1
CANADA’S
INTERMEDIATE
GOLD
PRODUCER
Corporate Presentation
Toronto, May 7-8, 2014
2
Forward Looking Information
This presentation contains certain forward-looking information and statements as defined in applicable securities law (referred to herein as
“forward-looking statements”). Forward-looking statements include, but are not limited to, statements with respect to Detour Gold’s future
financial or operating performance; guidance for production, total cash costs, capital costs, exploration costs; expected throughput, mining
and recovery rates; expected future production and mining activities; opportunities to optimize the mine operation; the updated mine plan
and economic analysis of the Detour Lake mine including, but not limited to, the life of mine plan, the waste to ore ratio, processing and
production rates, grades, metallurgical recovery rates, operating and sustaining capital costs, and the projected life of mine, opportunities to
optimize the mine operation; the success and continuation of exploration activities, the future price of gold, reclamation obligations,
government regulations and environmental risks.
Forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause actual results, performance
or achievements to be materially different from any of its future results, performance or achievements expressed or implied by forward-
looking statements. These risks, uncertainties and other factors include, but are not limited to, assumptions and parameters underlying the
life of mine update not being realized, a decrease in the future gold price, discrepancies between actual and estimated production, changes
in costs (including labour, supplies, fuel and equipment), changes to tax rates; environmental compliance and changes in environmental
legislation and regulation, exchange rate fluctuations, general economic conditions and other risks involved in the gold exploration and
development industry, as well as those risk factors discussed in the section entitled “Description of Business - Risk Factors” in Detour
Gold’s 2013 AIF and in the continuous disclosure documents filed by Detour Gold on and available on SEDAR at www.sedar.com.
Such forward-looking statements are also based on a number of assumptions which may prove to be incorrect, including, but not limited to,
assumptions about the following: the availability of financing for exploration and development activities; operating and sustaining capital
costs; the Company’s ability to attract and retain skilled staff; sensitivity to metal prices and other sensitivities; the supply and demand for,
and the level and volatility of the price of, gold; the supply and availability of consumables and services; the exchange rates of the Canadian
dollar to the U.S. dollar; energy and fuel costs; the accuracy of reserve and resource estimates and the assumptions on which the reserve
and resource estimates are based; market competition; ongoing relations with employees and impacted communities and general business
and economic conditions. Accordingly, readers should not place undue reliance on forward-looking statements. The forward-looking
statements contained herein are made as of the date hereof, or such other date or dates specified in such statements.
All forward-looking statements in this presentation are necessarily based on opinions and estimates made as of the date such statements
are made and are subject to important risk factors and uncertainties, many of which cannot be controlled or predicted. Detour Gold and the
Qualified Persons who authored the associated Technical Report undertake no obligation to update publicly or otherwise revise any
forward-looking statements contained herein whether as a result of new information or future events or otherwise, except as may be
required by law.
3
Notes to Investors
The mineral reserve and resource estimates reported in this presentation were prepared in accordance with Canadian National Instrument 43-
101Standards of Disclosure for Mineral Projects (“NI 43-101”), as required by Canadian securities regulatory authorities. For United States reporting
purposes, the United States Securities and Exchange Commission (“SEC”) applies different standards in order to classify mineralization as a
reserve. In particular, while the terms “measured,” “indicated” and “inferred” mineral resources are required pursuant to NI 43-101, the SEC does
not recognize such terms. Canadian standards differ significantly from the requirements of the SEC. Investors are cautioned not to assume that
any part or all of the mineral deposits in these categories constitute or will ever be converted into reserves. In addition, “inferred” mineral resources
have a great amount of uncertainty as to their existence and great uncertainty as to their economic and legal feasibility. It cannot be assumed that
all or any part of an inferred mineral resource will ever be upgraded to a higher category. Under Canadian securities laws, issuers must not make
any disclosure of results of an economic analysis that includes inferred mineral resources, except in rare cases.
On February 4, 2014, Detour Gold announced an updated life of mine plan for the Detour Lake mine. The NI 43-101 compliant Technical Report for
this update was filed on SEDAR on February 4, 2014. The following QPs participated in this update: BBA Inc., under the direction of André Allaire,
Eng., Acting President and CEO and Patrice Live, Eng., Director Mining; SGS Canada Inc., under the direction of Yann Camus, Eng., Project
Engineer, and Maxime Dupéré, P.Geo., Senior Geologist; and AMEC Environment & Infrastructure, a Division of AMEC Americas Limited, David G.
Ritchie M.Eng., P.Eng, Senior Associate Geotechnical Engineer and Geotechnical Engineering Group Manager.
The scientific and technical content of this presentation has been reviewed, verified and approved by Drew Anwyll, P.Eng.,
Vice President of Operations, a Qualified Person as defined by Canadian Securities Administrators
National Instrument 43-101 “Standards of Disclosure for Mineral Projects”.
Information Containing Estimates of Mineral Reserves and Resources
Non-IFRS Financial Performance Measures
The Company has included “Total cash cost per gold ounce sold (TCC)” and “Adjusted net loss” in this presentation which are non-IFRS measures.
The Company believes that these measures, in addition to conventional measures prepared in accordance with IFRS, provide investors an
improved ability to evaluate the underlying performance of the Company and its ability to generate operating earnings and cash flow from its mining
operations. Refer to the MD&A of March 31, 2014 or relevant period for reconciliation of these measures.
Detour Gold reports total cash costs on a sales basis. Total cash costs per gold ounce sold include production costs such as mining, processing,
refining, site administration, costs associated with providing royalty in-kind ounces, and costs for agreements with Aboriginal communities, but are
exclusive of depreciation and depletion, reclamation, non-cash share-based compensation and deferred stripping. Total cash costs are reduced by
silver sales and divided by gold ounces sold to arrive at total cash costs per gold ounce sold. Further details regarding total cash costs per gold
ounce sold and a reconciliation to the nearest IFRS measures are provided in our MD&A accompanying our financial statements filed on
www.sedar.com. Total cash costs plus capex per gold ounce sold includes TCC as calculated above plus sustaining capital and deferred stripping
divided by gold ounces sold. These non-IFRS measures are intended to provide additional information and should not be considered in isolation or
as a substitute for measures of performance prepared in accordance with IFRS. These measures do not have any standardized meaning
prescribed under IFRS, and therefore may not be comparable to other issuers. Other companies may calculate this measure differently.
4
Invest in Detour Gold
15.5MILLION
oz of gold
in proven and
probable reserves
600
average annual gold
production over next 10 years
~ THOUSAND
oz / year21
in mining-friendly
Ontario, Canada
+ YEAR
mine life
A premier intermediate Canadian gold producer
and long-term investment opportunity
5
ONTARIO
Toronto
DETOUR LAKE MINE
Flagship Operation in Canada
Detour Lake mine investment thesis
 Low-risk, safe mining jurisdiction
 High-quality asset with long mine life
 Production growth opportunities
 Strong cash flow growth following ramp-up
completion
 Leverage to gold price & weakening
Canadian dollar
 Strong exploration upside on 100% owned
land package of 630 km2 on Greenstone Belt
6
2014
INCREASE
production
DECREASE
costs
7
2014 Guidance
450-500
estimated gold production
THOUSAND
oz
US$800-900
estimated total cash costs
TCC
per oz sold
US$131
estimated capital expenditures
MILLION
capex
Other
 US$19 M Corporate G&A
 US$3 M Exploration program
3
1. Refer to the section on Non-IFRS Financial Performance Measures on slide 3 of this presentation.
2. The following price and cost assumptions were used to forecast 2014 production and costs: diesel fuel price of
C$0.95 per litre; power cost of C$0.05 per kilowatt hour; and exchange rate of $1US:$1.05C.
3. Includes deferred stripping costs of US$35 M.
1, 2
second year
of operation
2014
8
2014 Developments
22%
Positive developments to date:
 Updated Life of Mine Plan
 Closed equity financing for net
proceeds of US$149 million
 Repaid US$40 million of debt in Q1
 Secured 6-year power contract at
C$0.05/kWh
 Q1 production of 107,154 oz
Next Milestones:
 Complete ramp-up of Detour Lake
 Generate positive cash flows in H2
9
Steady state production
& optimization
 Mill throughput rates gradually
increase to 55,000 tpd in Q4
 Quarterly production increase
expected as mine ramps up:
› H1 = 200,000-225,000 oz
› H2 = 250,000-275,000 oz
 50% of overall mill feed from
higher grade ore zones
19 MT
ore milled
3.3:1 WASTE:ORE
strip ratio
0.87 G/T AU
head grade
92 %
gold recovery
(1)
1. Includes 7% dilution at 0.20 g/t.
2014 Targets
2014 Operating Plan
10
Q1 2014 Operating Results - Mine
Q1’14 Performance:
 4.9 Mt ore mined; strip ratio 2.9:1
 Total of 19.2 Mt mined vs 20.9 Mt
planned; shortfall due to:
› In-pit rehandling for pit development
› Shovel allocation (
 Avg. mining rates of 213,000 tpd
 Run-of-mine stockpiles of 2.8 Mt @
0.78 g/t at Q1 end
 Dilution reduced to 4.6%
Next steps:
 Mining rates to 230,000 tpd in Q2
 Complete mine development by summer
to access higher grade ore for H2
Mining Rates (K tpd)
Q1’13 Q2’13 Q3’13 Q1’14Q4’13
Ex-Pit
In-linewith
Budget
0
50
100
150
200
250
In-pit
rehandling
Shovel
test
231513
213
11
Q1 2014 Operating Results - Mill
Q1’14 Performance:
 4.1 Mt ore processed @ 0.90 g/t Au
 Mill availability 80% vs budget of
82%
 Recovery rates as planned
 Reduction in cyanide, SO2 and
grinding media consumptions
Next steps:
 Further improve mill availability
 Reach nameplate capacity of 55,000
tpd in Q4
0
1
2
3
4
5
Q1'13 Q2'13 Q3'13 Q4'13 Q1'14
1.0
0.8
0.2
0.0
0.4
0.6
TonnesMilled(Mt)
Q1’13 Q2’13 Q3’13 Q1’14Q4’13
80 82 85 92 91
Mill production
HeadGrade(g/tAu)
Recovery %
12
Q1 2014 Operating Results - Costs
Total Cash Costs:
Q1’14 Q4’13
Gold oz sold 84,560 oz 95,000 oz
TCC/ oz sold1 US$976/oz US$1,174/oz
Q1 Progress:
 Higher unit mining costs as a result
of ex-pit tonnes shortfall
 Unit processing costs under budget
with lower reagents consumption
$-
$5
$10
$15
$20
$25
$30
G&A $3.57/t G&A $4.13/t
Processing
$11.13/t
Processing
$11.75/t
Mining
$2.87/t
mined
Mining
$2.60/t
mined
$28.22/t $29.15/t
1. Refer to the section on Non-IFRS Financial Performance Measures on slide 3 of this presentation.
Unit Costs (C$/t milled)
Q4’13Q1’14
Next steps:
 Downward trend to continue with
throughput and production increase
Total Cash Costs
$0
13
Q1 2014 Financial Results
Key financial statistics (US$ M) Q1’14
Revenues $110.0 M
Production costs $83.1 M
Depreciation & depletion $30.6M
Loss from mine operations $3.7 M
Cash used by operations $32.1 M
Net loss/Adjusted net loss1 $54.9 M/$28.9 M
Net loss & Adjusted net loss per share1 $0.38/$0.20
Cash & short-term investments $145.2 M
 Capex2 totals US$96 M for 2014; only US$5.5 M spent in Q1
 No capitalization of stripping costs during period
 70,000 oz hedged at an average of US$1,225/oz = < 20% of 2014
remaining forecasted gold sales
1. Refer to the section on Non-IFRS Financial Performance Measures on slide 3 of this presentation.
2. Sustaining capital excludes deferred stripping, which is budgeted at US$35 M for 2014.
14
2014- LIFE OF MINE
Updated plan – 02/04/2014
2035
15
LOM Plan
02/2014
Update
Proven & Probable Reserves (M oz) 1 15.5
Gold grade (g/t) 1.02
Strip ratio (waste:ore) 3.5
Estimated gold recovery (%) 92
Mine life (years) 21.7
Annual gold production (oz) 660,000
Total cash costs (TCC) (C$/oz sold) 2 $723
Sustaining capital (C$ billion) $1.14
TCC + capex (C$/oz sold) 2 $848
LOM Summary
1. Estimated using a gold price of US$1,000/oz. Includes stockpiles as of December 31, 2013.
2. Refer to the section on Non-IFRS Performance Measures on slide 3. Capex = sustaining capital expenditures + deferred stripping.
Main objective: Optimize first 5 years
16
TCC1
(C$/oz sold)
800
700
600
500
400
300
200
100
0
Gold Production
(‘000 oz)
Gold Production/Cost Profile
900
850
800
750
700
650
600
550
500
598,000 oz
C$759/oz
0.96 g/t
596,000 oz
C$762/oz
0.91 g/t
659,000 oz
C$778/oz
1.00 g/t
765,000 oz
C$639/oz
1.16 g/t
1. Refer to the section on Non-IFRS Financial Performance Measures on
slide 3 of this presentation.
600,000 oz/yr for first 10 yrs
17
Growth Opportunities
 Increase throughput to 61,000 tpd/ 94%
availability for 2017
› Starts in 2014 with installation of 1
cyanide detox tank and 1 additional
oxygen plant
 Incorporate Block A into current mine plan
 Evaluate heap leach potential of the
low-grade stockpiles
› Grading 0.4-0.5 g/t Au and currently
classified as waste
 Test exploration potential of large
prospective property
18
Block A Potential
US$1,000/oz
US$1,200/oz
15.5 Moz
@ 1.02 g/t Au
P+P
2.0 Moz
@ 1.15 g/t Au
M+I
~5.5 km
19
Lower Detour
Area
15.5 M oz in Reserves
630 km2
2014 Exploration Focus
20
2014 Exploration Focus
Lower Detour Area: 14,874 m of drilling completed in 2014
 New mineralized system with strike length of 300 m
 Tested from surface to depth of 300 m
 Qtz or qtz-tourmaline veins with pyrite &
visible gold
21
Invest in Detour Gold
15.5MILLION
oz of gold
in proven and
probable reserves
600
average annual gold
production over next 10 years
~ THOUSAND
oz / year21
in mining-friendly
Ontario, Canada
+ YEAR
mine life
A premier intermediate Canadian gold producer
and long-term investment opportunity
22
ADDITIONAL
information
 Shareholder Information
 Corporate Responsibility
 Detour Lake Mine: LOM
Operating Costs
 Detour Lake Mine: LOM &
2014 Sustaining Capital
 Detour Gold: Reserves &
Resources
 Debt Repayment Schedule
 Management & Directors
23
Shareholder Information
Paulson & Co
>80% INSTITUTIONS TOTAL10.8 M Share options
13.0 M Convertible notes 1
181.2 M FULLY DILUTED
157.4 M Issued & outstanding
Share Structure (03/31/2014) Top Shareholders
1. Conversion price for the Notes is US$38.50.
15%
C$1.9 BILLION
market capUS$145.2 MILLION
cash position
Share Structure Top Shareholders
24
Focus on health and safety of our employees, the well-being of
our community and the protection of the natural environment
 Hiring in the region, giving priority to local Aboriginal communities:
 665 full-time employees*
 93% of workforce from region
 25% are Aboriginals
 Scholarship and job training
 Supporting local communities
 Business opportunities
 Participation in municipal development
 Corporate philanthropy
Northern
Ontario
40%
Cochrane
23%
Cochrane
Area
30%
Rest of
Ontario
4%
3%
Other
Corporate Responsibility
WORKFORCE ORIGIN
* As of March 31, 2014. Excludes corporate office at 34 full-time employees.
25
09/12 02/14
Operating Costs
C$/t
milled
C$/t
milled
C$/t
mined
C$/oz
sold 2
Mining costs 11.65 11.55 2.56 392
Processing costs 7.83 7.82 266
G&A 1.86 2.44 83
Total cash
operating costs
21.34 21.81 741
Other adjustments 1 (18)
Total cash costs 723
25
LOM Operating Costs
1. Other adjustments include costs for deferred stripping, agreements with Aboriginal communities, refining charges and are net
of silver by-product credits.
2. Refer to the section on Non-IFRS Financial Performance Measures on slide 3 of this presentation.
Maintenance
Labour &
Contractors
Power
Diesel
G&A and
other
Consumables
30%
20%
26%
7%
11%
6%
2014 COSTS:
80% of costs in Cdn$
26
LOM Sustaining Capital
Description
5 years
2014 -2018
(C$ M)
Sustaining
Capital LOM
(C$ M)
Mining 168 1 535
Process Plant 71 2 126
TMA 203 3 454
G&A 14 28
Total 456 1,143
Deferred Stripping 225 614
Mine Closure 70
Higher capital in first 5 years:
1. Ramp-up to 38 trucks
2. Complete plant debottlenecking exercise
3. Prepare TMA foundation for 2nd and 3rd cell
50% of sustaining
capital costs in Cdn$
Mine
US$33 M
TMA
US$40 M
Deferred
Stripping
US$35 M
2014 SUSTAINING CAPITAL:
US$131 M
Other
US$5 M
Mill
US$18 M
27
Effective December 31, 2013 Tonnes (Mt) Grade (g/t Au)
Contained Gold
(koz)
Reserves
(1,2,3,4)
Detour Lake Mine Proven 94.4 1.29 3,901
Probable 379.7 0.95 11,585
P&P 474.0 1.02 15,486
Stockpiles 2.4 0.82 63
Total P&P 476.4 1.02 15,549
Resources
(3,4)
Detour Lake Mine Measured (M) 16.4 1.37 725
Indicated (I) 65.9 1.01 2,150
M+I 82.4 1.09 2,874
Block A Measured (M) 1.5 1.21 57
Indicated (I) 52.5 1.15 1,934
M+I 53.9 1.15 1,991
Total M+I 136.3 1.11 4,866
Detour Lake Mine Inferred 19.2 0.75 465
Block A Inferred 2.5 1.23 99
Total Inferred 21.7 0.81 564
Detour Gold: Reserves & Resources
1. Mineral reserves calculated using a gold price of US$1,000/oz; mineral resources calculated using US$1,200/oz. Foreign exchange rate of
C$1.03 to US$1.00.
2. Mineral reserves estimated using a 4% dilution at 0.20 g/t Au (7% at 0.20 g/t Au for 2014) and 5% ore loss.
3. Based on an elevated cut-off grade of 0.5 g/t Au for Detour Lake and cut-off grade of 0.6 g/t Au for Block A.
4. Mineral resources are exclusive of mineral reserves. Mineral resources that are not mineral reserves do not have
demonstrated economic viability. Mineral reserves and resources are compliant with
CIM definitions.
28
Derivative Instruments
Currency Contracts at April 30, 2014 Ounces
Notional Amount
US ‘000s
Contract
Rate/Price
Currency Collars $20,000 1.040
Currency Forwards (USD/CAD) $40,000 1.122
Total Derivative Assets $60,000
Currency Collars $20,000 1.085
Gold forwards 30,000 Cdn$1,329/oz
Gold forwards 85,000 US$1,273/oz
Total Derivative Liabilities 115,000 $20,000 US$1,256/oz1
 January 2014 commenced gold sales risk management program;
continued FX risk management program throughout Q1
 Hedging gains and losses are recorded in net finance income/costs
1. Using exchange rate of $1US:$1.10C.
29
Debt Repayment Schedule
At March 31, 2014
Revolving Credit
Facility (1) CAT Finance Lease Convertible Notes
Face Value US$30 M (1) US$150 M US$500 M
Maturity March 2016 Jan 2017-Dec 2018(2) November 30, 2017
Interest Rate LIBOR + 3% LIBOR + 4% 5.5%
Payable Monthly Quarterly Semi-annually
Conversion Price n/a n/a $38.50
Payment schedule Principal Principal + Interest Principal Interest
Total
(US$M)
2014 - $11.1 - $27.5 $38.6
2015 - $34.5 - $27.5 $62.0
2016 $30 $32.6 - $27.5 $90.1
2017 - $35.8 $500 $27.5 $563.3
Thereafter - $7.1 - - $7.1
Total (US$M) $30 $121.1 $500 $110.0 $761.1
1. The Revolving Credit Facility provides for borrowings of up to C$90 M and is subject to a completion test prior to September 30, 2014.
The Company intends to repay the Revolving Credit Facility within the next 12 months.
2. Includes multiple leases with maturities of 5 yrs from lease date.
30
 Michael Kenyon
Executive Chairman
 Paul Martin
President and CEO
 Pierre Beaudoin
COO
 James Mavor
CFO
 Julie Galloway
Sr VP General Counsel &
Corporate Secretary
 Derek Teevan
Sr VP Corporate &
Aboriginal Affairs
 Drew Anwyll
VP Operations
 Pat Donovan
VP Corporate Development
 Jean-Francois Metail
VP Reserves and Resources
 Rachel Pineault
VP HR & Aboriginal Affairs
 James Robertson
VP Environment &
Sustainability
 Andrew Croal
Director Technical Services
 Laurie Gaborit
Director Investor Relations
 Alberto Heredia
Controller
 Bill Snelling
Director Corporate Systems & Controls
 Rickardo Welyhorsky
Director Mineral Processing
 Charles Hennessey
General Manager Operations
 Peter Crossgrove
 Louis Dionne
 Robert E. Doyle
 André Falzon
 Alex G. Morrison
 Jonathan Rubenstein
 Graham Wozniak
 Ingrid Hibbard
 Michael Kenyon
 Paul Martin
Management & Directors
Management
Directors
31
Paul Martin
President and Chief Executive Officer
Email: pmartin@detourgold.com
Phone: 416.304.0800
Laurie Gaborit
Director Investor Relations
Email: lgaborit@detourgold.com
Phone: 416.304.0800
www.detourgold.com
Contact Information

Contenu connexe

Tendances

Dgc 14 03_19-20 - ms conference
Dgc 14 03_19-20 - ms conferenceDgc 14 03_19-20 - ms conference
Dgc 14 03_19-20 - ms conferenceDetourGold
 
Dgc 14 09_14 - denver gold forum
Dgc 14 09_14 - denver gold forumDgc 14 09_14 - denver gold forum
Dgc 14 09_14 - denver gold forumDetourGold
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate PresentationDetourGold
 
DGC 14_10_17 - RJ Texas Gold Investor Forum
DGC 14_10_17 - RJ Texas Gold Investor ForumDGC 14_10_17 - RJ Texas Gold Investor Forum
DGC 14_10_17 - RJ Texas Gold Investor ForumDetourGold
 
Dgc 14 09_04 - bo_aml conference
Dgc 14 09_04 - bo_aml conferenceDgc 14 09_04 - bo_aml conference
Dgc 14 09_04 - bo_aml conferenceDetourGold
 
Dgc 14 11_06 - corporate presentation
Dgc 14 11_06 - corporate presentationDgc 14 11_06 - corporate presentation
Dgc 14 11_06 - corporate presentationDetourGold
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate PresentationDetourGold
 
Dgc 14 11_19-20 - gs metals & mining conference
Dgc 14 11_19-20 - gs metals & mining conferenceDgc 14 11_19-20 - gs metals & mining conference
Dgc 14 11_19-20 - gs metals & mining conferenceDetourGold
 
Dgc 14 11_07 - corporate presentation
Dgc 14 11_07 - corporate presentationDgc 14 11_07 - corporate presentation
Dgc 14 11_07 - corporate presentationDetourGold
 
DGC 14_03_2-5 - pdac conference
DGC 14_03_2-5 - pdac conferenceDGC 14_03_2-5 - pdac conference
DGC 14_03_2-5 - pdac conferenceDetourGold
 
Dgc 14 02_23-26 - bmo conference
Dgc 14 02_23-26 - bmo conferenceDgc 14 02_23-26 - bmo conference
Dgc 14 02_23-26 - bmo conferenceDetourGold
 
Dgc 15 03_02 - pdac corporate presentation
Dgc 15 03_02 - pdac corporate presentationDgc 15 03_02 - pdac corporate presentation
Dgc 15 03_02 - pdac corporate presentationDetourGold
 
Dgc 15 03_11 - corporate presentation
Dgc 15 03_11 - corporate presentationDgc 15 03_11 - corporate presentation
Dgc 15 03_11 - corporate presentationDetourGold
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate PresentationDetourGold
 
Dgc 15 01_20 - corporate presentation
Dgc 15 01_20 - corporate presentationDgc 15 01_20 - corporate presentation
Dgc 15 01_20 - corporate presentationDetourGold
 

Tendances (15)

Dgc 14 03_19-20 - ms conference
Dgc 14 03_19-20 - ms conferenceDgc 14 03_19-20 - ms conference
Dgc 14 03_19-20 - ms conference
 
Dgc 14 09_14 - denver gold forum
Dgc 14 09_14 - denver gold forumDgc 14 09_14 - denver gold forum
Dgc 14 09_14 - denver gold forum
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
DGC 14_10_17 - RJ Texas Gold Investor Forum
DGC 14_10_17 - RJ Texas Gold Investor ForumDGC 14_10_17 - RJ Texas Gold Investor Forum
DGC 14_10_17 - RJ Texas Gold Investor Forum
 
Dgc 14 09_04 - bo_aml conference
Dgc 14 09_04 - bo_aml conferenceDgc 14 09_04 - bo_aml conference
Dgc 14 09_04 - bo_aml conference
 
Dgc 14 11_06 - corporate presentation
Dgc 14 11_06 - corporate presentationDgc 14 11_06 - corporate presentation
Dgc 14 11_06 - corporate presentation
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
Dgc 14 11_19-20 - gs metals & mining conference
Dgc 14 11_19-20 - gs metals & mining conferenceDgc 14 11_19-20 - gs metals & mining conference
Dgc 14 11_19-20 - gs metals & mining conference
 
Dgc 14 11_07 - corporate presentation
Dgc 14 11_07 - corporate presentationDgc 14 11_07 - corporate presentation
Dgc 14 11_07 - corporate presentation
 
DGC 14_03_2-5 - pdac conference
DGC 14_03_2-5 - pdac conferenceDGC 14_03_2-5 - pdac conference
DGC 14_03_2-5 - pdac conference
 
Dgc 14 02_23-26 - bmo conference
Dgc 14 02_23-26 - bmo conferenceDgc 14 02_23-26 - bmo conference
Dgc 14 02_23-26 - bmo conference
 
Dgc 15 03_02 - pdac corporate presentation
Dgc 15 03_02 - pdac corporate presentationDgc 15 03_02 - pdac corporate presentation
Dgc 15 03_02 - pdac corporate presentation
 
Dgc 15 03_11 - corporate presentation
Dgc 15 03_11 - corporate presentationDgc 15 03_11 - corporate presentation
Dgc 15 03_11 - corporate presentation
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
Dgc 15 01_20 - corporate presentation
Dgc 15 01_20 - corporate presentationDgc 15 01_20 - corporate presentation
Dgc 15 01_20 - corporate presentation
 

En vedette

Detour Gold Corporate Presentation
Detour Gold Corporate PresentationDetour Gold Corporate Presentation
Detour Gold Corporate PresentationDetourGold
 
Corporate Presentation June 18-22, 2012
Corporate Presentation June 18-22, 2012Corporate Presentation June 18-22, 2012
Corporate Presentation June 18-22, 2012DetourGold
 
Canaccord Global Resource Conference Corporate Presentation
Canaccord Global Resource Conference Corporate PresentationCanaccord Global Resource Conference Corporate Presentation
Canaccord Global Resource Conference Corporate PresentationDetourGold
 
Dgc 15 07_30 - corporate presentation
Dgc 15 07_30 - corporate presentationDgc 15 07_30 - corporate presentation
Dgc 15 07_30 - corporate presentationDetourGold
 
Reservation xii
Reservation xiiReservation xii
Reservation xiimiarno
 
Dgc 14 05_01 _ q12014
Dgc 14 05_01 _ q12014Dgc 14 05_01 _ q12014
Dgc 14 05_01 _ q12014DetourGold
 

En vedette (6)

Detour Gold Corporate Presentation
Detour Gold Corporate PresentationDetour Gold Corporate Presentation
Detour Gold Corporate Presentation
 
Corporate Presentation June 18-22, 2012
Corporate Presentation June 18-22, 2012Corporate Presentation June 18-22, 2012
Corporate Presentation June 18-22, 2012
 
Canaccord Global Resource Conference Corporate Presentation
Canaccord Global Resource Conference Corporate PresentationCanaccord Global Resource Conference Corporate Presentation
Canaccord Global Resource Conference Corporate Presentation
 
Dgc 15 07_30 - corporate presentation
Dgc 15 07_30 - corporate presentationDgc 15 07_30 - corporate presentation
Dgc 15 07_30 - corporate presentation
 
Reservation xii
Reservation xiiReservation xii
Reservation xii
 
Dgc 14 05_01 _ q12014
Dgc 14 05_01 _ q12014Dgc 14 05_01 _ q12014
Dgc 14 05_01 _ q12014
 

Similaire à Canada's Intermediate Gold Producer Corporate Presentation

Dgc 14 08_06 - corporate presentation
Dgc 14 08_06 - corporate presentationDgc 14 08_06 - corporate presentation
Dgc 14 08_06 - corporate presentationDetourGold
 
Dgc 14 09_25 - corporate presentation
Dgc 14 09_25 - corporate presentationDgc 14 09_25 - corporate presentation
Dgc 14 09_25 - corporate presentationDetourGold
 
2014 Denver Gold Forum
2014 Denver Gold Forum2014 Denver Gold Forum
2014 Denver Gold ForumDetourGold
 
2014 Denver Gold Forum
2014 Denver Gold Forum2014 Denver Gold Forum
2014 Denver Gold ForumDetourGold
 
Goldman Sachs Global Metals & Mining Conference
Goldman Sachs Global Metals & Mining ConferenceGoldman Sachs Global Metals & Mining Conference
Goldman Sachs Global Metals & Mining ConferenceDetourGold
 
Goldman Sachs Global Metals & Mining Conference
Goldman Sachs Global Metals & Mining ConferenceGoldman Sachs Global Metals & Mining Conference
Goldman Sachs Global Metals & Mining ConferenceDetourGold
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate PresentationDetourGold
 
Dgc 15 03_02-pdac-corporate-presentation_v001_c1cd6h
Dgc 15 03_02-pdac-corporate-presentation_v001_c1cd6hDgc 15 03_02-pdac-corporate-presentation_v001_c1cd6h
Dgc 15 03_02-pdac-corporate-presentation_v001_c1cd6hDetourGold
 
BMO Global Metals & Mining Conference, Florida
BMO Global Metals & Mining Conference, FloridaBMO Global Metals & Mining Conference, Florida
BMO Global Metals & Mining Conference, FloridaDetourGold
 
BMO Global Metals & Mining Conference, Florida
BMO Global Metals & Mining Conference, FloridaBMO Global Metals & Mining Conference, Florida
BMO Global Metals & Mining Conference, FloridaDetourGold
 
BMO Global Metals & Mining Conference, Florida
BMO Global Metals & Mining Conference, FloridaBMO Global Metals & Mining Conference, Florida
BMO Global Metals & Mining Conference, FloridaDetourGold
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate PresentationDetourGold
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate PresentationDetourGold
 
Dgc 14 07_30 _ q2 2014 results
Dgc 14 07_30 _ q2 2014 resultsDgc 14 07_30 _ q2 2014 results
Dgc 14 07_30 _ q2 2014 resultsDetourGold
 
Dgc 16 01_26 - td conference
Dgc 16 01_26 - td conferenceDgc 16 01_26 - td conference
Dgc 16 01_26 - td conferenceDetourGold
 
Dgc 16 02_09-10 - corporate presentation
Dgc 16 02_09-10 - corporate presentationDgc 16 02_09-10 - corporate presentation
Dgc 16 02_09-10 - corporate presentationDetourGold
 

Similaire à Canada's Intermediate Gold Producer Corporate Presentation (16)

Dgc 14 08_06 - corporate presentation
Dgc 14 08_06 - corporate presentationDgc 14 08_06 - corporate presentation
Dgc 14 08_06 - corporate presentation
 
Dgc 14 09_25 - corporate presentation
Dgc 14 09_25 - corporate presentationDgc 14 09_25 - corporate presentation
Dgc 14 09_25 - corporate presentation
 
2014 Denver Gold Forum
2014 Denver Gold Forum2014 Denver Gold Forum
2014 Denver Gold Forum
 
2014 Denver Gold Forum
2014 Denver Gold Forum2014 Denver Gold Forum
2014 Denver Gold Forum
 
Goldman Sachs Global Metals & Mining Conference
Goldman Sachs Global Metals & Mining ConferenceGoldman Sachs Global Metals & Mining Conference
Goldman Sachs Global Metals & Mining Conference
 
Goldman Sachs Global Metals & Mining Conference
Goldman Sachs Global Metals & Mining ConferenceGoldman Sachs Global Metals & Mining Conference
Goldman Sachs Global Metals & Mining Conference
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
Dgc 15 03_02-pdac-corporate-presentation_v001_c1cd6h
Dgc 15 03_02-pdac-corporate-presentation_v001_c1cd6hDgc 15 03_02-pdac-corporate-presentation_v001_c1cd6h
Dgc 15 03_02-pdac-corporate-presentation_v001_c1cd6h
 
BMO Global Metals & Mining Conference, Florida
BMO Global Metals & Mining Conference, FloridaBMO Global Metals & Mining Conference, Florida
BMO Global Metals & Mining Conference, Florida
 
BMO Global Metals & Mining Conference, Florida
BMO Global Metals & Mining Conference, FloridaBMO Global Metals & Mining Conference, Florida
BMO Global Metals & Mining Conference, Florida
 
BMO Global Metals & Mining Conference, Florida
BMO Global Metals & Mining Conference, FloridaBMO Global Metals & Mining Conference, Florida
BMO Global Metals & Mining Conference, Florida
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
Dgc 14 07_30 _ q2 2014 results
Dgc 14 07_30 _ q2 2014 resultsDgc 14 07_30 _ q2 2014 results
Dgc 14 07_30 _ q2 2014 results
 
Dgc 16 01_26 - td conference
Dgc 16 01_26 - td conferenceDgc 16 01_26 - td conference
Dgc 16 01_26 - td conference
 
Dgc 16 02_09-10 - corporate presentation
Dgc 16 02_09-10 - corporate presentationDgc 16 02_09-10 - corporate presentation
Dgc 16 02_09-10 - corporate presentation
 

Plus de DetourGold

Dgc 17 04_4-6_dgf zurich corporate 1x1 presentation
Dgc 17 04_4-6_dgf zurich corporate 1x1 presentationDgc 17 04_4-6_dgf zurich corporate 1x1 presentation
Dgc 17 04_4-6_dgf zurich corporate 1x1 presentationDetourGold
 
Dgc 17 03_24_corporate presentation
Dgc 17 03_24_corporate presentationDgc 17 03_24_corporate presentation
Dgc 17 03_24_corporate presentationDetourGold
 
Dgc 17 02_27 - bmo presentation_final
Dgc 17 02_27 - bmo presentation_finalDgc 17 02_27 - bmo presentation_final
Dgc 17 02_27 - bmo presentation_finalDetourGold
 
Presentation dgc 17-01_31 _ q4 ops 2017 guidance webcast
Presentation   dgc 17-01_31 _ q4 ops 2017 guidance webcastPresentation   dgc 17-01_31 _ q4 ops 2017 guidance webcast
Presentation dgc 17-01_31 _ q4 ops 2017 guidance webcastDetourGold
 
Dgc 16 11_8-9 - corporate presentation
Dgc 16 11_8-9 - corporate presentationDgc 16 11_8-9 - corporate presentation
Dgc 16 11_8-9 - corporate presentationDetourGold
 
Dgc 16 11_02 - corporate presentation
Dgc 16 11_02 - corporate presentationDgc 16 11_02 - corporate presentation
Dgc 16 11_02 - corporate presentationDetourGold
 
Dgc 16 09_18-21 - dgf conference_1x1
Dgc 16 09_18-21 - dgf conference_1x1Dgc 16 09_18-21 - dgf conference_1x1
Dgc 16 09_18-21 - dgf conference_1x1DetourGold
 
Dgc 16 09_08 - baml conference
Dgc 16 09_08 - baml conferenceDgc 16 09_08 - baml conference
Dgc 16 09_08 - baml conferenceDetourGold
 
Dgc 16 08_30-31 - corporate presentation
Dgc 16 08_30-31 - corporate presentationDgc 16 08_30-31 - corporate presentation
Dgc 16 08_30-31 - corporate presentationDetourGold
 
Dgc 16 06_14-15 - rbc conference
Dgc 16 06_14-15 - rbc conferenceDgc 16 06_14-15 - rbc conference
Dgc 16 06_14-15 - rbc conferenceDetourGold
 
Dgc 16 05_10-12 - BAML conference
Dgc 16 05_10-12 - BAML conferenceDgc 16 05_10-12 - BAML conference
Dgc 16 05_10-12 - BAML conferenceDetourGold
 
BMO Global Metals & Mining Conference - Hollywood, FL
BMO Global Metals & Mining Conference - Hollywood, FLBMO Global Metals & Mining Conference - Hollywood, FL
BMO Global Metals & Mining Conference - Hollywood, FLDetourGold
 
Dgc 16 01_20 - cibc whistler conference
Dgc 16 01_20 - cibc whistler conferenceDgc 16 01_20 - cibc whistler conference
Dgc 16 01_20 - cibc whistler conferenceDetourGold
 
Dgc 15 12_1-2 - scotia mining conference 1-1
Dgc 15 12_1-2 - scotia mining conference 1-1Dgc 15 12_1-2 - scotia mining conference 1-1
Dgc 15 12_1-2 - scotia mining conference 1-1DetourGold
 
Dgc 15 11_17 - rj texas gold investor forum
Dgc 15 11_17 - rj texas gold investor forumDgc 15 11_17 - rj texas gold investor forum
Dgc 15 11_17 - rj texas gold investor forumDetourGold
 
Dgc 15 11_10 - nbf-tsx canadian miners conference
Dgc 15 11_10 - nbf-tsx canadian miners conferenceDgc 15 11_10 - nbf-tsx canadian miners conference
Dgc 15 11_10 - nbf-tsx canadian miners conferenceDetourGold
 
Dgc 15 10_29 - corporate presentation
Dgc 15 10_29 - corporate presentationDgc 15 10_29 - corporate presentation
Dgc 15 10_29 - corporate presentationDetourGold
 
Dgc 15 09_20-23 - dgf 1x1 presentation
Dgc 15 09_20-23 - dgf 1x1 presentationDgc 15 09_20-23 - dgf 1x1 presentation
Dgc 15 09_20-23 - dgf 1x1 presentationDetourGold
 
Dgc 15 09_10-11 - baml 1x1 presentation
Dgc 15 09_10-11 - baml 1x1 presentationDgc 15 09_10-11 - baml 1x1 presentation
Dgc 15 09_10-11 - baml 1x1 presentationDetourGold
 
Dgc 15 09_10-11 - corporate presentation_bo_aml
Dgc 15 09_10-11 - corporate presentation_bo_amlDgc 15 09_10-11 - corporate presentation_bo_aml
Dgc 15 09_10-11 - corporate presentation_bo_amlDetourGold
 

Plus de DetourGold (20)

Dgc 17 04_4-6_dgf zurich corporate 1x1 presentation
Dgc 17 04_4-6_dgf zurich corporate 1x1 presentationDgc 17 04_4-6_dgf zurich corporate 1x1 presentation
Dgc 17 04_4-6_dgf zurich corporate 1x1 presentation
 
Dgc 17 03_24_corporate presentation
Dgc 17 03_24_corporate presentationDgc 17 03_24_corporate presentation
Dgc 17 03_24_corporate presentation
 
Dgc 17 02_27 - bmo presentation_final
Dgc 17 02_27 - bmo presentation_finalDgc 17 02_27 - bmo presentation_final
Dgc 17 02_27 - bmo presentation_final
 
Presentation dgc 17-01_31 _ q4 ops 2017 guidance webcast
Presentation   dgc 17-01_31 _ q4 ops 2017 guidance webcastPresentation   dgc 17-01_31 _ q4 ops 2017 guidance webcast
Presentation dgc 17-01_31 _ q4 ops 2017 guidance webcast
 
Dgc 16 11_8-9 - corporate presentation
Dgc 16 11_8-9 - corporate presentationDgc 16 11_8-9 - corporate presentation
Dgc 16 11_8-9 - corporate presentation
 
Dgc 16 11_02 - corporate presentation
Dgc 16 11_02 - corporate presentationDgc 16 11_02 - corporate presentation
Dgc 16 11_02 - corporate presentation
 
Dgc 16 09_18-21 - dgf conference_1x1
Dgc 16 09_18-21 - dgf conference_1x1Dgc 16 09_18-21 - dgf conference_1x1
Dgc 16 09_18-21 - dgf conference_1x1
 
Dgc 16 09_08 - baml conference
Dgc 16 09_08 - baml conferenceDgc 16 09_08 - baml conference
Dgc 16 09_08 - baml conference
 
Dgc 16 08_30-31 - corporate presentation
Dgc 16 08_30-31 - corporate presentationDgc 16 08_30-31 - corporate presentation
Dgc 16 08_30-31 - corporate presentation
 
Dgc 16 06_14-15 - rbc conference
Dgc 16 06_14-15 - rbc conferenceDgc 16 06_14-15 - rbc conference
Dgc 16 06_14-15 - rbc conference
 
Dgc 16 05_10-12 - BAML conference
Dgc 16 05_10-12 - BAML conferenceDgc 16 05_10-12 - BAML conference
Dgc 16 05_10-12 - BAML conference
 
BMO Global Metals & Mining Conference - Hollywood, FL
BMO Global Metals & Mining Conference - Hollywood, FLBMO Global Metals & Mining Conference - Hollywood, FL
BMO Global Metals & Mining Conference - Hollywood, FL
 
Dgc 16 01_20 - cibc whistler conference
Dgc 16 01_20 - cibc whistler conferenceDgc 16 01_20 - cibc whistler conference
Dgc 16 01_20 - cibc whistler conference
 
Dgc 15 12_1-2 - scotia mining conference 1-1
Dgc 15 12_1-2 - scotia mining conference 1-1Dgc 15 12_1-2 - scotia mining conference 1-1
Dgc 15 12_1-2 - scotia mining conference 1-1
 
Dgc 15 11_17 - rj texas gold investor forum
Dgc 15 11_17 - rj texas gold investor forumDgc 15 11_17 - rj texas gold investor forum
Dgc 15 11_17 - rj texas gold investor forum
 
Dgc 15 11_10 - nbf-tsx canadian miners conference
Dgc 15 11_10 - nbf-tsx canadian miners conferenceDgc 15 11_10 - nbf-tsx canadian miners conference
Dgc 15 11_10 - nbf-tsx canadian miners conference
 
Dgc 15 10_29 - corporate presentation
Dgc 15 10_29 - corporate presentationDgc 15 10_29 - corporate presentation
Dgc 15 10_29 - corporate presentation
 
Dgc 15 09_20-23 - dgf 1x1 presentation
Dgc 15 09_20-23 - dgf 1x1 presentationDgc 15 09_20-23 - dgf 1x1 presentation
Dgc 15 09_20-23 - dgf 1x1 presentation
 
Dgc 15 09_10-11 - baml 1x1 presentation
Dgc 15 09_10-11 - baml 1x1 presentationDgc 15 09_10-11 - baml 1x1 presentation
Dgc 15 09_10-11 - baml 1x1 presentation
 
Dgc 15 09_10-11 - corporate presentation_bo_aml
Dgc 15 09_10-11 - corporate presentation_bo_amlDgc 15 09_10-11 - corporate presentation_bo_aml
Dgc 15 09_10-11 - corporate presentation_bo_aml
 

Dernier

Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environmentelijahj01012
 
Entrepreneurship lessons in Philippines
Entrepreneurship lessons in  PhilippinesEntrepreneurship lessons in  Philippines
Entrepreneurship lessons in PhilippinesDavidSamuel525586
 
Supercharge Your eCommerce Stores-acowebs
Supercharge Your eCommerce Stores-acowebsSupercharge Your eCommerce Stores-acowebs
Supercharge Your eCommerce Stores-acowebsGOKUL JS
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfShashank Mehta
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024Adnet Communications
 
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...Hector Del Castillo, CPM, CPMM
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...ssuserf63bd7
 
Healthcare Feb. & Mar. Healthcare Newsletter
Healthcare Feb. & Mar. Healthcare NewsletterHealthcare Feb. & Mar. Healthcare Newsletter
Healthcare Feb. & Mar. Healthcare NewsletterJamesConcepcion7
 
20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdfChris Skinner
 
WSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfWSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfJamesConcepcion7
 
NAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors DataNAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Peter Ward
 
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...ssuserf63bd7
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdfShaun Heinrichs
 
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptxGo for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptxRakhi Bazaar
 
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdfChris Skinner
 
Jewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreJewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreNZSG
 

Dernier (20)

Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environment
 
Entrepreneurship lessons in Philippines
Entrepreneurship lessons in  PhilippinesEntrepreneurship lessons in  Philippines
Entrepreneurship lessons in Philippines
 
Supercharge Your eCommerce Stores-acowebs
Supercharge Your eCommerce Stores-acowebsSupercharge Your eCommerce Stores-acowebs
Supercharge Your eCommerce Stores-acowebs
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdf
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024
 
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
 
Healthcare Feb. & Mar. Healthcare Newsletter
Healthcare Feb. & Mar. Healthcare NewsletterHealthcare Feb. & Mar. Healthcare Newsletter
Healthcare Feb. & Mar. Healthcare Newsletter
 
20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf
 
WSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfWSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdf
 
NAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors DataNAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors Data
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...
 
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf
 
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptxGo for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
 
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
 
Jewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreJewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource Centre
 
The Bizz Quiz-E-Summit-E-Cell-IITPatna.pptx
The Bizz Quiz-E-Summit-E-Cell-IITPatna.pptxThe Bizz Quiz-E-Summit-E-Cell-IITPatna.pptx
The Bizz Quiz-E-Summit-E-Cell-IITPatna.pptx
 

Canada's Intermediate Gold Producer Corporate Presentation

  • 2. 2 Forward Looking Information This presentation contains certain forward-looking information and statements as defined in applicable securities law (referred to herein as “forward-looking statements”). Forward-looking statements include, but are not limited to, statements with respect to Detour Gold’s future financial or operating performance; guidance for production, total cash costs, capital costs, exploration costs; expected throughput, mining and recovery rates; expected future production and mining activities; opportunities to optimize the mine operation; the updated mine plan and economic analysis of the Detour Lake mine including, but not limited to, the life of mine plan, the waste to ore ratio, processing and production rates, grades, metallurgical recovery rates, operating and sustaining capital costs, and the projected life of mine, opportunities to optimize the mine operation; the success and continuation of exploration activities, the future price of gold, reclamation obligations, government regulations and environmental risks. Forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause actual results, performance or achievements to be materially different from any of its future results, performance or achievements expressed or implied by forward- looking statements. These risks, uncertainties and other factors include, but are not limited to, assumptions and parameters underlying the life of mine update not being realized, a decrease in the future gold price, discrepancies between actual and estimated production, changes in costs (including labour, supplies, fuel and equipment), changes to tax rates; environmental compliance and changes in environmental legislation and regulation, exchange rate fluctuations, general economic conditions and other risks involved in the gold exploration and development industry, as well as those risk factors discussed in the section entitled “Description of Business - Risk Factors” in Detour Gold’s 2013 AIF and in the continuous disclosure documents filed by Detour Gold on and available on SEDAR at www.sedar.com. Such forward-looking statements are also based on a number of assumptions which may prove to be incorrect, including, but not limited to, assumptions about the following: the availability of financing for exploration and development activities; operating and sustaining capital costs; the Company’s ability to attract and retain skilled staff; sensitivity to metal prices and other sensitivities; the supply and demand for, and the level and volatility of the price of, gold; the supply and availability of consumables and services; the exchange rates of the Canadian dollar to the U.S. dollar; energy and fuel costs; the accuracy of reserve and resource estimates and the assumptions on which the reserve and resource estimates are based; market competition; ongoing relations with employees and impacted communities and general business and economic conditions. Accordingly, readers should not place undue reliance on forward-looking statements. The forward-looking statements contained herein are made as of the date hereof, or such other date or dates specified in such statements. All forward-looking statements in this presentation are necessarily based on opinions and estimates made as of the date such statements are made and are subject to important risk factors and uncertainties, many of which cannot be controlled or predicted. Detour Gold and the Qualified Persons who authored the associated Technical Report undertake no obligation to update publicly or otherwise revise any forward-looking statements contained herein whether as a result of new information or future events or otherwise, except as may be required by law.
  • 3. 3 Notes to Investors The mineral reserve and resource estimates reported in this presentation were prepared in accordance with Canadian National Instrument 43- 101Standards of Disclosure for Mineral Projects (“NI 43-101”), as required by Canadian securities regulatory authorities. For United States reporting purposes, the United States Securities and Exchange Commission (“SEC”) applies different standards in order to classify mineralization as a reserve. In particular, while the terms “measured,” “indicated” and “inferred” mineral resources are required pursuant to NI 43-101, the SEC does not recognize such terms. Canadian standards differ significantly from the requirements of the SEC. Investors are cautioned not to assume that any part or all of the mineral deposits in these categories constitute or will ever be converted into reserves. In addition, “inferred” mineral resources have a great amount of uncertainty as to their existence and great uncertainty as to their economic and legal feasibility. It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category. Under Canadian securities laws, issuers must not make any disclosure of results of an economic analysis that includes inferred mineral resources, except in rare cases. On February 4, 2014, Detour Gold announced an updated life of mine plan for the Detour Lake mine. The NI 43-101 compliant Technical Report for this update was filed on SEDAR on February 4, 2014. The following QPs participated in this update: BBA Inc., under the direction of André Allaire, Eng., Acting President and CEO and Patrice Live, Eng., Director Mining; SGS Canada Inc., under the direction of Yann Camus, Eng., Project Engineer, and Maxime Dupéré, P.Geo., Senior Geologist; and AMEC Environment & Infrastructure, a Division of AMEC Americas Limited, David G. Ritchie M.Eng., P.Eng, Senior Associate Geotechnical Engineer and Geotechnical Engineering Group Manager. The scientific and technical content of this presentation has been reviewed, verified and approved by Drew Anwyll, P.Eng., Vice President of Operations, a Qualified Person as defined by Canadian Securities Administrators National Instrument 43-101 “Standards of Disclosure for Mineral Projects”. Information Containing Estimates of Mineral Reserves and Resources Non-IFRS Financial Performance Measures The Company has included “Total cash cost per gold ounce sold (TCC)” and “Adjusted net loss” in this presentation which are non-IFRS measures. The Company believes that these measures, in addition to conventional measures prepared in accordance with IFRS, provide investors an improved ability to evaluate the underlying performance of the Company and its ability to generate operating earnings and cash flow from its mining operations. Refer to the MD&A of March 31, 2014 or relevant period for reconciliation of these measures. Detour Gold reports total cash costs on a sales basis. Total cash costs per gold ounce sold include production costs such as mining, processing, refining, site administration, costs associated with providing royalty in-kind ounces, and costs for agreements with Aboriginal communities, but are exclusive of depreciation and depletion, reclamation, non-cash share-based compensation and deferred stripping. Total cash costs are reduced by silver sales and divided by gold ounces sold to arrive at total cash costs per gold ounce sold. Further details regarding total cash costs per gold ounce sold and a reconciliation to the nearest IFRS measures are provided in our MD&A accompanying our financial statements filed on www.sedar.com. Total cash costs plus capex per gold ounce sold includes TCC as calculated above plus sustaining capital and deferred stripping divided by gold ounces sold. These non-IFRS measures are intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. These measures do not have any standardized meaning prescribed under IFRS, and therefore may not be comparable to other issuers. Other companies may calculate this measure differently.
  • 4. 4 Invest in Detour Gold 15.5MILLION oz of gold in proven and probable reserves 600 average annual gold production over next 10 years ~ THOUSAND oz / year21 in mining-friendly Ontario, Canada + YEAR mine life A premier intermediate Canadian gold producer and long-term investment opportunity
  • 5. 5 ONTARIO Toronto DETOUR LAKE MINE Flagship Operation in Canada Detour Lake mine investment thesis  Low-risk, safe mining jurisdiction  High-quality asset with long mine life  Production growth opportunities  Strong cash flow growth following ramp-up completion  Leverage to gold price & weakening Canadian dollar  Strong exploration upside on 100% owned land package of 630 km2 on Greenstone Belt
  • 7. 7 2014 Guidance 450-500 estimated gold production THOUSAND oz US$800-900 estimated total cash costs TCC per oz sold US$131 estimated capital expenditures MILLION capex Other  US$19 M Corporate G&A  US$3 M Exploration program 3 1. Refer to the section on Non-IFRS Financial Performance Measures on slide 3 of this presentation. 2. The following price and cost assumptions were used to forecast 2014 production and costs: diesel fuel price of C$0.95 per litre; power cost of C$0.05 per kilowatt hour; and exchange rate of $1US:$1.05C. 3. Includes deferred stripping costs of US$35 M. 1, 2 second year of operation 2014
  • 8. 8 2014 Developments 22% Positive developments to date:  Updated Life of Mine Plan  Closed equity financing for net proceeds of US$149 million  Repaid US$40 million of debt in Q1  Secured 6-year power contract at C$0.05/kWh  Q1 production of 107,154 oz Next Milestones:  Complete ramp-up of Detour Lake  Generate positive cash flows in H2
  • 9. 9 Steady state production & optimization  Mill throughput rates gradually increase to 55,000 tpd in Q4  Quarterly production increase expected as mine ramps up: › H1 = 200,000-225,000 oz › H2 = 250,000-275,000 oz  50% of overall mill feed from higher grade ore zones 19 MT ore milled 3.3:1 WASTE:ORE strip ratio 0.87 G/T AU head grade 92 % gold recovery (1) 1. Includes 7% dilution at 0.20 g/t. 2014 Targets 2014 Operating Plan
  • 10. 10 Q1 2014 Operating Results - Mine Q1’14 Performance:  4.9 Mt ore mined; strip ratio 2.9:1  Total of 19.2 Mt mined vs 20.9 Mt planned; shortfall due to: › In-pit rehandling for pit development › Shovel allocation (  Avg. mining rates of 213,000 tpd  Run-of-mine stockpiles of 2.8 Mt @ 0.78 g/t at Q1 end  Dilution reduced to 4.6% Next steps:  Mining rates to 230,000 tpd in Q2  Complete mine development by summer to access higher grade ore for H2 Mining Rates (K tpd) Q1’13 Q2’13 Q3’13 Q1’14Q4’13 Ex-Pit In-linewith Budget 0 50 100 150 200 250 In-pit rehandling Shovel test 231513 213
  • 11. 11 Q1 2014 Operating Results - Mill Q1’14 Performance:  4.1 Mt ore processed @ 0.90 g/t Au  Mill availability 80% vs budget of 82%  Recovery rates as planned  Reduction in cyanide, SO2 and grinding media consumptions Next steps:  Further improve mill availability  Reach nameplate capacity of 55,000 tpd in Q4 0 1 2 3 4 5 Q1'13 Q2'13 Q3'13 Q4'13 Q1'14 1.0 0.8 0.2 0.0 0.4 0.6 TonnesMilled(Mt) Q1’13 Q2’13 Q3’13 Q1’14Q4’13 80 82 85 92 91 Mill production HeadGrade(g/tAu) Recovery %
  • 12. 12 Q1 2014 Operating Results - Costs Total Cash Costs: Q1’14 Q4’13 Gold oz sold 84,560 oz 95,000 oz TCC/ oz sold1 US$976/oz US$1,174/oz Q1 Progress:  Higher unit mining costs as a result of ex-pit tonnes shortfall  Unit processing costs under budget with lower reagents consumption $- $5 $10 $15 $20 $25 $30 G&A $3.57/t G&A $4.13/t Processing $11.13/t Processing $11.75/t Mining $2.87/t mined Mining $2.60/t mined $28.22/t $29.15/t 1. Refer to the section on Non-IFRS Financial Performance Measures on slide 3 of this presentation. Unit Costs (C$/t milled) Q4’13Q1’14 Next steps:  Downward trend to continue with throughput and production increase Total Cash Costs $0
  • 13. 13 Q1 2014 Financial Results Key financial statistics (US$ M) Q1’14 Revenues $110.0 M Production costs $83.1 M Depreciation & depletion $30.6M Loss from mine operations $3.7 M Cash used by operations $32.1 M Net loss/Adjusted net loss1 $54.9 M/$28.9 M Net loss & Adjusted net loss per share1 $0.38/$0.20 Cash & short-term investments $145.2 M  Capex2 totals US$96 M for 2014; only US$5.5 M spent in Q1  No capitalization of stripping costs during period  70,000 oz hedged at an average of US$1,225/oz = < 20% of 2014 remaining forecasted gold sales 1. Refer to the section on Non-IFRS Financial Performance Measures on slide 3 of this presentation. 2. Sustaining capital excludes deferred stripping, which is budgeted at US$35 M for 2014.
  • 14. 14 2014- LIFE OF MINE Updated plan – 02/04/2014 2035
  • 15. 15 LOM Plan 02/2014 Update Proven & Probable Reserves (M oz) 1 15.5 Gold grade (g/t) 1.02 Strip ratio (waste:ore) 3.5 Estimated gold recovery (%) 92 Mine life (years) 21.7 Annual gold production (oz) 660,000 Total cash costs (TCC) (C$/oz sold) 2 $723 Sustaining capital (C$ billion) $1.14 TCC + capex (C$/oz sold) 2 $848 LOM Summary 1. Estimated using a gold price of US$1,000/oz. Includes stockpiles as of December 31, 2013. 2. Refer to the section on Non-IFRS Performance Measures on slide 3. Capex = sustaining capital expenditures + deferred stripping. Main objective: Optimize first 5 years
  • 16. 16 TCC1 (C$/oz sold) 800 700 600 500 400 300 200 100 0 Gold Production (‘000 oz) Gold Production/Cost Profile 900 850 800 750 700 650 600 550 500 598,000 oz C$759/oz 0.96 g/t 596,000 oz C$762/oz 0.91 g/t 659,000 oz C$778/oz 1.00 g/t 765,000 oz C$639/oz 1.16 g/t 1. Refer to the section on Non-IFRS Financial Performance Measures on slide 3 of this presentation. 600,000 oz/yr for first 10 yrs
  • 17. 17 Growth Opportunities  Increase throughput to 61,000 tpd/ 94% availability for 2017 › Starts in 2014 with installation of 1 cyanide detox tank and 1 additional oxygen plant  Incorporate Block A into current mine plan  Evaluate heap leach potential of the low-grade stockpiles › Grading 0.4-0.5 g/t Au and currently classified as waste  Test exploration potential of large prospective property
  • 18. 18 Block A Potential US$1,000/oz US$1,200/oz 15.5 Moz @ 1.02 g/t Au P+P 2.0 Moz @ 1.15 g/t Au M+I ~5.5 km
  • 19. 19 Lower Detour Area 15.5 M oz in Reserves 630 km2 2014 Exploration Focus
  • 20. 20 2014 Exploration Focus Lower Detour Area: 14,874 m of drilling completed in 2014  New mineralized system with strike length of 300 m  Tested from surface to depth of 300 m  Qtz or qtz-tourmaline veins with pyrite & visible gold
  • 21. 21 Invest in Detour Gold 15.5MILLION oz of gold in proven and probable reserves 600 average annual gold production over next 10 years ~ THOUSAND oz / year21 in mining-friendly Ontario, Canada + YEAR mine life A premier intermediate Canadian gold producer and long-term investment opportunity
  • 22. 22 ADDITIONAL information  Shareholder Information  Corporate Responsibility  Detour Lake Mine: LOM Operating Costs  Detour Lake Mine: LOM & 2014 Sustaining Capital  Detour Gold: Reserves & Resources  Debt Repayment Schedule  Management & Directors
  • 23. 23 Shareholder Information Paulson & Co >80% INSTITUTIONS TOTAL10.8 M Share options 13.0 M Convertible notes 1 181.2 M FULLY DILUTED 157.4 M Issued & outstanding Share Structure (03/31/2014) Top Shareholders 1. Conversion price for the Notes is US$38.50. 15% C$1.9 BILLION market capUS$145.2 MILLION cash position Share Structure Top Shareholders
  • 24. 24 Focus on health and safety of our employees, the well-being of our community and the protection of the natural environment  Hiring in the region, giving priority to local Aboriginal communities:  665 full-time employees*  93% of workforce from region  25% are Aboriginals  Scholarship and job training  Supporting local communities  Business opportunities  Participation in municipal development  Corporate philanthropy Northern Ontario 40% Cochrane 23% Cochrane Area 30% Rest of Ontario 4% 3% Other Corporate Responsibility WORKFORCE ORIGIN * As of March 31, 2014. Excludes corporate office at 34 full-time employees.
  • 25. 25 09/12 02/14 Operating Costs C$/t milled C$/t milled C$/t mined C$/oz sold 2 Mining costs 11.65 11.55 2.56 392 Processing costs 7.83 7.82 266 G&A 1.86 2.44 83 Total cash operating costs 21.34 21.81 741 Other adjustments 1 (18) Total cash costs 723 25 LOM Operating Costs 1. Other adjustments include costs for deferred stripping, agreements with Aboriginal communities, refining charges and are net of silver by-product credits. 2. Refer to the section on Non-IFRS Financial Performance Measures on slide 3 of this presentation. Maintenance Labour & Contractors Power Diesel G&A and other Consumables 30% 20% 26% 7% 11% 6% 2014 COSTS: 80% of costs in Cdn$
  • 26. 26 LOM Sustaining Capital Description 5 years 2014 -2018 (C$ M) Sustaining Capital LOM (C$ M) Mining 168 1 535 Process Plant 71 2 126 TMA 203 3 454 G&A 14 28 Total 456 1,143 Deferred Stripping 225 614 Mine Closure 70 Higher capital in first 5 years: 1. Ramp-up to 38 trucks 2. Complete plant debottlenecking exercise 3. Prepare TMA foundation for 2nd and 3rd cell 50% of sustaining capital costs in Cdn$ Mine US$33 M TMA US$40 M Deferred Stripping US$35 M 2014 SUSTAINING CAPITAL: US$131 M Other US$5 M Mill US$18 M
  • 27. 27 Effective December 31, 2013 Tonnes (Mt) Grade (g/t Au) Contained Gold (koz) Reserves (1,2,3,4) Detour Lake Mine Proven 94.4 1.29 3,901 Probable 379.7 0.95 11,585 P&P 474.0 1.02 15,486 Stockpiles 2.4 0.82 63 Total P&P 476.4 1.02 15,549 Resources (3,4) Detour Lake Mine Measured (M) 16.4 1.37 725 Indicated (I) 65.9 1.01 2,150 M+I 82.4 1.09 2,874 Block A Measured (M) 1.5 1.21 57 Indicated (I) 52.5 1.15 1,934 M+I 53.9 1.15 1,991 Total M+I 136.3 1.11 4,866 Detour Lake Mine Inferred 19.2 0.75 465 Block A Inferred 2.5 1.23 99 Total Inferred 21.7 0.81 564 Detour Gold: Reserves & Resources 1. Mineral reserves calculated using a gold price of US$1,000/oz; mineral resources calculated using US$1,200/oz. Foreign exchange rate of C$1.03 to US$1.00. 2. Mineral reserves estimated using a 4% dilution at 0.20 g/t Au (7% at 0.20 g/t Au for 2014) and 5% ore loss. 3. Based on an elevated cut-off grade of 0.5 g/t Au for Detour Lake and cut-off grade of 0.6 g/t Au for Block A. 4. Mineral resources are exclusive of mineral reserves. Mineral resources that are not mineral reserves do not have demonstrated economic viability. Mineral reserves and resources are compliant with CIM definitions.
  • 28. 28 Derivative Instruments Currency Contracts at April 30, 2014 Ounces Notional Amount US ‘000s Contract Rate/Price Currency Collars $20,000 1.040 Currency Forwards (USD/CAD) $40,000 1.122 Total Derivative Assets $60,000 Currency Collars $20,000 1.085 Gold forwards 30,000 Cdn$1,329/oz Gold forwards 85,000 US$1,273/oz Total Derivative Liabilities 115,000 $20,000 US$1,256/oz1  January 2014 commenced gold sales risk management program; continued FX risk management program throughout Q1  Hedging gains and losses are recorded in net finance income/costs 1. Using exchange rate of $1US:$1.10C.
  • 29. 29 Debt Repayment Schedule At March 31, 2014 Revolving Credit Facility (1) CAT Finance Lease Convertible Notes Face Value US$30 M (1) US$150 M US$500 M Maturity March 2016 Jan 2017-Dec 2018(2) November 30, 2017 Interest Rate LIBOR + 3% LIBOR + 4% 5.5% Payable Monthly Quarterly Semi-annually Conversion Price n/a n/a $38.50 Payment schedule Principal Principal + Interest Principal Interest Total (US$M) 2014 - $11.1 - $27.5 $38.6 2015 - $34.5 - $27.5 $62.0 2016 $30 $32.6 - $27.5 $90.1 2017 - $35.8 $500 $27.5 $563.3 Thereafter - $7.1 - - $7.1 Total (US$M) $30 $121.1 $500 $110.0 $761.1 1. The Revolving Credit Facility provides for borrowings of up to C$90 M and is subject to a completion test prior to September 30, 2014. The Company intends to repay the Revolving Credit Facility within the next 12 months. 2. Includes multiple leases with maturities of 5 yrs from lease date.
  • 30. 30  Michael Kenyon Executive Chairman  Paul Martin President and CEO  Pierre Beaudoin COO  James Mavor CFO  Julie Galloway Sr VP General Counsel & Corporate Secretary  Derek Teevan Sr VP Corporate & Aboriginal Affairs  Drew Anwyll VP Operations  Pat Donovan VP Corporate Development  Jean-Francois Metail VP Reserves and Resources  Rachel Pineault VP HR & Aboriginal Affairs  James Robertson VP Environment & Sustainability  Andrew Croal Director Technical Services  Laurie Gaborit Director Investor Relations  Alberto Heredia Controller  Bill Snelling Director Corporate Systems & Controls  Rickardo Welyhorsky Director Mineral Processing  Charles Hennessey General Manager Operations  Peter Crossgrove  Louis Dionne  Robert E. Doyle  André Falzon  Alex G. Morrison  Jonathan Rubenstein  Graham Wozniak  Ingrid Hibbard  Michael Kenyon  Paul Martin Management & Directors Management Directors
  • 31. 31 Paul Martin President and Chief Executive Officer Email: pmartin@detourgold.com Phone: 416.304.0800 Laurie Gaborit Director Investor Relations Email: lgaborit@detourgold.com Phone: 416.304.0800 www.detourgold.com Contact Information