REQUIREMENTS FOR BUILDING PLAN APPROVAL AT THE
MINISTRY OF LANDS, HOUSING AND URBAN DEVELOPMENT
Below are the requirements for project application and approval at the Ministry of
Lands, Housing and Urban Development. However, the fees payable varies,
depending on the size, use and volume of development involved.
Assessment fees are worked on porata that is, volume multiply by fees order.
RESIDENTIAL BUILDING
Bungalow Building in Ado Ekiti.
i. Four (4) sets of working drawings with architectural seal.
ii. Approved survey plan by surveyor General.
iii. Assessment Fee
iv. Ratification Fee
v. Land use clearance
vi. Perimeter Fencing
vii. Location plan must be sealed by a Registered Town Planner.
Bungalow Building in Other Local Government Headquarters
i. Four (4) sets of working drawings with architectural seal.
ii. Approved survey plan by surveyor General.
iii. Assessment Fee
iv. Ratification Fee
v. Land use clearance
vi. Perimeter Fencing
vii. Location plan must be sealed by a Registered Town Planner.
Bungalow Building in Other Towns
i. Four (4) sets of working drawings with architectural seal.
ii. Approved survey plan by surveyor General.
iii. Assessment Fee
iv. Ratification Fee
v. Land use clearance
vi. Perimeter Fencing
2
vii. Location plan must be sealed by a Registered Town Planner.
Storey Building in Ado Ekiti.
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Letter of supervision by the Structural Engineer.
iv. Approved survey plan by surveyor General.
v. Assessment Fee
vi. Ratification Fee
vii. Land use clearance
viii. Perimeter Fencing
ix. Location plan must be sealed by a Registered Town Planner.
Storey Building in Other Local Government Headquarters.
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Letter of supervision by the Structural Engineer.
iv. Approved survey plan by surveyor General.
v. Assessment Fee
vi. Ratification Fee
vii. Land use clearance
viii. Perimeter Fencing
ix. Location plan must be sealed by a Registered Town Planner.
Storey Building in Other Towns.
I. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Letter of supervision by the Structural Engineer.
iv. Approved survey plan by surveyor General.
v. Assessment Fee
vi. Ratification Fee
vii. Land use clearance
viii. Perimeter Fencing
ix. Location plan must be sealed by a Registered Town Planner.
3
COMMERCIAL BUILDING
Bungalow/ Storey Building in Ado Ekiti.
I. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Environmental Impact Assessment.
iv. Letter of supervision by the Structural Engineer.
v. Approved survey plan by surveyor General.
vi. Assessment Fee
vii. Ratification Fee
viii. Land use clearance
ix. Perimeter Fencing
x. Location plan must be sealed by a Registered Town Planner.
Bungalow/ Storey Building in Other Towns.
I. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Environmental Impact Assessment.
iv. Letter of supervision by the Structural Engineer.
v. Approved survey plan by surveyor General.
vi. Assessment Fee
vii. Ratification Fee
viii. Land use clearance
ix. Perimeter Fencing
x. Location plan must be sealed by a Registered Town Planner.
BANK BUILDING
I. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Environmental Impact Assessment.
4
iv. Letter of supervision by the Structural Engineer.
v. Approved survey plan by surveyor General.
vi. Assessment Fee
vii. Ratification Fee
viii. Land use clearance
ix. Perimeter Fencing
x. Location plan must be sealed by a Registered Town Planner.
PETROL FILLING STATION
SPATIAL REQUIREMENTS SCHEDULE
Minimum Spatial Requirements
1.
Requirement/ condition
Site Area Minimum
Major
1500m
Domestic
Retailers
900-1000m
2. Minimum Frontal Width. 30m 18m
3. Minimum distance between
Filling station at the same side of
the road.
500m 180m
4. On the other side of road 200m 120m
5. Minimum drive way width abuting
the station.
12m 9m
6. Minimum width of each gate
egress and ingress (open frontage
is preferred). No block wall fence
in the frontage.
6.0m 4.5m
7. The set back of the building
structures and installations within
the station.
6.0m 4.5m
8. …to adjoining properties of
residential structures.
8.2m 6.0m
9. Minimum set back to the NNPC or
Gas Pipeline
45m 45m
10. Minimum setback to 130/132kv 50m 50m
5
line
11. Minimum setback to the centre of
medium tension power line (33kv)
30m 15m
12. Minimum setback to the low
tension power line (11kv)
20m 15m
13. Minimum setback to stream from
the centre of the property where
there is no embankment walls.
30m 30m
14. Minimum setback from the
property line to the edge of any
stream where there are no
embankment wall.
15m 10m
15. Minimum setback to the centre of
road intersection.
45m 20m
16. Minimum distance from property
line to the centre line of secondary
road i.e State & Intercity road.
30m 20m
i. Four (4) sets of Electrical drawings sealed by a Registered Engineer
ii. Environmental Impact Assessment.
iii. Fire Service Clearance.
iv. Police Traffic Clearance.
v. Letter of suitability/feasibility Approval from DPR.
vi. Land use clearance Approval.
vii. Current 3 years tax clearance and 3 years Development levy.
viii. Letter of supervision by the Structural Engineer.
ix. Approved survey plan by surveyor General.
x. Assessment Fee
xi. Ratification Fee
xii. Land use clearance
xiii. Perimeter Fencing
xiv. Location plan must be sealed by a Registered Town Planner.
Filling Station in Other Local Government Area.
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
6
iii. Four (4) sets of Mechanical drawings sealed by a Registered
Engineer.
iv. Four (4) sets of Electrical drawings sealed by a Registered Engineer
v. Environmental Impact Assessment.
vi. Fire Service Clearance.
vii. Police Traffic Clearance.
viii. Land use clearance Approval.
ix. Letter of suitability/feasibility Approval from DPR.
x. Current 3 years tax clearance and 3 years Development levy.
xi. Letter of supervision by the Structural Engineer.
xii. Approved survey plan by surveyor General.
xiii. Assessment Fee
xiv. Ratification Fee
xv. Land use clearance
xvi. Perimeter Fencing
xvii. Location plan must be sealed by a Registered Town Planner.
Filling Station in Other Towns.
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
Iii. Four (4) sets of Mechanical drawings sealed by a Registered
Engineer.
iii. Four (4) sets of Electrical drawings sealed by a Registered Engineer
iv. Environmental Impact Assessment.
v. Fire Service Clearance.
vi. Police Traffic Clearance.
vii. Land use clearance Approval.
viii. Letter of suitability/feasibility Clearance from DPR.
ix. Current 3 years tax clearance and 3 years Development Levy.
x. Letter of supervision by the Structural Engineer.
xi. Approved survey plan by surveyor General.
xii. Assessment Fee
xiii. Ratification Fee
xiv. Land use clearance
xv. Perimeter Fencing
xvi. Location plan must be sealed by a Registered Town Planner.
7
GAS STATION.
SPATIAL REQUIREMENTS SCHEDULE
Minimum Spatial Requirements
1.
Requirement/ condition
Site Area Minimum
Major
1500m
Domestic
Retailers
900-1000m
2. Minimum Frontal Width. 30m 18m
3. Minimum distance between
Filling station at the same side of
the road.
500m 180m
4. On the other side of road 200m 120m
5. Minimum drive way width abuting
the station.
12m 9m
6. Minimum width of each gate
egress and ingress (open frontage
is preferred). No block wall fence
in the frontage.
6.0m 4.5m
7. The set back of the building
structures and installations within
the station.
6.0m 4.5m
8. …to adjoining properties of
residential structures.
8.2m 6.0m
9. Minimum set back to the NNPC or
Gas Pipeline
45m 45m
10. Minimum setback to 130/132kv
line
50m 50m
11. Minimum setback to the centre of
medium tension power line (33kv)
30m 15m
12. Minimum setback to the low
tension power line (11kv)
20m 15m
13. Minimum setback to stream from
the centre of the property where
there is no embankment walls.
30m 30m
8
14. Minimum setback from the
property line to the edge of any
stream where there are no
embankment wall.
15m 10m
15. Minimum setback to the centre of
road intersection.
45m 20m
16. Minimum distance from property
line to the centre line of secondary
road i.e State & Intercity road.
30m 20m
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Four (4) sets of Mechanical drawings sealed by a Registered
Engineer.
iv. Four (4) sets of Electrical drawings sealed by a Registered Engineer
v. Environmental Impact Assessment.
vi. Fire Service Clearance.
vii. Police Traffic Clearance.
viii. Land use clearance Approval.
ix. Letter of suitability/feasibility from DPR.
x. Current 3 years tax clearance and 3 years Development Levy.
xi. Letter of supervision by the Structural Engineer.
xii. Approved survey plan by surveyor General.
xiii. Assessment Fee
xiv. Ratification Fee
xv. Land use clearance
xvi. Perimeter Fencing
xvii. Location plan must be sealed by a Registered Town Planner.
HOSTEL.
Bungalow Building in Ado Ekiti.
i. Four (4) sets of working drawings with architectural seal.
ii. Approved survey plan by surveyor General.
iii. Assessment Fee
iv. Ratification Fee
9
v. Land use clearance
vi. Perimeter Fencing
vii. Location plan must be sealed by a Registered Town Planner.
viii. Environmental Impact Assessment.
Storey Building in Ado Ekiti.
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Letter of supervision by the Structural Engineer.
iv. Approved survey plan by surveyor General.
v. Assessment Fee
vi. Ratification Fee
vii. Land use clearance
viii. Perimeter Fencing
ix. Location plan must be sealed by a Registered Town Planner.
x. Environmental Impact Assessment.
Bungalow Building in Other Local Government.
i. Four (4) sets of working drawings with architectural seal.
ii. Approved survey plan by surveyor General.
iii. Assessment Fee
iv. Ratification Fee
v. Land use clearance
vi. Perimeter Fencing
vii. Location plan must be sealed by a Registered Town Planner.
viii. Environmental Impact Assessment.
Storey Building in Other Towns.
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Letter of supervision by the Structural Engineer.
iv. Approved survey plan by surveyor General.
v. Assessment Fee
vi. Ratification Fee
10
vii. Land use clearance
viii. Perimeter Fencing
ix. Location plan must be sealed by a Registered Town Planner.
x. Environmental Impact Assessment.
SAWMILL.
Saw Mill in Ado Ekiti.
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Letter of supervision by the Structural Engineer.
iv. Approved survey plan by surveyor General.
v. Assessment Fee
vi. Ratification Fee
vii. Land use clearance
viii. Perimeter Fencing
ix. Location plan must be sealed by a Registered Town Planner.
x. Environmental Impact Assessment.
Saw Mill in Other Towns.
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Letter of supervision by the Structural Engineer.
iv. Approved survey plan by surveyor General.
v. Assessment Fee
vi. Ratification Fee
vii. Land use clearance
viii. Perimeter Fencing
ix. Location plan must be sealed by a Registered Town Planner.
x. Environmental Impact Assessment.
xi.
HOTEL/EATERY/RESTAURANTS
Bungalow Building in Ado Ekiti.
i. Four (4) sets of working drawings with architectural seal.
ii. Approved survey plan by surveyor General.
iii. Assessment Fee
11
iv. Ratification Fee
v. Land use clearance
vi. Perimeter Fencing
vii. Location plan must be sealed by a Registered Town Planner.
viii. Environmental Impact Assessment.
Storey Building in Ado Ekiti.
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Letter of supervision by the Structural Engineer.
iv. Approved survey plan by surveyor General.
v. Assessment Fee
vi. Ratification Fee
vii. Land use clearance
viii. Perimeter Fencing
ix. Location plan must be sealed by a Registered Town Planner.
x. Environmental Impact Assessment.
Bungalow Building in Other Local Government.
i. Four (4) sets of working drawings with architectural seal.
ii. Approved survey plan by surveyor General.
iii. Assessment Fee
iv. Ratification Fee
v. Land use clearance
vi. Perimeter Fencing
vii. Location plan must be sealed by a Registered Town Planner.
viii. Environmental Impact Assessment.
Storey Building in Other Towns.
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Letter of supervision by the Structural Engineer.
iv. Approved survey plan by surveyor General.
12
v. Assessment Fee
vi. Ratification Fee
vii. Land use clearance
viii. Perimeter Fencing
ix. Location plan must be sealed by a Registered Town Planner.
x. Environmental Impact Assessment.
LIGHT INDUSTRY
Block Making Industry
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Letter of supervision by the Structural Engineer.
iv. Approved survey plan by surveyor General.
v. Assessment Fee
vi. Ratification Fee
vii. Land use clearance
viii. Perimeter Fencing
ix. Location plan must be sealed by a Registered Town Planner.
x. Environmental Impact Assessment.
Concrete Industry
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Letter of supervision by the Structural Engineer.
iv. Approved survey plan by surveyor General.
v. Assessment Fee
vi. Ratification Fee
vii. Land use clearance
viii. Perimeter Fencing
ix. Location plan must be sealed by a Registered Town Planner.
x. Environmental Impact Assessment.
Stone crushing Industry (Mechanical)
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Letter of supervision by the Structural Engineer.
iv. Approved survey plan by surveyor General.
13
v. Assessment Fee
vi. Ratification Fee
vii. Land use clearance
viii. Perimeter Fencing
ix. Location plan must be sealed by a Registered Town Planner.
x. Environmental Impact Assessment.
Stone crushing Industry with Asphalt
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Letter of supervision by the Structural Engineer.
iv. Approved survey plan by surveyor General.
v. Assessment Fee
vi. Ratification Fee
vii. Land use clearance
viii. Perimeter Fencing
ix. Location plan must be sealed by a Registered Town Planner.
x. Environmental Impact Assessment.
AGRICULTURAL DEVELOPMENT
Mechanized Farming
i. Four (4) sets of working drawings with architectural seal.
ii. Approved survey plan by surveyor General.
iii. Assessment Fee
iv. Ratification Fee
v. Land use clearance
vi. Perimeter Fencing
vii. Location plan must be sealed by a Registered Town Planner.
viii. Environmental Impact Assessment.
POULTRY FARMING
i. Four (4) sets of working drawings with architectural seal.
ii. Approved survey plan by surveyor General.
iii. Assessment Fee = (100-200) Birds
iv. Assessment Fee = (201-500) Birds
v. Ratification Fee
vi. Land use clearance
14
vii. Perimeter Fencing
viii. Location plan must be sealed by a Registered Town Planner.
ix. Environmental Impact Assessment.
FISHERY FARMING
i. Four (4) sets of working drawings with architectural seal.
ii. Approved survey plan by surveyor General.
iii. Assessment Fee (commercial)
iv. Assessment Fee (Domestic)
v. Ratification Fee
vi. Land use clearance
vii. Perimeter Fencing
viii. Location plan must be sealed by a Registered Town Planner.
ix. Environmental Impact Assessment.
PIGGERY FARMING
i. Four (4) sets of working drawings with architectural seal.
ii. Approved survey plan by surveyor General.
iii. Assessment Fee (commercial)
iv. Assessment Fee (Domestic)
v. Ratification Fee
vi. Land use clearance
vii. Perimeter Fencing
viii. Location plan must be sealed by a Registered Town Planner.
ix. Environmental Impact Assessment.
RELIGION CAMP GROUND
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Letter of supervision by the Structural Engineer.
iv. Approved survey plan by surveyor General.
v. Assessment Fee
vi. Ratification Fee
vii. Land use clearance
viii. Perimeter Fencing
ix. Location plan must be sealed by a Registered Town Planner.
15
x. Environmental Impact Assessment.
PLACE OF WORSHIP
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Letter of supervision by the Structural Engineer.
iv. Approved survey plan by surveyor General.
v. Assessment Fee
vi. Ratification Fee
vii. Land use clearance
viii. Perimeter Fencing
ix. Location plan must be sealed by a Registered Town Planner.
x. Environmental Impact Assessment.
EDUCATION INSTITUTION
Nursery/Primary school/Secondary school/Post-Secondary school
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Letter of supervision by the Structural Engineer.
iv. Approved survey plan by surveyor General.
v. Assessment Fee
vi. Ratification Fee
vii. Land use clearance
viii. Perimeter Fencing
ix. Location plan must be sealed by a Registered Town Planner.
x. Environmental Impact Assessment.
CHANGE OF SITE OF AN APPROVED PLAN
Residential
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Letter of supervision by the Structural Engineer.
iv. Approved survey plan by surveyor General.
v. Assessment Fee = 25% of current charge
vi. Location plan must be sealed by a Registered Town Planner.
16
Commercial/Petrol Station/ Sawmill
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Letter of supervision by the Structural Engineer.
iv. Approved survey plan by surveyor General.
v. Assessment Fee = 25% of current charge
vi. Location plan must be sealed by a Registered Town Planner.
vii. Environmental Impact Assessment.
RENEWAL OF BUILDING PLAN
Residential/Commercial/Industrial
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Letter of supervision by the Structural Engineer.
iv. Approved survey plan by surveyor General.
v. Assessment Fee = 20% of current charge
vi. Location plan must be sealed by a Registered Town Planner.
vii. Environmental Impact Assessment. (Commercial/Industrial)
LAYOUT PLAN
i. Six (6) sets of layout plan with locational plan prepared by a
Registered Town Planner.
ii. Approved survey plan by surveyor General.
iii. Land Use Clearance
iv. Assessment Fee 0.5 Ha- 2.5Ha
2.5Ha - 5.0Ha
5.1Ha - 10Ha
Above 10Ha
v. Location plan must be sealed by a Registered Town Planner.
vi. Environmental Impact Assessment.
ROAD CONSTRUCTION YARD PROJECT SITE
i. Four (4) sets of working drawings with architectural seal
ii. Approved survey plan by surveyor General.
iii. Assessment Fee
17
iv. Location plan must be sealed by a Registered Town Planner.
v. Environmental Impact Assessment.
PENALTY IN RESPECTOF UNAPPROVED EXISTING BUILDING PLAN
i. Assessment Fee = The present Assessment + 50% of the assessment
OPERATIONAL MODE OF PLANNING PERMIT DEPARTMENT
Payments are made on these categories
i. Commercial
ii. Corporate bodies
iii. Individual/private
Condition for approval of mast/base transceiver station(BTS) for all
categories of mast.
i. Submission of four working drawings.
ii. Submission of three copies of site analysis report.
(SAR)/Environmental impact Assessment (EIA)
iii. Joint site visitation to the site.
iv. Issuance of demand notice for effective payment.
v. Submission of evidence of payment in accordance with the demand
notice.
vi. Issuance of approval/ permit letter.
vii. Continuous oversight function over the site activities.
MEDIA HOUSES
1. Submission of application for the project of intension.
2. Submission of four copies of working drawings which must include the
followings.
i. Perimeter survey plan of the site signed by the Surveyor General.
ii. Four copies of the working drawings of the building projects which
can include the: electrical, mechanical, land scape e.t.c
18
iii. Evidence of payment of tax and Ekiti State Development levy for 3
years.
iv. Broadcasting license.
v. EIA/SAR
3. Issuance of demand notices for effective payment.
4. Joint site visitation.
5. Evidence of payment in the manners prescribed in the demand notice.
6. Issuance of approval /permit.
REQUIREMENTS FOR LAYING OF OPTIC FIBRE.
1. Submission of application by the prospective service provider showing.
i. The name of the routes covered by the cables.
ii. Map of the road network of the routes from origin to the last point.
iii. Schedule/tabulation sheet of name, distances, total and categories of the
affected routes.
2. Joint site visitation to the affected routes.
3. Issuance of demand notice generated from the application submitted.
4. Evidence of payment of the prescribed fee as entrenched in the demand
notice.
5. Continuous oversight function of the ministry.
6. Issuance of certificate of completion when the job is satisfactorily
implemented.
Note:Penalty for contravension is double of the assessment fee above and other
condition determined by the ministry.

Contenu connexe

Tendances

ARCHITECTURAL SITE VISIT
ARCHITECTURAL SITE VISITARCHITECTURAL SITE VISIT
ARCHITECTURAL SITE VISITahergirish0
 
Architectural Professional Practice - Introduction
Architectural Professional Practice - IntroductionArchitectural Professional Practice - Introduction
Architectural Professional Practice - IntroductionGalala University
 
High rise building design
High rise building design High rise building design
High rise building design Somesh Siddharth
 
Heydar Aliyev Center Structural system and materials
Heydar Aliyev Center Structural system and materialsHeydar Aliyev Center Structural system and materials
Heydar Aliyev Center Structural system and materialsSasanSafar
 
Deterioration in building
Deterioration in buildingDeterioration in building
Deterioration in buildingRumi Tamakhu
 
Site Planning- Principles and Considerations
Site Planning- Principles and Considerations Site Planning- Principles and Considerations
Site Planning- Principles and Considerations ameed inam
 
Adrian Navarro Architectural Technologist Portfolio
Adrian Navarro Architectural Technologist PortfolioAdrian Navarro Architectural Technologist Portfolio
Adrian Navarro Architectural Technologist PortfolioAdrian Navarro
 
National building code
National building codeNational building code
National building codeMayank Rawat
 
Vertical architecture campus synopsis
Vertical architecture campus synopsisVertical architecture campus synopsis
Vertical architecture campus synopsisAr. Sahid Akhtar
 
Design of residential building
Design of residential buildingDesign of residential building
Design of residential buildingK.MAHESH KUMAR
 
Architecture Professional practice
Architecture Professional  practice Architecture Professional  practice
Architecture Professional practice Ar. Mukunda K.S
 
Working Drawings Checklists
Working Drawings ChecklistsWorking Drawings Checklists
Working Drawings Checklists'Sola Ige
 
Kochi jew town street & synagogue-taiyaba
Kochi jew town street & synagogue-taiyabaKochi jew town street & synagogue-taiyaba
Kochi jew town street & synagogue-taiyabaTaiyaba Rashid
 
Case Study of Building Services in Multi-Purpose Buildings involving Public Use
Case Study of Building Services in Multi-Purpose Buildings involving Public UseCase Study of Building Services in Multi-Purpose Buildings involving Public Use
Case Study of Building Services in Multi-Purpose Buildings involving Public UseCarmen Chan
 
ARCHITECT'S ACT 1972
ARCHITECT'S ACT 1972ARCHITECT'S ACT 1972
ARCHITECT'S ACT 1972Gagan Jain
 

Tendances (20)

ARCHITECTURAL SITE VISIT
ARCHITECTURAL SITE VISITARCHITECTURAL SITE VISIT
ARCHITECTURAL SITE VISIT
 
The architects act, 1972
The architects act, 1972The architects act, 1972
The architects act, 1972
 
Architectural Professional Practice - Introduction
Architectural Professional Practice - IntroductionArchitectural Professional Practice - Introduction
Architectural Professional Practice - Introduction
 
High rise building design
High rise building design High rise building design
High rise building design
 
Heydar Aliyev Center Structural system and materials
Heydar Aliyev Center Structural system and materialsHeydar Aliyev Center Structural system and materials
Heydar Aliyev Center Structural system and materials
 
FSI calculation
FSI calculationFSI calculation
FSI calculation
 
Deterioration in building
Deterioration in buildingDeterioration in building
Deterioration in building
 
Site Planning- Principles and Considerations
Site Planning- Principles and Considerations Site Planning- Principles and Considerations
Site Planning- Principles and Considerations
 
Housing gr
Housing grHousing gr
Housing gr
 
Adrian Navarro Architectural Technologist Portfolio
Adrian Navarro Architectural Technologist PortfolioAdrian Navarro Architectural Technologist Portfolio
Adrian Navarro Architectural Technologist Portfolio
 
National building code
National building codeNational building code
National building code
 
Waffle or ribbed slab
Waffle or ribbed slabWaffle or ribbed slab
Waffle or ribbed slab
 
Vertical architecture campus synopsis
Vertical architecture campus synopsisVertical architecture campus synopsis
Vertical architecture campus synopsis
 
Design of residential building
Design of residential buildingDesign of residential building
Design of residential building
 
Architecture Professional practice
Architecture Professional  practice Architecture Professional  practice
Architecture Professional practice
 
Working Drawings Checklists
Working Drawings ChecklistsWorking Drawings Checklists
Working Drawings Checklists
 
Kochi jew town street & synagogue-taiyaba
Kochi jew town street & synagogue-taiyabaKochi jew town street & synagogue-taiyaba
Kochi jew town street & synagogue-taiyaba
 
3 iia
3 iia3 iia
3 iia
 
Case Study of Building Services in Multi-Purpose Buildings involving Public Use
Case Study of Building Services in Multi-Purpose Buildings involving Public UseCase Study of Building Services in Multi-Purpose Buildings involving Public Use
Case Study of Building Services in Multi-Purpose Buildings involving Public Use
 
ARCHITECT'S ACT 1972
ARCHITECT'S ACT 1972ARCHITECT'S ACT 1972
ARCHITECT'S ACT 1972
 

Similaire à Building Plan Approval Requirements

ICI/ITD P1
ICI/ITD P1ICI/ITD P1
ICI/ITD P1Mao Hua
 
ICI_P1_PLANNER
ICI_P1_PLANNERICI_P1_PLANNER
ICI_P1_PLANNERMao Hua
 
ITD/ICI Project 1
ITD/ICI Project 1ITD/ICI Project 1
ITD/ICI Project 1TeoViVien
 
ITD_P1_PLANNER DRAWING
ITD_P1_PLANNER DRAWINGITD_P1_PLANNER DRAWING
ITD_P1_PLANNER DRAWINGMao Hua
 
ICI Project 1- Urban Planner
ICI Project 1- Urban PlannerICI Project 1- Urban Planner
ICI Project 1- Urban PlannerEricaGloriaChin
 
Unit 1-introduction to civil engg final
Unit 1-introduction to civil engg finalUnit 1-introduction to civil engg final
Unit 1-introduction to civil engg finalDYPCET
 
MEASUREMENT PDF
MEASUREMENT PDFMEASUREMENT PDF
MEASUREMENT PDFIDHAMUKI
 
CAC BUOC DAU TU DU AN.pdf
CAC BUOC DAU TU DU AN.pdfCAC BUOC DAU TU DU AN.pdf
CAC BUOC DAU TU DU AN.pdfHuynhVu29
 
building plan and designing and ppt.ppt
building plan and designing and  ppt.pptbuilding plan and designing and  ppt.ppt
building plan and designing and ppt.pptSureshKumarMP3
 
Scope of civil engineering,Role of civil Engineer in Society
Scope of civil engineering,Role of civil Engineer in SocietyScope of civil engineering,Role of civil Engineer in Society
Scope of civil engineering,Role of civil Engineer in SocietyRAMPRASAD KUMAWAT
 
Griffith Avenue SHD ncac presentation 21 01-2019
Griffith Avenue SHD ncac presentation 21 01-2019Griffith Avenue SHD ncac presentation 21 01-2019
Griffith Avenue SHD ncac presentation 21 01-2019Naoise
 
Wasa guidelines for design of water and wastewater systems
Wasa   guidelines for design of water and wastewater systemsWasa   guidelines for design of water and wastewater systems
Wasa guidelines for design of water and wastewater systemsJeffrey James
 

Similaire à Building Plan Approval Requirements (20)

ICI/ITD P1
ICI/ITD P1ICI/ITD P1
ICI/ITD P1
 
ICI_P1_PLANNER
ICI_P1_PLANNERICI_P1_PLANNER
ICI_P1_PLANNER
 
ITD/ICI Project 1
ITD/ICI Project 1ITD/ICI Project 1
ITD/ICI Project 1
 
13
1313
13
 
ITD_P1_PLANNER DRAWING
ITD_P1_PLANNER DRAWINGITD_P1_PLANNER DRAWING
ITD_P1_PLANNER DRAWING
 
ICI Project 1- Urban Planner
ICI Project 1- Urban PlannerICI Project 1- Urban Planner
ICI Project 1- Urban Planner
 
Unit 1-introduction to civil engg final
Unit 1-introduction to civil engg finalUnit 1-introduction to civil engg final
Unit 1-introduction to civil engg final
 
MEASUREMENT PDF
MEASUREMENT PDFMEASUREMENT PDF
MEASUREMENT PDF
 
Hrc nmmc guidelines
Hrc nmmc guidelinesHrc nmmc guidelines
Hrc nmmc guidelines
 
Ghazawi-CV updat - April 2016
Ghazawi-CV updat - April 2016Ghazawi-CV updat - April 2016
Ghazawi-CV updat - April 2016
 
CAC BUOC DAU TU DU AN.pdf
CAC BUOC DAU TU DU AN.pdfCAC BUOC DAU TU DU AN.pdf
CAC BUOC DAU TU DU AN.pdf
 
Decision Notice
Decision NoticeDecision Notice
Decision Notice
 
Column & beam
Column & beamColumn & beam
Column & beam
 
Airport Commerce
Airport CommerceAirport Commerce
Airport Commerce
 
building plan and designing and ppt.ppt
building plan and designing and  ppt.pptbuilding plan and designing and  ppt.ppt
building plan and designing and ppt.ppt
 
Training Report
Training ReportTraining Report
Training Report
 
Scope of civil engineering,Role of civil Engineer in Society
Scope of civil engineering,Role of civil Engineer in SocietyScope of civil engineering,Role of civil Engineer in Society
Scope of civil engineering,Role of civil Engineer in Society
 
Griffith Avenue SHD ncac presentation 21 01-2019
Griffith Avenue SHD ncac presentation 21 01-2019Griffith Avenue SHD ncac presentation 21 01-2019
Griffith Avenue SHD ncac presentation 21 01-2019
 
Chapter 1
Chapter 1Chapter 1
Chapter 1
 
Wasa guidelines for design of water and wastewater systems
Wasa   guidelines for design of water and wastewater systemsWasa   guidelines for design of water and wastewater systems
Wasa guidelines for design of water and wastewater systems
 

Plus de Government of Ekiti State, Nigeria

An Account of Stewardship by the Biodun Abayomi Oyebanji Administration of Ek...
An Account of Stewardship by the Biodun Abayomi Oyebanji Administration of Ek...An Account of Stewardship by the Biodun Abayomi Oyebanji Administration of Ek...
An Account of Stewardship by the Biodun Abayomi Oyebanji Administration of Ek...Government of Ekiti State, Nigeria
 
2021 REPORT OF THE EKITI STATE DEBT SUSTAINABILITY ANALYSIS AND DEBT MANAGEME...
2021 REPORT OF THE EKITI STATE DEBT SUSTAINABILITY ANALYSIS AND DEBT MANAGEME...2021 REPORT OF THE EKITI STATE DEBT SUSTAINABILITY ANALYSIS AND DEBT MANAGEME...
2021 REPORT OF THE EKITI STATE DEBT SUSTAINABILITY ANALYSIS AND DEBT MANAGEME...Government of Ekiti State, Nigeria
 
Ekiti State Drugs and Health Supplies Management Agency Law 2021
Ekiti State Drugs and Health Supplies Management Agency Law 2021Ekiti State Drugs and Health Supplies Management Agency Law 2021
Ekiti State Drugs and Health Supplies Management Agency Law 2021Government of Ekiti State, Nigeria
 
State Address on the Occasion of 25th Anniversary of Ekiti State.
State Address on the Occasion of 25th Anniversary of Ekiti State.State Address on the Occasion of 25th Anniversary of Ekiti State.
State Address on the Occasion of 25th Anniversary of Ekiti State.Government of Ekiti State, Nigeria
 
REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICES – FIRMS)
REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICES – FIRMS)REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICES – FIRMS)
REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICES – FIRMS)Government of Ekiti State, Nigeria
 
PRESS STATEMENT FROM THE DESK OF THE CHAIRMAN, LOCAL COUNCIL DEVELOPMENT AREA...
PRESS STATEMENT FROM THE DESK OF THE CHAIRMAN, LOCAL COUNCIL DEVELOPMENT AREA...PRESS STATEMENT FROM THE DESK OF THE CHAIRMAN, LOCAL COUNCIL DEVELOPMENT AREA...
PRESS STATEMENT FROM THE DESK OF THE CHAIRMAN, LOCAL COUNCIL DEVELOPMENT AREA...Government of Ekiti State, Nigeria
 
PROFILE OF HIS ROYAL MAJESTY OBA GABRIEL AYODELE ADEJUWON, FCTI., ADETILA ILU...
PROFILE OF HIS ROYAL MAJESTY OBA GABRIEL AYODELE ADEJUWON, FCTI., ADETILA ILU...PROFILE OF HIS ROYAL MAJESTY OBA GABRIEL AYODELE ADEJUWON, FCTI., ADETILA ILU...
PROFILE OF HIS ROYAL MAJESTY OBA GABRIEL AYODELE ADEJUWON, FCTI., ADETILA ILU...Government of Ekiti State, Nigeria
 
Ekiti State Joint Local Government Account and Allocation of Revenue (3rd Ame...
Ekiti State Joint Local Government Account and Allocation of Revenue (3rd Ame...Ekiti State Joint Local Government Account and Allocation of Revenue (3rd Ame...
Ekiti State Joint Local Government Account and Allocation of Revenue (3rd Ame...Government of Ekiti State, Nigeria
 
Projects (Completed and Ongoing) MINISTRY OF PHYSICAL, URBAN AND REGIONAL PLA...
Projects (Completed and Ongoing) MINISTRY OF PHYSICAL, URBAN AND REGIONAL PLA...Projects (Completed and Ongoing) MINISTRY OF PHYSICAL, URBAN AND REGIONAL PLA...
Projects (Completed and Ongoing) MINISTRY OF PHYSICAL, URBAN AND REGIONAL PLA...Government of Ekiti State, Nigeria
 
2020-2022 MEDIUM TERM EXPENDITURE FRAMEWORK (MTEF) MEDIUM TERM SECTORAL STRA...
2020-2022 MEDIUM TERM EXPENDITURE FRAMEWORK (MTEF)  MEDIUM TERM SECTORAL STRA...2020-2022 MEDIUM TERM EXPENDITURE FRAMEWORK (MTEF)  MEDIUM TERM SECTORAL STRA...
2020-2022 MEDIUM TERM EXPENDITURE FRAMEWORK (MTEF) MEDIUM TERM SECTORAL STRA...Government of Ekiti State, Nigeria
 
A Communique issued at the end of the 30th teleconference meeting of the Nige...
A Communique issued at the end of the 30th teleconference meeting of the Nige...A Communique issued at the end of the 30th teleconference meeting of the Nige...
A Communique issued at the end of the 30th teleconference meeting of the Nige...Government of Ekiti State, Nigeria
 

Plus de Government of Ekiti State, Nigeria (20)

An Account of Stewardship by the Biodun Abayomi Oyebanji Administration of Ek...
An Account of Stewardship by the Biodun Abayomi Oyebanji Administration of Ek...An Account of Stewardship by the Biodun Abayomi Oyebanji Administration of Ek...
An Account of Stewardship by the Biodun Abayomi Oyebanji Administration of Ek...
 
2021 REPORT OF THE EKITI STATE DEBT SUSTAINABILITY ANALYSIS AND DEBT MANAGEME...
2021 REPORT OF THE EKITI STATE DEBT SUSTAINABILITY ANALYSIS AND DEBT MANAGEME...2021 REPORT OF THE EKITI STATE DEBT SUSTAINABILITY ANALYSIS AND DEBT MANAGEME...
2021 REPORT OF THE EKITI STATE DEBT SUSTAINABILITY ANALYSIS AND DEBT MANAGEME...
 
COVID-19 VACCINATION SITES (EKITI STATE)
COVID-19  VACCINATION SITES (EKITI STATE)COVID-19  VACCINATION SITES (EKITI STATE)
COVID-19 VACCINATION SITES (EKITI STATE)
 
Re-Imagining Health Service Delivery 2020-2021 Annual Report
Re-Imagining Health Service Delivery  2020-2021 Annual ReportRe-Imagining Health Service Delivery  2020-2021 Annual Report
Re-Imagining Health Service Delivery 2020-2021 Annual Report
 
Ekiti State Mental Health Law 2021
Ekiti State Mental Health Law 2021Ekiti State Mental Health Law 2021
Ekiti State Mental Health Law 2021
 
Ekiti State Drugs and Health Supplies Management Agency Law 2021
Ekiti State Drugs and Health Supplies Management Agency Law 2021Ekiti State Drugs and Health Supplies Management Agency Law 2021
Ekiti State Drugs and Health Supplies Management Agency Law 2021
 
State Address on the Occasion of 25th Anniversary of Ekiti State.
State Address on the Occasion of 25th Anniversary of Ekiti State.State Address on the Occasion of 25th Anniversary of Ekiti State.
State Address on the Occasion of 25th Anniversary of Ekiti State.
 
REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICES – FIRMS)
REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICES – FIRMS)REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICES – FIRMS)
REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICES – FIRMS)
 
ENTITLED: TOWARDS A MORE PERFECT UNION
ENTITLED: TOWARDS A MORE PERFECT UNIONENTITLED: TOWARDS A MORE PERFECT UNION
ENTITLED: TOWARDS A MORE PERFECT UNION
 
2021 WORLD HUMANITARIAN DAY
2021 WORLD HUMANITARIAN DAY2021 WORLD HUMANITARIAN DAY
2021 WORLD HUMANITARIAN DAY
 
PRESS STATEMENT FROM THE DESK OF THE CHAIRMAN, LOCAL COUNCIL DEVELOPMENT AREA...
PRESS STATEMENT FROM THE DESK OF THE CHAIRMAN, LOCAL COUNCIL DEVELOPMENT AREA...PRESS STATEMENT FROM THE DESK OF THE CHAIRMAN, LOCAL COUNCIL DEVELOPMENT AREA...
PRESS STATEMENT FROM THE DESK OF THE CHAIRMAN, LOCAL COUNCIL DEVELOPMENT AREA...
 
PROFILE OF HIS ROYAL MAJESTY OBA GABRIEL AYODELE ADEJUWON, FCTI., ADETILA ILU...
PROFILE OF HIS ROYAL MAJESTY OBA GABRIEL AYODELE ADEJUWON, FCTI., ADETILA ILU...PROFILE OF HIS ROYAL MAJESTY OBA GABRIEL AYODELE ADEJUWON, FCTI., ADETILA ILU...
PROFILE OF HIS ROYAL MAJESTY OBA GABRIEL AYODELE ADEJUWON, FCTI., ADETILA ILU...
 
Ekiti State Joint Local Government Account and Allocation of Revenue (3rd Ame...
Ekiti State Joint Local Government Account and Allocation of Revenue (3rd Ame...Ekiti State Joint Local Government Account and Allocation of Revenue (3rd Ame...
Ekiti State Joint Local Government Account and Allocation of Revenue (3rd Ame...
 
Ekiti State Audit Service Commission Law, 2021
Ekiti State Audit Service Commission Law, 2021Ekiti State Audit Service Commission Law, 2021
Ekiti State Audit Service Commission Law, 2021
 
Projects (Completed and Ongoing) MINISTRY OF PHYSICAL, URBAN AND REGIONAL PLA...
Projects (Completed and Ongoing) MINISTRY OF PHYSICAL, URBAN AND REGIONAL PLA...Projects (Completed and Ongoing) MINISTRY OF PHYSICAL, URBAN AND REGIONAL PLA...
Projects (Completed and Ongoing) MINISTRY OF PHYSICAL, URBAN AND REGIONAL PLA...
 
2020-2022 MEDIUM TERM EXPENDITURE FRAMEWORK (MTEF) MEDIUM TERM SECTORAL STRA...
2020-2022 MEDIUM TERM EXPENDITURE FRAMEWORK (MTEF)  MEDIUM TERM SECTORAL STRA...2020-2022 MEDIUM TERM EXPENDITURE FRAMEWORK (MTEF)  MEDIUM TERM SECTORAL STRA...
2020-2022 MEDIUM TERM EXPENDITURE FRAMEWORK (MTEF) MEDIUM TERM SECTORAL STRA...
 
RECORDS OF LAND DISPUTE (PETITION) AND RESOLUTION, 2017-2019
RECORDS OF LAND DISPUTE (PETITION) AND RESOLUTION, 2017-2019RECORDS OF LAND DISPUTE (PETITION) AND RESOLUTION, 2017-2019
RECORDS OF LAND DISPUTE (PETITION) AND RESOLUTION, 2017-2019
 
Keep Girls In School
Keep Girls In SchoolKeep Girls In School
Keep Girls In School
 
A Communique issued at the end of the 30th teleconference meeting of the Nige...
A Communique issued at the end of the 30th teleconference meeting of the Nige...A Communique issued at the end of the 30th teleconference meeting of the Nige...
A Communique issued at the end of the 30th teleconference meeting of the Nige...
 
FLAGGING OFF 0F EKITI RICE PYRAMID PROJECT
FLAGGING OFF 0F EKITI RICE PYRAMID PROJECTFLAGGING OFF 0F EKITI RICE PYRAMID PROJECT
FLAGGING OFF 0F EKITI RICE PYRAMID PROJECT
 

Dernier

PEO AVRIL POUR LA COMMUNE D'ORGERUS INFO
PEO AVRIL POUR LA COMMUNE D'ORGERUS INFOPEO AVRIL POUR LA COMMUNE D'ORGERUS INFO
PEO AVRIL POUR LA COMMUNE D'ORGERUS INFOMAIRIEORGERUS
 
call girls in Tilak Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Tilak Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Tilak Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Tilak Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️saminamagar
 
call girls in Vasant Kunj DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vasant Kunj DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Vasant Kunj DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vasant Kunj DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️saminamagar
 
call girls in Narela DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Narela DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Narela DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Narela DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️saminamagar
 
Stop throwing your old clothes and start donating
Stop throwing your old clothes and start donatingStop throwing your old clothes and start donating
Stop throwing your old clothes and start donatingSERUDS INDIA
 
2024: The FAR, Federal Acquisition Regulations - Part 26
2024: The FAR, Federal Acquisition Regulations - Part 262024: The FAR, Federal Acquisition Regulations - Part 26
2024: The FAR, Federal Acquisition Regulations - Part 26JSchaus & Associates
 
办理约克大学毕业证成绩单|购买加拿大文凭证书
办理约克大学毕业证成绩单|购买加拿大文凭证书办理约克大学毕业证成绩单|购买加拿大文凭证书
办理约克大学毕业证成绩单|购买加拿大文凭证书zdzoqco
 
call girls in Mayur Vihar Phase III DELHI 🔝 >༒9540349809 🔝 genuine Escort Ser...
call girls in Mayur Vihar Phase III DELHI 🔝 >༒9540349809 🔝 genuine Escort Ser...call girls in Mayur Vihar Phase III DELHI 🔝 >༒9540349809 🔝 genuine Escort Ser...
call girls in Mayur Vihar Phase III DELHI 🔝 >༒9540349809 🔝 genuine Escort Ser...saminamagar
 
call girls in Yamuna Pushta DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Yamuna Pushta DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Yamuna Pushta DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Yamuna Pushta DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️saminamagar
 
Call Girl Benson Town - Phone No 7001305949 For Ultimate Sexual Urges
Call Girl Benson Town - Phone No 7001305949 For Ultimate Sexual UrgesCall Girl Benson Town - Phone No 7001305949 For Ultimate Sexual Urges
Call Girl Benson Town - Phone No 7001305949 For Ultimate Sexual Urgesnarwatsonia7
 
Call Girls Near Surya International Hotel New Delhi 9873777170
Call Girls Near Surya International Hotel New Delhi 9873777170Call Girls Near Surya International Hotel New Delhi 9873777170
Call Girls Near Surya International Hotel New Delhi 9873777170Sonam Pathan
 
call girls in Laxmi Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Laxmi Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Laxmi Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Laxmi Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️saminamagar
 
2024: The FAR, Federal Acquisition Regulations - Part 25
2024: The FAR, Federal Acquisition Regulations - Part 252024: The FAR, Federal Acquisition Regulations - Part 25
2024: The FAR, Federal Acquisition Regulations - Part 25JSchaus & Associates
 
Yellow is My Favorite Color By Annabelle.pdf
Yellow is My Favorite Color By Annabelle.pdfYellow is My Favorite Color By Annabelle.pdf
Yellow is My Favorite Color By Annabelle.pdfAmir Saranga
 
call girls in Mayapuri DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Mayapuri DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Mayapuri DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Mayapuri DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️saminamagar
 
call girls in Punjabi Bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Punjabi Bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Punjabi Bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Punjabi Bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️saminamagar
 
High-Level Thematic Event on Tourism - SUSTAINABILITY WEEK 2024- United Natio...
High-Level Thematic Event on Tourism - SUSTAINABILITY WEEK 2024- United Natio...High-Level Thematic Event on Tourism - SUSTAINABILITY WEEK 2024- United Natio...
High-Level Thematic Event on Tourism - SUSTAINABILITY WEEK 2024- United Natio...Christina Parmionova
 
Call Girls In Pullman Hotel New Delhi Aerocity 9873777170
Call Girls In Pullman Hotel New Delhi Aerocity 9873777170Call Girls In Pullman Hotel New Delhi Aerocity 9873777170
Call Girls In Pullman Hotel New Delhi Aerocity 9873777170Sonam Pathan
 
Action Toolkit - Earth Day 2024 - April 22nd.
Action Toolkit - Earth Day 2024 - April 22nd.Action Toolkit - Earth Day 2024 - April 22nd.
Action Toolkit - Earth Day 2024 - April 22nd.Christina Parmionova
 

Dernier (20)

PEO AVRIL POUR LA COMMUNE D'ORGERUS INFO
PEO AVRIL POUR LA COMMUNE D'ORGERUS INFOPEO AVRIL POUR LA COMMUNE D'ORGERUS INFO
PEO AVRIL POUR LA COMMUNE D'ORGERUS INFO
 
call girls in Tilak Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Tilak Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Tilak Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Tilak Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
 
call girls in Vasant Kunj DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vasant Kunj DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Vasant Kunj DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vasant Kunj DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
 
call girls in Narela DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Narela DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Narela DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Narela DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
 
Stop throwing your old clothes and start donating
Stop throwing your old clothes and start donatingStop throwing your old clothes and start donating
Stop throwing your old clothes and start donating
 
2024: The FAR, Federal Acquisition Regulations - Part 26
2024: The FAR, Federal Acquisition Regulations - Part 262024: The FAR, Federal Acquisition Regulations - Part 26
2024: The FAR, Federal Acquisition Regulations - Part 26
 
办理约克大学毕业证成绩单|购买加拿大文凭证书
办理约克大学毕业证成绩单|购买加拿大文凭证书办理约克大学毕业证成绩单|购买加拿大文凭证书
办理约克大学毕业证成绩单|购买加拿大文凭证书
 
call girls in Mayur Vihar Phase III DELHI 🔝 >༒9540349809 🔝 genuine Escort Ser...
call girls in Mayur Vihar Phase III DELHI 🔝 >༒9540349809 🔝 genuine Escort Ser...call girls in Mayur Vihar Phase III DELHI 🔝 >༒9540349809 🔝 genuine Escort Ser...
call girls in Mayur Vihar Phase III DELHI 🔝 >༒9540349809 🔝 genuine Escort Ser...
 
call girls in Yamuna Pushta DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Yamuna Pushta DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Yamuna Pushta DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Yamuna Pushta DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
 
Call Girl Benson Town - Phone No 7001305949 For Ultimate Sexual Urges
Call Girl Benson Town - Phone No 7001305949 For Ultimate Sexual UrgesCall Girl Benson Town - Phone No 7001305949 For Ultimate Sexual Urges
Call Girl Benson Town - Phone No 7001305949 For Ultimate Sexual Urges
 
Call Girls Near Surya International Hotel New Delhi 9873777170
Call Girls Near Surya International Hotel New Delhi 9873777170Call Girls Near Surya International Hotel New Delhi 9873777170
Call Girls Near Surya International Hotel New Delhi 9873777170
 
call girls in Laxmi Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Laxmi Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Laxmi Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Laxmi Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
 
2024: The FAR, Federal Acquisition Regulations - Part 25
2024: The FAR, Federal Acquisition Regulations - Part 252024: The FAR, Federal Acquisition Regulations - Part 25
2024: The FAR, Federal Acquisition Regulations - Part 25
 
Yellow is My Favorite Color By Annabelle.pdf
Yellow is My Favorite Color By Annabelle.pdfYellow is My Favorite Color By Annabelle.pdf
Yellow is My Favorite Color By Annabelle.pdf
 
call girls in Mayapuri DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Mayapuri DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Mayapuri DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Mayapuri DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
 
call girls in Punjabi Bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Punjabi Bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Punjabi Bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Punjabi Bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
 
High-Level Thematic Event on Tourism - SUSTAINABILITY WEEK 2024- United Natio...
High-Level Thematic Event on Tourism - SUSTAINABILITY WEEK 2024- United Natio...High-Level Thematic Event on Tourism - SUSTAINABILITY WEEK 2024- United Natio...
High-Level Thematic Event on Tourism - SUSTAINABILITY WEEK 2024- United Natio...
 
Call Girls In Pullman Hotel New Delhi Aerocity 9873777170
Call Girls In Pullman Hotel New Delhi Aerocity 9873777170Call Girls In Pullman Hotel New Delhi Aerocity 9873777170
Call Girls In Pullman Hotel New Delhi Aerocity 9873777170
 
Hot Sexy call girls in Palam Vihar🔝 9953056974 🔝 escort Service
Hot Sexy call girls in Palam Vihar🔝 9953056974 🔝 escort ServiceHot Sexy call girls in Palam Vihar🔝 9953056974 🔝 escort Service
Hot Sexy call girls in Palam Vihar🔝 9953056974 🔝 escort Service
 
Action Toolkit - Earth Day 2024 - April 22nd.
Action Toolkit - Earth Day 2024 - April 22nd.Action Toolkit - Earth Day 2024 - April 22nd.
Action Toolkit - Earth Day 2024 - April 22nd.
 

Building Plan Approval Requirements

  • 1. 1 REQUIREMENTS FOR BUILDING PLAN APPROVAL AT THE MINISTRY OF LANDS, HOUSING AND URBAN DEVELOPMENT Below are the requirements for project application and approval at the Ministry of Lands, Housing and Urban Development. However, the fees payable varies, depending on the size, use and volume of development involved. Assessment fees are worked on porata that is, volume multiply by fees order. RESIDENTIAL BUILDING Bungalow Building in Ado Ekiti. i. Four (4) sets of working drawings with architectural seal. ii. Approved survey plan by surveyor General. iii. Assessment Fee iv. Ratification Fee v. Land use clearance vi. Perimeter Fencing vii. Location plan must be sealed by a Registered Town Planner. Bungalow Building in Other Local Government Headquarters i. Four (4) sets of working drawings with architectural seal. ii. Approved survey plan by surveyor General. iii. Assessment Fee iv. Ratification Fee v. Land use clearance vi. Perimeter Fencing vii. Location plan must be sealed by a Registered Town Planner. Bungalow Building in Other Towns i. Four (4) sets of working drawings with architectural seal. ii. Approved survey plan by surveyor General. iii. Assessment Fee iv. Ratification Fee v. Land use clearance vi. Perimeter Fencing
  • 2. 2 vii. Location plan must be sealed by a Registered Town Planner. Storey Building in Ado Ekiti. i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee vi. Ratification Fee vii. Land use clearance viii. Perimeter Fencing ix. Location plan must be sealed by a Registered Town Planner. Storey Building in Other Local Government Headquarters. i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee vi. Ratification Fee vii. Land use clearance viii. Perimeter Fencing ix. Location plan must be sealed by a Registered Town Planner. Storey Building in Other Towns. I. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee vi. Ratification Fee vii. Land use clearance viii. Perimeter Fencing ix. Location plan must be sealed by a Registered Town Planner.
  • 3. 3 COMMERCIAL BUILDING Bungalow/ Storey Building in Ado Ekiti. I. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Environmental Impact Assessment. iv. Letter of supervision by the Structural Engineer. v. Approved survey plan by surveyor General. vi. Assessment Fee vii. Ratification Fee viii. Land use clearance ix. Perimeter Fencing x. Location plan must be sealed by a Registered Town Planner. Bungalow/ Storey Building in Other Towns. I. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Environmental Impact Assessment. iv. Letter of supervision by the Structural Engineer. v. Approved survey plan by surveyor General. vi. Assessment Fee vii. Ratification Fee viii. Land use clearance ix. Perimeter Fencing x. Location plan must be sealed by a Registered Town Planner. BANK BUILDING I. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Environmental Impact Assessment.
  • 4. 4 iv. Letter of supervision by the Structural Engineer. v. Approved survey plan by surveyor General. vi. Assessment Fee vii. Ratification Fee viii. Land use clearance ix. Perimeter Fencing x. Location plan must be sealed by a Registered Town Planner. PETROL FILLING STATION SPATIAL REQUIREMENTS SCHEDULE Minimum Spatial Requirements 1. Requirement/ condition Site Area Minimum Major 1500m Domestic Retailers 900-1000m 2. Minimum Frontal Width. 30m 18m 3. Minimum distance between Filling station at the same side of the road. 500m 180m 4. On the other side of road 200m 120m 5. Minimum drive way width abuting the station. 12m 9m 6. Minimum width of each gate egress and ingress (open frontage is preferred). No block wall fence in the frontage. 6.0m 4.5m 7. The set back of the building structures and installations within the station. 6.0m 4.5m 8. …to adjoining properties of residential structures. 8.2m 6.0m 9. Minimum set back to the NNPC or Gas Pipeline 45m 45m 10. Minimum setback to 130/132kv 50m 50m
  • 5. 5 line 11. Minimum setback to the centre of medium tension power line (33kv) 30m 15m 12. Minimum setback to the low tension power line (11kv) 20m 15m 13. Minimum setback to stream from the centre of the property where there is no embankment walls. 30m 30m 14. Minimum setback from the property line to the edge of any stream where there are no embankment wall. 15m 10m 15. Minimum setback to the centre of road intersection. 45m 20m 16. Minimum distance from property line to the centre line of secondary road i.e State & Intercity road. 30m 20m i. Four (4) sets of Electrical drawings sealed by a Registered Engineer ii. Environmental Impact Assessment. iii. Fire Service Clearance. iv. Police Traffic Clearance. v. Letter of suitability/feasibility Approval from DPR. vi. Land use clearance Approval. vii. Current 3 years tax clearance and 3 years Development levy. viii. Letter of supervision by the Structural Engineer. ix. Approved survey plan by surveyor General. x. Assessment Fee xi. Ratification Fee xii. Land use clearance xiii. Perimeter Fencing xiv. Location plan must be sealed by a Registered Town Planner. Filling Station in Other Local Government Area. i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
  • 6. 6 iii. Four (4) sets of Mechanical drawings sealed by a Registered Engineer. iv. Four (4) sets of Electrical drawings sealed by a Registered Engineer v. Environmental Impact Assessment. vi. Fire Service Clearance. vii. Police Traffic Clearance. viii. Land use clearance Approval. ix. Letter of suitability/feasibility Approval from DPR. x. Current 3 years tax clearance and 3 years Development levy. xi. Letter of supervision by the Structural Engineer. xii. Approved survey plan by surveyor General. xiii. Assessment Fee xiv. Ratification Fee xv. Land use clearance xvi. Perimeter Fencing xvii. Location plan must be sealed by a Registered Town Planner. Filling Station in Other Towns. i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. Iii. Four (4) sets of Mechanical drawings sealed by a Registered Engineer. iii. Four (4) sets of Electrical drawings sealed by a Registered Engineer iv. Environmental Impact Assessment. v. Fire Service Clearance. vi. Police Traffic Clearance. vii. Land use clearance Approval. viii. Letter of suitability/feasibility Clearance from DPR. ix. Current 3 years tax clearance and 3 years Development Levy. x. Letter of supervision by the Structural Engineer. xi. Approved survey plan by surveyor General. xii. Assessment Fee xiii. Ratification Fee xiv. Land use clearance xv. Perimeter Fencing xvi. Location plan must be sealed by a Registered Town Planner.
  • 7. 7 GAS STATION. SPATIAL REQUIREMENTS SCHEDULE Minimum Spatial Requirements 1. Requirement/ condition Site Area Minimum Major 1500m Domestic Retailers 900-1000m 2. Minimum Frontal Width. 30m 18m 3. Minimum distance between Filling station at the same side of the road. 500m 180m 4. On the other side of road 200m 120m 5. Minimum drive way width abuting the station. 12m 9m 6. Minimum width of each gate egress and ingress (open frontage is preferred). No block wall fence in the frontage. 6.0m 4.5m 7. The set back of the building structures and installations within the station. 6.0m 4.5m 8. …to adjoining properties of residential structures. 8.2m 6.0m 9. Minimum set back to the NNPC or Gas Pipeline 45m 45m 10. Minimum setback to 130/132kv line 50m 50m 11. Minimum setback to the centre of medium tension power line (33kv) 30m 15m 12. Minimum setback to the low tension power line (11kv) 20m 15m 13. Minimum setback to stream from the centre of the property where there is no embankment walls. 30m 30m
  • 8. 8 14. Minimum setback from the property line to the edge of any stream where there are no embankment wall. 15m 10m 15. Minimum setback to the centre of road intersection. 45m 20m 16. Minimum distance from property line to the centre line of secondary road i.e State & Intercity road. 30m 20m i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Four (4) sets of Mechanical drawings sealed by a Registered Engineer. iv. Four (4) sets of Electrical drawings sealed by a Registered Engineer v. Environmental Impact Assessment. vi. Fire Service Clearance. vii. Police Traffic Clearance. viii. Land use clearance Approval. ix. Letter of suitability/feasibility from DPR. x. Current 3 years tax clearance and 3 years Development Levy. xi. Letter of supervision by the Structural Engineer. xii. Approved survey plan by surveyor General. xiii. Assessment Fee xiv. Ratification Fee xv. Land use clearance xvi. Perimeter Fencing xvii. Location plan must be sealed by a Registered Town Planner. HOSTEL. Bungalow Building in Ado Ekiti. i. Four (4) sets of working drawings with architectural seal. ii. Approved survey plan by surveyor General. iii. Assessment Fee iv. Ratification Fee
  • 9. 9 v. Land use clearance vi. Perimeter Fencing vii. Location plan must be sealed by a Registered Town Planner. viii. Environmental Impact Assessment. Storey Building in Ado Ekiti. i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee vi. Ratification Fee vii. Land use clearance viii. Perimeter Fencing ix. Location plan must be sealed by a Registered Town Planner. x. Environmental Impact Assessment. Bungalow Building in Other Local Government. i. Four (4) sets of working drawings with architectural seal. ii. Approved survey plan by surveyor General. iii. Assessment Fee iv. Ratification Fee v. Land use clearance vi. Perimeter Fencing vii. Location plan must be sealed by a Registered Town Planner. viii. Environmental Impact Assessment. Storey Building in Other Towns. i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee vi. Ratification Fee
  • 10. 10 vii. Land use clearance viii. Perimeter Fencing ix. Location plan must be sealed by a Registered Town Planner. x. Environmental Impact Assessment. SAWMILL. Saw Mill in Ado Ekiti. i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee vi. Ratification Fee vii. Land use clearance viii. Perimeter Fencing ix. Location plan must be sealed by a Registered Town Planner. x. Environmental Impact Assessment. Saw Mill in Other Towns. i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee vi. Ratification Fee vii. Land use clearance viii. Perimeter Fencing ix. Location plan must be sealed by a Registered Town Planner. x. Environmental Impact Assessment. xi. HOTEL/EATERY/RESTAURANTS Bungalow Building in Ado Ekiti. i. Four (4) sets of working drawings with architectural seal. ii. Approved survey plan by surveyor General. iii. Assessment Fee
  • 11. 11 iv. Ratification Fee v. Land use clearance vi. Perimeter Fencing vii. Location plan must be sealed by a Registered Town Planner. viii. Environmental Impact Assessment. Storey Building in Ado Ekiti. i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee vi. Ratification Fee vii. Land use clearance viii. Perimeter Fencing ix. Location plan must be sealed by a Registered Town Planner. x. Environmental Impact Assessment. Bungalow Building in Other Local Government. i. Four (4) sets of working drawings with architectural seal. ii. Approved survey plan by surveyor General. iii. Assessment Fee iv. Ratification Fee v. Land use clearance vi. Perimeter Fencing vii. Location plan must be sealed by a Registered Town Planner. viii. Environmental Impact Assessment. Storey Building in Other Towns. i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General.
  • 12. 12 v. Assessment Fee vi. Ratification Fee vii. Land use clearance viii. Perimeter Fencing ix. Location plan must be sealed by a Registered Town Planner. x. Environmental Impact Assessment. LIGHT INDUSTRY Block Making Industry i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee vi. Ratification Fee vii. Land use clearance viii. Perimeter Fencing ix. Location plan must be sealed by a Registered Town Planner. x. Environmental Impact Assessment. Concrete Industry i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee vi. Ratification Fee vii. Land use clearance viii. Perimeter Fencing ix. Location plan must be sealed by a Registered Town Planner. x. Environmental Impact Assessment. Stone crushing Industry (Mechanical) i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General.
  • 13. 13 v. Assessment Fee vi. Ratification Fee vii. Land use clearance viii. Perimeter Fencing ix. Location plan must be sealed by a Registered Town Planner. x. Environmental Impact Assessment. Stone crushing Industry with Asphalt i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee vi. Ratification Fee vii. Land use clearance viii. Perimeter Fencing ix. Location plan must be sealed by a Registered Town Planner. x. Environmental Impact Assessment. AGRICULTURAL DEVELOPMENT Mechanized Farming i. Four (4) sets of working drawings with architectural seal. ii. Approved survey plan by surveyor General. iii. Assessment Fee iv. Ratification Fee v. Land use clearance vi. Perimeter Fencing vii. Location plan must be sealed by a Registered Town Planner. viii. Environmental Impact Assessment. POULTRY FARMING i. Four (4) sets of working drawings with architectural seal. ii. Approved survey plan by surveyor General. iii. Assessment Fee = (100-200) Birds iv. Assessment Fee = (201-500) Birds v. Ratification Fee vi. Land use clearance
  • 14. 14 vii. Perimeter Fencing viii. Location plan must be sealed by a Registered Town Planner. ix. Environmental Impact Assessment. FISHERY FARMING i. Four (4) sets of working drawings with architectural seal. ii. Approved survey plan by surveyor General. iii. Assessment Fee (commercial) iv. Assessment Fee (Domestic) v. Ratification Fee vi. Land use clearance vii. Perimeter Fencing viii. Location plan must be sealed by a Registered Town Planner. ix. Environmental Impact Assessment. PIGGERY FARMING i. Four (4) sets of working drawings with architectural seal. ii. Approved survey plan by surveyor General. iii. Assessment Fee (commercial) iv. Assessment Fee (Domestic) v. Ratification Fee vi. Land use clearance vii. Perimeter Fencing viii. Location plan must be sealed by a Registered Town Planner. ix. Environmental Impact Assessment. RELIGION CAMP GROUND i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee vi. Ratification Fee vii. Land use clearance viii. Perimeter Fencing ix. Location plan must be sealed by a Registered Town Planner.
  • 15. 15 x. Environmental Impact Assessment. PLACE OF WORSHIP i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee vi. Ratification Fee vii. Land use clearance viii. Perimeter Fencing ix. Location plan must be sealed by a Registered Town Planner. x. Environmental Impact Assessment. EDUCATION INSTITUTION Nursery/Primary school/Secondary school/Post-Secondary school i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee vi. Ratification Fee vii. Land use clearance viii. Perimeter Fencing ix. Location plan must be sealed by a Registered Town Planner. x. Environmental Impact Assessment. CHANGE OF SITE OF AN APPROVED PLAN Residential i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee = 25% of current charge vi. Location plan must be sealed by a Registered Town Planner.
  • 16. 16 Commercial/Petrol Station/ Sawmill i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee = 25% of current charge vi. Location plan must be sealed by a Registered Town Planner. vii. Environmental Impact Assessment. RENEWAL OF BUILDING PLAN Residential/Commercial/Industrial i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee = 20% of current charge vi. Location plan must be sealed by a Registered Town Planner. vii. Environmental Impact Assessment. (Commercial/Industrial) LAYOUT PLAN i. Six (6) sets of layout plan with locational plan prepared by a Registered Town Planner. ii. Approved survey plan by surveyor General. iii. Land Use Clearance iv. Assessment Fee 0.5 Ha- 2.5Ha 2.5Ha - 5.0Ha 5.1Ha - 10Ha Above 10Ha v. Location plan must be sealed by a Registered Town Planner. vi. Environmental Impact Assessment. ROAD CONSTRUCTION YARD PROJECT SITE i. Four (4) sets of working drawings with architectural seal ii. Approved survey plan by surveyor General. iii. Assessment Fee
  • 17. 17 iv. Location plan must be sealed by a Registered Town Planner. v. Environmental Impact Assessment. PENALTY IN RESPECTOF UNAPPROVED EXISTING BUILDING PLAN i. Assessment Fee = The present Assessment + 50% of the assessment OPERATIONAL MODE OF PLANNING PERMIT DEPARTMENT Payments are made on these categories i. Commercial ii. Corporate bodies iii. Individual/private Condition for approval of mast/base transceiver station(BTS) for all categories of mast. i. Submission of four working drawings. ii. Submission of three copies of site analysis report. (SAR)/Environmental impact Assessment (EIA) iii. Joint site visitation to the site. iv. Issuance of demand notice for effective payment. v. Submission of evidence of payment in accordance with the demand notice. vi. Issuance of approval/ permit letter. vii. Continuous oversight function over the site activities. MEDIA HOUSES 1. Submission of application for the project of intension. 2. Submission of four copies of working drawings which must include the followings. i. Perimeter survey plan of the site signed by the Surveyor General. ii. Four copies of the working drawings of the building projects which can include the: electrical, mechanical, land scape e.t.c
  • 18. 18 iii. Evidence of payment of tax and Ekiti State Development levy for 3 years. iv. Broadcasting license. v. EIA/SAR 3. Issuance of demand notices for effective payment. 4. Joint site visitation. 5. Evidence of payment in the manners prescribed in the demand notice. 6. Issuance of approval /permit. REQUIREMENTS FOR LAYING OF OPTIC FIBRE. 1. Submission of application by the prospective service provider showing. i. The name of the routes covered by the cables. ii. Map of the road network of the routes from origin to the last point. iii. Schedule/tabulation sheet of name, distances, total and categories of the affected routes. 2. Joint site visitation to the affected routes. 3. Issuance of demand notice generated from the application submitted. 4. Evidence of payment of the prescribed fee as entrenched in the demand notice. 5. Continuous oversight function of the ministry. 6. Issuance of certificate of completion when the job is satisfactorily implemented. Note:Penalty for contravension is double of the assessment fee above and other condition determined by the ministry.