Publicité
Publicité

Contenu connexe

Dernier(20)

Publicité

FORMATION EVALUATION PROJECT.pptx

  1. FORMATION EVALUATION PROJECT PRESENTERS: Ruzin, Jala and Mahmud
  2. SHALE VOLUME 10173 ft: 𝐼𝐺𝑅 = 𝐺𝑅𝑙𝑜𝑔 − 𝐺𝑅𝑚𝑖𝑛 𝐺𝑅𝑚𝑎𝑥 − 𝐺𝑅𝑚𝑖𝑛 = 53 − 11 99 − 11 = 0.477 𝑉𝑠ℎ = 0.083 23.7×𝐼𝐺𝑅 − 1 = 𝟎. 𝟏𝟗𝟗 𝒐𝒓 𝟏𝟗. 𝟗%
  3. Density porosity 𝜑𝑑 = 𝜌𝑚𝑎 − 𝜌𝑏 𝜌𝑚𝑎 − 𝜌𝑓 = 2.65 − 2.420818 2.65 − 1 = 𝟎. 𝟏𝟑𝟖𝟗 𝒐𝒓 𝟏𝟑. 𝟖𝟗% 𝜌𝑚𝑎= 2.65 g/cm3 𝜌𝑓= 1 g/cm3 𝜌𝑏= 2.420818 g/cm3
  4. Sonic Porosity 𝜑𝑠 = 5 8 × ∆𝑡𝑙𝑜𝑔 − ∆𝑡𝑚𝑎 ∆𝑡𝑙𝑜𝑔 = 94.27595 − 55.6 94.27595 = 𝟎. 𝟐𝟓𝟔𝟒 𝒐𝒓 𝟐𝟓. 𝟔𝟒% ∆𝑡𝑚𝑎= 55.6 us ft ∆𝑡𝑙𝑜𝑔= 94.27595 us/ft
  5. Neutron porosity 𝜑𝑁 = 𝟎. 𝟐𝟑𝟖𝟕𝟏𝟏𝟓 𝒐𝒓 𝟐𝟑. 𝟖𝟕%
  6. Average or Total porosity 𝜑𝑎 = 𝜑𝑑 + 𝜑𝑠 + 𝜑𝑛 3 = 13.89 + 25.64 + 23.87 3 = 𝟐𝟏. 𝟏𝟑%
  7. Effective porosity 𝜑𝑒 = 𝜑𝑡 × 1 − 𝑉𝑠ℎ = 21.13 × 1 − 0.199 = 𝟏𝟔. 𝟗𝟐𝟓 %
  8. Water Saturation 𝑆𝑤 = ( 𝑎 × 𝑅𝑤 𝑅𝑡 × 𝜑𝑚) 1/𝑛 = ( 0.81 × 0.066 47.38 × 0.242552)0.5 = 𝟏𝟑. 𝟖𝟒𝟖 % a = 0.81 m = 2 n = 2 𝑅𝑤 = 0.066 ohm m RESERVOIR INTERVAL: 10362-11160 ft
  9. 𝑆ℎ = 1 − 𝑆𝑤 = 1 − 0.13848 = 𝟎. 𝟖𝟔𝟏𝟓𝟐 𝒐𝒓 𝟖𝟔. 𝟏𝟓𝟐 % Sh > 60 %, it is considered as pay zone for the well. Negative hydrocarbon saturation values show water bearing formations.
  10. Permeability 𝑘 = ( 100𝜑2.25 𝑆𝑤𝑖 )2 = ( 100 × 0.242552.25 0.2 )2 = 𝟒𝟐𝟔. 𝟏𝟒 𝒎𝑫
  11. THANKS FOR ATTENTION
Publicité