // 32
  33. 33. ADULT SERVICES / SANCTUARY PERKINS+WILL / TURNER CONSTRUCTION COMPANY DCPL, NEW SOUTHWEST LIBRARY // COMMUNITY MEETING 5 // 09.27.18 // 33
  34. 34. MEETING SPACES / LEVEL 02 TRANSFORMATION LAB PERKINS+WILL / TURNER CONSTRUCTION COMPANY DCPL, NEW SOUTHWEST LIBRARY // COMMUNITY MEETING 5 // 09.27.18 // 34
  35. 35. MEETING / TRANSFORMATION LAB: 20 + 2-3 STOOLS TRAINING / TRANSFORMATION LAB: 20 + 2-3 STOOLS TRANSFORMATION LAB / FLEXIBLE LAYOUT OPTIONS PERKINS+WILL / TURNER CONSTRUCTION COMPANY DCPL, NEW SOUTHWEST LIBRARY // COMMUNITY MEETING 5 // 09.27.18 // 35
  36. 36. MEETING SPACES / TRANSFORMATION LAB        LAPTOP P P CNC F LC TV TRANSFORMATION LAB ENLARGED FLOOR PLAN NOT TO SCALE 1 TRANSFORMATION LAB AXON VIEW 3 CNC ROUTER3D PRINTER 3D PRINTER LASER CUTTER PC TRANSFORMATION LAB WEST ELEVATION NOT TO SCALE 2        LAPTOP P P CNC F LC TV TRANSFORMATION LAB ENLARGED FLOOR PLAN NOT TO SCALE 1 PERKINS+WILL / TURNER CONSTRUCTION COMPANY DCPL, NEW SOUTHWEST LIBRARY // COMMUNITY MEETING 5 // 09.27.18 // 36
  37. 37. MEETING SPACES / LEVEL 02 STUDY ROOMS PERKINS+WILL / TURNER CONSTRUCTION COMPANY DCPL, NEW SOUTHWEST LIBRARY // COMMUNITY MEETING 5 // 09.27.18 // 37
  38. 38. MEETING SPACES / LEVEL 02 CONFERENCE ROOM PERKINS+WILL / TURNER CONSTRUCTION COMPANY DCPL, NEW SOUTHWEST LIBRARY // COMMUNITY MEETING 5 // 09.27.18 // 38
  39. 39. PERKINS+WILL / TURNER CONSTRUCTION COMPANY DCPL, NEW SOUTHWEST LIBRARY // COMMUNITY MEETING 5 // 09.27.18 // 39
  40. 40. PERKINS+WILL / TURNER CONSTRUCTION COMPANY DCPL, NEW SOUTHWEST LIBRARY // COMMUNITY MEETING 5 // 09.27.18 // 40
  41. 41. PERKINS+WILL / TURNER CONSTRUCTION COMPANY DCPL, NEW SOUTHWEST LIBRARY // COMMUNITY MEETING 5 // 09.27.18 // 41
  42. 42. PERKINS+WILL / TURNER CONSTRUCTION COMPANY DCPL, NEW SOUTHWEST LIBRARY // COMMUNITY MEETING 5 // 09.27.18 // 42
  43. 43. NEXT STEPS • CFA MEETING • PERMITTING • CONSTRUCTION Sign up for periodic emails at: dclibrary.org/newsouthwestlibrary Email questions or comments to: Martha.Saccocio@dc.gov PERKINS+WILL / TURNER CONSTRUCTION COMPANY DCPL, NEW SOUTHWEST LIBRARY // COMMUNITY MEETING 5 // 09.27.18 // 43
  44. 44. W ESLEYPLACE KSTREETSW PERKINS+WILL / TURNER CONSTRUCTION COMPANY DCPL, NEW SOUTHWEST LIBRARY // COMMUNITY MEETING 5 // 09.27.18 // 44

×