SlideShare une entreprise Scribd logo
1  sur  4
Télécharger pour lire hors ligne
DIPESH KUMAR
B-Tech in Electronics & Instrumentation Engineering
Project Engineer - Instrumentation
GE OIL & GAS Measurement & Control.
Address: A-25 Krupal Society-1
Manjhalpur
Vadodara – 390011, Gujarat, India
Mobile: (+91)- 7698228824
Email: dipesh.aeie@gmail.com
5+ Years of Experience in the field of Instrumentation Engineering in Engineering Design,
Construction, Commissioning Maintenance & EPC Projects in Petrochemicals and Textile Industry.
TECHNICAL SKILLS
 Prepare Loop Diagrams, Functional Logic Diagrams, Wiring Termination Diagrams, Installation
Hook-up Drawings, Typical Installation and fabrication drawings, Instrument location Plans,
Control Panel / Auxiliary Console layout Drawings, Control/Equipment Room Lay-outs, Cable
Tray/Trench Lay-outs, Cable route index, Cable Schedules and Cable Drum Schedules, JB
location layouts and schedules, Interconnection Schedules, Fire/Smoke Detection Lay-out, Bill
of material for bulks and Alarm / Trip schedules.
 Installation, Commissioning, Maintenance, Calibration and Loop checking of various field
instruments.
 Working experience in Engineering, Procurement and Construction (EPC).
 Basic Knowledge in SPI (SMART PLANT INTOOLS).
 Ability to manage, handle and supervise a team of skilled work force.
 Selection & Sizing of Thermowell, DP type Flow Meter, Control Valves ( MOV, ROV, SOV),
Relief Valves and Actuators.
 Review of control philosophy, P&ID diagrams, cause & effect diagrams, instruments list.
 Experience in Installation & Commissioning of Control Panels.
 Evaluating and defining the scope of project, project status review.
 Preparing project schedules/plans.
 Monitoring projects with respect to Cost, Resource Deployment, Time over-runs and Quality
Compliance to ensure timely execution of projects.
 Exposure to engineering surveys & documentation, Material take off (MTO) and as-built
drawings etc.
 Pre-commissioning & commissioning of JBs, Instrument Enclosure Installation, Impulse tubes,
Cable/Conduit Routing, Loop Checking, Hydro test, Enclosure ratings, Area classification and
Enclosures, terminations, equipment layout and Earthling.
 Versatile and capable with extensive Experience of Maintenance Management including
Inspection, Calibration and testing, Up-grading, Maintenance and fault diagnosis in Oil & Gas
and petrochemical plants.
 Good troubleshooting and problem solving skills.
EMPLOYMENT DETAILS
23-12-2014 to Present
Organization GE OIL & GAS Measurement & Control.
Designation Project Engineer - Instrumentation
Project 1 Terminal Automation System & Tank- Farm Management
System (ADANI HAZIRA)
Project 2 Jamnagar 3 Refinery Project.Terminal Automation System & Tank- Farm Management
System (HPCL , HASSAN)
Roles & Responsibilities
 Evaluation of Project.
 Preparation of the design basis document, Cause and Effect Diagrams, Loop Diagrams,
Functional Logic Diagrams, Terminations Diagrams, JB schedules, Gland Schedule, PLC IO list,
Panel Wiring drawing, SLD, Cable Block Diagrams.
 Preparation of AutoCAD Drawing, Panel GA Drawing, cable routing, control room layouts,
Installation Hook-up Drawings, Instrument Plot Plans, Control Panel Drawings,
Control/Equipment Room Lay-outs, Cable Tray/Trench Lay-out.
 Preparation of Cable routing, scheduling, Drum Schedule, Instrument Cable Selections, Cable
philosophy identification, Quantity estimation, interconnection drawings preparation etc.
 Review of technical documents including project design drawings, equipment specifications,
evaluate vendor data/ information and prepare comments review comments.
 Preparing/ Reviewing specifications / datasheets, interface diagrams, MTOs and any calculations
(control valve, flow element, UPS load etc.) that may be needed.
 Performing peer reviews participating in gate reviews and consultant/ Client comments on
deliverables and implementing solutions as necessary.
 Review specifications Process Data Sheets (PDS), Piping & Instrumentation Diagrams (P&ID's).
 Review Philosophies, Area Classification Drawings, Fire and Gas Detector & Layout Drawings
and other relevant documents.
 Preparation & Evaluation of all documents for the system like Terminal Automation System
(TAS), Tank Farm Management System (TFMS), Public announcement (PA), CCTV, Fire Alarm
System (FA).
 Preparation of Power Distribution Panel with SLD.
10-05-2011 to 18-12-2014
(3 year & 7 month)
Organization
FCIPL.
Designation Engineer - Instrumentation
Project
Client
Integrated Utilities & Offsite.
ONGC Petro addition Limited (OPaL),Dahej, Gujarat.
 The scope of the project includes Demineralization and condensate polishing unit (DM
CPU), Hydrogen generation unit (HGU), Pump house (Raw water & Fire water),
loading/unloading gantry, Tank farm, Flare, Control rooms (CCR, UCR, OCR & LPCR),
substations.
 Site Survey (DM Plant, HGU, Tank Farm, Raw Water and Fire Water Pump house,
Loading/Unloading Gantry, Control Room, Substations) and co-ordination with other
departments to provide front for Contractors.
 Checking Incoming materials as per PO and approval of the same from consultant (EIL).
 Planning, scheduling and execution of the instrumentation work.
 Preparation of DPR & WPR.
 Preparation of ITP (Inspection Test plan) and Job Procedure for Execution of
Instrumentation work.
 Verifying & Modifying of the Various Engineering Drawings like P& ID Diagrams,
Instrumentation Index, Cable Schedule, Field Location Layout and other Construction and
Process Related Drawings as per project requirement.
 Execution of the instrumentation works like installation of instruments, Cable laying,
Termination and Gladding, S.S Tubing, as per above mentioned drawings.
 Carrying out Calibration activities of the instruments like Pressure Gauges, Pressure
Transmitters, Flow transmitter, Level Transmitter, Temperature Gauges and Loop Checking
& Maintenance of all other field instruments.
 To carry out activities like instrument installation like control valve, PT, TT, LT, special type
valves, gas Detection system.
 Control room Panel erection, inter-panel cable lying, glanding ferruling and termination as
per the cable schedule.
 Carrying out activity of Loop checking & cold commissioning.
 Preparation of Ferrule, MCT Block design, Drawing Modification as per site Conditions and
Preparation of as built Drawings.
 Preparation of punch list as per client standards and ensuring its rectification within time.
 Prepared and submittal of loop checking and instrument inspection reports.
 Inspection of Materials & Preparation of QA/QC record accordingly.
 Responsible for Managing and maintaining good relationship with the company manpower
and contractor for successful completion of assigned work.
 Work as per EIL Standard.
05-08-2010 to 09-05-2011
(9 month)
Organization
FABTECH PROJECTS & ENGINEERS
Designation GRADUATE ENGINEER TRAINEE(GET)
Roles & Responsibilities
 Shift operation & maintain Daily/Monthly data.
 Modification & Automation, shutdown work, maintenance prevention and break down analysis.
 Maintenance & installation of Electrical, Electronics & Pneumatic instruments.
 Preventive Maintenance of control panels & Root Cause elimination of problem.
 Maintenance of various Drives.
 Energy saving & housekeeping.
 Involve in Installation and Commissioning Activities like Visual Inspection, Power up, System
Level Test, Loop Check & Functionality Test.
 Review and clarify JB Cable Schedule, Cable schedule, Instrument loop drawing, Interconnection
wiring drawings.
 Performed the modification of control circuits and control loops as per the plant change requests
and updated all related plant drawings to reflect actual changes.
 Responsible for providing existing instruments data base, logics and other documents to the
concern project team.
 Installation, Commissioning, Calibration of various field instruments PT, TT, DP, LT (DP &
Radar Type), RTD, Pressure Switch, Orifice Meter.
 Supervise installation of Hookup Air tubing, Impulse tubing & Analyzer tubing.
 Planning and Execution of plant shutdown within the stipulated time frame ensuring zero or
minimum production loss.
 Leading a team consisting of Instrument Technicians and Instrument Fitters for Installation and
commissioning, maintenance of process control and panel board instrumentation.
EDUCATION QUALIFICATION & CERTIFICATIONS
B.Tech. (ELECTRONICS & INSTRUMENTATION ENGINEERING) 2010 from (ASANSOL
ENGINEERING COLLEGE, WEST BENGAL UNIVERSITY OF TECHNOLOGY.)
PERSONAL DOSSIER
Date of Birth 01th March, 1988
Passport K8281795 valid through 09/04/2023
PAN BCMPK3961M
Language Proficiency English, Hindi.
IT Forte MS Office, Excel, Word. SPI(Smart Plant Intool),AutoCAD.
Skype ID dipeshco
DECLARATION
I hereby declare that all information stated above is true to the best of my knowledge.
DIPESH KUMAR

Contenu connexe

Tendances

Chandrasekar G resume - Instrument Engineer new
Chandrasekar G resume - Instrument Engineer newChandrasekar G resume - Instrument Engineer new
Chandrasekar G resume - Instrument Engineer newChandra Sekar
 
Mark Crame Lead Instrument Engineer CV
Mark Crame Lead Instrument Engineer CVMark Crame Lead Instrument Engineer CV
Mark Crame Lead Instrument Engineer CVMark Crame
 
Ariel Pacis CV(2016)
Ariel Pacis CV(2016)Ariel Pacis CV(2016)
Ariel Pacis CV(2016)Ariel Pacis
 
Resume-Rajib Sharma
Resume-Rajib SharmaResume-Rajib Sharma
Resume-Rajib SharmaRajib Sharma
 
Jaime_Navarro_Resume
Jaime_Navarro_ResumeJaime_Navarro_Resume
Jaime_Navarro_ResumeJaime Navarro
 
Jaime_Navarro_Resume
Jaime_Navarro_ResumeJaime_Navarro_Resume
Jaime_Navarro_ResumeJaime Navarro
 
Instrumentation Engineer
Instrumentation EngineerInstrumentation Engineer
Instrumentation EngineerRoger Pelletier
 
Instrumentation Engineer - Jibin Jacob
Instrumentation Engineer - Jibin JacobInstrumentation Engineer - Jibin Jacob
Instrumentation Engineer - Jibin JacobJibin Jacob
 
Latest resume
Latest resumeLatest resume
Latest resumeArun Das
 
Latest resume
Latest resumeLatest resume
Latest resumeArun Das
 
Raval rajesh raval r_2016_master_instrument_baroda
Raval rajesh raval r_2016_master_instrument_barodaRaval rajesh raval r_2016_master_instrument_baroda
Raval rajesh raval r_2016_master_instrument_barodaRajesh Raval
 

Tendances (20)

Chandrasekar G resume - Instrument Engineer new
Chandrasekar G resume - Instrument Engineer newChandrasekar G resume - Instrument Engineer new
Chandrasekar G resume - Instrument Engineer new
 
Mark Crame Lead Instrument Engineer CV
Mark Crame Lead Instrument Engineer CVMark Crame Lead Instrument Engineer CV
Mark Crame Lead Instrument Engineer CV
 
Ariel Pacis CV(2016)
Ariel Pacis CV(2016)Ariel Pacis CV(2016)
Ariel Pacis CV(2016)
 
Gorga Silalahi (CV)
Gorga Silalahi (CV)Gorga Silalahi (CV)
Gorga Silalahi (CV)
 
Resume-Rajib Sharma
Resume-Rajib SharmaResume-Rajib Sharma
Resume-Rajib Sharma
 
vyasVP
vyasVPvyasVP
vyasVP
 
Instrument engineer CV
Instrument engineer CVInstrument engineer CV
Instrument engineer CV
 
Jaime_Navarro_Resume
Jaime_Navarro_ResumeJaime_Navarro_Resume
Jaime_Navarro_Resume
 
Jaime_Navarro_Resume
Jaime_Navarro_ResumeJaime_Navarro_Resume
Jaime_Navarro_Resume
 
RESUME ORIG
RESUME ORIGRESUME ORIG
RESUME ORIG
 
CV
CVCV
CV
 
CV instrument (E&I) Engineer2
CV instrument (E&I) Engineer2CV instrument (E&I) Engineer2
CV instrument (E&I) Engineer2
 
Instrumentation Engineer
Instrumentation EngineerInstrumentation Engineer
Instrumentation Engineer
 
rineesh cv IN
rineesh cv  INrineesh cv  IN
rineesh cv IN
 
KARTHICK-DESIGN RESUME
KARTHICK-DESIGN RESUMEKARTHICK-DESIGN RESUME
KARTHICK-DESIGN RESUME
 
Instrumentation Engineer - Jibin Jacob
Instrumentation Engineer - Jibin JacobInstrumentation Engineer - Jibin Jacob
Instrumentation Engineer - Jibin Jacob
 
Latest resume
Latest resumeLatest resume
Latest resume
 
Latest resume
Latest resumeLatest resume
Latest resume
 
AK+CV
AK+CVAK+CV
AK+CV
 
Raval rajesh raval r_2016_master_instrument_baroda
Raval rajesh raval r_2016_master_instrument_barodaRaval rajesh raval r_2016_master_instrument_baroda
Raval rajesh raval r_2016_master_instrument_baroda
 

En vedette (20)

CSP Review Report_Final (1)
CSP Review Report_Final (1)CSP Review Report_Final (1)
CSP Review Report_Final (1)
 
Mule security-jaas
Mule security-jaasMule security-jaas
Mule security-jaas
 
Introduction to mule esb
Introduction to mule esbIntroduction to mule esb
Introduction to mule esb
 
Mule velocity
Mule velocityMule velocity
Mule velocity
 
Anypoint data gateway
Anypoint data gatewayAnypoint data gateway
Anypoint data gateway
 
Mule batch processing
Mule batch processingMule batch processing
Mule batch processing
 
Mule quartz
Mule quartz Mule quartz
Mule quartz
 
Soap request in mule
Soap request in mule Soap request in mule
Soap request in mule
 
Damaging damzelz' no.1
Damaging damzelz' no.1Damaging damzelz' no.1
Damaging damzelz' no.1
 
Mule anypoint exchange
Mule anypoint exchangeMule anypoint exchange
Mule anypoint exchange
 
Mule real-world-old
Mule real-world-oldMule real-world-old
Mule real-world-old
 
Mule oracle connectors
Mule oracle connectorsMule oracle connectors
Mule oracle connectors
 
Mule soap
Mule soapMule soap
Mule soap
 
Creating dynamic json in mule
Creating dynamic json in muleCreating dynamic json in mule
Creating dynamic json in mule
 
Documantation with mule
Documantation with mule Documantation with mule
Documantation with mule
 
Mmc rest api user groups
Mmc rest api user groups Mmc rest api user groups
Mmc rest api user groups
 
Mule technology
Mule technologyMule technology
Mule technology
 
xslt in mule
xslt in mulexslt in mule
xslt in mule
 
Groovy in Mule
Groovy in MuleGroovy in Mule
Groovy in Mule
 
Mule google connectors
Mule google connectorsMule google connectors
Mule google connectors
 

Similaire à Instrumentation Engineer Resume - 5+ Years Experience

Similaire à Instrumentation Engineer Resume - 5+ Years Experience (20)

instrumentation Engineering Cv
instrumentation Engineering Cvinstrumentation Engineering Cv
instrumentation Engineering Cv
 
Nadim Siddique CV
Nadim Siddique CVNadim Siddique CV
Nadim Siddique CV
 
Resume 2016 june
Resume 2016 juneResume 2016 june
Resume 2016 june
 
BHARATH KUMAR REDDY
BHARATH KUMAR REDDYBHARATH KUMAR REDDY
BHARATH KUMAR REDDY
 
Ankit updated Resume
Ankit updated  ResumeAnkit updated  Resume
Ankit updated Resume
 
NAVEEN SUKUMAR PAKIRLA Resume1
NAVEEN SUKUMAR PAKIRLA Resume1NAVEEN SUKUMAR PAKIRLA Resume1
NAVEEN SUKUMAR PAKIRLA Resume1
 
abhinav rawat resume
abhinav rawat resumeabhinav rawat resume
abhinav rawat resume
 
Brij mohan cv
Brij mohan  cvBrij mohan  cv
Brij mohan cv
 
1 CV for instrument technician in 8 years exp
1 CV for instrument technician in 8 years exp1 CV for instrument technician in 8 years exp
1 CV for instrument technician in 8 years exp
 
asif sup new (4)
asif sup new (4)asif sup new (4)
asif sup new (4)
 
Sr Lead Engineer - Instrumentation & control
Sr Lead Engineer - Instrumentation & controlSr Lead Engineer - Instrumentation & control
Sr Lead Engineer - Instrumentation & control
 
Instrumentation & Control Engineer
Instrumentation &  Control EngineerInstrumentation &  Control Engineer
Instrumentation & Control Engineer
 
vinodh
vinodhvinodh
vinodh
 
roshan-CV1
roshan-CV1roshan-CV1
roshan-CV1
 
Fahad CV
Fahad CVFahad CV
Fahad CV
 
Electrical Engineer 2
Electrical Engineer 2Electrical Engineer 2
Electrical Engineer 2
 
vijins new-11-2016
vijins new-11-2016vijins new-11-2016
vijins new-11-2016
 
Resume_Deopura
Resume_DeopuraResume_Deopura
Resume_Deopura
 
Latest resume
Latest resumeLatest resume
Latest resume
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 

Instrumentation Engineer Resume - 5+ Years Experience

  • 1. DIPESH KUMAR B-Tech in Electronics & Instrumentation Engineering Project Engineer - Instrumentation GE OIL & GAS Measurement & Control. Address: A-25 Krupal Society-1 Manjhalpur Vadodara – 390011, Gujarat, India Mobile: (+91)- 7698228824 Email: dipesh.aeie@gmail.com 5+ Years of Experience in the field of Instrumentation Engineering in Engineering Design, Construction, Commissioning Maintenance & EPC Projects in Petrochemicals and Textile Industry. TECHNICAL SKILLS  Prepare Loop Diagrams, Functional Logic Diagrams, Wiring Termination Diagrams, Installation Hook-up Drawings, Typical Installation and fabrication drawings, Instrument location Plans, Control Panel / Auxiliary Console layout Drawings, Control/Equipment Room Lay-outs, Cable Tray/Trench Lay-outs, Cable route index, Cable Schedules and Cable Drum Schedules, JB location layouts and schedules, Interconnection Schedules, Fire/Smoke Detection Lay-out, Bill of material for bulks and Alarm / Trip schedules.  Installation, Commissioning, Maintenance, Calibration and Loop checking of various field instruments.  Working experience in Engineering, Procurement and Construction (EPC).  Basic Knowledge in SPI (SMART PLANT INTOOLS).  Ability to manage, handle and supervise a team of skilled work force.  Selection & Sizing of Thermowell, DP type Flow Meter, Control Valves ( MOV, ROV, SOV), Relief Valves and Actuators.  Review of control philosophy, P&ID diagrams, cause & effect diagrams, instruments list.  Experience in Installation & Commissioning of Control Panels.  Evaluating and defining the scope of project, project status review.  Preparing project schedules/plans.  Monitoring projects with respect to Cost, Resource Deployment, Time over-runs and Quality Compliance to ensure timely execution of projects.  Exposure to engineering surveys & documentation, Material take off (MTO) and as-built drawings etc.  Pre-commissioning & commissioning of JBs, Instrument Enclosure Installation, Impulse tubes, Cable/Conduit Routing, Loop Checking, Hydro test, Enclosure ratings, Area classification and Enclosures, terminations, equipment layout and Earthling.  Versatile and capable with extensive Experience of Maintenance Management including Inspection, Calibration and testing, Up-grading, Maintenance and fault diagnosis in Oil & Gas and petrochemical plants.  Good troubleshooting and problem solving skills.
  • 2. EMPLOYMENT DETAILS 23-12-2014 to Present Organization GE OIL & GAS Measurement & Control. Designation Project Engineer - Instrumentation Project 1 Terminal Automation System & Tank- Farm Management System (ADANI HAZIRA) Project 2 Jamnagar 3 Refinery Project.Terminal Automation System & Tank- Farm Management System (HPCL , HASSAN) Roles & Responsibilities  Evaluation of Project.  Preparation of the design basis document, Cause and Effect Diagrams, Loop Diagrams, Functional Logic Diagrams, Terminations Diagrams, JB schedules, Gland Schedule, PLC IO list, Panel Wiring drawing, SLD, Cable Block Diagrams.  Preparation of AutoCAD Drawing, Panel GA Drawing, cable routing, control room layouts, Installation Hook-up Drawings, Instrument Plot Plans, Control Panel Drawings, Control/Equipment Room Lay-outs, Cable Tray/Trench Lay-out.  Preparation of Cable routing, scheduling, Drum Schedule, Instrument Cable Selections, Cable philosophy identification, Quantity estimation, interconnection drawings preparation etc.  Review of technical documents including project design drawings, equipment specifications, evaluate vendor data/ information and prepare comments review comments.  Preparing/ Reviewing specifications / datasheets, interface diagrams, MTOs and any calculations (control valve, flow element, UPS load etc.) that may be needed.  Performing peer reviews participating in gate reviews and consultant/ Client comments on deliverables and implementing solutions as necessary.  Review specifications Process Data Sheets (PDS), Piping & Instrumentation Diagrams (P&ID's).  Review Philosophies, Area Classification Drawings, Fire and Gas Detector & Layout Drawings and other relevant documents.  Preparation & Evaluation of all documents for the system like Terminal Automation System (TAS), Tank Farm Management System (TFMS), Public announcement (PA), CCTV, Fire Alarm System (FA).  Preparation of Power Distribution Panel with SLD. 10-05-2011 to 18-12-2014 (3 year & 7 month) Organization FCIPL. Designation Engineer - Instrumentation Project Client Integrated Utilities & Offsite. ONGC Petro addition Limited (OPaL),Dahej, Gujarat.  The scope of the project includes Demineralization and condensate polishing unit (DM CPU), Hydrogen generation unit (HGU), Pump house (Raw water & Fire water), loading/unloading gantry, Tank farm, Flare, Control rooms (CCR, UCR, OCR & LPCR), substations.
  • 3.  Site Survey (DM Plant, HGU, Tank Farm, Raw Water and Fire Water Pump house, Loading/Unloading Gantry, Control Room, Substations) and co-ordination with other departments to provide front for Contractors.  Checking Incoming materials as per PO and approval of the same from consultant (EIL).  Planning, scheduling and execution of the instrumentation work.  Preparation of DPR & WPR.  Preparation of ITP (Inspection Test plan) and Job Procedure for Execution of Instrumentation work.  Verifying & Modifying of the Various Engineering Drawings like P& ID Diagrams, Instrumentation Index, Cable Schedule, Field Location Layout and other Construction and Process Related Drawings as per project requirement.  Execution of the instrumentation works like installation of instruments, Cable laying, Termination and Gladding, S.S Tubing, as per above mentioned drawings.  Carrying out Calibration activities of the instruments like Pressure Gauges, Pressure Transmitters, Flow transmitter, Level Transmitter, Temperature Gauges and Loop Checking & Maintenance of all other field instruments.  To carry out activities like instrument installation like control valve, PT, TT, LT, special type valves, gas Detection system.  Control room Panel erection, inter-panel cable lying, glanding ferruling and termination as per the cable schedule.  Carrying out activity of Loop checking & cold commissioning.  Preparation of Ferrule, MCT Block design, Drawing Modification as per site Conditions and Preparation of as built Drawings.  Preparation of punch list as per client standards and ensuring its rectification within time.  Prepared and submittal of loop checking and instrument inspection reports.  Inspection of Materials & Preparation of QA/QC record accordingly.  Responsible for Managing and maintaining good relationship with the company manpower and contractor for successful completion of assigned work.  Work as per EIL Standard. 05-08-2010 to 09-05-2011 (9 month) Organization FABTECH PROJECTS & ENGINEERS Designation GRADUATE ENGINEER TRAINEE(GET) Roles & Responsibilities  Shift operation & maintain Daily/Monthly data.  Modification & Automation, shutdown work, maintenance prevention and break down analysis.  Maintenance & installation of Electrical, Electronics & Pneumatic instruments.
  • 4.  Preventive Maintenance of control panels & Root Cause elimination of problem.  Maintenance of various Drives.  Energy saving & housekeeping.  Involve in Installation and Commissioning Activities like Visual Inspection, Power up, System Level Test, Loop Check & Functionality Test.  Review and clarify JB Cable Schedule, Cable schedule, Instrument loop drawing, Interconnection wiring drawings.  Performed the modification of control circuits and control loops as per the plant change requests and updated all related plant drawings to reflect actual changes.  Responsible for providing existing instruments data base, logics and other documents to the concern project team.  Installation, Commissioning, Calibration of various field instruments PT, TT, DP, LT (DP & Radar Type), RTD, Pressure Switch, Orifice Meter.  Supervise installation of Hookup Air tubing, Impulse tubing & Analyzer tubing.  Planning and Execution of plant shutdown within the stipulated time frame ensuring zero or minimum production loss.  Leading a team consisting of Instrument Technicians and Instrument Fitters for Installation and commissioning, maintenance of process control and panel board instrumentation. EDUCATION QUALIFICATION & CERTIFICATIONS B.Tech. (ELECTRONICS & INSTRUMENTATION ENGINEERING) 2010 from (ASANSOL ENGINEERING COLLEGE, WEST BENGAL UNIVERSITY OF TECHNOLOGY.) PERSONAL DOSSIER Date of Birth 01th March, 1988 Passport K8281795 valid through 09/04/2023 PAN BCMPK3961M Language Proficiency English, Hindi. IT Forte MS Office, Excel, Word. SPI(Smart Plant Intool),AutoCAD. Skype ID dipeshco DECLARATION I hereby declare that all information stated above is true to the best of my knowledge. DIPESH KUMAR