Organizational Design:
Organizational Change and
Learning
QSB2413 Management Science
Introduction
• Change is about aligning people, resources and
culture with a shift in organizational direction.
• Changes are often initiated by critical events such
as:
Globalization and competition
New CEO
Mergers or acquisitions
Deregulation or market shifts
Failure in operating results
Organizational Change
• The process by which organizations move
from their present state to some desired
future state to increase their effectiveness.
• Goal is to find improved ways of using
resources and capabilities in order to increase
an organization’s ability to create value.
Organizational Change
• An alteration of an organization’s
environment, structure, culture, technology,
or people.
–A constant force
–An organizational reality
–An opportunity or a threat
• Change Agent - A person who initiates and
assumes the responsibility for managing a
change in an organization.
Basic Questions for Change Agent
• What are the forces acting upon me?
– What are the pressures I should take into
consideration as I decide what to change and how
I should change it?
• What should we change?
– Should the changes be strategic and companywide
or relatively limited?
• How should we change it?
– How should we actually implement the change?
The Drivers of Change
1. Technological factors
2. Organizational factors
3. Economic factors
4. Governmental influences
5. Societal / Cultural influences
6. Clients have changed
(1) Technological Factors
The industry and its building
• Structure and fabric – since mid 19th Centuries
• Building services – last 50 years
• Construction methods – mechanization,
industrialization
Society and industry generally
• Information technology (system)
• Manufacturing, business processes (taking place
in buildings)
(2) Organizational Factors
Increasing specialization
• Driven by technology, business strategy,
legislation.
Separation of function
• Especially design from construction
• Growth for professional boundaries
• The professional “hierarchy”
(3) Economic Factors
The importance of the industry
• E.g. Construction industry contributes 6% to 7%
of UK economic activity, 5% - 6% of Malaysia
economic activity.
The economic cycle – “boom and bust”
• Why construction suffers more and for longer
The industry as economic regulator
• Governmental intention often overstressed
• General economic controls affect industry
becoming hard
(4) Governmental Influences
Control of economy
• As client of the industry – approximate 25% of
output is commissioned by public sector
• Current changes in procurement – public or
private project (PAM/JKR form of contract)
Legislation and Taxation
• Direct impact – Planning, building regulations,
safety
• Indirect impact – Tax concessions, development
areas, etc.
(5) Societal/Cultural Influences
Greater influence of general public
• Less accepting of authority – government,
professions
• Environmental consciousness - protest
Broader cultural influences
• Changing population, easier world travel
Entrepreneurial attitudes
• Have varied with time
• Increase in small businesses since late 70’s
(6) Changing Clients
Growth of the corporate client
• Compared with 19th C, it was about the importance of
individual & sole trader
Globalization
• Changing market for business & clients they generate
Business priorities
• Increasing concentration on time & cost performance
• Less tolerant of failings – more litigious
Transfer of management methods
• Project Management, procurement methods
Change Agent
Types of Organizational Change
Radical Change
• Major makeovers of organizations.
• Major makeovers of their component systems.
Gradual Change
• Occurs more frequently and with less dramatic
impact.
• E.g. New products, new technologies, new
systems.
Phases Of Change
3-Stage Process
Unfreezing: Getting people and things ready for
change
Changing: Implementing the change
Refreezing: Making sure the change sticks as
part of the new routine
Targets of Change
• Targets of change include improving
effectiveness at four different levels:-
(1) Human resources
(2) Functional resources
(3) Technological capabilities
(4) Organizational capabilities
Target For Change
• Purpose: Clarify or create new missions, visions
and objectives.
• Objectives: Due to change in the environment,
specific performance standards have to be
modified or new performance standards set.
• E.g. In construction industry, firms are
encouraged to apply the technology in order to
improve the productivity instead of using the
conventional methods of construction (BIM or
IBS).
Target For Change
• Tasks: Updating job designs and scope for
individuals and groups.
• People:
- Update recruiting and selection practices.
- Improving training and development.
Target For Change
• Structure: Update organizational design and
coordination mechanism.
• E.g. team structure, virtual organization,
boundaryless organization (eliminate chain of
commands).
Target For Change
• Technology: Improve equipment, facilities and
workflow.
• Culture: Core beliefs and values have to be
clarified and modified to adapt to the
changing environment.
Target For Change
• Strategy: Strategic and operational plans have to
be clarified, modified or new ones created
including:
- External interface
- Mission
- Managing organization mission
- Prescribed networks
- Organizational process
- Motivation of people
- Emergent networks
What is resistance to change?
Resistance To Change
• Individual resistance (e.g. loss of position,
power, status, quality of life and authority).
• Organizational resistance (e.g. change in the
balance of power and structural inertia).
Why do people often resist to change?
Resistance To Change
• Information: “What’s going to happen?”
• Personal involvement: “Will I survive the
change?”
• Implementation: “How do I get started on the
change?”
• Impact: “How will the change benefit us and
organization?”
Overcoming Resistance:
A framework For Change
References:
Management: Challenges for tomorrow’s leaders/Pamela S. Lewis – edition 6
A Framework For Change
Step 1: Establishing a Sense of Urgency
• The need for change
• Discuss changes in the market or competitive
conditions
• Condition might be negative/crisis or
positive/opportunity for the organization
• Clearly stated and shared throughout the
organization (communicate)
A Framework For Change
Step 2: Creating the Guiding Coalition
• A team of people who are charged with taking,
initiating and effecting the change
• Manager must select those who have an
emotional commitment to change and who have
the right skills to effect the change
• An effective guiding coalition must have the right
composition, a significant level of trust from
others and a shared objective for their work
A Framework For Change
Step 3: Developing a change vision
• Change vision – how the organization will look
once the change has been implemented.
• The vision should be compelling, motivating,
realistic and time specific.
• Vision is a very powerful tool for enabling
others to see the proposed change’s impact
and understand how the future will be.
A Framework For Change
Step 4: Communicating the Vision
• The most important part of the change process
is effective communication.
• The message should go out to every
constituent affected by the change.
• The message should be simple and repeatable.
• Communication is two-way and open dialogue.
A Framework For Change
Step 5: Empowering Broad-Based Action
• Empowering organizational members to
implement the change.
• Managers must provide training and
educational opportunities to help employees
learn the new behaviors, develop new
technical skills, interpersonal skills and
attitudes.
A Framework For Change
Step 6: Generating Short-term Wins
• Ensuring short-term goals are established that
are highly visible and achievable.
• Short-term wins not only encourage
supporters of the change, but also can turn
neutral people into supporters and reluctant
supporters into active helpers.
A Framework For Change
Step 7: Never Letting Up
• Persistence – critical for successful change
initiatives.
• Leaders must continue to push the
organization towards the ultimate goals.
• New behaviors and practices must be fully
absorbed by the organization to ensure that
the change will be long-lasting.
A Framework For Change
Step 8: Incorporating Changes in the Culture
• Organizational culture is a deeply rooted
phenomenon.
• New practices must grow deep roots in order
to remain firmly planted in the culture.
Some general rules about cultural
change
Cultural Change
• You must be able to prove that the new way is
superior to the old.
• The success must be visible and well
communicated.
• You will lose some people in the process.
• You must reinforce new norms and value with
incentives and rewards – including promotions.
• Reinforce the culture with every new employee.
Summary
• It is impossible to change one aspect of an
organization without affecting other aspects.
• Changes in products or services offered may
require new technology, a new distribution
system, new employee skills or different
relationships with customers.
• Learning to recognize and manage change is one
of the most important skills a manager can
develop.
• Change is natural. Managers must help
organizations work with it, not against it.
Discussion
• What is the cause to change in an construction
organization?
- Competitive environment
- Customer preferences
- Information technology (IBS/BIM)
- Globalization
• List the reasons of resistance to change.
- Rigid culture
- Personality
Discussion
• Do you think change is good to construction
industry? Example using BIM.
• What about other industries, says
manufacturing? Auto industry – car producing
(hybrid / electronic technology)
• Innovation – key to success
• http://www.strategy-
business.com/article/rr00006?gko=643d0
The End

More Related Content

Viewers also liked (8)

MS Tutorial 5
MS Tutorial 5MS Tutorial 5
MS Tutorial 5
 
El caballito de mar by Leonel and Esme
El caballito de mar by Leonel and EsmeEl caballito de mar by Leonel and Esme
El caballito de mar by Leonel and Esme
 
Sartori vs negroponte
Sartori vs negroponteSartori vs negroponte
Sartori vs negroponte
 
Food commodoties
Food commodotiesFood commodoties
Food commodoties
 
TMA Mobile Testing
TMA Mobile TestingTMA Mobile Testing
TMA Mobile Testing
 
BS 2 Escalators arrangement
BS 2 Escalators arrangementBS 2 Escalators arrangement
BS 2 Escalators arrangement
 
Organ on a chip
Organ on a chipOrgan on a chip
Organ on a chip
 
Surveying ch-two
Surveying ch-twoSurveying ch-two
Surveying ch-two
 

Similar to MS Lecture 5 org change

Managing Organisational Change
Managing Organisational ChangeManaging Organisational Change
Managing Organisational Change
Anirudh Kotlo
 

Similar to MS Lecture 5 org change (20)

innovation and change in healthcare ( pptx
innovation and change in healthcare ( pptxinnovation and change in healthcare ( pptx
innovation and change in healthcare ( pptx
 
97352954 strategic-change-management-ppt
97352954 strategic-change-management-ppt97352954 strategic-change-management-ppt
97352954 strategic-change-management-ppt
 
Strategic Change and Strategic Leadership
Strategic Change and Strategic LeadershipStrategic Change and Strategic Leadership
Strategic Change and Strategic Leadership
 
Managing Organisational Change
Managing Organisational ChangeManaging Organisational Change
Managing Organisational Change
 
Organizational Change and Development - Module 1 - MG University - Organizat...
Organizational Change and Development - Module 1 - MG University -  Organizat...Organizational Change and Development - Module 1 - MG University -  Organizat...
Organizational Change and Development - Module 1 - MG University - Organizat...
 
Change management
Change managementChange management
Change management
 
Change management in a project environment webinar, 5 December 2022
Change management in a project environment webinar, 5 December 2022Change management in a project environment webinar, 5 December 2022
Change management in a project environment webinar, 5 December 2022
 
Tqm change mgmt
Tqm change mgmtTqm change mgmt
Tqm change mgmt
 
Change Management For Enhanced Productivity.pptx
Change Management For Enhanced Productivity.pptxChange Management For Enhanced Productivity.pptx
Change Management For Enhanced Productivity.pptx
 
Change and the business environment
Change and the business environmentChange and the business environment
Change and the business environment
 
Change management
Change managementChange management
Change management
 
Organizational Change
Organizational ChangeOrganizational Change
Organizational Change
 
Summary for Managing Organizational Design
Summary for Managing Organizational Design Summary for Managing Organizational Design
Summary for Managing Organizational Design
 
Organizational Culture & Change
Organizational Culture & ChangeOrganizational Culture & Change
Organizational Culture & Change
 
Strategic Change Management in Large Organisations - Brian Martin
Strategic Change Management in Large Organisations - Brian MartinStrategic Change Management in Large Organisations - Brian Martin
Strategic Change Management in Large Organisations - Brian Martin
 
MANAGING CHANGE & INNOVATIONS
MANAGING CHANGE & INNOVATIONSMANAGING CHANGE & INNOVATIONS
MANAGING CHANGE & INNOVATIONS
 
Organizational innovation and change
Organizational innovation and changeOrganizational innovation and change
Organizational innovation and change
 
Management of Change
Management of ChangeManagement of Change
Management of Change
 
Changepdf.pdf
Changepdf.pdfChangepdf.pdf
Changepdf.pdf
 
What is Management of Change?
What is Management of Change?What is Management of Change?
What is Management of Change?
 

More from Est

SABD PROGRAMME GUIDE 2017
SABD PROGRAMME GUIDE 2017SABD PROGRAMME GUIDE 2017
SABD PROGRAMME GUIDE 2017
Est
 
Sabd undergraduate pg draft v3
Sabd undergraduate pg draft   v3Sabd undergraduate pg draft   v3
Sabd undergraduate pg draft v3
Est
 
BS 2 Fire protection 4
BS 2 Fire protection 4BS 2 Fire protection 4
BS 2 Fire protection 4
Est
 
CSCM Chapter 11 relationship management cscm
CSCM Chapter 11 relationship management cscmCSCM Chapter 11 relationship management cscm
CSCM Chapter 11 relationship management cscm
Est
 
CSCM Partnering
CSCM PartneringCSCM Partnering
CSCM Partnering
Est
 
CSCM Communication in construction
CSCM Communication in constructionCSCM Communication in construction
CSCM Communication in construction
Est
 
CSCM Material delivery problems cscm
CSCM Material delivery problems cscmCSCM Material delivery problems cscm
CSCM Material delivery problems cscm
Est
 
BS 2 Escalators 1of 2
BS 2 Escalators 1of 2BS 2 Escalators 1of 2
BS 2 Escalators 1of 2
Est
 
BS 2 Group assignment brief question august 2016
BS 2 Group assignment brief  question august 2016BS 2 Group assignment brief  question august 2016
BS 2 Group assignment brief question august 2016
Est
 
BS 2 Variable air volume systems
BS 2 Variable air volume systemsBS 2 Variable air volume systems
BS 2 Variable air volume systems
Est
 
CSCM Supply chain management 312 cscm
CSCM Supply chain management 312 cscmCSCM Supply chain management 312 cscm
CSCM Supply chain management 312 cscm
Est
 
CSCM Bim group assignment.docx
CSCM Bim group assignment.docxCSCM Bim group assignment.docx
CSCM Bim group assignment.docx
Est
 
CSCM individual assignment
CSCM individual assignmentCSCM individual assignment
CSCM individual assignment
Est
 
Management science group assignment MS
Management science group assignment MSManagement science group assignment MS
Management science group assignment MS
Est
 
MS Tutorial 12 hrm
MS Tutorial 12 hrmMS Tutorial 12 hrm
MS Tutorial 12 hrm
Est
 
MS Case study development for entrepreneur mark zuckerberg
MS Case study development for entrepreneur mark zuckerbergMS Case study development for entrepreneur mark zuckerberg
MS Case study development for entrepreneur mark zuckerberg
Est
 
MS Lecture 7 leadership and motivation
MS Lecture 7 leadership and motivationMS Lecture 7 leadership and motivation
MS Lecture 7 leadership and motivation
Est
 
MS Lecture 8 communication
MS Lecture 8 communicationMS Lecture 8 communication
MS Lecture 8 communication
Est
 
MS Qsb 2413 group project 2016
MS Qsb 2413 group project 2016MS Qsb 2413 group project 2016
MS Qsb 2413 group project 2016
Est
 
BS 2 5 electrical installatition
BS 2 5 electrical installatitionBS 2 5 electrical installatition
BS 2 5 electrical installatition
Est
 

More from Est (20)

SABD PROGRAMME GUIDE 2017
SABD PROGRAMME GUIDE 2017SABD PROGRAMME GUIDE 2017
SABD PROGRAMME GUIDE 2017
 
Sabd undergraduate pg draft v3
Sabd undergraduate pg draft   v3Sabd undergraduate pg draft   v3
Sabd undergraduate pg draft v3
 
BS 2 Fire protection 4
BS 2 Fire protection 4BS 2 Fire protection 4
BS 2 Fire protection 4
 
CSCM Chapter 11 relationship management cscm
CSCM Chapter 11 relationship management cscmCSCM Chapter 11 relationship management cscm
CSCM Chapter 11 relationship management cscm
 
CSCM Partnering
CSCM PartneringCSCM Partnering
CSCM Partnering
 
CSCM Communication in construction
CSCM Communication in constructionCSCM Communication in construction
CSCM Communication in construction
 
CSCM Material delivery problems cscm
CSCM Material delivery problems cscmCSCM Material delivery problems cscm
CSCM Material delivery problems cscm
 
BS 2 Escalators 1of 2
BS 2 Escalators 1of 2BS 2 Escalators 1of 2
BS 2 Escalators 1of 2
 
BS 2 Group assignment brief question august 2016
BS 2 Group assignment brief  question august 2016BS 2 Group assignment brief  question august 2016
BS 2 Group assignment brief question august 2016
 
BS 2 Variable air volume systems
BS 2 Variable air volume systemsBS 2 Variable air volume systems
BS 2 Variable air volume systems
 
CSCM Supply chain management 312 cscm
CSCM Supply chain management 312 cscmCSCM Supply chain management 312 cscm
CSCM Supply chain management 312 cscm
 
CSCM Bim group assignment.docx
CSCM Bim group assignment.docxCSCM Bim group assignment.docx
CSCM Bim group assignment.docx
 
CSCM individual assignment
CSCM individual assignmentCSCM individual assignment
CSCM individual assignment
 
Management science group assignment MS
Management science group assignment MSManagement science group assignment MS
Management science group assignment MS
 
MS Tutorial 12 hrm
MS Tutorial 12 hrmMS Tutorial 12 hrm
MS Tutorial 12 hrm
 
MS Case study development for entrepreneur mark zuckerberg
MS Case study development for entrepreneur mark zuckerbergMS Case study development for entrepreneur mark zuckerberg
MS Case study development for entrepreneur mark zuckerberg
 
MS Lecture 7 leadership and motivation
MS Lecture 7 leadership and motivationMS Lecture 7 leadership and motivation
MS Lecture 7 leadership and motivation
 
MS Lecture 8 communication
MS Lecture 8 communicationMS Lecture 8 communication
MS Lecture 8 communication
 
MS Qsb 2413 group project 2016
MS Qsb 2413 group project 2016MS Qsb 2413 group project 2016
MS Qsb 2413 group project 2016
 
BS 2 5 electrical installatition
BS 2 5 electrical installatitionBS 2 5 electrical installatition
BS 2 5 electrical installatition
 

Recently uploaded

Recently uploaded (20)

2024: The FAR, Federal Acquisition Regulations, Part 30
2024: The FAR, Federal Acquisition Regulations, Part 302024: The FAR, Federal Acquisition Regulations, Part 30
2024: The FAR, Federal Acquisition Regulations, Part 30
 
An Atoll Futures Research Institute? Presentation for CANCC
An Atoll Futures Research Institute? Presentation for CANCCAn Atoll Futures Research Institute? Presentation for CANCC
An Atoll Futures Research Institute? Presentation for CANCC
 
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
 
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'Israël
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'IsraëlAntisemitism Awareness Act: pénaliser la critique de l'Etat d'Israël
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'Israël
 
celebrity 💋 Agra Escorts Just Dail 8250092165 service available anytime 24 hour
celebrity 💋 Agra Escorts Just Dail 8250092165 service available anytime 24 hourcelebrity 💋 Agra Escorts Just Dail 8250092165 service available anytime 24 hour
celebrity 💋 Agra Escorts Just Dail 8250092165 service available anytime 24 hour
 
2024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 292024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 29
 
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
 
TEST BANK For Essentials of Negotiation, 7th Edition by Roy Lewicki, Bruce Ba...
TEST BANK For Essentials of Negotiation, 7th Edition by Roy Lewicki, Bruce Ba...TEST BANK For Essentials of Negotiation, 7th Edition by Roy Lewicki, Bruce Ba...
TEST BANK For Essentials of Negotiation, 7th Edition by Roy Lewicki, Bruce Ba...
 
best call girls in Pune - 450+ Call Girl Cash Payment 8005736733 Neha Thakur
best call girls in Pune - 450+ Call Girl Cash Payment 8005736733 Neha Thakurbest call girls in Pune - 450+ Call Girl Cash Payment 8005736733 Neha Thakur
best call girls in Pune - 450+ Call Girl Cash Payment 8005736733 Neha Thakur
 
VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...
 
Tuvalu Coastal Adaptation Project (TCAP)
Tuvalu Coastal Adaptation Project (TCAP)Tuvalu Coastal Adaptation Project (TCAP)
Tuvalu Coastal Adaptation Project (TCAP)
 
(NEHA) Call Girls Nagpur Call Now 8250077686 Nagpur Escorts 24x7
(NEHA) Call Girls Nagpur Call Now 8250077686 Nagpur Escorts 24x7(NEHA) Call Girls Nagpur Call Now 8250077686 Nagpur Escorts 24x7
(NEHA) Call Girls Nagpur Call Now 8250077686 Nagpur Escorts 24x7
 
A Press for the Planet: Journalism in the face of the Environmental Crisis
A Press for the Planet: Journalism in the face of the Environmental CrisisA Press for the Planet: Journalism in the face of the Environmental Crisis
A Press for the Planet: Journalism in the face of the Environmental Crisis
 
Akurdi ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
Akurdi ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...Akurdi ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...
Akurdi ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
 
Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'
 
Postal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptxPostal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptx
 
VIP Model Call Girls Shikrapur ( Pune ) Call ON 8005736733 Starting From 5K t...
VIP Model Call Girls Shikrapur ( Pune ) Call ON 8005736733 Starting From 5K t...VIP Model Call Girls Shikrapur ( Pune ) Call ON 8005736733 Starting From 5K t...
VIP Model Call Girls Shikrapur ( Pune ) Call ON 8005736733 Starting From 5K t...
 
Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
 
Chakan ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
Chakan ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...Chakan ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...
Chakan ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
 
Election 2024 Presiding Duty Keypoints_01.pdf
Election 2024 Presiding Duty Keypoints_01.pdfElection 2024 Presiding Duty Keypoints_01.pdf
Election 2024 Presiding Duty Keypoints_01.pdf
 

MS Lecture 5 org change

  • 1. Organizational Design: Organizational Change and Learning QSB2413 Management Science
  • 2. Introduction • Change is about aligning people, resources and culture with a shift in organizational direction. • Changes are often initiated by critical events such as: Globalization and competition New CEO Mergers or acquisitions Deregulation or market shifts Failure in operating results
  • 3. Organizational Change • The process by which organizations move from their present state to some desired future state to increase their effectiveness. • Goal is to find improved ways of using resources and capabilities in order to increase an organization’s ability to create value.
  • 4. Organizational Change • An alteration of an organization’s environment, structure, culture, technology, or people. –A constant force –An organizational reality –An opportunity or a threat • Change Agent - A person who initiates and assumes the responsibility for managing a change in an organization.
  • 5. Basic Questions for Change Agent • What are the forces acting upon me? – What are the pressures I should take into consideration as I decide what to change and how I should change it? • What should we change? – Should the changes be strategic and companywide or relatively limited? • How should we change it? – How should we actually implement the change?
  • 6. The Drivers of Change 1. Technological factors 2. Organizational factors 3. Economic factors 4. Governmental influences 5. Societal / Cultural influences 6. Clients have changed
  • 7. (1) Technological Factors The industry and its building • Structure and fabric – since mid 19th Centuries • Building services – last 50 years • Construction methods – mechanization, industrialization Society and industry generally • Information technology (system) • Manufacturing, business processes (taking place in buildings)
  • 8. (2) Organizational Factors Increasing specialization • Driven by technology, business strategy, legislation. Separation of function • Especially design from construction • Growth for professional boundaries • The professional “hierarchy”
  • 9. (3) Economic Factors The importance of the industry • E.g. Construction industry contributes 6% to 7% of UK economic activity, 5% - 6% of Malaysia economic activity. The economic cycle – “boom and bust” • Why construction suffers more and for longer The industry as economic regulator • Governmental intention often overstressed • General economic controls affect industry becoming hard
  • 10. (4) Governmental Influences Control of economy • As client of the industry – approximate 25% of output is commissioned by public sector • Current changes in procurement – public or private project (PAM/JKR form of contract) Legislation and Taxation • Direct impact – Planning, building regulations, safety • Indirect impact – Tax concessions, development areas, etc.
  • 11. (5) Societal/Cultural Influences Greater influence of general public • Less accepting of authority – government, professions • Environmental consciousness - protest Broader cultural influences • Changing population, easier world travel Entrepreneurial attitudes • Have varied with time • Increase in small businesses since late 70’s
  • 12. (6) Changing Clients Growth of the corporate client • Compared with 19th C, it was about the importance of individual & sole trader Globalization • Changing market for business & clients they generate Business priorities • Increasing concentration on time & cost performance • Less tolerant of failings – more litigious Transfer of management methods • Project Management, procurement methods
  • 14.
  • 15. Types of Organizational Change Radical Change • Major makeovers of organizations. • Major makeovers of their component systems. Gradual Change • Occurs more frequently and with less dramatic impact. • E.g. New products, new technologies, new systems.
  • 16. Phases Of Change 3-Stage Process Unfreezing: Getting people and things ready for change Changing: Implementing the change Refreezing: Making sure the change sticks as part of the new routine
  • 17. Targets of Change • Targets of change include improving effectiveness at four different levels:- (1) Human resources (2) Functional resources (3) Technological capabilities (4) Organizational capabilities
  • 18. Target For Change • Purpose: Clarify or create new missions, visions and objectives. • Objectives: Due to change in the environment, specific performance standards have to be modified or new performance standards set. • E.g. In construction industry, firms are encouraged to apply the technology in order to improve the productivity instead of using the conventional methods of construction (BIM or IBS).
  • 19. Target For Change • Tasks: Updating job designs and scope for individuals and groups. • People: - Update recruiting and selection practices. - Improving training and development.
  • 20. Target For Change • Structure: Update organizational design and coordination mechanism. • E.g. team structure, virtual organization, boundaryless organization (eliminate chain of commands).
  • 21. Target For Change • Technology: Improve equipment, facilities and workflow. • Culture: Core beliefs and values have to be clarified and modified to adapt to the changing environment.
  • 22. Target For Change • Strategy: Strategic and operational plans have to be clarified, modified or new ones created including: - External interface - Mission - Managing organization mission - Prescribed networks - Organizational process - Motivation of people - Emergent networks
  • 23. What is resistance to change?
  • 24. Resistance To Change • Individual resistance (e.g. loss of position, power, status, quality of life and authority). • Organizational resistance (e.g. change in the balance of power and structural inertia).
  • 25. Why do people often resist to change?
  • 26. Resistance To Change • Information: “What’s going to happen?” • Personal involvement: “Will I survive the change?” • Implementation: “How do I get started on the change?” • Impact: “How will the change benefit us and organization?”
  • 28. References: Management: Challenges for tomorrow’s leaders/Pamela S. Lewis – edition 6
  • 29. A Framework For Change Step 1: Establishing a Sense of Urgency • The need for change • Discuss changes in the market or competitive conditions • Condition might be negative/crisis or positive/opportunity for the organization • Clearly stated and shared throughout the organization (communicate)
  • 30. A Framework For Change Step 2: Creating the Guiding Coalition • A team of people who are charged with taking, initiating and effecting the change • Manager must select those who have an emotional commitment to change and who have the right skills to effect the change • An effective guiding coalition must have the right composition, a significant level of trust from others and a shared objective for their work
  • 31. A Framework For Change Step 3: Developing a change vision • Change vision – how the organization will look once the change has been implemented. • The vision should be compelling, motivating, realistic and time specific. • Vision is a very powerful tool for enabling others to see the proposed change’s impact and understand how the future will be.
  • 32. A Framework For Change Step 4: Communicating the Vision • The most important part of the change process is effective communication. • The message should go out to every constituent affected by the change. • The message should be simple and repeatable. • Communication is two-way and open dialogue.
  • 33. A Framework For Change Step 5: Empowering Broad-Based Action • Empowering organizational members to implement the change. • Managers must provide training and educational opportunities to help employees learn the new behaviors, develop new technical skills, interpersonal skills and attitudes.
  • 34. A Framework For Change Step 6: Generating Short-term Wins • Ensuring short-term goals are established that are highly visible and achievable. • Short-term wins not only encourage supporters of the change, but also can turn neutral people into supporters and reluctant supporters into active helpers.
  • 35. A Framework For Change Step 7: Never Letting Up • Persistence – critical for successful change initiatives. • Leaders must continue to push the organization towards the ultimate goals. • New behaviors and practices must be fully absorbed by the organization to ensure that the change will be long-lasting.
  • 36. A Framework For Change Step 8: Incorporating Changes in the Culture • Organizational culture is a deeply rooted phenomenon. • New practices must grow deep roots in order to remain firmly planted in the culture.
  • 37. Some general rules about cultural change
  • 38. Cultural Change • You must be able to prove that the new way is superior to the old. • The success must be visible and well communicated. • You will lose some people in the process. • You must reinforce new norms and value with incentives and rewards – including promotions. • Reinforce the culture with every new employee.
  • 39. Summary • It is impossible to change one aspect of an organization without affecting other aspects. • Changes in products or services offered may require new technology, a new distribution system, new employee skills or different relationships with customers. • Learning to recognize and manage change is one of the most important skills a manager can develop. • Change is natural. Managers must help organizations work with it, not against it.
  • 40. Discussion • What is the cause to change in an construction organization? - Competitive environment - Customer preferences - Information technology (IBS/BIM) - Globalization • List the reasons of resistance to change. - Rigid culture - Personality
  • 41. Discussion • Do you think change is good to construction industry? Example using BIM. • What about other industries, says manufacturing? Auto industry – car producing (hybrid / electronic technology) • Innovation – key to success • http://www.strategy- business.com/article/rr00006?gko=643d0