SlideShare une entreprise Scribd logo
1  sur  32
 
The Challenge We Face High-speed operations with little margin for error Minimal separation and rapid pace  Complex environment Low visibility in poor weather Combination of Factors Minimizes Safety Margin
System Overview To illustrate the point- JFK- 1068 airport operations per day ORD- 2410 airport operations per day LAX- 1615 airport operations per day ATL- 2644 airport operations per day Numbers taken at random from a week in March, 2011
System Overview The U.S. air transportation system contains- Over 20,000 landing facilities Over 5,000 public use airports 562 airports certificated by the FAA Discussions of system capacity cannot be limited to the en route and terminal environment.
Increasing Capacity  It means more than improving efficiency and expanding our infrastructure- It means making our current environment as safe as possible; It means looking for opportunities to improve safety while increasing our capacity; It means viewing the airport environment as a critical part of the overall air traffic system.
Engineering Solutions to Capacity and Safety
Airfield Design and Configuration The basic runway and taxiway configurations at many US airports were constructed prior to the modern jet age.  Since that time, the volume, speed, and complexity of air traffic have all grown, contributing to the risk of runway incursions.
Airfield Design and Configuration What can be done? Avoid layouts that include complex intersections; Avoid layouts that include closely spaced parallel runways; Avoid layouts that require aircraft and vehicles to cross runways;
Airfield Design and Configuration What can be done? Avoid layouts that require aircraft taxiing for takeoff to cross the active runway at an intermediate point to reach the approach end of the active runway; Avoid layouts that will result in aircraft taxiing or back taxiing on runways.
Addressing Flight Crew Performance to Eliminate Pilot Deviations
Addressing Flight Crew Issues Problem: Pilots fail to hold short after acknowledging hold short instructions. Install a hold position sign on the right side of the taxiway; Paint a hold position sign on the pavement surface; Install runway guard light. Solutions:
Addressing Flight Crew Issues Problem: Pilots fail to turn as instructed or make a wrong turn. Use a 12-inch-wide centerline outlined in black to delineate the preferred route; Paint direction and/or location signs on the pavement surface Provide charting materials that help identify “hot spots.” Solutions:
Addressing Flight Crew Issues Problem: Pilots land on the parallel taxiway rather that the runways. Install Runway End Identifier Lights at the end of the runway; Construct an asphalt blast pad with yellow chevrons at the beginning of the runway; Install approach light systems for the runway. Solutions:
Addressing Vehicle and Pedestrian Impact on Runway Incursions
Addressing Vehicle/Pedestrian Deviations Airport rules and regulations pertaining to vehicle operations; Areas where they are authorized to drive; Location of perimeter roads;  Boundaries of movement and non-movement area; Airport layout, including the designation of runways and taxiways. Driver training:
Addressing Vehicle/Pedestrian Deviations Meaning of airfield signage and markings; Proper radio phraseology, procedures, and frequencies; Meaning of light gun signals; Traffic patterns associated with each runway; Right of way rules; Accident/incident reporting requirements. Driver training:
Addressing Vehicle/Pedestrian Deviations Initial and recurrent driver training is required by the FAA as part of the airport certification program; The FAA reviews and audits training programs to ensure the content meets regulatory requirements; Airports are subject to civil penalty if training is not completed and accurate records are not kept.  Driver training:
VPDs - Types of Vehicles
Finding Technical Solutions to Reducing Runway Incursions
Airport Markings Enhanced Taxiway Centerline http://www.faa.gov/airports_airtraffic/airports/airport_safety/signs_marking/ The enhanced taxiway centerline marking begins 150 feet prior to holding position markings and must be installed at all holding positions for runways on the entire airport.
Runway Status Lights (RWSL)  RWSL to be installed at 22 ASDE-X airports Takeoff Hold Lights (THLs) Runway Entrance Lights (RELs)
Alternating Yellow and Green Old Standard New Standard RWSL – Runway Entrance Lights (RELs)
Alternating Yellow and Green Old Standard New Standard RWSL – Take-Off Hold Lights (THLs)
Runway Incursion Reduction Goal By 2013, reduce runway incursions by 10%
Making the Airport Environment Safer
Winter Operations
Snow Ops Cert Alert - Excursions ,[object Object],[object Object],[object Object],[object Object]
RSA Improvement Program: Progress RSA Improvements: COSTS 2000 - 2008 327 2009 - 2015 130 2000 - 2007 $240 MILLION / yr 2007 - 2015 $1.2 BILLION GOAL 454
EMAS Installations Baton Rouge Metropolitan Airport, LA Roanoke Regional Airport, WV Little Rock Airport, AR Greater Binghamton Airport, NY Photos Courtesy of ESCO
  Successful EMAS Capture EMAS capture of a Falcon 900 at Greenville Downtown Airport, SC July 17, 2006
In conclusion  Lessons we’ve applied in the US: The performance of the airport system is every bit as important to capacity as radar and air traffic services; The more performance we try to “wring” out of our system, the smaller the safety margins become; Achieving the desired level of safety is possible, but it requires a multidisciplinary approach and a commitment from both regulator and user.
For questions, contact-  Mike Brown [email_address] Thank you for your time

Contenu connexe

Tendances

TRANSPORTATION ENGINEERING - II - AIRPORT ENGINEERING
TRANSPORTATION ENGINEERING - II - AIRPORT ENGINEERINGTRANSPORTATION ENGINEERING - II - AIRPORT ENGINEERING
TRANSPORTATION ENGINEERING - II - AIRPORT ENGINEERINGGovindaRajuluBadana1
 
INTELLIGENT TRANSPORT SYSTEM (ITS)
INTELLIGENT TRANSPORT SYSTEM (ITS)INTELLIGENT TRANSPORT SYSTEM (ITS)
INTELLIGENT TRANSPORT SYSTEM (ITS)Chaitanya Sasetti
 
Airport planning - Railways, airports, docks and harbour engineering (RAHE)
Airport planning - Railways, airports, docks and harbour engineering  (RAHE)Airport planning - Railways, airports, docks and harbour engineering  (RAHE)
Airport planning - Railways, airports, docks and harbour engineering (RAHE)Shanmugasundaram N
 
Compartive study of surface heliport and elevated heliport
Compartive study of surface heliport and elevated heliportCompartive study of surface heliport and elevated heliport
Compartive study of surface heliport and elevated heliportJayakrishnan Jayarajan
 
Railways, airports, docks and harbour engineering introduction (RAHE)
Railways, airports, docks and harbour engineering introduction (RAHE)Railways, airports, docks and harbour engineering introduction (RAHE)
Railways, airports, docks and harbour engineering introduction (RAHE)Shanmugasundaram N
 
Intelligent Transport System
Intelligent Transport SystemIntelligent Transport System
Intelligent Transport SystemRajendra Naik
 
Airport planning
Airport planning Airport planning
Airport planning Sonali99999
 
Air Traffic Control
Air Traffic ControlAir Traffic Control
Air Traffic ControlParth Desani
 
Taxiway design and geometrical design of taxiway
Taxiway design and geometrical design of taxiwayTaxiway design and geometrical design of taxiway
Taxiway design and geometrical design of taxiwayBALAJI ND
 
Airport introduction
Airport introductionAirport introduction
Airport introductionjagadish108
 
Intelligent Transportation Systems - ITS
Intelligent Transportation Systems - ITSIntelligent Transportation Systems - ITS
Intelligent Transportation Systems - ITSVijai Krishnan V
 
Airport Engineering
Airport EngineeringAirport Engineering
Airport EngineeringArbaz Kazi
 
Airport presentation 5th unit
Airport presentation 5th unitAirport presentation 5th unit
Airport presentation 5th unitT.Naga Anusha
 
Intelligent transport system
Intelligent transport systemIntelligent transport system
Intelligent transport systemvenkatsai91
 

Tendances (20)

Airport layout
Airport layoutAirport layout
Airport layout
 
Airport elements.
Airport elements.Airport elements.
Airport elements.
 
TRANSPORTATION ENGINEERING - II - AIRPORT ENGINEERING
TRANSPORTATION ENGINEERING - II - AIRPORT ENGINEERINGTRANSPORTATION ENGINEERING - II - AIRPORT ENGINEERING
TRANSPORTATION ENGINEERING - II - AIRPORT ENGINEERING
 
INTELLIGENT TRANSPORT SYSTEM (ITS)
INTELLIGENT TRANSPORT SYSTEM (ITS)INTELLIGENT TRANSPORT SYSTEM (ITS)
INTELLIGENT TRANSPORT SYSTEM (ITS)
 
Airport planning - Railways, airports, docks and harbour engineering (RAHE)
Airport planning - Railways, airports, docks and harbour engineering  (RAHE)Airport planning - Railways, airports, docks and harbour engineering  (RAHE)
Airport planning - Railways, airports, docks and harbour engineering (RAHE)
 
Compartive study of surface heliport and elevated heliport
Compartive study of surface heliport and elevated heliportCompartive study of surface heliport and elevated heliport
Compartive study of surface heliport and elevated heliport
 
Railways, airports, docks and harbour engineering introduction (RAHE)
Railways, airports, docks and harbour engineering introduction (RAHE)Railways, airports, docks and harbour engineering introduction (RAHE)
Railways, airports, docks and harbour engineering introduction (RAHE)
 
Intelligent Transport System
Intelligent Transport SystemIntelligent Transport System
Intelligent Transport System
 
Runways
RunwaysRunways
Runways
 
Airport
AirportAirport
Airport
 
Airport planning
Airport planning Airport planning
Airport planning
 
Airport engineering PART-1
Airport engineering PART-1 Airport engineering PART-1
Airport engineering PART-1
 
Air Traffic Control
Air Traffic ControlAir Traffic Control
Air Traffic Control
 
Taxiway design and geometrical design of taxiway
Taxiway design and geometrical design of taxiwayTaxiway design and geometrical design of taxiway
Taxiway design and geometrical design of taxiway
 
Airport introduction
Airport introductionAirport introduction
Airport introduction
 
Intelligent Transportation Systems - ITS
Intelligent Transportation Systems - ITSIntelligent Transportation Systems - ITS
Intelligent Transportation Systems - ITS
 
Airport Engineering
Airport EngineeringAirport Engineering
Airport Engineering
 
Airport lighting
Airport lightingAirport lighting
Airport lighting
 
Airport presentation 5th unit
Airport presentation 5th unitAirport presentation 5th unit
Airport presentation 5th unit
 
Intelligent transport system
Intelligent transport systemIntelligent transport system
Intelligent transport system
 

En vedette

Airfields World Congress 2015 - Latest Program
Airfields World Congress 2015 - Latest ProgramAirfields World Congress 2015 - Latest Program
Airfields World Congress 2015 - Latest ProgramApple Kuan
 
SAFETY MEASURES FOR TABLE-TOP RUNWAY OF MANGALORE AIRPORT
SAFETY MEASURES FOR TABLE-TOP RUNWAY OF MANGALORE AIRPORTSAFETY MEASURES FOR TABLE-TOP RUNWAY OF MANGALORE AIRPORT
SAFETY MEASURES FOR TABLE-TOP RUNWAY OF MANGALORE AIRPORTPranamesh Chakraborty
 
Ar10x96 barricade how to for construction personnel
Ar10x96 barricade how to for construction personnelAr10x96 barricade how to for construction personnel
Ar10x96 barricade how to for construction personnelRyan Sueoka
 
Mangalore air-crash-report
Mangalore air-crash-reportMangalore air-crash-report
Mangalore air-crash-reportmorphieus
 
EMAS - Engineered Material Arrestor System (seminar ppt)
EMAS - Engineered Material Arrestor System (seminar ppt) EMAS - Engineered Material Arrestor System (seminar ppt)
EMAS - Engineered Material Arrestor System (seminar ppt) Chinnu Mohanan
 
Ramp safety
Ramp safetyRamp safety
Ramp safetymahchu12
 

En vedette (7)

Airfields World Congress 2015 - Latest Program
Airfields World Congress 2015 - Latest ProgramAirfields World Congress 2015 - Latest Program
Airfields World Congress 2015 - Latest Program
 
Sport Aviation Safety
Sport Aviation SafetySport Aviation Safety
Sport Aviation Safety
 
SAFETY MEASURES FOR TABLE-TOP RUNWAY OF MANGALORE AIRPORT
SAFETY MEASURES FOR TABLE-TOP RUNWAY OF MANGALORE AIRPORTSAFETY MEASURES FOR TABLE-TOP RUNWAY OF MANGALORE AIRPORT
SAFETY MEASURES FOR TABLE-TOP RUNWAY OF MANGALORE AIRPORT
 
Ar10x96 barricade how to for construction personnel
Ar10x96 barricade how to for construction personnelAr10x96 barricade how to for construction personnel
Ar10x96 barricade how to for construction personnel
 
Mangalore air-crash-report
Mangalore air-crash-reportMangalore air-crash-report
Mangalore air-crash-report
 
EMAS - Engineered Material Arrestor System (seminar ppt)
EMAS - Engineered Material Arrestor System (seminar ppt) EMAS - Engineered Material Arrestor System (seminar ppt)
EMAS - Engineered Material Arrestor System (seminar ppt)
 
Ramp safety
Ramp safetyRamp safety
Ramp safety
 

Similaire à Improving Airport Safety Through Design, Technology and Training

CONCEPT OF OPERATIONS: THE TRANSITION FROM CREWED TO UNCREWED UAM
CONCEPT OF OPERATIONS: THE TRANSITION FROM CREWED TO UNCREWED UAMCONCEPT OF OPERATIONS: THE TRANSITION FROM CREWED TO UNCREWED UAM
CONCEPT OF OPERATIONS: THE TRANSITION FROM CREWED TO UNCREWED UAMiQHub
 
Terminal Design
Terminal DesignTerminal Design
Terminal DesignMal Mai
 
Enhancing Pilot Ability to Perform CDA with Descriptive Waypoints
Enhancing Pilot Ability to Perform CDA with Descriptive WaypointsEnhancing Pilot Ability to Perform CDA with Descriptive Waypoints
Enhancing Pilot Ability to Perform CDA with Descriptive WaypointsMichael LaMarr
 
THE INDUSTRY PERSPECTIVE ON RPAS by Luc Lallouette
THE INDUSTRY PERSPECTIVE ON RPAS by Luc LallouetteTHE INDUSTRY PERSPECTIVE ON RPAS by Luc Lallouette
THE INDUSTRY PERSPECTIVE ON RPAS by Luc LallouetteALIAS Network
 
India Aviation ICT Forum 2013 - Manish Sinha, Deputy COO, Hyderabad Internati...
India Aviation ICT Forum 2013 - Manish Sinha, Deputy COO, Hyderabad Internati...India Aviation ICT Forum 2013 - Manish Sinha, Deputy COO, Hyderabad Internati...
India Aviation ICT Forum 2013 - Manish Sinha, Deputy COO, Hyderabad Internati...SITA
 
Batangas Airport Philippines.pdf
Batangas Airport Philippines.pdfBatangas Airport Philippines.pdf
Batangas Airport Philippines.pdfssuser553bbc
 
Batangas Airport.pdf
Batangas Airport.pdfBatangas Airport.pdf
Batangas Airport.pdfssuser553bbc
 
Air Traffic Control Database Management System for Seamless Transit
Air Traffic Control Database Management System for Seamless TransitAir Traffic Control Database Management System for Seamless Transit
Air Traffic Control Database Management System for Seamless TransitIRJET Journal
 
Design & application of cdo for ahmedabad airport within ahmedabad tma
Design & application of cdo for ahmedabad airport within ahmedabad tmaDesign & application of cdo for ahmedabad airport within ahmedabad tma
Design & application of cdo for ahmedabad airport within ahmedabad tmaARVIND KUMAR SINGH
 
India Aviation ICT Forum - P.S. Nair, CEO, Corporate, Airport Sector, GMR Air...
India Aviation ICT Forum - P.S. Nair, CEO, Corporate, Airport Sector, GMR Air...India Aviation ICT Forum - P.S. Nair, CEO, Corporate, Airport Sector, GMR Air...
India Aviation ICT Forum - P.S. Nair, CEO, Corporate, Airport Sector, GMR Air...SITA
 
India Aviation ICT Forum - P.S. Nair, CEO - Corporate, Airport Sector, GMR Ai...
India Aviation ICT Forum - P.S. Nair, CEO - Corporate, Airport Sector, GMR Ai...India Aviation ICT Forum - P.S. Nair, CEO - Corporate, Airport Sector, GMR Ai...
India Aviation ICT Forum - P.S. Nair, CEO - Corporate, Airport Sector, GMR Ai...SITA
 
INFORM-Measuring and Monitoring Aircraft Turn Operations v3
INFORM-Measuring and Monitoring Aircraft Turn Operations v3INFORM-Measuring and Monitoring Aircraft Turn Operations v3
INFORM-Measuring and Monitoring Aircraft Turn Operations v3David Foster
 
Airside Ops & Ntm
Airside Ops & NtmAirside Ops & Ntm
Airside Ops & NtmAiDY
 
Airport planning part 2 -erau webinar
Airport planning part 2 -erau webinarAirport planning part 2 -erau webinar
Airport planning part 2 -erau webinarERAUWebinars
 
Economic impact of ground handling industry
Economic impact of ground handling industryEconomic impact of ground handling industry
Economic impact of ground handling industryBrendan Korman
 

Similaire à Improving Airport Safety Through Design, Technology and Training (20)

CONCEPT OF OPERATIONS: THE TRANSITION FROM CREWED TO UNCREWED UAM
CONCEPT OF OPERATIONS: THE TRANSITION FROM CREWED TO UNCREWED UAMCONCEPT OF OPERATIONS: THE TRANSITION FROM CREWED TO UNCREWED UAM
CONCEPT OF OPERATIONS: THE TRANSITION FROM CREWED TO UNCREWED UAM
 
Terminal Design
Terminal DesignTerminal Design
Terminal Design
 
Enhancing Pilot Ability to Perform CDA with Descriptive Waypoints
Enhancing Pilot Ability to Perform CDA with Descriptive WaypointsEnhancing Pilot Ability to Perform CDA with Descriptive Waypoints
Enhancing Pilot Ability to Perform CDA with Descriptive Waypoints
 
ATM Concept 4D ASAS and TFM
ATM Concept 4D ASAS and TFMATM Concept 4D ASAS and TFM
ATM Concept 4D ASAS and TFM
 
THE INDUSTRY PERSPECTIVE ON RPAS by Luc Lallouette
THE INDUSTRY PERSPECTIVE ON RPAS by Luc LallouetteTHE INDUSTRY PERSPECTIVE ON RPAS by Luc Lallouette
THE INDUSTRY PERSPECTIVE ON RPAS by Luc Lallouette
 
India Aviation ICT Forum 2013 - Manish Sinha, Deputy COO, Hyderabad Internati...
India Aviation ICT Forum 2013 - Manish Sinha, Deputy COO, Hyderabad Internati...India Aviation ICT Forum 2013 - Manish Sinha, Deputy COO, Hyderabad Internati...
India Aviation ICT Forum 2013 - Manish Sinha, Deputy COO, Hyderabad Internati...
 
Batangas Airport Philippines.pdf
Batangas Airport Philippines.pdfBatangas Airport Philippines.pdf
Batangas Airport Philippines.pdf
 
Batangas Airport.pdf
Batangas Airport.pdfBatangas Airport.pdf
Batangas Airport.pdf
 
Air Traffic Control Database Management System for Seamless Transit
Air Traffic Control Database Management System for Seamless TransitAir Traffic Control Database Management System for Seamless Transit
Air Traffic Control Database Management System for Seamless Transit
 
CDM Aviation Point of View
CDM Aviation Point of View CDM Aviation Point of View
CDM Aviation Point of View
 
Design & application of cdo for ahmedabad airport within ahmedabad tma
Design & application of cdo for ahmedabad airport within ahmedabad tmaDesign & application of cdo for ahmedabad airport within ahmedabad tma
Design & application of cdo for ahmedabad airport within ahmedabad tma
 
India Aviation ICT Forum - P.S. Nair, CEO, Corporate, Airport Sector, GMR Air...
India Aviation ICT Forum - P.S. Nair, CEO, Corporate, Airport Sector, GMR Air...India Aviation ICT Forum - P.S. Nair, CEO, Corporate, Airport Sector, GMR Air...
India Aviation ICT Forum - P.S. Nair, CEO, Corporate, Airport Sector, GMR Air...
 
India Aviation ICT Forum - P.S. Nair, CEO - Corporate, Airport Sector, GMR Ai...
India Aviation ICT Forum - P.S. Nair, CEO - Corporate, Airport Sector, GMR Ai...India Aviation ICT Forum - P.S. Nair, CEO - Corporate, Airport Sector, GMR Ai...
India Aviation ICT Forum - P.S. Nair, CEO - Corporate, Airport Sector, GMR Ai...
 
INFORM-Measuring and Monitoring Aircraft Turn Operations v3
INFORM-Measuring and Monitoring Aircraft Turn Operations v3INFORM-Measuring and Monitoring Aircraft Turn Operations v3
INFORM-Measuring and Monitoring Aircraft Turn Operations v3
 
Airside Ops & Ntm
Airside Ops & NtmAirside Ops & Ntm
Airside Ops & Ntm
 
Training Report
Training ReportTraining Report
Training Report
 
Airport planning part 2 -erau webinar
Airport planning part 2 -erau webinarAirport planning part 2 -erau webinar
Airport planning part 2 -erau webinar
 
Economic impact of ground handling industry
Economic impact of ground handling industryEconomic impact of ground handling industry
Economic impact of ground handling industry
 
A-CDM
A-CDMA-CDM
A-CDM
 
Filling the gap
Filling the gapFilling the gap
Filling the gap
 

Plus de Fiesp Federação das Indústrias do Estado de SP

Plus de Fiesp Federação das Indústrias do Estado de SP (20)

Informativo DEREX - novembro/2016
Informativo DEREX - novembro/2016Informativo DEREX - novembro/2016
Informativo DEREX - novembro/2016
 
Informativo derex - outubro/2016
Informativo derex - outubro/2016Informativo derex - outubro/2016
Informativo derex - outubro/2016
 
Informativo do Derex – Setembro de 2016
Informativo do Derex – Setembro de 2016Informativo do Derex – Setembro de 2016
Informativo do Derex – Setembro de 2016
 
Apresentação emprego agosto 2016
Apresentação emprego agosto 2016 Apresentação emprego agosto 2016
Apresentação emprego agosto 2016
 
Naira Sato
Naira SatoNaira Sato
Naira Sato
 
Marcela Scavone
Marcela ScavoneMarcela Scavone
Marcela Scavone
 
Ladislau Martin
Ladislau MartinLadislau Martin
Ladislau Martin
 
Agustin Vargas
Agustin Vargas Agustin Vargas
Agustin Vargas
 
Apresentação Emprego - Julho 2016
Apresentação Emprego - Julho 2016Apresentação Emprego - Julho 2016
Apresentação Emprego - Julho 2016
 
Informativo derex - julho/2016
Informativo derex - julho/2016Informativo derex - julho/2016
Informativo derex - julho/2016
 
Apresentação conjuntura junho/2016
Apresentação conjuntura junho/2016Apresentação conjuntura junho/2016
Apresentação conjuntura junho/2016
 
Pesquisa Sensor - Julho/2016
Pesquisa Sensor - Julho/2016Pesquisa Sensor - Julho/2016
Pesquisa Sensor - Julho/2016
 
Apresentação Emprego - Junho 2016
Apresentação Emprego - Junho 2016Apresentação Emprego - Junho 2016
Apresentação Emprego - Junho 2016
 
Informativo do derex - Junho de 2016
Informativo do derex - Junho de 2016Informativo do derex - Junho de 2016
Informativo do derex - Junho de 2016
 
Sensor - junho/2016
Sensor -  junho/2016Sensor -  junho/2016
Sensor - junho/2016
 
Apresentação conjuntura - Maio/2016
Apresentação conjuntura - Maio/2016Apresentação conjuntura - Maio/2016
Apresentação conjuntura - Maio/2016
 
Informativo derex - Maio/2016
Informativo derex - Maio/2016Informativo derex - Maio/2016
Informativo derex - Maio/2016
 
Apresentação Emprego/Maio 2016
Apresentação Emprego/Maio 2016Apresentação Emprego/Maio 2016
Apresentação Emprego/Maio 2016
 
Apresentação conjuntura abril/2016
Apresentação conjuntura abril/2016Apresentação conjuntura abril/2016
Apresentação conjuntura abril/2016
 
Sensor - maio/2016
Sensor - maio/2016Sensor - maio/2016
Sensor - maio/2016
 

Improving Airport Safety Through Design, Technology and Training

  • 1.  
  • 2. The Challenge We Face High-speed operations with little margin for error Minimal separation and rapid pace Complex environment Low visibility in poor weather Combination of Factors Minimizes Safety Margin
  • 3. System Overview To illustrate the point- JFK- 1068 airport operations per day ORD- 2410 airport operations per day LAX- 1615 airport operations per day ATL- 2644 airport operations per day Numbers taken at random from a week in March, 2011
  • 4. System Overview The U.S. air transportation system contains- Over 20,000 landing facilities Over 5,000 public use airports 562 airports certificated by the FAA Discussions of system capacity cannot be limited to the en route and terminal environment.
  • 5. Increasing Capacity It means more than improving efficiency and expanding our infrastructure- It means making our current environment as safe as possible; It means looking for opportunities to improve safety while increasing our capacity; It means viewing the airport environment as a critical part of the overall air traffic system.
  • 6. Engineering Solutions to Capacity and Safety
  • 7. Airfield Design and Configuration The basic runway and taxiway configurations at many US airports were constructed prior to the modern jet age. Since that time, the volume, speed, and complexity of air traffic have all grown, contributing to the risk of runway incursions.
  • 8. Airfield Design and Configuration What can be done? Avoid layouts that include complex intersections; Avoid layouts that include closely spaced parallel runways; Avoid layouts that require aircraft and vehicles to cross runways;
  • 9. Airfield Design and Configuration What can be done? Avoid layouts that require aircraft taxiing for takeoff to cross the active runway at an intermediate point to reach the approach end of the active runway; Avoid layouts that will result in aircraft taxiing or back taxiing on runways.
  • 10. Addressing Flight Crew Performance to Eliminate Pilot Deviations
  • 11. Addressing Flight Crew Issues Problem: Pilots fail to hold short after acknowledging hold short instructions. Install a hold position sign on the right side of the taxiway; Paint a hold position sign on the pavement surface; Install runway guard light. Solutions:
  • 12. Addressing Flight Crew Issues Problem: Pilots fail to turn as instructed or make a wrong turn. Use a 12-inch-wide centerline outlined in black to delineate the preferred route; Paint direction and/or location signs on the pavement surface Provide charting materials that help identify “hot spots.” Solutions:
  • 13. Addressing Flight Crew Issues Problem: Pilots land on the parallel taxiway rather that the runways. Install Runway End Identifier Lights at the end of the runway; Construct an asphalt blast pad with yellow chevrons at the beginning of the runway; Install approach light systems for the runway. Solutions:
  • 14. Addressing Vehicle and Pedestrian Impact on Runway Incursions
  • 15. Addressing Vehicle/Pedestrian Deviations Airport rules and regulations pertaining to vehicle operations; Areas where they are authorized to drive; Location of perimeter roads; Boundaries of movement and non-movement area; Airport layout, including the designation of runways and taxiways. Driver training:
  • 16. Addressing Vehicle/Pedestrian Deviations Meaning of airfield signage and markings; Proper radio phraseology, procedures, and frequencies; Meaning of light gun signals; Traffic patterns associated with each runway; Right of way rules; Accident/incident reporting requirements. Driver training:
  • 17. Addressing Vehicle/Pedestrian Deviations Initial and recurrent driver training is required by the FAA as part of the airport certification program; The FAA reviews and audits training programs to ensure the content meets regulatory requirements; Airports are subject to civil penalty if training is not completed and accurate records are not kept. Driver training:
  • 18. VPDs - Types of Vehicles
  • 19. Finding Technical Solutions to Reducing Runway Incursions
  • 20. Airport Markings Enhanced Taxiway Centerline http://www.faa.gov/airports_airtraffic/airports/airport_safety/signs_marking/ The enhanced taxiway centerline marking begins 150 feet prior to holding position markings and must be installed at all holding positions for runways on the entire airport.
  • 21. Runway Status Lights (RWSL) RWSL to be installed at 22 ASDE-X airports Takeoff Hold Lights (THLs) Runway Entrance Lights (RELs)
  • 22. Alternating Yellow and Green Old Standard New Standard RWSL – Runway Entrance Lights (RELs)
  • 23. Alternating Yellow and Green Old Standard New Standard RWSL – Take-Off Hold Lights (THLs)
  • 24. Runway Incursion Reduction Goal By 2013, reduce runway incursions by 10%
  • 25. Making the Airport Environment Safer
  • 27.
  • 28. RSA Improvement Program: Progress RSA Improvements: COSTS 2000 - 2008 327 2009 - 2015 130 2000 - 2007 $240 MILLION / yr 2007 - 2015 $1.2 BILLION GOAL 454
  • 29. EMAS Installations Baton Rouge Metropolitan Airport, LA Roanoke Regional Airport, WV Little Rock Airport, AR Greater Binghamton Airport, NY Photos Courtesy of ESCO
  • 30. Successful EMAS Capture EMAS capture of a Falcon 900 at Greenville Downtown Airport, SC July 17, 2006
  • 31. In conclusion Lessons we’ve applied in the US: The performance of the airport system is every bit as important to capacity as radar and air traffic services; The more performance we try to “wring” out of our system, the smaller the safety margins become; Achieving the desired level of safety is possible, but it requires a multidisciplinary approach and a commitment from both regulator and user.
  • 32. For questions, contact- Mike Brown [email_address] Thank you for your time