SlideShare a Scribd company logo
1 of 4
Download to read offline
DAVID A. GOSHORN, LEED AP PROJECT MANAGER / OWNER REP
DAVEGOSHORN@GMAIL.COM 455 S CLARKSON STREET
CELL: (720) 273-4226 DENVER, CO 80209
EXPERIENCE Over 12 years of experience as Project Manager and Owner Representative.
Held management positions with general contractors, including third-party
consulting, engineering, field supervision, superintendent, preconstruction, and
project oversight in Colorado along with international preconstruction
experience. Projects have included historical renovation, medical & hospital,
higher education, brewery, mixed-use hotel residential condo building,
construction claims research, management, mitigation and various tenant
improvements.
RESPONSIBILITIES Owner representation during design and construction process, including design
development, oversight of construction activities, team alignment according to
project interests, phasing, scheduling, and project scope achievement. Review
of contractor, subcontractor, and design team billings, pay applications, project
budgets, contractor bids, requested change orders, value engineering, quality
control, issue and conflict mitigation, closeout, and adherence to the contract.
Effectively orchestrating, guiding, and controlling all aspects of preconstruction,
construction management, general contracting, bid-day estimates, value
engineering, cost control and management, submittals, product data, owner
training, and redesign proposals, from contract inception through project
completion and beyond.
Establishing and maintaining harmonious client relationships with Owners,
Architects, Engineers, and Prime/Sub Contractors. Ensuring the project team
feels a sense of ownership in their jobs, tasks, duties, and helps provide
solutions to issues rather than just pointing them out.
Identify, write, and negotiate cost effective subcontract and material purchases,
project organization, buyout, prime/subcontractor interviews, establish budgets
and contract price, review contract conditions, avoid or mitigate claims and
conflict, estimate, prepare, and negotiate change orders, prepare owner billings,
review and approve subcontractor pay-applications, assign tasks based on team
member strengths, management and attention to detail on multiple projects at
different locations.
EDUCATION Bachelor of Science in Construction Management with Management Minor –
Minnesota State University Mankato. 3.75 Cumulative GPA – Magna Cum
Laude
DAVID A. GOSHORN, LEED AP PROJECT MANAGER / OWNER REPRESENTATIVE
MANAGEMENT &
OWNER REP
PROJECTS
Tivoli Brewery, Denver, CO
$8,000,000 – 4,250-square feet (Grupo Denim/GD Holdings) – October 2014 to
Present
Owner Representative for historic renovation of new full 14,000 barrel/yr
brewery and tap-house/restaurant inside original historical Tivoli brewery
space on Auraria Campus (State College Campus). Design team selection,
design overview, general contractor oversight, contract review & approval,
asbestos abatement lead, and project budget management.
Four Seasons Hotel & Private Residences, Denver, CO
(Grupo Denim/GD Holdings) – February 2012 to Present
Owner Representative and Project Manager for building developer/owner. In
charge of construction defect claims management and mitigation for condo
wood flooring, building balcony rails, and CPVC sprinkler pipe connections.
PM and Superintendent for various Capitol Expenditure projects of hotel
including but not limited to Podium EPDM full roof replacement, Level 3 Spa
renovation and Salon build-out from existing gym, and Four Seasons Hotel full
storefront and entry door replacement with revolving door.
Four Seasons Hotel & Private Residences, Denver, CO
(1133 Tower LLC; Denver, CO) – February 2012 to March 2014
Project Manager and Residential Closeout Consultant for building
developer/owner, sales team, and hotel operator for 102 high-end Residential
Condos. Buyer walks and review, punch list generation and negotiations,
subcontractor selection, scheduling and oversight, quality review, installation
management, product procurement, invoicing review and approval, warranty
review, buyer acceptance sign-off and closing.
GD Holdings ‘Phase II - Tower II’, Denver, CO
(Grupo Denim/GD Holdings) – March 2014 to May 2015
Project Manager for building developer/owner on design development &
budgeting of an additional $140,000,000 38 story post-tension high-rise on 14th
Street & Lawrence. Easement & contract research, area calcs, review of
architectural and structural designs, programing, cost model review, design
change management, utility tie-in and structural research with GC into existing
building, and design team invoicing.
Four Seasons Hotel & Private Residences, Denver, CO
$190,000,000 – 860,181-square feet (1111 Tower/Grupo Denim; Denver, CO) –
October 2010 – January 2011
Owner Representative and Closeout Consultant for 239 5-star hotel suites,
health & fitness center, full service salon & spa.
DAVID A. GOSHORN, LEED AP PROJECT MANAGER / OWNER REPRESENTATIVE
FIELD MANAGEMENT
PROJECTS
Four Seasons Hotel & Private Residences, Denver, CO
$190,000,000 – 860,181-square feet (Swinerton Builders-Denver; Arvada, CO) –
April 2008 – June 2010
Project Manager for a 45 story post-tension high-rise with precast and curtain
wall exterior, 239 5-star hotel suites, 102 high-end condominiums, full kitchen
with restaurant, bar, health & fitness center, full service salon & spa, rooftop
pools, hot tubs, whirlpools, 16,000 square foot of meeting space.
Beaty Hall Building at AIMS Community College, Greeley, CO
$6,000,000 – 65,000-square feet (Alliance Construction Solutions; Loveland, CO) –
March 2005 – April 2008
APM for a one and a half-story renovation that included TV studios, recording
studios, sound rooms, high-tech labs, control rooms and visual arts studios.
Health & Science Building at AIMS Community College, Greeley, CO
$14,000,000 – 70,000-square feet (Alliance Construction Solutions; Loveland, CO) –
March 2005 – April 2008
APM for construction of a new three-story building on the college campus,
consisting of multiple science labs, multiple health and nursing labs, chemical &
biohazard storage.
Hilton Garden Inn, Fort Collins, CO
$8,000,000 – 75,000-square feet (Alliance Construction Solutions; Loveland, CO) –
March 2005 – April 2008
Senior Field Engineer and Assistant Superintendent for a four-story, design-
build hospitality project which included 120 rooms, business center, full
restaurant, bar, pool and fitness area.
Centennial Elementary School in Thompson School District, Loveland, CO
$9,000,000 – 75,000-square feet (Alliance Construction Solutions; Loveland, CO) –
March 2005 – April 2008
Senior Project Engineer for new construction and renovation of the existing
building.
Winona Elementary School in Thompson School District, Loveland, CO
$9,000,000 – 77,000-square feet (Alliance Construction Solutions; Loveland, CO) –
March 2005 – April 2008
Senior Project Engineer for new construction and renovation of the existing
building.
DAVID A. GOSHORN, LEED AP PROJECT MANAGER / OWNER REPRESENTATIVE
PRECON & TRAINING
PROJECTS
CERTIFICATIONS &
TRAINING
MILITARY SERVICE
REFERENCES
Education Trust Fund – Academic Publishing Centers & Zonal Central Teaching
Research Laboratory Projects, Multiple Locations – Nigeria, Africa (The Camber
Group; New Berlin, WI) – March 2011 – February 2012
PM for preconstruction and team assignments. Duties included: review of
preliminary drawings, constructability review and development of baseline
CPM schedules, teaming and task assignments, pre-investigative services,
development of drawing logs, responsibility matrices, action list requirements,
and construction checklist implementation.
Denver Health & Hospital Authority – Misc. Projects, Denver, CO (Alliance
Construction Solutions; Loveland, CO) – March 2005 – April 2008
Preconstruction and Training Manager for various renovations. Duties
included: infection control training and equipment requirements, interim life
safety measures, request for proposals and requests for qualifications,
healthcare professional training of teams assigned for joint commission and
patient safety management, pre-investigative services of existing facilities,
healthcare design and construction checklist implementation.
LEED 2.0 Accredited Professional (Enrolled in LEED AP+ continued education)
Healthcare Construction Certification
ASHE Training
OSHA 10-Hour Certification
Fork lift, Sky lift, Scissor Lift, Boom Lift Certified
CPR Certified
First Aid and Personal Safety Courses
Combat Engineer – Active Duty Army (Fort Stewart, GA) – June 1999 – June 2002
Developed, practiced, and trained others in safe usage of explosives and
demolition devices, constructed bridges and took part in peacekeeping
operations in Bosnia Herzegovina. Honorable Discharge.
GD Holdings 1111/1133 Tower LLC
Dan Wolf – Associate Partner Pam Fisher – Controller
c. (720) 946-3923 c. (720) 241-0733
dan@grupodenimusa.com pfisher@towerprivateresidences.com

More Related Content

What's hot

Hans Goetze Cv Project Director Portfolio Large Ici 14oct2011
Hans Goetze Cv Project Director Portfolio Large Ici  14oct2011Hans Goetze Cv Project Director Portfolio Large Ici  14oct2011
Hans Goetze Cv Project Director Portfolio Large Ici 14oct2011
Hans Goetze
 
Chris Rohn - Architectural Professional
Chris Rohn - Architectural ProfessionalChris Rohn - Architectural Professional
Chris Rohn - Architectural Professional
chrisrohn
 
John R. Gustafson P.E.'s Resume
John R. Gustafson P.E.'s ResumeJohn R. Gustafson P.E.'s Resume
John R. Gustafson P.E.'s Resume
John Gustafson
 
Jon Rose Design company profile Dec 2016
Jon Rose Design company profile Dec 2016Jon Rose Design company profile Dec 2016
Jon Rose Design company profile Dec 2016
Jon Rose
 
Brian P Loftus Resume(24AUG2015)
Brian P Loftus Resume(24AUG2015)Brian P Loftus Resume(24AUG2015)
Brian P Loftus Resume(24AUG2015)
Brian Loftus
 
SBS Brochure 2014.1 Retail Electronic
SBS Brochure 2014.1 Retail ElectronicSBS Brochure 2014.1 Retail Electronic
SBS Brochure 2014.1 Retail Electronic
Joyce Reweda
 
Kawahira, Casey - Portfolio,linked
Kawahira, Casey - Portfolio,linkedKawahira, Casey - Portfolio,linked
Kawahira, Casey - Portfolio,linked
Casey Kawahira
 

What's hot (20)

Dudley 2-7-2017
Dudley 2-7-2017Dudley 2-7-2017
Dudley 2-7-2017
 
Dy Head CV
Dy Head CVDy Head CV
Dy Head CV
 
Hans Goetze Cv Project Director Portfolio Large Ici 14oct2011
Hans Goetze Cv Project Director Portfolio Large Ici  14oct2011Hans Goetze Cv Project Director Portfolio Large Ici  14oct2011
Hans Goetze Cv Project Director Portfolio Large Ici 14oct2011
 
Chris Rohn - Architectural Professional
Chris Rohn - Architectural ProfessionalChris Rohn - Architectural Professional
Chris Rohn - Architectural Professional
 
Mario Perez: Resume + Sample Projects 2013
Mario Perez: Resume + Sample Projects 2013Mario Perez: Resume + Sample Projects 2013
Mario Perez: Resume + Sample Projects 2013
 
John R. Gustafson P.E.'s Resume
John R. Gustafson P.E.'s ResumeJohn R. Gustafson P.E.'s Resume
John R. Gustafson P.E.'s Resume
 
David Green_21-06-16
David Green_21-06-16David Green_21-06-16
David Green_21-06-16
 
Prajeesh K. CV - Sep 2016
Prajeesh K. CV - Sep 2016Prajeesh K. CV - Sep 2016
Prajeesh K. CV - Sep 2016
 
Final Design Report
Final Design ReportFinal Design Report
Final Design Report
 
Mai gabica cv 2020
Mai gabica cv 2020Mai gabica cv 2020
Mai gabica cv 2020
 
Resume
ResumeResume
Resume
 
Multi Unit Housing.3.26.12
Multi Unit Housing.3.26.12Multi Unit Housing.3.26.12
Multi Unit Housing.3.26.12
 
Jon Rose Design company profile Dec 2016
Jon Rose Design company profile Dec 2016Jon Rose Design company profile Dec 2016
Jon Rose Design company profile Dec 2016
 
Brian P Loftus Resume(24AUG2015)
Brian P Loftus Resume(24AUG2015)Brian P Loftus Resume(24AUG2015)
Brian P Loftus Resume(24AUG2015)
 
Erwin Mendoza CV
Erwin Mendoza CVErwin Mendoza CV
Erwin Mendoza CV
 
SBS Brochure 2014.1 Retail Electronic
SBS Brochure 2014.1 Retail ElectronicSBS Brochure 2014.1 Retail Electronic
SBS Brochure 2014.1 Retail Electronic
 
RAVIKUMAR CV updated 08092016
RAVIKUMAR CV updated 08092016RAVIKUMAR CV updated 08092016
RAVIKUMAR CV updated 08092016
 
Kawahira, Casey - Portfolio,linked
Kawahira, Casey - Portfolio,linkedKawahira, Casey - Portfolio,linked
Kawahira, Casey - Portfolio,linked
 
joy S resume
joy S resumejoy S resume
joy S resume
 
CV
CVCV
CV
 

Viewers also liked

S Wilson 2016 Resume
S Wilson 2016 ResumeS Wilson 2016 Resume
S Wilson 2016 Resume
Shauna Wilson
 
Change Management Brochure
Change Management BrochureChange Management Brochure
Change Management Brochure
Adriano Lino
 

Viewers also liked (20)

Ingles1
Ingles1Ingles1
Ingles1
 
Cuerpos en sintonía
Cuerpos en sintoníaCuerpos en sintonía
Cuerpos en sintonía
 
Capturas de video
Capturas de videoCapturas de video
Capturas de video
 
Primer t
Primer tPrimer t
Primer t
 
Ingles
InglesIngles
Ingles
 
Trabajo 2 ingles
Trabajo 2 inglesTrabajo 2 ingles
Trabajo 2 ingles
 
Un día común de homus tóxicus
Un día común de homus tóxicusUn día común de homus tóxicus
Un día común de homus tóxicus
 
CS12A - Lesson 1 : Human Population
CS12A - Lesson 1 : Human PopulationCS12A - Lesson 1 : Human Population
CS12A - Lesson 1 : Human Population
 
drinking
 drinking  drinking
drinking
 
ติดตั้ง Postgres
ติดตั้ง Postgresติดตั้ง Postgres
ติดตั้ง Postgres
 
Atherosclerosis
AtherosclerosisAtherosclerosis
Atherosclerosis
 
S Wilson 2016 Resume
S Wilson 2016 ResumeS Wilson 2016 Resume
S Wilson 2016 Resume
 
Week11 1st draft
Week11 1st draftWeek11 1st draft
Week11 1st draft
 
Change Management Brochure
Change Management BrochureChange Management Brochure
Change Management Brochure
 
TCA Cycle
TCA CycleTCA Cycle
TCA Cycle
 
протокол6
протокол6протокол6
протокол6
 
Diventare famosi con lo stack ELK
Diventare famosi con lo stack ELKDiventare famosi con lo stack ELK
Diventare famosi con lo stack ELK
 
Influence campaign
Influence campaignInfluence campaign
Influence campaign
 
Project gt tire cutting rsa
Project gt tire cutting rsaProject gt tire cutting rsa
Project gt tire cutting rsa
 
MAB Deck
MAB DeckMAB Deck
MAB Deck
 

Similar to Dave Goshorn - Resume

Similar to Dave Goshorn - Resume (20)

Stan Shipley Resume, Projects 11mr18
Stan Shipley   Resume, Projects 11mr18Stan Shipley   Resume, Projects 11mr18
Stan Shipley Resume, Projects 11mr18
 
121207 webb jennifer-portfolio
121207 webb jennifer-portfolio121207 webb jennifer-portfolio
121207 webb jennifer-portfolio
 
Dale Riley - Resume2016
Dale Riley - Resume2016Dale Riley - Resume2016
Dale Riley - Resume2016
 
RESUME OF PROFESSIONAL EXPERIENCE
RESUME OF PROFESSIONAL EXPERIENCERESUME OF PROFESSIONAL EXPERIENCE
RESUME OF PROFESSIONAL EXPERIENCE
 
101014 Melton Jennifer Resume
101014 Melton Jennifer Resume101014 Melton Jennifer Resume
101014 Melton Jennifer Resume
 
latest CV_pradeep
latest CV_pradeeplatest CV_pradeep
latest CV_pradeep
 
Lou Houlemarde
Lou HoulemardeLou Houlemarde
Lou Houlemarde
 
Resume 042516
Resume 042516Resume 042516
Resume 042516
 
Derek swift cv_2016
Derek swift cv_2016Derek swift cv_2016
Derek swift cv_2016
 
CHIP WEDEKINDFINALRESUME
CHIP WEDEKINDFINALRESUMECHIP WEDEKINDFINALRESUME
CHIP WEDEKINDFINALRESUME
 
Jois Lakshmipathy - CV
Jois Lakshmipathy - CVJois Lakshmipathy - CV
Jois Lakshmipathy - CV
 
Allman Alexis Resume Copy
Allman Alexis Resume CopyAllman Alexis Resume Copy
Allman Alexis Resume Copy
 
EJP Construction Manager
EJP Construction ManagerEJP Construction Manager
EJP Construction Manager
 
Jvm resume
Jvm resumeJvm resume
Jvm resume
 
New Updated 7.62 Resume8
New Updated 7.62 Resume8New Updated 7.62 Resume8
New Updated 7.62 Resume8
 
New Updated 7.62 Resume8
New Updated 7.62 Resume8New Updated 7.62 Resume8
New Updated 7.62 Resume8
 
NM_CV1
NM_CV1NM_CV1
NM_CV1
 
Mike Haller - Professional Resume
Mike Haller - Professional ResumeMike Haller - Professional Resume
Mike Haller - Professional Resume
 
RE Resume YUANG LEE 2015 12 21
RE Resume YUANG LEE   2015 12 21RE Resume YUANG LEE   2015 12 21
RE Resume YUANG LEE 2015 12 21
 
Daniel O Connell Professional Construction Consultant
Daniel O Connell Professional Construction ConsultantDaniel O Connell Professional Construction Consultant
Daniel O Connell Professional Construction Consultant
 

Dave Goshorn - Resume

  • 1. DAVID A. GOSHORN, LEED AP PROJECT MANAGER / OWNER REP DAVEGOSHORN@GMAIL.COM 455 S CLARKSON STREET CELL: (720) 273-4226 DENVER, CO 80209 EXPERIENCE Over 12 years of experience as Project Manager and Owner Representative. Held management positions with general contractors, including third-party consulting, engineering, field supervision, superintendent, preconstruction, and project oversight in Colorado along with international preconstruction experience. Projects have included historical renovation, medical & hospital, higher education, brewery, mixed-use hotel residential condo building, construction claims research, management, mitigation and various tenant improvements. RESPONSIBILITIES Owner representation during design and construction process, including design development, oversight of construction activities, team alignment according to project interests, phasing, scheduling, and project scope achievement. Review of contractor, subcontractor, and design team billings, pay applications, project budgets, contractor bids, requested change orders, value engineering, quality control, issue and conflict mitigation, closeout, and adherence to the contract. Effectively orchestrating, guiding, and controlling all aspects of preconstruction, construction management, general contracting, bid-day estimates, value engineering, cost control and management, submittals, product data, owner training, and redesign proposals, from contract inception through project completion and beyond. Establishing and maintaining harmonious client relationships with Owners, Architects, Engineers, and Prime/Sub Contractors. Ensuring the project team feels a sense of ownership in their jobs, tasks, duties, and helps provide solutions to issues rather than just pointing them out. Identify, write, and negotiate cost effective subcontract and material purchases, project organization, buyout, prime/subcontractor interviews, establish budgets and contract price, review contract conditions, avoid or mitigate claims and conflict, estimate, prepare, and negotiate change orders, prepare owner billings, review and approve subcontractor pay-applications, assign tasks based on team member strengths, management and attention to detail on multiple projects at different locations. EDUCATION Bachelor of Science in Construction Management with Management Minor – Minnesota State University Mankato. 3.75 Cumulative GPA – Magna Cum Laude
  • 2. DAVID A. GOSHORN, LEED AP PROJECT MANAGER / OWNER REPRESENTATIVE MANAGEMENT & OWNER REP PROJECTS Tivoli Brewery, Denver, CO $8,000,000 – 4,250-square feet (Grupo Denim/GD Holdings) – October 2014 to Present Owner Representative for historic renovation of new full 14,000 barrel/yr brewery and tap-house/restaurant inside original historical Tivoli brewery space on Auraria Campus (State College Campus). Design team selection, design overview, general contractor oversight, contract review & approval, asbestos abatement lead, and project budget management. Four Seasons Hotel & Private Residences, Denver, CO (Grupo Denim/GD Holdings) – February 2012 to Present Owner Representative and Project Manager for building developer/owner. In charge of construction defect claims management and mitigation for condo wood flooring, building balcony rails, and CPVC sprinkler pipe connections. PM and Superintendent for various Capitol Expenditure projects of hotel including but not limited to Podium EPDM full roof replacement, Level 3 Spa renovation and Salon build-out from existing gym, and Four Seasons Hotel full storefront and entry door replacement with revolving door. Four Seasons Hotel & Private Residences, Denver, CO (1133 Tower LLC; Denver, CO) – February 2012 to March 2014 Project Manager and Residential Closeout Consultant for building developer/owner, sales team, and hotel operator for 102 high-end Residential Condos. Buyer walks and review, punch list generation and negotiations, subcontractor selection, scheduling and oversight, quality review, installation management, product procurement, invoicing review and approval, warranty review, buyer acceptance sign-off and closing. GD Holdings ‘Phase II - Tower II’, Denver, CO (Grupo Denim/GD Holdings) – March 2014 to May 2015 Project Manager for building developer/owner on design development & budgeting of an additional $140,000,000 38 story post-tension high-rise on 14th Street & Lawrence. Easement & contract research, area calcs, review of architectural and structural designs, programing, cost model review, design change management, utility tie-in and structural research with GC into existing building, and design team invoicing. Four Seasons Hotel & Private Residences, Denver, CO $190,000,000 – 860,181-square feet (1111 Tower/Grupo Denim; Denver, CO) – October 2010 – January 2011 Owner Representative and Closeout Consultant for 239 5-star hotel suites, health & fitness center, full service salon & spa.
  • 3. DAVID A. GOSHORN, LEED AP PROJECT MANAGER / OWNER REPRESENTATIVE FIELD MANAGEMENT PROJECTS Four Seasons Hotel & Private Residences, Denver, CO $190,000,000 – 860,181-square feet (Swinerton Builders-Denver; Arvada, CO) – April 2008 – June 2010 Project Manager for a 45 story post-tension high-rise with precast and curtain wall exterior, 239 5-star hotel suites, 102 high-end condominiums, full kitchen with restaurant, bar, health & fitness center, full service salon & spa, rooftop pools, hot tubs, whirlpools, 16,000 square foot of meeting space. Beaty Hall Building at AIMS Community College, Greeley, CO $6,000,000 – 65,000-square feet (Alliance Construction Solutions; Loveland, CO) – March 2005 – April 2008 APM for a one and a half-story renovation that included TV studios, recording studios, sound rooms, high-tech labs, control rooms and visual arts studios. Health & Science Building at AIMS Community College, Greeley, CO $14,000,000 – 70,000-square feet (Alliance Construction Solutions; Loveland, CO) – March 2005 – April 2008 APM for construction of a new three-story building on the college campus, consisting of multiple science labs, multiple health and nursing labs, chemical & biohazard storage. Hilton Garden Inn, Fort Collins, CO $8,000,000 – 75,000-square feet (Alliance Construction Solutions; Loveland, CO) – March 2005 – April 2008 Senior Field Engineer and Assistant Superintendent for a four-story, design- build hospitality project which included 120 rooms, business center, full restaurant, bar, pool and fitness area. Centennial Elementary School in Thompson School District, Loveland, CO $9,000,000 – 75,000-square feet (Alliance Construction Solutions; Loveland, CO) – March 2005 – April 2008 Senior Project Engineer for new construction and renovation of the existing building. Winona Elementary School in Thompson School District, Loveland, CO $9,000,000 – 77,000-square feet (Alliance Construction Solutions; Loveland, CO) – March 2005 – April 2008 Senior Project Engineer for new construction and renovation of the existing building.
  • 4. DAVID A. GOSHORN, LEED AP PROJECT MANAGER / OWNER REPRESENTATIVE PRECON & TRAINING PROJECTS CERTIFICATIONS & TRAINING MILITARY SERVICE REFERENCES Education Trust Fund – Academic Publishing Centers & Zonal Central Teaching Research Laboratory Projects, Multiple Locations – Nigeria, Africa (The Camber Group; New Berlin, WI) – March 2011 – February 2012 PM for preconstruction and team assignments. Duties included: review of preliminary drawings, constructability review and development of baseline CPM schedules, teaming and task assignments, pre-investigative services, development of drawing logs, responsibility matrices, action list requirements, and construction checklist implementation. Denver Health & Hospital Authority – Misc. Projects, Denver, CO (Alliance Construction Solutions; Loveland, CO) – March 2005 – April 2008 Preconstruction and Training Manager for various renovations. Duties included: infection control training and equipment requirements, interim life safety measures, request for proposals and requests for qualifications, healthcare professional training of teams assigned for joint commission and patient safety management, pre-investigative services of existing facilities, healthcare design and construction checklist implementation. LEED 2.0 Accredited Professional (Enrolled in LEED AP+ continued education) Healthcare Construction Certification ASHE Training OSHA 10-Hour Certification Fork lift, Sky lift, Scissor Lift, Boom Lift Certified CPR Certified First Aid and Personal Safety Courses Combat Engineer – Active Duty Army (Fort Stewart, GA) – June 1999 – June 2002 Developed, practiced, and trained others in safe usage of explosives and demolition devices, constructed bridges and took part in peacekeeping operations in Bosnia Herzegovina. Honorable Discharge. GD Holdings 1111/1133 Tower LLC Dan Wolf – Associate Partner Pam Fisher – Controller c. (720) 946-3923 c. (720) 241-0733 dan@grupodenimusa.com pfisher@towerprivateresidences.com