THE POWER SITUATION
                       AN ADVOCACY FOR GOOD SENSE OF PRIORITY

A. Current Power Situation

   1. Supply Outlook
      a. Luzon – 1200MW needed to assure sustainability and reliability
         • only 600MW (GN Power) expected in 2013
         • 300MW is needed every year
         • There is not enough reserve
      b. Visayas – ok but would need 200MW by 2013 and on every year.
      c. Mindanao – already in trouble
         • rotational black outs ranging from 2 to 4 hours is ongoing and expected to get
             worse when the dry season comes
         • only the 300MW of STEAG is in process of getting started and would be
             expected to be online in 2013-14 earliest
         • 300MW of Aboitiz is also in the making and may be on line by 2014-15/

   2. Power generation is now in the control of 4 large groups, namely, Lopez, Pangilinan,
      SMC, Aboitiz with smaller ones like AES (600MW), Salcon (250Mw+) in Cebu and Bohol
      and Globe (Metro Bank) in Cebu and Capiz

   3. Distribution is controlled by Meralco (71%) in Luzon, Aboitiz (700MW+) in Visayas plus a
      300+MW in Davao and Cotabato and southern Davao, Cepalco (100+MW) in Cagayan de
      Oro, Ceneco a coop (100+MW) in Bacolod, and 30MW in Bohol (Salcon). All the rest are
      mostly coops ranging from 5MW to 20+MW

B. Our Power Rate is the HIGHEST in the region based on the 2007-08 survey – PH is USD
   0.18 /kWh, Singapore USD 0.15/kWh, Thailand USD0.08/kWh, Indonesia, Vietnam and
   Malaysia were much lower. Today, PH is USD 0.21/kWh.

C. Based on current demand level of 7,300MW, every one (1) centavo per kWh is equal to
   P657,000,000.00 per annum.

   Every one (1) centavo of power increase means P263,000,000.00 or 40% is taken away from
   the table of the poor (lifeline customers), P118,000,000.00 or 10% is taken away from the
   clothing, medicine and transpo budget of the housewife and the final P341,000,000.00 or
   52% is added to the cost of production and commerce.

D. That is why PH is rated very low in competitiveness and why the PPP and its desired
   drawing effects (jobs and investments) would have low probability of success.
E. WE NEED TO FOCUS ON

     1. BUILDING OUR REQUIRED POWER BASE LOAD AND RESERVES,
     2. STOP THE ESCALATING POWER COST OR TARIFF AND FORMULATE A PROGRAM ON
        HOW TO BRING IT TO COMPETITIVE LEVEL (VS OUR NEIGHBORS –DIRECT COMPETITORS)
     3. START BY STOPPING OR SUSPENDING ANYTHING UNNECESSARY AND EXTRANEOUS
        PROGRAM THAT WOULD ADD COST TO OUR POWER

F.   Power Cost Increases Anticipated

     1. PSALM‘s P1 Trillion stranded debt and cost to be charged to “Universal Charges” -
        estimated at P0.39/kWh initially only.
     2. SPUG budget short fall of P7B just for 2011 ---estimated at P0.07/kWh again to be
        included in the “Universal Charges”
     3. The pending petitions of Meralco and other Utilities for recovery under the GRAM and
        CERA
     4. The increase in “Generation Charges” from the PSA renewals by the privatized Gencos
        whose TSCs (Transition Supply Contracts) are up for renewal in 2012.
     5. The increase in “Generation Charge” from the renewal of the TSCs (Transition Supply
        Contracts) of the IPPs (thru the IPPAs) which are up for renewal in 2012.

G. AND NOW, this RE Program that would add P0.1256/kWh PLUS the required 100% reserve
   creating additional Pxx/kWh and the required National Grid Corp. of the Phil. (NGCP)
   systems investments to accommodate these RE plants creating another additional
   Pxxx/kWh

H. We are not against RE BUT…

     1. We have already 34% RE and it is highest in the world PLUS the RE plants do not assure
        us of security and sustainability because while the fuels are free, they are not
        controllable in volume, supply, intensity and availability
     2. Applicable technologies are not yet commercially matured; we would be diverting our
        priority wrongfully both in value and volume.
     3. The front and effective costs of the RE plants (Wind and Solar) are AWESOME because
        their average usefulness or annual average availability is only 24% to 30% (at very best
        still unattained) so that only 24MW to 30MW is actually the annual average availability
        of a 100%MW solar or wind power plant. And they would require a 100% reserve
        provision.


WE MUST REMAIN FOCUSED ON OUR PRIORITIES, I.E. BUILD THE BASE LOADS AND RESERVES
          AND STOP ANY UNNECESSARY POTENTIAL POWER COST INCREASE.

More Related Content

What's hot

Singapores Electricity Market After Market Reform
Singapores Electricity Market After Market ReformSingapores Electricity Market After Market Reform
Singapores Electricity Market After Market Reform
electricitygovernance
 
New Energy Conference-Mohammad Abu Zarour from NEPCO
New Energy Conference-Mohammad Abu Zarour from NEPCONew Energy Conference-Mohammad Abu Zarour from NEPCO
New Energy Conference-Mohammad Abu Zarour from NEPCO
EDAMA
 
Flinders Island Isolated Power System (IPS) Connect 2016 H KUMAR SOLOMON POWER
Flinders Island Isolated Power System (IPS) Connect 2016 H KUMAR SOLOMON POWERFlinders Island Isolated Power System (IPS) Connect 2016 H KUMAR SOLOMON POWER
Flinders Island Isolated Power System (IPS) Connect 2016 H KUMAR SOLOMON POWER
james hamilton
 

What's hot (20)

Jaguar Land Rover
Jaguar Land RoverJaguar Land Rover
Jaguar Land Rover
 
TransGrid's Renewable Energy Hub
TransGrid's Renewable Energy Hub TransGrid's Renewable Energy Hub
TransGrid's Renewable Energy Hub
 
Singapores Electricity Market After Market Reform
Singapores Electricity Market After Market ReformSingapores Electricity Market After Market Reform
Singapores Electricity Market After Market Reform
 
Is the PH power supply ready for the AEC?
Is the PH power supply ready for the AEC?Is the PH power supply ready for the AEC?
Is the PH power supply ready for the AEC?
 
New Energy Conference-Mohammad Abu Zarour from NEPCO
New Energy Conference-Mohammad Abu Zarour from NEPCONew Energy Conference-Mohammad Abu Zarour from NEPCO
New Energy Conference-Mohammad Abu Zarour from NEPCO
 
SWOT of Green Deal and the delivery model proposed - Shaun Taylor, Solartech Ltd
SWOT of Green Deal and the delivery model proposed - Shaun Taylor, Solartech LtdSWOT of Green Deal and the delivery model proposed - Shaun Taylor, Solartech Ltd
SWOT of Green Deal and the delivery model proposed - Shaun Taylor, Solartech Ltd
 
South Lanarkshire College
South Lanarkshire College South Lanarkshire College
South Lanarkshire College
 
Investing in Maryland's Energy Future
Investing in Maryland's Energy FutureInvesting in Maryland's Energy Future
Investing in Maryland's Energy Future
 
Flinders Island Isolated Power System (IPS) Connect 2016 H KUMAR SOLOMON POWER
Flinders Island Isolated Power System (IPS) Connect 2016 H KUMAR SOLOMON POWERFlinders Island Isolated Power System (IPS) Connect 2016 H KUMAR SOLOMON POWER
Flinders Island Isolated Power System (IPS) Connect 2016 H KUMAR SOLOMON POWER
 
ISO New England Slides Used During Jan 16, 2016 Webinar
ISO New England Slides Used During Jan 16, 2016 WebinarISO New England Slides Used During Jan 16, 2016 Webinar
ISO New England Slides Used During Jan 16, 2016 Webinar
 
Electricity Storage Forum 2016
Electricity Storage Forum 2016Electricity Storage Forum 2016
Electricity Storage Forum 2016
 
ISO New England Remarks Made During Jan 16, 2016 Webinar
ISO New England Remarks Made During Jan 16, 2016 WebinarISO New England Remarks Made During Jan 16, 2016 Webinar
ISO New England Remarks Made During Jan 16, 2016 Webinar
 
Medford Energy Independence Project
Medford Energy Independence ProjectMedford Energy Independence Project
Medford Energy Independence Project
 
History of UP Energy Crisis
History of UP Energy CrisisHistory of UP Energy Crisis
History of UP Energy Crisis
 
Renewable Energy A Major Opportunity Solar Energy In Turkey
Renewable Energy A Major Opportunity Solar Energy In TurkeyRenewable Energy A Major Opportunity Solar Energy In Turkey
Renewable Energy A Major Opportunity Solar Energy In Turkey
 
Local Energy & Microgrids Conference 2016
Local Energy & Microgrids Conference  2016 Local Energy & Microgrids Conference  2016
Local Energy & Microgrids Conference 2016
 
Suttonbridge1
Suttonbridge1Suttonbridge1
Suttonbridge1
 
Wesm 101 20151230
Wesm 101 20151230Wesm 101 20151230
Wesm 101 20151230
 
Battery Storage Can Work in Every Level from Large to Small Companies to SMEs
Battery Storage Can Work in Every Level from Large to Small Companies to SMEsBattery Storage Can Work in Every Level from Large to Small Companies to SMEs
Battery Storage Can Work in Every Level from Large to Small Companies to SMEs
 
$MER 1H20 Briefing Presentation
$MER 1H20 Briefing Presentation$MER 1H20 Briefing Presentation
$MER 1H20 Briefing Presentation
 

Similar to Philippine power situation

Energy crises in pakistan butt presentation
Energy crises in pakistan butt presentationEnergy crises in pakistan butt presentation
Energy crises in pakistan butt presentation
goodamazing
 
Sunpowerd - Distributed Solar in Ghana
Sunpowerd - Distributed Solar in GhanaSunpowerd - Distributed Solar in Ghana
Sunpowerd - Distributed Solar in Ghana
Alex Pischalnikov
 
Report on Power Scenario in Arunachal Pradesh
Report on Power Scenario in Arunachal PradeshReport on Power Scenario in Arunachal Pradesh
Report on Power Scenario in Arunachal Pradesh
Anuradha Goswami
 

Similar to Philippine power situation (20)

Energy crises in pakistan butt presentation
Energy crises in pakistan butt presentationEnergy crises in pakistan butt presentation
Energy crises in pakistan butt presentation
 
Country report
Country reportCountry report
Country report
 
Manipur solar policy 2014
Manipur solar policy 2014Manipur solar policy 2014
Manipur solar policy 2014
 
Managing the Winds of Change – California Experiences
Managing the Winds of Change – California ExperiencesManaging the Winds of Change – California Experiences
Managing the Winds of Change – California Experiences
 
Towards Net Zero Power 04.03.2020.pptx
Towards Net Zero Power 04.03.2020.pptxTowards Net Zero Power 04.03.2020.pptx
Towards Net Zero Power 04.03.2020.pptx
 
Sunpowerd - Distributed Solar in Ghana
Sunpowerd - Distributed Solar in GhanaSunpowerd - Distributed Solar in Ghana
Sunpowerd - Distributed Solar in Ghana
 
Energycrisesinpakistanbuttpresentation 120602154635-phpapp02
Energycrisesinpakistanbuttpresentation 120602154635-phpapp02Energycrisesinpakistanbuttpresentation 120602154635-phpapp02
Energycrisesinpakistanbuttpresentation 120602154635-phpapp02
 
SEO-PPT-5 for educational purchase work
SEO-PPT-5 for educational  purchase workSEO-PPT-5 for educational  purchase work
SEO-PPT-5 for educational purchase work
 
Gloomy Power Scene By Arjumand Ansar
Gloomy Power Scene By Arjumand AnsarGloomy Power Scene By Arjumand Ansar
Gloomy Power Scene By Arjumand Ansar
 
Quaid‑e‑Azam Solar Park 1.pptx
Quaid‑e‑Azam Solar Park 1.pptxQuaid‑e‑Azam Solar Park 1.pptx
Quaid‑e‑Azam Solar Park 1.pptx
 
Power Sector Analysis Report 2017_Sultanate of Oman
Power Sector Analysis Report 2017_Sultanate of Oman Power Sector Analysis Report 2017_Sultanate of Oman
Power Sector Analysis Report 2017_Sultanate of Oman
 
Report on Power Scenario in Arunachal Pradesh
Report on Power Scenario in Arunachal PradeshReport on Power Scenario in Arunachal Pradesh
Report on Power Scenario in Arunachal Pradesh
 
Lushetsky - Solar Vision Forum
Lushetsky - Solar Vision ForumLushetsky - Solar Vision Forum
Lushetsky - Solar Vision Forum
 
Chapter 5 Smart electrical grid , Smart City Summer Course, AUST, 2015
Chapter 5 Smart electrical grid , Smart City Summer Course, AUST, 2015Chapter 5 Smart electrical grid , Smart City Summer Course, AUST, 2015
Chapter 5 Smart electrical grid , Smart City Summer Course, AUST, 2015
 
AUROVILLE RENEWABLE ENERGY SOURCING PLAN
AUROVILLE RENEWABLE ENERGY SOURCING PLANAUROVILLE RENEWABLE ENERGY SOURCING PLAN
AUROVILLE RENEWABLE ENERGY SOURCING PLAN
 
Detailed project report.pptx
Detailed project report.pptxDetailed project report.pptx
Detailed project report.pptx
 
Solar power - A developer prespective
Solar power - A developer prespectiveSolar power - A developer prespective
Solar power - A developer prespective
 
Clean Energy Australia Report
Clean Energy Australia ReportClean Energy Australia Report
Clean Energy Australia Report
 
Nepal Energy Scenario
Nepal Energy ScenarioNepal Energy Scenario
Nepal Energy Scenario
 
Load Research Concept and Approach _Kolkata.pptx
Load Research Concept and Approach  _Kolkata.pptxLoad Research Concept and Approach  _Kolkata.pptx
Load Research Concept and Approach _Kolkata.pptx
 

More from FEF Philippines

FEF STATEMENT ON THE PRESIDENT’S REQUEST FOR EMERGENCY POWER FROM CONGRESS: ...
FEF STATEMENT ON THE PRESIDENT’S REQUEST FOR EMERGENCY POWER FROM CONGRESS:  ...FEF STATEMENT ON THE PRESIDENT’S REQUEST FOR EMERGENCY POWER FROM CONGRESS:  ...
FEF STATEMENT ON THE PRESIDENT’S REQUEST FOR EMERGENCY POWER FROM CONGRESS: ...
FEF Philippines
 

More from FEF Philippines (20)

Fef hails cabinet's decision not to extend quantitative restrictions on rice ...
Fef hails cabinet's decision not to extend quantitative restrictions on rice ...Fef hails cabinet's decision not to extend quantitative restrictions on rice ...
Fef hails cabinet's decision not to extend quantitative restrictions on rice ...
 
FEF Statement on Philippine Pension System
FEF Statement on Philippine Pension SystemFEF Statement on Philippine Pension System
FEF Statement on Philippine Pension System
 
FEF Statement on SMC Sale to PLDT and Globe
FEF Statement on SMC Sale to PLDT and GlobeFEF Statement on SMC Sale to PLDT and Globe
FEF Statement on SMC Sale to PLDT and Globe
 
FEF Statement on Mass Civil Registration and A National ID System
FEF Statement on Mass Civil Registration and A National ID SystemFEF Statement on Mass Civil Registration and A National ID System
FEF Statement on Mass Civil Registration and A National ID System
 
FEF Statement on Philippine Rice Policy
FEF Statement on Philippine Rice PolicyFEF Statement on Philippine Rice Policy
FEF Statement on Philippine Rice Policy
 
FEF Congratulates President Elect Rodrigo Duterte
FEF Congratulates President Elect Rodrigo DuterteFEF Congratulates President Elect Rodrigo Duterte
FEF Congratulates President Elect Rodrigo Duterte
 
Fef position on lowering income tax rates
Fef position on lowering income tax rates Fef position on lowering income tax rates
Fef position on lowering income tax rates
 
Speech on inclusive economic growth by Calixto Chikiamco
Speech on inclusive economic growth  by Calixto ChikiamcoSpeech on inclusive economic growth  by Calixto Chikiamco
Speech on inclusive economic growth by Calixto Chikiamco
 
Five arrows for inclusive growth
Five arrows for inclusive growth Five arrows for inclusive growth
Five arrows for inclusive growth
 
FEF Statement on the Extension of the Comprehensive Agrarian Reform Program
FEF Statement on the Extension of the Comprehensive Agrarian Reform ProgramFEF Statement on the Extension of the Comprehensive Agrarian Reform Program
FEF Statement on the Extension of the Comprehensive Agrarian Reform Program
 
STATEMENT OF THE FOUNDATION FOR ECONOMIC FREEDOM (FEF) ON THE MRT-LRT FARE IN...
STATEMENT OF THE FOUNDATION FOR ECONOMIC FREEDOM (FEF) ON THE MRT-LRT FARE IN...STATEMENT OF THE FOUNDATION FOR ECONOMIC FREEDOM (FEF) ON THE MRT-LRT FARE IN...
STATEMENT OF THE FOUNDATION FOR ECONOMIC FREEDOM (FEF) ON THE MRT-LRT FARE IN...
 
FEF STATEMENT ON THE PRESIDENT’S REQUEST FOR EMERGENCY POWER FROM CONGRESS: ...
FEF STATEMENT ON THE PRESIDENT’S REQUEST FOR EMERGENCY POWER FROM CONGRESS:  ...FEF STATEMENT ON THE PRESIDENT’S REQUEST FOR EMERGENCY POWER FROM CONGRESS:  ...
FEF STATEMENT ON THE PRESIDENT’S REQUEST FOR EMERGENCY POWER FROM CONGRESS: ...
 
Press Release: FEF Statement of Support for the Passage of the Bangsamoro Bas...
Press Release: FEF Statement of Support for the Passage of the Bangsamoro Bas...Press Release: FEF Statement of Support for the Passage of the Bangsamoro Bas...
Press Release: FEF Statement of Support for the Passage of the Bangsamoro Bas...
 
Estillore rfpa process_flow_of_applications
Estillore rfpa process_flow_of_applicationsEstillore rfpa process_flow_of_applications
Estillore rfpa process_flow_of_applications
 
Tiamson introduction to land titling
Tiamson  introduction to land titlingTiamson  introduction to land titling
Tiamson introduction to land titling
 
Orceo converting tax declaration into titles
Orceo converting tax declaration into titlesOrceo converting tax declaration into titles
Orceo converting tax declaration into titles
 
Katigbak rfp and cadastral survey
Katigbak rfp and cadastral surveyKatigbak rfp and cadastral survey
Katigbak rfp and cadastral survey
 
FEF Statement of Support for Charter Change on Lifting Economic Restrictions
FEF Statement of Support for Charter Change on Lifting Economic RestrictionsFEF Statement of Support for Charter Change on Lifting Economic Restrictions
FEF Statement of Support for Charter Change on Lifting Economic Restrictions
 
FEF Press Release: FEF Opposes the Increase in Installation Capacity Under th...
FEF Press Release: FEF Opposes the Increase in Installation Capacity Under th...FEF Press Release: FEF Opposes the Increase in Installation Capacity Under th...
FEF Press Release: FEF Opposes the Increase in Installation Capacity Under th...
 
FEF Opposes the Increase in Solar Installation Capacity Under the FIT Subsidy
FEF Opposes the Increase in Solar Installation Capacity Under the FIT SubsidyFEF Opposes the Increase in Solar Installation Capacity Under the FIT Subsidy
FEF Opposes the Increase in Solar Installation Capacity Under the FIT Subsidy
 

Recently uploaded

Breaking Down the Flutterwave Scandal What You Need to Know.pdf
Breaking Down the Flutterwave Scandal What You Need to Know.pdfBreaking Down the Flutterwave Scandal What You Need to Know.pdf
Breaking Down the Flutterwave Scandal What You Need to Know.pdf
UK Journal
 

Recently uploaded (20)

Enterprise Knowledge Graphs - Data Summit 2024
Enterprise Knowledge Graphs - Data Summit 2024Enterprise Knowledge Graphs - Data Summit 2024
Enterprise Knowledge Graphs - Data Summit 2024
 
Intro in Product Management - Коротко про професію продакт менеджера
Intro in Product Management - Коротко про професію продакт менеджераIntro in Product Management - Коротко про професію продакт менеджера
Intro in Product Management - Коротко про професію продакт менеджера
 
AI mind or machine power point presentation
AI mind or machine power point presentationAI mind or machine power point presentation
AI mind or machine power point presentation
 
WSO2CONMay2024OpenSourceConferenceDebrief.pptx
WSO2CONMay2024OpenSourceConferenceDebrief.pptxWSO2CONMay2024OpenSourceConferenceDebrief.pptx
WSO2CONMay2024OpenSourceConferenceDebrief.pptx
 
Continuing Bonds Through AI: A Hermeneutic Reflection on Thanabots
Continuing Bonds Through AI: A Hermeneutic Reflection on ThanabotsContinuing Bonds Through AI: A Hermeneutic Reflection on Thanabots
Continuing Bonds Through AI: A Hermeneutic Reflection on Thanabots
 
Simplified FDO Manufacturing Flow with TPMs _ Liam at Infineon.pdf
Simplified FDO Manufacturing Flow with TPMs _ Liam at Infineon.pdfSimplified FDO Manufacturing Flow with TPMs _ Liam at Infineon.pdf
Simplified FDO Manufacturing Flow with TPMs _ Liam at Infineon.pdf
 
BT & Neo4j _ How Knowledge Graphs help BT deliver Digital Transformation.pptx
BT & Neo4j _ How Knowledge Graphs help BT deliver Digital Transformation.pptxBT & Neo4j _ How Knowledge Graphs help BT deliver Digital Transformation.pptx
BT & Neo4j _ How Knowledge Graphs help BT deliver Digital Transformation.pptx
 
Choosing the Right FDO Deployment Model for Your Application _ Geoffrey at In...
Choosing the Right FDO Deployment Model for Your Application _ Geoffrey at In...Choosing the Right FDO Deployment Model for Your Application _ Geoffrey at In...
Choosing the Right FDO Deployment Model for Your Application _ Geoffrey at In...
 
IESVE for Early Stage Design and Planning
IESVE for Early Stage Design and PlanningIESVE for Early Stage Design and Planning
IESVE for Early Stage Design and Planning
 
Breaking Down the Flutterwave Scandal What You Need to Know.pdf
Breaking Down the Flutterwave Scandal What You Need to Know.pdfBreaking Down the Flutterwave Scandal What You Need to Know.pdf
Breaking Down the Flutterwave Scandal What You Need to Know.pdf
 
The Metaverse: Are We There Yet?
The  Metaverse:    Are   We  There  Yet?The  Metaverse:    Are   We  There  Yet?
The Metaverse: Are We There Yet?
 
1111 ChatGPT Prompts PDF Free Download - Prompts for ChatGPT
1111 ChatGPT Prompts PDF Free Download - Prompts for ChatGPT1111 ChatGPT Prompts PDF Free Download - Prompts for ChatGPT
1111 ChatGPT Prompts PDF Free Download - Prompts for ChatGPT
 
State of the Smart Building Startup Landscape 2024!
State of the Smart Building Startup Landscape 2024!State of the Smart Building Startup Landscape 2024!
State of the Smart Building Startup Landscape 2024!
 
Microsoft CSP Briefing Pre-Engagement - Questionnaire
Microsoft CSP Briefing Pre-Engagement - QuestionnaireMicrosoft CSP Briefing Pre-Engagement - Questionnaire
Microsoft CSP Briefing Pre-Engagement - Questionnaire
 
PLAI - Acceleration Program for Generative A.I. Startups
PLAI - Acceleration Program for Generative A.I. StartupsPLAI - Acceleration Program for Generative A.I. Startups
PLAI - Acceleration Program for Generative A.I. Startups
 
ASRock Industrial FDO Solutions in Action for Industrial Edge AI _ Kenny at A...
ASRock Industrial FDO Solutions in Action for Industrial Edge AI _ Kenny at A...ASRock Industrial FDO Solutions in Action for Industrial Edge AI _ Kenny at A...
ASRock Industrial FDO Solutions in Action for Industrial Edge AI _ Kenny at A...
 
Secure Zero Touch enabled Edge compute with Dell NativeEdge via FDO _ Brad at...
Secure Zero Touch enabled Edge compute with Dell NativeEdge via FDO _ Brad at...Secure Zero Touch enabled Edge compute with Dell NativeEdge via FDO _ Brad at...
Secure Zero Touch enabled Edge compute with Dell NativeEdge via FDO _ Brad at...
 
Oauth 2.0 Introduction and Flows with MuleSoft
Oauth 2.0 Introduction and Flows with MuleSoftOauth 2.0 Introduction and Flows with MuleSoft
Oauth 2.0 Introduction and Flows with MuleSoft
 
TopCryptoSupers 12thReport OrionX May2024
TopCryptoSupers 12thReport OrionX May2024TopCryptoSupers 12thReport OrionX May2024
TopCryptoSupers 12thReport OrionX May2024
 
Using IESVE for Room Loads Analysis - UK & Ireland
Using IESVE for Room Loads Analysis - UK & IrelandUsing IESVE for Room Loads Analysis - UK & Ireland
Using IESVE for Room Loads Analysis - UK & Ireland
 

Philippine power situation

  • 1. THE POWER SITUATION AN ADVOCACY FOR GOOD SENSE OF PRIORITY A. Current Power Situation 1. Supply Outlook a. Luzon – 1200MW needed to assure sustainability and reliability • only 600MW (GN Power) expected in 2013 • 300MW is needed every year • There is not enough reserve b. Visayas – ok but would need 200MW by 2013 and on every year. c. Mindanao – already in trouble • rotational black outs ranging from 2 to 4 hours is ongoing and expected to get worse when the dry season comes • only the 300MW of STEAG is in process of getting started and would be expected to be online in 2013-14 earliest • 300MW of Aboitiz is also in the making and may be on line by 2014-15/ 2. Power generation is now in the control of 4 large groups, namely, Lopez, Pangilinan, SMC, Aboitiz with smaller ones like AES (600MW), Salcon (250Mw+) in Cebu and Bohol and Globe (Metro Bank) in Cebu and Capiz 3. Distribution is controlled by Meralco (71%) in Luzon, Aboitiz (700MW+) in Visayas plus a 300+MW in Davao and Cotabato and southern Davao, Cepalco (100+MW) in Cagayan de Oro, Ceneco a coop (100+MW) in Bacolod, and 30MW in Bohol (Salcon). All the rest are mostly coops ranging from 5MW to 20+MW B. Our Power Rate is the HIGHEST in the region based on the 2007-08 survey – PH is USD 0.18 /kWh, Singapore USD 0.15/kWh, Thailand USD0.08/kWh, Indonesia, Vietnam and Malaysia were much lower. Today, PH is USD 0.21/kWh. C. Based on current demand level of 7,300MW, every one (1) centavo per kWh is equal to P657,000,000.00 per annum. Every one (1) centavo of power increase means P263,000,000.00 or 40% is taken away from the table of the poor (lifeline customers), P118,000,000.00 or 10% is taken away from the clothing, medicine and transpo budget of the housewife and the final P341,000,000.00 or 52% is added to the cost of production and commerce. D. That is why PH is rated very low in competitiveness and why the PPP and its desired drawing effects (jobs and investments) would have low probability of success.
  • 2. E. WE NEED TO FOCUS ON 1. BUILDING OUR REQUIRED POWER BASE LOAD AND RESERVES, 2. STOP THE ESCALATING POWER COST OR TARIFF AND FORMULATE A PROGRAM ON HOW TO BRING IT TO COMPETITIVE LEVEL (VS OUR NEIGHBORS –DIRECT COMPETITORS) 3. START BY STOPPING OR SUSPENDING ANYTHING UNNECESSARY AND EXTRANEOUS PROGRAM THAT WOULD ADD COST TO OUR POWER F. Power Cost Increases Anticipated 1. PSALM‘s P1 Trillion stranded debt and cost to be charged to “Universal Charges” - estimated at P0.39/kWh initially only. 2. SPUG budget short fall of P7B just for 2011 ---estimated at P0.07/kWh again to be included in the “Universal Charges” 3. The pending petitions of Meralco and other Utilities for recovery under the GRAM and CERA 4. The increase in “Generation Charges” from the PSA renewals by the privatized Gencos whose TSCs (Transition Supply Contracts) are up for renewal in 2012. 5. The increase in “Generation Charge” from the renewal of the TSCs (Transition Supply Contracts) of the IPPs (thru the IPPAs) which are up for renewal in 2012. G. AND NOW, this RE Program that would add P0.1256/kWh PLUS the required 100% reserve creating additional Pxx/kWh and the required National Grid Corp. of the Phil. (NGCP) systems investments to accommodate these RE plants creating another additional Pxxx/kWh H. We are not against RE BUT… 1. We have already 34% RE and it is highest in the world PLUS the RE plants do not assure us of security and sustainability because while the fuels are free, they are not controllable in volume, supply, intensity and availability 2. Applicable technologies are not yet commercially matured; we would be diverting our priority wrongfully both in value and volume. 3. The front and effective costs of the RE plants (Wind and Solar) are AWESOME because their average usefulness or annual average availability is only 24% to 30% (at very best still unattained) so that only 24MW to 30MW is actually the annual average availability of a 100%MW solar or wind power plant. And they would require a 100% reserve provision. WE MUST REMAIN FOCUSED ON OUR PRIORITIES, I.E. BUILD THE BASE LOADS AND RESERVES AND STOP ANY UNNECESSARY POTENTIAL POWER COST INCREASE.