CMgt2340 Surveying

Chapter 6 Traverse
Surveys
Objectives





Match terms related to traversing with the
correct definitions.
List major sources of error in traverse
operations.
Perform traverse calculations in order to
determine closure, accuracy, and area.
Perform a closed loop traverse.
Terms and Definitions
 Angular

Error
 Closed Traverse
 Departure
 Error of Closure
 Latitude
 Open Traverse
Sources of Error in Traverse Operations





Errors in measurement of angles and
distances.
Poor selection of traverse points resulting in
bad sighting conditions (into sun, through
timber, etc.)
Failing to measure the angles an equal
number of times direct and reversed
(doubling and averaging)
9 Steps to Computing a Traverse’s
Closure, Accuracy, and Area










1. Draw a sketch of the traverse with points and angles.
2. Compute the angular error and adjust the angles.
3. Compute the bearings or azimuths.
4. Compute Latitudes and Departures.
5. Compute the error of closure.
6. Compute the measure of accuracy.
7. Compute corrections for latitudes and departures.
8. Calculate Adjusted Latitudes and Departures.
9. Calculate the area of the traverse using the Double Meridian
Distance (DMD) method.
Problem (see figure 6.4 in text)




A five-sided closed field traverse has the
following angles: A=101°24’00”,
B=149°13’00”, C=80°58’30”, D=116° 19’00”,
E=92°04’30”. The lengths of the sides are as
follows: AE 350.10’, ED 579.03’, DC 368.28’,
CB 382.20’, BA 401.58’.
Determine the traverse’s closure, accuracy,
and area.
Closure (steps 1-5)


Step 1 Draw a sketch of the traverse with points and angles.

30”
00”

00”

00”

30”
Closure (steps 1-5)



Step 2 Compute the angular error and adjust the angles.
(n-2)180= (5-2)180= 540°00’00”
BAE

101°24’00”

+12”

101°24’12”

CBA

149°13’00”

+12”

149°13’12”

DCB

80°58’30”

+12”

80°58’42”

EDC

116°19’00”

+12”

116°19’12”

AED

92°04’30”

+12”

92°04’42”

539°59’00”

+12”

540°00’00”

Σ

-1’00”/5=-12”
Closure (steps 1-5)


Step 3 Compute the azimuths (or bearings).
Course

Azimuth

Bearing

BAE

152°46’12”

S27°13’48”E

AED

64°50’54”

N64°50’54”E

EDC

1°10’06”

N1°10’06”E

DCB

262°08’48”

S82°08’48”W

CBA

231°22’00”

S51°22’00”W
Closure (steps 1-5)







Step 4 Compute Latitudes and Departures.
What are latitudes and departures?
For any given line BA, latitude is the change in y and departure
is the change in x (see figure 6.6, p.167).
Latitude (north is +, south is -).
Departure (west is -, east is +).
If a survey has been perfectly performed, the plus latitudes will
equal the minus latitudes and the same with the departures.
Dep. BA (-)
Lat. BA (-)

A

B
Closure (steps 1-5)


Step 4 Compute Latitudes and Departures.



Formula for finding Lats and Deps
Latitude=Horizontal distance (H) cos θ
Departure=Horizontal distance (H) sin θ



Closure (steps 1-5)
On the TI-30xa calculator, enter 152.4612, 2nd key,
DMS-DD, cos, X, 350.10


Step 4 continued
STA

Distance

Azimuth

Latitude
(cos)

Departure
(sin)

BAE

350.10

152°46’12”

-311.30

160.19

AED

579.03

64°50’54”

246.10

524.13

EDC

368.28

1°10’06”

368.20

7.51

DCB

382.20

262°08’48”

-52.22

-378.62

CBA

401.58

231°22’00”

-250.72

-313.70
Closure (steps 1-5)
Step 5 Compute the error of closure (E).
 Sum the latitudes and departures. Since they do not equal zero, the
traverse did not make it back to the original point.
 The mathematical distance between the original point and the new point
is the error of closure (E) (see Fig. 6.11, p 156).
 E=square root of (Σlat2+Σdep2)=sq rt (0.062+0.492)=0.49


Course

Distance

Azimuth

Latitude Departure
(cos)
(sin)

BAE

350.10

152°46’12”

-311.30

160.19

AED

579.03

64°50’54”

246.10

524.13

EDC

368.28

1°10’06”

368.20

7.51

DCB

382.20

262°08’48”

-52.22

-378.62

CBA

401.58

231°22’00”

-250.72

-313.70

P= 2081.19

Σ= +0.06

-0.49
Accuracy (step 6)








Step 6 Compute the measure of accuracy.
Precision Ratio= Error of Closure (E) to Total distance around
the traverse (P).
Precision Ratio= E/P = 0.49/2081.19
Precision Ratios are always written with the numerator as 1,
thus if we divide both by the original numerator we have the new
format (1/4247)
We then round the denominator to the nearest 100.
= 1/4200
Accuracy (step 6)






What is the importance of the Precision Ratio?
So that states and provinces are able to mandate the
level of competency on given works.
A gravel road could pass with a 1/3000, whereas a
monorail would need a 1/7500 to 1/10000 level of
precision.
In our example, if we specified that the survey must
meet a 1/7500 Precision Ratio, we would have to
resurvey because we are only at 1/4200.
Area (step 7)






Step 7 Compute corrections for latitudes and departures.
Just like balancing angles, once we identify the sum of the
latitudes and departures, we need to distribute that error before
proceeding.
One way to distribute the error is through the compass rule.
This technique distributes errors in latitude and departure for
each course in the same proportion as the course distance is to
the traverse perimeter.
Area (step 7)








The formula is as follows:
C lat AB = Σ lat x AB/P
Where C lat AB = correction in latitude AB
Σ lat = error of closure in latitude
AB = distance AB
P = Perimeter of traverse
(the formula for departure is the same, just substitute
dep for lat)
Area (step 7)




Using the calculator, we can set up a
constant in memory such as .06/2081.19 and
then multiply this by each course distance.
For example, for the latitudes, perform the
above calculation and store it as M1. Then
for each course, enter RCL1, X, the next
course distance.
Area (step 7)


Since the sum of latitudes were positive error, the corrections
become negative. The departures had negative error, so the
corrections are positive.
Course

Distance

Latitude Departure
(cos)
(sin)

C lat

C dep

BAE

350.10

-311.30

160.19

-.01

+.08

AED

579.03

246.10

524.13

-.02

+.14

EDC

368.28

368.20

7.51

-.01

+.09

DCB

382.20

-52.22

-378.62

-.01

+.09

CBA

401.58

-250.72

-313.70

-.01

+.09

-0.49

-.06

+0.49

Σ= +0.06
Area (step 8)



Step 8 Calculate Adjusted Latitudes and Departures.
Add the corrections to each original latitude and departure.
Latitude
(cos)

Departure
(sin)

C lat

C dep Balanced Balanced
latitudes Departures

-311.30

160.19

-.01

+.08

-311.31

+160.27

246.10

524.13

-.02

+.14

+246.08

+524.27

368.20

7.51

-.01

+.09

+368.19

+7.60

-52.22

-378.62

-.01

+.09

-52.23

-378.53

-250.72

-313.70

-.01

+.09

-250.73

-313.61

+0.06

-0.49

-.06

+0.49

0.00

0.00
Area (step 9)
Step 9 Calculate the area of the traverse using the Double Meridian
Distance (DMD) method.
 To get started, transfer the dep for the 1st course into the DMD column.


Course

Balanced Balanced
latitudes Departures

BAE

-311.31

+160.27

AED

+246.08

+524.27

EDC

+368.19

+7.60

DCB

-52.23

-378.53

CBA

-250.73

-313.61

0.00

0.00

DMD
160.27

DBL
Area
Area (step 9)


Next, multiply the DMD of the 1st by lat of 1st and record in DBL
area for 1st.

X
Course

Balanced Balanced
latitudes Departures

BAE

-311.31

+160.27

AED

+246.08

+524.27

EDC

+368.19

+7.60

DCB

-52.23

-378.53

CBA

-250.73

-313.61

0.00

0.00

DMD
160.27

DBL
Area
= - 49,894
Area (step 9)


Add DMD of 1st row to dep of 1st row to dep of 2nd row and record in DMD
for 2nd row.

+
Course

Balanced Balanced
latitudes Departures

DMD

BAE

-311.31

+160.27

160.27

AED

+246.08

+524.27 = 844.81

EDC

+368.19

+7.60

DCB

-52.23

-378.53

CBA

-250.73

-313.61

0.00

0.00

DBL
Area
- 49,894
Area (step 9)


Repeat the steps (multiply the DMD of the 2nd by lat of 2nd and
record in DBL area for 2nd).

X
Course

Balanced Balanced
latitudes Departures

DMD

DBL
Area

BAE

-311.31

+160.27

160.27

- 49,894

AED

+246.08

+524.27

844.81

=+207,891

EDC

+368.19

+7.60

DCB

-52.23

-378.53

CBA

-250.73

-313.61

0.00

0.00
Area (step 9)


Repeat the process until all calculations are made for all
courses.

Course

Balanced Balanced
latitudes Departures

DMD

DBL
Area

BAE

-311.31

+160.27

160.27

- 49,894

AED

+246.08

+524.27

844.81

+207,891

EDC

+368.19

+7.60

1376.68

+506,880

DCB

-52.23

-378.53

1005.75

- 52,530

CBA

-250.73

-313.61

313.61

- 78,631

0.00

0.00

533,716
Area (step 9)





Sum all of DBL areas and divide by 2
533,716 sq ft /2=266,858 sq ft
Divide by 43,560 sq ft /acre to find answer in acres
266,858/43,560 = 6.126 acres
References Cited
 Examples

and step by step tutorials
were copied directly from the following:
 Mid-America Vocational Curriculum
Consortium, Inc., Basic Surveying
Technology, Stillwater, OK: Oklahoma
State Department of Vocational
Technical Education, 1987

More Related Content

What's hot

Site survey Fieldwork 2 traversing
Site survey Fieldwork 2 traversingSite survey Fieldwork 2 traversing
Site survey Fieldwork 2 traversing
Sheng Zhe
 
Triangulation and trilateration pdf...
Triangulation and trilateration pdf...Triangulation and trilateration pdf...
Triangulation and trilateration pdf...
Gokul Saud
 
Lecture 04 angle corrections
Lecture 04 angle correctionsLecture 04 angle corrections
Lecture 04 angle corrections
Rehan Hanif
 
S2 2 leveling
S2 2 levelingS2 2 leveling
S2 2 leveling
Est
 
Basics Of Surveying
Basics Of SurveyingBasics Of Surveying
Basics Of Surveying
stooty s
 
Lecture 02 distance corrections
Lecture 02 distance correctionsLecture 02 distance corrections
Lecture 02 distance corrections
Rehan Hanif
 

What's hot (20)

Survey 2 curves1
Survey 2 curves1Survey 2 curves1
Survey 2 curves1
 
Volume
VolumeVolume
Volume
 
Theodolite surveying
Theodolite surveyingTheodolite surveying
Theodolite surveying
 
1392741020 traverse survey
1392741020 traverse survey1392741020 traverse survey
1392741020 traverse survey
 
surveying- lecture notes for engineers
surveying- lecture notes for engineerssurveying- lecture notes for engineers
surveying- lecture notes for engineers
 
Site survey Fieldwork 2 traversing
Site survey Fieldwork 2 traversingSite survey Fieldwork 2 traversing
Site survey Fieldwork 2 traversing
 
Traverse Survey Part 1/2
Traverse Survey Part 1/2Traverse Survey Part 1/2
Traverse Survey Part 1/2
 
EDM and Total Stations
EDM and Total StationsEDM and Total Stations
EDM and Total Stations
 
Surveying problem solving
Surveying problem solvingSurveying problem solving
Surveying problem solving
 
Triangulation and trilateration pdf...
Triangulation and trilateration pdf...Triangulation and trilateration pdf...
Triangulation and trilateration pdf...
 
Triangulation
Triangulation Triangulation
Triangulation
 
Vertical Alignment in road design
Vertical Alignment in road designVertical Alignment in road design
Vertical Alignment in road design
 
Theodolite
TheodoliteTheodolite
Theodolite
 
Lecture 04 angle corrections
Lecture 04 angle correctionsLecture 04 angle corrections
Lecture 04 angle corrections
 
S2 2 leveling
S2 2 levelingS2 2 leveling
S2 2 leveling
 
Curves
CurvesCurves
Curves
 
Basics Of Surveying
Basics Of SurveyingBasics Of Surveying
Basics Of Surveying
 
Lec. 11 setting out simple circular curve
Lec. 11 setting out simple circular curveLec. 11 setting out simple circular curve
Lec. 11 setting out simple circular curve
 
Ge 105 lecture 2 (TAPING CORRECTION) by: Broddett B. Abatayo
Ge 105 lecture 2 (TAPING CORRECTION) by: Broddett B. AbatayoGe 105 lecture 2 (TAPING CORRECTION) by: Broddett B. Abatayo
Ge 105 lecture 2 (TAPING CORRECTION) by: Broddett B. Abatayo
 
Lecture 02 distance corrections
Lecture 02 distance correctionsLecture 02 distance corrections
Lecture 02 distance corrections
 

Viewers also liked (11)

traversing of survey
traversing of surveytraversing of survey
traversing of survey
 
Vampire Electricity-Standby Power
Vampire Electricity-Standby PowerVampire Electricity-Standby Power
Vampire Electricity-Standby Power
 
Trigonometric levelling jithin
Trigonometric levelling   jithinTrigonometric levelling   jithin
Trigonometric levelling jithin
 
levelling and contouring
 levelling and  contouring levelling and  contouring
levelling and contouring
 
Theodolite Traversing
Theodolite TraversingTheodolite Traversing
Theodolite Traversing
 
Trigonometric leveling
Trigonometric leveling Trigonometric leveling
Trigonometric leveling
 
Tacheometry ppt
Tacheometry pptTacheometry ppt
Tacheometry ppt
 
Tacheometric survey
Tacheometric surveyTacheometric survey
Tacheometric survey
 
Levelling
LevellingLevelling
Levelling
 
Surveying
Surveying Surveying
Surveying
 
Industries
IndustriesIndustries
Industries
 

Similar to Chap.6 traverse surveys

Fieldwork 2
Fieldwork 2 Fieldwork 2
Fieldwork 2
JamesMoy7
 
s2 5 tutorial traversing - compass rule and transit rule
s2 5 tutorial traversing - compass rule and transit rules2 5 tutorial traversing - compass rule and transit rule
s2 5 tutorial traversing - compass rule and transit rule
Est
 

Similar to Chap.6 traverse surveys (20)

Site Surveying Traversing
Site Surveying TraversingSite Surveying Traversing
Site Surveying Traversing
 
Surveying traverse
Surveying traverseSurveying traverse
Surveying traverse
 
216 surveying traverse explained
216 surveying traverse explained216 surveying traverse explained
216 surveying traverse explained
 
Coordinate geometry fundamentals 2012
Coordinate geometry fundamentals 2012Coordinate geometry fundamentals 2012
Coordinate geometry fundamentals 2012
 
Traversing Practical part 1
Traversing Practical part 1Traversing Practical part 1
Traversing Practical part 1
 
Site survey report 2
Site survey report 2Site survey report 2
Site survey report 2
 
Assignment 2 - Traverse
Assignment 2 - TraverseAssignment 2 - Traverse
Assignment 2 - Traverse
 
travesing.pdf
travesing.pdftravesing.pdf
travesing.pdf
 
Traversing Notes |surveying II | Sudip khadka
Traversing Notes |surveying II | Sudip khadka Traversing Notes |surveying II | Sudip khadka
Traversing Notes |surveying II | Sudip khadka
 
Site surveying report 2
Site surveying report 2Site surveying report 2
Site surveying report 2
 
ch5.pdf
ch5.pdfch5.pdf
ch5.pdf
 
COMPUTERIZED LAYOUT METHODS ,CRAFT , ALDEP
COMPUTERIZED LAYOUT METHODS ,CRAFT , ALDEPCOMPUTERIZED LAYOUT METHODS ,CRAFT , ALDEP
COMPUTERIZED LAYOUT METHODS ,CRAFT , ALDEP
 
Ge 105 lecture 1 (LEAST SQUARES ADJUSTMENT) by: Broddett B. Abatayo
Ge 105 lecture 1 (LEAST SQUARES ADJUSTMENT) by: Broddett B. AbatayoGe 105 lecture 1 (LEAST SQUARES ADJUSTMENT) by: Broddett B. Abatayo
Ge 105 lecture 1 (LEAST SQUARES ADJUSTMENT) by: Broddett B. Abatayo
 
Project 2- traversing
Project 2- traversingProject 2- traversing
Project 2- traversing
 
Project 2- traversing
Project 2- traversingProject 2- traversing
Project 2- traversing
 
Fieldwork 2
Fieldwork 2 Fieldwork 2
Fieldwork 2
 
Fieldwork 2
Fieldwork 2 Fieldwork 2
Fieldwork 2
 
s2 5 tutorial traversing - compass rule and transit rule
s2 5 tutorial traversing - compass rule and transit rules2 5 tutorial traversing - compass rule and transit rule
s2 5 tutorial traversing - compass rule and transit rule
 
GEODETIC Least Square with fx 991-es plus
GEODETIC Least Square with fx 991-es plusGEODETIC Least Square with fx 991-es plus
GEODETIC Least Square with fx 991-es plus
 
Ss report 2
Ss report 2Ss report 2
Ss report 2
 

Recently uploaded

Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
panagenda
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
?#DUbAI#??##{{(☎️+971_581248768%)**%*]'#abortion pills for sale in dubai@
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Victor Rentea
 

Recently uploaded (20)

TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
CNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In PakistanCNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In Pakistan
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectors
 
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamDEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
WSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering Developers
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
Exploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusExploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with Milvus
 
Vector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptxVector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptx
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
 

Chap.6 traverse surveys

  • 1. CMgt2340 Surveying Chapter 6 Traverse Surveys
  • 2. Objectives     Match terms related to traversing with the correct definitions. List major sources of error in traverse operations. Perform traverse calculations in order to determine closure, accuracy, and area. Perform a closed loop traverse.
  • 3. Terms and Definitions  Angular Error  Closed Traverse  Departure  Error of Closure  Latitude  Open Traverse
  • 4. Sources of Error in Traverse Operations    Errors in measurement of angles and distances. Poor selection of traverse points resulting in bad sighting conditions (into sun, through timber, etc.) Failing to measure the angles an equal number of times direct and reversed (doubling and averaging)
  • 5. 9 Steps to Computing a Traverse’s Closure, Accuracy, and Area          1. Draw a sketch of the traverse with points and angles. 2. Compute the angular error and adjust the angles. 3. Compute the bearings or azimuths. 4. Compute Latitudes and Departures. 5. Compute the error of closure. 6. Compute the measure of accuracy. 7. Compute corrections for latitudes and departures. 8. Calculate Adjusted Latitudes and Departures. 9. Calculate the area of the traverse using the Double Meridian Distance (DMD) method.
  • 6. Problem (see figure 6.4 in text)   A five-sided closed field traverse has the following angles: A=101°24’00”, B=149°13’00”, C=80°58’30”, D=116° 19’00”, E=92°04’30”. The lengths of the sides are as follows: AE 350.10’, ED 579.03’, DC 368.28’, CB 382.20’, BA 401.58’. Determine the traverse’s closure, accuracy, and area.
  • 7. Closure (steps 1-5)  Step 1 Draw a sketch of the traverse with points and angles. 30” 00” 00” 00” 30”
  • 8. Closure (steps 1-5)   Step 2 Compute the angular error and adjust the angles. (n-2)180= (5-2)180= 540°00’00” BAE 101°24’00” +12” 101°24’12” CBA 149°13’00” +12” 149°13’12” DCB 80°58’30” +12” 80°58’42” EDC 116°19’00” +12” 116°19’12” AED 92°04’30” +12” 92°04’42” 539°59’00” +12” 540°00’00” Σ -1’00”/5=-12”
  • 9. Closure (steps 1-5)  Step 3 Compute the azimuths (or bearings). Course Azimuth Bearing BAE 152°46’12” S27°13’48”E AED 64°50’54” N64°50’54”E EDC 1°10’06” N1°10’06”E DCB 262°08’48” S82°08’48”W CBA 231°22’00” S51°22’00”W
  • 10. Closure (steps 1-5)       Step 4 Compute Latitudes and Departures. What are latitudes and departures? For any given line BA, latitude is the change in y and departure is the change in x (see figure 6.6, p.167). Latitude (north is +, south is -). Departure (west is -, east is +). If a survey has been perfectly performed, the plus latitudes will equal the minus latitudes and the same with the departures. Dep. BA (-) Lat. BA (-) A B
  • 11. Closure (steps 1-5)  Step 4 Compute Latitudes and Departures.  Formula for finding Lats and Deps Latitude=Horizontal distance (H) cos θ Departure=Horizontal distance (H) sin θ  
  • 12. Closure (steps 1-5) On the TI-30xa calculator, enter 152.4612, 2nd key, DMS-DD, cos, X, 350.10  Step 4 continued STA Distance Azimuth Latitude (cos) Departure (sin) BAE 350.10 152°46’12” -311.30 160.19 AED 579.03 64°50’54” 246.10 524.13 EDC 368.28 1°10’06” 368.20 7.51 DCB 382.20 262°08’48” -52.22 -378.62 CBA 401.58 231°22’00” -250.72 -313.70
  • 13. Closure (steps 1-5) Step 5 Compute the error of closure (E).  Sum the latitudes and departures. Since they do not equal zero, the traverse did not make it back to the original point.  The mathematical distance between the original point and the new point is the error of closure (E) (see Fig. 6.11, p 156).  E=square root of (Σlat2+Σdep2)=sq rt (0.062+0.492)=0.49  Course Distance Azimuth Latitude Departure (cos) (sin) BAE 350.10 152°46’12” -311.30 160.19 AED 579.03 64°50’54” 246.10 524.13 EDC 368.28 1°10’06” 368.20 7.51 DCB 382.20 262°08’48” -52.22 -378.62 CBA 401.58 231°22’00” -250.72 -313.70 P= 2081.19 Σ= +0.06 -0.49
  • 14. Accuracy (step 6)       Step 6 Compute the measure of accuracy. Precision Ratio= Error of Closure (E) to Total distance around the traverse (P). Precision Ratio= E/P = 0.49/2081.19 Precision Ratios are always written with the numerator as 1, thus if we divide both by the original numerator we have the new format (1/4247) We then round the denominator to the nearest 100. = 1/4200
  • 15. Accuracy (step 6)     What is the importance of the Precision Ratio? So that states and provinces are able to mandate the level of competency on given works. A gravel road could pass with a 1/3000, whereas a monorail would need a 1/7500 to 1/10000 level of precision. In our example, if we specified that the survey must meet a 1/7500 Precision Ratio, we would have to resurvey because we are only at 1/4200.
  • 16. Area (step 7)     Step 7 Compute corrections for latitudes and departures. Just like balancing angles, once we identify the sum of the latitudes and departures, we need to distribute that error before proceeding. One way to distribute the error is through the compass rule. This technique distributes errors in latitude and departure for each course in the same proportion as the course distance is to the traverse perimeter.
  • 17. Area (step 7)        The formula is as follows: C lat AB = Σ lat x AB/P Where C lat AB = correction in latitude AB Σ lat = error of closure in latitude AB = distance AB P = Perimeter of traverse (the formula for departure is the same, just substitute dep for lat)
  • 18. Area (step 7)   Using the calculator, we can set up a constant in memory such as .06/2081.19 and then multiply this by each course distance. For example, for the latitudes, perform the above calculation and store it as M1. Then for each course, enter RCL1, X, the next course distance.
  • 19. Area (step 7)  Since the sum of latitudes were positive error, the corrections become negative. The departures had negative error, so the corrections are positive. Course Distance Latitude Departure (cos) (sin) C lat C dep BAE 350.10 -311.30 160.19 -.01 +.08 AED 579.03 246.10 524.13 -.02 +.14 EDC 368.28 368.20 7.51 -.01 +.09 DCB 382.20 -52.22 -378.62 -.01 +.09 CBA 401.58 -250.72 -313.70 -.01 +.09 -0.49 -.06 +0.49 Σ= +0.06
  • 20. Area (step 8)   Step 8 Calculate Adjusted Latitudes and Departures. Add the corrections to each original latitude and departure. Latitude (cos) Departure (sin) C lat C dep Balanced Balanced latitudes Departures -311.30 160.19 -.01 +.08 -311.31 +160.27 246.10 524.13 -.02 +.14 +246.08 +524.27 368.20 7.51 -.01 +.09 +368.19 +7.60 -52.22 -378.62 -.01 +.09 -52.23 -378.53 -250.72 -313.70 -.01 +.09 -250.73 -313.61 +0.06 -0.49 -.06 +0.49 0.00 0.00
  • 21. Area (step 9) Step 9 Calculate the area of the traverse using the Double Meridian Distance (DMD) method.  To get started, transfer the dep for the 1st course into the DMD column.  Course Balanced Balanced latitudes Departures BAE -311.31 +160.27 AED +246.08 +524.27 EDC +368.19 +7.60 DCB -52.23 -378.53 CBA -250.73 -313.61 0.00 0.00 DMD 160.27 DBL Area
  • 22. Area (step 9)  Next, multiply the DMD of the 1st by lat of 1st and record in DBL area for 1st. X Course Balanced Balanced latitudes Departures BAE -311.31 +160.27 AED +246.08 +524.27 EDC +368.19 +7.60 DCB -52.23 -378.53 CBA -250.73 -313.61 0.00 0.00 DMD 160.27 DBL Area = - 49,894
  • 23. Area (step 9)  Add DMD of 1st row to dep of 1st row to dep of 2nd row and record in DMD for 2nd row. + Course Balanced Balanced latitudes Departures DMD BAE -311.31 +160.27 160.27 AED +246.08 +524.27 = 844.81 EDC +368.19 +7.60 DCB -52.23 -378.53 CBA -250.73 -313.61 0.00 0.00 DBL Area - 49,894
  • 24. Area (step 9)  Repeat the steps (multiply the DMD of the 2nd by lat of 2nd and record in DBL area for 2nd). X Course Balanced Balanced latitudes Departures DMD DBL Area BAE -311.31 +160.27 160.27 - 49,894 AED +246.08 +524.27 844.81 =+207,891 EDC +368.19 +7.60 DCB -52.23 -378.53 CBA -250.73 -313.61 0.00 0.00
  • 25. Area (step 9)  Repeat the process until all calculations are made for all courses. Course Balanced Balanced latitudes Departures DMD DBL Area BAE -311.31 +160.27 160.27 - 49,894 AED +246.08 +524.27 844.81 +207,891 EDC +368.19 +7.60 1376.68 +506,880 DCB -52.23 -378.53 1005.75 - 52,530 CBA -250.73 -313.61 313.61 - 78,631 0.00 0.00 533,716
  • 26. Area (step 9)     Sum all of DBL areas and divide by 2 533,716 sq ft /2=266,858 sq ft Divide by 43,560 sq ft /acre to find answer in acres 266,858/43,560 = 6.126 acres
  • 27. References Cited  Examples and step by step tutorials were copied directly from the following:  Mid-America Vocational Curriculum Consortium, Inc., Basic Surveying Technology, Stillwater, OK: Oklahoma State Department of Vocational Technical Education, 1987