MACHINING TIME CALCULATION

20ME706PE
PROCESS PLANNING
AND COST
ESTIMATION
•UNIT I INTRODUCTION TO PROCESS PLANNING
•UNIT II PROCESS PLANNING ACTIVITIES
•UNIT III INTRODUCTION TO COST ESTIMATION
•UNIT IV PRODUCTION COST ESTIMATION
•UNIT V MACHINING TIME CALCULATION
UNIT V
MACHINING TIME CALCULATION
• Estimation of machining time
• Importance of machine time calculation
• Calculation of machining time for different lathe operations,
Drilling and Boring
• Machining time calculation for Milling, Shaping and Planning
• Machining time calculation for grinding
Introduction
• To estimate the total cost of any product involving machining
operations, the machining cost is to be estimated primarily.
• In order to estimate the machining cost, one has to calculate
the machining time required for these machining operations.
• After knowing the machining time and rate of machining, the
total machining cost can be calculated.
• Therefore the estimation of machining time for various
operations such as lathe, drilling. boring, shaping, planning,
milling and grinding operations are very essential in the cost
estimation activity.
What is meant by Machining Time?
• It is time for which the machine works on the component
• From the time when the tool touches the work to when the
tool leaves the component after completion of operation
• The machining time depends on die type and extent of
machining required, material being machined, speed, feed,
depth of cut and number of cuts required
• In addition to the actual machining time, an estimator has to
consider other time elements such as set-up time, handling
time, tear down time, down time and allowances to the
workers.
FACTORS TO BE CONSIDERED FOR
MACHINE TIME CALCULATION
•Set up time
•Operation time
•Tear down time
•Personal allowance
•Fatigue allowance
•Checking allowance
•Miscellaneous allowance
SETUPTIME
• This takes into account the time required to prepare the
machine for doing the job with the time taken to study the
blue print.
• The time to prepare the machine, in turn
• The time to install and adjust the tools in the machine, as well
as to make the machine ready to start the work.
OPERATION TIME
• The sum of handling time and machining time for a job is
called operation time.
• It is the duration of time that elapses between output of two
consecutive units of production.
TEAR DOWN TIME
• Tear down time takes into account the time necessary to
remove from the machine all tools and accessories, such as
jigs and fixtures, gauges and instruments etc.
• The time required for clearing operational chips from the
machine table and clearing of the machine itself are included
on this.
• Tear down time is generally 10 minute per shift of 8 hrs.
PERSONALALLOWANCE
• The time allowed for workers to meet their personal needs,
such as going to the urinal, drinking water, smoking, washing
their hands, etc is known as personal allowance.
• It is generally 5 to 10 minutes
FATIGUE ALLOWANCE
• The long working hours and poor working conditions such as
poor lighting, poor ventilation etc., cause fatigue
• Fatigue effect the efficiency of worker
• Fatigue decreases the worker capacity to work.
• The allowance for fatigue is taken depending upon the type
of work.
IMPORTANCE OF MACHINING TIME
CALCULATION
•To find the manufacturing cost of a particular job the
calculation of machining time is important, this
requires one or more machining operations.
•After determining the total time for machining, and
knowing the machining cost per unit time, the total
cost of machining can be worked out.
•Machining time is calculated by applying certain
basic formulae, tables of variables and constants.
• The basic formula used is
TRAVEL OF THE TOOL
• This is determined from the dimensions in the actual drawing of the part to be
manufactured.
• The necessary allowances for the tool approach and over-run for clearing the
tool off the job are taken into account with the actual length of the work, to
find the travel of the tool.
FEED
• Feed is the distance, through which the tool advances into the job in
one revolution
• If the work or the distance that the table holding the work travels is
one stroke of the tool. In metric units, feed is usually expressed in
mm/revolution or mm/stroke.
• Feed depends on the depth of cut, fitness of the work desired, rpm of
the job, etc.
DEPTH OF CUT
• It is the penetration of the cutting tool into the job in a single cut.
• In metric units, the depth of cut is expressed in mm.
• The depth of cut depends upon the fitness of the job required, such as
higher depth of cut for rough cut and smaller depth of cut for finish
cut.
RPM
• It represents the number of revolutions of the m/c spindle in one
minute.
• Thus it is the number of revolutions per minute of the job or of tool.
CUTTING SPEED
• The cutting speed can be defined as the relative surface speed
between the tool and the job.
• It is expressed in meters per minute (mpm)
• For example if a job of diameter D mm is revolving at a speed of N
rpm
CALCULATION OF MACHINING TIME FOR
DIFFERENT LATHE
OPERATIONS
Where D = Diameter of given blank,
d = diameter of blank after turning.
• In turning operation, the depth of cut should not exceed 3 mm for
rough cuts and 0.7 5 mm for finishing cuts.
MACHINING TIME CALCULATION
MACHINING TIME CALCULATION
FACING OPERATION
KNURLING
Continued…
REAMING
EXTERNAL RELIEF TURNING
TAPPING
THREADING
DRILLING
BORING
CHAMFERING
MACHINING TIME CALCULATION
MACHINING TIME CALCULATION
MACHINING TIME CALCULATION
MACHINING TIME CALCULATION
MACHINING TIME CALCULATION
MACHINING TIME CALCULATION
MACHINING TIME CALCULATION
MACHINING TIME FOR SHAPING AND PLANING
• Shaping, planning and slotting operations are carried out on
reciprocating machines with a single point cutting tool.
Formula used
MACHINING TIME CALCULATION
MACHINING TIME CALCULATION
MACHINING TIME CALCULATION
MACHINING TIME CALCULATION
Estimation of time for milling operation
The approach is the distance the cutter must be engaged
before the full depth of cut is reached.
When cutter diameter is less than the width of the work.
(b) When cutter diameter is greater than the width of the
work.
Slab milling operation:
MACHINING TIME CALCULATION
Estimation of time for Grinding operation
MACHINING TIME CALCULATION
MACHINING TIME CALCULATION
Formula used
MACHINING TIME CALCULATION
MACHINING TIME CALCULATION
MACHINING TIME CALCULATION
MACHINING TIME CALCULATION
1 sur 53

Recommandé

PPCE Unit 5 par
PPCE Unit   5PPCE Unit   5
PPCE Unit 5Aravind Ra
356 vues52 diapositives
MACHINING TIME CALCULATION par
MACHINING TIME CALCULATIONMACHINING TIME CALCULATION
MACHINING TIME CALCULATIONSIVASHANKAR N
73 vues52 diapositives
PPCE Unit-5.pptx par
PPCE Unit-5.pptxPPCE Unit-5.pptx
PPCE Unit-5.pptxDJAGADEESH1
17 vues51 diapositives
PPCE Unit-5.pptx par
PPCE Unit-5.pptxPPCE Unit-5.pptx
PPCE Unit-5.pptxDr.PERIASAMY K
25 vues51 diapositives
MACHINING TIME CALCULATION par
MACHINING TIME CALCULATIONMACHINING TIME CALCULATION
MACHINING TIME CALCULATIONSathishkumarM89
507 vues51 diapositives
MACHINING TIME CALCULATION par
MACHINING TIME CALCULATIONMACHINING TIME CALCULATION
MACHINING TIME CALCULATIONMohanKirthik
5.3K vues80 diapositives

Contenu connexe

Similaire à MACHINING TIME CALCULATION

unit 03 ppt MT- 2.pptx par
unit 03 ppt MT- 2.pptxunit 03 ppt MT- 2.pptx
unit 03 ppt MT- 2.pptxVENKATESH676259
13 vues137 diapositives
Process planning with an example par
Process planning with an exampleProcess planning with an example
Process planning with an exampleHiran Gabriel
1K vues12 diapositives
PMTF INTERNSHIP (9 june tp 25 june-2015) par
PMTF INTERNSHIP (9 june tp 25 june-2015)PMTF INTERNSHIP (9 june tp 25 june-2015)
PMTF INTERNSHIP (9 june tp 25 june-2015)Asim Aslam
490 vues13 diapositives
Internship Presentation_Hamza-Nasir-Mechatronics-CEME_NUST par
Internship Presentation_Hamza-Nasir-Mechatronics-CEME_NUSTInternship Presentation_Hamza-Nasir-Mechatronics-CEME_NUST
Internship Presentation_Hamza-Nasir-Mechatronics-CEME_NUSTHamza Nasir
141 vues29 diapositives
SNSCT par
SNSCTSNSCT
SNSCTDharunCk
5 vues10 diapositives
internship presentation.pptx par
internship presentation.pptxinternship presentation.pptx
internship presentation.pptxChinmaiKumar
63 vues17 diapositives

Similaire à MACHINING TIME CALCULATION(20)

Process planning with an example par Hiran Gabriel
Process planning with an exampleProcess planning with an example
Process planning with an example
Hiran Gabriel1K vues
PMTF INTERNSHIP (9 june tp 25 june-2015) par Asim Aslam
PMTF INTERNSHIP (9 june tp 25 june-2015)PMTF INTERNSHIP (9 june tp 25 june-2015)
PMTF INTERNSHIP (9 june tp 25 june-2015)
Asim Aslam490 vues
Internship Presentation_Hamza-Nasir-Mechatronics-CEME_NUST par Hamza Nasir
Internship Presentation_Hamza-Nasir-Mechatronics-CEME_NUSTInternship Presentation_Hamza-Nasir-Mechatronics-CEME_NUST
Internship Presentation_Hamza-Nasir-Mechatronics-CEME_NUST
Hamza Nasir141 vues
internship presentation.pptx par ChinmaiKumar
internship presentation.pptxinternship presentation.pptx
internship presentation.pptx
ChinmaiKumar63 vues
2. LATHE OPERATIONS.ppt par MPIndhu
2. LATHE OPERATIONS.ppt2. LATHE OPERATIONS.ppt
2. LATHE OPERATIONS.ppt
MPIndhu19 vues
lathe operations par Raja P
lathe operationslathe operations
lathe operations
Raja P246 vues
Chapter 3 CNC turning and machining centers par RAHUL THAKER
Chapter 3 CNC turning and machining centersChapter 3 CNC turning and machining centers
Chapter 3 CNC turning and machining centers
RAHUL THAKER1.3K vues
Machining time and costs par endika55
Machining time and costsMachining time and costs
Machining time and costs
endika552.7K vues
Process Selection and Facility layout.ppt par SandipanMaji3
Process Selection and Facility layout.pptProcess Selection and Facility layout.ppt
Process Selection and Facility layout.ppt
SandipanMaji3132 vues
Economics of metal cutting operations par Darshan Panchal
Economics of metal cutting operationsEconomics of metal cutting operations
Economics of metal cutting operations
Darshan Panchal10.8K vues
Process Planning & Cost Estimation par Prabhu Bose
Process Planning & Cost Estimation Process Planning & Cost Estimation
Process Planning & Cost Estimation
Prabhu Bose2.1K vues

Plus de DJAGADEESH1

INTRODUCTION TO PROCESS PLANNING par
INTRODUCTION TO PROCESS PLANNINGINTRODUCTION TO PROCESS PLANNING
INTRODUCTION TO PROCESS PLANNINGDJAGADEESH1
128 vues62 diapositives
PROCESS PLANNING ACTIVITIES par
PROCESS PLANNING ACTIVITIESPROCESS PLANNING ACTIVITIES
PROCESS PLANNING ACTIVITIESDJAGADEESH1
60 vues56 diapositives
PRODUCTION COST ESTIMATION par
PRODUCTION COST ESTIMATIONPRODUCTION COST ESTIMATION
PRODUCTION COST ESTIMATIONDJAGADEESH1
40 vues87 diapositives
INTRODUCTION TO COST ESTIMATION par
INTRODUCTION TO COST ESTIMATIONINTRODUCTION TO COST ESTIMATION
INTRODUCTION TO COST ESTIMATIONDJAGADEESH1
55 vues78 diapositives
POM UNIT-I.pdf par
POM UNIT-I.pdfPOM UNIT-I.pdf
POM UNIT-I.pdfDJAGADEESH1
12 vues108 diapositives
POM UNIT-3.pdf par
POM UNIT-3.pdfPOM UNIT-3.pdf
POM UNIT-3.pdfDJAGADEESH1
18 vues67 diapositives

Dernier

START Newsletter 3 par
START Newsletter 3START Newsletter 3
START Newsletter 3Start Project
7 vues25 diapositives
2023Dec ASU Wang NETR Group Research Focus and Facility Overview.pptx par
2023Dec ASU Wang NETR Group Research Focus and Facility Overview.pptx2023Dec ASU Wang NETR Group Research Focus and Facility Overview.pptx
2023Dec ASU Wang NETR Group Research Focus and Facility Overview.pptxlwang78
180 vues19 diapositives
GDSC Mikroskil Members Onboarding 2023.pdf par
GDSC Mikroskil Members Onboarding 2023.pdfGDSC Mikroskil Members Onboarding 2023.pdf
GDSC Mikroskil Members Onboarding 2023.pdfgdscmikroskil
63 vues62 diapositives
dummy.pptx par
dummy.pptxdummy.pptx
dummy.pptxJamesLamp
5 vues2 diapositives
BCIC - Manufacturing Conclave - Technology-Driven Manufacturing for Growth par
BCIC - Manufacturing Conclave -  Technology-Driven Manufacturing for GrowthBCIC - Manufacturing Conclave -  Technology-Driven Manufacturing for Growth
BCIC - Manufacturing Conclave - Technology-Driven Manufacturing for GrowthInnomantra
15 vues4 diapositives
Global airborne satcom market report par
Global airborne satcom market reportGlobal airborne satcom market report
Global airborne satcom market reportdefencereport78
6 vues13 diapositives

Dernier(20)

2023Dec ASU Wang NETR Group Research Focus and Facility Overview.pptx par lwang78
2023Dec ASU Wang NETR Group Research Focus and Facility Overview.pptx2023Dec ASU Wang NETR Group Research Focus and Facility Overview.pptx
2023Dec ASU Wang NETR Group Research Focus and Facility Overview.pptx
lwang78180 vues
GDSC Mikroskil Members Onboarding 2023.pdf par gdscmikroskil
GDSC Mikroskil Members Onboarding 2023.pdfGDSC Mikroskil Members Onboarding 2023.pdf
GDSC Mikroskil Members Onboarding 2023.pdf
gdscmikroskil63 vues
BCIC - Manufacturing Conclave - Technology-Driven Manufacturing for Growth par Innomantra
BCIC - Manufacturing Conclave -  Technology-Driven Manufacturing for GrowthBCIC - Manufacturing Conclave -  Technology-Driven Manufacturing for Growth
BCIC - Manufacturing Conclave - Technology-Driven Manufacturing for Growth
Innomantra 15 vues
Ansari: Practical experiences with an LLM-based Islamic Assistant par M Waleed Kadous
Ansari: Practical experiences with an LLM-based Islamic AssistantAnsari: Practical experiences with an LLM-based Islamic Assistant
Ansari: Practical experiences with an LLM-based Islamic Assistant
SUMIT SQL PROJECT SUPERSTORE 1.pptx par Sumit Jadhav
SUMIT SQL PROJECT SUPERSTORE 1.pptxSUMIT SQL PROJECT SUPERSTORE 1.pptx
SUMIT SQL PROJECT SUPERSTORE 1.pptx
Sumit Jadhav 22 vues
Design of machine elements-UNIT 3.pptx par gopinathcreddy
Design of machine elements-UNIT 3.pptxDesign of machine elements-UNIT 3.pptx
Design of machine elements-UNIT 3.pptx
gopinathcreddy37 vues
ASSIGNMENTS ON FUZZY LOGIC IN TRAFFIC FLOW.pdf par AlhamduKure
ASSIGNMENTS ON FUZZY LOGIC IN TRAFFIC FLOW.pdfASSIGNMENTS ON FUZZY LOGIC IN TRAFFIC FLOW.pdf
ASSIGNMENTS ON FUZZY LOGIC IN TRAFFIC FLOW.pdf
AlhamduKure8 vues
Créativité dans le design mécanique à l’aide de l’optimisation topologique par LIEGE CREATIVE
Créativité dans le design mécanique à l’aide de l’optimisation topologiqueCréativité dans le design mécanique à l’aide de l’optimisation topologique
Créativité dans le design mécanique à l’aide de l’optimisation topologique
MongoDB.pdf par ArthyR3
MongoDB.pdfMongoDB.pdf
MongoDB.pdf
ArthyR349 vues
_MAKRIADI-FOTEINI_diploma thesis.pptx par fotinimakriadi
_MAKRIADI-FOTEINI_diploma thesis.pptx_MAKRIADI-FOTEINI_diploma thesis.pptx
_MAKRIADI-FOTEINI_diploma thesis.pptx
fotinimakriadi12 vues
Design of Structures and Foundations for Vibrating Machines, Arya-ONeill-Pinc... par csegroupvn
Design of Structures and Foundations for Vibrating Machines, Arya-ONeill-Pinc...Design of Structures and Foundations for Vibrating Machines, Arya-ONeill-Pinc...
Design of Structures and Foundations for Vibrating Machines, Arya-ONeill-Pinc...
csegroupvn8 vues

MACHINING TIME CALCULATION

  • 2. •UNIT I INTRODUCTION TO PROCESS PLANNING •UNIT II PROCESS PLANNING ACTIVITIES •UNIT III INTRODUCTION TO COST ESTIMATION •UNIT IV PRODUCTION COST ESTIMATION •UNIT V MACHINING TIME CALCULATION
  • 3. UNIT V MACHINING TIME CALCULATION • Estimation of machining time • Importance of machine time calculation • Calculation of machining time for different lathe operations, Drilling and Boring • Machining time calculation for Milling, Shaping and Planning • Machining time calculation for grinding
  • 4. Introduction • To estimate the total cost of any product involving machining operations, the machining cost is to be estimated primarily. • In order to estimate the machining cost, one has to calculate the machining time required for these machining operations. • After knowing the machining time and rate of machining, the total machining cost can be calculated. • Therefore the estimation of machining time for various operations such as lathe, drilling. boring, shaping, planning, milling and grinding operations are very essential in the cost estimation activity.
  • 5. What is meant by Machining Time? • It is time for which the machine works on the component • From the time when the tool touches the work to when the tool leaves the component after completion of operation • The machining time depends on die type and extent of machining required, material being machined, speed, feed, depth of cut and number of cuts required • In addition to the actual machining time, an estimator has to consider other time elements such as set-up time, handling time, tear down time, down time and allowances to the workers.
  • 6. FACTORS TO BE CONSIDERED FOR MACHINE TIME CALCULATION •Set up time •Operation time •Tear down time •Personal allowance •Fatigue allowance •Checking allowance •Miscellaneous allowance
  • 7. SETUPTIME • This takes into account the time required to prepare the machine for doing the job with the time taken to study the blue print. • The time to prepare the machine, in turn • The time to install and adjust the tools in the machine, as well as to make the machine ready to start the work.
  • 8. OPERATION TIME • The sum of handling time and machining time for a job is called operation time. • It is the duration of time that elapses between output of two consecutive units of production. TEAR DOWN TIME • Tear down time takes into account the time necessary to remove from the machine all tools and accessories, such as jigs and fixtures, gauges and instruments etc. • The time required for clearing operational chips from the machine table and clearing of the machine itself are included on this. • Tear down time is generally 10 minute per shift of 8 hrs.
  • 9. PERSONALALLOWANCE • The time allowed for workers to meet their personal needs, such as going to the urinal, drinking water, smoking, washing their hands, etc is known as personal allowance. • It is generally 5 to 10 minutes FATIGUE ALLOWANCE • The long working hours and poor working conditions such as poor lighting, poor ventilation etc., cause fatigue • Fatigue effect the efficiency of worker • Fatigue decreases the worker capacity to work. • The allowance for fatigue is taken depending upon the type of work.
  • 10. IMPORTANCE OF MACHINING TIME CALCULATION •To find the manufacturing cost of a particular job the calculation of machining time is important, this requires one or more machining operations. •After determining the total time for machining, and knowing the machining cost per unit time, the total cost of machining can be worked out. •Machining time is calculated by applying certain basic formulae, tables of variables and constants.
  • 11. • The basic formula used is TRAVEL OF THE TOOL • This is determined from the dimensions in the actual drawing of the part to be manufactured. • The necessary allowances for the tool approach and over-run for clearing the tool off the job are taken into account with the actual length of the work, to find the travel of the tool.
  • 12. FEED • Feed is the distance, through which the tool advances into the job in one revolution • If the work or the distance that the table holding the work travels is one stroke of the tool. In metric units, feed is usually expressed in mm/revolution or mm/stroke. • Feed depends on the depth of cut, fitness of the work desired, rpm of the job, etc. DEPTH OF CUT • It is the penetration of the cutting tool into the job in a single cut. • In metric units, the depth of cut is expressed in mm. • The depth of cut depends upon the fitness of the job required, such as higher depth of cut for rough cut and smaller depth of cut for finish cut.
  • 13. RPM • It represents the number of revolutions of the m/c spindle in one minute. • Thus it is the number of revolutions per minute of the job or of tool. CUTTING SPEED • The cutting speed can be defined as the relative surface speed between the tool and the job. • It is expressed in meters per minute (mpm) • For example if a job of diameter D mm is revolving at a speed of N rpm
  • 14. CALCULATION OF MACHINING TIME FOR DIFFERENT LATHE OPERATIONS
  • 15. Where D = Diameter of given blank, d = diameter of blank after turning. • In turning operation, the depth of cut should not exceed 3 mm for rough cuts and 0.7 5 mm for finishing cuts.
  • 35. MACHINING TIME FOR SHAPING AND PLANING • Shaping, planning and slotting operations are carried out on reciprocating machines with a single point cutting tool.
  • 41. Estimation of time for milling operation
  • 42. The approach is the distance the cutter must be engaged before the full depth of cut is reached. When cutter diameter is less than the width of the work.
  • 43. (b) When cutter diameter is greater than the width of the work.
  • 46. Estimation of time for Grinding operation